# SDR YENA2008013

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: February 2, 2008
- Submitted: February 5, 2008
- Operation: Air carrier
- Aircraft: [N266JB](https://openairdocs.org/aircraft/N266JB), registered now
- Make and model: Emb ERJ 190-100 IGW
- Registry model: [EMB ERJ 190-100 IGW](https://openairdocs.org/model/embraer-erj-190-100-igw) (OpenAirDocs)
- Aircraft serial: 19000054
- Aircraft time: 2,786 hours, 1,714 cycles
- System (JASC): [3240 · Landing Gear Brake System](https://openairdocs.org/jasc/3240)
- Part: Control Valve
- Part number: 398912
- Part serial: 1183
- Condition: Faulted
- Location: Breaks
- Part time: 338 hours, 176 cycles
- Stage of operation: AP
- How discovered: O
- Nature of condition: S
- Precautionary procedure: O
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/YENA2008013

## Discrepancy

FLT NR 611, PWM-JFK, MESSAGES AT GEAR EXTENSION- BRK LH FAULT, BRK RT FAULT, REDUCED BRAKE EFFECTIVENESS ON ROLL OUT AND TAXI IN NOTED.  DE/RE-ENERGIZE A/C PER FIM 32-41-00.  REPLACED NR 4 BRAKE CONTROL VALVE PER AMM 32-41-00.  OPS OK, LEAK CHECKED OK.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
