# SDR YYFA20130516003

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: May 16, 2013
- Submitted: May 16, 2013
- Operation: Air carrier
- Aircraft: N836NK
- Make and model: Doug DC-9-83
- Registry model: [Doug DC-9-83](https://openairdocs.org/model/douglas-dc-9-83) (OpenAirDocs)
- Aircraft serial: 53045
- Aircraft time: 43,654 hours, 30,361 cycles
- System (JASC): [2997 · Hydraulic Power System Wiring](https://openairdocs.org/jasc/2997)
- Part: Connector
- Condition: Dirty
- Location: Hyd Pump
- Stage of operation: TX
- How discovered: O
- Nature of condition: J
- Precautionary procedure: D
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/YYFA20130516003

## Discrepancy

RIGHT AUXILLARY HYD PUMP CIRCUIT BREAKER OUT UNABLE A/B RESET.  CLEANED CONNECTOR ON AUX PUMP RESET BREAKER OPS CHECK GOOD MM 29-00-00. CAPT RMI HEADING FLAG DISPLAYED. CYCLED POWER RMI CAME UP OPS CHECK GOOD MM 34-00-00.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
