# SDR ZW0A0208203

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: August 3, 2002
- Submitted: August 5, 2002
- Operation: Air carrier
- Aircraft: [N914TW](https://openairdocs.org/aircraft/N914TW), registered now
- Make and model: Doug DC-9-82
- Registry model: [Doug DC-9-82](https://openairdocs.org/model/mcdonnell-douglas-dc-9-82) (OpenAirDocs)
- Aircraft serial: 49185
- Aircraft time: 56,130 hours, 29,218 cycles
- System (JASC): [3610 · Pneumatic Distribution System](https://openairdocs.org/jasc/3610)
- Part: B-Nut
- Condition: Loose
- Location: A/C Bay
- Stage of operation: CL
- How discovered: O
- Nature of condition: J
- Precautionary procedure: A
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/ZW0A0208203

## Discrepancy

DURING TAKEOFF HIGH TEMP LIGHT IN TAIL COMPARTMENT RESULT IN UNSCHEDULED LANDING/RETURN TO STL.  PNEUMATIC PRESS REGULATOR RELIEF LINE LOOSE HEAT EXCHANGE VENTING TO TAIL COMPARTMENT RT HEAT EXCHANGE PERRY SEAL LEAKING.  TIGHTENED B-NUT ON LT PRESS REGULATOR RELIEF LINE REPOSITIONED HEAT EXCHANGER SEALS REPLACED RT PAC PERRY SEAL.  LEAK CHECK TAIL COMPARTMENT WITH ENGINES AT HI POWER PER MD 9-36-07.  LEAK CHECK ALL NORMAL.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
