# SDR YENA2022071100662

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: July 10, 2022
- Submitted: July 11, 2022
- Operation: Air carrier
- Aircraft: [N281JB](https://openairdocs.org/aircraft/N281JB), registered now
- Make and model: Emb ERJ 190-100 IGW
- Registry model: [EMB ERJ 190-100 IGW](https://openairdocs.org/model/embraer-erj-190-100-igw) (OpenAirDocs)
- Aircraft serial: 103
- Aircraft time: 39,822 hours, 25,975 cycles
- System (JASC): [3510 · Crew Oxygen System](https://openairdocs.org/jasc/3510)
- Part: Valve
- Part number: 10139521
- Part serial: 2019030010
- Condition: Leaking
- Location: 720001-01-001-Lh
- Part time: 1,928 hours, 1,309 cycles
- Stage of operation: CL
- How discovered: V
- Nature of condition: J
- Precautionary procedure: A
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/YENA2022071100662

## Discrepancy

FLT#614, RDU-BOS. (AIRFRACFT DECLARED AN EMERGENCY AND DIVERTED TO RIC) 'BLEED 1 AND 2 FAIL. FL 320 BLEED 1 FAILED FOLLOWED BLEED 2 FAILED.  A/I WAS OFF RESET UNSUCCESSFUL EMER DES -  DIVERT TO RIC ( ENGINE BLEED SYS - BOTH - UNPRESSURIZED); FOUND #1 ENG NAPR SO VALVE AT FAULT AND LEAKING AT MATING SURFACE ON PNEUMATIC LINE. REMOVED AND REPLACED NAPR VALVE REF AMM 36-11-03-400-801-A. THIS CLEARS MDDR # 478830. MX-4 UPDATED. PLACARD REMOVED. MCC ADVISED. DISPATCHER # 11299.'

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
