# Search: Precise Flight Inc.

In the text of STC certificates: 129 matches in release 2026-10-30. Page 1.

- [STC SA2602NM](https://openairdocs.org/stc/SA2602NM.md): Installation of Precise Flight, Inc. 100 Series Speedbrake System in accordance with Precise Flight, Inc. Speedbrake Installation Drawing No. 210S006A, dated October 17, 1988, and Drawing List No. 210S008A, dated October 20, 1988, or later FAA approved revisions.  Or Installation of Precise Flight, Inc. Speedbrake 2000 System in accordance with Precise · Precise Flight Inc · Certificate · Nov 7, 2003
  > …Installation of **Precise** **Flight**, **Inc**. 100 Series Speedbrake System in accordance with **Precise** **Flight**, **Inc**. Speedbrake Installation Drawing…
- [STC SA00918SE](https://openairdocs.org/stc/SA00918SE.md): Precise Flight Inc. speed brake system.  Manufactured in accordance with Precise Flight Engineering Drawing List 010S0000, Revision W, or later FAA approved revision.  Installed in accordance with Precise Flight Engineering Drawing List 300S0000, Revision J, or later FAA approved revision.  Maintained in accordance with Precise Flight Instructions for Continued Airworthiness, contained in Airplane Flight Manual Supplement Document 300SMAN0001, latest FAA approved revision.

NOTE:  This approval is limited to airplanes which have had speed brake provisions installed in the wing at the Lancair factory during the manufacture of the airplane. · Precise Flight Inc · Certificate · Nov 7, 2003
  > …**Precise** **Flight**, **Inc**. speed brake system. Manufactured in accordance with **Precise** **Flight** Engineering Drawing List 010S0000, Revision W…
- [STC SE1780NM](https://openairdocs.org/stc/SE1780NM.md): Installation of Precise Flight standby vacuum system (SVS III). · Precise Flight Inc · Certificate · Mar 10, 2005
  > …Or Installation of **Precise** **Flight**, **Inc**. SVS V, in accordance with **Precise** **Flight**, **Inc**. Engineering Drawing 000V0000, Revision…
- [STC SA00233SE](https://openairdocs.org/stc/SA00233SE.md): Installation of the Precise Flight Series 100 Speedbrake System · Precise Flight Inc · Certificate · Mar 10, 2005
  > …Or Installation of **Precise** **Flight**, **Inc**. Speedbrake 2000 System in accordance with **Precise** **Flight** Drawing List 577S0000, Revision…
- [STC SA01129SE](https://openairdocs.org/stc/SA01129SE.md): Precise Flight Inc. recognition light system. · Precise Flight Inc · Certificate · Mar 15, 2006
  > …**Precise** **Flight** **Inc**. recognition light system. Manufactured in accordance with **Precise** **Flight** Engineering Drawing List 565W0000, Revision J…
- [STC SA01708SE](https://openairdocs.org/stc/SA01708SE.md): Installation of the fixed oxygen system. · Precise Flight Inc · Certificate · Oct 4, 2006
  > …Certificate Number SA01708SE This certificate, issued to **Precise** **Flight**, **Inc**. 63354 Powell Butte Rd. Bend, OR 97760 certifies…
- [STC SA00762SE](https://openairdocs.org/stc/SA00762SE.md): Installation of Precise Flight, Inc. Speedbrake 2000 System · Precise Flight Inc · SA00762SEaml.pdf · Nov 7, 2003
  > …SA00762SE **PRECISE** **FLIGHT** **INC**. For SPEEDBRAKE 2000 INSTALLATION PAGE 1 of 2 REVISIONS Rev. Description of Changes FAA…
- [STC SA00520SE](https://openairdocs.org/stc/SA00520SE.md): Installation of Precise Flight Speedbrake System. · Precise Flight Inc · Certificate · Jan 8, 2008
  > …Installation of **Precise** **Flight** Speedbrake System manufactured in accordance with **Precise** **Flight**, **Inc**. Engineering Drawing List 010S0000, Rev…
- [STC SA4005NM](https://openairdocs.org/stc/SA4005NM.md): Precise Flight Inc. Pulselite Control System · Precise Flight Inc · Certificate · Jun 4, 2001
  > …**Precise** **Flight** **Inc**. Pulselite Control System manufactured in accordance with **Precise** **Flight** Engineering Drawing Lists 002P0000, Revision H…
- [STC SA4150NM](https://openairdocs.org/stc/SA4150NM.md): Installation of Precise Flight Series 100 Speedbrake System. · Precise Flight Inc · Certificate · Nov 7, 2003
  > …Or Installation of **Precise** **Flight**, **Inc**. Speedbrake 2000 System in accordance with **Precise** **Flight** Drawing List 577S0000, Revision…
- [STC SA01075SE](https://openairdocs.org/stc/SA01075SE.md): Installation of the Precise Flight, Inc., SpeedBrake 2000 System. · Precise Flight Inc · Certificate · Jul 19, 2006
  > …Installation of the **Precise** **Flight**, **Inc**. SpeedBrake 2000 System. Manufactured in accordance with **Precise** **Flight** Engineering Drawing List…
- [STC SA1781NM](https://openairdocs.org/stc/SA1781NM.md): Installation of Precise speedbrake system. · Precise Flight Inc · Certificate · Mar 10, 2005
  > …1) Installation of Hydraulic actuated **Precise** **Flight** Speedbrake System in accordance with **Precise** **Flight**, **Inc**. Speedbrake System Drawing…
- [STC SA520NE](https://openairdocs.org/stc/SA520NE.md): Installation of a Simmonds Precision Computerized Fuel Gauging System, with Volumetric Top-off Device in accordance with Simmonds Precision Installation Drawing List Report Number 2615, Revision A, dated April 8, 1987, or later FAA approved revision. · Simmonds Precision Products Inc · Certificate · Jan 6, 2005
  > …Number SA520NE This Certificate issued to Simmonds **Precision** Products, **Inc**. d/b/a Goodrich Corporation Fuel and Utility…
- [STC SA2162NM](https://openairdocs.org/stc/SA2162NM.md): Installation of the Precise Flight stand-by vacuum system (SVS) · Precise Flight Inc · SA2162NM AML .pdf · Nov 7, 2003
  > …SA2162NM **PRECISE** **FLIGHT**, **INC**. For INSTALLATION OF **PRECISE** **FLIGHT** STANDBY VACUUM SYSTEM Issue Date: May 23, 1988 Item…
- [STC ST00053BO](https://openairdocs.org/stc/ST00053BO.md): Installation of a Simmonds Precision Products fuel quantity indicating system incorporating a volumetric top-off function. · Simmonds Precision Products Inc · Certificate · Nov 9, 2004
  > …Simmonds **Precision** Airplane **Flight** Manual Supplement No. 10037-AFM-01, Revision 2, dated March 22, 1996, or later…
- [STC SA01232SE](https://openairdocs.org/stc/SA01232SE.md): Installation of a Semi-Portable Oxygen System. · Precise Flight Inc · Certificate · May 7, 2007
  > …A copy of this Certificate and FAA approved AFMS, **Precise** **Flight**, **Inc**. Document 003NMAN0001, Revision A, dated April…
- [STC SA298NE](https://openairdocs.org/stc/SA298NE.md): Installation of Simmonds Precision Computerized Fuel Quantity Indicator System in accordance with Simmonds Precision Installation Drawing List, Report Numbers E-2447, Revision E; and E-2523(optional), no revision, or later FAA-approved revisions. · Simmonds Precision Products Inc · Certificate · Apr 19, 2004
  > …Number SA298NE This Certificate issued to Simmonds **Precision** Products, **Inc**. d/b/a Goodrich Corporation Fuel and Utility…
- [STC SA01060SE](https://openairdocs.org/stc/SA01060SE.md): Installation of a semi-portable oxygen system. · Precise Flight Inc · Certificate · May 7, 2007
  > …A copy of this Certificate and FAA approved AFMS, **Precise** **Flight** **Inc**. Document 005NMAN0001, Revision C, dated April…
- [STC SA2683NM](https://openairdocs.org/stc/SA2683NM.md): Installation of Precise Flight, Inc. stand-by vacuum system (SVS) · Precise Flight Inc · SA2683NM_AML.pdf · Mar 10, 2005
  > …SA2683NM **PRECISE** **FLIGHT**, **INC**. For INSTALLATION OF **PRECISE** **FLIGHT** STANDBY VACUUM SYSTEM Issue Date: May 23, 1988 Original…
- [STC SR01821SE](https://openairdocs.org/stc/SR01821SE.md): Installation of High Intensity Discharge (HID) aviation lighting system manufactured · Precise Flight Inc · Certificate · Mar 3, 2008
  > …Installation of High Intensity Discharge (HID) aviation lighting system manufactured in accordance with **Precise** **Flight**, **Inc**., Engineering Drawing…

Next page: https://openairdocs.org/search.md?q=Precise%20Flight%20Inc.&type=stctext&page=2

All collections: https://openairdocs.org/search.md?q=Precise%20Flight%20Inc.
