# Air Cruisers Service Bulletin BAe146: No revision named

- Rights: © Air Cruisers. Filed by the FAA in regulations.gov docket FAA-2016-9392, the docket of AD 2018-23-12. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Air Cruisers Service Bulletin BAe146](https://openairdocs.org/service-documents/air-cruisers/bae146.md)
- Title as filed: SB BAe 146 201-25-23
- Pages: 9
- PDF: https://openairdocs.org/files/sha256/03/0a/030ac7afef76a1e5cb89e319ada0446ec33b39aee0490ae13e87c92cd167e47f
- Page: https://openairdocs.org/service-documents/air-cruisers/bae146/file/030ac7afef76

## Text

Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

S.B. BAe146 201-25-23
HIGHLIGHTS
To: Holders of BAe 146 Evacuation Slide/Raft System
Service Bulletin BAe 146 201-25-23
Title: Equipment/Furnishings-Emergency Equipment 
BAe 146  Evacuation Slide/Raft System
Fusible Plug Recall
Effectivity: Evacuation Slide System P/Ns D30543-109, -110, -111, -112, -113, -114,  
-115, and -116
                   Reservoir and Valve Assembly D31811-103
                   Inflation Valve D18306-101, serial numbers listed herein.
                  
To recall Fusible Plugs LOT PA-21 and PA-22 installed in inflation valves and inflation 
systems in service. Fusible Plugs are safety devices which safely vent the pressure from 
charged inflation systems in the event the inflation systems are subjected to excessive 
temperatures. Two incidents have been reported from the field where fusible plugs 
manufactured from the suspect lots have activated below their rated temperature of 174 
degrees Fahrenheit. Testing conducted on fusible plug from suspect lots indicate that the 
plugs activate (vent gas) between the temperature range of 130 to 150 degrees 
Fahrenheit.  Activation of the fusible plugs will vent all gas from the inflation system 
reservoir rendering the slide/raft unusable. 
Comments regarding this Service Bulletin, including those of an editorial nature, should 
be e-mailed to: technicalpublications@zodiacaerospace.com

### Page 2

(No text on this page.)

### Page 3

S.B. BAe 146 201-25-23
Page 1 of 7
ISSUE DATE: 10 Dec 2010
SERVICE BULLETIN
EQUIPMENT FURNISHINGS -EMERGENCY EQUIPMENT
BAe SLIDE/RAFT EVACUATION SYSTEMS
FUSIBLE PLUG RECALL
1. Planning Information 
A. Effectivity 
BAe 146 Evacuation Slide/Raft System
D30543-109, -110, -111, -112, -113, -114, -115, and -116
Reservoir and Valve Assembly 
D31811-103
Inflation Valve 
D18306-101
Inflation valves shipped as spares: S/N R08-008114, R0-008116, R08-
008117, R08-009574, R09-512374, R09-512375, and R09-514690.
NOTE: Fusible Plugs, P/N B13984-3, Lot PA-21 or PA-22, shipped from Air 
Cruisers Company approximate dates of Oct 1, 2008 through Oct 1, 2009. 
Fusible plugs shipped as spares could potentially be installed on systems, 
reservoir and valve assemblies and inflation valves listed above. 
B. Reason
To recall Fusible Plugs LOT PA-21 and PA-22 installed in inflation valves 
and inflation systems in service. Fusible Plugs are safety devices which 
safely vent the pressure from charged inflation systems in the event the 
inflation systems are subjected to excessive temperatures. Two incidents 
have been reported from the field where fusible plugs manufactured from 
the suspect lots have activated below their rated temperature of 174 
degrees Fahrenheit. Testing conducted on fusible plug from suspect lots 
indicate that the plugs activate (vent gas) between the temperature range of 
130 to 150 degrees Fahrenheit. Activation of the fusible plugs will vent all 
gas from the inflation system reservoir rendering the slide/raft unusable. 
C. Compliance 
It is recommended that this modification be accomplished at the next 
access to the equipment.

### Page 4

S.B. BAe 146 201-25-23
Page 2 of 7
ISSUE DATE: 10 Dec 2010
SERVICE BULLETIN
D. Description
NOTE: Only those organizations authorized by the FAA or other 
airworthiness authorities are permitted to perform this modification. 
Operators are to check all fusible plugs, B13984-3. Any fusible plug 
stamped with lot number PA-21 or PA-22 are to be scrapped. Check 
evacuation system, reservoir and valve assemblies and valves in spares for 
fusible plugs with the above stated lot numbers. Plugs with suspect lot 
numbers shall be replaced with new plugs following instructions detailed in 
the applicable Component Maintenance Manual (CMM). Re-identify with 
marking called out in accomplishment instructions. 
E. Approval
Certification, TSO-C69a
This service bulletin contains modification information which has been 
submitted to the FAA under the TSO-C69a authorization for the affected 
articles. 
F . Labor Hours 
It will take approximately 0.25 hour per system to accomplish the 
instructions outlined in this service bulletin. 
G. Material - Cost and Availability
(1). EDR (Engineering Data Release) Kit referenced in Paragraph 3, is 
available at free of charge, 60 days upon receipt of a no charge pur-
chase order which lists the part number and serial number of the 
system and/or valve. The free of charge condition, and availability, 
will be in effect for three years after original issue date of the ser-
vice bulletin, thereafter price and availability upon request. 
(2). EDR Kit is available from your local authorized Zodiac Services 
distributor. Please contact Zodiac Service Europe, Cage Code 
FAUX0; Zodiac Aerospace UK, Cage Code U03Z8; Zodiac 
Services Americas, Cage Code 567V9; In-Services Middle East, 
Cage Code SFB76 or Zodiac Services Asia, Cage Code QC054.
H. Tooling - None. 
I. Weight and Balance - None. 
J. Electrical Load Data - Not affected.

### Page 5

S.B. BAe 146 201-25-23
Page 3 of 7
ISSUE DATE: 10 Dec 2010
SERVICE BULLETIN
K. References
Air Cruisers Company Service Information Letter (SIL) 25-246.
L. Other Publication Affected 
Air Cruisers Component Maintenance Manual (CMM) 25-65-16 will have to 
be updated to reflect this service bulletin. 
M. Family Tree Charts of Modification Relationships- None. 
2. Accomplishment Instructions
WARNING: REPLACEMENT OF THE FUSIBLE PLUG SHALL NOT BE 
PERFORMED WITH THE RESERVOIR UNDER PRESSURE 
(CHARGED). 
A. Inspect all inflation valves and reservoir and valve assemblies in service.
(1). Inspect all valves, D18306-101, for fusible plugs lot number PA-21 
or PA-22.
(2). Inspect all reservoir and valve inflation assemblies, D31811-103 for 
fusible plugs lot number PA-21 or PA-22. 
(3). If fusible plug, B13984-3, has a lot number PA-21 or PA-22 remove, 
discard, and replace with new fusible plug and O-Ring from EDR 
Kit, reference Paragraph 3. Install and torque per instructions 
outlined in the applicable CMM.
B. Inspect evacuation system as follows:
(1). Gain access to the reservoir and valve assembly and inspect fusible 
plug for lot number. 
(2). If fusible plug, B13984-3, has a lot number of PA-21 or PA-22 
remove, discard, and replace with new fusible plug and O-Ring from 
EDR Kit, reference Paragraph 3. Install and torque per instructions 
outlined in the applicable CMM. 
(3). Repack evacuation system per applicable folding procedure.
(4). Mark “Inspected/Replaced per S.B. BAe146 201-25-23” in minimum 
1/4 inch high characters adjacent to the part identification on the 
reservoir and valve assembly and adjacent nomenclature placard 
on the girt with indelible contrasting ink. 
(5). Return to service.

### Page 6

S.B. BAe 146 201-25-23
Page 4 of 7
ISSUE DATE: 10 Dec 2010
SERVICE BULLETIN
3. Material Information
A. The below EDR (Engineering Data Release) Kit is needed to modify one 
inflation valve. 
* see paragraph 1.G.
New P/N QTY .
Unit 
List 
Price
Key Word Old P/N Disposition
EDR 
90-1495-101
1* K i t -
Consisting of:
B14056-906 1 - O-Ring B14056-906 Install per 
CMM 25-65-16
B13984-3 1 - Fusible Plug B13984-3 Install per-
CMM 25-65-16

### Page 7

S.B. BAe 146 201-25-23
Page 5 of 7
ISSUE DATE: 10 Dec 2010
SERVICE BULLETIN
LOCATION OF RESERVOIR AND VALVE ASSEMBLY
FIGURE 1
EVACUATION SLIDE/RAFT
RESERVOIR AND VALVE ASSEMBLY
LOCATED ON THE UNDERSIDE OF 
THE SLIDE/RAFT

### Page 8

S.B. BAe 146 201-25-23
Page 6 of 7
ISSUE DATE: 10 Dec 2010
SERVICE BULLETIN
TYPICAL LOCATION OF FUSIBLE PLUG ON VALVE
FIGURE 2
FUSIBLE PLUG
INFLATION VALVE
WITH O-RING

### Page 9

S.B. BAe 146 201-25-23
Page 7 of 7
ISSUE DATE: 10 Dec 2010
SERVICE BULLETIN
INSPECT LOT NUMBERS ON FUSIBLE PLUG
FIGURE 3
FUSIBLE PLUG
FUSIBLE PLUG 
MARKED 
LOT NUMBER

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
