# SDR USAA2014042100003

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: April 17, 2014
- Submitted: April 21, 2014
- Operation: Air carrier
- Aircraft: [N700UW](https://openairdocs.org/aircraft/N700UW), registered now
- Make and model: Airbus A319-112
- Registry model: [Airbus A319-112](https://openairdocs.org/model/airbus-industrie-a319-112) (OpenAirDocs)
- Aircraft serial: 885
- Aircraft time: 43,462 hours, 24,745 cycles
- System (JASC): [2560 · Emergency Equipment](https://openairdocs.org/jasc/2560)
- Part: Mount Bolt
- Condition: Broken
- Location: Evac Raft
- Stage of operation: NR
- How discovered: O
- Nature of condition: O
- Precautionary procedure: K
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/USAA2014042100003

## Discrepancy

THE RT AFT BUSTLE VELCRO WILL NOT STAY ON.  FOUND RAFT PACK UPPER MOUNT BOLT BROKEN. R & R MOUNT BOLT ASSEMBLY IAW AMM 25-62-44-400-007A.  ACFT OK FOR SERVICE.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
