# SDR USAA2010020290262

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: February 1, 2010
- Submitted: February 2, 2010
- Operation: Air carrier
- Aircraft: N909AW
- Make and model: Boeing 757-2G7
- Registry model: [Boeing 757-2G7](https://openairdocs.org/model/boeing-757-2g7) (OpenAirDocs)
- Aircraft serial: 24522
- Aircraft time: 74,123 hours, 26,433 cycles
- System (JASC): [5315 · Fuselage Main, Floor Beam](https://openairdocs.org/jasc/5315)
- Part: Floorbeam
- Part number: 143N50656
- Condition: Corroded
- Location: Fuselage
- Stage of operation: IN
- How discovered: V
- Nature of condition: O
- Precautionary procedure: K
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/USAA2010020290262

## Discrepancy

MCN - C4 - MAJOR REPAIR - LEVEL 2 GALVANIC CORROSION ON FLOORBEAM AT BS 740, WL 208 BETWEEN RBL 50 TO RBL 58.  REPAIRED FLOORBEAM AT BS 740, WL 208 BETWEEN RBL 50 TO RBL 58 IAW B757 SRM 53-00-51.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
