# Airbus Helicopters Alert Service Bulletin EC155-53A038

Copy: No revision named ("Airbus Helicopters ASB No. EC155-53A038 Rev 0"), 21 pages: PDF https://openairdocs.org/files/sha256/10/bf/10bf9a135ab72bc884453956515a19e412df5009c303a8ebab55a3e812f93c01; text https://openairdocs.org/service-documents/airbus-helicopters/ec155-53a038/file/10bf9a135ab7.md. Rights: © Airbus Helicopters. Filed by the FAA in regulations.gov docket FAA-2021-0717, the docket of AD 2021-18-06. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Airbus Helicopters](https://openairdocs.org/service-documents/airbus-helicopters.md)
- Type: Service bulletin (Alert Service Bulletin)
- Number: EC155-53A038
- Page: https://openairdocs.org/service-documents/airbus-helicopters/ec155-53a038

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2021-18-06](https://openairdocs.org/ad/2021-18-06.md), effective Sep 10, 2021: No revision named

Also cited in [1 proposed AD](https://openairdocs.org/service-documents/airbus-helicopters/ec155-53a038/proposed.md).

## Text (21 pages)

Rights: © Airbus Helicopters. Filed by the FAA in regulations.gov docket FAA-2021-0717, the docket of AD 2021-18-06. Not covered by OpenAirDocs’ CC0 dedication. This text is OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1 (OCR)

AIRBUS
HELICOPTERS  ASB N° EC155-53A038
Civil versions: B, B1
ALERT SERVICE BULLETIN
CORRECTIVE MEASURE
FUSELAGE - Cowling and Fairings
Modification of the MGB fixed cowling attachment
Corresponds to modification 365P084788.06
For the attention of
Revision No.  Date of issue
Revision 0  2018-12-20
Summary:
This ALERT SERVICE BULLETIN consists in modifying the primary attachment system of the fixed cowling of Main
Gear Box (MGB) and in adding a second one to provide redundancy for the locking.
Compliance:
Compliance with this ALERT SERVICE BULLETIN is mandatory.
Revision 0 2018-12-20  Page 1/21
This document is available on the Internet: www.airbushelicopters.com/techpub

### Page 2 (OCR)

AIRBUS
HELICOPTERS  ASB N° EC155-53A038
1.  PLANNING INFORMATION
1.A. EFFECTIVITY
1.A.1. Helicopters/installed equipment or parts
Helicopters PRE-MOD 365P084788.06.
NOTE
Refer to the aircraft individual inspection record (RIC AMS)
to identify the actual modification status of the helicopter.
1.A.2. Non-installed equipment or parts
Not applicable.
1.B. ASSOCIATED REQUIREMENTS
Not applicable.
1.C. REASON
When returning from a mission, the pilot of an AS365 N helicopter heard a noise outside, coming from his
right. The pilot observed no change in the helicopter's behavior; the pilot continued his mission.
On the ground, the pilot observed the loss of motor cowlings, MGB fixed and removable cowlings, as well as
impacts on a blade and the horizontal stabilizer leading edge.
Tearing of the attachment brackets (fixed parts) of the MGB cowlings was also observed.
Investigations have shown that the rupture of the cowling attachment was linked to an assembly under stress
of the cowling on its support causing a fatigue rupture of the bracket.
Consequently, Airbus Helicopters has defined the modification 365P084788.06 to improve the MGB fixed
cowling attachment.
This ALERT SERVICE BULLETIN consists in modifying the primary attachment system of the Main Gear
Box (MGB) fixed cowling and adding a second one to provide redundancy for the locking.
This ALERT SERVICE BULLETIN supersedes compliances with the ALERT SERVICE BULLETIN 53A035.
1.D. DESCRIPTION
This ALERT SERVICE BULLETIN consists in:
- replacing the front bracket,
- checking for the absence of assembly under stress of the MGB fixed cowlings on the radiator bulkhead,
- installing an additional locking system.
Revision 0 2018-12-20  Page 2/21
This document is available on the Internet: www.airbushelicopters.com/techpub

### Page 3 (OCR)

AIRBUS
HELICOPTERS  ASB N° EC155-53A038
1.E. COMPLIANCE
1.E.1. Compliance at H/C manufacturer level
Airbus Helicopters makes compliance with the instructions in paragraph 3. of this ALERT SERVICE
BULLETIN mandatory before delivery of the helicopter.
1.E.2. Compliance in service
The works are to be performed on the helicopter by the operator.
Helicopters/installed equipment or parts:
For helicopters on which ALERT SERVICE BULLETIN No. 53A035 has not been complied with:
Comply with paragraphs 3.B.2.a., 3.B.2.b., 3.B.2.c., 3.B.2.d., 3.B.3. of this ALERT SERVICE BULLETIN No.
53A038 within 110 flight hours as from receipt of ALERT SERVICE BULLETIN No. 53A035 Revision 0,
AND,
For helicopters on which ALERT SERVICE BULLETIN No. 53A035 has been complied with:
Comply with paragraph 3. within 660 flight hours without exceeding December 31, 2020 (first deadline
reached), following receipt of this ALERT SERVICE BULLETIN issued on the date mentioned in the page
footer.
Non-installed equipment or parts:
Not applicable.
1.F. APPROVAL
Approval of modifications:
The information or instructions relate to the modification 365P084788.06 approved on September 25, 2018
under the authority of EASA Design Organization Approval No. 21J.700 for civil version helicopters subject to
an Airworthiness Certificate.
Approval of this document:
The technical information contained in this ALERT SERVICE BULLETIN revision O which was approved on
December 11, 2018 under the authority of EASA Design Organization Approval No. 21J.700 for civil version
helicopters subject to an Airworthiness Certificate.
Revision 0 2018-12-20  Page 3/21
This document is available on the Internet: www.airbushelicopters.com/techpub

### Page 4 (OCR)

AIRBUS
HELICOPTERS  ASB N° EC155-53A038
1.G. MANPOWER
For compliance with this ALERT SERVICE BULLETIN, Airbus Helicopters recommends the following
personnel qualification:
Qualification:  - 1 Airframe technician
Time for the operations is indicated for reference, for a standard configuration and excludes curing time for
adhesives and paints.
Time for the operations: - 5 hours approximately for Airframe Technician
The helicopter downtime is estimated at approximately 1 day.
1.H. WEIGHT AND BALANCE
Negligible.
1.I. POWER CONSUMPTION
Not applicable.
1.J. SOFTWARE UPGRADES/UPDATES
Not applicable.
1.K. REFERENCES
The following documents are required for compliance with this ALERT SERVICE BULLETIN.
AMM: 24.00.00.911: General Safety Instructions - Electrical Power.
AMM: 53.53.00.061: Removal / Installation - MGB Cowlings.
MTC: 20.02.04.401: Installation of rivets - pitch and edge distance - Riveting.
MTC: 20.02.05.401: Joining by riveting - Joining.
MTC: 20.02.05.404: Assembly by screws and nuts - Joining.
MTC: 20.03.06.428: Repair of surface defects on a cowling or a fairing - Structural repairs.
MTC: 20.03.06.429: Repair of perforation of the skin on a cowling or a fairing - Structural repairs.
MTC: 20.04.05.403: Finish scheme 4080 - Paint and primer application procedure.
MTC: 20.06.01.411: Application of HYSOL EA 9396 cement (CM 616) - Bonding with adhesives.
MTC: 20.06.04.305: Application of mixtures No. 16 and 17 - Use of bonding mixtures.
MTC: 20.08.05.103: Monitoring of parts in operation - marking - service life customization - General rules
applicable to aircraft.
Revision 0 2018-12-20  Page 4/21
This document is available on the Internet: www.airbushelicopters.com/techpub

### Page 5 (OCR)

AIRBUS
HELICOPTERS  ASB N° EC155-53A038
1.L. OTHER AFFECTED PUBLICATIONS
The modification will be integrated into the following manuals:
- Aircraft Maintenance Manual (AMM),
- Illustrated Parts Catalog (IPC).
The IPC and AMM documentation will be updated for the next revision.
1.M. PART INTERCHANGEABILITY OR MIXABILITY
Not applicable.
Revision 0 2018-12-20  Page 5/21
This document is available on the Internet: www.airbushelicopters.com/techpub

### Page 6 (OCR)

AIRBUS
HELICOPTERS  ASB N° EC155-53A038
2. EQUIPMENT OR PARTS INFORMATION
2.A. EQUIPMENT OR PARTS: PRICE - AVAILABILITY - PROCUREMENT
For any information concerning cost of modification kit and components or for assistance, contact the Airbus
Helicopters Network Sales and Customer Relations Department.
Airbus Helicopters
Etablissement de Marignane
Direction Ventes et Relations Client
13725 MARIGNANE CEDEX
FRANCE
NOTE 1
On the purchase order, please always specify the mode of
transport, the destination and the numbers of the helicopters
to be modified.
NOTE 2
For ALERT SERVICE BULLETINs order by:
Telex: HELICOP 410 969F
Fax: +33 (0)4.42.85.99.96.
2.B. LOGISTIC INFORMATION
Not applicable.
2.C. EQUIPMENT OR PARTS REQUIRED PER HELICOPTER/COMPONENT
Kits to be ordered for one helicopter or one assembly:
New  Former
Designation  Qty  P/N  Item  P/N  Instruction
Modif. MGB fixed
cowling attachment  1  365P08-4788-0871
including:
Front bracket  1  365A24-1133-00
Ejecting blade  1  350A58-1023-21
Screw  5  22125BC050024L
Washer  5  23116AG050LE
Plastic eyelet  2  GP6
DZUS Lock  1  AJ6-90
Blind rivet  2  ASNA0363T0401
Flat washer  2  ASNA0113-32ADL
Nut  5  ASN52320BH050N
Shim  1  365P08-4788-25
Equipped bracket  1  365P08-4788-09  11
Revision 0 2018-12-20  Page 6/21
This document is available on the Internet: www.airbushelicopters.com/techpub

### Page 7 (OCR)

AIRBUS
HELICOPTERS  ASB N° EC155-53A038
Equipment or parts to be ordered separately:
For compliance with paragraph 3.B.2.d.2. order according to the following list.
New  Former
Designation  Qty  P/N  Item  P/N  Instruction
Screw  2  22125BC050024L  3
Washer  2  23116AG050LE  4
Nut  2  ASN52320BH050N  9
Screw  2  22125BC050020L  12
Screw  2  22125BC050022L  13
Screw  2  22125BC050026L  14
Screw  2  22125BC050028L  15
Screw  2  22125BC050030L  16
For compliance with paragraph 3.B.2.e.3. order according to the following list.
New  Former
Designation  Qty  P/N  Item  P/N  Instruction
Rivet  2  ASNA0363T0402  17
Rivet  2  ASNA0363T0403  18
Consumables to be ordered separately:
As per Work Cards and Tasks mentioned in this ALERT SERVICE BULLETIN and the following list:
Designation  Qty  Product P/N  Item
Hollow filler  AR  BJO-0930  CM7931  20
Glass fiber  AR  ECS0030-27  CM7246  21
Glue  AR  ECS0010.10  CM616  22
Glass fiber  AR  ECS0030-28  CM7020  23
Tedlar film  AR  ECS0008.20  CM7212  24
Consumables can be ordered separately from the company KLX AEROSPACE SOLUTIONS.
Website:  https://www.kixaerospace.com/klxaero/
Telephone:  +1.305.925.2600
AOG:  +1.305.471.8888
2.D. EQUIPMENT OR PARTS TO BE RETURNED
Not applicable.
Revision 0 2018-12-20  Page 7/21
This document is available on the Internet: www.airbushelicopters.com/techpub

### Page 8 (OCR)

AIRBUS
HELICOPTERS  ASB N° EC155-53A038
3. ACCOMPLISHMENT INSTRUCTIONS
3.A. GENERAL
- Read and comply with the instructions concerning the installation of rivets, as per Work Cards 20.02.04.401
and 20.02.05.401 (MTC).
- Unless indicated otherwise, read and comply with the instructions concerning assembling with screws and
nuts, as per work card 20.02.05.404 (MTC).
- Read and comply with the instructions for repair concerning surface defaults on a cowling or fairing, as per
Work Card 20.03.06.428 (MTC).
- Read and comply with the instructions for repair following a perforation of a cowling or fairing coating, as
per Work Card 20.03.06.429 (MTC).
- Read and comply with the instructions for the application of HYSOL EA 9396 glue, as per Work Card
20.06.01.411 (MTC).
- Read and comply with the instructions for the application of mixes No. 16 and No. 17, as per Work Card
20.06.04.305 (MTC).
3.B. WORK STEPS
3.B.1. Preliminary steps
- Disconnect all electrical power supplies as per Task 24.00.00.911 (AMM).
- Install appropriate access equipment.
- Remove the MGB removable cowlings (n) and the MGB fixed cowling RH (b) (Figure 1) as per
Task 53.53.00.061 (AMM).
3.B.2. Procedure
3.B.2.a. Removing the front bracket (Figure 1)
- Remove the screws (f), washers (g) and nuts (j) from the front bracket attachment (a) on the radiator
bulkhead (k).
- Remove and discard the screws (c), washers (d) and nuts (e) from the front bracket attachment (a) on
the MGB fixed cowling LH (h).
- Remove and discard the front bracket (a).
Revision 0 2018-12-20  Page 8/21
This document is available on the Internet: www.airbushelicopters.com/techpub

### Page 9 (OCR)

AIRBUS
HELICOPTERS  ASB N° EC155-53A038
3.B.2.b. Checking for the absence of assembly under stress (Figure 1)
- Position the front bracket (1).
- Install the screws (3) as per the photo below.
- Make sure that the 3 screws (3) are not in contact in the front bracket (1) bores.
• 3
NOTE 1
During the installation of the screws (3) the contact of at
least one screw with the front bracket (1) holes is tolerated
only if this contact does not generate stress during the
assembly of the front bracket (1).
- 3
Assembly with contact  Assembly without contact
Example of an assembly under stress of the front bracket (1) on the screws (3) of the fixed cowling LH (h)
(the 3 attachment screws (3) are in contact with the bracket (see the red arrows))
- If assembly is not under stress, secure the front bracket (1) on the MGB fixed cowling LH (h) using the
screws (3), washers (4) and nuts (9) as per the detail B of figure 1.
- If assembly is under stress, comply with paragraph 3.B.2.d. 1.
Revision 0 2018-12-20  Page 9/21
This document is available on the Internet: www.airbushelicopters.com/techpub

### Page 10 (OCR)

AIRBUS
HELICOPTERS  ASB N° EC155-53A038
- Install and lock the MGB fixed cowling RH (b) using the « DZUS».
- Measure the play « J» between the front bracket (1) and the shim (p).
- Make sure that the clearance « J» is less or equal to 1 mm (.039 in) as per photo below.
J ≤ 1 mm (.039 in)
p
Measuring the clearance « J»
- If the clearance « J» is compliant (assembly not under stress), secure the front bracket (1) on the
shim (p) and the radiator bulkhead (k) using the screws (f), washers (g) and nuts (j).
- If the clearance « J» is not compliant (assembly under stress), comply with the paragraph 3.B.2.d.2.
3.B.2.c. Checking the MGB fixed cowling attachment holes (RH and LH) on the radiator bulkhead
- Make sure that the drilling to a diameter of Ø 8mm of the biplane horizontal stabilizer tip junctions (m)
of the MGB fixed cowlings (b) and (h) is not ovalized more than half of the diameter of the screw.
- Otherwise, comply with paragraph 3.B.2.d.3.
b
. h
m
Revision 0 2018-12-20  Page 10/21
This document is available on the Internet: www.airbush  elicopters.com/techpub

### Page 11 (OCR)

AIRBUS
HELICOPTERS  ASB N° EC155-53A038
3.B.2.d. Reparation solutions
3.B.2.d.1. Change the location of the front bracket (1) attachment holes of the MGB fixed cowling LH (h)
- Define the new locations of the attachment holes on the cowling in accordance with the bracket (1)
then drill a diameter of Ø 5.2 mm (.204 in.).
• CAUTION
IF THE NEW HOLES ARE DRILLED IN THE HYGRID
(SEE PHOTO BELOW ON THE RIGHT), DO NOT
PERFORM THE STRIPPING TO A DIAMETER OF Ø
20 MM (.788 IN.).
Example of drilling in the honeycomb  Example of drilling in the HYGRID
- Manually strip all of the damaged zone of the attachment holes of the MGB fixed cowling LH (h) in the
honeycomb of the cowling to a diameter of 20 mm (.788 in.).
NOTE 2
If the attachment hole of the MGB fixed cowling LH (h) is
tangent to the HYGRID insert, only the honeycomb must be
stripped to a diameter of Ø 20 mm (.788 in.).
Honeycomb
• HYGRID
New hole
Stripped honeycomb zone
(Ø 20 mm (.788 in.))
Revision 0 2018-12-20  Page 11/21
This document is available on the Internet: www.airbushelicopters.com/techpub

### Page 12 (OCR)

AIRBUS
HELICOPTERS  ASB N° EC155-53A038
NOTE 3
The stripping to a diameter of • 20 mm (.788 in.) of the
attachment holes of the MGB fixed cowling LH (h) also
applies to old unused holes.
New hole  Old hole
Honeycomb
Stripped honeycomb zone
(• 20 mm (.788 in.))
- Fill all the attachment holes of the MGB fixed cowling LH (h) with the mixture No.17 (20) + (22) and
apply the reinforcing fibers (21) on both sides.
NOTE 4
The filling of the attachment holes of the MGB fixed cowling
LH (h) with the mixture No.17 and the application of
reinforcing fibers also applies to old unused holes.
- Place the bracket (1) to localize the positions of the attachment holes on the cowling.
- Drill the new holes in the MGB fixed cowling LH (h) to a diameter of • 5.2 mm (.204 in.).
- Install the bracket (1) on the MGB fixed cowling LH (h) using the screws (3), the washer (4)
and the nuts (9).
- Tighten the nuts (9) as per the torque value defined in figure 1, detail B.
3.B.2.d.2. Manufacturing of a radiator bulkhead shim (paragraph 3.B.2.b. Photo «Measuring the clearance J»)
- Manufacture a shim (not shown in the figure), in composite of 70 mm by 20 mm (2.76 in. by .79 in.) by
layering multiple glass fibers (21) + glue (22) to eliminate the clearance « J» as per Work Card
20.03.06.408 (MTC).
- Using the glue (22) affix this shim on the radiator bulkhead (k) at the level of front bracket (1) mating
surface as per Work Card 20.06.01.411 (MTC).
- Drill the shim in accordance with the existing holes on the shim (p).
- Install the bracket (1) on the radiator bulkhead (k) using the screws (3) or (12) or (13) or (14) or (15) or
(16), the washer (4) and the nuts (9).
NOTE 5
The screws (f) will be replaced by the screws (3) or (12) or
(13) or (14) or (15) or (16) depending on the thickness of the
shim added.
- Install the screws (3) or (12) or (13) or (14) or (15) or (16) and tighten the nuts (9) to the torque
indicated in the figure.
Revision 0 2018-12-20  Page 12/21
This document is available on the Internet: www.ai  ushelicopters.com/techpub

### Page 13 (OCR)

AIRBUS
HELICOPTERS  ASB N° EC155-53A038
3.B.2.d.3. Reconstruction of biplane horizontal stabilizer tip junctions (m) holes of the MGB fixed cowlings RH (b)
and/or LH (h) (Paragraph 3.B.2.c.)
- Fill the attachment holes of the right (b) and/or left (h) MGB fixed cowlings with mixture No.17 (20) +
(22) and apply the reinforcing fibers 21) on both sides.
- Drill the biplane horizontal stabilizer tip junctions (m) of the right (b) and/or left (h) MGB fixed cowlings
to a diameter of Ø 8 mm (.314 in.) as per the radiator bulkhead (k) (paragraph 3.B.2.c.).
- Install the MGB removable cowlings (n) as per the Task 53.53.00.061 (AMM).
3.B.2.e. Installation of additional locking (Figure 2)
3.B.2.e.1. Modification of the MGB cowling LH (Figure 2)
- Position the equipped bracket (11) on the cowling LH (h) as per Detail C.
- Locate the position of the attachment holes of the equipped bracket (11) and drill.
- Strip the cowling to a diameter of 15 mm (.59 in.) as per SECTION F-F.
- Fill the equipped bracket attachment holes (11) with the mixture No.17 (20) + 22) and apply the
fiber glass (21) on both sides.
- After curing, drill the cowling LH to a diameter of 5.2 mm (h).
- Install the equipped bracket (11) on the cowling LH (h) with the screws (3), the washer (4), the
shim (10) and the nuts (9) (SECTION E-E).
- Tighten the nuts (9) to the torque indicated in the figure.
11
Revision 0 2018-12-20  Page 13/21
This document is available on the Internet: www.airbushelicopters.com/techpub

### Page 14 (OCR)

AIRBUS
HELICOPTERS  ASB N° EC155-53A038
3.B.2.e.2. Modification of the MGB fixed cowling RH (Figure 2 and 3)
Measure M as per Figure 3, detail K.
CAUTION
IF THE MEASURE  M IS  < 30mm,
PARAGRAPH 3.B.2.e.3. IF THE MEASURE M IS ≥ 30mm
GO TO PARAGRAPH 3.B.2.e.4.
3.B.2.e.3. Stripping of the MGB fixed cowling RH (b) (Figure 3)
- Strip the honeycomb in the zone A of the MGB fixed cowling RH (b) to make sure of a continuity with
the existing monolithic edge.
- Remove the Tedlar film from the zone B as per the Section L-L.
- Apply the mixture No. 17 (20) + (22) as per Section L-L.
- Apply the reinforcing fibers (23) using the glue (22) as per Detail K and Section L-L.
- Apply the Tedlar film (24) using the glue (22) as per Detail K and Section L-L.
- Comply with the paragraph 3.B.e.3.
3.B.2.e.4. Installation of the DZUS lock on the fixed cowling RH (b) (Figure 2)
- Position the MGB fixed cowling RH (b).
- Mark the position of the lock on the MGB fixed cowling RH (b) using the equipped bracket hole (11)
of the fixed cowling LH (h) (DETAIL C).
- Remove the MGB fixed cowling RH (b).
- Drill a T hole to a diameter of Ø 14 mm on the MGB fixed cowling RH (b) (SECTION H-H).
- Install the MGB fixed cowling RH (b) as per the Task 53.53.00.061 (AMM).
- Install the DZUS lock (6) on the ejection blade (2) using the plastic eyelet (5) (DETAIL C).
- lock the DZUS lock (6) in the equipped bracket (11).
• 7 Or 17 Or 18
Revision 0 2018-12-20  Page 14/21
This document is available on the Internet: www.airbushelicopters.com/techpub

### Page 15 (OCR)

AIRBUS
HELICOPTERS  ASB N° EC155-53A038
- Position the ejection blade (2) as per the DETAIL G.
- Counterdrill to a diameter of 3.3 mm the MGB fixed cowling RH (b) in accordance with the fixation
holes of the ejecting blade (2) (SECTION G-G).
- Rivet the ejection blade (2) on the MGB fixed cowling RH (b) using the rivets (7) or (17) or (18) and
the flat washers (8) (DETAIL C).
3.B.3. Final steps
- If necessary, make finish paint touch-ups as per Work Card 20.04.05.403 (MTC).
- Clear access equipment.
- Connect all electrical power supplies as per Task 24.00.00.911 (AMM).
Revision 0 2018-12-20  Page 15/21
This document is available on the Internet: www.airbushelicopters.com/techpub

### Page 16 (OCR)

AIRBUS
HELICOPTERS  ASB N° EC155-53A038
3.C. COMPLIANCE CONFIRMATION
Compliance with this document:
Record full compliance with this ALERT SERVICE BULLETIN No. 53A038 revision 0 in the helicopter
documents.
Tracking of modifications in the documentation:
Record embodiment of the modification 365P084788.06 in the helicopter documents
Identification of modifications on equipment or parts:
Identify the parts / assemblies as per the table below and/or Work Card 20.08.05.103 (MTC)
Designation  Former P/N  New P/N  MOD  Type of Marking
MGB fixed cowling RH  Former P/N  Former P/N  365P084788.06  Stamp
and LH  + 365P084788.06
3.D. OPERATING AND MAINTENANCE INSTRUCTIONS
Operating instructions:
Not applicable.
Maintenance instructions:
- Perform a detailed inspection of the front bracket (1) and the equipped bracket (11) to make sure there is
no cracks or corrosion, in particular around the attachment holes and the bending radii.
If the front bracket (1) or the equipped bracket (11) shows a crack or corrosion comply with paragraph 3. of
this ALERT SERVICE BULLETIN.
- The Aircraft Maintenance Manual (AMM) will incorporate these instructions in the next revision. Following
the integration of these instructions in the Aircraft Maintenance Manual (AMM), refer to this document.
Revision 0 2018-12-20  Page 16/21
This document is available on the Internet: www.airbushelicopters.com/techpub

### Page 17 (OCR)

AIRBUS
HELICOPTERS  ASB N° EC155-53A038
See Fig 2
WD
13
14
15
16
C
-0X014
0,3 à 0,35daN.m  9  4  1X09 4
26.6 à 31 Ibf.in  0,3 à 0,350aN.m
Back to paragraph 3.B.  26.6 à 31 Ibf.in
Figure 1
Revision 0 2018-12-20  Page 17/21
This document is available on the Internet: www.  elicopters.com/techpub

### Page 18 (OCR)

AIRBUS
HELICOPTERS  ASB N° EC155-53A038
PAGE INTENTIONALLY LEFT BLANK
Revision 0 2018-12-20  Page 18/21
This document is available on the Internet: www.airbushelicopters.com/techpub

### Page 19 (OCR)

AIRBUS
HELICOPTERS  ASB N° EC155-53A038
SECTION
F-F
C  нґ
7 Or 17 Or 18
0X00 4g
,3 à 0,35daN.m
26.6 à 31 Ibf.in
JG 6
E
Ф15 HONEYCOMB RECESS
FWD >
SECTION
H-H
Z - 1140  SECTION
E-E  ø 3,3
0807 4g
0,3 à 0,35daN.m
26.6 à 31 Ibf.in
10
Back to paragraph 3.B.2.e.
Figure 2
Revision 0 2018-12-20  Page 19/21
This document is available on the Internet: www.airbushelicopters.com/techpub

### Page 20 (OCR)

AIRBUS
HELICOPTERS  ASB N° EC155-53A038
PAGE INTENTIONALLY LEFT BLANK
Revision 0 2018-12-20  Page 20/21
This document is available on the Internet: www.airbushelicopters.com/techpub

### Page 21 (OCR)

AIRBUS
HELICOPTERS  ASB N° EC155-53A038
SECTION
L-L
J  ZONE A
30mm
1.181in
30mm
1.181in
ZONE A
25
L  20mm
.787in
ZONE B
20mm
787 in
22
23
Back to paragraph 3.B.2.e.3.
Figure 3
Revision 0 2018-12-20  Page 21/21
This document is available on the Internet: www.airbushelicopters.com/techpub

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
