# SDR UIEA2021050101035

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: May 1, 2021
- Submitted: May 5, 2021
- Operation: Air carrier
- Aircraft: [N1409A](https://openairdocs.org/aircraft/N1409A), registered now
- Make and model: Boeing 767306
- Aircraft serial: 27960
- Aircraft time: 94,728 hours, 18,664 cycles
- System (JASC): [2810 · Fuel Storage](https://openairdocs.org/jasc/2810)
- Part: Sensor
- Condition: No Test
- Location: Surge Tank
- Stage of operation: IN
- How discovered: C
- Nature of condition: L
- Precautionary procedure: K
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/UIEA2021050101035

## Discrepancy

FUEL TANK OPENING REQUIRED DUE TO THE RIGHT SURGE TANK FUEL LEVEL SENSOR FAIL TEST. NOTE: PANEL TO BE OPEN 642AB(<P>R/H SURGE TANK PLATE 642AB REMOVED FOR TANK ACCESS. REF M/M 28-11-03-004-001. APU BATTERY AND MAIN BATTERIES DISCONNECTED. OK TO REINSTALL R/H SURGE TANK PLATE. REINSTALLED R/H SURGE TANK PLATE 642AB PER AMM 28-11-03. NO LEAKS. RECONNECTED APU BATTERY PER AMM 24-31-04, OPS CHECK GOOD. RECONNECTED MAIN BATTERY PER AMM 24-31-01, OPS CHECK GOOD. <BR /></P>)

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
