# Airbus Canada Service Bulletin BD500-538005: No revision named

- Rights: © Airbus Canada Limited Partnership. Filed by the FAA in regulations.gov docket FAA-2021-0201, the docket of AD 2021-22-17. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Airbus Canada Service Bulletin BD500-538005](https://openairdocs.org/service-documents/airbus-canada/bd500-538005.md)
- Title as filed: BD500-538005_001
- Pages: 28
- PDF: https://openairdocs.org/files/sha256/77/d5/77d5b2fd0d5dec28b109c1b18c7b7eeba39374e324984f5ad63f3527b413fcff
- Page: https://openairdocs.org/service-documents/airbus-canada/bd500-538005/file/77d5b2fd0d5d

## Text

Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

BD500-538005
 
 
 2020-07-08  Page 1
 
Service Bulletin
Fuselage - Aerodynamic Fairings -
Inspection of the Support Structure of the
WTBF
BD500-538005
Issue No. 001
Copyright © 2020 Airbus Canada Limited Partnership
All rights reserved. No part of this work may be reproduced or copied in any form or by any means without written permission of Airbus
Canada Limited Partnership.
The Airbus and A220 logos are registered trademarks of Airbus Canada Limited Partnership.
The information, technical data and the designs disclosed herein are the exclusive property of Airbus Canada Limited Partnership or
contain proprietary rights of others and are not to be used or disclosed to others without the written consent of Airbus Canada Limited
Partnership. The recipient of this document, by its retention and use, agrees to hold in confidence the technical data and designs contained
herein. The foregoing shall not apply to persons having proprietary rights to such information, technical data or such designs to the extent
that such rights exist.
Manufacturer:
Airbus Canada Limited Partnership
Customer Services
13100 Henri-Fabre Blvd., Mirabel, Quebec
Canada J7N 3C6

### Page 2

BD500-538005
 
Intentionally left blank
 
 2020-07-08  Page 2

### Page 3

BD500-538005
 
 
 2020-07-08  Page 1
Table of contents
The listed documents are included in Issue 001, dated 2020-07-08, of this publication.
Document title Data module code Issue date Applicable
to
Fuselage - Aerodynamic Fairings -
Inspection of the Support Structure of the
WTBF - Service Bulletin
BD500-A-J53-80-05-00AAA-930A-A 2020-07-08 50010-54999,
55003-59999
PART A: Inspection of the Support
Structure of the WTBF - Accomplishment
instruction
BD500-A-J53-80-05-01AAA-933A-A 2020-07-08 50010-54999,
55003-59999
PART B: Adjusting of the WTBF Tie Rods
- Accomplishment instruction
BD500-A-J53-80-05-02AAA-933A-A 2020-07-08 50010-54999,
55003-59999

### Page 4

BD500-538005
 
Intentionally left blank
 
 2020-07-08  Page 2

### Page 5

BD500-538005
 
See applicability on the
first page of the DM
BD500-A-J53-80-05-00AAA-930A-A
BD500-A-J53-80-05-00AAA-930A-A
 2020-07-08  Page 1
Fuselage - Aerodynamic Fairings - Inspection of the
Support Structure of the WTBF - Service Bulletin
 
Applicability: 50010-54999, 55003-59999
 
Table of contents Page
Fuselage - Aerodynamic Fairings - Inspection of the Support Structure of the WTBF -
Service Bulletin.......................................................................................................................... 1
References................................................................................................................................ 1
Service Bulletin.......................................................................................................................... 1
Common information................................................................................................................. 1
1 Maintenance Publications........................................................................................... 6
2 Operational Publications............................................................................................. 6
List of tables Page
1 References.................................................................................................................. 1
References
Table 1  References
Data Module/Technical Publication Title
BD500-A-J53-80-05-01AAA-933A-A PART A: Inspection of the Support Structure of the
WTBF - Accomplishment instruction
BD500-A-J53-80-05-02AAA-933A-A PART B: Adjusting of the WTBF Tie Rods -
Accomplishment instruction
Service Bulletin
Common information
THIS SERVICE BULLETIN IS SENT TO EACH OPERATOR. IF THE OPERATOR HAS
LEASED AIRCRAFT, SEND THE SERVICE BULLETIN TO THE LESSEE. IF THE OPERATOR
HAS SOLD AIRCRAFT OR TRANSFERRED SPARES IN THE LAST SIX MONTHS, SEND
THIS SERVICE BULLETIN TO THE NEW OWNER, UNLESS CONFIRMATION WAS
RECEIVED THAT AIRBUS HAS INCLUDED THE NEW OPERATOR ON THE DISTRIBUTION
LIST.
Management information
Compliance category: Recommended (Service bulletin recommended to be accomplished to
prevent significant operational disruptions)
Task category: Inspection
Original issue date: 2020-07-08
Impact list
None

### Page 6

BD500-538005
 
See applicability on the
first page of the DM
BD500-A-J53-80-05-00AAA-930A-A
BD500-A-J53-80-05-00AAA-930A-A
 2020-07-08  Page 2
Accomplishment limits
Time compliance: Basic limit
Remarks:
Refer to the Compliance section of the Planning Information section.
Replacement service bulletin
None
Revision information
Initial issue
Summary
Applicability
BD-500-1A10, Aircraft 50010 thru 54999
BD-500-1A11, Aircraft 55003 thru 59999
Reason
It is possible for the frames and longerons of the support structure of the Wing To Body Fairing
(WTBF) to have cracks.
Description
This service bulletin is divided into two parts: PART A and PART B.
PART A
The aircraft is put in standard configuration for maintenance. Access doors are opened. If
necessary, access panels are removed. Between FS931.0 and FS1015.0, at RBL40.0 and
LBL40.0, an inspection of longerons of the support structure of the WTBF is done. At FS973.0,
an inspection of the frames of the support structure of the WTBF and of tie rods are done. If
removed, the access panels are installed. The access doors are closed.
PART B
The aircraft is put in standard configuration for maintenance. Access doors are opened. If
necessary, access panels are removed. Two tie rods are disconnected. The tie rods are
adjusted and connected. If removed, the access panels are installed. The access doors are
closed.
Concurrent requirements
None
Manpower
It will take an estimated 8.0 h to complete PART A and PART B of this service bulletin.
Material information
For a list of consumables, refer to the different tasks that are given as references in this service
bulletin.

### Page 7

BD500-538005
 
See applicability on the
first page of the DM
BD500-A-J53-80-05-00AAA-930A-A
BD500-A-J53-80-05-00AAA-930A-A
 2020-07-08  Page 3
Planning information
Applicability
Aircraft affected:
AIRCRAFT MODEL SERVICE AIRCRAFT SERIAL
NUMBER
PRODUCTION AIRCRAFT
SERIAL NUMBERS
BD-500-1A10 50010 thru 54999 There is no production effec-
tivity.
BD-500-1A11 55003 thru 59999 There is no production effec-
tivity.
Note
The instructions in this service bulletin are only applicable to the systems and parts
installed at the time of delivery of the aircraft or as changed by Airbus Service Bulletins.
Before you do this service bulletin, examine all Supplemental Type Certificates (STCs),
Supplemental Type Approvals (STAs), or equivalent action changes to make sure that you
can complete this service bulletin.
Reason
Problem and effect
It is possible for the frames and longerons of the support structure of the Wing To Body Fairing
(WTBF) to have cracks. This can cause extended ground time to repair the support structure of
the WTBF.
Objective/Solution
This service bulletin gives the procedure to inspect the support structure of the WTBF and ad-
just the load on two tie rods. This will make sure that frames and longerons do not have cracks.
Description
This service bulletin is divided into two parts: PART A and PART B.
PART A
The aircraft is put in standard configuration for maintenance. Access doors are opened. If
necessary, access panels are removed. Between FS931.0 and FS1015.0, at RBL40.0 and
LBL40.0, an inspection of longerons of the support structure of the WTBF is done. At FS973.0,
an inspection of the frames of the support structure of the WTBF and of tie rods are done. If
removed, the access panels are installed. The access doors are closed.
PART B
The aircraft is put in standard configuration for maintenance. Access doors are opened. If
necessary, access panels are removed. Two tie rods are disconnected. The tie rods are
adjusted and connected. If removed, the access panels are installed. The access doors are
closed.

### Page 8

BD500-538005
 
See applicability on the
first page of the DM
BD500-A-J53-80-05-00AAA-930A-A
BD500-A-J53-80-05-00AAA-930A-A
 2020-07-08  Page 4
Compliance
Applicability: 50010-50019, 55003-55046
Recommended Service Bulletin
For aircraft that have less than 4000 flight hours, Airbus recommends that PART A and PART B
of this service bulletin be done at or before the aircraft has 4850 flight hours, unless otherwise
directed by the airworthiness authority of the operator.
For aircraft that have 4000 flight hours or more, Airbus recommends that PART A and PART B
of this service bulletin be done within 850 flight hours from the release date of the initial issue of
this service bulletin, unless otherwise directed by the airworthiness authority of the operator.
Airbus recommends that PART A of this service bulletin be repeated at an interval of 850 flight
hours from the initial inspection.
Applicability: 50020-54999, 55047-59999
Recommended Service Bulletin
For aircraft that have less than 1200 flight hours, Airbus recommends that PART A and PART B
of this service bulletin be done within 850 flight hours from the release date of the initial issue of
this service bulletin, unless otherwise directed by the airworthiness authority of the operator.
For aircraft that have 1200 flight hours or more, Airbus recommends that PART A and PART B
of this service bulletin be done within 500 flight hours from the release date of the initial issue of
this service bulletin, unless otherwise directed by the airworthiness authority of the operator.
Airbus recommends that PART A of this service bulletin be repeated at an interval of 500 flight
hours from the initial inspection.
Note
If it is not possible to complete all the instructions in this service bulletin because of
the configuration of the aircraft, speak with a CRC representative at 1-866-A220-CRC
(1-866-222-0272) or 1-450-476-7676 or e-mail at A220_crc@abc.airbus for analysis and to
get an approved disposition to complete this service bulletin.
Note
This service bulletin does not affect Airworthiness Limitations Items (ALIs) or Damage
Tolerance Inspections (DTIs).
Concurrent requirements
None
Approval
The technical content of this service bulletin has been approved under the authority of the TC-
CA Design Approval Organization No: DAO #19-Q-02.
Manpower
The man-hours given below are estimates for direct labor done by an experienced crew on an
aircraft prepared for maintenance.
These estimates do not include the time necessary for:

### Page 9

BD500-538005
 
See applicability on the
first page of the DM
BD500-A-J53-80-05-00AAA-930A-A
BD500-A-J53-80-05-00AAA-930A-A
 2020-07-08  Page 5
- Administrative functions such as planning, liaising, familiarization, and report writing.
- Non-productive elapsed time such as rest time, having meals, and crew shift changes.
- Elapsed time such as for paint to dry, sealant to cure, and fuel tank venting.
- Preparation for modification (unless specified in the Accomplishment Instructions) such as
cleaning and getting parts, tools, consumables, and ground equipment.
- Quality assurance inspections, troubleshooting and/or correction of discrepancies found
when a task is done.
- All other activities that are not considered by Airbus as directly related to the accomplish-
ment of this procedure.
PART A
It will take an estimated 2.5 h to complete this service bulletin. The man-hours are divided as
shown in the table that follows:
TASK MAN-HOURS
Job Set-Up 0.5 h
Procedure 1.5 h
Test 0 h
Job Close-Up 0.5 h
PART B
It will take an estimated 6.5 h to complete this service bulletin. The man-hours are divided as
shown in the table that follows:
TASK MAN-HOURS
Job Set-Up 2.0 h
Procedure 2.5 h
Test 0 h
Job Close-Up 2.0 h
Weight and balance
Not changed
Electrical load data
Not changed
Referenced documentation
Refer to the SB Introduction document BD500-000000 for definition or explanation of service
bulletin content.
For Airbus Canada reference only: Restriction and/or Special Instruction (RSI)
C-500-000-53-0073, Revision B

### Page 10

BD500-538005
 
See applicability on the
first page of the DM
BD500-A-J53-80-05-00AAA-930A-A
BD500-A-J53-80-05-00AAA-930A-A
 2020-07-08  Page 6
For Airbus Canada reference only: Restriction and/or Special Instruction (RSI)
C-500-000-53-0074, Revision B
For Airbus Canada reference only: PCR 59378
Documentation affected
1 Maintenance Publications
Aircraft Maintenance Publication (AMP)
2 Operational Publications
None
Industry support information
For on-site labor assistance, please speak with a speak with a CRC representative at 1-866-
A220-CRC (1-866-222-0272) or 1-450-476-7676 or e-mail at A220_crc@abc.airbus.
Material information
None
Accomplishment instructions
PART A BD500-A-J53-80-05-01AAA-933A-A
PART B BD500-A-J53-80-05-02AAA-933A-A
Additional information
Additional information
APPENDIX A
DATA SHEET
OPERATOR NAME:
AIRCRAFT SERIAL NUMBER:
AIRCRAFT FLIGHT HOURS:
AIRCRAFT FLIGHT CYCLES:
DATE OF INSPECTION:
Tie Rod Part Number L1 (Initial
Length)
L2 (New length) Rotation
Turn (Clock-
wise (CW),
Counter Clock-
wise (CCW)
Left Side C01366900-047
Right Side C01366900-047
Send Data Sheet to:

### Page 11

BD500-538005
 
See applicability on the
first page of the DM
BD500-A-J53-80-05-00AAA-930A-A
BD500-A-J53-80-05-00AAA-930A-A
End of data module
 2020-07-08  Page 7
Customer Response Center (CRC)
E-mail: a220_crc@abc.airbus
Subject: WTBF Longeron Strut reporting CRM CASE 52403
ref:_00D61HPW2._5004NgVerm:ref
(Note: subject must be included exactly as shown above)

### Page 12

BD500-538005
 
Intentionally left blank
See applicability on the
first page of the DM
BD500-A-J53-80-05-00AAA-930A-A
BD500-A-J53-80-05-00AAA-930A-A
 2020-07-08  Page 8

### Page 13

BD500-538005
 
See applicability on the
first page of the DM
BD500-A-J53-80-05-01AAA-933A-A
BD500-A-J53-80-05-01AAA-933A-A
 2020-07-08  Page 1
PART A: Inspection of the Support Structure
of the WTBF - Accomplishment instruction
 
Applicability: 50010-54999, 55003-59999
 
Table of contents Page
PART A: Inspection of the Support Structure of the WTBF - Accomplishment instruction........ 1
References................................................................................................................................ 1
Preliminary requirements.......................................................................................................... 2
Procedure.................................................................................................................................. 3
1 Job set-up................................................................................................................... 3
2 Procedure.................................................................................................................... 3
3 Job close-up................................................................................................................ 6
4 Administrative.............................................................................................................. 6
Requirements after job completion ........................................................................................... 6
List of tables Page
1 References.................................................................................................................. 1
2 Required conditions.................................................................................................... 2
3 Support equipment...................................................................................................... 2
4 Consumables, materials, and expendables ................................................................ 2
5 Spares......................................................................................................................... 2
6 Required conditions.................................................................................................... 6
List of figures Page
1 Inspection of the WTBF support structure .................................................................. 5
References
Table 1  References
Data Module/Technical Publication Title
BD500-A-J12-00-00-01AAA-398A-A Standard configuration for maintenance - Aircraft
system configuration
BD500-A-J52-47-03-01AAA-540A-A Wing To Body Fairing (WTBF) servicing doors - Open
for access procedure
BD500-A-J53-82-85-01AAA-520A-A Forward left side panel (195HB), aft Wing To Body
Fairing (WTBF) - Remove procedure
BD500-A-J53-82-85-03AAA-520A-A Forward right side panel (196HB), aft Wing To Body
Fairing (WTBF) - Remove procedure
BD500-A-J51-10-01-01AAA-018A-A Visual inspection - Introduction
BD500-A-J53-82-85-01AAA-720A-A Forward left side panel (195HB), aft Wing To Body
Fairing (WTBF) - Install procedure
BD500-A-J53-82-85-03AAA-720A-A Forward right side panel (196HB), aft Wing To Body
Fairing (WTBF) - Install procedure

### Page 14

BD500-538005
 
See applicability on the
first page of the DM
BD500-A-J53-80-05-01AAA-933A-A
BD500-A-J53-80-05-01AAA-933A-A
 2020-07-08  Page 2
Data Module/Technical Publication Title
BD500-A-J52-47-03-01AAA-740A-A Wing To Body Fairing (WTBF) servicing doors - Close
after access procedure
Preliminary requirements
Required conditions
Table 2  Required conditions
Action/Condition Data Module/Technical publication
None
Support equipment
Table 3  Support equipment
Name Identification/Reference Quantity Remark
None
Consumables, materials, and expendables
Table 4  Consumables, materials, and expendables
Name Identification/Reference Quantity Remark
None
Spares
Table 5  Spares
Name Identification/Reference Quantity Remark
None
Safety conditions
None

### Page 15

BD500-538005
 
See applicability on the
first page of the DM
BD500-A-J53-80-05-01AAA-933A-A
BD500-A-J53-80-05-01AAA-933A-A
 2020-07-08  Page 3
Procedure
1 Job set-up
Note
The steps in the Job set-up section of this service bulletin are recommended
steps. The steps give a recommendation to get access to the work area. This
recommendation is to give a safe work area and to minimize possible damage to
surrounding aircraft parts. Alternative steps can be used at the discretion of the
operator.
1.1 Make sure that the aircraft is in standard configuration for maintenance (refer to
AMP BD500-A-J12-00-00-01AAA-398A-A).
1.2 Open the access doors that follow:
DOOR NAME REFERENCE
195AB Door AMP BD500-A-
J52-47-03-01AAA-540A-A
195BB Door AMP BD500-A-
J52-47-03-01AAA-540A-A
196AB Door AMP BD500-A-
J52-47-03-01AAA-540A-A
196CB Door AMP BD500-A-
J52-47-03-01AAA-540A-A
1.3 If necessary for better access, remove the access panels that follow:
DOOR NAME REFERENCE
195HB Panel AMP BD500-A-
J53-82-85-01AAA-520A-A
196HB Panel AMP BD500-A-
J53-82-85-03AAA-520A-A
2 Procedure
2.1 If it is not possible to complete all the instructions in this service bulletin
because of the configuration of the aircraft, speak with a CRC representative
at 1 866 A220 CRC (1-866-222-0272) or 1-450-476-7676 or e-mail at
A220_crc@abc.airbus for analysis and to get an approved disposition to
complete this service bulletin.
Refer to figure 1
2.2 Between FS931.0 and FS1015.0, inspect the support structure of the Wing to
Body Fairing (WTBF) as follows:

### Page 16

BD500-538005
 
See applicability on the
first page of the DM
BD500-A-J53-80-05-01AAA-933A-A
BD500-A-J53-80-05-01AAA-933A-A
 2020-07-08  Page 4
2.2.1 Between FS931.0 and FS1015.0, do a Detailed Visual Inspection
(DVI) of the longeron at RBL40.0. Make sure that there are no cracks
or other damage (refer to ANDTP BD500-A-J51-10-01-01AAA-018A-
A).
2.2.2 At FS973.0, do a DVI of the frames inboard and outboard of RBL40.0.
Make sure that there are no cracks or other damage (refer to ANDTP
BD500-A-J51-10-01-01AAA-018A-A).
2.2.3 At FS973.0, just outboard of RBL40.0, do a DVI of the tie rod. Make
sure that there are no cracks or other damage (refer to ANDTP
BD500-A-J51-10-01-01AAA-018A-A).
2.2.4 Between FS931.0 and FS1015.0, do a DVI of the longeron at
LBL40.0. Make sure that there are no cracks or other damage (refer to
ANDTP BD500-A-J51-10-01-01AAA-018A-A).
2.2.5 At FS973.0, do a DVI of the frames inboard and outboard of LBL40.0.
Make sure that there are no cracks or other damage (refer to ANDTP
BD500-A-J51-10-01-01AAA-018A-A).
2.2.6 At FS973.0, just outboard of LBL40.0, do a DVI of the tie rod. Make
sure that there are no cracks or other damage (refer to ANDTP
BD500-A-J51-10-01-01AAA-018A-A).
2.3 If you find any cracks or damage, speak with a CRC representative
at 1 866 A220 CRC (1-866-222-0272) or 1-450-476-7676 or e-mail at
A220_crc@abc.airbus for analysis and to get an approved disposition.

### Page 17

BD500-538005
 
See applicability on the
first page of the DM
BD500-A-J53-80-05-01AAA-933A-A
BD500-A-J53-80-05-01AAA-933A-A
 2020-07-08  Page 5
FS973.0
FS931.0
FS1015.0
FRAME
FRAME
RBL40.0
LBL40.0
FRAME
FRAME
LONGERON
LONGERON
TIE ROD
TIE ROD
LEGEND
Inspection zone.
ICN-BD500-A-J538005-F-3AB48-62772-A-001-01
Figure 1 Inspection of the WTBF support structure

### Page 18

BD500-538005
 
See applicability on the
first page of the DM
BD500-A-J53-80-05-01AAA-933A-A
BD500-A-J53-80-05-01AAA-933A-A
End of data module
 2020-07-08  Page 6
3 Job close-up
Note
The steps in the Job close-up section of this service bulletin, except for the return-
to-service tests, are recommended steps. The steps give a recommendation to
install components removed during the Job set-up. This recommendation is to
make sure that the aircraft is safe and ready to return to service. Alternative steps
can be used at the discretion of the operator.
3.1 Remove all tools, equipment, and unwanted materials from the work area.
3.2 If removed, install the access panels that follow:
DOOR NAME REFERENCE
195HB Panel AMP BD500-A-
J53-82-85-01AAA-720A-A
196HB Panel AMP BD500-A-
J53-82-85-03AAA-720A-A
3.3 Close the access doors that follow:
DOOR NAME REFERENCE
195AB Door AMP BD500-A-
J52-47-03-01AAA-740A-A
195BB Door AMP BD500-A-
J52-47-03-01AAA-740A-A
196AB Door AMP BD500-A-
J52-47-03-01AAA-740A-A
196CB Door AMP BD500-A-
J52-47-03-01AAA-740A-A
4 Administrative
When PART A of this service bulletin is completed, record in the applicable aircraft
records that you have completed PART A of this service bulletin.
Requirements after job completion
Required conditions
Table 6  Required conditions
Action/Condition Data Module/Technical publication
None

### Page 19

BD500-538005
 
See applicability on the
first page of the DM
BD500-A-J53-80-05-02AAA-933A-A
BD500-A-J53-80-05-02AAA-933A-A
 2020-07-08  Page 1
PART B: Adjusting of the WTBF Tie Rods - Accomplishment instruction
 
Applicability: 50010-54999, 55003-59999
 
Table of contents Page
PART B: Adjusting of the WTBF Tie Rods - Accomplishment instruction ................................. 1
References................................................................................................................................ 1
Preliminary requirements.......................................................................................................... 2
Procedure.................................................................................................................................. 3
1 Job set-up................................................................................................................... 3
2 Procedure.................................................................................................................... 4
3 Job close-up................................................................................................................ 10
4 Administrative.............................................................................................................. 10
Requirements after job completion ........................................................................................... 10
List of tables Page
1 References.................................................................................................................. 1
2 Required conditions.................................................................................................... 2
3 Support equipment...................................................................................................... 2
4 Consumables, materials, and expendables ................................................................ 2
5 Spares......................................................................................................................... 3
6 Required conditions.................................................................................................... 10
List of figures Page
1 WTBF Tie Rod ............................................................................................................ 7
2 Tie Rod........................................................................................................................ 8
3 Tie Rod Insert Threads ............................................................................................... 9
References
Table 1  References
Data Module/Technical Publication Title
BD500-A-J12-00-00-01AAA-398A-A Standard configuration for maintenance - Aircraft
system configuration
BD500-A-J52-47-03-01AAA-540A-A Wing To Body Fairing (WTBF) servicing doors - Open
for access procedure
BD500-A-J53-82-85-01AAA-520A-A Forward left side panel (195HB), aft Wing To Body
Fairing (WTBF) - Remove procedure
BD500-A-J53-82-85-03AAA-520A-A Forward right side panel (196HB), aft Wing To Body
Fairing (WTBF) - Remove procedure
BD500-A-J51-21-11-04AAA-259A-A Corrosion inhibiting jointing compound - Corrosion
prevention procedures
BD500-A-J20-31-00-00AAA-711A-A Torquing of threaded fasteners - Tighten procedure
BD500-A-J20-20-05-00AAA-720A-A Cotter pin - Install procedure

### Page 20

BD500-538005
 
See applicability on the
first page of the DM
BD500-A-J53-80-05-02AAA-933A-A
BD500-A-J53-80-05-02AAA-933A-A
 2020-07-08  Page 2
Data Module/Technical Publication Title
BD500-A-J20-20-01-00AAA-720A-A Lockwire - Install procedure
BD500-A-J53-82-55-04AAA-520A-A Aft fairing strut, Wing To Body Fairing (WTBF) -
Remove procedure
BD500-A-J53-82-55-04AAA-720A-A Aft fairing strut, Wing To Body Fairing (WTBF) - Install
procedure
BD500-A-J53-82-85-01AAA-720A-A Forward left side panel (195HB), aft Wing To Body
Fairing (WTBF) - Install procedure
BD500-A-J53-82-85-03AAA-720A-A Forward right side panel (196HB), aft Wing To Body
Fairing (WTBF) - Install procedure
BD500-A-J52-47-03-01AAA-740A-A Wing To Body Fairing (WTBF) servicing doors - Close
after access procedure
Preliminary requirements
Required conditions
Table 2  Required conditions
Action/Condition Data Module/Technical publication
None
Support equipment
Table 3  Support equipment
Name Identification/Reference Quantity Remark
None
Consumables, materials, and expendables
Table 4  Consumables, materials, and expendables
Name Identification/Reference Quantity Remark
None

### Page 21

BD500-538005
 
See applicability on the
first page of the DM
BD500-A-J53-80-05-02AAA-933A-A
BD500-A-J53-80-05-02AAA-933A-A
 2020-07-08  Page 3
Spares
Table 5  Spares
Name Identification/Reference Quantity Remark
None
Safety conditions
None
Procedure
1 Job set-up
Note
The steps in the Job set-up section of this service bulletin are recommended
steps. The steps give a recommendation to get access to the work area. This
recommendation is to give a safe work area and to minimize possible damage to
surrounding aircraft parts. Alternative steps can be used at the discretion of the
operator.
1.1 Make sure that the aircraft is in standard configuration for maintenance (refer to
AMP BD500-A-J12-00-00-01AAA-398A-A).
1.2 Open the access doors that follow:
DOOR NAME REFERENCE
195AB Door AMP BD500-A-
J52-47-03-01AAA-540A-A
195BB Door AMP BD500-A-
J52-47-03-01AAA-540A-A
196AB Door AMP BD500-A-
J52-47-03-01AAA-540A-A
196CB Door AMP BD500-A-
J52-47-03-01AAA-540A-A
1.3 If necessary for better access, remove the access panels that follow:
DOOR NAME REFERENCE
195HB Panel AMP BD500-A-
J53-82-85-01AAA-520A-A

### Page 22

BD500-538005
 
See applicability on the
first page of the DM
BD500-A-J53-80-05-02AAA-933A-A
BD500-A-J53-80-05-02AAA-933A-A
 2020-07-08  Page 4
DOOR NAME REFERENCE
196HB Panel AMP BD500-A-
J53-82-85-03AAA-520A-A
2 Procedure
2.1 If it is not possible to complete all the instructions in this service bulletin
because of the configuration of the aircraft, speak with a CRC representative
at 1 866 A220 CRC (1-866-222-0272) or 1-450-476-7676 or e-mail at
A220_crc@abc.airbus for analysis and to get an approved disposition to
complete this service bulletin.
2.2 On the right side, adjust the load on the tie rod of the support structure of the
WTBF as follows:
Refer to figure 1 and figure 2
2.2.1 With an indelible ink pen, make a mark to index the tube body and the
fork end of the tie rod at FS973.0, just outboard of RBL40.0.
2.2.2 Measure the distance between the end of the tube body and the inside
of the fork end. Record the measurement in appendix A as L1.
Refer to figure 1
2.2.3 Remove and discard the cotter pin (5) from the nut (6).
2.2.4 Remove the nut (6), washers (4) (2), bushing (3) and bolt (1) that
attaches the lower end of the tie rod to the support structure.
Refer to figure 1 and figure 2
2.2.5 Remove and discard the safety cable or lock wire form the tie rod jam
nut.
2.2.6 Loosen the jam nut sufficiently to allow the tube body to turn.
Refer to figure 1
2.2.7 Apply Corrosion Inhibiting Compound (CIC) on the washer (4) (refer to
AMP BD500-A-J51-21-11-04AAA-259A-A).
2.2.8 Apply grease MIL-PRF-23827 TYP 1 on the bushing (3) and the bolt
(1).
2.2.9 Turn the tube body clock wise or counter clock wise sufficiently to
install the bolt (1), the washer (2), and the bushing (3), and the bolt
(1) is free to turn. Record the minimum amount of rotation of the tube
body necessary in appendix A.
Note
The amount of rotation of the tube body is +/- 1/8 of a turn.
2.2.10 Install the washer (4) and nut (6).
2.2.11 Turn the tube body clock wise or counter clock wise sufficiently so that
the bolt (1) is no longer free to turn.
2.2.12 Torque the nut (6) to 160 - 190 lbf •in. (18.08 - 21.47 N•m) (refer to
AMP BD500-A-J20-31-00-00AAA-711A-A).
2.2.13 Install the cotter pin (5) (refer to AMP BD500-A-
J20-20-05-00AAA-720A-A).

### Page 23

BD500-538005
 
See applicability on the
first page of the DM
BD500-A-J53-80-05-02AAA-933A-A
BD500-A-J53-80-05-02AAA-933A-A
 2020-07-08  Page 5
2.2.14 Torque the jam nut to 53 - 80 lbf •in. (5.99 - 9.04 N•m) (refer to AMP
BD500-A-J20-31-00-00AAA-711A-A).
Refer to figure 1 and figure 2
2.2.15 Safety the jam nut and locking device with lock wire (refer to AMP
BD500-A-J20-20-01-00AAA-720A-A).
Refer to figure 1 and figure 3
2.2.16 On both ends of the tie-rod, make sure that no threads of the inserts
are visible.
2.2.17 If threads of the inserts are visible, do as follows:
2.2.17.1 Remove and discard the tie rod (refer to AMP BD500-A-
J53-82-55-04AAA-520A-A).
2.2.17.2 Install a new tie rod (refer to AMP BD500-A-
J53-82-55-04AAA-720A-A).
Refer to figure 1 and figure 2
2.2.18 Measure the distance between the end of the tube body and the inside
of the fork end. Record the measurement in appendix A as L2.
2.3 On the left side, adjust the load on the tie rod of the support structure of the
WTBF as follows:
Refer to figure 1 and figure 2
2.3.1 With an indelible ink pen, make a mark to index the tube body and the
fork end of the tie rod at FS973.0, just outboard of LBL40.0.
2.3.2 Measure the distance between the end of the tube body and the inside
of the fork end. Record the measurement in appendix A as L1.
Refer to figure 1
2.3.3 Remove and discard the cotter pin (5) from the nut (6).
2.3.4 Remove the nut (6), washers (4) (2), bushing (3) and bolt (1) that
attaches the lower end of the tie rod to the support structure.
Refer to figure 1 and figure 2
2.3.5 Remove and discard the safety cable or lock wire form the tie rod jam
nut.
2.3.6 Loosen the jam nut sufficiently to allow the tube body to turn.
Refer to figure 1
2.3.7 Apply Corrosion Inhibiting Compound (CIC) on the washer (4) (refer to
AMP BD500-A-J51-21-11-04AAA-259A-A).
2.3.8 Apply grease MIL-PRF-23827 TYP 1 on the bushing (3) and the bolt
(1).
2.3.9 Turn the tube body clock wise or counter clock wise sufficiently to
install the bolt (1), the washer (2), and the bushing (3), and the bolt
(1) is free to turn. Record the minimum amount of rotation of the tube
body necessary in appendix A.
Note
The amount of rotation of the tube body is +/- 1/8 of a turn.
2.3.10 Install the washer (4) and nut (6).

### Page 24

BD500-538005
 
See applicability on the
first page of the DM
BD500-A-J53-80-05-02AAA-933A-A
BD500-A-J53-80-05-02AAA-933A-A
 2020-07-08  Page 6
2.3.11 Turn the tube body clock wise or counter clock wise sufficiently so that
the bolt (1) is no longer free to turn.
2.3.12 Torque the nut (6) to 160 - 190 lbf •in. (18.08 - 21.47 N•m) (refer to
AMP BD500-A-J20-31-00-00AAA-711A-A).
2.3.13 Install the cotter pin (5) (refer to AMP BD500-A-
J20-20-05-00AAA-720A-A).
Refer to figure 1 and figure 2
2.3.14 Torque the jam nut to 53 - 80 lbf •in. (5.99 - 9.04 N•m) (refer to AMP
BD500-A-J20-31-00-00AAA-711A-A).
2.3.15 Safety the jam nut and locking device with lock wire (refer to AMP
BD500-A-J20-20-01-00AAA-720A-A).
Refer to figure 1 and figure 3
2.3.16 On both ends of the tie-rod, make sure that no threads of the inserts
are visible.
2.3.17 If threads of the inserts are visible, do as follows:
2.3.17.1 Remove and discard the tie rod (refer to AMP BD500-A-
J53-82-55-04AAA-520A-A).
2.3.17.2 Install a new tie rod (refer to AMP BD500-A-
J53-82-55-04AAA-720A-A).
Refer to figure 1 and figure 2
2.3.18 Measure the distance between the end of the tube body and the inside
of the fork end. Record the measurement in appendix A as L2.

### Page 25

BD500-538005
 
See applicability on the
first page of the DM
BD500-A-J53-80-05-02AAA-933A-A
BD500-A-J53-80-05-02AAA-933A-A
 2020-07-08  Page 7
FR54
FR56
1
2
3
4
65
TIE ROD
(REF)
5. Cotter pin MS24665-300
LEGEND
3. Bushing
4. Washer
6. Nut
1. Bolt
2. Washer
ICN-BD500-A-J538005-F-3AB48-63154-A-001-01
Figure 1 WTBF Tie Rod

### Page 26

BD500-538005
 
See applicability on the
first page of the DM
BD500-A-J53-80-05-02AAA-933A-A
BD500-A-J53-80-05-02AAA-933A-A
 2020-07-08  Page 8
INSERT
(REF)
TUBE BODY
(REF)
JAM NUT
(REF)
INDEX LINE
L1
L2
ICN-BD500-A-J538005-F-3AB48-63155-A-001-01
Figure 2 Tie Rod

### Page 27

BD500-538005
 
See applicability on the
first page of the DM
BD500-A-J53-80-05-02AAA-933A-A
BD500-A-J53-80-05-02AAA-933A-A
 2020-07-08  Page 9
INSERT
(REF)
EXAMPLE OF THREADS
OF INSERT SHOWING
(TYPICAL)
ICN-BD500-A-J538005-F-3AB48-63156-A-001-01
Figure 3 Tie Rod Insert Threads

### Page 28

BD500-538005
 
See applicability on the
first page of the DM
BD500-A-J53-80-05-02AAA-933A-A
BD500-A-J53-80-05-02AAA-933A-A
End of data module
 2020-07-08  Page 10
3 Job close-up
Note
The steps in the Job close-up section of this service bulletin, except for the return-
to-service tests, are recommended steps. The steps give a recommendation to
install components removed during the Job set-up. This recommendation is to
make sure that the aircraft is safe and ready to return to service. Alternative steps
can be used at the discretion of the operator.
3.1 Remove all tools, equipment, and unwanted materials from the work area.
3.2 If removed, install the access panels that follow:
DOOR NAME REFERENCE
195HB Panel AMP BD500-A-
J53-82-85-01AAA-720A-A
196HB Panel AMP BD500-A-
J53-82-85-03AAA-720A-A
3.3 Close the access doors that follow:
DOOR NAME REFERENCE
195AB Door AMP BD500-A-
J52-47-03-01AAA-740A-A
195BB Door AMP BD500-A-
J52-47-03-01AAA-740A-A
196AB Door AMP BD500-A-
J52-47-03-01AAA-740A-A
196CB Door AMP BD500-A-
J52-47-03-01AAA-740A-A
4 Administrative
When PART B of this service bulletin is completed, record in the applicable aircraft
records that you have completed PART B of this service bulletin.
Requirements after job completion
Required conditions
Table 6  Required conditions
Action/Condition Data Module/Technical publication
None

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.