# Airbus Helicopters Alert Service Bulletin EC225-05A053

Copy: No revision named ("ASB EC225 05A053 Rev 0"), 11 pages: PDF https://openairdocs.org/files/sha256/09/c4/09c45f5960cdc2966f9b69bcb8cfe4f29af69092050ce113ddefdb0eac419df0; text https://openairdocs.org/service-documents/airbus-helicopters/ec225-05a053/file/09c45f5960cd.md. Rights: © Airbus Helicopters. Filed by the FAA in regulations.gov docket FAA-2020-0978, the docket of AD 2020-23-02. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Airbus Helicopters](https://openairdocs.org/service-documents/airbus-helicopters.md)
- Type: Service bulletin (Alert Service Bulletin)
- Number: EC225-05A053
- Page: https://openairdocs.org/service-documents/airbus-helicopters/ec225-05a053

## Text (11 pages)

Rights: © Airbus Helicopters. Filed by the FAA in regulations.gov docket FAA-2020-0978, the docket of AD 2020-23-02. Not covered by OpenAirDocs’ CC0 dedication. This text is OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1 (OCR)

AIRBUS
HELICOPTERS  ASB No. EC225-05A053
Civil version: LP
ALERT SERVICE BULLETIN
PROTECTIVE MEASURE
TIME LIMITS - MAINTENANCE CHECK - Main rotor- swashplate assembly
Reduced inspection interval limit for the check of the swashplate bearing
ATA: 62
For the attention of
Revision No.  Date of issue
Revision 0  2020-03-31
Summary:
The purpose of this ALERT SERVICE BULLETIN is to reduce the periodicity of the Check of the swashplate
assembly's ball bearing from 1100 flight hours to 150 flight hours.
Compliance:
Compliance with this ALERT SERVICE BULLETIN is mandatory.
ASB EC225 05A053
Revision 0 2020-03-31  Page 1/11
This document is available on the Internet: www.airbushe  elicopters.com/techpub

### Page 2 (OCR)

AIRBUS
HELICOPTERS  ASB No. EC225-05A053
1. PLANNING INFORMATION
1.A. EFFECTIVITY
1.A.1. Helicopters/installed equipment or parts
Helicopter EC225 version LP equipped with Main Rotor Mast P/N: 332A31-3001-01M, 332A31-3001-02M,
332A31-3002-00M, 332A31-3002-01M, 332A31-3002-02M, 332A31-3032-00M and 332A31-3032-01M.
1.A.2. Non-installed equipment or parts
Main Rotor Mast P/N: 332A31-3001-01M, 332A31-3001-02M, 332A31-3002-00M, 332A31-3002-01M,
332A31-3002-02M, 332A31-3032-00M and 332A31-3032-01M.
1.B. ASSOCIATED REQUIREMENTS
Not applicable.
1.C. REASON
Airbus Helicopters has identified a manufacturing and control issue concerning the ceramic balls of the
swashplate bearings which could lead to a potential premature spalling of the swashplate bearing.
The purpose of this ALERT SERVICE BULLETIN is to reduce the periodicity of the Check of the swashplate
assembly's ball bearing from 1100 flight hours to an interval not exceeding 150 flight hours.
Airbus Helicopters makes compliance with this ALERT SERVICE BULLETIN mandatory.
1.D. DESCRIPTION
This ALERT SERVICE BULLETIN consists in:
- remove the main rotor blades,
- perform a check of the ball bearing of the swashplate assembly,
- if necessary, replace the main rotor mast,
- install the main rotor blades.
Revision 0 2020-03-31  Page 2/11
This document is available on the Internet: www.airbushelicopters.com/techpub

### Page 3 (OCR)

AIRBUS
HELICOPTERS  ASB No. EC225-05A053
1.E. COMPLIANCE
1.E.1. Compliance at H/C manufacturer level
Not applicable.
1.E.2. Compliance in service
Helicopters/ installed equipment or parts:
Comply with paragraph 3. as per table No. 1 below:
Table No. 1
Flight hours
since the last check
(Sub-Task 62-20-00-213-091 of  the Task 62-20-00-213 (MMA))  Compliance time  Periodicity
or
Since new
Comply with paragraph 3.
within 50 flight hours
following the receipt of this
ALERT SERVICE
More than 100 flight hours  BULLETIN without
hours since the last check  exceeding 1100 flight  paragraph 3. at  Comply with
Comply with paragraph 3.  since new.  or  exceeding 150  interval not  flight hours
without exceeding 150 flight
100 flight hours or less  hours since the last check
or
since new.
Non-installed equipment or parts:
Comply with Sub-Task 62-20-00-213-091 of the Task 62-20-00-213 (MMA) before installation on
helicopter.
Revision 0 2020-03-31  Page 3/11
This document is available on the Internet: www.airbushelicopters.com/techpub

### Page 4 (OCR)

AIRBUS
HELICOPTERS  ASB No. EC225-05A053
1.F. APPROVAL
Approval of modifications:
Not applicable.
Approval of this document:
The technical information contained in this ALERT SERVICE BULLETIN Revision 0 was approved on
March 30, 2020 under the authority of EASA Design Organization Approval No. 21J.700 for civil version
helicopters subject to an Airworthiness Certificate.
The technical information contained in this ALERT SERVICE BULLETIN Revision O was approved on
March 30, 2020 under the prerogatives of the recognition of design capability FRA21J-002-DGA for French
Government helicopters.
1.G. MANPOWER
For compliance with this ALERT SERVICE BULLETIN, Airbus Helicopters recommends the following staff
qualification:
Qualification: 2 Mechanical Technicians.
The Estimated Man-hours are indicated for reference purposes only and based on a standard helicopter
configuration.
Estimated Man-hours:
4 hours for one Mechanical Technician.
The estimated helicopter downtime is indicated for reference purposes only, based on a standard helicopter
configuration.
Helicopter downtime is estimated half a day.
1.H. WEIGHT AND BALANCE
Not applicable.
1.I. POWER CONSUMPTION
Not applicable.
1.J. SOFTWARE UPGRADES/UPDATES
Not applicable.
Revision 0 2020-03-31  Page 4/11
This document is available on the Internet: www.airbushelicopters.com/techpub

### Page 5 (OCR)

AIRBUS
HELICOPTERS  ASB No. EC225-05A053
1.K. REFERENCES
Aircraft Maintenance Manual (MMA)
MMA: 62-10-00-061: Removal - Installation - MAIN ROTOR BLADES
MMA: 62-20-00-021: Removal - Main rotor mast - MAIN ROTOR MAST ASSEMBLY
MMA: 62-20-00-213: Removal - Check - MAIN ROTOR MAST ASSEMBLY
MMA: 62-23-00-061: Rotating or Non-Rotating Scissors Removal-Installation - CONTROL SYSTEM
MMA: 62-23-00-062: Pitch-Change Rod Removal-Installation - CONTROL SYSTEM
Standard Practices Manual (MTC)
MTC: 20-07-03-406: Instructions applicable when working on an aircraft electrical circuit and power
generating systems - Technical instructions
MTC: 20-07-03-408: Appearance Checks on an aircraft after an inspection or repair - Technical instructions
1.L. OTHER AFFECTED PUBLICATIONS
Not applicable.
1.M. PART INTERCHANGEABILITY OR MIXABILITY
Not applicable.
Revision 0 2020-03-31  Page 5/11
This document is available on the Internet: www.airbushelicopters.com/techpub

### Page 6 (OCR)

AIRBUS
HELICOPTERS  ASB No. EC225-05A053
2. EQUIPMENT OR PARTS INFORMATION
2.A. EQUIPMENT OR PARTS: PRICE - AVAILABILITY - PROCUREMENT
Price
For any information on the price of modification kits and/or components or for assistance, contact the Airbus
Helicopters Network Sales and Customer Relations Department.
Availability
Delivery lead times will be indicated by the Sales and Customer Relations Department on the operator's
request.
Procurement
Order the required quantity from the Airbus Helicopters Network Sales and Customer Relations Department:
Airbus Helicopters
Etablissement de Marignane
Direction Ventes et Relations Client
13725 MARIGNANE CEDEX
FRANCE
NOTE 1
On the purchase order, please specify the mode of
transport, the destination and the serial numbers of the
helicopters to be modified.
NOTE 2
For ALERT SERVICE BULLETINS, order by:
Telex: HELICOP 410 969F
Fax: +33 (0)4.42.85.99.96
2.B. LOGISTIC INFORMATION
Not applicable.
Revision 0 2020-03-31  Page 6/11
This document is available on the Internet: www.airbushelicopters.com/techpub

### Page 7 (OCR)

AIRBUS
HELICOPTERS  ASB No. EC225-05A053
2.C. EQUIPMENT OR PARTS REQUIRED PER HELICOPTER/COMPONENT
Equipment or parts to be ordered separately:
Old
Key Word  Qty  New P/N  Item
PIN  →→  Instruction
Main rotor mast assy  1  332A31-3001-01M  1  332A31-3001-01M  Replace if
necessary
Main rotor mast assy  1  332A31-3001-02M  2  332A31-3001-02M  Replace if
necessary
Main rotor mast assy  332A31-3002-00M  3  332A31-3002-00M  Replace if
necessary
Main rotor mast assy  332A31-3002-01M  4  332A31-3002-01M  Replace if
necessary
Main rotor mast assy  1  332A31-3002-02M  5  332A31-3002-02M  Replace if
necessary
Main rotor mast assy  1  332A31-3032-00M  6  332A31-3032-00M  Replace if
necessary
Main rotor mast assy  1  332A31-3032-01M  7  332A31-3032-01M  Replace if
necessary
Revision 0 2020-03-31  Page 7/11
This document is available on the Internet: www.airbushelicopters.com/techpub

### Page 8 (OCR)

AIRBUS
HELICOPTERS  ASB No. EC225-05A053
Consumables to be ordered separately:
As per the Work Cards and Tasks indicated in this ALERT SERVICE BULLETIN.
Aviatec global aviation
Website: https://www.aviatec.net
Telephone: +33 1.34.46.45.25 or +49 4193.8803.630
Fax: +33 1 34.46.45.26 or +49 4193.8803.699
AOG: +49 4193.8803.660
AOG email: aog@aviatec.aero
Gaches chimie
Website: www.gaches.com
Telephone: +33 5.61.31.64.45
Fax: +33 5.61.40.98.63
AOG email: marketplace@gaches.com
BDSI
Website: https://www.boeingdistribution.com
Telephone: +1.305.925.2600
Fax: +1.305.507.7191
AOG: +1.305.471.8888
AOG email: AOGdesk@Boeingdistribution.com
Special tools:
Key Word  Qty  Tool P/N or equivalent  Item
Commercial
Strap  (Load capacity of 2500 daN  ZZ
minimum)
Commercial
Rubber sleeve  (Length 600 mm and thickness  УУ
2mm)
2.D. EQUIPMENT OR PARTS TO BE RETURNED
- Return main rotor mast assembly as per the procedure described in Information Notice No. 2832-1-00.
- Inform Airbus Helicopters to the following address:
https://keycopter.airbushelicopters.com
Revision 0 2020-03-31  Page 8/11
This document is available on the Internet: www.airbushelicopters.com/techpub

### Page 9 (OCR)

AIRBUS
HELICOPTERS  ASB No. EC225-05A053
3. ACCOMPLISHMENT INSTRUCTIONS
3.A. GENERAL
Not applicable.
3.B. WORK STEPS
3.B.1. Preliminary steps
- Disconnect all the electrical power supplies as per Work Card 20-07-03-406 (MTC).
- Install appropriate access equipment.
3.B.2.a. Disconnect of the pitch rods and scissor rods
- Remove main rotor blades as per Task 62-10-00-061(MMA).
- Disconnect the pitch rods as per Sub-Task 62-23-00-032-001 of the Task 62-23-00-062 (MMA).
- Disconnect the rotating scissors from the swashplates as per Sub-Task 62-23-00-031-001 of the Task
62-23-00-061 (MMA).
3.B.2.b. Check of the ball bearing of the swashplate assembly
Compliance with the work steps concerned with the check is described in a video which is accessible by
following the link below:
https://dai.ly/k4G3nKqpHcsyDyvUY6B
- Perform a check of the ball bearing of the swashplate assembly as per Sub-Task 62-20-00-213-091 of the
Task 62-20-00-213 (MMA).
- Interpret results as per paragraph 3.B.2.c.
Revision 0 2020-03-31  Page 9/11
This document is available on the Internet: www.airbushelicopters.com/techpub

### Page 10 (OCR)

AIRBUS
HELICOPTERS  ASB No. EC225-05A053
3.B.2.c. Interpretation of the results
- If there is a hard point and/or a sensitive axial play as per Sub-Task 62-20-00-213-091 of the
Task 62-20-00-213 (MMA):
. Remove the main rotor mast assembly as per Task 62-20-00-021 (MMA).
• Install a new main rotor mast assembly (1) or (2) or (3) or (4) or (5) or (6) or (7) as per
Task 62-20-00-021 (MMA).
. Return the main rotor mast assembly (a) (not shown) to Airbus Helicopters as per paragraph 2.D.
- If there is no hard point and/or a sensitive axial play:
. Comply with paragraphs 3.B.2.d.
3.B.2.d. Installation of the pitch rods and scissor rods
- Connect the rotating scissors from the swashplates as per Sub-Task 62-23-00-431-001 of the
Task 62-23-00-061 (MMA).
- Install a strap (zz) (not shown) with two rubber sleeves (yy) (not shown) between the non-rotating
swashplate (not shown) and the main rotor sleeve (not shown).
- Position the rubber sleeves (yy) at contact area with the non-rotating swashplate (not shown) and the
main rotor blade sleeve (not shown) to prevent damage.
NOTE 1
The use of the strap (zz) makes it possible to align one axe
of one pitch rods with one axe of the swashplate (a) or (1) or
- Connect the pitch rods as per sub-task 62-23-00-432-001 of the Task 62-23-00-062 (MMA).
NOTE 2
Make sure to actuate slowly the pawl of the strap (zz) to
avoid interference between the pitch-rod and the swashplate
(a) or (1) or (2) or (3) or (4) or (5) or (6) or (7).
- Remove the strap (zz) and the rubber sleeves (yy).
- Install main rotor blades as per Task 62-10-00-061(MMA).
3.B.4. Final steps
- Clean the work areas and the helicopter and return them to their initial condition as per Work Card
20-07-03-408 (MTC).
- Remove the access equipment.
- Connect all electrical power supplies as per Work Card 20-07-03-406 (MTC).
Revision 0 2020-03-31  Page 10/11
This document is available on the Internet: www.airbushelicopters.com/techpub

### Page 11 (OCR)

AIRBUS
HELICOPTERS  ASB No. EC225-05A053
3.C. RECORD OF COMPLIANCE
Compliance with this document:
Record full compliance with this ALERT SERVICE BULLETIN, with the revision number in the log card (FM)
of the swashplate assembly.
Please confirm compliance with this ALERT SERVICE BULLETIN:
QR-Code or hypertext link
NOTE 3
The  recording of  compliance with ALERT SERVICE
BULLETIN in the R-Tex tool does not replace the recording
in the helicopter documents.
ASB EC225 05A053
3.D. OPERATING AND MAINTENANCE INSTRUCTIONS
Not applicable.
Revision 0 2020-03-31  Page 11/11
This document is available on the Internet: www.airbushelicopters.com/techpub

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
