# Eurocopter Alert Service Bulletin EC225-05A033

Copy: No revision named ("Eurocopter ASB No EC225-05A033 Rev 0"), 79 pages: PDF https://openairdocs.org/files/sha256/8f/3d/8f3df61937e02caf21a31843d341826b39e46edbad1388118103a5af7a3c190d; text https://openairdocs.org/service-documents/airbus-helicopters/ec225-05a033/file/8f3df61937e0.md. Rights: © Airbus Helicopters. Filed by the FAA in regulations.gov docket FAA-2016-9143; AD 2017-19-21 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Airbus Helicopters](https://openairdocs.org/service-documents/airbus-helicopters.md) (issued as Eurocopter)
- Type: Service bulletin (Alert Service Bulletin)
- Number: EC225-05A033
- Page: https://openairdocs.org/service-documents/airbus-helicopters/ec225-05a033

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2017-19-21](https://openairdocs.org/ad/2017-19-21.md), effective Oct 30, 2017: No revision named

Also cited in [1 proposed AD](https://openairdocs.org/service-documents/airbus-helicopters/ec225-05a033/proposed.md).

## Text (79 pages)

Rights: © Airbus Helicopters. Filed by the FAA in regulations.gov docket FAA-2016-9143; AD 2017-19-21 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. This text is OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1 (OCR)

EUROCOPTER
AN EADS COMPANY  ASB No. EC225-05A033
Civil version(s): LP
ALERT SERVICE BULLETIN
SUBJECT: TIME LIMITS - MAINTENANCE CHECKS
Modification of the emergency spraying system and its maintenance
Corresponds to modifications 0728019, 0728026, 0753025, 0753027 and 0753028
For the attention of
Revision No.  Date of issue
Revision 0  2013-07-14
Summary:
Modify part of the MGB emergency spraying system, improve the general maintenance, modify the flight manual
emergency procedures in the event of emergency spraying system (EMLUB) activation and cancel the limitations of
EASB 04A010.
Compliance:
Compliance with this ALERT SERVICE BULLETIN is mandatory.
Revision 0 2013-07-14  Page 1/79
This document is available on the internet: www.eurocopter.com/techpub

### Page 2 (OCR)

- EUROCOPTER
AN EADS COMPANY  ASB No. EC225-05A033
1. PLANNING INFORMATION
1.A. EFFECTIVITY
1.A.1. Helicopters/installed equipment
This ALERT SERVICE BULLETIN is applicable to all EC225 helicopters.
1.A.2. Non-installed equipment
AUXITROL AIR pressure switch: MA193-00
INDUSTRIA AIR pressure switch: MC7014-0-00
AUXITROL GLYCOL pressure switch: MA194-01
INDUSTRIA GLYCOL pressure switch: MC7015-0-00
GLYCOL pump: 332A32-5051-00
GLYCOL motor pump: 332A32-5042-00
GLYCOL reservoir assembly: 332A72-2717-00
GLYCOL reservoir assembly: 332A72-2717-01
Optional MGB lubrication card for the glycol heater system: 704A46580127
MGB lubrication card: 704A46580106
1.B. ASSOCIATED REQUIREMENTS
Not applicable.
1.C. REASON
Following two controlled ditchings in the North Sea in 2012, the investigations revealed the need to modify
the MGB emergency spraying system and the associated maintenance.
The triggering thresholds of the PRE MOD 0753025 AIR pressure switch and PRE MOD 0753027 GLYCOL
pressure switch as well as the 30-second delay on the emergency MGB lubrication card may generate
untimely alarms.
In addition, there is a flight envelope area in which the performance of the emergency lubrication pump is
different from the certified performance.
Therefore, the purpose of this ALERT SERVICE BULLETIN is to, replace the AIR and GLYCOL pressure
switches thus enabling the modification of the triggering thresholds, modify the helicopter wiring if necessary,
replace the GLYCOL pump, replace the MGB lubrication card and comply with a new maintenance
procedure on the emergency spraying system.
These modifications enable the flight manual limitations introduced by EASB 04A010 to be canceled.
Consequently, EUROCOPTER makes compliance with this ALERT SERVICE BULLETIN mandatory.
1.D. DESCRIPTION
Replacement of the GLYCOL pump corresponding to modification 0728019.
Replacement of the AIR pressure switch corresponding to modification 0753025.
Modification of the helicopter wiring corresponding to modification 0753028 if not yet embodied.
Replacement of the GLYCOL pressure switch corresponding to modification 0753027.
Replacement of the MGB lubrication card corresponding to modification 0728026.
Check of the GLYCOL pump flow rate.
Check of the calibration and behavior of the AIR and GLYCOL pressure switches.
Functional test of the electrical system.
Check of the pressure supplied by the engine to the AIR system.
Deletion of the flight manual pages introduced by EASB 04A010.
Insertion of additional pages given in APPENDIX 4.C into the flight manual.
Revision 0 2013-07-14  Page 2/79
This document is available on the internet: www.eurocopter.com/techpub

### Page 3 (OCR)

* EUROCOPTER
AN EADS COMPANY  ASB No. EC225-05A033
1.E. COMPLIANCE
1.E.1. Compliance at the works
Helicopters/installed equipment:
Not applicable.
Non-installed equipment:
Not applicable.
1.E.2. Compliance in service
The work on the helicopter is to be performed by the operator.
Helicopters/installed equipment:
Comply with paragraph 3. of this ALERT SERVICE BULLETIN within 500 flying hours without exceeding
4 months following receipt of this ALERT SERVICE BULLETIN Revision 0, issued on the date indicated at
the bottom of the page. Once compliance with paragraph 3. of this ALERT SERVICE BULLETIN has been
ensured and before the next flight, remove the emergency procedure pages introduced by EASB 04A010
from the flight manual and insert the new flight manual pages introduced by appendix 4.C or any subsequent
approved revisions of these pages.
THEN
Comply with the task 63-26-00-721 given in Appendix 4.A of this ALERT SERVICE BULLETIN, or any
subsequent revision of this task, every 800 flight hours (margin of 25 flight hours) and insert it into the MMA.
CAUTION
PENDING THE UPDATE OF THE MMA WORK CARDS, THE PAGES
IN TASK 63-26-00-721 IN APPENDIX 4.A OF THIS ALERT SERVICE
BULLETIN  SUPERSEDE  PAGES
TASK 63-26-00-721 DATED JULY 07, 2011
Revision 0 2013-07-14  Page 3/79
This document is available on the internet: www.eurocopter.com/techpub

### Page 4 (OCR)

- EUROCOPTER
AN EADS COMPANY  ASB No. EC225-05A033
Non-installed equipment:
Discard the stored parts listed below within 6 months following the issue of this ALERT SERVICE BULLETIN:
AUXITROL AIR pressure switch: MA193-00
INDUSTRIA AIR pressure switch: MC7014-0-00
AUXITROL GLYCOL pressure switch: MA194-01
INDUSTRIA GLYCOL pressure switch: MC7015-0-00
GLYCOL pump: 332A32-5051-00
Modify stocks of the components listed below as per paragraph 3.B.9 after compliance with this ALERT
SERVICE BULLETIN:
GLYCOL motor pump: 332A32-5042-00
GLYCOL reservoir assembly: 332A72-2717-00
GLYCOL reservoir assembly: 332A72-2717-01
Modify stocks of the components listed below as per paragraph 2.D after compliance with this ALERT
SERVICE BULLETIN:
Optional MGB lubrication card for the glycol heater system: 704A46580127
MGB lubrication card: 704A46580106
1.F. APPROVAL
Approval of modifications:
The information or instructions relate to modifications 0728019, 0728026, 0753025, 0753027 which were
approved on July 11, 2013, by the EASA for helicopters of civil versions subject to an Airworthiness
Certificate.
The information or instructions relate to modification 0753028 which was approved on February 21, 2013 by
the EASA for helicopters of civil versions subject to an Airworthiness Certificate.
Approval of this document:
The technical information contained in this ALERT SERVICE BULLETIN Revision 0 was approved
on July 12, 2013 under the authority of EASA Design Organization Approval No. 21J.056 for helicopters of
civil versions subject to an Airworthiness Certificate.
Revision 0 2013-07-14  Page 4/79
This document is available on the internet: www.eurocopter.com/techpub

### Page 5 (OCR)

EUROCOPTER
AN EADS COMPANY  ASB No. EC225-05A033
1.G. MANPOWER
For compliance with this ALERT SERVICE BULLETIN, EUROCOPTER recommends the following personnel
qualifications:
Qualification: 1 Pilot and 3 Mechanics.
The time for the operations is given for information purposes, for a standard configuration.
Time for modifications: 3 hours for the Mechanics
Time for maintenance: 8 hours for the mechanics and 30 minutes for the pilot
Estimated helicopter grounding time: Approximately 1 day.
1.H. WEIGHT AND BALANCE
Not applicable.
1.1. EFFECT ON ELECTRICAL LOADS
Not applicable.
1.J. SOFTWARE MODIFICATION EMBODIMENT RECORD
Not applicable.
1.K. REFERENCES
MMA: 07-10-00-491 Jacking and Lowering the Aircraft
MMA: 24-00-00-611 General instructions
MMA: 32-30-00-481 Installation of the ground/flight simulator
MMA: 63-26-00-061 Removal - Installation of the spraying system
MMA: 63-26-00-062 Reservoir - Removal / Installation
MMA: 63-26-00-063 Motor Pump - Removal / Installation
MMA: 63-26-00-065 Removal - Installation of Air and Glycol Pressure Sensors
MMA: 63-26-00-064 Removal - Installation of the Emergency Lubrication Solenoid Valve
MMA: 63-26-00-871 Filling - Draining the reservoir
MMA: 71-00-00-051 Removal - Installation
MTC: 20.02.01.403 Installation of hydraulic unions - "FLEXIRAC" flexible unions
MTC: 20.02.01.404 Installation of hydraulic unions - "SM HARRISON" unions
MTC: 20.02.06.409 Safetying and locking assemblies: Safetying with Loctite compound
MTC: 20.04.01.102 Use of cleaning products on individual parts and on aircraft
MTC: 20.07.03.406 Technical instructions - Instructions applicable when working on an aircraft electrical
circuit and power generating systems
MTC: 20.07.04.451 Technical instructions - Aircraft ground run and ground check
Revision 0 2013-07-14  Page 5/79
This document is available on the internet: www.eurocopter.com/techpub

### Page 6 (OCR)

- EUROCOPTER
AN EADS COMPANY  ASB No. EC225-05A033
1.L. DOCUMENTS AFFECTED
The modifications will be integrated into the following manuals:
MMA,
ICO,
IPC,
MSM
PMV.
These documents will be issued subsequently.
1.M. INTERCHANGEABILITY OR MIXABILITY OF PARTS
Interchangeability:
PRE MOD 0753025 AIR pressure switches and POST MOD 0753025 AIR pressure switches are not
interchangeable.
PRE MOD 0753027 GLYCOL pressure switches and POST MOD 0753027 GLYCOL pressure switches are
not interchangeable.
PRE MOD 0728019 GLYCOL pumps and POST MOD 0728019 GLYCOL pumps are not interchangeable.
PRE MOD 0728026 emergency MGB lubrication cards and POST MOD 0728026 emergency MGB
lubrication cards are not interchangeable.
Mixability:
Modifications 0728019, 0728026, 0753025, 0753027 and 0753028 must be embodied jointly and any
mixability is prohibited.
Revision 0 2013-07-14  Page 6/79
This document is available on the internet: www.eurocopter.com/techpub

### Page 7 (OCR)

- EUROCOPTER
AN EADS COMPANY  ASB No. EC225-05A033
2. MATERIAL INFORMATION
2.A. MATERIAL: PRICE - AVAILABILITY - PROCUREMENT
2.A.1. Return of the MGB lubrication card
The removed MGB lubrication card must be returned to EUROCOPTER for modification. This modification
will be embodied free of charge by EUROCOPTER.
Please contact your usual EUROCOPTER correspondent at the EUROCOPTER Sales and Customer
Relations Department center who will explain the conditions and associated planning.
When organizing compliance with this ALERT SERVICE BULLETIN, please specify the following information:
. Customer contact details,
. Aircraft number,
• Part number (P/N) and Serial number (S/N) of the MGB lubrication card.
2.A.2. EUROCOPTER
For any information concerning the price of kits and/or components, contact the EUROCOPTER network
Sales & Customer Relations Department.
EUROCOPTER
Etablissement de Marignane
Direction Ventes et Relations Client (ECR)
13725 MARIGNANE CEDEX
FRANCE
NOTE 1
On the purchase order, please always specify the mode of
transport, the destination and the numbers of the helicopters to
be modified.
NOTE 2
For ALERT SERVICE BULLETINS, order by:
Telex: HELICOP 410 969F
Fax: +33 (0)4.42.85.99.96
Revision 0 2013-07-14  Page 7/79
This document is available on the internet: www.eurocopter.com/techpub

### Page 8 (OCR)

→ EUROCOPTER
AN EADS COMPANY  ASB No. EC225-05A033
2.B. INFORMATION CONCERNING INDUSTRIAL SUPPORT
Not applicable.
2.C. MATERIAL REQUIRED FOR EACH HELICOPTER/COMPONENT
Material to be ordered separately:
Former
Key Word  Qty  Material P/N  Item
PIN  →  Instruction
EMLUB system
modification KIT,  332AEMLUB00071
including:
AIR pressure  MC7014-1-00  1  MC7014-0-00 OR  DISCARD
switch  MA193-00
AIR seal  1  DHS621-100.04  2  DHS621-100.04  DISCARD
GLYCOL pressure  MC7015-1-00  3  MC7015-0-00 OR  DISCARD
switch  MA194-01
GLYCOL seal  1  DHS621-100.03  4  DHS621-100.03  DISCARD
GLYCOL pump  1  332A32-5043-00  5  332A32-5051-00  DISCARD
GLYCOL pump
countersunk head  6  22256BC060012L
screw
Motor pump  2  MS29513-148  9
assembly seal
O-ring  M83248/1-011  17
Material to be ordered separately if necessary:
Former
Key Word  Qty  Material P/N  Item
P/N  Instruction
GLYCOL motor  pump  1  332A32-5042-01  7  332A32-5042-00  paragraph 3.B.9  Modify as per
P2.4 solenoid valve  1  6910A01  8
Frangible disc  1  332A61-4126-21  19
Identification heat-
shrink sleeve  AIR  NSA937201MR1000  20
Revision 0  2013-07-14  Page 8/79
This document is available on the internet: www.eurocopter.com/techpub

### Page 9 (OCR)

→ EUROCOPTER
AN EADS COMPANY  ASB No. EC225-05A033
Products to be ordered separately:
Key Word  Qty  Product P/N  Item
Castrol hydrosafe 620  A/R  171  13
Lockwire  A/R  776  14
Bubble 7034  A/R  7034  15
Low-strength thread-lock  AIR  ASNA4017  16
compound
Sealing compound  AIR  PR1771 B2  18
Specific tooling:
Helicopter maintenance and operation after compliance with this ALERT SERVICE BULLETIN require the
use of new tools.
Key Word  Qty  Tool P/N or equivalent  Item
DRUCK tool  1  DP1610E  (zz)
P2.4 solenoid valve test kit  1  332A97-9000-00 / 332A97-9001-00  (35)
GLYCOL AIR pressure switch test kit  1  332A97-9003-00  (xx)
GLYCOL pump test kit  1  332A97-9002-00  (ww)
Electrical jumper  1  332A97-3404-00  (VV)
Case Emergency Lubrication  1  332A97-3401-00  (uu)
GROUND / FLIGHT simulator  1  332A97-6102-00  (kk)
Tools manufactured by the user:
Key Word  Qty  Tool P/N or equivalent  Item
Test cable with a bulb (28V max. 5V)  A/R  (tt)
Locally made shunt wire  A/R  (SS)
Locally made "Y"-type shunt wire  A/R  (гг)
Revision 0 2013-07-14  Page 9/79
This document is available on the internet: www.eurocopter.com/techpub

### Page 10 (OCR)

EUROCOPTER
AN EADS COMPANY  ASB No. EC225-05A033
Tools supplied by the user:
Key Word  Qty  Tool P/N or equivalent  Item
Flexible pipe Øint = 20 mm and  Lmax = 1.20 m  A/R  OFF THE SHELF  (99)
Measuring recipient, 0.01 liter scale  OFF THE SHELF  (PP)
Tightening clamp  A/R  OFF THE SHELF  (00)
Cable clamp  A/R  OFF THE SHELF  (nn)
Hot air gun  OFF THE SHELF  (mm)
Impact screwdriver  OFF THE SHELF
2.D. MATERIAL TO BE RETURNED
In order to schedule the modification MGB lubrication cards, please contact EUROCOPTER as per
paragraph 2.A.1.
Key Word  Qty  Material P/N  Item  Former  P/N  →  Instruction
MGB lubrication  Return to
for optional  card  1  704A46580146  10  704A46580127  EUROCOPTER
GLYCOL heater  paragraph 2.A.1  as per
system
Return to
MGB lubrication  1  704A46580147  11  704A46580106  EUROCOPTER
card  as per
paragraph 2.A. 1
Revision 0 2013-07-14  Page 10/79
This document is available on the internet: www.eurocopter.com/techpub

### Page 11 (OCR)

Z EUROCOPTER
AN EADS COMPANY  ASB No. EC225-05A033
3. ACCOMPLISHMENT INSTRUCTIONS
3.A. GENERAL
Read and comply with the general electrical instructions as per MMA Task 24-00-00-611.
Read and comply with the instructions concerning the installation of flexible FLEXIRAC unions as per MTC
Work Card 20.02.01.403.
Read and comply with the instructions concerning the installation of SM Harrison unions as per MTC Work
Card 20.02.01.404.
Read and comply with the instructions for safetying and locking assemblies with Loctite as per MTC Work
Card 20.02.06.409.
Read and comply with the instructions for cleaning/degreasing parts on the helicopter as per MTC Work
Card 20.04.01.102.
Read and comply with the technical instructions applicable when working on an aircraft electrical circuit or
when energizing aircraft power generating systems on ground as per MTC Work Card 20.07.03.406.
Read and comply with the technical instructions applicable to ground runs as per MTC Work
Card 20.07.04.451.
3.B. OPERATIONAL PROCEDURE
NOTE 1
During first compliance, paragraph 2 of this ALERT SERVICE
BULLETIN replaces paragraph 1 of appendix 4.A
3.B.1. Preliminary steps
- Disconnect all electrical power supplies.
- Install the access equipment.
- Open the MGB sliding cowling.
3.B.2. Replacement of the glycol pump corresponding to modification 0728019
3.B.2.a. Removal of the glycol pump (Figure 1)
- Remove the glycol motor pump as per Sub-task 63-26-00-031-001 of MMA Task 63-26-00-063.
- Clamp the glycol motor pump in a vice fitted with soft jaws.
- Using an appropriate impact screwdriver (II):
. Remove and discard the 6 attachment screws (c).
- Disassemble the glycol pump (b) from the reduction gear (a).
- Discard the glycol pump (b).
- Retain the reduction gear (a).
Revision 0 2013-07-14  Page 11/79
This document is available on the internet: www.eurocopter.com/techpub

### Page 12 (OCR)

* EUROCOPTER
AN EADS COMPANY  ASB No. EC225-05A033
3.B.2.b. Installation of the glycol pump (Figure 1)
NOTEZ
When installing the glycol pump, the pump and the reduction
gear may differ in color.
- Make sure that no particles enter the pump.
- Using the drive shaft of the reduction gear (a), make sure that the new pump rotates freely, without friction
points.
- On the reduction gear (a) retained after removal:
. Replace the O-ring (17) of the drive shaft.
. Position the glycol pump (5).
. Apply a bead of PR sealing compound (18) between the glycol pump (5) and the reduction gear (a) as per
MTC 20-05-01-222.
- Install the attachment screws (6) with thread-lock compound (16) on the glycol pump (5).
- Tighten the screws to a torque of between 0.9 mdaN and 1 mdaN.
Make sure that the attachment screws (6) do not protrude from the glycol pump (5).
- Reidentify the motor pump assembly as per paragraph 3.C.
- Reidentify the fitted reservoir assembly as per paragraph 3.C.
• Install the two seals (9) on the motor pump.
- Install the glycol motor pump as per sub-task 63-26-00-431-001 of MMA Task 63-26-00-063.
- Create a new Log Card (FM) for the glycol reservoir assembly as per paragraph 3.C and
MTC 20.08.05.101.
- Mark the following information on the Log Card:
• Glycol reservoir assembly: P/N and S/N
- List the following components on the Log Card:
Motor pump assembly: P/N and S/N of the pump.
. Electrical actuator: P/N and S/N.
3.B.3. Modification of the AIR pressure switch corresponding to modification 0753025 and the GLYCOL pressure
switch corresponding to modification 0753027.
- Remove and discard the AIR pressure switch as per Sub-task 63-26-00-033-001 of MMA Task 63-26-065.
- Remove and discard the GLYCOL pressure switch as per Sub-task 63-26-033-002 of MMA task 63-26-065.
- Blank the orifices of the main distribution unit open to the air.
NOTE 3
In order to test the pressure switches it is necessary to use the following
special tools:
DRUCK DPI610E test set (zz) with AIR GLYCOL pressure switch test set
332A97-9003-00 (xx) and electrical jumper assembly 332A97-3404-00
(WV). They can be ordered as per paragraph 2 of this ALERT SERVICE
BULLETIN.
NOTE 4
For this test use the new AIR MC 7014-1-00 and GLYCOL MC 7015-1-00
pressure switches.
- Comply with sub-task 63-26-00-721-003 as described in paragraph 3.3 of Appendix 4.A.
Revision 0 2013-07-14  Page 12/79
This document is available on the internet: www.eurocopter.com/techpub

### Page 13 (OCR)

→ EUROCOPTER
AN EADS COMPANY  ASB No. EC225-05A033
CAUTION
THE EMBODIMENT OF MODIFICATIONS 0753025
AND 0753027 REQUIRES THE EMBODIMENT OF
MODIFICATION 0753028.
- Before installation of the new pressure-switches, check in the helicopter documention that MOD 0753028
(modification of the wiring) has been embodied in new or by retrofit, in compliance with EASB 05A032.
• If MOD 0753028 has not been embodied, comply with paragraph 3.B.8 of this ALERT SERVICE
BULLETIN.
- Install the AIR pressure switch (1) P/N: MC7014-1-00, fitted with its new seal (2) as per
Sub-task 63-26-00-433-001 of MMA Task 63-26-00-065.
- Install the GLYCOL pressure switch (3) P/N: MC7015-1-00, fitted with its new seal (4) as per
Sub-task 63-26-00-433-002 of MMA Task 63-26-00-065.
3.B.4. Modification of the MGB lubrication card corresponding to modification 0728026 (Figure 2).
NOTE 5
Before sending the MGB lubrication card, it is necessary to
contact EUROCOPTER in order to organize its return. Refer to
paragraph 2.D. to determine the conditions.
- Remove the emergency MGB lubrication card (d) or (e) (6QK1).
- Return the MGB lubrication card to EUROCOPTER as per paragraph 2.D.
- Install the new MGB lubrication card 10 or 11 (6QK1):
Part number of the removed MGB  Part number of the MGB
lubrication card  lubrication card to be installed
Optional MGB lubrication card for  704A46580127  704A46580146
the glycol heater system
MGB lubrication card  704A46580106  704A46580146 OR
704A46580147
3.B.5 Functional tests of the emergency spraying system
3.B.5.a. Preparation
- Comply with paragraph 2 of appendix 4.A.
3.B.5.b. Test of the power supply voltages
- Comply with sub-task 63-26-00-721-001 as described in paragraph 3.1 of appendix 4.A.
3.B.5.c. Test of the Hydrosafe 620 circuit.
NOTE 6
For this test, the GLYCOL PUMP TEST KIT 332A97-9002-00
(wW), a measuring recipient (pp) (0.01 liter scale) and a timer
must be used. They can be ordered as per paragraph 2. of this
ALERT SERVICE BULLETIN.
Revision 0 2013-07-14  Page 13/79
This document is available on the internet: www.eurocopter.com/techpub

### Page 14 (OCR)

- EUROCOPTER
AN EADS COMPANY  ASB No. EC225-05A033
NOTE T
When replacing the GLYCOL motor pump (7) and its seal (9),
order them as per paragraph 2. of this ALERT SERVICE
BULLETIN.
NOTE 8
During the test of the Hydrosafe 620 system, stored oil may
come out in addition to the glycol, following replacement of the
glycol pump.
NOTE 9
If the test of the Hydrosafe 620 system is not conclusive when
complying with this ALERT SERVICE BULLETIN: contact the
EUROCOPTER Technical Support.
- Comply with sub-task 63-26-00-721-002 as described in paragraph 3.2 of appendix 4.A.
3.B.5.d. Functional test of the electrical system
NOTE 10
For this test, emergency lubrication unit 332A97-3401-00 (uu)
or a locally made tool must be used, ordered as per
paragraph 2. of this ALERT SERVICE BULLETIN.
- Comply with sub-task 63-26-00-721-004 as described in paragraph 3.4 of appendix 4.A.
Revision 0 2013-07-14  Page 14/79
This document is available on the internet: www.eurocopter.com/techpub

### Page 15 (OCR)

— EUROCOPTER
AN EADS COMPANY  ASB No. EC225-05A033
3.B.5.e. Test of the P2.4 system with rotor spinning
NOTE 11
For this test, the following special tools must be used:
P2.4 test set P/N: 332A97-9000-00 or 332A97-9001-00 (VY)
and cable clamps (nn), ordered as per paragraph 2. of this
ALERT SERVICE BULLETIN.
NOTE 12
When replacing the P2.4 solenoid valve (8), order it as per
paragraph 2. of this ALERT SERVICE BULLETIN.
NOTE 13
If the P6-P1 pressure > 0.03 bars (43.511 psi), comply with
Task 63-26-00-723 as described in Appendix 4.B.
- Comply with sub-task 63-26-00-721-005 as described in paragraph 3.5 of appendix 4.A.
- Fill in Appendix 4.D.
3.B.6. Modification of the Flight Manual
- Remove the pages modifying the flight manual emergency procedures in the event of emergency
spraying system (EMLUB) activation introduced by EASB 04A010 from the Flight Manual.
- Insert the additional pages given in APPENDIX 4.C into the flight manual.
3.B.7. Final steps
- Comply with paragraph 4 of appendix 4.A.
Revision 0 2013-07-14  Page 15/79
This document is available on the internet: www.eurocopter.com/techpub

### Page 16 (OCR)

→ EUROCOPTER
AN EADS COMPANY  ASB No. EC225-05A033
3.B.8 Wiring modification corresponding to MOD 0753028:
NOTE 14
This paragraph is only applicable if modification 0753028 has not been
previously embodied.
3.B.8.a. Wiring modification for PRE MOD 0726933 aircraft (Rework on shielding of the torquemeter system
harness)
- Remove and retain sleeves (3QK) and (4QK).
- Disconnect the wires from movable connectors (3QK) and (4QK) (Figure 3 detail A) as per
MTC 20.80.20.101.
- Using a permanent marker, write the following information on the sleeves (20):
Harness part  MOD number
number
332A088706.00  0753028
- Install the heat-shrink sleeves 20) on all harnesses.
- Connect connectors (3QK) and (4QK) as per Figure 3 detail B and MTC 20.80.20.101.
- Install sleeves (3QK) and (4QK) retained after removal.
- Shrink-fit the sleeve using a hot air gun (mm).
- Record the embodiment of modification 0753028 in the helicopter documents.
- Continue complying with paragraph 3.B.3
3.B.8.b. Wiring modification for POST MOD 0726933 aircraft (Rework on shielding of the torquemeter system
harness
- Remove and retain sleeves (3QK) and (4QK).
- Disconnect the wires from movable connectors (3QK) and (4QK) (Figure 3 detail A) as per
MTC 20.80.20.101.
- Using a permanent marker, write the following information on the sleeves (20):
Harness part  MOD number
number
332A088706.01  0753028
- Install the heat-shrink sleeves (20) on all harnesses.
- Connect connectors (3QK) and (4QK) as per Figure 3 detail B and MTC 20.80.20.101.
- Install sleeves (3QK) and (4QK) retained after removal.
- Shrink-fit the sleeve using a hot air gun (mm).
- Record the embodiment of modification 0753028 in the helicopter documents.
- Continue complying with paragraph 3.B.3.
Revision 0 2013-07-14  Page 16/79
This document is available on the internet: www.eurocopter.com/techpub

### Page 17 (OCR)

- EUROCOPTER
AN EADS COMPANY  ASB No. EC225-05A033
3.B.9. Operational procedure on non-installed equipment
3.B.9.a. Modification of motor pump assembly 332A32-5042-00
Remove and discard pump 332A32-5051-00 from motor pump 332A32-5042-00.
Install pump 332A32-5043-00 on the motor pump as per paragraph 3.B.2.b. of this ALERT SERVICE
BULLETIN
- Reidentify the motor pump assembly and reservoir assembly as per paragraph 3.C and MTC 20.08.05.103:
3.B.9.b. Follow-up of the reservoir assembly:
- Create a new Log Card (FM) for the glycol reservoir as per paragraph 3.C and MTC 20.08.05.101.
- Mark the tollowing information on the Log Card:
. Glycol reservoir assembly: P/N and S/N
- List the following components on the Log Card:
• Motor pump assembly: P/N and S/N of the pump.
. Electrical actuator: P/N and S/N
Revision 0 2013-07-14  Page 17/79
This document is available on the internet: www.eurocopter.com/techpub

### Page 18 (OCR)

* EUROCOPTER
AN EADS COMPANY  ASB No. EC225-05A033
3.C. IDENTIFICATION
Identification of this document:
Record compliance with this ALERT SERVICE BULLETIN Revision O in the helicopter documents.
Identification of modifications on the documentation:
Record the embodiment of MOD 0753025 in the helicopter documents.
Record the embodiment of MOD 0753027 in the helicopter documents.
Record the embodiment of MOD 0728019 in the helicopter documents.
Record the embodiment of MOD 0728026 in the helicopter documents.
Record the embodiment of modification 0728019 and the number of this ALERT SERVICE BULLETIN in the
Log Card of the reservoir assembly.
Identify parts / assemblies as per table below and/or MTC 20.08.05.103.
Key Word  Former P/N  New P/N  MOD  Type of marking
GLYCOL  332A32-5042-00  332A32-5042-01  0728019  STAMP
motor pump
Reservoir assy  332A72-2717-00  332A72-2717-00 + kit  0728019  STAMP
332A089049
Reservoir assy  332A72-2717-01  332A72-2717-02  0728019  STAMP
3.D. OPERATING AND MAINTENANCE INSTRUCTIONS
Maintenance instructions:
Pending the update of the Work Cards and each time the emergency spraying system is replaced (Removal
/ Installation) as indicated in MMA Task 63-26-00-061, comply with task 63-26-00-721 of appendix 4.A of this
ALERT SERVICE BULLETIN instead of MMA Task 63-26-00-721 dated July 07, 2011.
Pending the update of the Work Cards and each time the glycol reservoir is replaced (Removal / Installation)
as indicated in MMA Task 63-26-00-062, comply with sub-task 63-26-00-721-002 of appendix 4.A of this
ALERT SERVICE BULLETIN instead of MMA Task 63-26-00-721 dated July 07, 2011.
Pending the update of the Work Cards and each time the glycol motor pump is replaced (Removal /
Installation) as indicated in MMA Task 63-26-00-063, comply with sub-task 63-26-00-721-002 of
appendix 4.A of this ALERT SERVICE BULLETIN instead of sub-task 63-26-00-721-002 of MMA
Task 63-26-00-721 dated July 07, 2011.
Pending the update of the Work Cards and each time the electrical actuator is replaced (Removal /
Installation) as indicated in MMA Task 63-26-00-067, comply with sub-task 63-26-00-721-002 of
appendix 4.A of this ALERT SERVICE BULLETIN instead of sub-task 63-26-00-721-002 of MMA
Task 63-26-00-721 dated July 07, 2011.
Revision 0 2013-07-14  Page 18/79
This document is available on the internet: www.eurocopter.com/techpub

### Page 19 (OCR)

→ EUROCOPTER
AN EADS COMPANY  ASB No. EC225-05A033
Pending the update of the Work Cards and each time the glycol reservoir is filled as indicated in MMA
Task 63-26-00-871, comply with sub-task 63-26-00-721-002 of appendix 4.A of this ALERT SERVICE
BULLETIN instead of sub-task 63-26-00-721-002 of MMA Task 63-26-00-721 dated July 07, 2011.
Pending the update of the Work Cards and each time the (AIR / GLYCOL) pressure sensors are replaced
(Removal / Installation) as indicated in MMA Task 63-26-00-065, comply with sub-tasks 63-26-00-721-003
and 63-26-00-721-004 of appendix 4.A of this ALERT SERVICE BULLETIN instead of MMA
Task 63-26-00-721 dated July 07, 2011.
Pending the update of the Work Cards and each time the solenoid valve is replaced as indicated in MMA
Task 63-26-00-064, comply with sub-task 63-26-00-721-005 of appendix 4.A of this ALERT SERVICE
BULLETIN instead of sub-task 63-26-00-721-003 of MMA Task 63-26-00-721 dated July 07, 2011.
Pending the update of the Work Cards and each time the air cooler is replaced as indicated in MMA
Task 63-26-00-066, comply with sub-task 63-26-00-721-005 of appendix 4.A of this ALERT SERVICE
BULLETIN instead of MMA Task 63-26-00-721 dated July 07, 2011.
Pending the update of the Work Cards and each time MMA Task 05-53-00-231 is used, comply with
sub-task 63-26-00-721-005 of appendix 4.A of this ALERT SERVICE BULLETIN instead of MMA
sub-task 63-26-00-721-003 dated July 07, 2011.
The Aircraft Maintenance Manual (MMA) and the Master Servicing Manual (MSM) will incorporate these
instructions in a future revision. Following integration of these instructions in the Aircraft Maintenance Manual
(MMA) and the Master Servicing Manual, refer to these manuals.
Revision 0 2013-07-14  Page 19/79
This document is available on the internet: www.eurocopter.com/techpub

### Page 20 (OCR)

→ EUROCOPTER
AN EADS COMPANY  ASB No. EC225-05A033
(a)
(с)
(17)
(9)
Figure 1
≥З.B.2.
Revision 0 2013-07-14  Page 20/79
This document is available on the internet: www.eurocopter.com/techpub

### Page 21 (OCR)

→ EUROCOPTER
AN EADS COMPANY  ASB No. EC225-05A033
- 6QK
(11)
Figure 2
≥З.B.4.
Revision 0 2013-07-14  Page 21/79
This document is available on the internet: www.eurocopter.com/techpub

### Page 22 (OCR)

EUROCOPTER
AN EADS COMPANY  ASB No. EC225-05A033
28
ЗОК  GLYCOL
PRESSURE  SENSOR
412  9VU
29  -LOW-
27A A  274  4QK  AIR
PRESSURE  SENSOR
412  9VU
Detail А: PRE MOD 0753028
GLYCOL
PRESSURE  SENSOR
412  9VU
29
/ 4VCA  41Ż
274  40K  AIR
PRESSURE  SENSOR
412  9vU
Detail B: POST MOD 0753028
Figure 3: Embodiment of MOD 0753028
≥3.B.8.
Revision 0 2013-07-14  Page 22/79
This document is available on the internet: www.eurocopter.com/techpub

### Page 23 (OCR)

- EUROCOPTER
AN EADS COMPANY  ASB No. EC225-05A033
4. APPENDIX
4.A. APPENDIX 1
EUROCOPTER
AIRCRAFT MAINTENANCE MANUAL EC225
Task 63-26-00-721
MGB LUBRICATION BACK UP SYSTEM
Emergency lubrication functional tests
1 REQUIRED EQUIPMENT
1.1 Special Tools
A/C tool kit: Engine cowling walkways
assembly
Electrical ground power unit (or  GB45/20V04
equivalent)
Test lead with lamp (28V 5W max.)  Made locally
Shunt  Made locally
"Y" type shunt  Made locally
Flight/Ground simulator  332A976102.00
DRUCK tool  DPI610E
Air & Glycol Mano Thresholds Test  332A973404.00
Mano Air electrical loom  )332A973404.00
Mano Glycol electrical loom  332A973404.00
GLYCOL PUMP TEST KIT  332A979002.00
Hose Inner dia. = 20 millimeters (.787 in)  Commercial
and Lmax = 1200 millimeters (47.24 in)
Graduated recipient (accurate to 0.01 L  Commercial
(0026 US gal - .0022 UK gal))
GLYCOL AIR PRESSURE SWITCH  332A979003.00
TEST KIT
- [DPI610E connection 332A979003.20]
[GLYCOL 332A979003.21]
[AIR 3324979003.22]
[Hose Commercial
P2.4 VALVE TEST KIT  332A979000.00
[Transmitter assembly 332A973402.00]
[Support assembly 332A979000.11]
[Air system 332A979000.10]
[Calibration sheet 332A979000.31]
- _ [Air pressure sensor EFE - PHE 167 BAR G]
or
P2.4 VALVE TOOL  332A979001.00
- [KENT CHAMBER 332A979001.10]
63-26-00-721  Page 1
2013.06.03
Revision 0 2013-07-14  Page 23/79
This document is available on the internet: www.eurocopter.com/techpub

### Page 24 (OCR)

- EUROCOPTER
AN EADS COMPANY  ASB No. EC225-05A033
JEUROCOPTER
AIRCRAFT MAINTENANCE MANUAL EC225
[ATTACHMENT ASSEMBLY 332A979001.11]
[CONNECTOR 332A979001.12)
- [USER MANUAL 332A979001.33]
[PIPE GP 60 332A979001.61]
[SENSOR 2600BGA4001 G3UA]
Emergency lubrication unit  332A973401.00
Chronometer  Commercial
Multimeter  Commercial
1.2  Materials
Bubble fluid  CM 7034
Locwire  CM 776
1.3  Replacement Parts
Name  Item  Figure  Part No.
O-ring  (8)  (Figure 4)  IPC 63.26.00.01
O-ring  (10)  (Figuré 4)  IPC 63.26.00.01
1.4 Applicable Documents
Aircraft Maintenance Manual (MMA):
Task 07-10-00-491  Jacking and Lowering the Aircraft
Task 24-00-00-611  General Instructions
Task 32-30-00-481  Installation of the flight/ground simulator
Task 63-26-00-061  Removal - Installation of the spraying system
Task 63-26-00-062  Reservoir- Removal/Installation
Task 63-26-00-063  Motor Pump - Removal/Installation
Task 63-26-00-064  Removal-Installation of the Emergency
Lubrication Solenoid Valve
Task 63-26-00-065  Removal - Installation of Air and Glycol Pressure
Sensors
Task 63-26-00-723  Electrovalve leak test
Task 63-26-00-871  Fluid Reservoir - Filling/Draining
Task 71-00-00-051  Removal-Installation
1.5  General Information
Standard Practices Manual (MTC):
MTC 20.02.01.403  Installation of "FLEXIRAC" flexible unions
MTC 20.02.01.404  Installation of "SM HARRISON" unions
MTC 20.07.03.406  Instructions applicable when working on an
aircraft electrical circuit and power generating
systems
63-26-00-721  Page 2
2013.06.03
Revision 0 2013-07-14  Page 24/79
This document is available on the internet: www.eurocopter.com/techpub

### Page 25 (OCR)

- EUROCOPTER
AN EADS COMPANY  ASB No. EC225-05A033
EUROCOPTER
AIRCRAFT MAINTENANCE MANUAL EC225
2 PRELIMINARY STEPS
< CAUTION
BEFORE YOU DO WORK ON THE AIRCRAFT
ELECTRICAL SYSTEM, OBEY THE GENERAL
INSTRUCTIONS GIVEN IN TASK 24-00-00-611.
¿CAUTIONS
BEFORE YOU DO WORK ON THE EMERGENCY
LUBRICATION SYSTEM, MAKE SURE THAT THE
ENVIRONMENT IS CLEAN.
MAKE SURE THAT NO UNWANTED MATERIAL
GOES INTO THE PIPES.
SEAL THE VENT PORTS
- Install the access equipment.
Open the sliding cowling.
Open the engine cowlings and install the A/C tool kit Engine cowling walkways assembly)
Make sure that the "MGB EMLUB" and "AVCS" circuit breakers are closed.
Connect the [Electrical ground power unit (or equivalent) GB45/20V04].
- Energize the aircraft electrical system.
3 PROCEDURE
(Figure 1)(Figure 2)(Figure 3)(Figure 4)(Figure 5) (Figure 6)(Figure 7)(Figure 8)(Figure 9)(Figure 10)
(Figure 11)(Figure 12)(Figure 13)(Figure 14)(Figure 15)(Figure 16)(Figure 17)(Figure 18)(Figure 19)
(Figure 20)
Sub-task 63-26-00-721-001
3.1  Power supply test
(PRE MOD 0726587)
- On the maintenance panel:
make sup that the toW 3)( and «PW2" (2) ignits come on,
set the "PS PW" switch (3) to "off"
• make sure that the "PW I" (1) and "PW2" (2) lights go off.
(POST MOD 0726587)
- On the maintenance panel:
63-26-00-721  Page 3
2013.06.03
>3.B.5.a.
Revision 0 2013-07-14  Page 25/79
This document is available on the internet: www.eurocopter.com/techpub

### Page 26 (OCR)

- EUROCOPTER
AN EADS COMPANY  ASB No. EC225-05A033
TEUROCOPTER
AIRCRAFT MAINTENANCE MANUAL EC225
set the "PS PW" switch (3) (Figure 1) to "power" and hold it,
make sure that the "PW 1" (1) and "PW2" (2) lights come on,
release the "PS PW" switch (3) on the maintenance panel,
make sure that the "PW1" (1) and "PW2" (2) lights go off.
Sub-task 63-26-00-721-002
3.2 Hydrosafe 620 system test
- De-energize the aircraft electrical system.
Sonnect the supply pipe (4) (gure 3) to the pLYCOL PUMP TEST KIT 332497900200(1  P TEST KIT 332A979002.00) (1
make sure that the union is correctly attached and then tighten it one sith of a turn.
Install the [Hose Inner dia. = 20 mimeters (.787 in) and Lmax = 1200 milimeters (47.24 in)
Commercial (3) on the [GLYCOL PUMP TEST KIT 3324979002.00] (1) with a clamp
Put the [Hose Inner dia. = 20 millimeters (.787 in) and Lmax = 1200 millimeters (47.24 in
Commercial (3) in a [Graduated recipient (accurate to 0.01 L (.0026 US gal - .0022 UK gal))
Commercial (2).
Energize the aircraft electrical system.
< CAUTION >
MAKE SURE THAT:
THE [GRADUATED RECIPIENT (ACCURATE
TO 0.01 L (.0026 US GAL - .0022 UK GAL))
COMMERCIAL] (2) IS IN A STABLE AND
HORIZONTAL POSITION.
THE ROUTING OF THE [HOSE INNER DIA. =
20 MILLIMETERS (-787 IN) AND LMAX = 1200
MILLIMETERS (47.24 IN) COMMERICAL (3)
DOES NOT INCLUDE A LOW POINT.
Put the pump into service for 2 minutes. To do this, push the "PUMP" pushbutton (4) (Figure 1)
on the maintenance panel (fill the pump).
NOTE:
One push on the "PUMP" pushbutton is sufficient
to start the test. The pump stops automatically
after 2 minutes.
- Drain the [Graduated recipient (accurate to 0.01 L (.0026 US gal - .0022 UK gal)) Commercial]
(2) (Figure 3).
Put the /Hose Inner dia. = 20 milimeters (.787 in) and Lmax = 1200 milimeters (47.24 in)
Commercial] (3) in a [Graduated recipient (accurate to 0.01 L (.0026 US gal - .0022 UK gal))
Commercial (2).
Put the pump into service for 2 minutes. To do this, push the "PUMP" pushbutton (4) (Figure 1)
on the maintenance panel.
63-26-00-721  Page 4
2013.06.03
>3.B.5.b.
Revision 0 2013-07-14  Page 26/79
This document is available on the internet: www.eurocopter.com/techpub

### Page 27 (OCR)

• EUROCOPTER
AN EADS COMPANY  ASB No. EC225-05A033
• EUROCOPTER
AIRCRAFT MAINTENANCE MANUAL EC225
No  Checks  Rework  Rejection criteria
Make sure that the quantity of If the volume collected is less If the system is in good
hydrosate collected agrees  than the correct volume of  condition:
with the chart (Figure 18).  hydrosafe (Figure 18):  replace the motor pump
do a check of the general  assembly as per  task
condition of the hydrosafe  63-26-00-063 and replace
system, the motor pump  the electric actuator as per
and the hose,  task 63-26-00-067.
do a check with [Bubble
fluid CM 7034] to make If the volume collected is more
sure that there is no leak than the correct volume of
hydrosate (Figure 18):
replace the electric  ac-
tuator as  per  task
63-26-00-067.
If the motor pump does not
operate (no volume collected):
replace the motor pump
assembly  as per  task
63-26-00-063 and replace
the electric actuator as per
task 63-26-00-067.
2  Do a check of the consistericy  If the hydrosafe is degraded:
and the color of the hydrosafe.  Replace the hydrosafe as
per task 63-26-00-871.
- Loosen the clamp of the [Hose Inner dia. = 20 milimeters (.787 in) and Lmax = 1200 millimeters
47.24 In) Commercial (3) (Figure 3)
• Remove the /Hose Inner dia. = 20 millimeters (.787 in) and Lmax = 1200 millimeters (47.24 in)
Commercial [3) from the [GLYCOL PUMP TEST KIT 332A979002.00] (1).
- Disconnect the supply pipe (4) from the /GLYCOL PUMP TEST KIT 3324979002.00] (1).
con tid o the feseroir as per subask be 00-89-002 of task 692 6-0001. (1)
Sub-task 63-26-00-721-003
3.3  Check of the calibration and correct behavior of the AIR and GLYCOL pressure
sensors
- De-energize the aircraft electrical system.
3.3.1  AIR pressure switch
- Remove the AIR pressure switch (4) (Figure 2) as per sub-task 63-26-00-033-001 of task
63-26-00-065. Keep the O-ring (8) (Figure 4)
Install the mechanical interface [A/R 3324979003.22] (7) with the O-ring (8) on the AIF
pressure switch (11).
Install the mechanical interface [DPI610E connection 3324979003.20] (5) on the output
onnector (6) (Figure 5) of the [Outage DRUCK DPI610E] (1
- Connect the [Mano Air  electrical loom 3324973404.00] (1) (Figure 4) to the AIR pressur
63-26-00-721  Page 5
2013.06.03
>3.B.5.C.
Revision 0 2013-07-14  Page 27/79
This document is available on the internet: www.eurocopter.com/techpub

### Page 28 (OCR)

→ EUROCOPTER
AN EADS COMPANY  ASB No. EC225-05A033
EUROCOPTER
AIRCRAFT MAINTENANCE MANUAL EC225
switch (11).
Connect the [Mano Air electrical loom 332A973404.00] (1) to the [Air & Glycol Mano
Thresholds Test 332A973404.00] (2).
Install  the AIR pressure switch (11) with the clamp (13) the mechanical interface [DPI610E  Install the [Hose Commercial] (6) on the mechanical interface [AIR 3324979003.22] (7) o  [Hose Commercial]
connection 3324979003.20] (5) with the clamp (13).
Connect  the  "COMMON"  terminal  [Air & Glycol Mano  Thresholds
Test 3324973404.00] (2) with the "ground" terminal (3) (Detail A) at the top right of the
[DRUCK tool DPI610E] (1) (Figure 5)
Connect the "HIGH" terminal of the [Air & Glycol Mano Thresholds Test 3324973404.00] (2
Tighten the thumbw heel (2) of the (DRUCK too DPI610E/ (1) fuly. <  (Figure 4) with the terminal (4) (Detail A) of the [DRUCK tool DPI610E](1) (Figure 5).  Open the vent screw (7).
Loosen the gradual pressurizing screw (5) fully.
Start the [DRUCK tool DPI610E] (1) as per the user manual
Let the pressure shown on the /DRUCK too/ DPI610E (1) become stable
Record the "Patm" pressure shown on the /DRUCK tool-DP/610E (1)
Close the vent screw (7).
- Push the F1 key (8) on the (DRUCK tool DPI610E) (1).
CAUTION
MAKE SURE THAT THE  SELECTOR (3) OF
THE HAND PUMP (4) IS IN THE "POSITIVE
PRESSURE" POSITION.
- With the hand pump (4) of the [DRUCK tool DPI610E] (1), slowly and gradually pressurize
the AIR pressure switch (11) (Figure 4) up to: Patm measured before + 350 mbars +/- 100
mbars (5.076 psi +/- 1.450 psi)
- Tighten the gradual pressurizing screw (5) (Figure 5) fully.
No.  Checks  Rework  Rejection criteria
1  Make sure that the AIR  If the state of the AIR pressure
pressure switch (11) (Figure  switch (11) (Figure 4) does not
4) changes from the OPEN  change:
state (Detail A) (Figure 5) to  - replace the AIR pressure
the CLOSED state (Detail B)  switch (11) as per  task
when you increase the  63-26-00-065.
pressure.
2  Make sure that the "CLOSED  If the calibration value of the
AT" closing pressure value  AIR pressure switch (11) is
(Detail B) (Figure 5) of the  different from the specified
AIR pressure switch (11)  range:
(Figure 4) is between:  replace the AIR pressure
Patm + 500 mbars (7.252 psi)  switch (11) as per  task
and Patm + 550 mbars (7.977  63-26-00-065.
psi).
- Open the vent screw (7) (Figure 5).
63-26-00-721  Page 6
2013.06.03
Revision 0 2013-07-14  Page 28/79
This document is available on the internet: www.eurocopter.com/techpub

### Page 29 (OCR)

- EUROCOPTER
AN EADS COMPANY  ASB No. EC225-05A033
TEUROCOPTER
AIRCRAFT MAINTENANCE MANUAL EC225
Disconnect the "HIGH" terminal of the [Air & Glycol Mano Thresholds Test 3324973404.00]
(2) (Figure 4).
Let the pressure shown on the [DRUCK tool DPI610E] (1) (Figure 5) become stable.
Close the vent screw (7).
Push the F1 key (8) on the [DRUCK tool DPI610E] (1).
Make sure that the gradual pressurizing screw (5) is tightened fully.
With the hand pump (4) of the [DRUCK tool DPI610E] (1), slowly and gradually pressurize
the AIR pressure switch (11) (Figure 4) up to: Patm measured before + 700 mbars +/- 100
mbars (10.153 psi +/- 1.450 psi).
Connect the "LOW" terminal of the [Air & Glycol Mano Thresholds Test 3324973404.00] (2)
with the terminal (4) (Detail A) of the [DRUCK tool DPI610E] (1) (Figure 5).
- Loosen the gradual pressurizing screw (5) fully.
No.  Checks  Rework  / Rejection criteria
Make sure that the AIR  It the state of the AIR pressure
pressure switch (11) (Figure  switch (11) (Figure 4) does not
4) changes from the OPEN  change.
state (Detail A) (Figure 5) to  replace the AIR pressure
the CLOSED state (Detail B)  switch (11) as per  task
(Figure 5).  63-26-00-065.
2  Make sure that the "CLOSED  If the calibration value of the
AT" closing pressure value  AIR pressure switch (11) Is
(Detail B) (Figure 5) of the  different from the specified
AIR pressure switch (11)  range:
(Figure 4) is between:  replace the AIR pressure
Patm + 400 mbars (5.801 psi)  switch (11) as per  task
and Patm + 500 mbars (7.252  63-26-00-065.
psi).
Open the vent screw (7) (Figure 5)
Disconnect the "LOW  terminal of the [Air & Glycol Mano Thresholds Test 332A973404.00]
(2) (Figure 4):
Disconnect the [Mano Air electrical loom 3324973404.00] (1) from the AIR pressure switch
Disconnect the [Mano Air electrical loom 332A973404.00] (1) from the [Air & Glycol Mano
Thresholds Test 3324973404.00J (2)
Rémove the mechanical interface [AIR 3324979003.22] (7) and the O-ring (8) from the AIR
pressure switch (11).
Discard the O-ring (8)
oosen the clamp (13) of the [Hose Commercial) (6
Remove the [Hose Commercial] (6) from the mechanical intertace [AIR 332A979003.22] (11
and its clamp (13).
Stop the [DRUCK tool DPI610E] (1) (Figure 5) as per the user manual
Install the AIR pressure switch (4) (Figure 2) as per sub-task 63-26-00-433-001 of task
63-26-00-065.
3.3.2  GLYCOL pressure switch
- Remove the GLYCOL pressure switch (5) (Figure 2) as per sub-task 63-26-00-033-002 of
task 63-26-00-065 Keep the O ring (10) (Figure 4)
- Install the mechanical interface [GLYCOL 3324979003.21] (9) with the O-ring (10) on the
GLYCOL pressure switch (12).
63-26-00-721  Page 7
2013.06.03
Revision 0 2013-07-14  Page 29/79
This document is available on the internet: www.eurocopter.com/techpub

### Page 30 (OCR)

- EUROCOPTER
AN EADS COMPANY  ASB No. EC225-05A033
EUROCOPTER
AIRCRAFT MAINTENANCE MANUAL EC225
Connect the [Mano Glycol electrical loom 332A973404.00] (1) to the GLYCOL pressure
switch (12).
Connect the [Mano Glycol electrical loom 332A973404.00] (1) to the [Air & Glycol Mano
Thresholds Test 332A973404.00] (2).
Install the [Hose Commercial] (6) on the mechanical interface [GLYCOL 3324979003.21] (9)
on the GLYCOL pressure switch (12) with the clamp (13).
Install  the  [Hose Commercial]  (6)  on  the  mechanical interface [DPI610E
connection 332A979003.20 (5) with the clamp (13)
Make sure that the thumbwheel (2) (Figure 5) of the [DRUCK tool DPI610E] (1) is tightene‹
(Figure 4) with the terminal on the left of the "mA in" marking (4) (Detail A) of the (DRUCK
tool DPI610E] (1) (Figure 5).
Make sure that the vent screw (7) is open.
Start the [DRUCK tool DPI610E) (1) as per the user manual:
• Let the pressure shown on the [DRUCK tool DPI610E] (1) become stable.
Record the "Patm" pressure shown on the [DRUCK tooi-DPI610E] (1):
Close the vent screw (7)
Push the F1 key (8) on the [DRUCK tool DPI610E] (1).
¿ CAUTIONS
MAKE SURE THAT THE  SELECTOR (3) OF
THE HAND PUMP (4) 1S  IN THE "POSITIVE
PRESSURE" POSITION,
- With the hand pump (4) of the [DRUCK tool DPI610E] (1), slowly and gradually pressurize
the GLYCOL pressure switch (12) (Figure 4) up to: Patm measured before +450 mbars +/-
100 mbars (6.527 psi +/- 1.450 psi).
- Tighten the gradual pressurizing screw (5) (Figure 5) fully.
No.  Checks  Rework  Rejection criteria
1  Make sure that the GLYCOL  If the state of the GLYCOL
pressure switch (12) (Figure  pressure switch (12) (Figure 4)
4) changes from the OPEN  does not change:
state (Detail A) (Figure 5) to  replace  the  GLYCOL
the CLOSED state (Detail B)  pressure switch (12) as
when you increase the  per task 63-26-00-065.
pressure.
Make sure that the "CLOSED  If the calibration value of the
AT" closing pressure value  GLYCOL pressure switch (12)
(Detail B) (Figure 5) of the  is different from the specified
GLYCOL pressure switch (12)  range:
(Figure 4) is between:  replace  the  • GLYCOL
Patm + 620 mbars (8.992 psi)  pressure switch (12) as
and Patm + 670 mbars (9.717  per task 63-26-00-065.
psi).
- Open the vent screw (7) (Figure 5).
63-26-00-721  Page 8
2013.06.03
Revision 0 2013-07-14  Page 30/79
This document is available on the internet: www.eurocopter.com/techpub

### Page 31 (OCR)

→ EUROCOPTER
AN EADS COMPANY  ASB No. EC225-05A033
TEUROCOPTER
AIRCRAFT MAINTENANCE MANUAL EC225
Disconnect the "HIGH" terminal of the [Air & Glycol Mano Thresholds Test 332A973404.00]
(2) (Figure 4).
Let the pressure shown on the [DRUCK tool DPI610E] (1) (Figure 5) become stable.
Close the vent screw (7).
Push the F1 key (8) on the [DRUCK tool DPI610E] (1).
Make sure that the gradual pressunzing screw (5) is tightened tull
Nith the hand pump (4) of the /DRUCK tool DPI610E] (1), slowly and gradually pressuriz
the GLYCOL pressure switch (12) (Figure 4) up to: Patm measured before + 800 mbars +-
• Connect the "LOW"  Connect the LOW Terminal of the (Air & Glycol Mano Thresholds Test 332A973404.00] (2)
with the terminal (4) (Detail A) of the [DRUCK tool DPI610E] (1) (Figure 5).
- Loosen the gradual pressurizing screw (5) fully.
Checks  Rework  Rejection criteria
Make sure that the GLYCOL  If the state of the GLYCOL
pressure switch (12) (Figure  pressure switch (12) (Figure 4)
4) changes from the OPEN  does not change:
state (Detall A) (Figure 5) to  replace  the  GLYCOL
the CLOSED state (Detail B).  pressure switch (12)  as
per task 63-26-00-065.
2  Make sure that the ⅘CLOSED  If the calibration value of the
AT" closing pressure value  GLYCOL pressure switch (12)
(Detall B) (Figure 5) of the  is different from the specified
GLYCOL pressure switch (12)  range:
(Figure 4) is between:  replace  the  GLYCOL
Patm + 520 mbars (7.542 psi)  pressure  switch (12) as
and Patm + 620 mbars (8.992  per task 63-26-00-065.
psi).
Open the vent screw (7) (Figure 5).
Let the pressure shown on the [DRUCK tool DP/610E] (1) become stable.
Stop the [DRUCK tool DPI610E] (1) as per the user manual.
Discorínect the [Mano Glycol efectrical loom 332A973404.00] (1) (Figure 4) from the [Air &
ycol Mano Thresholds Test 332A973404.00) (
sconnect the [Mano Glycol electrical loom 3324973404.00] (1) from the GLYCOL pressu
switch (12).
Loosen the clamps (13) of the /Hose Commercial (6).
Remove  [Hose Commercial (6)  the mechanical interface [DP/610E
connection 332A979003.20J (5).
Remove  the  [Hose Commercial] (6) from the mechanical interface [GLY-
COL 3324979003.21] (9).
Remove the mechanical interface [DP/610E connection 3324979003.20] (5) from the output
connector (6) (Figure 5) of the DRUCK tool DPI610E) (1).
Remove the mechanical interface [GLYCOL 3324979003.21] (9) (Figure 4) and the O-ring
(10) from the GLYCOL pressure switch (12).
Disconnect the "COMMON" and "LOW" terminals of the [Air & Glycol Mano Thresholds  Disconnect the
Test 332A973404.00J (2).
Disconnect the "ground" terminal (3) on the top right of the [DRUCK tool DPI610E] (1)
(Figure 5).
- Disconnect the terminal on the left of the "mA in" marking (4) (Figure 4) of the [DRUCK
tool DPI610E] (1) (Figure 5).
- Install the GLYCÖL pressure switch (5) (Figure 2) as per sub-task 63-26-00-433-002 of task
63-26-00-721  Page 9
2013.06.03
Revision 0 2013-07-14  Page 31/79
This document is available on the internet: www.eurocopter.com/techpub

### Page 32 (OCR)

- EUROCOPTER
AN EADS COMPANY  ASB No. EC225-05A033
EUROCOPTER
AIRCRAFT MAINTENANCE MANUAL EC225
63-26-00-065.
Sub-task 63-26-00-721-004
NOTE:
This sub-task gives two procedures for the
electrical functional test
one procedure with the locally made tool,
one procedure with tool 332497-3401-00.
To make sure that the system operates correctly,
you only have to do one of these procedures (the
operator can choose).
3.4  Electrical functional test
- De-energize the aircraft electrical system.
3.4.1  Test with the locally made tool for the air and glycol pressure switches
- Make two test leads (1) (Figure 6) with two wires and a 28V 5W max. lamp:
one for the movable connector of the electric pump (10K
one for the movable connector of the P2.4 electrovalve (2QK)
Make two shunts that adapt to the movable connector of the glycol pressure switch (3QK)
(Figure 7) and the movable connector of the air pressure switch (4QK).
Make two "y" type shunts that adapt to the movable connector of the glycol pressure switch
(3QK) and the movable connector of the air pressure switch (4QK).
Remove the frangible cover from the EM LUB pushbutton (8QK) (2) (Figure 6)
Install the [Flight/Ground simulator 332A976102.00] as per sub-task 32-30-00-481-001 of
task 32-30-00-481.
NOTE:
If the [Flight/Ground simulator 332A976102 00)
is not  available, you can lift the aircraft on
jacks as per sub-task 07-10-00-491-001 of task
07-10-00-491.
Disconnect the connector from the P2.4 electrovalve (2QK).
Connect a test lead (1) to terminals A and B of the P2.4 electrovalve (2QK) movable
connector (3).
- Disconnect the power supply connector from the electric pump (1QK).
Connect a test lead (1) to terminals A and B of the electric pump (1QK) movable connector
(4).
Disconnect the connector from the air pressure switch (4QK) (Figure 7) as per sub-task
63-26-00-033-001 of task 63-26-00-065.
Connect a shunt (7) between terminals 3 and 1 to give the low pressure state.
Disconnect the  connector from the glycol pressure switch (3QK) as per sub-task
63-26-00-033-002 of task 63-26-00-065.
Connect a shunt (5) between terminals 3 and 1 to give the low pressure state.
63-26-00-721 Page 10
2013.06.03
>3.B.3.
Revision 0 2013-07-14  Page 32/79
This document is available on the internet: www.eurocopter.com/techpub

### Page 33 (OCR)

→ EUROCOPTER
AN EADS COMPANY  ASB No. EC225-05A033
EUROCOPTER
AIRCRAFT MAINTENANCE MANUAL EC225
Energize the aircraft electrical system.
CAUTION
BEFORE YOU SET [FLIGHT/GROUND SIMULA-
TOR 332A976102.00J SWITCH TO FLIGHT, MAKE
SURE THAT THE SYSTEMS RELATED TO THE
FLIGHT/GROUND LOGIC HAVE PROTECTION.
ACTIONS  -CHECKS
Set the switch of the Flight/Ground
simulator 332A976102.00J to the GROUND position
or make sure that the landing gear shock absorbers
are compressed.
Make sure that the MGB.P light (1) (Figure 7)
comes on on the CWP.
Make sure that the MP (2) and S/B.P (3)
captions come on on the VMS.
Set the switch of the [Fight/Ground
simulator 332A976102.00J to the FLIGHT position
or extend the landing gear shock absorbers as per
sub-task 07-10-00-491-001 of task 07-10-00-491.
Push the EM LUB SHOT pushbutton (2) until the
light goes off, and start the chronometer.
Make sure that the EMLUB SHOT light (2
(Figure 6) comes on.
After 1 minute and 10 seconds (-0/+15 s),
make sure that the red MGB EMLUB warning
light (10) (Figure 7) comes on on the CWP.
- Make sure that the 28V lamp connected to the
P2.4 electrovalve comes on.
- Make sure that the 28V lamp connected to the
glycol pump power supply connector comes on.
Disconnect the shunt (5) between terminals 3 and 1
of the glycol pressure switch (3K).
Disconnect the shunt (7) between terminals 3 and 1
of the air pressure switch (4QK).
Connect a shunt (9) between terminals 3 and 2 of
the air pressure switch (4QK) movable connector.
Connect a shunt (4) between terminals 3 and 2 of
the glycol pressure switch (3QK).
Connect a shunt (5) between terminals 3 and 1 of
the glycol pressure switch (3QK) movable
connector.
Connect a shunt (4) between terminals 3 and 2 of
the glycol pressure switch (3QK).
Connect a shunt (6) between terminals 1, 2 and 3
of the glycol pressure switch (3QK).
Connect a shunt (4) between terminals 3 and 2 of
the glycol pressure switch (3QK).
Make sure that the MGB EMLUB light (10) goes
off on the CWP.
Make sure that the MGB EMLUB light (10)
comes on on the CWP.
Make sure that the MGB EMLUB light (10) goes
off on the CWP.
Make sure that the MGB EMLUB light (10)
comes on on the CWP.
Make sure that the MGB EMLUB light (10) goes
off on the CWP.
63-26-00-721  Page 11
2013.06.03
Revision 0 2013-07-14  Page 33/79
This document is available on the internet: www.eurocopter.com/techpub

### Page 34 (OCR)

• EUROCOPTER
AN EADS COMPANY  ASB No. EC225-05A033
EUROCOPTER
AIRCRAFT MAINTENANCE MANUAL EC225
ACTIONS
Disconnect the shunt (4) from the glycol pressure
switch (3QK) and let the connector stay fully free.
Connect a shunt (4) between terminals 3 and 2 of
the glycol pressure switch (3QK).
Connect a shunt (7) between terminals 3 and 1 of
the air pressure switch (4QK).
Connect a shunt (9) between terminals 3 and 2 of
the air pressure switch (4QK) movable connector.
Connect a shunt (8) between terminals 1, 2 and 3
of the air pressure switch (4QK).
Connect a shunt (9) between terminals 3 and 2 of
the air pressure switch (4QK) movable connector.
Disconnect the shunt (9) from the air pressure
switch (4QK) and let the connector stay fully free.
Connect a shunt (9) between terminals 3 and 2 of
the air pressure switch (4QK) movable connéctor.
CHECKS
Make sure that the MGB EMLUB light (10)
comes on on the CWP.
Make sure that the MGB EMLUB light (10) goes
off on the CWP.
Make sure that the MGB EMLUB light (10)
comes on on the CWP.
Make sure that the MGB EMLUB light (10) goes
off on the CWP.
Make sure that the MGB EMLUB light (10)
comes on the CWP:
Make sure that the MGB EMLUB light (10) goes
off on the CWP
Make sure that the MGB EMLUB light (10)
comes on on the CWP.
Make sure that the MGB EMLUB light (10) goes
off on the CWP.
Make sure that the 28V lamp connected to the
P2.4 electrovalve stays on.
Make sure that the 28V lamp connected to the
glycol pump power supply connector stays on.
If the test is not correct:
if applicable, set the switch of the [Flight/Ground simulator 332A976102.00] to the
GROUND positiori (green light on),
de-energize the aircraft electrical system,
replace the lubrication PCB,
energize the aircraft electrical system,
do the electrical functional test again as per sub-task 63-26-00-721-004,
if the test is not correct again, contact the EUROCOPTER technical support department.
3.4.2  Final steps after the test
- If applicable, set the switch of the [Flight/Ground simulator 3324976102.00] to the GROUND
position (green light on).
De-energize the aircraft electrical system.
63-26-00-721 Page 12
2013.06.03
Revision 0 2013-07-14  Page 34/79
This document is available on the internet: www.eurocopter.com/techpub

### Page 35 (OCR)

→ EUROCOPTER
AN EADS COMPANY  ASB No. EC225-05A033
PEUROCOPTER
AIRCRAFT MAINTENANCE MANUAL EC225
ECATIONS
BEFORE  YOU  ENERGIZE THE  AICRAFT
ELECTRICAL POWER SYSTEMS AGAIN, WAIT
FOR 5 MINUTES TO SET THE ELECTRONIC
BOARD AGAIN.
Disconnect the shunt from the connector of the glycol pressure switch (3QK).
- Connect the connector to the GLYCOL pressure switch (3QK) (5) (Figure 2) as per sub-task
63-26-00-433-002 of task 63-26-00-065.
• Connect the connector to the dor pressure swire with (40K).  - Connect  connector  the air pressure  as per sub-task
63-26-00-433-001 of task 63-26-00-065.
sconnect the test lead (1) (Figure 6) trom the power supply connector of the electric pum
connect the power supply connector to the electric pump (1QK
Disconnect the test lead (1) from the P2.4 electrovale connector.
Connect the connector to the P2.4 electrovale (2QK) as per sub-task 63-26-00-431-001 of
task 63-26-00-064.
If  applicable,  remove the [Fight/Ground simulator 332A97610200] as per sub-task
32-30-00-481-001 of task 32-30-00-481.
NOTE
If the aircraft is on jacks, lower the aircraft onto its
wheels as per sub-task 07-10-00-091-001 of task
07-10-00-491.
- Install the frangible cover on the EMLUB pushbutton (SQK) (2).
3.4.3  Test with tool 332A97-3401-00 for the air and glycol pressure switches
- Remove the frangible cover from the EMLUB pushbutton (8QK) (2) (Figure 6).
Iristall the [Fight/Ground simulator 3324976102.00] as per sub-task 32-30-00-481-001 of
task 32-30-00-481.
NOTE:
If the [Flight/Ground simulator 332A976102.00]
is not available, you can lift the aircraft on
jacks as per sub-task 07-10-00-491-001 of task
07-10-00-491.
Disconnect the connector from the P2.4 electrovalve (2QK)
Connect the [Emergency lubrication unit 332A973401.00] (1) (Figure 8) (Detail C) to the
movable connector of the P2.4 electrovalve (2QK) (Detail A) and set the switch to LOW.
Disconnect the power supply connector from the electric pump (1QK) (Detail B).
Connect the [Emergency lubrication unit 3324973401.00] (1) (Detail C) to the power supply
connector of the Glycol pump (1QK) (Detail B) and set the switch to LOW.
Disconnect the connector from the air pressure switch (4QK) as per (Figure 7) sub-task
63-26-00-033-001 of task 63-26-00-065.
Connect the [Emergency lubrication unit 3324973401.00] (1) (Figure 8) (Detail C) to the
supply connector of the air pressure switch (4QK) (Figure 7).
- Disconnect the connector  from the glycol pressure switch (3QK) as per sub-task
63-26-00-721  Page 13
2013.06.03
Revision 0 2013-07-14  Page 35/79
This document is available on the internet: www.eurocopter.com/techpub

### Page 36 (OCR)

→ EUROCOPTER
AN EADS COMPANY  ASB No. EC225-05A033
EUROCOPTER
AIRCRAFT MAINTENANCE MANUAL EC225
63-26-00-033-002 of task 63-26-00-065.
- Connect the [Emergency lubrication unit 332A973401.00] (1) (Figure 8) (Detail C) to the
supply connector of the glycol pressure switch (3QK) (Figure 7).
Energize the aircraft electrical system.
CAUTION S
BEFORE YOU SET THE [FLIGHT/GROUND SIM-
ULATOR 332A976102.00J SWITCH TO FLIGHT,
MAKE SURE THAT THE SYSTEMS RELATED TO
THE FLIGHT/GROUND LOGIC HAVE PROTEC-
TION.
ACTIONS
Set the switch of the /Flight/Ground
simulator 332A976102.00J to the GROUND position
or make sure that the landing gear shock absorbers
are compressed.
Set the switch of the [Flight/Ground
simulator 332A976102.00J to the FLIGHT position
or extend the landing gear shock absorbers as per
sub-task 07-10-00-491-001 of task 07-10-00-491.
Push the EM LUB SHOT pushbutton (2) until the
light goes off, and start the chronometer.
Set the air pressure switch control to NO LOW (HI).
Set the glycol pressure switch control to NO LOW
(HI).
Set the glycol pressure switch control to LOW
(Figure 8).
Set the glycol pressure switch control to NO LOW
(HI) (Figure 8).
Push and hold NO LOW (HI) & LOW pushbutton of
the glycol pressure switch (Figure 8).
Release the NO LOW (HI) & LOW pushbutton of
the glycol pressure switch (Figure 8).
CHECKS
Make sure that the MGB.P light (1) (Figure 7)
comes on on the CWP.
Make sure that the MP (2) and S/B.P (3)
captions come on on the VMS.
Make sure that the EMLUB SHOT light (2)
(Figure 6) comes on.
After 1 minute and 10 seconds (-0/+15 s),
make sure that the red MGB EMLUB waming
light (10) (Figure 7) comes on on the CWP.
Make sure that the Control Electro-Valve light
comes on (Figure 8).
Make sure that the Control Electro pump light
comes on (Figure 8).
Make sure that the MGB EMLUB light (10)
(Figure 7) goes off on the CWP.
Make sure that the MGB EMLUB light (10)
(Figure 7) comes on on the CWP.
Make sure that the MGB EMLUB light (10)
(Figure 7) goes off on the CWP.
Make sure that the MGB EMLUB light (10)
(Figure 7) comes on on the CWP.
Make sure that the MGB EMLUB light (10)
(Figure 7) goes off on the CWP.
63-26-00-721  Page 14
2013.06.03
Revision 0 2013-07-14  Page 36/79
This document is available on the internet: www.eurocopter.com/techpub

### Page 37 (OCR)

- EUROCOPTER
AN EADS COMPANY  ASB No. EC225-05A033
IEUROCOPTER
AIRCRAFT MAINTENANCE MANUAL EC225
ACTIONS
Disconnect the connector of the [Emergency
lubrication unit 3324973401.00] (1) (Figure 8) from
the glycol pressure switch and let the connector
stay fully free.
Connect the connector of the /Emergency
lubrication unit 332A973401.00] (1) (Figure 8) to
the glycol pressure switch.
Set the glycol pressure switch control to NO LOW
(HI).
Set the air pressure switch control to LOW (Figure
8).
Set the air pressure switch control to NO LOW (HI)
(Figure 8).
Push and hold NO LOW (HI) & LOW pushbutton of
the air pressure switch (Figure 8).
CHECKS
Make sure that the MGB EMLUB light (10)
(Figure 7) comes on on the CWP.
Make sure that the MGB EMLUB light (10)
(Figure 7) goes off on the CWP.
Make sure that the MGB EMLUB light (10)
(Figure 7) comes on on the CWP.
Make sure that the MGB EMLUB light (10)
(Figure 7) goes off on the CWP.
Make sure that the MGB EMLUB light (10)
(Figure 7) comes on on the CWP.
Release the NO LOW (HI) & LOW pushbution of  Make sure that the MGB EMLUB light (10)
the air pressure switch (Figure 8).  (Figure 7) goes off on the CWP.
Disconnect the connector of the Emergency  Make sure that the MGB EMLUB light (10)
lubrication unit 332A973401.00] (1) (Figure 8) from  (Figure 7) comes on on the CWP.
the air pressure switch and let the connector stay
fully free.
Connect the connector of the /Emergency
lubrication unit 332A4973401,00] (1) (Figure 8) to
the air pressure switch.
Set the air pressure switch control to NO LOW (HI).  Make sure that the MGB EMLUB light (10)
(Figure 7) goes off on the CWP
- Make sure that the Control Electro-Valve light
stays on (Figure 8).
Make sure that the Control Electro pump light
stays on.
If the test is not correct:
• if applicable, set the switch of the [Fight/Ground simulator 3324976102.00] to the
GROUND position (green light on),
de-energize the aircraft electrical system,
replace the lubrication PCB,
energize the aircraft electrical system,
do the electrical functional test again as per sub-task 63-26-00-721-004,
if the test is not correct again, contact the EUROCOPTER technical support department.
3.4.4  Final steps after the test
- If applicable, set the switch of the [Flight/Ground simulator 3324976102 00] to the GROUND
position (green light on).
63-26-00-721  Page 15
2013.06.03
Revision 0 2013-07-14  Page 37/79
This document is available on the internet: www.eurocopter.com/techpub

### Page 38 (OCR)

→ EUROCOPTER
AN EADS COMPANY  ASB No. EC225-05A033
EUROCOPTER
AIRCRAFT MAINTENANCE MANUAL EC225
- De-energize the aircraft electrical system.
CAUTION
wwwwww
BEFORE  YOU  ENERGIZE  THE  AIRCRAFT
ELECTRICAL POWER SYSTEMS AGAIN, WAIT
FOR 5 MINUTES TO SET THE ELECTRONIC
BOARD AGAIN.
Disconnect the tool [Emergency lubrication unit 3324973401.00] (1) (Figure 8) (Detail C)
Disconnect the tesi Emergency lubricat  the tool (Emergency lubrication unit 332A973401.00) (1) (Detail C) from the
connector of the air pressure switch.
Connect the connector to the GLYCOL pressure switch (3QK) (5) (Figure 2) as per sub-task
63-26-00-433-002 of task 63-26-00-065
Connect  the  connector  to  the  air pressure  switch (4QK) (4) as per sub-task
63-26-00-433-001 of task 63-26-00-065.
Disconnect the tool from the power supply connector of the electric pump (1QK) (Figure 8).
Connect the power supply connector to the electric pump (1QK).
Disconnect the tool from the connector of the P2.4 electrovalve (2QK).
Remove the tool [Emergency lubrication unit 832A973401.00] (1) (Detail C)
Connect the connector to the P2.4 electrovalve (2QK) as per sub-task 63-26-00-431-001 of
task 63-26-00-064.
applicable,  remove the  [Flight/Ground simulator 332A976102.00] as per sub-task
32-30-00-481-001 of task 32-30-00-481.
NOTE
If the aircraft is on jacks, lower the aircraft onto its
wheels as per sub-task 07-10-00-091-001 of task
07-10-00-491
Install the frangible covér on the EMLUB pushbutton (8QK) (2) (Figure 6).
Sub-task 63-26-00-721-005
NOTE:
The P24 valve test is given with the two tools
332A979000.00 (VOLTAGE) and 332A979001.00
(CURRENT). You must do only one of the two
procedures at the operator's choice.
3.5 Test of the P2.4 system with the tool 332A979000.00 (VOLTAGE)
3.5.1  Installation of the tool P2.4 VALVE TEST KIT 332A979000.00
distributor.  - De-energize the aircraft electrical system.  Unsafety and disconnect the pipe of the air-air exchanger (3) (Figure 2) from the main  Seal the opening in the main vent distributor with a plug.
63-26-00-721  Page 16
2013.06.03
>3.B.5.d.
Revision 0 2013-07-14  Page 38/79
This document is available on the internet: www.eurocopter.com/techpub

### Page 39 (OCR)

→ EUROCOPTER
AN EADS COMPANY  ASB No. EC225-05A033
PEUROCOPTER
AIRCRAFT MAINTENANCE MANUAL EC225
Install the [Support assembly 332A979000.11] (4) (Figure 9) with clamps (3) on the Glycol
that the union is correctly attached and then tighten it one sixth of a tum.
Attach the tool exhaust pipe with clamps (1) (Figure 10) so that it goes to the rear of the
aircraft.
¿ CAUTION
MAKE SURE THAT THERE IS NO INTERFERENCE
BETWEEN THE EXHAUST PIPE ASSEMBLY AND
THE AIRCRAFT DYNAMIC SYSTEMS AND THE
COWLING WHEN IT IS CLOSED.
- Connect the [Air pressure sensor EFE -  PHE 167 BAR G] (1) (Figure 9) to the [Air
system 3324979000.10] (2).
- Put the utility connector and the [Transmitter  assembly 3324973402 00] (2) (Figure 10)
through the left cabin door.
< CAUTION
MAKE SURE THAT THERE IS NO INTERFERENCE
BETWEEN THE WIRING OF THE AIR PRESSURE
SENSOR (1) (FIGURE 9) AND THE AIRCRAFT
DYNAMIC SYSTEMS AND THE COWLINGS WHEN
THEY ARE CLOSED.
- Connect the utility connector to aircraft connector 1HL.
- Connect the [Multimeter Commercial] to the [Transmitter assembly 332A973402.00] (2)
(Figure 10).
Close the doors and the cowlings.
Remove the access equipment.
3.5.2  Test of the P2.4 valve
Energize the aircraft electrical system
Record the "Rotor not turning" Voltage value shown on the [Multimeter Commercial]
NOTE:
We recommend that you use the record and value
conversion tables (Figure 16) and (Figure 17).
Tell an approved person to start the two engines as per the flight manual procedure.
Record the values that follow:
QFE (In mbars),
"Rotor turning" voltage value shown on the [Multimeter Commercial].
63-26-00-721 Page 17
2013.06.03
Revision 0 2013-07-14  Page 39/79
This document is available on the internet: www.eurocopter.com/techpub

### Page 40 (OCR)

- EUROCOPTER
AN EADS COMPANY  ASB No. EC225-05A033
EUROCOPTER
AIRCRAFT MAINTENANCE MANUAL EC225
NOTE:
The recorded value can be different to zero.
Put the aircraft in the configuration that follows "configuration 1":
ENG 1 set to FLI
ENG 2 set to FLT,
AFCS ON
NR ILS OFF,
NR 104%.
Let the aircraft become stable for 10 minutes in this configuration.
Record the engine 1 T1 "configuration 1" value (in "C), shown on the FADEC page of the
VMS
Record the N1 value of engine 1 "configuration 1"
On the maintenance panel, set the "PS PW" switch (3) (Figure 1), to the "SENSOR" position
and keep it in this position for 30 to 35 s (P2.4 valve opens)
Nith a [Chronometer Commercial], record
• 10 to 20 s after you set the "PS PW" switch (3) to the "SENSOR" position, the "Opening
1" Voltage value shown on the [Multimeter Commercial]
• 1 minute after you set the "PS PW" switch (3) to the "SÉNSOR" position, the "Closing 1"
Voltage value shown on the [Multimeter Commercial):
Tell an approved person to stop engine 2 as per the flight manual procedure.
Put the aircraft in the configuration that follows "contiguration 2"
ENG 1 set to FLT,
ENG 2 OFF,
AFCS ON.
NR ILS OFF,
NR 104%.
Stabilize the aircraft in this configuration for 4 minutes.
Record the engine, 1 T1 "configuration 2" value (in "C), shown on the FADEC page of the
VMS
Record the N1 "configuration 2" value
On the mainténance panel, set the "PS PW" switch (3) to the "SENSOR" position and keep it
in this position for 30 to 35 s (P2.4 valve opens).
With a [Chronometer Commercial], record:
1o to 20 s after you set the "PS PW" switch (3) to the "SENSOR" position, the "Opening
2" Voltage value shown on the [Multimeter Commercial]
• 1 minute after you set the "PS PW" switch (3) to the "SENSOR" position, the "Closing 2"
Voltage value shown on the [Multimeter Commercial].
- Tell an approved person to stop the engine as per the flight manual procedure.
3.5.3  Calculate and correct the values
3.5.3.1  Conversion of the "Rotor Not Turning" Pressure
- With the [Calibration sheet 332A979000.31] of the  [P2.4 VALVE TEST
KIT 332A979000.00J, change "Rotor Not Turning" Voltage into Pressure P1.
63-26-00-721  Page 18
2013.06.03
Revision 0 2013-07-14  Page 40/79
This document is available on the internet: www.eurocopter.com/techpub

### Page 41 (OCR)

- EUROCOPTER
AN EADS COMPANY  ASB No. EC225-05A033
EUROCOPTER
AIRCRAFT MAINTENANCE MANUAL EC225
NOTE:
Pressure P1 is in bars.
3.5.3.2  Conversion of the "Rotor Turning" Pressure
- With  the  [Calibration  sheet 332A979000.31] of the [P2.4 VALVE TEST
KIT 332A979000.00J, change "Rotor Turning" Voltage into Pressure P2.
NOTE:
Pressure P2 is in bars.
3.5.3.3  Conversion of the "Closing 1" Pressure
- With  the  [Calibration  sheet 332A979000:31]  the  [P2.4 VALVE TEST
KIT 332A979000.00J, change "Closing 1" Voltage into Pressure P4.
NOTE:
Pressure P4 is in bars.
3.5.3.4  Conversion of the Closing 2" Pressure
- With the [Calibratiori  sheet 332A979000.31] of the [P2.4 VALVE TEST
KIT 332A979000.00], change "Closing 2" Voltage into Pressure P6.
NOTE:
Pressure P6 is in bars.
3.5.3.5  Conversion of the Opening 1" Pressure
With the  /Calibration  sheet 332A979000.31]  of the [P24 VALVE TEST
KIT 332A979000.00], change "Opening 1" Voltage into Pressure P3.
NOTE:
Pressure P3 is in bars.
3.5.3.6  Conversion of the Opening 2" Pressure
- With  the  [Calibration  sheet 332A979000.31]  of the  [P2.4 VALVE TEST
KIT 332A979000.00], change "Opening 2" Voltage into Pressure P5.
NOTE:
Pressure P5 is in bars.
3.5.3.7  Record constant K "configuration 1"
- With (Figure 11), calculate the value of K related to the engine 1 T1 "configuration 1"
value that you recorded before.
63-26-00-721  Page 19
2013.06.03
Revision 0 2013-07-14  Page 41/79
This document is available on the internet: www.eurocopter.com/techpub

### Page 42 (OCR)

- EUROCOPTER
AN EADS COMPANY  ASB No. EC225-05A033
EUROCOPTER
AIRCRAFT MAINTENANCE MANUAL EC225
NOTE:
You can use (Figure 11), to find the constant K.
3.5.3.8  Record constant K "configuration 2"
- With (Figure 11), calculate the value of K related to the engine 1 T1 "configuration 2"
value that you recorded before.
NOTE:
You can use (Figure 11), to find the constant K.
3.5.3.9  Calculate the corrected rating Ng'.1
- Multiply the N1 value "Configuration 1" that you recorded before by constant K
"configuration 1".
NOTE:
rating Ng. 1.  When you calculate this you get the corrected
3.5.3.10  Calculate the corrected rating Ng'.2
- Multiply the N1 value "Configuration 2" that you recorded before by constant K
"configuration 2".
NOTE:
When you calculate this you get the corrected
rating Ng. 2.
3.5.3.11  Interpretation of the calculated and corrected values
Plot the vértical straight line (Figure 14) relative to the corrected rating Ng'.1.
Plot the horizontal straight line relative to pressure P3.
Mark the point of intersection of the straight lines that you plotted before with a dot.
Plot the vertical straight line relative to the corrected rating Ng'.2
Plot the horizontal straight line relative to pressure P5.
Mark the point of intersection of the straight lines that you plotted before with a dot.
Find the reference curve relative to the measured QFE.
- If the two points relative to the intersection of the straight lines are above the reference
curve, example (Figure 15) (Detail A), subtract the P1 pressure value from the P6
pressure value, and refer to the table below:
Result that you calculated  Step that you must do
P6 - P1 ≤ 0.03 bars (43.511 psi): correct  Do the final steps
P6 - P1 > 0.03 bars (43.511 psi): incorrect  Do task 63-26-00-723
63-26-00-721  Page 20
2013.06.03
Revision 0 2013-07-14  Page 42/79
This document is available on the internet: www.eurocopter.com/techpub

### Page 43 (OCR)

- EUROCOPTER
AN EADS COMPANY  ASB No. EC225-05A033
EUROCOPTER
AIRCRAFT MAINTENANCE MANUAL EC225
NOTE:
The P1 pressure value was given by paragraph
3.5.3.1.
The P6 pressure value was given by paragraph
3.5.3.4.
• On the chart in (Figure 14), if a minimum of one of the two points relative to the
Intersection of the straight lines is below the reference curve, examples (Figure 15)
(Detail B) (Detail C): do the tests again as per paragraph 3.5.2.
- If a minimum of one of to points stays below the curve after two tests with paragraph  3.5.2., contact the EUROCOPTER support department.
3.5.4  Removal of the tool P2.4 VALVE TEST KIT 332A979000.00
- Disconnect the utility connector and the (Transmitter assembly 332A97340200] (2)
(Figure 10).
- Disconnect the [Air pressure sensor EFE  - PHE 167) BAR G] (1) (Figure 9) from the [Air
system 332A979000.10) (2).
- Loosen the clamps (1) (Figure 10) and remove the tool exhaust pipe.
Disconnect the air-air exchanger pipe (5) (Figure 9) from the [Air system 3324979000.10]
(2).
- Loosen the clamps  Glycol walkway and remove the [Support
assembly 332A979000.11] (4).
- Connect and safety the pipe of the air-air exchanger (3) (Figure 2) to the main distributor.  Remove the plug from the opening in the main vent distributor.
Test of the P2.4 system with the tool 332A979001.00 (CURRENT)
3.6.1  Installation of the tool, P2.4 VALVE TOOL 332A979001.00
• De-energize the aircraft electrical system
Unsafety  and disconnect the pipe of the air-air exchanger (3) (Figure 2) from the main
distributor.
Seal the opening in the main vent distributor with a plug.
Unsafety the attachment screws (4) (Figure 12) of the reservoir.
Remove the attachment screws (4) and the washers (5) of the reservoir
Install  the  [KENT  CHAMBER 332A979001.10]  the [ATTACHMENT
• Onstall the ATTACHMENT  ISSEMBLY 332ACCHMENT ASSEMBLY 332A979001.11] (7) on the walkway with Th
attachment screws (4).
NOTE:
It is not necessary to safety the attachment
screws (4) when you install the [ATTACHMENT
ASSEMBLY 332A979001.11] (7).
Connect the air-air exchanger pipe (3) to the [KENT CHAMBER 332A979001.10] (8), make
sure that the union is correctly attached and then tighten it one sixth of a turn
Connect the [PIPE GP 60 332A979001.61] (6) to the [KENT CHAMBER 332A979001.10]
- Adjust the position of the KENT CHAMBER 332A979001. 10) (8) with the adjustment screws
63-26-00-721  Page 21
2013.06.03
Revision 0 2013-07-14  Page 43/79
This document is available on the internet: www.eurocopter.com/techpub

### Page 44 (OCR)

- EUROCOPTER
AN EADS COMPANY  ASB No. EC225-05A033
EUROCOPTER
AIRCRAFT MAINTENANCE MANUAL EC225
(2).
CAUTIONS
MAKE SURE THAT THERE IS NO INTERFERENCE
BETWEEN THE [PIPE GP 60 3324979001.61] (6)
AND THE AIRCRAFT DYNAMIC SYSTEMS AND
THE SLIDING COWLING WHEN IT IS CLOSED.
- Attach the (PIPE GP 60 332A979001.61) with clamps (1) (Figure 13) so that it goes to the  rear of the aircraft.
- Connect  [SENSOR 2600BGA4001G3UA] (9)  (Figure 12)  the [KENT
CHAMBER 332A979001.10] (8).
- Connect the [CONNECTOR  332A979001.12] (1) to the (SENSOR 2600BGA4001 G3UA] (9).
CAUTION S
wwwww
MAKE SURE THAT THERE IS NO INTERFERENCE
BETWEEN THE [CONNECTOR 3324979001.12] (1)
AND THE AIRCRAFT DYNAMIC SYSTEMS AND
THE COWLINGS WHEN THEY ARE CLOSED.
Put the utility connector and the unit (2) (Figure 13) of the [CONNECTOR 332A979001.12]
(1) (Figure 12) through the left cabin door.
Connect the utility connector to aircraft connector 1HL
Connect the Multimeter Commercial] to the unit (2) (Figure 13).
Close the doors and the cowlings.
- Remove the access equipment.
3.6.2  Test of the P2.4 valve
Energize the aircraft electrical system.
Record the "Rotor not turning" Current value shown on the /Multimeter Commercial]
NOTE:
We recommend that you use the record and value
conversion tables (Figure 19) and (Figure 20).
Tell an approved person to start the two engines as per the flight manual procedure.
Record the values that follow:
QFE (in mbars)
'Rotor turning  Current value shown on the [Multimeter Commercial].
NOTE:
The recorded value can be different to zero.
- Put the aircraft in the configuration that follows "configuration 1":
63-26-00-721  Page 22
2013.06.03
Revision 0 2013-07-14  Page 44/79
This document is available on the internet: www.eurocopter.com/techpub

### Page 45 (OCR)

- EUROCOPTER
AN EADS COMPANY  ASB No. EC225-05A033
→ EUROCOPTER
AIRCRAFT MAINTENANCE MANUAL EC225
ENG 1 set to FLT
ENG 2 set to FLT
AFCS ON
NR ILS OFF
NR 104%
Let the aircraft become stable for 10 minutes in this configuration.
Record the engine 1 T1 "configuration 1" value (in °C), shown on the FADEC page of the
VMS.
• Record the N1 value of engine 1 "configuration 1"
On the maintenance panel, set the "PS PW" switch (3) (Figure 1), to the "SENSOR" position
and keep it in this position for 30 to 35 s (P2.4 valve opens).
- With a [Chronometer Commercial], record:
10 to 20 s after you set the "PS PW" switch (3) to the "SENSOR" position, the "Opening
I" Current value shown on the Multimeter Commercial
I minute after you set the "PS PW" switch (3) to the "SENSOR" position, the "Closing 1'
Current value shown on the [Multimeter Commercial.
Tell an approved person to stop engine 2 as per the flight manual procedure.
Put the aircraft in the configuration that follows configuration 2":
ENG 1 set to FLT
ENG 2 OFF
AFCS ON
NR ILS OFF
NR 104%
Stabilize the aircraft in this configuration for 4 minutes.
Record the engine 1 T1 "configuration 2" value (in "C), shown on the FADEC page of the
VMS.
Record the N1 "configuration 2" value.
On the maintenance panel, set the "PS PW" switch (3) to the "SENSOR" position and keep it
in this position for 30 to 35 s (P2.4 valve opens).
With a [Chronometer Commercial], record:
10-to-20 s after you set the "PS PW" switch (3) to the "SENSOR" position, the "Opening
2 Current value shown on the [Multimeter Commercial),
1 minute after you set the "PS PW" switch (3) to the "SENSOR" position, the "Closing 2"
Current value shown on the [Multimeter Commercial].
Tell an approved person to stop the engine as per the flight manual procedure.
3.6.3  Calculate and correct the values
Conversion of the "Rotor Not Tuming" Pressure
- With the [USER MANUAL 332A979001.33] of the [P2.4 VALVE TOOL 332A979001.00]
change "Rotor Not Turning" Current into Pressure P1.
NOTE:
Pressure P1 is in bars.
3.6.3.2  Conversion of the "Rotor Turning" Pressure
- With the [USER MANUAL 332A979001.33] of the [P2.4 VALVE TOOL 332A979001.00]
change "Rotor Turning" Current into Pressure P2.
63-26-00-721  Page 23
2013.06.03
Revision 0 2013-07-14  Page 45/79
This document is available on the internet: www.eurocopter.com/techpub

### Page 46 (OCR)

- EUROCOPTER
AN EADS COMPANY  ASB No. EC225-05A033
EUROCOPTER
AIRCRAFT MAINTENANCE MANUAL EC225
NOTE:
Pressure P2 is in bars.
3.6.3.3  Conversion of the "Closing 1" Pressure
- With the [USER MANUAL 332A979001.33] of the [P2.4 VALVE TOOL 332A979001.00]
change "Closing 1" Current into Pressure P4.
NOTE:
Pressure P4 is in bars.
3.6.3.4  Conversion of the "Closing 2" Pressure
- With the [USER MANUAL 3324979001.33] of the [P2.4 VALVE TOOL 3324979001.00]
change "Closing 2" Current into Pressure P6.
NOTE:
Pressure P6 is in bars.
3.6.3.5  Conversion of the "Opening 1" Pressute
- With the [USER MANUAL 332A979001.33] of the [P2.4 VALVE TOOL 332A979001.00]
change "Opening 1" Current into Pressure P3.
NOTE
Pressure P3 is in bars.
3.6.3.6  Conversion of the "Opening 2" Pressure
- With the [USER MANUAL 332A979001.33] of the [P2.4 VALVE TOOL 332A979001.00]
change "Opening 2" Current into Pressure P5.
NOTE:
Pressure P5 is in bars.
3.6.3.7  Record constant K "configuration 1"
With (Figure 11), calculate the value of K related to the engine 1 T1 "configuration 1"
value that you recorded before.
NOTE:
You can use (Figure 11) to find the constant K.
3.6.3.8  Record constant K "configuration 2"
- With (Figure 11), calculate the value of K related to the engine 1 T1 "configuration 2"
value that you recorded before.
63-26-00-721  Page 24
2013.06.03
Revision 0 2013-07-14  Page 46/79
This document is available on the internet: www.eurocopter.com/techpub

### Page 47 (OCR)

→ EUROCOPTER
AN EADS COMPANY  ASB No. EC225-05A033
EUROCOPTER
AIRCRAFT MAINTENANCE MANUAL EC225
NOTE:
You can use (Figure 11) to find the constant K.
3.6.3.9  Calculate the corrected rating Ng'.1
- Multiply the N1 value Configuration 1" that you recorded before by constant K.
NOTE:
When you calculate this you get the corrected
rating Ng: 1.
3.6.3.10  Calculate the corrected rating Ng'.2
- Multiply the N1 value "Configuration 2" that you recorded before by constant K.
NOTE:
When you calculate this you get the corrected
rating Ng: 2.
3.6.3.11  Interpretation of the calculated and corrected values
Plot the vertical straight line (Figure  14) relative to the corrected rating Ng'.1.
Plot the horizontal straight line relative to pressure P3.
Mark the point of intersection of the straight lines that you plotted before with a dot.
Plot the vertical straight line relative to the corrected rating Ng'.2.
Plot the horizontal straight line relative to pressure P5.
Mark the point of intersection of the straight lines that you plotted before with a dot.
Find the reference curve relative to the measured QFE.
If the two points relative to the intersection of the straight lines are above the reference
curve example (Figure 15) (Detail A), subtract the P1 pressure value from the P6
pressure value, and refer to the table below:
Resuit that you calculated  Step that you must do
P6 - P1 ≤ 0.03 bars (43.511 psi): corect  Do the final steps
P6 - P1 > 0.03 bars (43.511 psi): incorrect  Do task 63-26-00-723.
NOTE:
The P1 pressure value was given by paragraph
3.5.3.1.
The P6 pressure value was given by paragraph
3.5.3.4.
- On the chart in (Figure 14), if a minimum of one of the two points relative to the
intersection of the straight lines is below the reference curve, examples (Figure 15)
63-26-00-721  Page 25
2013.06.03
Revision 0 2013-07-14  Page 47/79
This document is available on the internet: www.eurocopter.com/techpub

### Page 48 (OCR)

- EUROCOPTER
AN EADS COMPANY  ASB No. EC225-05A033
EUROCOPTER
AIRCRAFT MAINTENANCE MANUAL EC225
(Detail B) (Detail C): Do the tests again. Refer to paragraph 3.5.2.
- If a minimum of one of the points stays below the curve after two tests with paragraph
3.5.2., contact the EUROCOPTER support department.
3.6.4  Removal of the tool P2.4 VALVE TOOL 332A979001.00
Disconnect the utility connector.
Disconnect  the  [CONNECTOR 3324979001.12] (1) (Figure 12) from the
[2051 108 [SENSOR 2600BGA4001 G3UA) (9) from the [KENT CHAM-
BER 332A979001.10] (8).
Loosen the clamps (1) (Figure 13) and remove the [PIPE GP 60 3324979001.61] (6)
(Figure 12).
Disconnect the air-air exchanger pipe (3) from the [KENT CHAMBER 332A979001.10] (8).
Remove the attachment screws (4) of the reservoir.
Remove the [ATTACHMENT ASSEMBLY 3324979001.11] (7).  Install the attachment screws (4) and the washers (5) of the reservoir.
Safety the attachment screws (4) of the reservoir.
Remove the plug from the opening in the main vent distributor
Connect and satety the pipe of the air-air exchanger (s) (Figure 2) to the main distributor.
4 FINAL STEPS
De-energize the aircraft electrical system.
Disconnect the [Electrical ground power unit (or equivalent) GB45/20V04].
Remove the A/C tool kit Engine cowling walkways assembly)
Close the engine cowlings.
Close the sliding cowling.
Remove the access equipment.
PRE
63-26-00-721 Page 26
2013.06.03
>3.B.5.e.
>3.B.7.
Revision 0 2013-07-14  Page 48/79
This document is available on the internet: www.eurocopter.com/techpub

### Page 49 (OCR)

- EUROCOPTER
AN EADS COMPANY  ASB No. EC225-05A033
EUROCOPTER
AIRCRAFT MAINTENANCE MANUAL EC225
ower  ACC  AVCC AVCPA  MEN up
PUMP sensor  down
AIR  GLY  FWD
S
AVCA
Figure 1
63-26-00-721 Page 27
2013.06.03
Revision 0 2013-07-14  Page 49/79
This document is available on the internet: www.eurocopter.com/techpub

### Page 50 (OCR)

• EUROCOPTER
AN EADS COMPANY  ASB No. EC225-05A033
JEUROCOPTER
AIRCRAFT MAINTENANCE MANUAL EC225
Figure 2
63-26-00-721  Page 28
2013.06.03
Revision 0 2013-07-14  Page 50/79
This document is available on the internet: www.eurocopter.com/techpub

### Page 51 (OCR)

- EUROCOPTER
AN EADS COMPANY  ASB No. EC225-05A033
EUROCOPTER
AIRCRAFT MAINTENANCE MANUAL EC225
PRE
Figure 3
63-26-00-721  Page 29
2013.06.03
Revision 0 2013-07-14  Page 51/79
This document is available on the internet: www.eurocopter.com/techpub

### Page 52 (OCR)

EUROCOPTER
AN EADS COMPANY  ASB No. EC225-05A033
EUROCOPTER
AIRCRAFT MAINTENANCE MANUAL EC225
MANOCONTACTS  • LOW  HIGH  COMMON  5 5 mA  max
Figure 4
63-26-00-721 Page 30
2013.06.03
Revision 0 2013-07-14  Page 52/79
This document is available on the internet: www.eurocopter.com/techpub

### Page 53 (OCR)

- EUROCOPTER
AN EADS COMPANY  ASB No. EC225-05A033
TEUROCOPTER
AIRCRAFT MAINTENANCE MANUAL EC225
00  B
SWITCH TEST  SWITCH TEST
CONTACT STATE  CONTACT STATE
CLOSED AT  xxx mbar
Figure 5
63-26-00-721  Page 31
2013.06.03
Revision 0 2013-07-14  Page 53/79
This document is available on the internet: www.eurocopter.com/techpub

### Page 54 (OCR)

- EUROCOPTER
AN EADS COMPANY  ASB No. EC225-05A033
JEUROCOPTER
AIRCRAFT MAINTENANCE MANUAL EC225
FIRE DETECTION  EMLUB
TEST
1QK  Tess  2QK
B
Figure 6
63-26-00-721  Page 32
2013.06.03
Revision 0 2013-07-14  Page 54/79
This document is available on the internet: www.eurocopter.com/techpub

### Page 55 (OCR)

• EUROCOPTER
AN EADS COMPANY  ASB No. EC225-05A033
SEUROCOPTER
AIRCRAFT MAINTENANCE MANUAL EC225
Figure 7
63-26-00-721 Page 33
2013.06.03
Revision 0 2013-07-14  Page 55/79
This document is available on the internet: www.eurocopter.com/techpub

### Page 56 (OCR)

→ EUROCOPTER
AN EADS COMPANY  ASB No. EC225-05A033
EUROCOPTER
AIRCRAFT MAINTENANCE MANUAL EC225
BOITIER LUBRIFICATION D'URGENCE / CASE EMERGENCY LUBRICATION
PN: 332A97340100  CE
OPTION RECHAUFFAGE GLYCOL
No Low (H)
OPTION REHEATING GLYCOL
Low  Glypol
Controle moteur p  Sensor  • No Low (H) & Low
Control Electro pur  Power Supply  Resistance de chauffage (115V)
Resistance of heating (115V)
Présence Alim
Capteur  No Low (H)  ON
o
LON  Air
OFF
Controle valve  O No Low (H) & Low  Sonde de T^
Control Electro-Valve  Power Supply  T° Sensor  Thermostat
Figure 8
63-26-00-721  Page 34
2013.06.03
Revision 0 2013-07-14  Page 56/79
This document is available on the internet: www.eurocopter.com/techpub

### Page 57 (OCR)

• EUROCOPTER
AN EADS COMPANY  ASB No. EC225-05A033
TEUROCOPTER
AIRCRAFT MAINTENANCE MANUAL EC225
Figure 9
63-26-00-721  Page 35
2013.06.03
Revision 0 2013-07-14  Page 57/79
This document is available on the internet: www.eurocopter.com/techpub

### Page 58 (OCR)

→ EUROCOPTER
AN EADS COMPANY  ASB No. EC225-05A033
PEUROCOPTER
AIRCRAFT MAINTENANCE MANUAL EC225
Mesure  Mesure
Point chaud  Point froid
Figure 10
63-26-00-721 Page 36
2013.06.03
Revision 0 2013-07-14  Page 58/79
This document is available on the internet: www.eurocopter.com/techpub

### Page 59 (OCR)

→ EUROCOPTER
AN EADS COMPANY  ASB No. EC225-05A033
—EUROCOPTER
AIRCRAFT MAINTENANCE MANUAL EC225
20 25
1°0, 10 15
Engine 1 - 5
(Enginé 1 T1) + 273,15)  /288.15  -40 -35 -30 -25 -20 -15 -10
·  078  .975
Engine 1 Ti  (°C)
Figure 11
63-26-00-721  Page 37
2013.06.03
Revision 0 2013-07-14  Page 59/79
This document is available on the internet: www.eurocopter.com/techpub

### Page 60 (OCR)

- EUROCOPTER
AN EADS COMPANY  ASB No. EC225-05A033
EUROCOPTER
_ AIRCRAFT MAINTENANCE MANUAL EC225
Figure 12
63-26-00-721  Page 38
2013.06.03
Revision 0 2013-07-14  Page 60/79
This document is available on the internet: www.eurocopter.com/techpub

The text continues at https://openairdocs.org/service-documents/airbus-helicopters/ec225-05a033/file/8f3df61937e0.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
