# SDR YENA2022091300914

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: September 12, 2022
- Submitted: September 13, 2022
- Operation: Air carrier
- Aircraft: [N281JB](https://openairdocs.org/aircraft/N281JB), registered now
- Make and model: Emb EMB110*
- Aircraft serial: 103
- Aircraft time: 39,943 hours, 26,073 cycles
- System (JASC): [5300 · Fuselage Structure (General)](https://openairdocs.org/jasc/5300)
- Part: None
- Condition: None
- Stage of operation: IN
- How discovered: V
- Nature of condition: O
- Precautionary procedure: K
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/YENA2022091300914

## Discrepancy

DURING HEAVY MAINTENANCE: CORROSION ON FLOOR SUPPORT BTW FR18 AND FR 19 Y= 640R AT W1. EVAL; REF TOMX WO 1974 N/R 00184 SUMMARY OF NRC S/N 00184: FLOOR SUPPORT BTW FR18 AND FR 19 Y= 640R AT W1 WAS REPLACED PER EMB 190 SRM 51-41-02. WORK ACCOMPLISHED BY 201534008 INSP BY 200801852.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
