# SDR YENA2021070700429

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: July 2, 2021
- Submitted: July 7, 2021
- Operation: Air carrier
- Aircraft: [N283JB](https://openairdocs.org/aircraft/N283JB), registered now
- Make and model: Emb ERJ 190-100 IGW
- Registry model: [EMB ERJ 190-100 IGW](https://openairdocs.org/model/embraer-erj-190-100-igw) (OpenAirDocs)
- Aircraft serial: 125
- Aircraft time: 36,743 hours, 23,603 cycles
- System (JASC): [3240 · Landing Gear Brake System](https://openairdocs.org/jasc/3240)
- Part: Control Module
- Part number: 142091143
- Part serial: 479A
- Condition: Failed
- Location: Brake System
- Part time: 7,994 hours, 5,615 cycles
- Stage of operation: AP
- How discovered: O
- Nature of condition: J
- Precautionary procedure: O
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/YENA2021070700429

## Discrepancy

FLT 1580, PBI-IAD. BRK RH FAUL , BRK LH FAULT ON FINAL APPROACH;  R & R BRAKE CONTROL MODULE  IAW AMM 32-41-07. WHILE ACCOMPLISHING OPS CK FOUND BRAKE SHUT OFF VALVE LEAKING. R & R BRAKE SHUT OFF VALVE IAW AMM 32-41-03. OPS / LEAK CHECK GOOD A/C OK FOR CONT. SVC

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
