# Airbus Service Bulletin A300-27-0206

Copy: No revision named ("A300-27-0206 REV 00"), 32 pages: PDF https://openairdocs.org/files/sha256/73/ea/73ead73ae0455a9c46f1ac379dc86967e9e6b75b5542de35472ed30fb8be1e73; text https://openairdocs.org/service-documents/airbus/a300-27-0206/file/73ead73ae045.md. Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2019-0482, the docket of AD 2019-19-07. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Airbus](https://openairdocs.org/service-documents/airbus.md)
- Type: Service bulletin (Service Bulletin)
- Number: A300-27-0206
- Page: https://openairdocs.org/service-documents/airbus/a300-27-0206

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2019-19-07](https://openairdocs.org/ad/2019-19-07.md), effective Nov 5, 2019: No revision named

Also cited in [1 proposed AD](https://openairdocs.org/service-documents/airbus/a300-27-0206/proposed.md).

## Text (32 pages)

Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2019-0482, the docket of AD 2019-19-07. Not covered by OpenAirDocs’ CC0 dedication. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

@A300
SERVICE BULLETIN
SUMMARY
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
This summary is for information only and is not approved for modification of the aircraft.
MANDATORY
 MANDATORY
 MANDATORY
ATA SYSTEM: 27
TITLE: FLIGHT CONTROLS - THS HYDRAULIC ACTUATION - INSPECTION OF
THE THS ACTUATOR RH BEARING INSTALLATION
**CONF ALL
MODIFICATIONS
None
REASON/DESCRIPTION/OPERATIONAL CONSEQUENCES
During heavy maintenance visit on A300-600 aircraft, departed parts were reported (right hand spherical
bearing and retaining parts) from Trimmable Horizontal Stabilizer (THS) actuator ball nut trunnion lower
attachment. The THS actuator has a fail-safe design at lower attachment by a primary and secondary
load path on RH and LH sides, which ensure the load path continuity between the Horizontal Tail plane
and the actuator. Only the primary load path is engaged in normal configuration thanks in particular to
the spherical bearing and retaining parts.
In case the spherical bearing departed, the primary load path is disconnected and the secondary load
path engaged. The secondary load path engagement remains hidden and the attachment will only
withstand the loads for a limited period of time.
NOTE
: The spherical bearing installation on each side is different, floating on the RH and fixed
to the Horizontal Tail Plane (HTP) arm on the LH.
AIRBUS requests a one-time inspection to check the correct installation of the RH spherical bearing on
wide body fleet.
The accomplishment of this Service Bulletin will contribute to ensure the reliable function of the THS
actuator.
GENERAL EVALUATION
EVALUATION TABLE
COMPLIANCE
 MANDATORY (1)
 CANCELS INSPECTION SB
 NO
POTENTIAL AD
 YES
 A/C OPERATION AFFECTED
 NO
RELIABILITY AFFECTED
 NO
 PAX COMFORT AFFECTED
 NO
COST SAVING
 NO
 ETOPS AFFECTED
 NO
DATE: Feb 19/19 SERVICE BULLETIN No.: A300-27-0206
REVISION No.: 00 - Feb 19/19 Page: 1
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 2

@A300
SERVICE BULLETIN
SUMMARY
EVALUATION TABLE
STRUCTURAL LIFE EXTN
 NO
 VENDOR SB INVOLVED
 NO
NOTE
 (1)
: Service Bulletin must be accomplished.
MATERIAL PRICE INFORMATION
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET
 QTY PER
A/C
PRICE PER
A/C (USD)
MAIN PARTS
Equipment BFEA01
 1
 See SB
 Bolt
Component COMPA01
 1
 See SB
 Washer, end cap, dowel
EFFECTIVITY
This Service Bulletin is applicable to this (these) operator(s) :
62N 81T A2S AFG F2I GLY IAW IRA IRM MIX MSB MSR RUN
STR TIW TNO
CONCURRENT REQUIREMENTS
None
REFERENCES / REPERCUSSIONS
TFU
 27.44.00.028
OEB
 None
AOT
 None
SIL
 None
ISI
 None
LINE MAINTENANCE AFFECTED
 No
LIFE LIMIT
 None
OTHER
 None
NATURE OF THE WORK
AIRCRAFT
 YES
EQUIPMENT
 NO
MANPOWER
Task 270206-832-801-001: Detailed Inspection of the THS Actuator RH Bearing Installation
TOTAL MANHOURS
 3.00
ELAPSED TIME (HOURS)
 1.25
APPENDICES
Appendix 01 - Inspection Report
DATE: Feb 19/19 SERVICE BULLETIN No.: A300-27-0206
REVISION No.: 00 - Feb 19/19 Page: 2
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 3

@A300
SERVICE BULLETIN
SUMMARY
**CONF ALL
RH BEARING ASSEMBLY
TO BE INSPECTED
TRIMMABLE HORIZONTAL STABILIZER ACTUATOR (THSA)
B
A
FR86
312AR
A
B
FR82
Z310
A_SB_270206_5_SAAA_01_00
Figure A-FSAAA - Sheet 01
DATE: Feb 19/19 SERVICE BULLETIN No.: A300-27-0206
REVISION No.: 00 - Feb 19/19 Page: 3
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 4

@A300
SERVICE BULLETIN
SUMMARY
This Page Intentionally Left Blank
DATE: Feb 19/19 SERVICE BULLETIN No.: A300-27-0206
REVISION No.: 00 - Feb 19/19 Page: 4
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 5

@A300
SERVICE BULLETIN
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
MANDATORY
 MANDATORY
 MANDATORY
ATA SYSTEM: 27
TITLE: FLIGHT CONTROLS - THS HYDRAULIC ACTUATION - INSPECTION OF
THE THS ACTUATOR RH BEARING INSTALLATION
MODIFICATION No.: None
This document contains AIRBUS PROPRIETARY INFORMATION and shall at all times remain the
property of AIRBUS; no intellectual property right or licence is granted by AIRBUS in connection with
any information contained in it. It is delivered on the express condition that said document and the
information contained in it shall be treated as confidential, shall not be used for any purpose other than
that for which it is hereby delivered. It shall not be disclosed in whole or in part to third parties and shall
not be duplicated in any manner (except for the purposes of performing the tasks described hereunder
and provided that any recipient of such document shall comply with the conditions herein), without
AIRBUS prior written consent.
1. PLANNING INFORMATION
**CONF ALL
A. EFFECTIVITY
(1) Models
B2-203 B2K-3C B4-103 B4-203 B4-2C C4-203 F4-203
(2) Effectivity by MSN
0075 0080 0085 0090 0107 0126 0139 0141 0151-0152 0154 0157 0160 0173 0175
0180 0183 0185 0203 0210 0212 0218 0220 0226-0227 0234-0236 0239 0244 0247
0255-0256 0259 0261 0274 0277 0292 0299 0302
(3) Effectivity by Operator
The Operator/MSN relationship is provided for information only and is correct at the time
of issue in accordance with the information available to AIRBUS. Any future changes
resulting from transfer of an aircraft from one operator to another will not be reflected in
this list unless the Service Bulletin is revised for another reason.
OPERATOR
 MSN
62N
 0183
81T
 0126 0141 0157 0277 0292
DATE: Feb 19/19 SERVICE BULLETIN No.: A300-27-0206
REVISION No.: 00 - Feb 19/19 Page: 1
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 6

@A300
SERVICE BULLETIN
OPERATOR
 MSN
A2S
 0203
AFG
 0180
F2I
 0235
GLY
 0085
IAW
 0239
IRA
 0080 0139 0151 0173 0185 0226 0256 0299 0302
IRM
 0090 0160 0175 0244
MIX
 0218
MSB
 0212
MSR
 0255
RUN
 0075 0107 0154
STR
 0236
TIW
 0152 0220 0234 0259 0261 0274
TNO
 0210 0227 0247
(4) Configuration by MSN
MSN
 CONFIGURATION
0075 0080 0085 0090 0107 0126 0139 0141 0151 0152 0154
0157 0160 0173 0175 0180 0183 0185 0203 0210 0212 0218
0220 0226 0227 0234 0235 0236 0239 0244 0247 0255 0256
0259 0261 0274 0277 0292 0299 0302
001
(5) Configuration definition
**CONF 001
Config. 001 is valid for all the aircraft given in the effectivity of this Service Bulletin as a
standard configuration.
(6) Material Effectivity
MATERIAL
 QTY PER A/C
 SEE NOTES
Equipment BFEA01
 1
Component COMPA01
 1
Consumable CMLA01
 1
B. CONCURRENT REQUIREMENTS
None
DATE: Feb 19/19 SERVICE BULLETIN No.: A300-27-0206
REVISION No.: 00 - Feb 19/19 Page: 2
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 7

@A300
SERVICE BULLETIN
C. REASON
(1) History
During heavy maintenance visit on A300-600 aircraft, departed parts were reported (right
hand spherical bearing and retaining parts) from Trimmable Horizontal Stabilizer (THS)
actuator ball nut trunnion lower attachment. The THS actuator has a fail-safe design at
lower attachment by a primary and secondary load path on RH and LH sides, which
ensure the load path continuity between the Horizontal Tail plane and the actuator. Only
the primary load path is engaged in normal configuration thanks in particular to the
spherical bearing and retaining parts.
In case the spherical bearing departed, the primary load path is disconnected and the
secondary load path engaged. The secondary load path engagement remains hidden
and the attachment will only withstand the loads for a limited period of time.
NOTE
: The spherical bearing installation on each side is different, floating on the
RH and fixed to the Horizontal Tail Plane (HTP) arm on the LH.
(2) Objective/Action
AIRBUS requests a one-time inspection to check the correct installation of the RH
spherical bearing on wide body fleet.
(3) Advantages
The accomplishment of this Service Bulletin will contribute to ensure the reliable function
of the THS actuator.
(4) Operational/Maintenance Consequences
None
D. DESCRIPTION
To accomplish this Service Bulletin it is necessary to :
Task 270206-832-801-001: Detailed Inspection of the THS Actuator RH Bearing Installation
(1) Do a Detailed Inspection of the THS Actuator RH Bearing Installation
(2) Depending on the Inspection Result, Torque and Safety the Bolt with new Lockwire
(3) Depending on the Inspection Result, Install new Dowel, End Cap, Washer, Bolt and
Lockwire
E. COMPLIANCE
(1) Classification
MANDATORY: Service Bulletin must be accomplished.
DATE: Feb 19/19 SERVICE BULLETIN No.: A300-27-0206
REVISION No.: 00 - Feb 19/19 Page: 3
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 8

@A300
SERVICE BULLETIN
(2) Accomplishment Timescale
This Service Bulletin has been classified Mandatory. It is expected that an Airworthiness
Directive (AD) published by the European Av iation Safety Agenc y (EASA) will be issued
to confirm this classification. It is anticipated that the AD will confirm the threshold
given but reference should be made to the AD for confirmation of the mandated
accomplishment timescale.
Table 1, Config. 001 - Detailed Inspection of the THS Actuator RH Bearing Installation
Condition
 Action
 Compliance time
 Repetitive interval
All aircraft
 Do a Detailed Inspection
of the THS Actuator RH
Bearing Installation in
accordance with TASK
270206-832-801 001
Within 18 months or 750
Flight Hours (FH) after
the service bulletin
issuance date
(whichever occurs first)
None
No finding found
 No further action
 None
 None
Findings found
And
Bearing found missing
Contact AIRBUS
 Before next flight
 None
Torque again and safety
the bolt with new
lockwire in accordance
with SUBTASK
270206-833-001 001
And
Before next flight
 None
Findings found
And
Bearing in place
And
Bolt and washer in
place and not damaged
No further action
 None
 None
Install new bolt, end
cap, washer, lockwire
and dowel in
accordance with
SUBTASK
270206-833-002 001
And
Before next flight
 None
Findings found
And
Bearing in place
And
Bolt and washer found
missing or damaged
No further action
 None
 None
F. APPROVAL
The technical content of this document is approved under the authority of Design
Organisation Approval No. EASA.21J.031.
If an aircraft listed in the effectivity has a modification or repair embodied that is not of
AIRBUS origin, and which affects the content of this Service Bulletin, the operator is
responsible for obtaining approval by its airworthiness authority for any adaptation necessary
before incorporation of the Service Bulletin.
DATE: Feb 19/19 SERVICE BULLETIN No.: A300-27-0206
REVISION No.: 00 - Feb 19/19 Page: 4
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 9

@A300
SERVICE BULLETIN
G. MANPOWER
The manpower estimates given in this Service Bulletin are based on the direct labor cost to
do the work. These estimates assume that the work will be done by experienced personnel,
and may need to be revised upwards to suit operator’s circumstances. The estimates do not
include the time to prepare, plan or inspect the work. Manufacture and procurement of parts
and tools, drying times for paints, sealants, etc., and general administration work are also not
included.
NOTE
: The minimum man-hours necessary to accomplish this Service Bulletin are
those for the Inspection. Depending on the inspection result, additional man-
hours can apply.
Task 270206-832-801-001: Detailed Inspection of the THS Actuator RH Bearing Installation
Get Access
 0.75
On Aircraft
Do a Detailed Inspection of the THS Actuator RH
Bearing Installation
0.25
Depending on the Inspection Result, Torque and
Safety the Bolt with new Lockwire
0.25
Depending on the Inspection Result, Install new Dowel,
End Cap, Washer, Bolt and Lockwire
1.00
Tests
 0.50
Close-Up
 0.25
TOTAL MANHOURS
 3.00
ELAPSED TIME (HOURS)
 1.25
H. WEIGHT AND BALANCE
Not Changed
I. ELECTRICAL LOAD DATA
Not Changed
J. REFERENCES
Aircraft Maintenance Manual (AMM)
 06-21-00 12-13-27 24-00-00
24-41-00 27-41-00 27-42-18
52-10-00 52-41-00 53-00-00
Elec. Std. Practices Manual (ESPM)
 20-55-00
In Service Information (ISI)
 00.00.00179
Standards Manual (SM)
K. PUBLICATION AFFECTED
None
L. INTERCHANGEABILITY/MIXABILITY
Not Applicable
DATE: Feb 19/19 SERVICE BULLETIN No.: A300-27-0206
REVISION No.: 00 - Feb 19/19 Page: 5
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 10

@A300
SERVICE BULLETIN
M. SPARES
None
DATE: Feb 19/19 SERVICE BULLETIN No.: A300-27-0206
REVISION No.: 00 - Feb 19/19 Page: 6
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 11

@A300
SERVICE BULLETIN
2. MATERIAL INFORMATION
**CONF ALL
A. MATERIAL - PRICE AND AVAILABILITY
(1) Procurement Addresses
For standard hardware the purchase order shall be addressed to AIRBUS. Quote the
number of this Service Bulletin, the MSN and, if applicable the Retrofit Information Letter
(RIL) reference. Please send your request to:
Component COMPA01
 AIRBUS Material, Logistics and Suppliers
Standard Parts
For ordering by internet:
http://spares.airbus.com or vi a SPEC2000
For ordering by E-mail:
ifd.spares@airbus.com
Phone: +49 (0) 40 50 76 40 03
For Europe, Middle East and Africa, vendor parts are to be procured from:
Equipment BFEA01
 SATAIR A/S
Amager Landevej 147A
2770 Kastrup
DENMARK
Email: INFO@SATAIR.COM
Phone: +45 3247 0100
Fax: +45 3151 3434
For Asia and Pacific, vendor parts are to be procured from:
Equipment BFEA01
 Satair Asia, Pte Ltd
12 Seletar Aerospace Link
797553 Singapore
SINGAPORE
Email: INFOSIN@SATAIR.COM
Phone: +65 6543 0977
Fax: +65 6543 0737
For Americas, vendor parts are to be procured from:
Equipment BFEA01
 Satair USA, Inc.
525 Westpark Dr Ste 400
30269-1577 Peachtree City
UNITED STATES
Email: SATAIRINQ@SATAIR.COM
Phone: +1 404 675 6333
Fax: +1 404 675 6311
(2) Price and Availability
Procurement terms for the equipment must be negotiated with the equipment supplier.
DATE: Feb 19/19 SERVICE BULLETIN No.: A300-27-0206
REVISION No.: 00 - Feb 19/19 Page: 7
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 12

@A300
SERVICE BULLETIN
Operator supplied standard hardware parts, required to accomplish this Service Bulletin,
are to be supplied from the operator’s stock.
B. INDUSTRY SUPPORT INFORMATION
AIRBUS will not provide industry support for accomplishment of this Service Bulletin.
Industry support terms for the equipment must be negotiated with the equipment supplier.
This Service Bulletin is the subject of an AIRBUS monitored retrofit campaign.
For the organization of this retrofit, you are kindly requested to contact AIRBUS retrofit
management department: monitored.retrofit@airbus.com.
C. LIST OF COMPONENTS
No Kit
D. LIST OF MATERIALS - OPERATOR SUPPLIED
(1) Consumable Materials
Consumable CMLA01
ITEM
 DESCRIPTION
 REFERENCE TO CML
MAT. No.
QTY PER A/C
 SEE
NOTES
Non Aqueous Cleaner-General
 08BAA9
 As required
Lockwire
 14QFB1
 As required
Textile-Lint Free Cotton
 14SBA1
 As required
(2) Components
Component COMPA01
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 ITEM
 OLD PART N˚
 INT
 SEE
NOTES
2
 SP126N
 1
 WASHER
 (1)
NOTE
: If you find part numbers of hardware components in the related kit(s)
which you cannot identify in the LIST OF COMPONENTS of this Service
Bulletin, refer to Standards Manual (SM). The SM will give you the
correct part number to part number relationship.
NOTE
: The above list of components is not an AIRBUS Kit, the required parts
shall be ordered as necessary through the given channel.
NOTE
 (1)
: The components listed above are only necessary if SUBTASK
270206-833-002 001 Depending on the Inspection Result, Install new
Dowel, End Cap, Washer, Bolt and Lockwire is to be accomplished. The
quantity of these items are to be ordered as required.
DATE: Feb 19/19 SERVICE BULLETIN No.: A300-27-0206
REVISION No.: 00 - Feb 19/19 Page: 8
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 13

@A300
SERVICE BULLETIN
(3) Equipment
Equipment BFEA01
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 ITEM
 OLD PART N˚
 INT
 SEE
NOTES
1
 CH116398F13-3
 1
 BOLT
 (1)
3
 CH723-559
 1
 END CAP
4
 CH117-01-505
 1
 DOWEL
NOTE
: If you find part numbers of hardware components in the related kit(s)
which you cannot identify in the LIST OF COMPONENTS of this Service
Bulletin, refer to Standards Manual (SM). The SM will give you the
correct part number to part number relationship.
NOTE
: The above list of components is not an AIRBUS Kit, the required parts
shall be ordered as necessary through the given channel.
NOTE
 (1)
: The components listed above are only necessary if SUBTASK
270206-833-002 001 Depending on the Inspection Result, Install new
Dowel, End Cap, Washer, Bolt and Lockwire is to be accomplished. The
quantity of these items are to be ordered as required.
E. PARTS TO BE RE-IDENTIFIED BY OPERATOR
None
F. TOOLING
(1) Tooling - Price and Availability
None
(2) Tools
To accomplish this Service Bulletin it is necessary to use the tools listed in the
subsequent referenced tasks:
- AMM 27-42-18, Page Block 401
NOTE
: For the inspection, use the flashlight and the flexible inspection mirror.
(3) Special Tools
None
DATE: Feb 19/19 SERVICE BULLETIN No.: A300-27-0206
REVISION No.: 00 - Feb 19/19 Page: 9
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 14

@A300
SERVICE BULLETIN
This Page Intentionally Left Blank
DATE: Feb 19/19 SERVICE BULLETIN No.: A300-27-0206
REVISION No.: 00 - Feb 19/19 Page: 10
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 15

@A300
SERVICE BULLETIN
3. ACCOMPLISHMENT INSTRUCTIONS
Task 270206-832-801-001 - Detailed Inspection of the THS Actuator RH Bearing Installation
WARNING
: MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND ALL THE CAUTIONS
INCLUDED IN THE REFERENCED PROCEDURES.
CAUTION
: ALWAYS OBEY THE PRECAUTIONS THAT FOLLOW TO KEEP
ELECTRICAL WIRING IN A SATISFACTORY CONDITION (ELECTRICALLY
AND MECHANICALLY SERVICEABLE) . WHEN YOU DO MAINTENANCE
WORK, REPAIRS OR MODIFICATIONS, ALWAYS KEEP ELECTRICAL WIRING,
COMPONENTS AND THE WORK AREA AS CLEAN AS POSSIBLE. TO DO
THIS:
- PUT PROTECTION, SUCH AS PLASTIC SHEETING, CLOTHS, ETC., AS
NECESSARY ON WIRING AND COMPONENTS.
- REGULARLY REMOVE ALL SHAVINGS, UNWANTED MATERIAL AND
OTHER CONTAMINATION.
THESE PRECAUTIONS WILL DECREASE THE RISK OF CONTAMINATION
AND DAMAGE TO THE ELECTRICAL WIRING INSTALLATION.
IF THERE IS CONTAMINATION, REFER TO ESPM 20-55-00.
NOTE
: The accomplishment instructions of this Service Bulletin include procedures given
in other documents or in other sections of the Service Bulletin. When the words
’refer to’ are used and the operator has a procedure accepted by the local authority
he belongs to, the accepted alternative procedure can be used. When the words ’in
accordance with’ are used then the given procedure must be followed.
NOTE
: The access and close-up instructions, not comprising return to service tests, in this
Service Bulletin do not constitute or affect the technical intent of the Service
Bulletin. Operators can therefore, as deemed necessary, omit or add access and/or
close-up steps to add flexibility to their maintenance operations as long as the
technical intent of the Service Bulletin is met within the set parameters.
NOTE
: Manual titles given in the accomplishment instructions are referred to by acronyms.
Refer to paragraph 1.J., References, for the definition of acronyms.
NOTE
: This Service Bulletin contains the instructions for the on-aircraft maintenance
necessary to ensure the continued airworthiness of the aircraft.
For any deviations to the instructions, including RC paragraph contained herein,
contact AIRBUS for further instructions and approval.
NOTE
: The purpose of flowcharts is to supplement the information given in the Procedure
and Compliance paragraphs and not to serve as the primary source for tasks or
compliance times given in this Service Bulletin.
NOTE
: This Service Bulletin is classified mandatory or expected to be classified mandatory
by an Airworthiness Directive (AD). The paragraphs 3.C. and 3.D. in these
accomplishment instructions are Required for Compliance (RC) and must be done
DATE: Feb 19/19 SERVICE BULLETIN No.: A300-27-0206
REVISION No.: 00 - Feb 19/19 Page: 11
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 16

@A300
SERVICE BULLETIN
to comply with the AD. To allow more flexibility, the rule "refer to" and "in
accordance with" will apply to these paragraphs 3.C. and 3.D. Other paragraphs
are recommended and may be deviated from, done as part of other actions or
done with accepted methods different from those given in the Service Bulletin, as
long as the RC paragraphs can be done and the aircraft can be put back into a
serviceable condition.
NOTE
: Discarded parts must be managed at the operator’s discretion.
Task Associated Data
Zone
312
Access
Door
 312AR
Manpower
TOTAL MANHOURS
 3.00
ELAPSED TIME (HOURS)
 1.25
A. GENERAL
(1) Subtask 270206-910-001-001 - Standard Practices
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 06-21-00, Page Block 001
53-00-00, Page Block 001
(a) For the identification of zones, refer to AMM 06-21-00, Page Block 001.
(b) For the Frame (FR) identification, refer to AMM 53-00-00, Page Block 001.
(c) For the identification of access panels, refer to AMM 06-21-00, Page Block 001.
(2) Subtask 270206-839-001-001 - Administrative
Manpower Resources
Skills
 NON SPECIFIC
Write in the applicable aircraft records that you have done all the work given in this
Service Bulletin.
B. PREPARATION
(1) Subtask 270206-941-001-001 - Job Set-up
Manpower Resources
Skills
 NON SPECIFIC
DATE: Feb 19/19 SERVICE BULLETIN No.: A300-27-0206
REVISION No.: 00 - Feb 19/19 Page: 12
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 17

@A300
SERVICE BULLETIN
References
Aircraft Maintenance Manual (AMM)
 24-00-00, Page Block 301
24-41-00, Page Block 301
27-41-00, Page Block 501
52-10-00, Page Block 001
52-41-00, Page Block 001
NOTE
: For the basic Aircraft configuration, refer to AMM Chapter "Introduction -
Aircraft status for maintenance" in Manual Front Matter section
(a) Make sure that the aircraft is electrically grounded, refer to AMM 24-00-00, Page
Block 301.
(b) Put an access platform in position at the FWD passenger/crew door 831.
(c) Open the FWD passenger/crew door 831, refer to AMM 52-10-00, Page Block 001.
(d) Put an access platform in position at zone 312.
(e) Open the access door 312AR, refer to AMM 52-41-00, Page Block 001.
(f) Do the job setup procedure given in the trimmable horizontal stabilizer control
adjustment test, refer to AMM 27-41-00, Page Block 501:
1
 Connect hydraulic ground power cart and pressurize Green hydraulic system
refer to AMM 24-41-00, Page Block 301.
2
 Set pitch trim control wheels to zero and secure in this position with locking
equipment P/N 97A27302009000.
3
 Depressurize Green hydraulic system.
4
 Do the job set-up procedure as specified in the trimmable horizontal stabilizer
control adjustment/test, refer to AMM 27-41-00, Page Block 501, paragraph
1.B.(1)(d) ’Open, safety and tag the following circuit breakers’.
C. PROCEDURE
(1) Subtask 270206-832-003-001 - Do a Detailed Inspection of the THS Actuator RH
Bearing Installation
Work Zones and Access Panels
Zone
 Access/Work location
312
 Access
 Door 312AR
Work location
 from Frame 80 to Frame 86
Manpower Resources
Manhours
 0.25
Minimum number of person
 1
Subtask elapsed time
 0.25
Skills
 NON SPECIFIC
DATE: Feb 19/19 SERVICE BULLETIN No.: A300-27-0206
REVISION No.: 00 - Feb 19/19 Page: 13
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 18

@A300
SERVICE BULLETIN
References
Aircraft Maintenance Manual (AMM)
 27-42-18, Page Block 401
In Service Information (ISI)
 00.00.00179
Fig. A-FBAAA
Inspection of the THS Actuator RH
Bearing Assembly
Sheet 01
Fig. A-FFAAA
Flowchart
Sheet 01
At the threshold given in planning information paragraph E.(2):
(a) Do a detailed inspection of the THS Actuator RH bearing assembly.
Refer to Fig. A-FFAAA
 and Fig. A-FBAAA
Refer to AMM 27-42-18 Page Block 401
NOTE
: Use the flashlight and flexible inspection mirror to perform the task.
1
 Make sure that the assembly (end cap, washer, bolt and lockwire) is correctly
installed.
2
 Make sure that the position of the bolt is correct with a manual check: the bolt
must touch the washer and must be well secured by lockwire and must not
move.
3
 If no findings found:
a
 No further action.
4
 If findings found:
a
 If the bearing is found missing:
<1> Contact AIRBUS before next flight.
NOTE
: Please provide Aircraft MSN, THS Actuator PN and
SN, nature of findings and pictures.
b
 If the bearing is in place:
<1> If the bolt is in place:
<a> If the bolt and/or washer is damaged, do SUBTASK
270206-833-002 001 Depending on the Inspection Result,
Install new Dowel, End Cap, Washer, Bolt and Lockwire .
<b> If the bolt and washer are not damaged, do SUBTASK
270206-833-001 001 Depending on the Inspection Result,
Torque and Safety the Bolt with new Lockwire .
DATE: Feb 19/19 SERVICE BULLETIN No.: A300-27-0206
REVISION No.: 00 - Feb 19/19 Page: 14
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 19

@A300
SERVICE BULLETIN
<c> Upload the completed Inspection Report sheet given in
Appendix 01 in accordance with ISI 00.00.00179.
NOTE
: Uploading the Inspection Report sheet is not
Required for Compliance.
and
<d> No further action.
<2> If the bolt is found missing:
<a> Do SUBTASK 270206-833-002 001 Depending on the
Inspection Result, Install new Dowel, End Cap, Washer, Bolt
and Lockwire
and
<b> Upload the completed Inspection Report sheet given in
Appendix 01 in accordance with ISI 00.00.00179.
NOTE
: Uploading the Inspection Report sheet is not
Required for Compliance.
and
<c> No further action.
(2) Subtask 270206-833-001-001 - Depending on the Inspection Result, Torque and
Safety the Bolt with new Lockwire
Work Zones and Access Panels
Zone
 Access/Work location
312
 Access
 Door 312AR
Work location
 from Frame 80 to Frame 86
Manpower Resources
Manhours
 0.25
Minimum number of person
 1
Subtask elapsed time
 0.25
Skills
 NON SPECIFIC
Material necessary to do the job
Consumable CMLA01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Lockwire
 14QFB1
References
Aircraft Maintenance Manual (AMM)
 27-42-18, Page Block 401
DATE: Feb 19/19 SERVICE BULLETIN No.: A300-27-0206
REVISION No.: 00 - Feb 19/19 Page: 15
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 20

@A300
SERVICE BULLETIN
References
Fig. A-FBBAA
Tightening and Safeness of the Bolt
Sheet 01
Sheet 02
(a) Torque and safety the bolt, item (1), with:
Refer to Fig. A-FBBAA
Refer to AMM 27-42-18, Page Block 401
Lockwire 14QFB1 As required
(3) Subtask 270206-833-002-001 - Depending on the Inspection Result, Install new
Dowel, End Cap, Washer, Bolt and Lockwire
Work Zones and Access Panels
Zone
 Access/Work location
312
 Access
 Door 312AR
Work location
 from Frame 80 to Frame 86
Manpower Resources
Manhours
 1.00
Minimum number of person
 1
Subtask elapsed time
 1.00
Skills
 AIRFRAME
Material necessary to do the job
Component COMPA01
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 SEE
NOTES
2
 SP126N
 1
 WASHER
 (1)
NOTE
: The above list of components is not an AIRBUS Kit, the required parts
shall be ordered as necessary through the given channel.
NOTE
 (1)
: The components listed above are only necessary if SUBTASK
270206-833-002 001 Depending on the Inspection Result, Install new
Dowel, End Cap, Washer, Bolt and Lockwire is to be accomplished. The
quantity of these items are to be ordered as required.
Equipment BFEA01
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 SEE
NOTES
1
 CH116398F13-3
 1
 BOLT
 (1)
3
 CH723-559
 1
 END CAP
4
 CH117-01-505
 1
 DOWEL
NOTE
: The above list of components is not an AIRBUS Kit, the required parts
shall be ordered as necessary through the given channel.
DATE: Feb 19/19 SERVICE BULLETIN No.: A300-27-0206
REVISION No.: 00 - Feb 19/19 Page: 16
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 21

@A300
SERVICE BULLETIN
NOTE
 (1)
: The components listed above are only necessary if SUBTASK
270206-833-002 001 Depending on the Inspection Result, Install new
Dowel, End Cap, Washer, Bolt and Lockwire is to be accomplished. The
quantity of these items are to be ordered as required.
Consumable CMLA01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Non Aqueous Cleaner-
General
08BAA9
 As required
Lockwire
 14QFB1
 As required
Textile-Lint Free Cotton
 14SBA1
 As required
References
Aircraft Maintenance Manual (AMM)
 27-42-18, Page Block 401
Fig. A-FBCAA
Installation of the New Dowel, End Cap,
Washer, Bolt and Lockwire
Sheet 01
Sheet 02
(a) Remove:
Refer to AMM 27-42-18, Page Block 401
Refer to Fig. A-FBCAA
1
 If necessary, remove:
1 Lockwire Discard
1 Bolt Item (1) Discard
1 Washer Item (2) Discard
2
 If end cap damaged, remove:
1 Dowel Item (4) Discard
1 End Cap Item (3) Discard
(b) Clean the work area with:
Textile-Lint Free
Cotton
14SBA1 As required
and
Non Aqueous
Cleaner-General
08BAA9 As required
(c) Install new bolt, washer and lockwire:
Refer to AMM 27-42-18, Page Block 401
DATE: Feb 19/19 SERVICE BULLETIN No.: A300-27-0206
REVISION No.: 00 - Feb 19/19 Page: 17
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 22

@A300
SERVICE BULLETIN
Refer to Fig. A-FBCAA
1 Washer SP126N Item 2
1 Bolt CH116398F13-3 Item 1
Lockwire 14QFB1 As required
and if the end cap was discarded:
1 Dowel CH117-01-505 Item 4
1 End Cap CH723-559 Item 3
D. TEST
(1) Subtask 270206-700-001-001 - Test
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 12-13-27, Page Block 001
27-41-00, Page Block 501
27-42-18, Page Block 401
(a) Remove the locking device from pitch trim control wheel, the safety clips, tags and
the circuit breakers opened, refer to SUBTASK 270206-941-001 001 Job Set-up
and AMM 27-41-00, Page Block 501.
(b) Do the functional test of THS, refer to AMM 27-41-00, Page Block 501.
E. CLOSE-UP
(1) Subtask 270206-942-001-002 - Close-up
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 27-41-00, Page Block 501
(a) Make sure that the work areas are clean and clear of tools and other items of
equipment.
(b) Do the close-up procedure, refer to AMM 27-41-00, Page Block 501.
(c) Put the aircraft back to its initial configuration.
DATE: Feb 19/19 SERVICE BULLETIN No.: A300-27-0206
REVISION No.: 00 - Feb 19/19 Page: 18
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 23

@A300
SERVICE BULLETIN
**CONF ALL
INSTALL NEW BOLT, WASHER, LOCKWIRE, DOWEL AND END CAP
IN ACCORDANCE WITH SUBTASK 270206−833−002−001,
AT THE THRESHOLD GIVEN IN THE
PLANNING INFORMATION PARAGRAPH E.(2)
TORQUE AND SAFETY WITH NEW LOCKWIRE IN ACCORDANCE
WITH SUBTASK 270206−833−001−001,
AT THE THRESHOLD GIVEN IN THE
PLANNING INFORMATION PARAGRAPH E.(2)
NOYES
NO FURTHER ACTION
FINDINGS?
MISSING?
BEARING FOUND
CONTACT AIRBUS BEFORE NEXT FLIGHT
YESNO
NO YES
THE PURPOSE OF FLOWCHARTS IS TO SUPPLEMENT THE INFORMATION GIVEN IN THE PROCEDURE AND COMPLIANCE PARAGRAPHS AND
NOT TO SERVE AS THE PRIMARY SOURCE FOR TASKS OR COMPLIANCE TIMES GIVEN IN THIS SERVICE BULLETIN.
NOTE:
DO A DETAILED INSPECTION OF THE THS ACTUATOR RH BEARING INSTALLATION
IN ACCORDANCE WITH TASK 270206−832−801−001, AT THE
THRESHOLD GIVEN IN THE PLANNING INFORMATION PARAGRAPH E.(2)
NO FURTHER ACTIONNO FURTHER ACTION
UPLOAD
THE INSPECTION REPORT
UPLOAD
THE INSPECTION REPORT
UPLOAD
THE INSPECTION REPORT
BOLT AND
WASHER FOUND MISSING 
OR DAMAGED?
A_SB_270206_5_FAAA_01_02
Figure A-FFAAA - Sheet 01
Flowchart
DATE: Feb 19/19 SERVICE BULLETIN No.: A300-27-0206
REVISION No.: 00 - Feb 19/19 Page: 19
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 24

@A300
SERVICE BULLETIN
**CONF ALL
C
B
A
FR86
312AR
A
B
FR82
Z310
C FWD
RH BEARING INSTALLATION
TO BE INSPECTED
TRIMMABLE HORIZONTAL STABILIZER (THS) ACTUATOR 
A_SB_270206_5_BAAA_01_01
Figure A-FBAAA - Sheet 01
Inspection of the THS Actuator RH Bearing Assembly
DATE: Feb 19/19 SERVICE BULLETIN No.: A300-27-0206
REVISION No.: 00 - Feb 19/19 Page: 20
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 25

@A300
SERVICE BULLETIN
**CONF ALL
C
B
A
FR86
312AR
A
B
FR82
Z310
C
SPHERICAL BEARING ATTACHMENT
A
A
A_SB_270206_5_BBAA_01_03
Figure A-FBBAA - Sheet 01
Tightening and Safeness of the Bolt
DATE: Feb 19/19 SERVICE BULLETIN No.: A300-27-0206
REVISION No.: 00 - Feb 19/19 Page: 21
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 26

@A300
SERVICE BULLETIN
**CONF ALL
LOCKWIRE
SPHERICAL
BEARING
A A
NOTE:
SECURE THE BOLT ITEM 1 WITH MATERIAL No 14QFB1.01
01
VIEW LOOKING AFT
(1)
A_SB_270206_5_BBAA_02_01
Figure A-FBBAA - Sheet 02
Tightening and Safeness of the Bolt
DATE: Feb 19/19 SERVICE BULLETIN No.: A300-27-0206
REVISION No.: 00 - Feb 19/19 Page: 22
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 27

@A300
SERVICE BULLETIN
**CONF ALL
C
B
A
FR86
312AR
A
B
FR82
Z310
C
SPHERICAL BEARING ATTACHMENT
A
A
A_SB_270206_5_BCAA_01_02
Figure A-FBCAA - Sheet 01
Installation of the New Dowel, End Cap, Washer, Bolt and Lockwire
DATE: Feb 19/19 SERVICE BULLETIN No.: A300-27-0206
REVISION No.: 00 - Feb 19/19 Page: 23
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 28

@A300
SERVICE BULLETIN
**CONF ALL
LOCKWIRE
SPHERICAL
BEARING
A A
NOTE:
SECURE THE BOLT ITEM 1 WITH MATERIAL No 14QFB1.01
01
VIEW LOOKING AFT
(1)
1
(3)
3
(2)
2
(4)
4
A_SB_270206_5_BCAA_02_01
Figure A-FBCAA - Sheet 02
Installation of the New Dowel, End Cap, Washer, Bolt and Lockwire
DATE: Feb 19/19 SERVICE BULLETIN No.: A300-27-0206
REVISION No.: 00 - Feb 19/19 Page: 24
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 29

@A300
SERVICE BULLETIN
Appendix 01 - Inspection Report
**CONF ALL
C
INSPECTION REPORT
SERVICE BULLETIN No :
A/C MSN :
FLIGHT CYCLES :
FLIGHT HOURS :
A300−27−0206
DATE OF INSPECTION :
INSPECTION METHOD : DETAILED
INSPECTION
UPLOAD THE COMPLETED INSPECTION REPORT
SHEET IN ACCORDANCE WITH ISI 00.00.00179
A
Z310
FR86
312AR
A
B
FR82
B
TRIMMABLE HORIZONTAL STABILIZER (THS) ACTUATOR 
C FWD
BOLT
RH BEARING
A_SB_270206_5_AAAA_01_00
Figure A-FAAAA - Sheet 01
Appendix 01 - Inspection Report
DATE: Feb 19/19 SERVICE BULLETIN No.: A300-27-0206
REVISION No.: 00 - Feb 19/19 Page: 1
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 30

@A300
SERVICE BULLETIN
Appendix 01 - Inspection Report
**CONF ALL
INSPECTION REPORT
SERVICE BULLETIN No :
A/C MSN :
FLIGHT CYCLES :
FLIGHT HOURS :
A300−27−0206
DATE OF INSPECTION :
INSPECTION METHOD : DETAILED
INSPECTION
UPLOAD THE COMPLETED INSPECTION REPORT
SHEET IN ACCORDANCE WITH ISI 00.00.00179
RH BEARING
IS THERE ANY FINDING?
BEARING IN PLACE?
BOLT IN PLACE?
THS ACTUATOR
PN:
SN:
NOYES
NOYES
NOYES
END CAP DAMAGED? NOYES
A_SB_270206_5_AAAA_02_00
Figure A-FAAAA - Sheet 02
Appendix 01 - Inspection Report
DATE: Feb 19/19 SERVICE BULLETIN No.: A300-27-0206
REVISION No.: 00 - Feb 19/19 Page: 2
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 31

@A300
SERVICE BULLETIN
Service Bulletin REPORTING
TITLE: FLIGHT CONTROLS - THS HYDRAULIC ACTUATION - INSPECTION OF
THE THS ACTUATOR RH BEARING INSTALLATION
MODIFICATION No.: None
SB Reporting status
This Service Bulletin will only be incorporated into affected customized Maintenance and Flight
Operations Products if it is duly reported to Airbus.
General information
The SB Reporting policy is published in ISI 00.00.00135. This document provides information regarding:
the SB Reporting means and benefits, the update of customized Maintenance Products and customized
Flight Operations Products.
If this Service Bulletin has an operational impact, refer to paragraph "Flight Operations Products" for
further information on the update of affected Flight Operations Products.
SB Reporting procedure
Standard practice to report SB is to use the online reporting application on AirbusWorld.
Refer to ISI 00.00.00179:
- For complete information on reporting means to Airbus. Question 2 "What are the standard
practices for SB reporting?"
- If this SB requires previous or simultaneous accomplishment of other SBs, Question 3 "What about
the reporting of prerequisite Service Bulletin?"
NOTE:
 ISI 00.00.00179 covers all the frequently asked questions about SB Reporting. It is revised on a
regular basis.
DATE: Feb 19/19 SERVICE BULLETIN No.: A300-27-0206
REVISION No.: 00 - Feb 19/19 Page: 1
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 32

@A300
SERVICE BULLETIN
QUALITY PERCEPTION FORM
Use this form to tell us what is your perception of the quality of this Service Bulletin. The reported data
that you provide us will be used to analyse areas of difficulties and to take corrective action to further
improve the quality of our Service Bulletins.
We thank you for the time you have taken in completing this form.
(Please rate on a scale of 1 to 4, with 4 being the highest score)
- Quality rating of this SB 4321
- Quality rating of the Accomplishment Instructions 4321
- Quality rating of the Illustrations 4321
- Is this SB easy to understand ? Y/N
If you have had difficulties in the accomplishment of this SB please quote below the area(s) and give a
short description of the issue.
Planning Material Instructions
X Effectivity X Kit content X Preparation
X Reason X List of Materials Operator Supplied X Mod/Inspection
X Manpower X Industry support X Test
X References X Re-identification X Close-Up
X Publication X Tooling X Illustrations
Comments:
Operator: Date:
Name/Title:
Please return this form to:
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX FRANCE
Attn : SEM4 Service Bulletins Management
F A X:( 3 3 )56 19 34 25 1
Or via your Resident Customer Support Office.
DATE: Feb 19/19 SERVICE BULLETIN No.: A300-27-0206
REVISION No.: 00 - Feb 19/19 Page: 1
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
