# Airbus Helicopters Service Bulletin EC155-63-016

Copy: Revision 5 ("Airbus Helicopters SB EC155-63-016 Rev 5"), 33 pages: PDF https://openairdocs.org/files/sha256/5f/59/5f59fbc13e1276537288b38e6108b15d214022e6dc6ed91bba77247541c0054f; text https://openairdocs.org/service-documents/airbus-helicopters/ec155-63-016/file/5f59fbc13e12.md. Rights: © Airbus Helicopters. Filed by the FAA in regulations.gov docket FAA-2021-0197, the docket of AD 2021-22-16. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Airbus Helicopters](https://openairdocs.org/service-documents/airbus-helicopters.md)
- Type: Service bulletin (Service Bulletin)
- Number: EC155-63-016
- Latest revision known: EC155-63-016, Revision 5 (OpenAirDocs)
- Page: https://openairdocs.org/service-documents/airbus-helicopters/ec155-63-016

## Text (33 pages)

Rights: © Airbus Helicopters. Filed by the FAA in regulations.gov docket FAA-2021-0197, the docket of AD 2021-22-16. Not covered by OpenAirDocs’ CC0 dedication. Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

SB No. EC155-63-016 
Revision 0    2017-08-11   Page 1/33 
Revision 5    2019-03-06                                         This document is available on the Internet: https://www.airbushelicopters.com/techpub/ 
 
 Civil versions: B, B1 
  
 
SERVICE BULLETIN 
 
PRODUCT IMPROVEMENT 
 
MAIN ROTOR DRIVE - Replacement of epicyclic  
reduction gear on MGB 
 
 
 
Revision No. Date of issue 
Revision 0 2017-08-11 
Revision 1 2017-09-08 
Revision 2 2017-11-14 
Revision 3 2018-03-02 
Revision 4 2018-07-26 
Revision 5 2019-03-06 
 
 
Summary: 
 
The purpose of this Service Bulletin is to describe the procedure for replacing the epicyclic reduction gear of the 
MGB (Main Gearbox), without removing the helicopter MGB, as part of the planet gear retrofit in accordance with 
ASB EC155-05A034. 
 
Reason for last revision: 
 
The purpose of revision 5 of this Service Bulletin is to modify effectivity to allow retrofitting of Type Z planet gear 
bearings through the procedure described in this Service Bulletin. 
 
Compliance:  
 
Compliance with this Service Bulletin is left to the Operator's initiative. 
 
For the attention of

### Page 2

SB No. EC155-63-016 
Revision 0    2017-08-11   Page 2/33 
Revision 5    2019-03-06                                         This document is available on the Internet: https://www.airbushelicopters.com/techpub/ 
 
1.  PLANNING INFORMATION 
 
CAUTION 
 
THIS SERVICE BULLETIN WAS DRAWN UP BASED 
ON THE ORIGINAL HELICOPTER CONFIGURATION 
(AS DEFINED IN THE INDIVIDUAL INSPECTION 
LOG BOOK (RIC)). IT TAKES INTO ACCOUNT ALL 
AIRBUS HELICOPTERS-APPROVED CONFIGURA-
TION CHANGES MADE AFTER DELIVERY, 
PROVIDED THAT AIRBUS HELICOPTERS WAS 
ADVISED THEREOF. IT DEVOLVES ON THE 
OPERATOR TO CHECK THE COMPATIBILITY OF 
ANY MODIFICATIONS WITH THE CURRENT 
HELICOPTER CONFIGURATION. IN THE CASE OF 
INCOMPATIBILITY, IT DEVOLVES ON THE USER 
TO DEFINE THE NECESSARY ADAPTATION WORK 
AND HAVE IT APPROVED BY THE AIR 
TRANSPORT AUTHORITIES IN THE COUNTRY 
CONCERNED, AND TO ENSURE AIRWORTHINESS 
FOLLOW-UP THEREOF. 
 
 
1.A.  EFFECTIVITY 
 
1.A.1. Helicopters/installed equipment or parts 
 
Helicopters: 
- equipped with an MGB P/N 365A32-9001-00, 
- equipped with equipped planet gear bearings P/N 365A32-9013-00 (TYPE Y) or  
365A32-9011-00 (TYPE Z), 
- POST MOD 0763C52 (Reinforced upper cover - Planet gear carrier roller bearing with reduced clearance). 
 
NOTE 1 
 
Refer to the aircraft Individual Inspection record (RIC AMS) 
and the aircraft log book to identify the actual configuration 
of the helicopter. 
 
NOTE 2 
 
The P/Ns of the MGBs may include letters complementing 
the P/N mentioned in this Service Bulletin, such as, for 
example, 365A32-9001-00 N. All the MGBs with other letters 
are also concerned by this Service Bulletin. 
 
The helicopter which complied with Service Bulletin No. 63C015 is not concerned by this Service Bulletin.

### Page 3

SB No. EC155-63-016 
Revision 0    2017-08-11   Page 3/33 
Revision 5    2019-03-06                                         This document is available on the Internet: https://www.airbushelicopters.com/techpub/ 
 
1.A.2. Non-installed equipment or parts 
 
In order to allow to the full application of this Service Bulletin, unserviceable MGB can be installed the on the 
aircraft before the replacement of the epicyclic reduction gear. 
This operation requires to follow usual cautions and prevention means such as: 
- INSTALL the MGB on bottom blocks (MGB suspension bars not installed), 
- DO NOT INSTALL the main rotor mast and MGB equipment and furnishings, 
- KEEP the shackle fixed on the top of the MGB. 
 
 
1.B.  ASSOCIATED REQUIREMENTS 
 
CAUTION 
 
BEFORE ANY WORK, CHECK WHETHER YOUR 
FLIGHT MANUAL (FLM) AS APPROVED BY THE 
COMPETENT AUTHORITIES HAS BEEN 
UPDATED. REFER TO PARAGRAPH 3.D. 
 
 
1.C.  REASON 
 
The purpose of this Service Bulletin is to describe the procedure for replacing the epicyclic reduction gear of 
the MGB (Main Gearbox), without removing the helicopter MGB, as part of the planet gear retrofit in 
accordance with ASB EC155-05A034. 
 
The purpose of Revision 1 of this Service Bulletin was to take into account improvement further to first 
installations. 
 
Revision 1 did not supersede compliance with Revision 0 of this Service Bulletin. 
 
The purpose of this revision 2 of this Service Bulletin was to provide details on the replacement method for 
the epicyclic reducer and to eliminate the case of the epicyclic reducer that did not pass the Airbus 
Helicopters factory bench. This revision also specifies the type of bearing concerned for the replacement of 
the epicyclic reducer. 
 
Revision 2 did not supersede compliance with Revision 1 of this Service Bulletin. 
 
The purpose of Revision 3 of this Service Bulletin was to add a precision to the message "MGB CHIP" 
depending on the presence or absence of the CAD (Caution Advisory Display) in the helicopter. 
 
Revision 3 did not affect compliance with the previous Revisions of this Service Bulletin. 
 
The purpose of revision 4 of this Service Bulletin was to clarify the configuration control of the new epicyclic 
reduction gear before installation on the MGB via the presence of modification 0763C52 of the MGB Log 
Card (FM) and the Follow-up Sheet (FS). 
 
Revision 4 did not affect compliance with the previous Revisions of this Service Bulletin. 
 
The purpose of revision 5 of this Service Bulletin is to modify effectivity to allow retrofitting of Type Z planet 
gear bearings through the procedure described in this Service Bulletin. 
 
Revision 5 does not affect compliance with the previous Revisions of this Service Bulletin.

### Page 4

SB No. EC155-63-016 
Revision 0    2017-08-11   Page 4/33 
Revision 5    2019-03-06                                         This document is available on the Internet: https://www.airbushelicopters.com/techpub/ 
 
1.D.  DESCRIPTION 
 
This Service Bulletin consists in replacing the epicyclic reduction gear with a new epicyclic reduction gear, 
which has undergone a factory bench acceptance test, without removing the MGB. 
 
If the MGB upper shim is a peel shim, it shall be replaced with a fixed shim as per modification 0763C28. 
 
 
1.E.  COMPLIANCE 
 
1.E.1. Compliance at H/C manufacturer level 
 
Not applicable. 
 
1.E.2. Compliance in service 
 
Helicopters/installed equipment or parts: 
 
Compliance with this Service Bulletin is left to the Operator's initiative. 
 
The operator must perform the preliminary and final work steps. 
 
The replacement of the epicyclic reduction gear MUST be performed by seconding Airbus Helicopters 
specialists qualified for this operation. 
Modification 0763C28 shall be embodied by seconding Airbus Helicopter specialists. 
 
Comply with paragraph 3.B. of this Service Bulletin. 
 
Non-installed equipment or parts: 
 
Not applicable.  
 
 
1.F.  APPROVAL 
 
 Approval of modifications: 
 
Not applicable.  
 
Approval of this document: 
 
The technical information contained in this Service Bulletin No. 63-016 Revision 0 was approved on 
August 10, 2017 under the authority of EASA Design Organization Approval No. EASA.21J.700 for civil 
version helicopters subject to an Airworthiness Certificate. 
 
The technical information contained in this Service Bulletin No. 63-016 Revision 1 was approved on  
September 06, 2017 under the authority of EASA Design Organization Approval No. EASA.21J.700 for civil 
version helicopters subject to an Airworthiness Certificate. 
 
The technical information contained in this Service Bulletin No. 63-016 Revision 2 was approved on  
November 14, 2017 under the authority of EASA Design Organization Approval No. EASA.21J.700 for civil 
version helicopters subject to an Airworthiness Certificate.

### Page 5

SB No. EC155-63-016 
Revision 0    2017-08-11   Page 5/33 
Revision 5    2019-03-06                                         This document is available on the Internet: https://www.airbushelicopters.com/techpub/ 
 
The technical information contained in this Service Bulletin No. 63-016 Revision 3 was approved on  
March 02, 2018 under the authority of EASA Design Organization Approval No. EASA.21J.700 for civil 
version helicopters subject to an Airworthiness Certificate. 
 
The technical information contained in this Service Bulletin No. 63-016 Revision 4 was approved on  
July 26, 2018 under the authority of EASA Design Organization Approval No. EASA.21J.700 for civil version 
helicopters subject to an Airworthiness Certificate. 
 
The technical information contained in this Service Bulletin No. 63-016 Revision 5 was approved on  
March 06, 2019 under the authority of EASA Design Organization Approval No. EASA.21J.700 for civil 
version helicopters subject to an Airworthiness Certificate. 
 
 
1.G.  MANPOWER 
 
For compliance with this Service Bulletin, Airbus Helicopters recommends the following personnel 
qualifications: 
 
Qualifications: 
- 2 Mechanical Technicians, 
- 1 Airbus Helicopters Specialist qualified for this operation, 
 
- 1 Pilot. 
 
The time for the operations is indicated for reference purposes only and based on a standard helicopter 
configuration. 
 
Time for the operations: 
- 45 hours for the Mechanical Technicians, 
- 10 hours for the Airbus Helicopters Specialist, 
 
- 1 hour for the Pilot (1 hour 45 if HUMS flight). 
 
Estimated helicopter downtime is indicated for reference purposes only, based on a standard helicopter 
configuration. 
 
The estimated helicopter downtime is 4 days. 
 
 
1.H.  WEIGHT AND BALANCE 
 
Not applicable. 
 
 
1.I.  POWER CONSUMPTION 
 
Not applicable. 
 
 
1.J.  SOFTWARE UPGRADES/UPDATES 
 
Not applicable.

### Page 6

SB No. EC155-63-016 
Revision 0    2017-08-11   Page 6/33 
Revision 5    2019-03-06                                         This document is available on the Internet: https://www.airbushelicopters.com/techpub/ 
 
1.K.  REFERENCES 
 
The following documents are required for compliance with this Service Bulletin: 
 
AMM: 05-39-00-221: Maintenance Checks at Calendar Intervals - Power Transmission System Components 
AMM: 12-20-00-211: Inspection - Magnetic plugs 
AMM: 21-50-34-401: Removal - Installation of the compressor - Split air conditioning system 
AMM: 24-00-00-911: General safety instructions - Electrical power 
AMM: 29-00-00-061: Removal / Installation Principle Applicable to a part / LRU 
AMM: 29-00-00-911: General Safety Instructions - Hydraulic Power 
AMM: 60-00-00-911: General safety instructions - Power transmission system 
AMM: 62-10-00-061: Removal / Installation - Main Rotor Blades 
AMM: 62-20-00-061: Removal / Installation - Rotor Hub and Shaft Unit 
AMM: 62-20-00-222: Inspection - After Removal / Installation of the MRH or of an MRH Component 
AMM: 63-20-00-611: Draining and filling the MGB 
AMM: 62-23-02-641: Greasing - Swashplate Bearing 
AMM: 63-20-00-062: Disassembly / Assembly - Main Gearbox 
AMM: 63-21-02-221: Inspection - Oil Filter 
 
MTC: 20.02.05.404: Joining by bolts and nuts 
MTC: 20.04.04.401: Surface treatment before painting 
MTC: 20.04.05.101: General information about painting means and paint touch-ups 
MTC: 20.04.05.402: Application of Epoxy primer P05 - P20 
MTC: 20.04.05.438: Application of STANDOX STANDOFLEET Finish Paint 
MTC: 20.05.01.101: General sealing methods - General sealing procedures 
MTC: 20.05.01.211: Sealing compound Mastinox 6856 K (CM 518) and 6856 H - General sealing 
procedures 
MTC: 20.05.01.222: Application of PR 1771 B2 sealant 
MTC: 20.05.01.223: Use of Sealing compound PR 1776 B2 / 1776 S 
MTC: 20.07.02.201: Helicopter parked in a repair shop 
MTC: 20.07.03.408: Appearance checks on an aircraft after an inspection or repair 
MTC: 20.08.01.601: Monitoring of lubricating oil contamination on mechanical assemblies equipped with 
magnetic plugs 
MTC: 20.08.05.101: Drafting and updating the log card (F.M) 
MTC: 20.09.01.901: Storage of commercialized helicopters - Storage, 
MTC: 20.09.02.901: Preservation and packing methods of airborne equipment 
 
ASB 05A034: Alert Service Bulletin 
 
FLM: Flight Manual 
 
SIN: 3116-S-63: Main Rotor Drive - Check for alignment of the red marks on the MGB and the flared housing 
 
Information Notice : 2832-I-00 : Procedure for returning parts to Airbus Helicopters for 
overhaul/repair/technical investigation/core unit return 
(not attached to this Service Bulletin).

### Page 7

SB No. EC155-63-016 
Revision 0    2017-08-11   Page 7/33 
Revision 5    2019-03-06                                         This document is available on the Internet: https://www.airbushelicopters.com/techpub/ 
 
1.L.  OTHER AFFECTED PUBLICATIONS 
 
Not applicable. 
 
 
1.M.  PART INTERCHANGEABILITY OR MIXABILITY 
 
Not applicable.

### Page 8

SB No. EC155-63-016 
Revision 0    2017-08-11   Page 8/33 
Revision 5    2019-03-06                                         This document is available on the Internet: https://www.airbushelicopters.com/techpub/ 
 
2.  EQUIPMENT OR PARTS INFORMATION 
 
 
2.A.  EQUIPMENT OR PARTS: PRICE - AVAILABILITY - PROCUREMENT 
 
Price 
 
For any information concerning the components or for assistance, contact the Airbus Helicopters Network 
Sales and Customer Relations Department. 
 
The cost of tools will be indicated upon Operator's request, contact the Sales and Customer Relations 
Department. 
 
Availability 
 
Delivery times will be indicated by the Sales and Customer Relations Department on Operator's request. 
 
Procurement conditions 
 
Order the required quantity from the Airbus Helicopters Network Sales and Customer Relations Department: 
 
Airbus Helicopters 
Etablissement de Marignane 
Direction Ventes et Relations Client 
13725 MARIGNANE CEDEX 
France 
 
NOTE 1 
 
On the purchase order, please specify the mode of 
transport, the destination and the numbers of the helicopters 
to be modified. 
 
 
2.B.  LOGISTIC INFORMATION 
 
Not applicable.

### Page 9

SB No. EC155-63-016 
Revision 0    2017-08-11   Page 9/33 
Revision 5    2019-03-06                                         This document is available on the Internet: https://www.airbushelicopters.com/techpub/ 
 
2.C.  EQUIPMENT OR PARTS REQUIRED PER HELICOPTER/COMPONENT 
 
Equipment or parts to be ordered separately: 
 
As per Work Cards and Tasks mentioned in this Service Bulletin and list below: 
 
Key Word Qty New  P/N Item     Old       P/N Instruction 
     
Epicyclic reduction 
gear 
1 365A32-7005-02 
with planet gears 
365A32-9011-00 
 
(1)  
365A32-9013-00 
365A32-9011-00 
Store 
Bolt (rotor shaft 
attachment)
For ref. 
(16) 
360A32-1192-20 (1a)   
Nut, hexagonal, 
self-locking
For ref. 
(16) 
ASN52320BH060N (1b)   
Nut, hexagonal, 
self-locking
For ref. 
(68) 
ASN52320BH080N (1c)   
Shim (MGB 
thickness/height)
For ref. 
(1) 
365A32-9210-20 (1d) 360A32-2139-21  
(PRE MOD 0763C28) 
365A32-9210-20 
365A32-9210-21 
365A32-9210-22 
Scrap 
Shim (MGB 
thickness/height)
For ref. 
(1) 
365A32-9210-21 (1e)   
Shim 
(0.8-mm thickness)
For ref. 
(1) 
365A32-9210-22 (1f)   
Seal For ref. 
(2) 
PS701-6006-190 (1g)   
Bolt (cover 
attachment)
For ref. 
(16) 
360A32-1194-20 (1h)   
Washer, plain For ref. 
(32) 
23112AG080LE (1i)   
Bolt, hexagonal head For ref. 
(16) 
22125BE060036L (1j)   
Washer, plain For ref. 
(16) 
23111AG060LE (1k)    
Seal For ref. 
(4) 
PS701-6006-001 (1m)   
Seal For ref. 
(2) 
PS701-6006-079 (1n)   
Seal For ref. 
(1) 
PS701-6006-176 (1p)

### Page 10

SB No. EC155-63-016 
Revision 0    2017-08-11   Page 10/33 
Revision 5    2019-03-06                                         This document is available on the Internet: https://www.airbushelicopters.com/techpub/ 
 
Consumables to be ordered separately: 
 
As per Work Cards and Tasks mentioned in this Service Bulletin and list below: 
 
Key Word Qty Product P/N CM  Item 
  
Sealant 0.5 kg ECS2339-60 6068 (16) 
Sealant 0.5 kg ECS2068.10 6240 (17) 
Grease, G-361 0.5 l DCSEA361 0149 (18) 
     
 
The consumables can be ordered separately, from the company KLX AEROSPACE SOLUTIONS. 
Website:    https://www.klxaerospace.com/klxaero/ 
Telephone:   +1.305.925.2600 
AOG:    +1.305.471.8888  
 
Special tools: 
 
As per Work Cards and Tasks mentioned in this Service Bulletin and list below or equivalent: 
 
Key Word Qty Tool P/N or equivalent Item 
 
    
Shackle, 33 FORCE 5000 DA 1 703A91-0208-01 See NOTE 2 
Extractor 3 6801J32-2023-00 or 
360A32202320-6801 See NOTE 2 
Set of blocks, MGB base 1 365A93-3840-00 - 
    
 
NOTE 2 
 
As a reminder, the shackle 33 FORCE 5000 DA above is 
mentioned through Task 05-39-00-221 (AMM) for the 
replacement of the epicyclic reduction gear. 
The set of MGB base blocks is specified in Task  
62-20-00-061 (AMM). 
The extractors and 33 FORCE 5000 DA shackle are Airbus 
Helicopters supplies which must be returned after use.  
The blanking cover handling (supplied with the epicyclic 
reducer) and the top cover of the epicyclic reducer (to be 
removed from the MGB) require the use of different 
shackles. If shackles other than those mentioned in the 
documentation (AMM and Service Bulletin) are used, make 
sure ahead of time that they have maximum load capacity 
(1000 kg) as well as their last test date.

### Page 11

SB No. EC155-63-016 
Revision 0    2017-08-11   Page 11/33 
Revision 5    2019-03-06                                         This document is available on the Internet: https://www.airbushelicopters.com/techpub/ 
 
2.D.  EQUIPMENT OR PARTS TO BE RETURNED 
 
The extractors and shackle 33 FORCE 5000 DA must be returned to Airbus Helicopters. 
 
In the framework of equipment return to Airbus Helicopters, return the epicyclic reduction gear as per 
procedure in Information Notice 2832-I-00. 
 
Bond a locally manufactured label “UNSERVICEABLE” with a white background to the epicyclic reduction 
gear. 
  
Write in RED on this label: 
- the serial number of the MGB from which the epicyclic reduction gear has been removed, 
- the serial number of the new epicyclic reduction gear (SAR xxx). 
 
Enclose a photocopy of the MGB log card (FM), completed with compliance with this Service Bulletin.

### Page 12

SB No. EC155-63-016 
Revision 0    2017-08-11   Page 12/33 
Revision 5    2019-03-06                                        This document is available on the Internet: https://www.airbushelicopters.com/techpub/ 
 
3.  ACCOMPLISHMENT INSTRUCTIONS 
 
 
3.A.  GENERAL 
 
- Read and comply with the general electrical instructions as per Task 24-00-00-911 (AMM). 
- Read and comply with the removal / Installation principle applicable to a part / LRU as per Task  
29-00-00-061 (AMM). 
- Read and comply with the general instructions concerning hydraulic power as per Task 
29-00-00-911 (AMM). 
- Read and comply with the general mechanical instructions as per Task 60-00-00-911 (AMM). 
- Read and comply with the general instructions on surface preparation before painting as per Work  
Card 20.04.04.401 (MTC). 
- Read and comply with the general information on painting methods and paint touch-ups as per Work  
Card 20.04.05.101 (MTC). 
- Read and comply with the general instructions for the application of epoxy primer P05-P20 as per Work 
Card 20.04.05.402 (MTC). 
- Read and comply with the general sealing procedures as per Work Card 20.05.01.101 (MTC). 
- Read and comply with the PR 1771 B2 sealant application method as per Work Card 20.05.01.222 (MTC). 
- Read and comply with the PR 1776 B2 / 1776 S sealing compound application instructions as per Work 
Card 20.05.01.223 (MTC). 
- Read and comply with the safety instructions for helicopters parked in a repair shop as per Work  
Card 20.07.02.201 (MTC). 
- Read and comply with the instructions for the monitoring of lubricating oil contamination on mechanical 
assemblies equipped with magnetic plugs as per Work Card 20.08.01.601 (MTC). 
 
Unless otherwise specified, tighten bolts to standard torque as per Work Card 20.02.05.404 (MTC). 
Removable parts and equipment which can be disassembled shall be attached after interlaying sealant  
(anti-corrosion agent) as per Work Card 20.05.01.211 (MTC). 
 
 
3.B.  WORK STEPS 
 
 
Customer responsibility  
 
Provide the MGB Log Card concerned by the work. 
Provide the helicopter RIC AMS concerned by the work. 
 
Airbus Helicopters Technician Responsibility 
 
Check on the MGB Log Card (FM) and the Follow-up Sheet (FS) for the epicyclic reduction gear the 
presence of MOD 0763C52 (see examples in Appendices 4.A. and 4.B.). If any doubt, contact the Airbus 
Helicopters Technical Support. 
 
In order to know the tightening torques to be applied, check the MGB Log Cards for the application of 
modification 0763B76 and/or the reference for MGB housing.

### Page 13

SB No. EC155-63-016 
Revision 0    2017-08-11   Page 13/33 
Revision 5    2019-03-06                                        This document is available on the Internet: https://www.airbushelicopters.com/techpub/ 
 
Modification Reference for MGB 
housing 
Log Card Tightening torque for nuts 
on MGB 
PRE 0763B76 365A32-2046-14 The reference is enough for the 
PRE MOD standard 
1.6 to 1.8 m.daN 
POST 0763B76 365A32-2046-13 
365A32-2046-15 
365A32-2046-16 
The reference is enough for the 
POST MOD standard 
2 to 2.2 m.daN 
PRE or POST 
0763B76 
365A32-2046-others You need the reference and the 
modification no. to know whether if 
it is PRE or POST MOD 0763B76 
To be determined by the 
reference/modification 
association 
 
Make sure the epicyclic reducer passed the factory bench by referring to case N° 12 of the Authorized 
Release Certificate EASA Form 1 (European Aviation Safety Agency). If nothing is specified then the 
epicyclic reducer has passed the factory bench. 
 
 
3.B.1. Preliminary steps 
 
- Park the helicopter in hangar. 
- Install appropriate access equipment. 
- Disconnect all electrical power supplies. 
- Remove all equipment and furnishings as required for access to the different work areas. 
 
 
3.B.2. Procedure 
 
 
CAUTION 
 
THE MGB MUST NOT BE REMOVED FROM THE 
HELICOPTER. 
 
NOTE 1 
 
External paint and markings are incumbent on Operator. 
 
Airbus Helicopters technician’s responsibility 
 
Depreserve epicyclic reduction gear (1) as per Work Card 20.09.02.901 (MTC).

### Page 14

SB No. EC155-63-016 
Revision 0    2017-08-11   Page 14/33 
Revision 5    2019-03-06                                        This document is available on the Internet: https://www.airbushelicopters.com/techpub/ 
 
3.B.2.a. Customer’s responsibility 
 
- Remove main rotor blades as per Sub-task 62-10-00-021-001 of Task 62-10-00-061 (AMM). 
 
CAUTION 
 
BEFORE LOOSENING THE ATTACHMENT BOLTS 
OF THE FIXED RING GEAR, THE STRESSES MUST 
BE RELIEVED OR REMOVED FROM THE 
EPICYCLIC REDUCTION GEAR: TO DO SO, 
SUSPENSION BARS MUST BE DISCONNECTED 
FROM THE MGB COVER AND A SET OF MGB 
BASE BLOCKS MUST BE INSTALLED, USING THE 
33FORCE 5000 DA SHACKLE AND LIFTING 
EQUIPMENT, IN ACCORDANCE WITH THE 
PRINCIPLE DESCRIBED IN TASK 62-20-00-061 
(AMM). 
 
- Remove the MRH (Main Rotor Hub) as per Sub-task 62-20-00-021-001 of Task 62-20-00-061 (AMM). 
- Install the MGB cover as per Task 05-39-00-221 (AMM). 
- Remove the LH and RH manifolds (k) as per Task 63-20-00-062 (AMM) (Figure 2 - Detail F). 
 
3.B.2.b. Airbus Helicopters technician’s responsibility 
 
CAUTION 
 
THE EPICYCLIC REDUCER MUST BE REPLACED 
DURING THE DAY SO AS TO LEAVE THE MGB 
OPEN ONLY FOR THE TIME NECESSARY FOR ITS 
REPLACEMENT. THIS PREVENTS INGESTION OF 
FOREIGN OBJECTS.  
THIS REPLACEMENT MUST BE CARRIED OUT IN A 
CLEAN AND WELL LIT REPAIR SHOP. 
 
 
CAUTION 
 
MAKE SURE THAT THE MODULE INTENDED FOR 
THE OPERATION (SERIAL NUMBER OF THE 
EPICYCLIC MODULE) HAS UNDERGONE A 
FACTORY BENCH ACCEPTANCE TEST. IF IN 
DOUBT, CONTACT THE AIRBUS HELICOPTERS 
TECHNICAL SUPPORT.

### Page 15

SB No. EC155-63-016 
Revision 0    2017-08-11   Page 15/33 
Revision 5    2019-03-06                                        This document is available on the Internet: https://www.airbushelicopters.com/techpub/ 
 
CAUTION 
 
BEFORE INSTALLING THE EPICYCLIC 
REDUCTION GEAR, CHECK FOR ABSENCE OF 
IMPACTS, SCRATCHES, TEAR-OFF OR FRETTING 
ON ALL PARTS: AND IN PARTICULAR ON THE 
BEARING FACE OF THE UPPER COVER AND 
FIXED RING GEAR. 
IF IN DOUBT, CONTACT THE AIRBUS 
HELICOPTERS TECHNICAL SUPPORT. 
 
 
CAUTION 
 
CARRY OUT CLEANING OPERATIONS WITH VERY 
PARTICULAR CARE IN ODER TO PREVENT THE 
INGRESS OF FOREIGN MATTER INTO THE MGB. 
INSTALL PROTECTIONS, IF NECESSARY. 
 
NOTE 2 
 
During the operations of the paragraph below, take 
photographs of each step and parts installed in the MGB, for 
archiving purposes. 
 
As per Figure 1 (Details A and C and SECTION A-A) and Figure 2 
- Mark positions of components to be removed and their disposition, including the four clamp attachment 
lugs (h) and (m) (Figure 1, Detail A and Figure 2, Detail E). 
- Remove, inspect and clean these components. 
- Remove attachment support (g) from hydraulic pipes (Figure 1, Detail C). 
- If mechanical air conditioning is installed, remove manifold upper stiffener (j) as per principle of Task  
21-50-34-401 (AMM) (Figure 2, Detail F). 
- If the HUMS installation is present on the helicopter, remove the accelerometers (not shown). 
 
CAUTION 
 
ACT PROGRESSIVELY ON THE EXTRACTORS IN 
ORDER TO DEBOND THE EPICYCLIC REDUCER 
WITHOUT CONSTRAINTS. 
 
CAUTION 
 
ENSURE THAT THE WORK BENCH IS CLEAN 
BEFORE OPERATING ON THE EPICYCLIC 
REDUCERS. 
 
- Remove the epicyclic reducer (a) and the fixed-ring gear (e), without removing the MGB according to 
Appendix 4.C.1. and Figure 1, Detail A. 
- Protect the top of the MGB in order to avoid the ingestion of foreign objects. 
- Store and condition the epicyclic reducer (a) according to the work Cards 20.09.01.901 (MTC) and 
20.09.02.901 (MTC).

### Page 16

SB No. EC155-63-016 
Revision 0    2017-08-11   Page 16/33 
Revision 5    2019-03-06                                        This document is available on the Internet: https://www.airbushelicopters.com/techpub/ 
 
NOTE 3 
 
Storage at the AIR1503 requires a dynamic operation of the 
MGB so that the oil is sufficiently fluid to effectively protect 
the various elements. The storage of the epicyclic reducer 
will be carried out by the application of MGB oil. 
 
- Retain fixed ring gear (e). 
- Perform visual inspections as per Sub-task 05-39-00-221-001 § 1.b.(4). of Task 05-39-00-221 (AMM). 
- Check the condition of: 
. surfaces in contact with the fixed ring gear and upper cover of epicyclic reduction gear (a), 
. PRE MOD 0763C28 shim (d1) or POST MOD 0763C28 shim (d2). 
 
- Before installing new epicyclic reduction gear (1) and fixed ring gear (e): 
. measure thickness A3 of the upper cover of removed epicyclic reduction gear (a) (Detail A and 
SECTION A-A), 
. take thickness E10 of shim (d1) or (d2) measured upon removal, 
. measure thickness A3’ of the upper cover of new epicyclic reduction gear (1) to be installed, 
. calculate thickness E10’ of new shim (1d) or (1e) or (1f): E10’ = A3 + E10 – A3’, 
. select a new shim (1d), (1e) or (1f) closest to the value of dimension E10’ obtained. 
- Check for presence of seal (1p) on upper cover of epicyclic reduction gear. 
 
CAUTION 
 
THE EMPTY SPACE BETWEEN THE TUBE, RING 
GEAR AND HOUSING WILL BE FILLED WITH 
GREASE (18) BEFORE INSTALLING SEALS (1n). 
 
NOTE 4 
 
Reminder of the symbol            as per Appendix 4.C.2.: 
CM518 anti-corrosion agent. 
 
- As per Appendix 4.C.2. and using new spare parts (1a) to (1n) after interlaying sealant (16): 
. assemble on a work bench the new epicyclic reducer (1) and the fixed-ring gear (e), 
. install a seal (1g), delivered with epicyclic reduction gear (1), between the epicyclic reduction gear and 
the fixed ring gear, 
. install the removed components in accordance with their marked position and disposition, 
. install the epicyclic reduction gear (1) / fixed ring gear (e) assembly on the MGB, 
 
. install attachment support (g) of the hydraulic pipes, 
. check that tubes (f) are fully against and towards the MGB. 
 
NOTE 5 
 
Draw special attention to the positioning of the upper cover 
of epicyclic reduction gear (1) in relation to the fixed ring 
gear. 
 
- If it has been removed, install the upper reinforcement (j) according to the principle of Task 
21-50-34-401 (AMM) (Figure 2, detail F). 
- Apply a bead of sealant to nuts (1c) of fixed ring gear (e) using sealant (17). 
- Apply a bead of sealant to the heads of bolts (1h) and (1j) using sealant (16).

### Page 17

SB No. EC155-63-016 
Revision 0    2017-08-11   Page 17/33 
Revision 5    2019-03-06                                        This document is available on the Internet: https://www.airbushelicopters.com/techpub/ 
 
- Fill the holes used for extractors using sealant (16). 
- Apply a coat of paint as per Work Card 20.04.05.438 (MTC) to the components cleaned upon removal. 
 
3.B.2.c. Customer’s responsibility 
 
CAUTION 
 
THE RED MARKS BETWEEN THE UPPER COVER 
AND THE FLARED HOUSING MUST BE ALIGNED 
(AMM TASK 62-20-00-061, PARAGRAPH 2.c.(2) 
AND SIN No. 3116-S-63). 
 
- Install the LH and RH manifold assemblies (k) as per Task 63-20-00-062 (AMM) (Figure 2 - Detail F). 
- Install the MRH as per Sub-task 62-20-00-421-001 of Task 62-20-00-061 (AMM).  
- Grease the swashplate bearing as per Sub-Task 62-23-02-641-001 of Task 62-23-02-641 (AMM). 
- Install the main rotor blades as per Sub-task 62-10-00-421-001 of Task 62-10-00-061 (AMM). 
- If equipped, Check that the message “MGB CHIP" is not displayed on the CAD (caution advisory display), 
otherwise check the warning panel. 
 
3.B.3. Tests 
 
- Set the helicopter into test conditions. 
- Reconnect all electrical power supplies. 
- Energize the helicopter. 
- Perform a functional test of the different helicopter installations that were disconnected, removed or 
impacted as per the Maintenance Manual (AMM) and the Flight Manual (FLM) to ensure the work has not 
impacted the helicopter installations. 
 
3.B.4. Final steps 
 
- Clean and recondition work areas and the helicopter as per Work Card 20.07.03.408 (MTC). 
- Install furnishings and equipment which were removed during preliminary steps (paragraph 3.B.1.). 
- Reconnect all electrical power supplies. 
- Remove access equipment. 
- Set the helicopter into flight condition. 
 
 
3.B.5. Ground run/flight test 
 
Customer responsibility 
 
- Carry out an MGB replacement type ground run as per Flight Manuals (FLM) listed in paragraph 3.D. 
- During ground run, check for correct operation of accessories driven by the MGB and at each phase, 
monitor the oil pressure and temperature parameters (Stabilized parameters). 
 
- On completion of the ground run: 
. check for leakage, 
. check for tightness of electrical magnetic plug (b) (Figure 1, Detail B), 
. remove electrical magnetic plug (b) from its receptacle, 
 
CAUTION 
 
THE ABSENCE OF OIL ON THE ELECTRICAL 
MAGNETIC PLUG OF THE FLARED HOUSING 
SHOWS A MALFUNCTION OF THE ROTOR MAST 
LUBRICATION SYSTEM.

### Page 18

SB No. EC155-63-016 
Revision 0    2017-08-11   Page 18/33 
Revision 5    2019-03-06                                        This document is available on the Internet: https://www.airbushelicopters.com/techpub/ 
 
. check for presence of oil on electrical magnetic plug (b), 
. ensure the absence of metal chips on electrical magnetic plug (b) and the other MGB electrical magnetic 
plugs as per Task 12-20-00-211 (AMM). 
. ensure the absence of chips on the oil filter cartridge (d) and in the filter body as per Task  
63-21-02-221 (AMM) (Figure 2 – Detail A), 
. install electrical magnetic plug (b) in its receptacle, 
. apply tightening torque values as per Sub-task 62-20-00-222-001 of Task 62-20-00-222 (AMM) and 
Master Servicing Manual (MSM) chapter 05-20-00, 
.  change the MGB oil as per Task 63-20-00-611 (AMM). 
 
- Perform a flight: 
. hover flight In Ground Effect (IGE) as per Flight Manual (FLM): 
.. lasting 15 minutes, and check for flight parameters, 
.. record oil pressure and temperature parameters every 5 minutes after temperature stabilization, 
. (if the HUMS installation is installed on helicopter) cruise flight for 45 minutes in order to obtain the 
conditions required for HUMS (Health and Usage Monitoring System) acquisitions. 
- If the HUMS flight has been performed, analyze the data after the flight and make sure that the monitoring 
and HUMS system operate correctly. 
 
3.B.6. Work steps for non-installed equipment or parts 
 
Not applicable. 
 
 
3.C.  COMPLIANCE CONFIRMATION 
 
Compliance with this document: 
 
Record full compliance with this Service Bulletin with the revision number, in the helicopter documents. 
 
Tracking of modifications in the documentation: 
 
Airbus Helicopters technician’s responsibility 
 
Record the embodiment of modification 0763C28 in the helicopter documents (if the MGB upper peel shim 
has been replaced by a pre-machined shim). 
 
Fill in the Log Card (FM) of the MGB, insert the epicyclic reduction gear follow-up sheet (FS) in the MGB Log 
Card, record the number of the Service Bulletin and the installation date as per Work Card 20.08.05.101 
(MTC). 
 
See example in Appendix 4.A. for the manner of filling the MGB Log Card.

### Page 19

SB No. EC155-63-016 
Revision 0    2017-08-11   Page 19/33 
Revision 5    2019-03-06                                        This document is available on the Internet: https://www.airbushelicopters.com/techpub/ 
 
3.D.  OPERATING AND MAINTENANCE INSTRUCTIONS 
 
Operating instructions: 
 
As per Flight Manual (FLM) in force. 
As per Flight Manual (FLM), Complementary Volume RN16 (16-25) or later revision, and Section 8.3. 
 
Maintenance instructions: 
 
According to the type of planet gears, ensure compliance with the various documents in force (EASB, ASB). 
Comply with the maintenance instructions after removal / installation for MRH, blades and MGB intervention 
according to the Master Servicing Manual (MSM).

### Page 20

SB No. EC155-63-016 
Revision 0    2017-08-11   Page 20/33 
Revision 5    2019-03-06                                        This document is available on the Internet: https://www.airbushelicopters.com/techpub/ 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
PAGE LEFT BLANK INTENTIONALLY

### Page 21 (OCR)

• AIRBUS
HELICOPTERS  SB No. EC155-63-016
SEE FIGURE 2 - Detail E -
1k
d1 or d2 •
1d or 1e or 1f
1i
1a
1g
SEE FIGURE 2 - Detail E — ha
1m -  SECTION
1n -  1m  A-A
Im  сД  1m
Figure 1
Revision 0  2017-08-11  Page 21/33
Revision 5  2019-03-06  This document is available on the Internet: httos://www.airbushe  pters com/techoub/

### Page 22

SB No. EC155-63-016 
Revision 0    2017-08-11   Page 22/33 
Revision 5    2019-03-06                                        This document is available on the Internet: https://www.airbushelicopters.com/techpub/ 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
PAGE LEFT BLANK INTENTIONALLY

### Page 23

SB No. EC155-63-016 
Revision 0    2017-08-11   Page 23/33 
Revision 5    2019-03-06                                        This document is available on the Internet: https://www.airbushelicopters.com/techpub/ 
 
 
 
 
Figure 2

### Page 24

SB No. EC155-63-016 
Revision 0    2017-08-11   Page 24/33 
Revision 5    2019-03-06                                        This document is available on the Internet: https://www.airbushelicopters.com/techpub/ 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
PAGE LEFT BLANK INTENTIONALLY

### Page 25 (OCR)

AIRBUS
HELICOPTERS  SB No. EC155-63-016
4. APPENDIX
4.A. . LOG CARD
LOG CARD I FICHE MATRICULE Fiche ardn®
veuse hiatenel neuf  Date  Support Partial  Unit is: EURES  Total Support  parts)
NOON SO198 DE RANSNISSION PRINCIPALE
DE-MoDIFY NOP3IB 36  Peace number  365A32900100  AHC 30107/2016  EC155 B1  0.00  148 TA ELISS -63-0298  REMOTED TO CHANTEE CONFIGUeRiON TO N'
Veration f ration n  B1
AIRBUS HELICOPTERS SAS Type  EC155
rence  Date
FC155-63-016
NON 13
NO D
NO DI
INVENTORY OF COMPONENTS
INVENTAIRE DES COMPOSANTS  PAGE 2
ASSEMBLY DESIGNATION  ASSEMENCERENCE SEE SUMBER VER
INSTALLATION
AMS0763C34  05/07/2026  0:00
AMS0763C52  FAGE6725  0:00
EC155-63A012R2  1709:00  1782.00
0:00  0.00
01220.00
EC15581
0:00
05/07/2016  3877:00  ....
FAC69894  0:00  EC15581
1772:00
0:00
05/02/2016 1772.00
EC15591
PAEM6835  0:00
05/07/2016  0:00  0.00
0:00  0.00
05/07/2026  0:00  EC15581  See Epicyclic reduction gear follow-up sheet
SD807  0:00
3684.00
FAEV2747
Revision 0 2017-08-11  Page 25/33
Revision 5 2019-03-06  This document is available on the Internet: https://www.airbushelicopters.com/techpub/

### Page 26

SB No. EC155-63-016 
Revision 0    2017-08-11   Page 26/33 
Revision 5    2019-03-06                                        This document is available on the Internet: https://www.airbushelicopters.com/techpub/ 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
PAGE LEFT BLANK INTENTIONALLY

### Page 27 (OCR)

AIRBUS
HELICOPTERS  SB No. EC155-63-016
4.A. LOG CARD (Cont'd)
INVENTAIRE DES COMPOSANTS  INVENTORY OF COMPONENTS  PAGE 3  INVENTAIRE DES COMPOSANTS  INVENTORY OF COMPONENTS  PAGE 4
NSTALLATION  INS PALE FION
SSEMBLY DESIGNATIOI  ASSEMBLY REFERENCE SERIAL NUMBER  VERSION  ASSEMBLY DESIGNATION  ASSEMBLY REFER
BOITE DE TRANSMISSION PRINCIPALE  2182  BOITE DE TRANSMISSION PRINCIPALE
COMPONENTS
COMPOSANTS
DESIGNATION  INSTALLATION  DESIGNATION  INSTALLATION  SPECIAL INFORMATION
05/07/2016  1809:00  05/07/2016  1809:00  ...
EC155B1  BC15581
365432-7100-20  FAF92020  0:00  ...  360432-3256-26  FAP97790  0:00
PIGNOR  05/07/2016|  0:00  ...  ROUE CONIQUE INF  05/07/2016  1809:00
165232-7100-20  FAG94757  0:00  .!..  EC155E1  FAFA7009  0:00
PIGION CONIQUE  05/07/2016  1809:00  15111  05/07/2016  0:00
365A32-0129-03  BEVEL GEAR  PAE97880  0:00  151511  EC15581  563832-9013-00  0:00  ....  See Ep cyclic reduction gear follow-up sheet
PIGNON CONIOUE  05/07/2016  1809:00  ....  05/01/2016  0:00
BEVEL GEAR  BC155B1  BC15581  See Epicyclic reduction gear follow-up sheet
FAE97881  0:00  151135  FAGU9357
PIGION CONIQUE FRANSHISSION AR  REAR TRANSMISSION BEVEL GEAR  05/07/2016  PAGT3377  0:00  0:00  ......  EC15581  SATELLITE BEARING EOUTPE  365A32-9013-00  05/07/2016  PACL0116  BC15581  See Epicyclic reduction gear follow-up sheet  YPE Z
ARBRE PEONON  05/07/2016  0:00  7041.00
05/07/2016
GEAR SHAFT  BC15581  SATELLITE BEARING EQUIPS  / 0.00  BC155B1  see Epicyclic reduction gear tollow-up snee
365A32-5422-20  FAETS 597  0:00  0.00  TYPE Z
ARBRE PIGNON  05/07/2016  0:00  3382.00
GEAR SHAPT  EC15581  See Epicyclic reduction gear flow-up sheet
451  0:00  0.00  0:00
05/07/2016  0:00  ......  SUPPORT EQUIPE  05/07/2016 1809:00
PLANET GEAR SHAPT  FA016752  0:00  ...s  BC15581  SUPPORT. FOUT PRD  PAF92343
CANET PIGNON CAG  05/07/2016  0.00  EC15581  See Epicyclic reduction gear follow-up sheet  SUPPORT BOUTF  05/07/2016 1809:00
360A32-1036-22  FAGH7061  360232-1163-04  FAF92345  ....
Revision 0 2017-08-11  Page 27/33
Revision 5 2019-03-06  This document is available on the Internet: http  s.com/techpub/

### Page 28

SB No. EC155-63-016 
Revision 0    2017-08-11   Page 28/33 
Revision 5    2019-03-06                                        This document is available on the Internet: https://www.airbushelicopters.com/techpub/ 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
PAGE LEFT BLANK INTENTIONALLY

### Page 29 (OCR)

AIRBUS
HELICOPTERS  SB No. EC155-63-016
4.B. EPICYCLIC REDUCTION GEAR FOLLOW-UP SHEET
Contrôle d'exécution des modifications et des Services Bulletins  Modification and Service Bulletin checking  LOG CARD I FICHE MATRICULE  Log card n°  Fiche n°
No.  Type of modification  Performing  unit or  Date of embodiement  Follow-up Sheet for new equipment / Fiche suiveuse Matériel neuf
contractor  and Inspection stamp  Materiel identification / Identification du matériel
Numéro  Nature de la modification  Unité  Date d'exécution et
ou société  tampon de contrôle  Name  REDUCTION GEAR, EPICYCLIC
d'execution  Dénomination REDUCTEUR EPICYCLOIDAL
AMS07 63C32  NATO Nomenclature  Nomenclature OTAN
AMS0763C52  AH Part number  365A32700502
EASA-2017-0116  R2  Référence AH
Manufacturer's Part number  ATO Manuf Code F021
Référence fabricant  ode OTAN fabrica
23/05/2018  Delivery configuration  Version
Configuration de livraison  Version
Serial number  Amendments
Numéro de série  Amendements
Supplier  AIRBUS HELICOPTERS SAS  Type
Fabricant  Type
Contract or order / Marché ou commande
Reference  Date
Paterence  Date
Issuing agency  Kit n°
Organisme émetteur  N° Kit ou lot
Contractor  Adress
Fournisseur  Adresse
AMS0763C32  Guarantee / Garantie
AMS0763C52  Equipment  Matériel  deli very  Date of  Date de  uaranteed storage perio  urée garantie de stockag  Date de mise en  Service date  service  Guarantee operation  Durée Garantie de  period
fonctionnement
Fab/man
4  Special information / Renseignements particuliers
Aircraft  Version  Operation  Certification  Attestation  Appendix to table 4 :  Annere au tableau 4  YES O  OUI  NO D  NON  No of sheet : 0  Nb de page
Unité ou société  Contractor  Date  Date  and S/N  Version et  Support Partial  Total  Inventory of lifed components : YES [X  NoN D  No of sheet : 1
No Appareil  Support  Partiel  Total  Inventaire des pièces à durée de Vie  OUI  Nb de page
Manuf. / Fab.*  Transfer sheet :  VES D  NON LI  No of sheet : 0
Receipt. / Réception.  Fiche Matricule de Transfert  Nb de page
Depreservation *
Destockage
Period overhaul *
Période de révision VP
Fitting  Montage  Operating limit  Limite de vie  Life limit  ATA
* Delete as necessary * Rayer la mention inutile  AIRBUS HELICOPTERS F 16-04 B3
Revision 0 2017-08-11  Page 29/33
Revision 5 2019-03-06  This document is available on the Internet: https://w  airbushelicopters.com/techpub/

### Page 30

SB No. EC155-63-016 
Revision 0    2017-08-11   Page 30/33 
Revision 5    2019-03-06                                        This document is available on the Internet: https://www.airbushelicopters.com/techpub/ 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
PAGE LEFT BLANK INTENTIONALLY

### Page 31

SB No. EC155-63-016 
Revision 0    2017-08-11   Page 31/33 
Revision 5    2019-03-06                                        This document is available on the Internet: https://www.airbushelicopters.com/techpub/ 
 
4.C. DETAILED PROCEDURE FOR REPLACEMENT OF EPICYCLIC REDUCTION GEAR 
 
4.C.1. MGB Removal 365A32-9001  
 
Assembly Kc 
 
 
a) Loosen, then remove nuts (635). 
 
b) Install the 3 extractors [D11] on the fixed ring 
gear. 
 
c) Using wrench and holding wrench, operate the 
extractors to separate the epicyclic reduction 
gear assy "Ki''. 
 
d) Using shackle [DM13], lift and remove  
assembly "Ki". 
 
e)  Remove "O" ring (655). 
 
f) Remove extractors [D 11], loosen, then remove  
bolts (S07), washers (S06), cover (S05),  
"O" ring (S04), braids (690). 
 
g) Maintain the bevel gear wheel (190) in three 
points 120° apart, with washers (60) and tooling 
nuts [M03]

### Page 32

SB No. EC155-63-016 
Revision 0    2017-08-11   Page 32/33 
Revision 5    2019-03-06                                        This document is available on the Internet: https://www.airbushelicopters.com/techpub/ 
 
Assembly Ki 
 
a) PRE MOD OP31B36 
Remove nuts (150).  
 
POST MOD OP31B36 
Remove the accelerometer sensor (850) on the 
bracket (860) loosen nuts (880). 
Remove flat washer (890) and insulating washer 
(900). 
Remove nut (635) and the sensor bracket (860). 
 
PRE MOD or POST MOD OP31B36 
Remove bolts (680), washers (145), nuts (635), 
lugs (675), bolts (665), washers (60), lugs (670). 
 
b) Remove ring gear (650), shim (640) or shim 
(640A). 
POST MOD 0763C28, “O" rings (655). 
 
c) Remove tubes (695), flanges for tubes (685), “O" 
rings (625) and “O" rings (40). 
 
Reduction gear (660) is to be disassembled as 
per Work Card 63.27.11.803.

### Page 33 (OCR)

AIRBUS
HELICOPTERS  SB No. EC155-63-016
4.C.2. MGB 365A32-9001 Installation
Assembly Ki  650  660
a) On fixed ring gear (650) fit "O" ring (655),
shim (640) or shim (640A) POST MOD
0763C28, epicyclic reduction gear (660)  positioned using the notch that is to be  FWD  AV •  _R1
aligned with that of the ring gear (identified
"R1" on Figure)
b) PRE MOD OP31B36:  680
Bolts (665), washers (60), nuts (635), bolts (680),  670  0,60-0,75 daN.m  G361
washers (145), nuts (150).  55-56 Ibf.in
Lugs (670) and (675) shall be installed after MGB  AVANT-PRE
MOD 63C62
bench test (Work Card 63.20.15.851 refers)
Turn the epicyclic reducer (660) in an anti-
clockwise direction to position the screws (680)
against the fixed-ring gear.  640A
Torque. Also torque nuts (635).
G361
0,85-1 daN.m
POST MOD OP31B36 (as per Détail B):  75-88 Ibf.in
Bracket (860) and accelerometer sensor (850)  APRES-POST
shall be installed after MGB bench test  MOD 63062 / 63C52
(Work Card 63.20.15.851 refers).
G361
2,2-2,6 daN.m
193-230 Ibf.in
APRES-POST
MOD 63C62 / 63C52  G361
1,6-1,8 daN.m
142-159 Ibf.in
AVANT-PRE
MOD 63C62
Revision 0  2017-08-11  Page 33/33
Revision 5  2019-03-06  This document is available on the Internet: https://www.airbushelicopters.com/techpub/

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
