# Airbus Helicopters Alert Service Bulletin EC135-85A-069

Copy: No revision named ("Airbus Helicopters ASB EC135-85A-069 Rev 0 (includes Goodrich SB 44301-10-17 Rev 4)"), 14 pages: PDF https://openairdocs.org/files/sha256/04/29/0429c8eff550a68086197381ebe306840dd302d648dfa482340120deac23e33b; text https://openairdocs.org/service-documents/airbus-helicopters/ec135-85a069/file/0429c8eff550.md. Rights: © Airbus Helicopters. Filed by the FAA in regulations.gov docket FAA-2021-0611; AD 2021-21-01 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Airbus Helicopters](https://openairdocs.org/service-documents/airbus-helicopters.md)
- Type: Service bulletin (Alert Service Bulletin)
- Number: EC135-85A-069
- Page: https://openairdocs.org/service-documents/airbus-helicopters/ec135-85a069

## ADs that cite it (2) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2021-21-01](https://openairdocs.org/ad/2021-21-01.md), effective Dec 10, 2021: No revision named
- [AD 2019-05-06](https://openairdocs.org/ad/2019-05-06.md), effective Apr 17, 2019: No revision named

Also cited in [2 proposed ADs](https://openairdocs.org/service-documents/airbus-helicopters/ec135-85a069/proposed.md).

## Text (14 pages)

Rights: © Airbus Helicopters. Filed by the FAA in regulations.gov docket FAA-2021-0611; AD 2021-21-01 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1 (OCR)

AIRBUS
HELICOPTERS  ASB EC135-85A-069
Valid for Version(s): T1, T2, T2+, T3, P1, P2, P2+, P3
635 T1, 635 T2+, 635 13, 635 P2+, 635 P3
ALERT SERVICE BULLETIN
SUBJECT:  OPTIONAL EQUIPMENT - External Mounted Hoist
Unintended detachment of hook assembly from the cable
For the attention of
Revision No.  Date of issue
Revision O  2017-08-02
Summary:
With this Alert Service Bulletin (ASB), Airbus Helicopters Deutschland (AHD) introduces a first
time inspection and a repetitive inspection of the hook assembly. Each inspection includes the
replacement of the retaining ring.
Compliance:
Compliance with this ASB is mandatory.
Revision 0, 2017-08-02  PAGE 1 of 5
This document is available on the internet: www.airbushelicopters.com/techpub/

### Page 2 (OCR)

AIRBUS
HELICOPTERS  ASB EC135-85A-069
1  PLANNING INFORMATION
1.A  EFFECTIVITY
1.A.1 Helicopters/installed equipment and parts
1. EC135, T1, T2, T2+, T3, P1, P2, P2+, P3, 635 T1, 635 T2+, 635 T3, 635 P2+, 635 PЗ,
all S/N equipped with external mounted hoist.
2. For the affected external mounted hoists refer to Section 1.A of the Goodrich
Service Bulletin 44301-10-17 Rev. 4.
1.A.2 Non-installed equipment and parts
Refer to Section 1.A of the Goodrich Service Bulletin 44301-10-17 Rev. 4.
1.B  ASSOCIATED REQUIREMENTS
Not applicable.
1.C  REASON
AHD was informed that a hook assembly, similar to what is installed on the EC135
had separated from the cable. This was caused by a combination of two independent
failures including an internal retaining ring failure combined with the elastomeric
energy absorber that had been deformed due to compression. This ASB introduces a
first time inspection and a repetitive inspection of the hook assembly.
Each inspection requires the replacement of the retaining ring and the inspection of
the energy absorber.
These measures are considered as an interim solution pending the availability of a
corrective design solution.
1.D  DESCRIPTION
Inspect the hook assembly. Replace the energy absorber if required. Replace the
retaining ring.
1.E  COMPLIANCE
1.E.1 Compliance at H/C manufacturer level
Helicopters/installed equipment and parts:
The inspection of the hook assembly and the replacement of the retaining ring must
be accomplished i.a.w. Section 2 of the Goodrich Service Bulletin 44301-10-17 Rev. 4
before the first hoist mission, then at intervals of 180 days.
Non-installed equipment and parts:
Refer to helicopters/ installed equipment and parts.
1.E.2  Compliance in service
Helicopters/installed equipment and parts:
The inspection of the hook assembly and the replacement of the retaining ring must
be accomplished i.a.w. Section 2 of the Goodrich Service Bulletin 44301-10-17 Rev. 4
within the next 90 days, then at intervals of 180 days.
PAGE 2 of 5  Revision 0, 2017-08-02
This document is available on the internet: www.airbushelicopters.com/techpub/

### Page 3 (OCR)

AIRBUS
HELICOPTERS  ASB EC135-85A-069
Non-installed equipment and parts:
The inspection of the hook assembly and the replacement of the retaining ring must
be accomplished i.a.w. Section 2 of the Goodrich Service Bulletin 44301-10-17 Rev. 4
before the first hoist mission, then at intervals of 180 days.
1.F  APPROVAL
Approval of this document:
The technical content of this document is approved under the authority of
DOANo.EASA.21J.700
1.G  MANPOWER
Refer to Section 1.F of the Goodrich Service Bulletin 44301-10-17 Rev. 4.
1.H  WEIGHT AND BALANCE
No effect on weight and balance.
POWER CONSUMPTION
Not affected.
1.J  SOFTWARE UPGRADES/UPDATES
Not changed.
1.K  REFERENCES
AMM EC135/EC635.
Refer to Section 1.L of the Goodrich Service Bulletin 44301-10-17 Rev. 4.
1.L  OTHER AFFECTED PUBLICATIONS
Publications already updated:
Not affected.
Publications to be updated:
Not affected.
1.M  INTERCHANGEABILITY OR MIXABILITY OF PARTS
Interchangeability:
Not affected.
Mixability:
Not affected.
Revision 0, 2017-08-02  PAGE 3 of 5
This document is available on the internet: www.airbushelicopters.com/techpub/

### Page 4 (OCR)

AIRBUS
HELICOPTERS  ASB EC135-85A-069
2  MATERIAL INFORMATION
2.A  MATERIAL: PRICE - AVAILABILITY - PROCUREMENT
Information on availability of required material kit SB-135-85A-069-2C will be
provided by AHD, Dept. Spares Order Administration on request.
The retaining ring will be provided free of cost by AHD for the first inspection. The
order must be placed at December 31, 2017 at the latest.
Material kits which are ordered outside the limits will be charged according to the
ruling prices.
2.B  LOGISTIC INFORMATION
Not applicable.
2.C  MATERIAL REQUIRED PER HELICOPTER/COMPONENT
Material kits to be ordered for one hook assembly:
Material kit SB-135-85A-069-2C.
No.  Keyword  Qty  New P/N  Old P/N  Rem.
1  Retaining ring  1  MS16625-4075  MS16625-4075
A = The retaining ring can be sourced locally.
PAGE 4 of 5  Revision 0, 2017-08-02
This document is available on the internet: www.airbushelicopters.com/techpub/

### Page 5 (OCR)

AIRBUS
HELICOPTERS  ASB EC135-85A-069
ACCOMPLISHMENT INSTRUCTIONS
З.А  GENERAL
Not applicable.
З.В  WORK STEPS
З.В.1  Preliminary steps
Energize the helicopter electrical system, refer to AMM, 24-00-00, 2-1.
3.В.2  Procedure
Refer to Section 2 of the Goodrich Service Bulletin 44301-10-17 Rev. 4.
З.В.З  Final steps
De-energize the helicopter electrical system, refer to AMM, 24-00-00, 2-1.
З.С  COMPLIANCE CONFIRMATION
Compliance with this document:
Confirm accomplishment of this ASB by an entry in the log card of the external
mounted hoist and in the historical record of the helicopter.
3.D  OPERATING AND MAINTENANCE INSTRUCTIONS
Operating instructions:
Not applicable.
Maintenance instructions:
Not applicable.
4  APPENDIX
Goodrich Service Bulletin 44301-10-17 Rev. 4.
Revision 0, 2017-08-02  PAGE 5 of 5
This document is available on the internet: www.airbushelicopters.com/techpub/

### Page 6

(No text on this page.)

### Page 7

Page 1 of 8
Jul 26/17
Rev 4
44301-10-17
WARNING - This information contains technical data subject to EAR ECCN: 9E991
SERVICE BULLETIN
Equipment/Furnishings - Rescue Hoist - System Safety
1. Planning Information
A. Effectivity
This Service Bulletin is applicable to the Rescue Hoists shown in the table below which use
hook assemblies p/n 44301-420, and 44301-423.
B. Reason
To increase the level of safety in the hook assembly and reduce the chance that the hook
assembly can separate from the hoist cable. This will be accomplished by periodic
inspection of the hook assembly.
C. Description
It was observed that a hook separated from the cable. This was caused by a dual failure;
an internal retaining ring failed and the elastomeric energy absorber (the bumper) took a
compression set. The retaining ring can corrode in a salt-laden environment. This Service
Bulletin provides instructions for the periodic inspection of hook components to prevent
separation of the hook from the cable.
D. Compliance
Incorporation of this Service Bulletin shall be performed within 90 days of its release. This
inspection shall be repeated every 180 days.
E. Approval
This Service Bulletin contains no modification information that revises the approved
configuration. The work performed is in compliance with the existing FAA/EASA approved
configuration.
HOOK P/N HOIST P/N
44301-420 44301-10-2
44301-420 44301-10-5
44301-420 44301-10-6
44301-423 44301-10-10
44301-423 44301-10-11
44301-423 44301-10-12
44301-423 44301-10-13

### Page 8

44301-10-17
Jul 26/17
Rev 4
Page 2 of 8
WARNING - This information contains technical data subject to EAR ECCN: 9E991
SERVICE BULLETIN
Equipment/Furnishings - Rescue Hoist - System Safety
F. Manpower
(1) The estimated amount of labor to accomplish the instructions of this Service Bulletin 
is 10 minutes.
(2) The work described in this Service Bulletin may be performed by personnel and 
facilities authorized to perform O-level hoist maintenance.
G. Material - Cost and Availability
(1) The following parts are required to accomplis h the instructions of this Service Bulletin 
for each unit:
(2) Material Availability
(a) Parts required for the implementation of this Service Bulletin can be sourced 
locally or provided by Airbus Helicopter.
H. Tooling - Price and Availability
None.
I. Weight and Balance
Not affected.
J. Electrical Load Data
Not affected.
K. Software Accomplishment Summary
Not applicable.
L. Reference
CMM 25-00-21-1
Table 1.  Required Parts
NEW P/N DESCRIPTION OLD P/N QTY DISPOSITION
MS16625-4075 Retaining Ring MS16625-4075 1 Replace
42305-290 Elastomeric Energy 
Absorber (bumper) 
42305-290 1 Replace on 
condition per 
Figure 1.

### Page 9

Page 3 of 8
Jul 26/17
Rev 4
44301-10-17
WARNING - This information contains technical data subject to EAR ECCN: 9E991
SERVICE BULLETIN
Equipment/Furnishings - Rescue Hoist - System Safety
M. Other Publications Affected
None
2. Accomplishment Instructions
A. Apply power to the hoist and use the control pendant to reel out the cable approximately 3 
ft. (1 m) to allow easy maintenance of the hook. Remove power from the hoist.
B. Within five minutes of reeling out the cabl e in step 2.A, measure the elastomeric energy 
absorber (bumper) to verify that it hasn’t taken a permanent compression set (ref Figure 1).
C. If the bumper has taken a permanent compression set, install a new bumper, P/N 42305-
290. Refer to CMM 25-00-21-1 for replacement instructions.
D. Remove the hook assembly (35, Figure 2) by removing the spring retainer (5) and 
unscrewing the hook carrier (10) from the body of the hook assembly and set aside.
E. Push the hoist cable into the cable hook retainer (15, Figure 2) and remove the seal cap 
(40) with attached o-ring (45).
F. Remove and discard the retaining ring (50).
G. If removed, install the spherical seat retainer ring (65, Figure 2) and the split cable retainer 
(60) on the swaged ball end of the rescue hoist cable. Use the rescue hoist cable to pull 
the spherical seat retainer ring (65) and the split cable retainer (60) into the lower disc (55). 
Make sure the assembly is bottomed out in the lower disc (55).
CAUTION: LOSS OF THE RETAINING RING CAN CONTRIBUTE TO SEPARATION OF 
THE HOOK FROM THE HOIST CABLE, POSSIBLY LEADING TO LOSS OF 
THE CABLE LOAD.
H. Install a new retaining ring (50, Figure 2) . Visually inspect retaining ring (50) after 
installation to make sure it is securely installed in its retaining groove (see Figure 3).
I. Install the assembled seal cap (40, Figure 2) with o-ring (45) into the lower disc (55). Make 
sure the o-ring (45) is not damaged during installation.
J. Reinstall the hook by screwing the carrier into the retainer (15, Figure 2) and installing the 
spring retainer (5).
NOTE: The two parts of the carrier (10) and (15) are a matched set (MSL #). When 
reassembling the carrier, do not intermix components between hook assemblies.
K. Apply power to the hoist and reel in the hook to the home position. Remove power from the 
hoist.

### Page 10

44301-10-17
Jul 26/17
Rev 4
Page 4 of 8
WARNING - This information contains technical data subject to EAR ECCN: 9E991
SERVICE BULLETIN
Equipment/Furnishings - Rescue Hoist - System Safety
L. Make a log entry noting completion of the inspection task.
3. Point of Contact
A. For information about this Service Bulletin, contact your Goodrich Corporation Customer 
Support Representative at the address listed below:
Goodrich Corporation SIS-CA
2727 E Imperial Hwy
Brea, CA 92821
USA
Phone: (714) 984-1461

### Page 11

Page 5 of 8
Jul 26/17
Rev 4
44301-10-17
WARNING - This information contains technical data subject to EAR ECCN: 9E991
SERVICE BULLETIN
Equipment/Furnishings - Rescue Hoist - System Safety
Figure 1.  Hook bumper compression
Replace if > 0.35
(8.9 mm
Nominal
0.25
(6.35 mm)
Nominal Hook and Bumper Bumper has taken a compression
set and must be replaced
D-LOK HOOK SHOWN AS AN EXAMPLE. 
MEASUREMENT IS THE SAME FOR ALL HOOKS.
$FFHSWDEOHLI
(8.9 mm)

### Page 12

44301-10-17
Jul 26/17
Rev 4
Page 6 of 8
WARNING - This information contains technical data subject to EAR ECCN: 9E991
SERVICE BULLETIN
Equipment/Furnishings - Rescue Hoist - System Safety
Figure 2.  Hook Assembly 44301-420, -423
60
60
53
60
65
60

### Page 13

Page 7 of 8
Jul 26/17
Rev 4
44301-10-17
WARNING - This information contains technical data subject to EAR ECCN: 9E991
SERVICE BULLETIN
Equipment/Furnishings - Rescue Hoist - System Safety
Figure 3.  Location of retaining ring
Retaining ring installed Retaining ring missingNote that the split cable
retainer is fully exposed

### Page 14

44301-10-17
Jul 26/17
Rev 4
Page 8 of 8
WARNING - This information contains technical data subject to EAR ECCN: 9E991
SERVICE BULLETIN
Equipment/Furnishings - Rescue Hoist - System Safety
THIS PAGE IS INTENTIONALLY LEFT BLANK

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
