# Search: Cargo Systems Incorporated

In the text of ADs: 120 matches in release 2026-11-13. Page 1.

- [AD 2002-16-20](https://openairdocs.org/ad/2002-16-20.md): (d) Actions Addressing the Main Deck Cargo Door Systems · PDF page 12
  > …the effective date of this AD, **incorporate** redesigned main deck **cargo** door **systems** ( e.g., warning/monitoring, power control, view…
- [AD 2002-16-22](https://openairdocs.org/ad/2002-16-22.md): (d) Actions Addressing the Main Deck Cargo Door Systems · PDF page 13
  > …the effective date of this AD, **incorporate** redesigned main deck **cargo** door **systems** ( e.g., warning/monitoring, power control, view…
- [AD 2002-16-21](https://openairdocs.org/ad/2002-16-21.md): (d) Actions Addressing the Main Deck Cargo Door Systems · PDF page 12
  > …the effective date of this AD, **incorporate** redesigned main deck **cargo** door **systems** (e.g., power control, view ports, and…
- [AD 2002-16-19](https://openairdocs.org/ad/2002-16-19.md): (d) Actions Addressing the Main Deck Cargo Door Systems · PDF page 12
  > …the effective date of this AD, **incorporate** redesigned main deck **cargo** door **systems** ( e.g., warning/monitoring, power control, view…
- [AD 2026-22-01](https://openairdocs.org/ad/2026-22-01.md): Material Incorporated by Reference Under 1 CFR Part 51 · PDF page 2
  > …the dropping control of the mechanical emergency release **system** of the **cargo** swing installation. Depending on the results of the…
- [AD 2023-04-12](https://openairdocs.org/ad/2023-04-12.md): Summary · PDF page 1 · superseded or historical
  > …**cargo** compartments had migrated from its original position, which could affect the fire extinguishing **system** efficiency in the **cargo** compartments…
- [AD 2018-03-21](https://openairdocs.org/ad/2018-03-21.md): (e) Reason · PDF page 2
  > …**system** for the lower deck **cargo** compartment. Such a condition could result in an uncontrolled fire in the **cargo** compartment.
- [AD 2001-26-03](https://openairdocs.org/ad/2001-26-03.md): Cost Impact · PDF page 2
  > …**cargo** door hinge | 60 | $200 | $22,800, or $3,800 per airplane. | | Inspection and evaluation of the **cargo** handling **system**…
- [AD 93-07-15](https://openairdocs.org/ad/93-07-15.md): Cargo Compartment
  > …information. (3) **Incorporate** the following **systems** and equipment: (i) Provide appropriate protective garmentsstored adjacent to the **cargo** compartment entrance. (ii…
- [AD 2001-26-01](https://openairdocs.org/ad/2001-26-01.md): Cost Impact · PDF page 2
  > …the **cargo** handling **system** | 16 | N/A | $10,560, or $960 per airplane. | | SA1377SO | Modification of main deck **cargo** floor…
- [AD 2002-16-22](https://openairdocs.org/ad/2002-16-22.md): Regulatory Evaluation Summary · PDF page 10
  > …These procedures are expected to include an inspection (until the **incorporation** of the redesigned main deck **cargo** door **systems**), described…
- [AD 89-17-01 R1](https://openairdocs.org/ad/89-17-01-R1.md): Main Cargo Door
  > …If the main **cargo** door-open indicating **system** functional check is not successfully accomplished, repair the main **cargo** door-open…
- [AD 2002-16-20](https://openairdocs.org/ad/2002-16-20.md): Regulatory Evaluation Summary · PDF page 9
  > …These procedures are expected to include an inspection (until the **incorporation** of the redesigned main deck **cargo** door **systems**), described…
- [AD 2002-16-19](https://openairdocs.org/ad/2002-16-19.md): Regulatory Evaluation Summary · PDF page 10
  > …The total cost to comply with the requirements for **incorporating** redesigned main deck **cargo** door **systems** is $25.1 million…
- [AD 2001-26-04](https://openairdocs.org/ad/2001-26-04.md): Cost Impact · PDF page 2
  > …the **cargo** handling **system** | 16 | N/A | $27,840, or $960 per airplane. | | Modification of main deck **cargo** floor | 40…
- [AD 2001-26-02](https://openairdocs.org/ad/2001-26-02.md): Cost Impact · PDF page 1
  > …the **cargo** handling **system** | 16 | N/A | $3,840, or $960 per airplane. | | ST00309AT | Modification of main deck **cargo** floor…
- [AD 90-21-19](https://openairdocs.org/ad/90-21-19.md): Main Deck Cargo Door Inspection
  > …This deactivates the **cargo** door warning annunciator **system**. C. Within 10 days after the effective date of this AD, and…
- [AD 2002-16-21](https://openairdocs.org/ad/2002-16-21.md): Regulatory Evaluation Summary · PDF page 10
  > …The FAA assumes that operators will **incorporate** redesigned main deck **cargo** door **systems** during regularly scheduled maintenance. (Kitty Hawk indicated…
- [AD 75-23-09](https://openairdocs.org/ad/75-23-09.md): Nose Cargo Door Latch System
  > …for the modification of the nose **cargo** door latch and lock **system**. **Incorporation** of this FAA approved modification will constitute…
- [AD 2025-07-05](https://openairdocs.org/ad/2025-07-05.md): Material Incorporated by Reference Under 1 CFR Part 51 · PDF page 2
  > …EASA AD 2024-0129 also specifies procedures for checking the condition and integrity of the temporary protection **system** (TPS) layer…

Next page: https://openairdocs.org/search.md?q=Cargo%20Systems%20Incorporated&type=text&page=2

All collections: https://openairdocs.org/search.md?q=Cargo%20Systems%20Incorporated
