# SDR VNAA2018071711101

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: July 17, 2018
- Submitted: July 21, 2018
- Operation: Air carrier
- Aircraft: [N209PS](https://openairdocs.org/aircraft/N209PS), registered now
- Make and model: Cndair CL6002B19
- Aircraft serial: 7874
- Aircraft time: 34,016 hours, 33,818 cycles
- System (JASC): [4930 · APU Engine Fuel and Control](https://openairdocs.org/jasc/4930)
- Part: Shutoff Valve
- Part number: 69254518
- Part serial: US0062
- Condition: Leaking
- Location: Apu
- Part time: 4,654 hours, 4,467 cycles
- Stage of operation: CL
- How discovered: O
- Nature of condition: K, B
- Precautionary procedure: K
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/VNAA2018071711101

## Discrepancy

FUEL SMELL FROM BOTH PACKS AT FL18. R&R APU SOV, OPS AND LEAK CK GOOD.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
