# SDR WX0A2015061972671

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: June 16, 2015
- Submitted: June 19, 2015
- Operation: Air carrier
- Aircraft: [N875GA](https://openairdocs.org/aircraft/N875GA), registered now
- Make and model: Doug DC-9-83
- Registry model: [Doug DC-9-83](https://openairdocs.org/model/douglas-dc-9-83) (OpenAirDocs)
- Aircraft serial: 53468
- Aircraft time: 36,403 hours, 24,511 cycles
- System (JASC): [3610 · Pneumatic Distribution System](https://openairdocs.org/jasc/3610)
- Part: Clamp
- Condition: Unsecure
- Location: Ac Bay
- Stage of operation: CL
- How discovered: O
- Nature of condition: J
- Precautionary procedure: A
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/WX0A2015061972671

## Discrepancy

TAIL COMPARTMENT TEMP HI ON AT 200 AFTER TAKEOFF.  APU WAS RUNNING WITH AIR OFF.  COMPLIED WITH QRH 21.4, LIGHT WENT OUT AFTER 1:15 DURING STEP 5.  REFERENCE WO 00258905, PERFORMED TASK CARD 21-059-005, FOUND CLAMP LT HEAT EXCHANGER CLAMP LEAK RE-SECURED.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
