# SDR VNAA202107021111

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: June 28, 2021
- Submitted: July 2, 2021
- Operation: Air carrier
- Aircraft: [N533AE](https://openairdocs.org/aircraft/N533AE), registered now
- Make and model: Cndair CL6002C10
- Aircraft serial: 10311
- Aircraft time: 24,640 hours, 18,223 cycles
- System (JASC): [2120 · Air Distribution System](https://openairdocs.org/jasc/2120)
- Part: Unknown
- Condition: Odor
- Location: Cabin
- Stage of operation: NR
- How discovered: 9
- Nature of condition: B
- Precautionary procedure: O
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/VNAA202107021111

## Discrepancy

BURNT TOAST SOUR SMELL FROM PACKS WITH APU AS BLEED SOURCE / DEFERRED APU PER MEL 49-10-01-2 CAT C. M-FUNCTION COMPLIED WITH VISUALLY VERIFIED DOOR CLOSED AND PULLED AND COLLARD CB'S N10, N11, R9 ON CBP-1. REF DDG 49-10-01. / PERFORMED GVI AND GENERAL CLEANING OF APU INLET SCREEN IAW CRJ 700 SRM 51-26-00-001-001 TO REMOVE CICADAS FROM APU INLET SCREEN, PERFORMED OPS CHECK OF AIR CONDITIONING DISTRIBUTION SYSTEM AND RAN BOTH PACKS FOR EXTENDED PERIOD OF TIME IAW CRJ 700 AMM 21-51-00-710-801, PERFORMED ENGINE AND ECS DRY OUT PROCEDURE IAW CRJ 700 AMM 72-00-00-100-803-A01-PSA, PEFORMED OPS CHECK OF GALLEY HEATER IAW CRJ 700 AMM 21-23-64-710-801, ALL OPS CHECKS GOOD, NO SMOKE NOTED AT ANY TIME, SMELL OF CICADAS DISSIPATED. PERFORMED MULTIPLE OPS CHECKS OF APU IAW CRJ 700 AMM 49-10-00-866-801/802, OPS CHECK GOOD, REACTIVATED APU TO REVERSE M FUNC BY REMOVING COLLARS AND RESETTING CBP-1 N10, N11, R9 IAW CRJ 700 AMM 49-10-00-440-801, THIS CLEARS MEL.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
