# SDR YENA20140302046

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: March 2, 2014
- Submitted: March 7, 2014
- Operation: Air carrier
- Aircraft: [N267JB](https://openairdocs.org/aircraft/N267JB), registered now
- Make and model: Emb ERJ 190-100 IGW
- Registry model: [EMB ERJ 190-100 IGW](https://openairdocs.org/model/embraer-erj-190-100-igw) (OpenAirDocs)
- Aircraft serial: 19000065
- Aircraft time: 20,035 hours, 12,039 cycles
- System (JASC): [2150 · Cabin Cooling System](https://openairdocs.org/jasc/2150)
- Part: Acm
- Part number: 10007004
- Part serial: 2006020243
- Condition: Failed
- Location: Right
- Part time: 12,009 hours, 7,383 cycles
- Stage of operation: DE
- How discovered: O
- Nature of condition: B
- Precautionary procedure: A
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/YENA20140302046

## Discrepancy

CREW DECLARED AN EMERGENCY DUE TO SMOKE IN CABIN AND SMOKE STOPPED WHEN "CABIN IFE" WAS TURNED OFF.  EXECUTED SMOKE CABIN SMOKE QRH TO IDENTIFY IFE, THEN EXECUTED SMOKE/FUME REMOVAL QRH TO DISIPATE SMOKE.  SUSPECT SMOKE WAS FROM IFE BECAUSE IT STOPPED WHEN REMOVED POWER FROM IFE IAW QRH PROCEDURE.  ACCOMPLISHED FIM TASK 21-20-00-810-801-A NO ABNORMALITIES NOTED.  ACCOMPLISHED ELECTRICAL ODOR INTEGRITY CHECK IAW MM 44-20-10, PAGES 5034-5036 VISUAL AND SENSORY INSPECTION SHOW NO EVIDENCE LTV SYSTEM IS COMPROMISED.  ALL OPS NORMAL.  FOUND DEBRIS ON HEAT EXCHANGER. RT AIR CYCLE MACHINE AND DUAL HEAT EXCHANGER WAS R & R IAW AMM 21-51-04 AND 21-51-05.  OPS AND LEAK CHECKED GOOD.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
