# Airbus Helicopters Alert Service Bulletin EC155-05A027

Copy: Revision 1 ("Airbus ASB No EC155-05A027 Rev 1"), 19 pages: PDF https://openairdocs.org/files/sha256/5c/26/5c2680b2b2aba43ecbead8a15b6b97ed0718da33f6692f910854605e0667eb01; text https://openairdocs.org/service-documents/airbus-helicopters/ec155-05a027/file/5c2680b2b2ab.md. Rights: © Airbus Helicopters. Filed by the FAA in regulations.gov docket FAA-2015-1570; AD 2015-10-05 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Airbus Helicopters](https://openairdocs.org/service-documents/airbus-helicopters.md)
- Type: Service bulletin (Alert Service Bulletin)
- Number: EC155-05A027
- Latest revision known: EC155-05A027, Revision 1, dated September 1, 2014 (OpenAirDocs)
- Page: https://openairdocs.org/service-documents/airbus-helicopters/ec155-05a027

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2015-10-05](https://openairdocs.org/ad/2015-10-05.md), effective Jun 5, 2015: Revision 1

## Text (19 pages)

Rights: © Airbus Helicopters. Filed by the FAA in regulations.gov docket FAA-2015-1570; AD 2015-10-05 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. This text is OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1 (OCR)

AIRBUS
HELICOPTERS  ASB No. EC155-05A027
Civil version: B, B1
ALERT SERVICE BULLETIN
SUBJECT: TIME LIMITS - MAINTENANCE CHECKS - External life rafts installed in the
footsteps
Check of the deployment system of the external life rafts located in the
footsteps
ATA 25
For the attention of
Revision No.  Date of issue
Revision 0  2014-06-12
Revision 1  2014-09-01
Summary:
Check for corrosion and measurement of the operational clearance in the junction units of the external life raft
installation in the footstep.
Reason for last Revision:
Revision 1 of this ALERT SERVICE BULLETIN consists in adding:
- modifications to the junction unit illustrations.
- details concerning compliance with AMM Task 25-69-01-721.
Compliance:
Airbus Helicopters renders compliance with this ALERT SERVICE BULLETIN mandatory, except for
paragraph 3.D.
Revision 0 2014-06-12  Page 1/19
Revision 1 2014-09-01  This document is available on the internet: www.airbushelicopters.com/techpub

### Page 2 (OCR)

AIRBUS
HELICOPTERS  ASB No. EC155-05A027
1. PLANNING INFORMATION
1.A. EFFECTIVITY
1.A.1. Helicopters/installed equipment
Helicopters equipped with external life rafts in the footsteps, with junction units
with Part Number (MP/N) 200188 (P/N 704A341302.30).
1.A.2. Non-installed equipment
On junction units with Part Number (MP/N) 200188 (P/N 704A341302.30).
1.B. ASSOCIATED REQUIREMENTS
Not applicable.
1.C. REASON
On an AS365 helicopter, during the maintenance operation scheduled at 600 flying hours or 24 months on
the external life rafts located in the footstep, the life raft deployment test carried out by the operator by pulling
the LH internal deployment handle did not function correctly.
Investigations revealed the presence of corrosion inside the LH junction unit MP/N 200197. The deployment
handle was blocked due to this corrosion.
Corrosion
Some EC155 version B and B1 helicopters are equipped with similar junction units with Part Number
(MP/N) 200188.
Consequently, pending a definitive solution and in order to prevent any risk of blockage in the external life
raft deployment control system, Airbus Helicopters makes compliance with the instructions of this ALERT
SERVICE BULLETIN mandatory, except for paragraph 3.D.
Revision 1 does not affect compliance with Revision 0 of this ALERT SERVICE BULLETIN
Revision 0 2014-06-12  Page 2/19
Revision 1 2014-09-01  This document is available on the internet: www.airbushelicopters.com/techpub

### Page 3 (OCR)

AIRBUS
HELICOPTERS  ASB No. EC155-05A027
1.D. DESCRIPTION
Compliance with this ALERT SERVICE BULLETIN Revision 0 consisted in:
- Checking that the drainage hole blank, located on the RH and LH junction units of the external life raft
installation, is correctly positioned
- Measuring the operational clearance between the junction unit pulleys and cover.
- Checking that there is no corrosion inside the junction units.
- If necessary, removing the corrosion from the cover surface and/or pulleys of the junction unit(s).
This ALERT SERVICE BULLETIN Revision 1 consists in:
- Adding modifications to the illustrations of the junction unit, in order to comply with its dimensions and
- Specifying the acceptable tensile loads during compliance with AMM Task 25-69-01-721, by adding
paragraph 4.B. and modifying the flow chart in paragraph 1.E.2.
- Modifying part of the wording in paragraph 1.E.2.
- Limiting compliance with this ALERT SERVICE BULLETIN required in the flow chart to paragraphs 3.A. and
1.E. COMPLIANCE
1.E.1. Compliance at the works
Helicopters/installed equipment:
Not applicable.
Non-installed equipment:
Before delivery, comply with paragraph 3.B.6. on the junction units specified in paragraph 1.A.2.
Revision 0 2014-06-12  Page 3/19
Revision 1 2014-09-01  This document is available on the internet: www.airbushelicopters.com/techpub

### Page 4 (OCR)

AIRBUS
HELICOPTERS  ASB No. EC155-05A027
1.E.2. Compliance in service
The work on the helicopter is to be performed by the operator.
Helicopters/installed equipment:
- Comply with this ALERT SERVICE BULLETIN within the time limits defined in the flowchart below:
Time limits for compliance
with this ALERT SERVICE
BULLETIN
Comply with AMM Task 25-69-01-721 before the next mission for which life rafts are needed following receipt
of this ALERT SERVICE BULLETIN Revision 1, issued on the date indicated at the bottom of the page.
YES  Are the tensile loads compliant  NO
with AMM Task  25-69-01-721
and paragraph 4.B. of this ASB?
Comply with paragraphs 3.A. and 3.B. of  Apply a maximum load of 29  DaN
this ALERT SERVICE BULLETIN within  (65.195 Ibf) to one of the two handles
110 flying hours following compliance  during  compliance  with  AMM
with AMM Task 25-69-01-721.  Task 25-69-01-721.
YES  NO
Did the snap wire break?
Comply with paragraphs 3.A. and 3.B
of this ALERT SERVICE BULLETIN  Comply with paragraphs 3.A. and
no later than within 15 days following  compliance  with  AMM  Task  3.B. of this ALERT SERVICE  BULLETIN before the  next
mission for which life rafts are
25-69-01-721.  needed
Fill in and return the list of the checked junction units (list given in the Appendix) within
1 month following compliance with paragraphs 3.A. and 3.B. of this ALERT SERVICE
BULLETIN Revision 1.
- If corrosion is found, send the list of checked junction units along with photos of
the corroded unit (before rework of the unit).
• Contact the Airbus Helicopters Technical Support Department:
Fax: + 33 (0)4.42.85.99.66.
E-mail: Support.Technical-Optionnal@airbus.com
END
Revision 0 2014-06-12  Page 4/19
Revision 1 2014-09-01  This document is available on the internet: www.airbushelicopters.com/techpub

### Page 5 (OCR)

AIRBUS
HELICOPTERS  ASB No. EC155-05A027
- For helicopters, regardless of whether or not they carry out missions for which life rafts are needed:
• In order to ensure that the operational clearance is checked and measured within a controlled calendar
time limit, Airbus Helicopters makes compliance with paragraph 3. of this ALERT SERVICE BULLETIN
mandatory, no later than within 3 months following receipt of this ALERT SERVICE BULLETIN, issued on
the date indicated at the bottom of the page.
Non-installed equipment:
At the latest before installation on the helicopter, comply with paragraph 3.B.6. on the junction units specified
in paragraph 1.A.2.
1.F. APPROVAL
Approval of modifications:
Not applicable.
Approval of this document:
The technical information contained in this ALERT SERVICE BULLETIN Revision O was approved
on June 11, 2014 under the authority of EASA Design Organization Approval No. 21J.056 for helicopters of
civil versions subject to an Airworthiness Certificate.
The technical information contained in this ALERT SERVICE BULLETIN Revision 1 was approved
on September 01, 2014 under the authority of EASA Design Organization Approval No. 21J.056 for
helicopters of civil versions subject to an Airworthiness Certificate.
1.G. MANPOWER
For compliance with this ALERT SERVICE BULLETIN, Airbus Helicopters recommends the following
personnel qualifications:
Qualification: 1 Mechanical Engineering Technician
The time for the operations is given for information purposes, for a standard configuration.
Time for the operations: 6 hours for 1 Mechanical Engineering Technician
1.H. WEIGHT AND BALANCE
Not applicable.
Revision 0 2014-06-12  Page 5/19
Revision 1 2014-09-01  This document is available on the internet: www.airbushelicopters.com/techpub

### Page 6 (OCR)

AIRBUS
HELICOPTERS  ASB No. EC155-05A027
1.I. EFFECT ON ELECTRICAL LOADS
Not applicable.
1.J. SOFTWARE MODIFICATION EMBODIMENT RECORD
Not applicable.
1.K. REFERENCES
The documents required for compliance with this ALERT SERVICE BULLETIN are as follows:
MTC: 20.02.01.418: General - Protection of electrical wiring during maintenance operations
MTC: 20.04.03.401: Corrosion inhibiting and removal procedures - General method for reconditioning
corroded metal surfaces
MTC: 20.04.04.403: Surface treatment before painting - Touch-up of protective treatment with Alodine 1200
MTC: 20.04.05.434: Paint and primer application procedure - Application of metal primer scheme P50
AMM: 25-69-01-063: External life raft installation - Removal/installation of life rafts
AMM: 25-69-01-061: Life raft - Removal/installation of the life raft deployment controls
AMM: 25-69-01-721: Life raft - Functional test of the life raft deployment control system
1.L. DOCUMENTS AFFECTED
Airbus Helicopters will modify the Aircraft Maintenance Manual (AMM) with respect to this ALERT SERVICE
BULLETIN
The affected document will be updated as part of a future revision.
1.M. INTERCHANGEABILITY OR MIXABILITY OF PARTS
Not applicable.
Revision 0 2014-06-12  Page 6/19
Revision 1 2014-09-01  This document is available on the internet: www.airbushelicopters.com/techpub

### Page 7 (OCR)

AIRBUS
HELICOPTERS  ASB No. EC155-05A027
2. MATERIAL INFORMATION
2.A. MATERIAL: PRICE - AVAILABILITY - PROCUREMENT
Price
For any information concerning the kits and/or components, contact the Airbus Helicopters Network Sales
and Customer Relations Department.
Availability
The kits and/or components will be delivered on customer's order.
Procurement conditions
Order the required quantity (unless otherwise specified)
from
Airbus Helicopters
Etablissement de Marignane
Direction Ventes et Relations Client (ECR)
13725 MARIGNANE CEDEX
France
NOTE 1
On the purchase order, please specify the mode of
transport, the destination and the serial numbers of the
helicopters to be modified.
NOTE 2
For ALERT SERVICE BULLETINS, order by:
Telex: HELICOP 410 969F
Fax: +33 (0)4.42.85.99.96
2.B. INFORMATION CONCERNING INDUSTRIAL SUPPORT
Not applicable.
2.C. MATERIAL REQUIRED FOR EACH HELICOPTER/COMPONENT
Components to be ordered for one helicopter or one assembly:
Former
Designation  Qty  New P/N  • Item
P/N  Instruction
To be returned as
Junction unit  1 or 2  200188  1
per paragraph 2.D.
Revision 0  2014-06-12  Page 7/19
Revision 1  2014-09-01  This document is available on the internet: www.airbushelicopters.com/techpub

### Page 8 (OCR)

AIRBUS
HELICOPTERS  ASB No. EC155-05A027
Products to be ordered separately:
Refer to the Work Cards and Tasks specified in this ALERT SERVICE BULLETIN and the list below:
Designation  Qty  Product P/N  Item
Protective product  DINOL AV 30  AR  CM 508  УУ
The products can be ordered separately from the INTERTURBINE AVIATION LOGISTICS company.
Website:  http://www.interturbine.com
Telephone:  +49.41.91.809.300
AOG:  +49.41.91.809.444
Specific tooling
Designation  Qty  Tool P/N or equivalent  Item
diameter 60 to 80mm  Internal micrometer,  Off the shelf  ZZ
2.D. MATERIAL TO BE RETURNED
Return the non-compliant junction units) to the following address:
Airbus Helicopters
Département EBSEEE
Bâtiment R6 Marseilleveyre
13725 MARIGNANE CEDEX - FRANCE
Revision 0 2014-06-12  Page 8/19
Revision 1 2014-09-01  This document is available on the internet: www.airbushelicopters.com/techpub

### Page 9 (OCR)

AIRBUS
HELICOPTERS  ASB No. EC155-05A027
3. ACCOMPLISHMENT INSTRUCTIONS
3.А. GENERAL
Read and comply with the protection rules for electrical wiring during maintenance operations as per MTC
Work Card 20.02.01.418.
3.B. OPERATIONAL PROCEDURE
The operational clearance measurements and the check for corrosion are only described for the LH junction
unit. Carry out the operational clearance measurements and the check for corrosion in the RH junction unit
by complying with the same operational procedure.
3.B.1. Preliminary steps
WARNING
HANDLE THE CONTAINER WITH CARE, TO
PREVENT  ACTIVATING THE CYLINDER
PERCUSSION AND TO PREVENT INJURY TO
PERSONNEL.
WARNING
BEFORE ANY WORK,  RIG THE FLIGHT
CONTROLS IN ORDER TO PREVENT INJURY TO
PERSONNEL AND MAKE SURE THAT THE
LOCKING PIP PIN FITTED WITH ITS PENNANT IS
PRESENT ON THE CYLINDER PERCUSSION
SYSTEM, IN ORDER TO PREVENT ACCIDENTAL
PERCUSSION.
- Remove and/or open all cowlings, panels, doors and equipment as required for access to the various work
zones.
- Disconnect the cylinder percussion system connection kit as per AMM Task 25-69-01-063.
Revision 0 2014-06-12  Page 9/19
Revision 1 2014-09-01  This document is available on the internet: www.airbushelicopters.com/techpub

### Page 10 (OCR)

AIRBUS
HELICOPTERS  ASB No. EC155-05A027
3.B.2. Check and measurement of the operational clearance of the junction unit
3.B.2.a. Check of the junction unit cover (Figures 1 and 2)
- Remove the screws (b) from the junction unit (f) (Figure 1).
- Remove the cover (a).
- Disconnect the deployment cables (c) and percussion cable (d) from the pulleys (e) located in the junction
unit (f) (Figure 1) as per AMM Task 25-69-01-061.
- Remove the junction unit (f) as per AMM Task 25-69-01-061.
- Make sure that the drainage hole located on the upper face of the junction unit cover (a) is blanked with a
cap (g) (Figure 2).
- Make sure that the drainage hole located on the lower face of the junction unit cover (a) is not blanked
(Figure 2).
NOTE
The blanking of the drainage holes depends on the position
of the junction unit on the helicopter (refer to Figure 2).
- Comply with paragraph 3.B.2.b.
3.B.2.b. Check of the condition of the junction unit cover and measurement of the operational clearance
(Figures 3 and 4)
- Make sure that there is no corrosion inside the cover (a) (Area A, Figure 3).
. If there is no corrosion:
- Measure and record the diameter (D1) of the cover using an internal micrometer (zz) (Figure 4).
- Comply with paragraph 3.B.2.c.
. If there is corrosion:
- Carry out and record measurements of the diameter of the cover using an internal micrometer (zz)
(Figure 4):
. Carry out an initial measurement (D1) on a non-corroded surface of the cover.
- If the measurement (D1) cannot be carried out (due to corrosion over the entire circumference
of the cover), comply with paragraph 3.B.3.
. Carry out a measurement (D2) on each corroded surface point of the cover.
- Comply with paragraph 3.B.2.c.
Revision 0 2014-06-12  Page 10/19
Revision 1 2014-09-01  This document is available on the internet: www.airbushelicopters.com/techpub

### Page 11 (OCR)

AIRBUS
HELICOPTERS  ASB No. EC155-05A027
3.B.2.c. Check of the condition of the junction unit pulleys and measurement of the operational clearance
(Figures 1 and 3)
- Make sure that there is no corrosion on the junction unit pulleys (Area B, Figure 3).
. If there is no corrosion:
- Measure and record the diameter (d1) (not shown) of the pulleys using a caliper gage.
- Interpret the results as per paragraph 3.B.2.d.
. If there is corrosion:
- Carry out and record measurements of the diameter of the pulleys using a caliper gage:
. Carry out an initial measurement (d1) (not shown) on a non-corroded surface
of the pulleys.
- If the measurement (d1) cannot be carried out (due to corrosion over the entire circumference
of the pulleys), comply with paragraph 3.B.3.
. Carry out a measurement (d2) (not shown) on each corroded surface point of the pulleys.
- Interpret the results as per paragraph 3.B.2.d.
3.B.2.d. Interpretation of the results
- Calculate the initial clearance (J) between the internal/external pulley and the cover of the junction unit:
• Initial clearance J = D1 - d1
. If (J) is greater than (Umax) (see Figure 4), comply with paragraph 3.B.3.
. If (J) is smaller than or equal to (Umax) (see Figure 4):
- If there are no corrosion marks on the junction unit cover and pulleys, comply with paragraph 3.B.4.
- If there is a corrosion mark on the junction unit cover:
. Calculate the depth of the rework (P1) to be carried out on the junction unit cover, for each
corrosion point:
- Depth of the rework P1 = D2 - D1
. If P1 is lower than 0, mechanically remove the corrosion from the surface as per MTC Work
Card 20.04.03.401 until P1 is higher than or equal to 0 on each reworked surface point.
. If P1 is higher than or equal to 0, record the P1 value for each reworked surface point.
Revision 0 2014-06-12  Page 11/19
Revision 1 2014-09-01  This document is available on the internet: www.airbushelicopters.com/techpub

### Page 12 (OCR)

AIRBUS
HELICOPTERS  ASB No. EC155-05A027
- If there is a corrosion mark on the junction unit pulley(s):
. Calculate the depth of the rework (P2) to be carried out on the junction unit pulley(s), for each
corrosion point:
- Depth of the rework P2 = d1 - d2
• If P2 is less than 0, mechanically remove the corrosion from the surface as per MTC Work
Card 20.04.03.401 until P2 is higher than or equal to 0 on each reworked surface point.
. If P2 is greater than or equal to 0, record the P2 value for each reworked surface point.
- Calculate the total clearance between the internal/external pulleys and the cover of the junction unit
for each reworked surface point:
• Total clearance = J + P1 +P2.
• If at least one of the two calculated total clearance values is greater than (max) (see Figure 4), comply
with paragraph 3.B.3.
• If all calculated total clearance values are less than or equal to (Umax) (see Figure 4), comply with
paragraph 3.B.4. on the junction unit (f).
3.B.3. Replacement of the junction unit
- Return the junction unit (f) as per paragraph 2.D.
- Order a new junction unit (1) as per paragraph 2.A
- Comply with paragraph 3.B.4. on the new junction unit (1).
3.B.4. Protection and installation of the junction unit (Figures 1 and 3)
- If the junction unit has been reworked as per 3.B.2.:
. Apply Alodine 1200 to each reworked surface point as per MTC Work Card 20.04.04.403.
- Apply metal primer scheme P50 to Areas A and B of the junction unit (Figure 3) as per MTC Work
Card 20.04.05.434.
- Apply Dinol AV 30 to Areas A and B of the junction unit (Figure 3) using a brush.
CAUTION
POSITION THE JUNCTION UNIT WITH THE
DOUBLE CONNECTION POINTING TOWARD
THE FRONT OF THE HELICOPTER.
- Install the junction unit as per AMM Task 25-69-01-061.
- Connect the deployment cables (c) and percussion cable (d) to the pulleys (e) located in the junction unit as
per AMM Task 25-69-01-061.
- Carry out a functional test of the life raft control system as per AMM Task 25-69-01-721.
- Install the cover (a) using the screws (b) of the junction unit,
then,
- tighten to torque as per Figure 1.
- Comply with paragraph 3.B.5.
Revision 0 2014-06-12  Page 12/19
Revision 1 2014-09-01  This document is available on the internet: www.airbushelicopters.com/techpub

### Page 13 (OCR)

AIRBUS
HELICOPTERS  ASB No. EC155-05A027
3.B.5. Final steps
CAUTION
REMOVE THE PIP PIN FROM THE PERCUSSION
SYSTEM CYLINDER AND THE RIGGING PINS
FROM THE FLIGHT CONTROLS.
- Connect the cylinder percussion system connection kit as per AMM Task 25-69-01-063.
- Install and/or close all cowlings, panels, doors and equipment removed and/or opened during the
preliminary steps (paragraph 3.B.1.).
3.B.6. Operational procedure on non-installed equipment
3.B.6.a. Measurement of the operational clearance between the junction unit cover and pulleys (Figures 1 and 4)
- Remove the screws (b) from the junction unit (f) (Figure 1).
- Remove the cover (a).
- Measure and record the diameter (D1) of the cover using an internal micrometer (zz) (Figure 4).
- Measure and record the diameter (d1) (not shown) of the pulleys using a caliper gage.
- Calculate the initial clearance (J) between the internal/external pulley and the cover of the junction unit:
• Initial clearance J = D1 - d1
- If (J) is greater than (Jmax) (see Figure 4):
• Transmit the Serial Number (S/N) of the checked junction unit to Airbus Helicopters:
Contact the Airbus Helicopters Technical Support Department:
Fax: +33 (0)4.42.85.99.66.
E-mail: Support. Technical-Optionnal@eurocopter.com
. Return the junction unit (f) as per paragraph 2.D.
- If (J) is less than or equal to (Jmax) (see Figure 4), comply with paragraph 3.B.6.b.
3.B.6.b. Protection of the junction unit (Figure 3)
- Apply Alodine 1200 to each reworked surface point as per MTC Work Card 20.04.04.403.
- Apply metal primer scheme P50 to Areas A and B of the junction unit (Figure 3)
as per MTC Work Card 20.04.05.434.
- Apply Dinol AV 30 (Vy) to Areas A and B of the junction unit (Figure 3) using a brush.
- Install the cover (a) using the screws (b) of the junction unit,
then,
- tighten to torque as per Figure 1.
- The junction unit can be installed.
Revision 0 2014-06-12  Page 13/19
Revision 1  2014-09-01  This document is available on the internet: www.airbushelicopters.com/techpub

### Page 14 (OCR)

AIRBUS
HELICOPTERS  ASB No. EC155-05A027
3.C. IDENTIFICATION
Identification of this document:
Record first compliance with this ALERT SERVICE BULLETIN, with the revision number, in the helicopter
documents.
3.D. OPERATING AND MAINTENANCE INSTRUCTIONS
Operating instructions:
Not applicable.
Maintenance instructions:
- Pending a definitive solution, comply with paragraphs 3.A. and 3.B. every 600 flying hours or 1 year
following first compliance with the instructions given in this ALERT SERVICE BULLETIN.
Then,
- fill in and return the list of checked junction units (list given in the Appendix) within 1 month following latest
compliance with this ALERT SERVICE BULLETIN.
- If corrosion is found, send the list of checked junction units along with photos of the corroded unit (before
rework of the unit).
. Contact the Airbus Helicopters Technical Support Department:
Fax: +33 (0)4.42.85.99.66.
E-mail: Support. Technical-Optionnal@airbus.com
The Aircraft Maintenance Manual (AMM) will incorporate these instructions as part of a future revision.
Refer to the AMM once these instructions are integrated.
Revision 0 2014-06-12  Page 14/19
Revision 1 2014-09-01  This document is available on the internet: www.airbushelicopters.com/techpub

### Page 15 (OCR)

AIRBUS
HELICOPTERS  ASB No. EC155-05A027
1x00 Lg
5 N.m
44.25 in.-Ib.
Figure 1: Removal/installation of the junction unit
Revision 0  2014-06-12  Page 15/19
Revision 1 2014-09-01  This document is available on the internet: www.airbushelicopters.com/techpub

### Page 16 (OCR)

AIRBUS
HELICOPTERS  ASB No. EC155-05A027
Junction unit cover located on the LH side of the helicopter, with blank (g) on
the upper drainage hole (h).
9
a
Junction unit cover located on the RH side of the helicopter, with blank (g) on
the upper drainage hole (i).
Figure 2: Drainage holes on the junction unit cover
Revision 0 2014-06-12  Page 16/19
Revision 1 2014-09-01  This document is available on the internet: www.airbushelicopters.com/techpub

### Page 17 (OCR)

AIRBUS
HELICOPTERS  ASB No. EC155-05A027
D = 61t0.2 mm (2.40t .0079 in)
Area A
Check of the junction unit cover  +0  -0.25  - .0098  +0
d = 60  mm (2.36  in)
Area B
Check of the junction unit pulleys
Figure 3: Check for corrosion
Revision 0 2014-06-12  Page 17/19
Revision 1 2014-09-01  This document is available on the internet: www.airbushelicopters.com/techpub

### Page 18 (OCR)

AIRBUS
HELICOPTERS  ASB No. EC155-05A027
+ Jmax = 0.75 mm (.029 in)
+ Jmax = 0.75 mm (.029 in)
Corroded surface
(cylindrical surface)
Non-corroded surface
(cylindrical surtace)
Initial measurement D1
Second measurement D2
Figure 4: Measurement of the clearance on the junction unit
Revision 0 2014-06-12  Page 18/19
Revision 1 2014-09-01  This document is available on the internet: www.airbushelicopters.com/techpub

### Page 19 (OCR)

AIRBUS
HELICOPTERS  ASB No. EC155-05A027
4. APPENDIX
_ 4.A. LIST OF CHECKED JUNCTION UNITS
Number of flying  Check of  Presence of  Flight for
Helicopter Serial  which life
Number (S/N)  hours logged by  the helicopter  junction unit  number  corrosion in the  junction unit*  rafts are  needed*
YES / NO  YES / NO
YES / NO  YES / NO
YES / NO  YES / NO
YES / NO  YES / NO
YES / NO  YES / NO
YES / NO  YES / NO
YES / NO  YES / NO
YES / NO  YES / NO
YES / NO  YES / NO
* Cross out as appropriate
4.B. ACCEPTABLE TENSILE LOADS
During compliance with AMM Task 25-69-01-721 on a junction unit MP/N 200188, a tensile load of
between 15 DaN (33.721 Ibf) and 20 DaN (44.961 Ibf) is acceptable.
Revision 0 2014-06-12  Page 19/19
Revision 1 2014-09-01  This document is available on the internet: www.airbushelicopters.com/techpub

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
