# SDR WRXR20241115003

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: November 15, 2024
- Submitted: November 15, 2024
- Operation: Air carrier
- Filed by: [Wichita State University, repair station WRXR027E](https://openairdocs.org/faa-repair-station/WRXR027E/wichita-state-university.md) (OpenAirDocs)
- Aircraft: [N543EA](https://openairdocs.org/aircraft/N543EA), registered now
- Make and model: Cndair CL6002C10
- Aircraft serial: 10323
- Aircraft time: 2,822 hours, 22,398 cycles
- System (JASC): [5320 · Fuselage Miscellaneous Structure](https://openairdocs.org/jasc/5320)
- Part: Floor Support
- Part number: CMS6283
- Condition: Corroded
- Location: Zone 20
- Part time: 2,822 hours, 22,398 cycles
- Stage of operation: IN
- How discovered: V
- Nature of condition: O
- Precautionary procedure: K
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/WRXR20241115003

## Discrepancy

3 AREAS OF PITTING CORROSION IN 2.5" X 1.5" AREA AT LBL 27/ FS 1031. PERFORMED FLOOR BEAM SPLICE REPAIR FOR SECTION FS 1031 TO FS 1060 LBL27 IAW CRJ700 SRM 53-00-41-201-001-A01 COMPLIED WITH REO 670-53-61-2389 DEVIATION TO SRM FLOOR BEAM SPLICE REPAIR (TASK 53-00-41-201-001-A01) AT LBL 27.00 AND BETWEEN FS1015.00 - FS1051.30

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
