# Airbus Helicopters Alert Service Bulletin EC155-04A014

## Copies (2)

Copies the FAA filed in AD dockets on regulations.gov, newest revision first. A newer revision may exist.

- Revision 6 ("Airbus Helicopters ASB EC155 04A014 Rev 6"), 23 pages: PDF https://openairdocs.org/files/sha256/70/03/7003479379f8d8c344b283fc9926a3da42b9d8005cfb7633d95d8e3389cd8596; text https://openairdocs.org/service-documents/airbus-helicopters/ec155-04a014/file/7003479379f8.md. Rights: © Airbus Helicopters. Filed by the FAA in regulations.gov docket FAA-2022-0102, the docket of AD 2022-09-04. Not covered by OpenAirDocs’ CC0 dedication.
- Airbus Helicopters ASB EC155 04A014 R5 ("Airbus Helicopters ASB EC155 04A014 R5"), 23 pages: PDF https://openairdocs.org/files/sha256/a8/55/a8553a02b84a6ac343ebe17f7fe162e185f49cb95696ff454aa5c16dde858111; text https://openairdocs.org/service-documents/airbus-helicopters/ec155-04a014/file/a8553a02b84a.md. Rights: © Airbus Helicopters. Filed by the FAA in regulations.gov docket FAA-2020-1123, the docket of AD 2021-05-05. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Airbus Helicopters](https://openairdocs.org/service-documents/airbus-helicopters.md)
- Type: Service bulletin (Alert Service Bulletin)
- Number: EC155-04A014
- Latest revision known: EC155-04A014, Revision 6, dated May 4, 2016 (OpenAirDocs)
- Page: https://openairdocs.org/service-documents/airbus-helicopters/ec155-04a014

## ADs that cite it (2) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2022-09-04](https://openairdocs.org/ad/2022-09-04.md), effective May 31, 2022: Revision 6
- [AD 2016-23-05](https://openairdocs.org/ad/2016-23-05.md), effective Dec 12, 2016: No revision named

Also cited in [1 proposed AD](https://openairdocs.org/service-documents/airbus-helicopters/ec155-04a014/proposed.md).

## Text (23 pages)

Revision 6, the newest copy. Rights: © Airbus Helicopters. Filed by the FAA in regulations.gov docket FAA-2022-0102, the docket of AD 2022-09-04. Not covered by OpenAirDocs’ CC0 dedication. This text is OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1 (OCR)

AIRBUS  HELICOPTERS
No. EC155-04A014
Civil version(s): B, B1
ALERT SERVICE BULLETIN
PROTECTIVE MEASURE
LIMITATIONS - Control rod double bearing
Tail Gearbox (TGB)
ATA: 65
For the attention of
Revision No.  Date of issue
Revision 0  2016-05-04
Revision 1  2016-06-03
Revision 2  2016-10-28
Revision 3  2017-07-20
Revision 4  2019-12-11
Revision 5  2020-03-25
Revision 6  2021-06-14
Summary:
- Periodic replacement of the TGB control rod double bearing on PRE MOD 07 65B63 TGBs.
- Pending the next replacement of the control rod double bearing, reducing the inspection interval for the TGB
magnetic plug to ensure that there are no particles, and removing the control shaft/rod assembly once or twice
(depending on the case) to inspect the double bearing.
- Maintaining the TGB operating oil at the maximum level.
Compliance with this ALERT SERVICE BULLETIN supersedes the instructions specified in EC155
ALERT SERVICE BULLETIN No. 05A022.
Reason for last revision:
Following additional tests and their analysis, the purpose of revision 6 of this ALERT SERVICE BULLETIN is to
reinforce the monitoring critera of the double bearing.
Compliance:
Airbus Helicopters renders compliance with this ALERT SERVICE BULLETIN mandatory.
Revision 0 2016-05-04  Page 1/23
Revision 6 2021-06-14  This document is available on the internet: www.airbushelicopters.com/techpubl

### Page 2 (OCR)

AIRBUS  HELICOPTERS
No. EC155-04A014
1.  PLANNING INFORMATION
1.A. EFFECTIVITY
1.A.1. Helicopters/installed equipment or parts
On PRE MOD 07 65B63 Tail Gearboxes (TGB).
NOTE 1
Series modification 07 65B63 creates a new TGB Part
Number 365A33-6005-09 enabling the instructions of this
ALERT SERVICE BULLETIN to be canceled.
Helicopters which embody MOD 07 65B63 are
instructions given in this
ALERT SERVICE BULLETIN.
1.A.2. Non-installed equipment or parts
On PRE MOD 07 65B63 TGBS.
On PRE MOD 07 65B57 double bearings.
1.B. ASSOCIATED REQUIREMENTS
Not applicable.
1.C. REASON
Revision 0
Airbus Helicopters has recently participated in investigations following an accident that was due to the loss of
yaw control on an AS365 N3 helicopter.
This helicopter had been subject to periodic checks carried out in accordance with the instructions given in
Revision 4 of ALERT SERVICE BULLETIN No. 05A022.
The preliminary examination of the TGB revealed that the control rod double bearing was damaged.
Investigations are ongoing to determine the cause of this damage and the reasons for its non-detection.
In order to prevent the risk of undetected double bearing damage, Airbus Helicopters makes compliance with
the instructions given in this ALERT SERVICE BULLETIN mandatory, the purpose of which is:
- to ensure that the TGB lubricating oil level is at the "max" level,
- to periodically replace the control rod double bearing on TGBs that do not embody the latest modifications,
- pending the next replacement of the control rod double bearing, to check more frequently that there are no
particles at the TGB magnetic plug, and to remove the control shaft/rod assembly once or twice (depending
on the case) for inspection of the double bearing,
- and to cancel compliance with ALERT SERVICE BULLETIN No. 05A022.
Revision 1
Following the issue of Revision 0 of this ALERT SERVICE BULLETIN, Airbus Helicopters would like to add
some details to paragraph 1.E.2.a.2. concerning the check of the magnetic plug.
Furthermore, in order to analyze the possibility of increasing the interval between periodic replacements
of POST MOD 07 65B57 bearings, Airbus Helicopters requests the return of some bearings.
A bearing monitoring sheet has therefore been added in appendix paragraph 4.B. It must be filled in and
returned to Airbus Helicopters during the next replacement following the issue of this
In addition, a flow chart has been added to paragraph 2.D. This flow chart explains the process for returning
bearings and the monitoring sheet given in Appendix 4.B. to Airbus Helicopters.
Revision 0  2016-05-04  Page 2/23
Revision 6  2021-06-14  This document is available on the internet: www.airbushelicopters.com/techpub/

### Page 3 (OCR)

AIRBUS  HELICOPTERS
No. EC155-04A014
Revision 2
Following the issue of Revisions 0 and 1 of this ALERT SERVICE BULLETIN, Airbus Helicopters wishes to
clarify paragraph 1.E.2. concerning the embodiment of MOD 07 65B56 or 07 65B58.
These MODs improve the sliding action of the control rod assembly in the TGB, by installing new guide rings.
MOD 07 65B56 is embodied on all new TGBs and during Overhaul (RG).
MOD 07 65B58 may be embodied through EC155 Service Bulletin No. 65-006 or during repair (RE).
Airbus Helicopters reminds you that it was mandatory to embody MOD 07 65B58 before
September 30, 2011, following the issue of EC155 ALERT SERVICE BULLETIN No. 05A022 Revision 1
dated July 13, 2011.
Airbus Helicopters requests that you check for the presence of new guide rings when replacing the double
bearing.
Revision 3
Since the issue of Revision 2, complementary tests have been performed on particle detection in the TGB.
In order to ensure an earlier detection of a potential degradation of the double bearing Airbus Helicopters
revised the current inspection and close monitoring procedure for PRE MOD 07 65B63 TGBs:
- the inspection interval for the electrical magnetic plug is changed from 100 flying hours to
25 flying hours, as for the manual magnetic plug,
- modification of the procedure after detection of particles as scale, flake, splinter or abrasion at the TGB
magnetic plug in order to identify quickly and more efficiently a double bearing degradation. Now, when
detection of these types of particles in the TGB, a metallurgical analysis or a complete cleaning of the TGB
is required.
In addition, a calendar limitation is introduced in order to ensure that POST MOD 07 65B63 will be the
standard on all TGB after 01/01/2024.
Revision 3 does not affect compliance with the previous revisions of this ALERT SERVICE BULLETIN
Airbus Helicopters renders compliance with this ALERT SERVICE BULLETIN mandatory.
Revision 4
The purpose of revision 4 is:
- to improve the washing procedure for the double bearing of the TGB control rod,
- to specify the commercial conditions related to the return of the bearings in paragraph 2.D,
- to remind customers to be cautious with abrasion particles (class g in the MTC).
Revision 5
Following experience feedback (flight hours cumulated and chip events) which allowed Airbus Helicopters to
review the global detection performances of the bearing degradation on POST MOD 65B63 TGBs,
ALERT SERVICE BULLETIN No. 04A016 has been revised to reduce the interval of the chip detector
inspection.
As a precautionary measure, Airbus Helicopters is also reducing the interval of the chip detector inspection
on PRE MOD 65B63 TGBs.
The purpose of revision 5 is to introduce this reduction of interval on the chip detector to 20 FH for bearings
with less than 250 FH and 10 FH for bearing with more than 250 FHS to improve detection of the particles.
This protective measure is a temporary measure.
Airbus Helicopters takes advantage of this revision to modify Appendix 4.B. to mention the type of oil used
and its manufacturer.
Revision 0 2016-05-04  Page 3/23
Revision 6  2021-06-14  This document is available on the internet: www.airbushelicopters.com/techpubl

### Page 4 (OCR)

AIRBUS  HELICOPTERS
No. EC155-04A014
Revision 6
Following additional tests and their analysis, the purpose of revision 6 of this ALERT SERVICE BULLETIN is
to reinforce the monitoring critera of the double bearing.
1.D. DESCRIPTION
The purpose of this ALERT SERVICE BULLETIN is to periodically replace the double bearing of the TGB
control rod.
1.E. COMPLIANCE
1.E.1. Compliance at H/C manufacturer level
Not applicable.
1.E.2. Compliance in service
1.E.2.a. Helicopters/installed equipment or parts:
NOTE 2
A flow chart which describes the maintenance operations
required by this ALERT SERVICE BULLETIN is also available
in Appendix 4.A.
1.E.2.a.1. Check of the TGB oil level
- Comply with paragraph 3.B.1. during each flight-related check (15 hours or 7 days).
1.E.2.a.2. Check of the TGB manual magnetic plug or magnetic plug with electrical indicating
- Check if there are particles at the TGB magnetic plug as per AMM Task 12-20-00-211 and comply with
paragraph 3.B.2. after each last flight of the day, pending the next replacement of the double
bearing following the issue of Revision 0 of this ALERT SERVICE BULLETIN on May 4, 2016.
- Then, after replacement of the double bearing:
. For double bearings with less than 250 FH:
.. Comply with the flow chart as per paragraph 3.B.2. within 10 FH from receipt of revision 6 of this
ALERT SERVICE BULLETIN issued on the date indicated in the page footer without exceeding
20 FH since the last inspection of the TGB chip detector
. For double bearings with 250 FH or more:
.. Comply with the flow chart as per paragraph 3.B.2. without exceeding 10 FH since the last
inspection of the TGB chip detector
Then,
- Comply with the flow chart as per paragraph 3.B.2. at intervals that do not exceed 10 FH.
Revision 0 2016-05-04  Page 4/23
Revision 6 2021-06-14  This document is available on the internet: www.airbushelicopters.com/techpub/

### Page 5 (OCR)

AIRBUS  HELICOPTERS
No. EC155-04A014
1.E.2.a.3. For all TGBS
- For all helicopters which comply with Revision 0 or 1 of this ALERT SERVICE BULLETIN:
. check for the MOD 07 65B56 or 07 65B58 indication on the TGB Log Card (FM):
- if one of these MODs is indicated, leave as is,
- if neither of these MODs is indicated, comply with EC155 Service Bulletin No. 65-006.
- For helicopters which do not comply with Revision 0 or 1 of this ALERT SERVICE BULLETIN:
CAUTION
WE REMIND YOU THAT IT IS MANDATORY TO
COMPLY  WITH  THE  INSTALLATION
INSTRUCTIONS AND TO USE THE SPECIFIC
TOOLS  FOR  THE  DOUBLE  BEARING
REPLACEMENT.
CAUTION
WHEN REPLACING  THE DOUBLE BEARING,
ENSURE THAT EMBODIMENT OF MOD 0765B56
OR 0765B58 HAS BEEN RECORDED ON THE TGB
LOG CARD (FM).
a) For PRE MOD 07 65B57 double bearings of the control shaft/rod assembly
NOTE 3
MOD 07 65B57 consists in introducing a new double bearing
(MP/N 704A33-651-245 or 704A33-651-246 depending on
the manufacturer).
This new double bearing:
- has an optimized design which favors the evacuation of
- has a reinforced structure,
- is interchangeable with a PRE MOD 07 65B57 double
bearing (MP/N 704A33-651-093 or 704A33-651-104
depending on the manufacturer).
1) For new double bearings or double bearings which have logged less than 335 flying hours
. At the latest when 350 flying hours are reached, replace the PRE MOD 07 65B57 double
bearing with a POST MOD 07 65B57 double bearing as per EC155
Service Bulletin No. 65-007:
.. When replacing the bearing, comply with paragraph 2.D.
. Then comply with paragraph 1.E.2.a.3.b)1).
Revision 0 2016-05-04  Page 5/23
Revision 6 2021-06-14  This document is available on the internet: www.airbushelicopters.com/techpub/

### Page 6 (OCR)

AIRBUS  HELICOPTERS
No. EC155-04A014
2) For double bearings which have logged 335 or more flying hours
• Replace the PRE MOD 07 65B57 double bearing with a POST MOD 07 65B57 double bearing
as per EC155 Service Bulletin No. 65-007 within 110 flying hours following receipt of this
ALERT SERVICE BULLETIN Revision 0, issued on the date indicated at the bottom of the
page:
..Pending the replacement of the double bearing, comply with paragraph 3.B.3. within
15 flying hours following receipt of this ALERT SERVICE BULLETIN Revision 0, issued on the
date indicated at the bottom of the page,
Then,
.. Comply with paragraph 3.B.3. every 55 flying hours maximum until the double bearing is
replaced.
.. When replacing the bearing, comply with paragraph 2.D.
. Then comply with paragraph 1.E.2.a.3.b)1).
b) For POST MOD 07 65B57 double bearings of the control shaft/rod assembly
NOTE 4
MOD 07 65B57 consists in introducing a new double bearing
(MP/N 704A33-651-245 or 704A33-651-246 depending on
the manufacturer).
This new double bearing:
- has an optimized design which favors the evacuation of
particles,
- has a reinforced structure,
- is interchangeable with a PRE MOD 07 65B57 double
(MP/N 704A33-651-093 or 704A33-651-104
depending on the manufacturer).
1) For new double bearings or double bearings which have logged less than 485 flying hours
• At the latest when 500 flying hours are reached, replace the double bearing as per Aircraft
Maintenance Manual (AMM) Task 65-20-01-961.
.. When replacing the bearing, comply with paragraph 2.D.
. Then, replace the double bearing every 500 flying hours as per AMM Task 65-20-01-961.
2) For double bearings which have logged more than 485 flying hours
• Replace the double bearing within 110 flying hours following receipt of this
ALERT SERVICE BULLETIN Revision 0, issued on the date indicated at the bottom of the
page:
..Pending the replacement of the double bearing, comply only once with paragraph 3.B.3.
within 15 flying hours following receipt of this ALERT SERVICE BULLETIN Revision 0, issued
on the date indicated at the bottom of the page,
.. When replacing the bearing, comply with paragraph 2.D.
. Then, replace the double bearing every 500 flying hours as per AMM Task 65-20-01-961.
1.E.2.a.4. Helicopters equipped with a TGB PRE MOD 07 65B63 will be unfit for flight from January 01, 2025.
Revision 0 2016-05-04  Page 6/23
Revision 6 2021-06-14  This document is available on the internet: www.airbushelicopters.com/techpubl

### Page 7 (OCR)

AIRBUS  HELICOPTERS
No. EC155-04A014
1.E.2.b. Non-installed equipment or parts:
CAUTION
WHEN REPLACING THE DOUBLE BEARING,
ENSURE THAT EMBODIMENT OF MOD 0765B56
OR 0765B58 HAS BEEN RECORDED ON THE
TGB LOG CARD (FM).
- It is prohibited to install PRE MOD 07 65B57 double bearings on TGBs from receipt of this
ALERT SERVICE BULLETIN issued on the date indicated at the bottom of the page.
- On TGBs equipped with a PRE MOD 07 65B57 double bearing:
Before installation on the helicopter, replace the control rod double bearing with a POST MOD 07 65B57
double bearing as per EC155 Service Bulletin No. 65-007.
- On TGBs equipped with a POST MOD 07 65B57 double bearing:
Comply with the instructions given in paragraph 1.E.2.a.3.b)
- Do not install TGB PRE MOD 07 07 65B63 after January 01, 2025.
1.F. APPROVAL
Approval of modifications:
The information or instructions related to modification 07 65B57 were approved on April 18, 2012 by the
EASA for helicopters of civil versions subject to an Airworthiness Certificate.
Approval of this document:
The technical information contained in this ALERT SERVICE BULLETIN Revision 0 was approved
on May 04, 2016 under the authority of EASA Design Organization Approval No. 21J.056 for helicopters of
civil versions subject to an Airworthiness Certificate.
The technical information contained in this ALERT SERVICE BULLETIN Revision 1 was approved
on June 03, 2016 under the authority of EASA Design Organization Approval No. 21J.056 for helicopters of
civil versions subject to an Airworthiness Certificate.
The technical information contained in this ALERT SERVICE BULLETIN Revision 2 was approved
on October 28, 2016 under the authority of EASA Design Organization Approval No. 21J.700 for helicopters
of civil versions subject to an Airworthiness Certificate.
The technical information contained in this ALERT SERVICE BULLETIN Revision 3 was approved
on July 19, 2017 under the authority of EASA Design Organization Approval No. 21J.700 for civil version
helicopters subject to an Airworthiness Certificate.
The technical information contained in this ALERT SERVICE BULLETIN Revision 4 was approved
on December 10, 2019 under the authority of EASA Design Organization Approval No. 21J.700 for civil
version helicopters subject to an Airworthiness Certificate.
The technical information contained in this ALERT SERVICE BULLETIN Revision 5 was approved
on March 24, 2020 under the authority of EASA Design Organization Approval No. 21J.700 for civil version
helicopters subject to an Airworthiness Certificate.
Revision 0 2016-05-04  Page 7/23
Revision 6 2021-06-14  This document is available on the internet: www.airbushelicopters.com/techpubl

### Page 8 (OCR)

AIRBUS  HELICOPTERS
No. EC155-04A014
The technical information contained in this ALERT SERVICE BULLETIN Revision 6 was approved
on June 09, 2021 under the authority of EASA Design Organization Approval No. 21J.700 for civil version
helicopters subject to an Airworthiness Certificate.
1.G. MANPOWER
For compliance with this Service Bulletin, Airbus Helicopters recommends the following staff qualifications:
Qualification:
- 1 Mechanical Engineering Technician
Or
- 1 Pilot with the appropriate training and certification for compliance with paragraph 3.B.1.
For compliance with paragraphs 3.B.2. and 3.B.3., the mechanical engineering technician qualification is
mandatory.
The Estimated Man-hours are indicated for reference purposes only and based on a standard helicopter
configuration.
Estimated Man-hours:
For compliance with paragraph 3.B.1.: approximately 30 minutes.
For compliance with paragraph 3.B.2.: approximately 1 hour (excluding metallurgical analysis).
For compliance with paragraph 3.B.3.: approximately 8 hours.
Approximately 2 days to replace the double bearing.
Estimated helicopter downtime:
Helicopter downtime is estimated at 2 days.
1.H. WEIGHT AND BALANCE
Not applicable.
1.l. POWER CONSUMPTION
Not applicable.
1.J. SOFTWARE UPGRADES/UPDATES
Not applicable.
Revision 0 2016-05-04  Page 8/23
Revision 6 2021-06-14  This document is available on the internet: www.airbushelicopters.com/techpub/

### Page 9 (OCR)

AIRBUS  HELICOPTERS
No. EC155-04A014
1.K. REFERENCES
Aircraft Maintenance Manual (AMM) Tasks:
05-50-01-211 - 12-20-00-211 - 65-20-01-061 - 65-20-01-066 - 65-20-01-611 - 65-20-01-961
Standard Practices Manual (MTC) Work Cards:
20-04-01-102 - 20-08-01-601
EC155 Service Bulletin No. 65-006
EC155 Service Bulletin No. 65-007
Information Notice (IN):
3481-1-00: The Marketplace: an AirbusWorld Ordering service
3643-1-00: Introduction of the digital Service Bulletin reporting R-Tex
1.L. OTHER AFFECTED PUBLICATIONS
Not applicable.
1.M. PART INTERCHANGEABILITY OR MIXABILITY
Not applicable.
Revision 0 2016-05-04  Page 9/23
Revision 6 2021-06-14  This document is available on the internet: www.airbushelicopters.com/techpub/

### Page 10 (OCR)

AIRBUS  HELICOPTERS
No. EC155-04A014
2. EQUIPMENT OR PARTS INFORMATION
2.A. EQUIPMENT OR PARTS: PRICE - AVAILABILITY - PROCUREMENT
The bearings will be supplied free of charge by the Airbus Helicopters Programs Department.
Specify the helicopter serial number when placing your order.
For any information concerning the kits or components or for assistance, contact the Airbus Helicopters
Network Sales & Customer Relations Department.
Order as required from:
Airbus Helicopters
Etablissement de Marignane
Direction Ventes et Relations Client
13725 MARIGNANE CEDEX
FRANCE
NOTE 1
On the purchase order, please specify the mode of
transport, the destination and the serial numbers of the
helicopters to be modified.
NOTE 2
For ALERT SERVICE BULLETINS, order by:
Telex: HELICOP 410 969F
Fax: +33 (0)4.42.85.99.96.
2.B. LOGISTIC INFORMATION
For any information concerning modification kits and/or components or for assistance, contact the
Airbus Helicopters Network Sales and Customer Relations Department.
Revision 0 2016-05-04  Page 10/23
Revision 6 2021-06-14  This document is available on the internet: www.airbushelicopters.com/techpub/

### Page 11 (OCR)

AIRBUS  HELICOPTERS
No. EC155-04A014
2.C. EQUIPMENT OR PARTS REQUIRED PER HELICOPTER/COMPONENT
Kits or components to be ordered for one helicopter or one assembly:
Former
Designation  Qty  New P/N  Item
P/N  →  Instruction
Double bearing
((FAG) POST  704A33-651-245  1  To be replaced
MOD 07 65B57)
Or
Double bearing
((SNR) POST  704A33-651-246  To be replaced
MOD 07 65B57)
Consumables to be ordered separately:
Refer to the Work Cards and Tasks specified in this ALERT SERVICE BULLETIN and the list below:
Designation  Qty  Consumable P/N  Item
WHITE SPIRIT  A/R  Off the shelf  2
You can order the consumables from the AirbusWorld Marketplace through e-ordering
(IN No. 3481-1-00).
If you cannot get access to e-ordering, please contact your Logistic Focal Point.
2.D. EQUIPMENT OR PARTS TO BE RETURNED
- Return the bearing monitoring sheet given in APPENDIX 4.B. to the Airbus Helicopters Technical Support:
Fax:  +33 (0)4.42.85.99.66
E-mail: support.technical-dyncomp.ah@airbus.com or TechnicalSupport.Helicopters@airbus.com)
- In accordance with the flow chart below, return the double bearing to the Airbus Helicopters Technical
Support at the following address:
Airbus Helicopters
Aéroport Marseille Provence
RETEX Factory - roulement double de BTA
MAH09MGA2 - B1 - LES BORIES
SOUS SOL - ARRIVEE
13725 Marignane CEDEX
FRANCE
NOTE 3
The expenses for the return of the bearing to Airbus
Helicopters  are  supported by Airbus Helicopters.
Revision 0 2016-05-04  Page 11/23
Revision 6 2021-06-14  This document is available on the internet: www.airbushelicopters.com/techpub/

### Page 12 (OCR)

AIRBUS  HELICOPTERS
No. EC155-04A014
Bearing
removal
PRE MOD  POST MOD
07 65B57  07 65B57
bearing  bearing
P/N: 704A33651.104  P/N: 704A33651.246
P/N: 704A33651.093  P/N: 704A33651.245
Correct  Presence of play  TSN ≤ 500 FH  TSN > 500 FH
condition  and/or particles
Correct  Presence of play
condition  and/or particles
Send the  Send the  Send the  Send the  Send the
monitoring sheet  monitoring sheet  monitoring sheet  monitoring sheet  monitoring sheet
given in  given in  given in  given in  given in
APPENDIX 4.B.  APPENDIX 4.B.  APPENDIX 4.B.  APPENDIX 4.B.  APPENDIX 4.B.
+ scrap the  + send the  + scrap the  + send the  + scrap the
bearing  bearing to  bearing  bearing to  bearing
Airbus  Airbus
Helicopters  Helicopters
Flow chart for the bearing return process
Revision 0 2016-05-04  Page 12/23
Revision 6 2021-06-14  This document is available on the internet: www.airbushelicopters.com/techpub/

### Page 13 (OCR)

AIRBUS  HELICOPTERS
No. EC155-04A014
3. ACCOMPLISHMENT INSTRUCTIONS
3.А. GENERAL
Not applicable.
3.B. WORK STEPS
3.B.1. Checking the TGB oil level
- Make sure that the TGB oil level is at the "max" level,
Otherwise,
• Top up the TGB oil level to the "max" level before resuming flights, as per AMM Task 65-20-01-611.
3.B.2. Checking the TGB manual magnetic plug or magnetic plug with electrical indicating
CAUTION
IN THE FLOW CHART, THE ABRASION PARTICLES
(CLASS g AS PER MTC) MUST BE TAKEN INTO
ACCOUNT IN ADDITION TO THE PARTICLE TYPES
USUALLY TAKEN INTO ACCOUNT.
abrasion
Figure 1: Example of abrasion on the magnetic plug
Revision 0 2016-05-04  Page 13/23
Revision 6 2021-06-14  This document is available on the internet: www.airbushelicopters.com/techpub/

### Page 14 (OCR)

AIRBUS  HELICOPTERS
No. EC155-04A014
Check the TGB magnetic
plug as per  AMM Task 12-20-00-211.  Presence of  particles?  No  Resume flights
Reminder: complete the "PARTICLE
DETECTION" follow-up sheet as per
Work Card 20-08-01-601 (MTC).
CAUTION
In this special case, abrasion-type particles
(class g as per MTC) must be taken into
account.
Yes
Comply with § F.2.a/b/c of Task 05-50-01-211 (AMM).
Characterize particle(s) as per Work Card 20-08-01-601 (MTC).
** If the collected particles are not clearly
characterized, perform a metallurgical analysis
and contact Airbus Helicopters
(support.technical-dyncomp.ah@airbus.com or
TechnicalSupport.Helicopters@airbus.com)  Is a module removal  Yes  Remove the TGB in
before resuming flights.  criterion reached as per  accordance with technical
20-08-01-601 (MTC)?  publications
Other names for material M50:
AMS6490
80DCV40  No
Are there abrasion (as per
Comply with  example in
Work Card 20-08-01-601 (MTC)  Figure 1)/scale/chip/splinter
procedures provided in  SIN No. 3095-S-63.*  No  lockwire, swarf, various non-  different from cotter pins,  type particles or particles
metallic debris ?**
res
Revision 0 2016-05-04  Page 14/23
Revision 6  2021-06-14  This document is available on the internet: www.airbushelicopters.com/techpub/

### Page 15 (OCR)

AIRBUS  HELICOPTERS
No. EC155-04A014
≤ 25 flying hours  What is the TSN (Time  > 25 flying hours
Since New) of the
double bearing?
Continue flights without exceeding a  Stop flights and carry out one of
25 FH TSN, then carry out one of the  the following inspections.
following inspections.
or
Perform a metallurgical
analysis of all the particles  Comply with paragraph
collected since the  З.В.3.
installation of the bearing
YES  Presence of  M50***  NO  NO  Presence of  play or  YES
particles ?  particles?
Resume flights with close monitoring as per
Work Card 05-50-00-211 (AMM) and comply with
paragraph 3.B.2. for the collected particles.
- Replace double bearing (d) (Figure 2) with a
double bearing (1) as per
Work Card 65-20-01-961 (AMM).
- Inform Airbus Helicopters using the contact
details given in NOTE 1 below.
* Other designations for material M50:
- AMS6490
80DCV40
NOTE 1
Airbus Helicopters Technical Support Department:
Fax: + 33(0)4.42.85.99.66
E-mail:  support.technical-dyncomp.ah@airbus.com  or
TechnicalSupport.Helicopters@airbus.com)
Keycopter: Technical Request Management
Revision 0 2016-05-04  Page 15/23
Revision 6 2021-06-14  This document is available on the internet: www.airbushelicopters.com/techpub/

### Page 16 (OCR)

AIRBUS  HELICOPTERS
No. EC155-04A014
3.B.3. Checking the play in the double bearing of the TGB control shaft/rod assembly (Figure 2)
- Remove the control shaft/rod assembly as per paragraph 3.B.4.a.
- Carry out a tactile check to ensure that there is no axial play in double bearing (d) (Figure 1):
• Apply an alternating manual axial load to control rod (c) whilst turning control shaft (b) (See DETAIL A
Figure 2).
З.В.З.а.  If no play is felt:
- Clean the control shaft/rod assembly using WHITE SPIRIT (2) as per Work Card 20-04-01-102 (MTC):
1) Inject WHITE SPIRIT (2) under pressure (for example using a can) into hole (a) of control shaft (b).
(See DETAIL B Figure 2).
. Hold shaft (b) in the vertical position pointing upwards.
• Manually turn control rod (c) several times to rinse double bearing (d) by draining the WHITE
SPIRIT (2) through the bearing. (See Detail B Figure 2).
. Collect the WHITE SPIRIT (2) on absorbent paper (e.g.: blotting paper):
- Pass a magnet over the absorbent paper to collect the magnetic particles.
2) Insert WHITE SPIRIT (2) (for example using a can) in the area of the control shaft (b) that must be
cleaned. (See DETAIL C Figure 2).
. Manually turn the control rod (c) several times to wash the double bearing (d) by draining the
WHITE SPIRIT (2).
. Collect the WHITE SPIRIT (2) on an absorbent paper (e.g. blotting paper):
- Pass a magnet over the absorbent paper to collect the magnetic particles.
NOTE 2
Make sure that the area pointed out in DETAIL C Figure 2 is
clean.
3) Repeat operation No. 1).
NOTE 3
As double bearing (d) is "pre-stressed" by definition, friction
points can be felt when turning double bearing (d): they are
not critical.
Revision 0 2016-05-04  Page 16/23
Revision 6 2021-06-14  This document is available on the internet: www.airbushelicopters.com/techpub/

### Page 17 (OCR)

AIRBUS  HELICOPTERS
No. EC155-04A014
If there are no magnetic particles or magnetic abrasion dust:
- Install the control shaft/rod assembly as per paragraph 3.B.4.b.
If there are magnetic particles or magnetic abrasion dust:
• Replace double bearing (d) with a double bearing (1) as per AMM Task 65-20-01-961.
. Install the control shaft/rod assembly as per paragraph 3.B.4.b.
• Inform the Airbus Helicopters Customer Service Technical Support Department in
accordance with paragraph 2.B.
. Comply with paragraph 2.D.
3.B.3.b. 1 play is felt:
- Replace double bearing (d) (Figure 2) with a double bearing (1) as per AMM Task 65-20-01-961.
- Install the control shaft/rod assembly as per paragraph 3.B.4.b.:
• Inform the Airbus Helicopters Customer Service Technical Support Department in accordance
with paragraph 2.B.
. Comply with paragraph 2.D.
3.B.4. Removal / Installation of the TGB control shaft/rod assembly
3.B.4.a. Removal of the TGB control shaft/rod assembly
CAUTION
BEFORE PERFORMING ANY OPERATION ON THE
TAIL ROTOR HUB (TRH) ASSEMBLY, LOCK THE
DRIVE SYSTEM WITH THE ROTOR BRAKE.
Remove the TGB control shaft/rod assembly as per AMM Task 65-20-01-066.
NOTE 4
AMM Task 65-20-01-066 refers to the procedure for
removing (if necessary) the double bearing as per
AMM Task 65-20-01-961. Only remove the double bearing it
there are doubts concerning its integrity.
NOTE 5
AMM Task 65-20-01-066 describes the procedure for
checking  the pitch-change spider  interchangeability
dimension. Reminder: this procedure is only required if the
pitch-change spider is replaced.
Revision 0 2016-05-04  Page 17/23
Revision 6 2021-06-14  This document is available on the internet: www.airbushelicopters.com/techpub/

### Page 18 (OCR)

AIRBUS  HELICOPTERS
No. EC155-04A014
3.B.4.b. Installation of the TGB control shaft/rod assembly
CAUTION
PARTICULAR CARE MUST BE TAKEN WHEN
CLEANING AND INSTALLING PARTS IN ORDER TO
PREVENT CREATING ANY CONTAMINATION.
- Check that there are no particles in the TGB cover lubrication hole.
- Install the TGB control shaft/rod assembly as per AMM Task 65-20-01-066.
3.C. RECORD OF COMPLIANCE
Compliance with this document:
- Record first compliance with paragraph 3.B.1. of this ALERT SERVICE BULLETIN in the helicopter
documents.
- Record first compliance with paragraph 3.B.2. of this ALERT SERVICE BULLETIN on the
TGB Log Card (FM).
- If necessary, record first compliance with paragraph 3.B.3. of this ALERT SERVICE BULLETIN on the
TGB Log Card (FM).
Tracking of modifications in the documentation:
- When replacing the PRE MOD 07 65B57 double bearing with a POST MOD 07 65B57 double bearing,
record the embodiment of MOD 07 65B57 on the TGB Log Card (FM).
- Record compliance with this ALERT SERVICE BULLETIN (see IN 3643-I-00 for instructions):
QR Code or hypertext link
NOTE 6
The  recording  compliance  with
ALERT SERVICE BULLETINS in the R-Tex tool does not
replace the recording in the helicopter documents.
ASB EC155-04A014
3.D. OPERATING AND MAINTENANCE INSTRUCTIONS
Not applicable.
Revision 0 2016-05-04  Page 18/23
Revision 6 2021-06-14  This document is available on the internet: www.airbushelicopters.com/techpub/

### Page 19 (OCR)

AIRBUS  HELICOPTERS
No. EC155-04A014
DETAIL B
b
DETAIL A  DETAIL C
Area to be cleaned
Return to paragraph 3.B.3.
Figure 2
Revision 0  2016-05-04  Page 19/23
Revision 6  2021-06-14  This document is available on the internet: www.airbushelicopters.com/techpub/

### Page 20 (OCR)

AIRBUS  HELICOPTERS
No. EC155-04A014
PAGE LEFT BLANK INTENTIONALLY
Revision 0 2016-05-04  Page 20/23
Revision 6 2021-06-14  This document is available on the internet: www.airbushelicopters.com/techpub/

### Page 21 (OCR)

AIRBUS  HELICOPTERS
No. EC155-04A014
4. APPENDIX
4.A. Process for compliance with paragraph 1.E.2.a.
If the TGB is PRE MOD 07 65B63
Maintain the TGB oil level at its  Bearing replacement  Check of the magnetic plug (paragraph 3.B.2.)
maximum (paragraph 3.B.1.)  Pending next double bearing replacement,
check (15 hours or 7 days)  during each flight-related  during ALF.
After bearing replacement : every 10 FH
If the control rod bearing is  If the control rod bearing is
PRE MOD 07 65B57  POST MOD 07 65B57
For new bearings or bearings  For bearings which have
For new bearings or bearings  which have logged less than  logged more than 335 FH  For bearings which have  which have logged less than  485 FH  logged more than 485 FH
335 FH
At the latest when 350 FH are  Within 110 FH following  At the latest when 500 FH  Within 110 FH following receipt of
reached, replace the PRE MOD  receipt of ASB Rev. 0, replace  are reached, replace the  ALERT SERVICE BULLETIN Rev. 0,
07 65B57 bearing with a POST  the PRE MOD 07 65B57  bearing with a POST MOD  replace the bearing with a POST MOD
MOD 07 65B57 bearing.  bearing with a POST MOD  07 65B57 bearing  07 65B57 bearing.
07 65B57 bearing.
Then replace the POST MOD  Then replace the bearing  Then replace the bearing every
bearing every 500 FH.  Then replace the POST MOD  bearing every 500 FH.  every 500 FH.  500 FH.
endind the bearin  thin ns rep folowint
Pending the bearing replacement:
Within 15 FH following receipt of  ALERT SERVICE BULLETIN Rev. 0,  perform a bearing play inspection with  disassembly (paragraph 3.B.3.)  Every 55FH since latest inspection,  SERVICE BULLETIN  receipt of ALERT  play inspection with  Rev. 0, perform a bearing  disassembly (paragraph
perform a bearing play inspection with  3.B.3.)
disassembly.
Revision 0  2016-05-04  Page 21/23
Revision 6  2021-06-14  This document is available on the internet: www.airbushelicopters.com/techpub/

### Page 22 (OCR)

AIRBUS  HELICOPTERS
No. EC155-04A014
PAGE LEFT BLANK INTENTIONALLY
Revision 0 2016-05-04  Page 22/23
Revision 6 2021-06-14  This document is available on the internet: www.airbushelicopters.com/techpub/

### Page 23 (OCR)

AIRBUS  HELICOPTERS
No. EC155-04A014
4.B. Bearing behavior monitoring sheet to be filled in and returned
Behavior monitoring sheet
P/N:
S/N:
Date of removal:
Version:
Customer:  TSN /TSO:  P/N:
TGB control rod
Helicopter  S/N:  TGB
Oil brand:  bearing  S/N:
Type of mission:  Oil reference:
Flying hours:
Please enclose the TGB Log
Card.
Condition of the bearing  Decision
Correct condition:  Presence of axial play:  Presence of particles:  Bearing to be sent to AH
Yes / No  Yes • / No •  Yes• / No •  Yes / No D
Revision 0 2016-05-04  Page 23/23
Revision 6 2021-06-14  This document is available on the internet: www.airbushelicopters.com/techpub/

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
