# Air Cruisers Service Bulletin A300/A310: No revision named

- Rights: © Air Cruisers. Filed by the FAA in regulations.gov docket FAA-2016-9392; AD 2018-23-12 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Air Cruisers Service Bulletin A300/A310](https://openairdocs.org/service-documents/air-cruisers/a300-a310.md)
- Title as filed: SB A300-A310 001-25-19
- Pages: 10
- PDF: https://openairdocs.org/files/sha256/64/13/641364ac46199463bc2e7317d1b75dfb9e091bf7724d20c71f6f5a3b24b1823e
- Page: https://openairdocs.org/service-documents/air-cruisers/a300-a310/file/641364ac4619

## Text

Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

S.B. A300/A310 001-25-19
HIGHLIGHTS
To: Holders of A300/A310 Evacuation Slide Systems
Service Bulletin A300/A310  001-25-19
Title: Equipment/Furnishings-Emergency Equipment 
A300/A310 Evacuation Slide Systems
Fusible Plug Recall
Effectivity: Evacuation Slide System P/Ns D31020-101 and D31021-105
                   Reservoir and Valve Assembly D17925-105 and D17925-111
                   Inflation Valve 61202-103, serial numbers listed herein.
                  
To re-call Fusible Plugs LOT P-21 and P-22 installed in inflation valves and inflation 
systems in service. Fusible Plugs are safety devices which safely vent the pressure from 
charged inflation systems in the event the inflation systems are subjected to excessive 
temperatures. Two incidents have been reported from the field where fusible plugs 
manufactured from the suspect lots have activated below their rated temperature of 174 
degrees Fahrenheit. Testing conducted on fusible plug from suspect lots indicate that the 
plugs activate (vent gas) between the temperature range of 130 to 150 degrees 
Fahrenheit.  Activation of the fusible plugs will vent all gas from the inflation system 
reservoir rendering the slide unusable. 
Comments regarding this Service Bulletin, including those of an editorial nature, should 
be e-mailed to: technicalpublications@zodiacaerospace.com

### Page 2

(No text on this page.)

### Page 3

S.B. A300/A310 001-25-19
Page 1 of 8
ISSUE DATE: 27 Aug 2010
SERVICE BULLETIN
EQUIPMENT FURNISHINGS -EMERGENCY EQUIPMENT
A300/A310 EVACUATION SLIDE SYSTEMS
FUSIBLE PLUG RECALL
1. Planning Information
A. Effectivity 
A300/A310 Mid Door Evacuation Slide System
D31020-101
S/N 0135, 0136, 0137, 
Reservoir and Valve Assembly 
D17925-105
Inflation Valve 
61202-103
S/N 408-R08-007985, 408-R08-009346, 408-R08-009347
-------------------------------------------------
A300 Emergency Exit Evacuation Slide System 
D31021-105
S/N 0638
Reservoir and Valve Assembly
D17925-111
Inflation Valve 
61202-103
S/N 408-R08-007394
Inflation valves, 61201-103, shipped as spares: S/N R08-007395, R08-
007984, R0-007986, R08-009343, R08-009344, R08-009345, R08-009348, 
R09-500176, R09-500177, R09-500179, R09-503508, R09-503510, and 
R09-503512.
NOTE: Fusible Plugs, P/N B13984-3, Lot PA-21 or PA-22, shipped from Air 
Cruisers Company approximate dates of Oct 1, 2008 through Oct 1, 2009. 
Fusible plugs shipped as spares could be potentially installed on systems 
Emergency Exit D31021-101, -103, -107and FWD and Aft Slides D31023-
101. Also potentially installed on Reservoir and Valve assemblies D17925-
105, -107, -109 and on inflation valves 61202-103.

### Page 4

S.B. A300/A310 001-25-19
Page 2 of 8
ISSUE DATE: 27 Aug 2010
SERVICE BULLETIN
B. Reason
To recall Fusible Plugs LOT P-21 and P-22 installed in inflation valves and 
inflation systems in service. Fusible Plugs are safety devices which safely 
vent the pressure from charged inflation systems in the event the inflation 
systems are subjected to excessive temperatures. Two incidents have been 
reported from the field where fusible plugs manufactured from the suspect 
lots have activated below their rated temperature of 174 degrees 
Fahrenheit. Testing conducted on fusible plug from suspect lots indicate 
that the plugs activate (vent gas) between the temperature range of 130 to 
150 degrees Fahrenheit. Activation of the fusible plugs will vent all gas from 
the inflation system reservoir rendering the slide unusable. 
C. Compliance 
It is recommended that this modification be accomplished at the next 
access to the equipment. 
D. Description
NOTE: Only those organizations authorized by the FAA or other 
airworthiness authorities are permitted to perform this modification. 
Operators are to check all fusible plugs, B13984-3. Any fusible plug 
stamped with lot number PA-21 or PA-22 are to be scrapped. Check 
evacuation system, reservoir and valve assemblies and valves in spares for 
fusible plugs with the above stated lot numbers. Plugs with suspect lot 
numbers shall be replaced with new plugs following instructions detailed in 
the Assembly section of Component Maintenance Manual (CMM) 25-65-02 
and/or 25-65-03. Re-identify with marking called out in accomplishment 
instructions. 
E. Approval
Certification, TSO-C69
This service bulletin contains modification information which has been 
submitted to the FAA under the TSO-C69 authorization for the affected 
articles. 
The modification procedures described in this VSB are reviewed and 
technically accepted by Airbus Design Office to apply to the Airbus fleet 
affected.

### Page 5

S.B. A300/A310 001-25-19
Page 3 of 8
ISSUE DATE: 27 Aug 2010
SERVICE BULLETIN
F . Labor Hours 
It will take approximately 0.25 hour per system to accomplish the 
instructions outlined in this service bulletin. 
G. Material - Cost and Availability
(1). EDR (Engineering Data Release) Kit referenced in Paragraph 3, is 
available at free of charge, 60 days upon receipt of a no charge pur-
chase order which lists the part number and serial number of the 
system and/or valve. The free of charge condition, and availability, 
will be in effect for three years after original issue date of the ser-
vice bulletin, thereafter price and availability upon request. 
(2). EDR Kit is available from your local authorized Zodiac Services 
distributor. Please contact Zodiac Service Europe, Cage Code 
FAUX0; Zodiac Aerospace UK, Cage Code U03Z8; Zodiac 
Services Americas, Cage Code 567V9; In-Services Middle East, 
Cage Code SFB76 or Zodiac Services Asia, Cage Code QC054.
H. Tooling - None. 
I. Weight and Balance - None. 
J. Electrical Load Data - Not affected. 
K. References
Air Cruisers Company Service Information Letter (SIL) 25-246.
L. Other Publication Affected 
Air Cruisers Component Maintenance Manual (CMM) 25-65-03 and/or 25-
65-02 will have to be updated to reflect this service bulletin. 
M. Family Tree Charts of Modification Relationships- None. 
2. Accomplishment Instructions
WARNING: REPLACEMENT OF THE FUSIBLE PLUG SHALL NOT BE 
PERFORMED WITH THE RESERVOIR UNDER PRESSURE 
(CHARGED). 
A. Inspect all inflation valves and reservoir and valve assemblies in service.
(1). Inspect all valves, 61202-103, for fusible plugs lot number PA-21 or 
PA-22.

### Page 6

S.B. A300/A310 001-25-19
Page 4 of 8
ISSUE DATE: 27 Aug 2010
SERVICE BULLETIN
(2). Inspect all reservoir and valve inflation assemblies for fusible plugs 
lot number PA-21 or PA-22. 
(3). If fusible plug, B13984-3, has a lot number PA-21 or PA-22 remove, 
discard, and replace with new fusible plug and O-Ring from EDR 
Kit, reference Paragraph 3. Install and torque per instructions 
outlined in Assembly section of CMM 25-65-02 and/or 25-65-03.
B. Inspect evacuation system as follows:
(1). Gain access to the reservoir and valve assembly and inspect fusible 
plug for lot number. 
(2). If fusible plug, B13984-3, has a lot number of PA-21 or PA-22 
remove, discard, and replace with new fusible plug and O-Ring from 
EDR Kit, reference Paragraph 3. Install and torque per instructions 
outlined in Assembly section of CMM 25-65-02 and/or 25-65-03. 
(3). Repack evacuation system per applicable folding procedure in 
Assembly section of CMM 25-60-40 and/or 25-60-42. 
(4). Mark “Inspected/Replaced per S.B. A300/A310 001-25-19” in 
minimum 1/4 inch high characters adjacent to the part identification 
on the reservoir and valve assembly and adjacent nomenclature 
placard on the girt/and or lacing cover with indelible contrasting ink. 
(5). Return to service.

### Page 7

S.B. A300/A310 001-25-19
Page 5 of 8
ISSUE DATE: 27 Aug 2010
SERVICE BULLETIN
3. Material Information
A. The below EDR (Engineering Data Release) Kit is needed to modify one 
inflation valve. 
* see paragraph 1.G.
New P/N QTY .
Unit 
List 
Price
Key Word Old P/N Disposition
EDR 
90-1495-101
1* K i t -
Consisting of:
B14056-906 1 - O-Ring B14056-906 Install per appli-
cable CMM
B13984-3 1 - Fusible Plug B13984-3 Install per appli-
cable CMM

### Page 8

S.B. A300/A310 001-25-19
Page 6 of 8
ISSUE DATE: 27 Aug 2010
SERVICE BULLETIN
LOCATION OF RESERVOIR AND VALVE ASSEMBLY
FIGURE 1
UNDERSIDE OF SLIDE
RESERVOIR AND VALVE ASSEMBLY

### Page 9

S.B. A300/A310 001-25-19
Page 7 of 8
ISSUE DATE: 27 Aug 2010
SERVICE BULLETIN
TYPICAL LOCATION OF FUSIBLE PLUG ON VALVE
FIGURE 2
FUSIBLE PLUG
INFLATION VALVE
AND O-RING

### Page 10

S.B. A300/A310 001-25-19
Page 8 of 8
ISSUE DATE: 27 Aug 2010
SERVICE BULLETIN
INSPECT LOT NUMBERS ON FUSIBLE PLUG
FIGURE 3
FUSIBLE PLUG
FUSIBLE PLUG 
MARKED 
LOT NUMBER

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.