# SDR VNAA2026062619902

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: June 24, 2026
- Submitted: June 27, 2026
- Operation: Air carrier
- Aircraft: [N509AE](https://openairdocs.org/aircraft/N509AE), registered now
- Make and model: Cndair CL6002C10
- Aircraft serial: 10078
- Aircraft time: 50,493 hours, 39,796 cycles
- System (JASC): [2820 · Aircraft Fuel Distribution System](https://openairdocs.org/jasc/2820)
- Part: Pump
- Part number: P93A25602
- Part serial: E86587
- Condition: Unserviceable
- Location: Cross Flow
- Part time: 32,585 hours, 26,044 cycles
- Stage of operation: CL
- How discovered: O
- Nature of condition: J
- Precautionary procedure: A
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/VNAA2026062619902

## Discrepancy

CROSSFLOW PUMP CAUTION MESSAGE WITH AUTO CROSSFLOW INHIB STATUS IN FLT.  PERFORMED GRAVITY CROSS QRH PROCEDURE FUEL BALANCED OUT. TURN GRAVITY CROSS FLOW SOV OFF FUEL INBALANCE CAME RT BACK IMMEDIATELY,  INSTALLATION OF THE CARTRIDGE, CROSS FLOW PUMP HAS BEEN COMPLETED IAW AMM 28-13-47-400-801-A01. OPS TEST OF THE FUEL/DEFUEL PANEL WAS COMPLETED IAW AMM 28-25-00-710-801-A01 STEPS 4(A)(7) THROUGH 4(A)(24). OPS TEST GOOD. MAGNETIC LEVEL INDICATOR CHECK HAS BEEN COMPLETED IAW AMM 12-11-28-750-802-A01. OPS CHECK GOOD. CAPACITANCE CHECK OF THE FUEL QUANTITY PROBES IS COMPLETED IAW AMM 28-41-09-720-801-750-802-A02. OPS CHECK GOOD. NO FURTHER DEFECTS NOTED.

---