# Airbus Helicopters Alert Service Bulletin EC225-53A048

Copy: No revision named ("Airbus ASB No EC225-53A048 Rev 0"), 17 pages: PDF https://openairdocs.org/files/sha256/d5/ea/d5ea79045151145404e919185bf591c0669c90d6d978ab492d0e65c4f7e3270e; text https://openairdocs.org/service-documents/airbus-helicopters/ec225-53a048/file/d5ea79045151.md. Rights: © Airbus Helicopters. Filed by the FAA in regulations.gov docket FAA-2016-5019; AD 2018-05-01 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Airbus Helicopters](https://openairdocs.org/service-documents/airbus-helicopters.md)
- Type: Service bulletin (Alert Service Bulletin)
- Number: EC225-53A048
- Page: https://openairdocs.org/service-documents/airbus-helicopters/ec225-53a048

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2018-05-01](https://openairdocs.org/ad/2018-05-01.md), effective Apr 5, 2018: No revision named

Also cited in [1 proposed AD](https://openairdocs.org/service-documents/airbus-helicopters/ec225-53a048/proposed.md).

## Text (17 pages)

Rights: © Airbus Helicopters. Filed by the FAA in regulations.gov docket FAA-2016-5019; AD 2018-05-01 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. This text is OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1 (OCR)

AIRBUS
HELICOPTERS  ASB No. EC225-53A048
Civil version(s): LP
ALERT SERVICE BULLETIN
SUBJECT: STRUCTURE - Jettisoning system
Functional check of the emergency jettisoning
system of the sliding plug doors
For the attention of
Revision No.  Date of issue
Revision 0  2014-08-18
Summary:
The purpose of this ALERT SERVICE BULLETIN is to check for correct operation of the emergency jettisoning
system of the sliding plug doors.
Compliance:
Compliance with this ALERT SERVICE BULLETIN is mandatory, except for paragraph 3.D.
Revision 0 2014-08-18  Page 1/17
This document is available on the internet: www.airbushelicopters.com/techpub

### Page 2 (OCR)

AIRBUS
HELICOPTERS  ASB No. EC225-53A048
1. PLANNING INFORMATION
1.A. EFFECTIVITY
NOTE 1
Mandatory compliance with this ALERT SERVICE BULLETIN
does not apply to helicopters delivered after July 14, 2014. Only
the recommended maintenance described in paragraph 3.D. is
applicable to these helicopters.
1.A.1. Helicopters/installed equipment
Helicopters delivered before July 14, 2014 and equipped with sliding plug doors.
1.A.2. Non-installed equipment
Not applicable.
1.B. ASSOCIATED REQUIREMENTS
Not applicable.
Revision 0 2014-08-18  Page 2/17
This document is available on the internet: www.airbushelicopters.com/techpub

### Page 3 (OCR)

AIRBUS
HELICOPTERS  ASB No. EC225-53A048
1.C. REASON
During a periodic inspection of the jettisoning mechanism of the lateral sliding plug doors, the emergency
jettisoning test of the door failed. The visual inspection of the mechanism revealed strong corrosion of the
jettisoning system bracket and obstruction of the water evacuation drain.
The analysis of the incident revealed several possible causes of this corrosion:
- contact between the aluminum bracket and the stainless steel air vent pipe
- stagnation of water due to PR compound
- obstruction of the water evacuation drain
A photo of the area at risk is shown below.
Stainless steel
pipe
Aluminum
bracket  Drain
Corrosion of the jettisoning mechanism of the lateral sliding plug doors may block the mechanism and make
door jettisoning in emergency situations impossible.
In order to prevent similar occurrences, Airbus Helicopters makes a visual check of the area mandatory to
make sure that there is no corrosion.
1.D. DESCRIPTION
- Removal of the door covering.
- Check for absence of PR compound.
- Check for absence of corrosion.
- Check for absence of interference between the stainless steel pipe and the aluminum bracket.
- Check for non-obstruction of the drain.
Revision 0 2014-08-18  Page 3/17
This document is available on the internet: www.airbushelicopters.com/techpub

### Page 4 (OCR)

AIRBUS
HELICOPTERS  ASB No. EC225-53A048
1.E. COMPLIANCE
Airbus Helicopters makes compliance with paragraph 1.E.2.a. mandatory.
Airbus Helicopters recommends compliance with paragraph 3.D.
1.E.1. Compliance at the works
Not applicable.
1.E.2. Compliance in service
Helicopters/installed equipment:
For helicopters which were delivered less than 12 months ago, comply with paragraph 3. of this ALERT
SERVICE BULLETIN at the latest when reaching 15 months since delivery.
For helicopters which were delivered more than 12 months ago, comply with paragraph 3. of this ALERT
SERVICE BULLETIN within 3 months following receipt of this ALERT SERVICE BULLETIN issued on the
date indicated at the bottom of the page.
Non-installed equipment: Not applicable.
1.F. APPROVAL
Approval of modifications: Not applicable.
Approval of this document:
The technical information contained in this ALERT SERVICE BULLETIN Revision 0 was approved
on August 18, 2014 under the authority of EASA Design Organization Approval No. 21J.056 for helicopters
of civil versions subject to an Airworthiness Certificate.
The technical information contained in this ALERT SERVICE BULLETIN Revision 0 was approved
on August 18, 2014 under the prerogatives of the recognition of design capability FRA21J-002-DGA for
French Government helicopters.
Revision 0 2014-08-18  Page 4/17
This document is available on the internet: www.airbushelicopters.com/techpub

### Page 5 (OCR)

AIRBUS
HELICOPTERS  ASB No. EC225-53A048
1.G. MANPOWER
Qualification:
2 Aircraft Structure Technicians
Time for the operations:
4 hours if the bracket is removed
Estimated helicopter grounding time:
half a day if the bracket is removed
1.H. WEIGHT AND BALANCE
Not applicable.
1.I. EFFECT ON ELECTRICAL LOADS
Not applicable.
1.J. SOFTWARE MODIFICATION EMBODIMENT RECORD
Not applicable.
1.K. REFERENCES
Aircraft Maintenance Manual (MMA):
- Task: 28-20-00-062
- Task: 52-12-03-711
- Task: 52-12-04-711
- Task: 52-12-01-021
Standard Practices Manual (MTC):
- Work Card: 20.02.01.103
- Work Card: 20.02.05.401
- Work Card: 20.02.05.404
- Work Card: 20.03.01.102
- Work Card: 20.04.03.102
- Work Card: 20.04.03.401
- Work Card: 20.04.04.403
- Work Card: 20.04.05.402
1.L. DOCUMENTS AFFECTED
The following documents will be updated subsequently: MMA, MET, PRE, MSM.
1.M. INTERCHANGEABILITY OR MIXABILITY OF PARTS
Not applicable.
Revision 0 2014-08-18  Page 5/17
This document is available on the internet: www.airbushelicopters.com/techpub

### Page 6 (OCR)

AIRBUS
HELICOPTERS  ASB No. EC225-53A048
2. MATERIAL INFORMATION
2.A. MATERIAL: PRICE - AVAILABILITY - PROCUREMENT
For any information concerning the price of components, contact the Airbus Helicopters Network Sales and
Customer Relations Department.
NOTE 1
On the purchase order, please specify the mode of transport,
the destination and the serial numbers of the helicopters to be
modified.
NOTE 2
For ALERT SERVICE BULLETINS, order by:
Telex: HELICOP 410 969F
2.B. INFORMATION CONCERNING INDUSTRIAL SUPPORT
Not applicable.
2.C. MATERIAL REQUIRED FOR EACH HELICOPTER/COMPONENT
Kits or components to be ordered for one helicopter or one assembly:
Material P/N  Qty  Item  Designation  Former P/N  Instruction
As per IPC  1  1  Bracket
ASNA2050DXJ48XX *  3  2  Rivet
ASNA2050DXJ40XX *  Rivet
ASNA0078E408  2  4  Rivet
23310CA015012  2  5  Pin
(*) Rivet length to be defined during assembly.
Material to be ordered separately:
Material P/N  Qty  Item  Designation  Former P/N  Instruction
332A21-1587-21  A/R  Drain  1 per door
Revision 0 2014-08-18  Page 6/17
This document is available on the internet: www.airbushelicopters.com/techpub

### Page 7 (OCR)

AIRBUS
HELICOPTERS  ASB No. EC225-53A048
Products to be ordered separately:
Refer to the Work Cards and Tasks specified in this ALERT SERVICE BULLETIN and the list below:
Material P/N  Qty  Item  Designation  Former P/N  Instruction
DHS171-143.21  A/R  10  Contact adhesive
EN3628-0,5  AIR  11  Lockwire
ASN42112EG  12  Sealing compound
The products can be ordered separately from the INTERTURBINE AVIATION LOGISTICS company.
http://www.interturbine.com
Telephone:  +49.41.91.809.300
+49.41.91.809.444
2.D. MATERIAL TO BE RETURNED
Not applicable.
Revision 0 2014-08-18  Page 7/17
This document is available on the internet: www.airbushelicopters.com/techpub

### Page 8 (OCR)

* AIRBUS
HELICOPTERS  ASB No. EC225-53A048
3. ACCOMPLISHMENT INSTRUCTIONS
3.A. GENERAL
Read and comply with the general instructions for joining by riveting as per MTC Work Card 20.02.05.401.
Read and comply with the general instructions for joining by bolts and nuts as per MTC Work
Card 20.02.05.404.
Read and comply with the general instructions concerning the unriveting principle as per MTC Work
Card 20.03.01.102.
Read and comply with the general instructions concerning the method for reconditioning corroded metal
surfaces as per MTC Work Card 20.04.03.401.
Read and comply with the general instructions concerning the protective treatment of surfaces against
corrosion as per MTC Work Card 20.04.03.102.
Read and comply with the general instructions concerning the installation of pipes as per MTC Work
Card 20.02.01.103.
3.B. OPERATIONAL PROCEDURE
The procedure is described for the LH side only. Comply with the same procedure on the RH side.
3.B.1. Preliminary steps
- Disconnect all electrical power supplies.
- Install the access equipment.
- Remove/open all paddings, coverings, panels and equipment as required for access to the different work
areas at frame X3855.
3.B.2.  Presence of PR compound (Figure 1)
If there is no sealing compound (PR) in area A (see correct area):
- Comply with paragraph 3.B.3.
If there is sealing compound (PR) in area A (see incorrect area):
- Remove the sealing compound using a spatula and clean the area.
Then comply with paragraph 3.B.3.
Revision 0 2014-08-18  Page 8/17
This document is available on the internet: www.airbushelicopters.com/techpub

### Page 9 (OCR)

→ AIRBUS
HELICOPTERS  ASB No. EC225-53A048
3.B.3. Check for corrosion on the bracket (Figure 1)
Visually check on all visible surfaces that bracket (a) is not corroded.
• If no corrosion is found on the bracket, comply with paragraph 3.B.5.
• If corrosion is found on the bracket:
- Remove the corrosion.
- Measure the depth
1) If the depth is less than 0.5mm:
Carry out a jettisoning test of the door concerned as per:
. MMA Task 52-12-03-711 (LH door) or 52-12-04-711 (RH door)
Interpretation of the results
If the jettisoning test result is correct:
- Touch up the whole bracket using Alodine 1200 as per MTC Work Card 20.04.04.403.
- Apply a P05-P20 protection to the bracket as per MTC Work Card 20.04.05.402.
- Carry out a paint touch-up as per the MTC.
- Comply with paragraph 3.B.5.
If the jettisoning test result is incorrect:
- Replace the bracket as per paragraph 3.B.4.
2) If the depth is greater than or equal to 0.5mm:
- Replace the bracket as per paragraph 3.B.4 within a maximum time limit of 6 months
following first compliance with this ALERT SERVICE BULLETIN,
Pending bracket replacement:
382-205-41 8 09 52-120491 EH door)
Interpretation of the results
If the jettisoning test result is correct:
- Touch up the whole bracket using Alodine 1200 as per MTC Work Card 20.04.04.403.
- Apply a P05-P20 protection to the bracket as per MTC Work Card 20.04.05.402.
- Carry out a paint touch-up as per the MTC.
- Comply with paragraph 3.B.5.
THEN
. Carry out a jettisoning test and comply with paragraph 3.B.6. (drain check) every
2 months without exceeding 6 months.
If the jettisoning test result is incorrect:
- Replace the bracket as per paragraph 3.B.4. before resuming flights.
Revision 0 2014-08-18  Page 9/17
This document is available on the internet: www.airbushelicopters.com/techpub

### Page 10 (OCR)

•AIRBUS
HELICOPTERS  ASB No. EC225-53A048
3.B.4. Bracket replacement
3.B.4.a. Replacement of the LH or RH bracket (Figures 2 and 3)
Figure 2
- Remove the plug door, if not yet removed, as per MMA Task 52-12-01-021.
For better access to the work area:
- Remove lockwire (k) from union (I).
- Loosen union (I) of air vent pipe (m) then disconnect the pipe.
- Loosen support (n) by removing screw (p), nut (q) and washer (r).
- Move pipe (m) to facilitate access to the bracket to be removed.
- If necessary, remove the LP fuel filter as per MMA Task 28-20-00-062.
Figure 2
- Remove the sealing compound (PR) from the gutter on the bracket side area B.
- Remove the contact adhesive from area B.
- Remove drain (b) from the gutter.
Figures 2 and 3
- Disconnect rod (c) by removing pin (d), bolt (e) and washer (f).
- Discard pin (d) and retain bolt (e) and washer (t).
- Remove rivet (g) from lever (i).
- Disconnect rod (w) from the other frame post on the door opening side by removing pin (s), bolt (t) and
washer (u).
- Discard pin (s) and retain bolt (t) and washer (u).
- Disconnect locking pin (x) by removing pin (a1), washer (y) and bolt (z).
- Discard pin (a1) and retain bolt (z) and washer (y).
- Remove rivet (b1) from bolt (h) then remove bolt (h) from lever (v).
NOTE 1
The locking mechanism is no longer held in place by the bolt on
either side of the bulkhead.
- Remove the 3 screws, washers and nuts (d1) which hold the bracket in place on the skin.
- Remove the 6 rivets (c1) which hold the bracket in place on the web of frame X3855 and mark the
attachment hole positions.
- Remove the bracket.
Revision 0 2014-08-18  Page 10/17
This document is available on the internet: www.airbushelicopters.com/techpub

### Page 11 (OCR)

→ AIRBUS
HELICOPTERS  ASB No. EC225-53A048
3.B.4.b. Installation of the LH or RH bracket (Figures 2 and 3)
Bracket:
- Position bracket (1) in its former installation position in accordance with the existing attachment holes.
- On bracket (1), mark and drill back 3 holes (X) to diameter 4.8mm and 2 holes (Y) to diameter 4mm in
accordance with the existing attachment holes.
- Install the bracket using the 6 rivets (2) and (3) which hold the bracket in place on the web of frame X3855.
(protection)
NOTE 2
Make sure that plate assembly (e1) and bracket (1) are
correctly attached.
- Install the 3 screws, washers and nuts which hold the bracket in place on the skin.
- Install bolt (h) in bracket (1) and in lever (v).
- Install lever I) on bolt (h).
- Install a rivet (4) in order to hold bolt (h) and lever ().
- Install a rivet (4) in order to hold bolt (h) and lever (v).
- Attach the locking pin using bolt (z), washer (y) and pin (5).
- Attach rod (w) using bolt (t), washer (u) and pin (5).
- Attach rod (c) using bolt (e), washer (f) and pin (5).
Drain:
- Make sure that the drain is not obstructed.
- Apply contact adhesive (10) to the gutter then slide in the drain.
- Leave the adhesive to dry.
- Apply sealing compound (12) around the gutter on the bracket side (Figure 2) without obstructing the drain.
LP filter:
- If previously removed, install the LP fuel filter as per MMA Task 28-20-00-062.
Air vent pipe:
- Position air vent pipe (m).
- Ensure a minimum clearance of 3mm between bracket (1) and pipe (m).
- Tighten support (n) by installing screw (p), nut (q) and washer (r).
- Tighten union (I) of air vent pipe (m).
- Safety union (I) using lockwire (11).
Then comply with paragraph 3.B.7.
Revision 0 2014-08-18  Page 11/17
This document is available on the internet: www.airbushelicopters.com/techpub

### Page 12 (OCR)

→ AIRBUS
HELICOPTERS  ASB No. EC225-53A048
3.B.5. Clearance between the bracket and the stainless steel pipe (Figure 2)
Check that there is a clearance greater than or equal to 3mm between bracket (a) and stainless steel
pipe (m).
If the clearance between bracket (a) and pipe (m) is greater than or equal to 3mm, comply with
paragraph 3.B.6.
• If the clearance between bracket (a) and pipe (m) is less than 3mm:
NOTE 3
In order to obtain a clearance greater than or equal to 3mm, it is
possible to slightly modify the positions of air vent pipe (m) and
its supports (n).
NOTE 4
Frame X3855 must not be drilled to move support (n).
- Remove lockwire (k) from union (I).
- Loosen unions (I) of air vent pipe (m).
- Loosen support (n).
- Position the support and the pipe to ensure a minimum clearance of 3mm.
- Retighten support (m) and unions (l) of the pipe.
- Safety union (I) using lockwire (11).
- Comply with paragraph 3.B.6.
3.B.6. Non-obstruction of the drain (Figures 2 and 4)
Compress the roller well piston of the middle rail (Figure 4 Area B),
Then,
Inject distilled water through the roller well of the middle rail in order to ensure that the water is evacuated
through the drain toward the outside of the helicopter:
• If the drain is not obstructed, comply with paragraph 3.B.7.
• If the drain is obstructed:
Remove sealing compound (2) from the gutter on the bracket area B side (Figure 2).
Remove contact adhesive from area B (Figure 2).
Remove drain (b) from the gutter.
Unclog the drain and the gutter using a spatula or brush.
Clean the gutter on the bracket side and the drain.
Apply contact adhesive (10) to the gutter then slide in the drain.
Leave the adhesive to dry.
Apply sealing compound (12) around the gutter on the bracket side (Figure 2).
Comply with paragraph 3.B.7.
3.B.7. Final steps
- Install and/or close all paddings, coverings, panels and equipment previously removed for access to the
different work areas.
- Remove the access equipment.
- Connect all electrical power supplies.
Revision 0 2014-08-18  Page 12/17
This document is available on the internet: www.airbushelicopters.com/techpub

### Page 13 (OCR)

AIRBUS
HELICOPTERS  ASB No. EC225-53A048
3.C. IDENTIFICATION
Identification of this document:
Record compliance with this ALERT SERVICE BULLETIN in the helicopter documents.
Identification of modifications on the documentation:
Not applicable.
Identification of modifications on the equipment:
Not applicable.
3.D. OPERATING AND MAINTENANCE INSTRUCTIONS
Pending the update of the documentation, comply with paragraph 3.B.6. on the LH and RH Sides
every 12 months (tolerance: 1 month).
Once these instructions have been integrated in the Master Servicing Manual (MSM), refer to this manual.
4. APPENDIX
Not applicable.
Revision 0 2014-08-18  Page 13/17
This document is available on the internet: www.airbushelicopters.com/techpub

### Page 14 (OCR)

AIRBUS
HELICOPTERS  ASB No. EC225-53A048
CORRECT  INCORRECT
SEALANT  SEALANT
APPLICATION  APPLICATION
AREA A
a
Figure 1
Revision 0 2014-08-18  Page 14/17
This document is available on the internet: www.airbushelicopters.com/techpub

### Page 15 (OCR)

AIRBUS
HELICOPTERS  ASB No. EC225-53A048
_ C  d1
Y
d
e
f
12
r
Figure 2
Revision 0 2014-08-18  Page 15/17
This document is available on the internet: www.airbushelicopters.com/techpub

### Page 16 (OCR)

•AIRBUS
HELICOPTERS  ASB No. EC225-53A048
g
el
2
LH bracket  RH bracket
Figure 3
Revision 0 2014-08-18  Page 16/17
This document is available on the internet: www.airbushelicopters.com/techpub

### Page 17 (OCR)

AIRBUS
HELICOPTERS  ASB No. EC225-53A048
AREA B
332A 21 3242 2^
Drain hole
Figure 4
Revision 0 2014-08-18  Page 17/17
This document is available on the internet: www.airbushelicopters.com/techpub

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
