# Airbus Service Bulletin A300-32-0465: Revision 01

- Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2014-0137; AD 2014-17-07 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Airbus Service Bulletin A300-32-0465](https://openairdocs.org/service-documents/airbus/a300-32-0465.md)
- Title as filed: U.S. DOT/FAA - Service Bulletin A300-32-0465 Revision 01
- Pages: 36
- PDF: https://openairdocs.org/files/sha256/d8/a3/d8a3cdeb087c43933d28b8e91a8e907e4500a894aadb92cc60ece22e8d02e585
- Page: https://openairdocs.org/service-documents/airbus/a300-32-0465/file/d8a3cdeb087c

## Text

Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

@A300
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
MANDATORY
 MANDATORY
 MANDATORY
ATA SYSTEM: 32
TITLE: LANDING GEAR - NORMAL EXTENSION AND RETRACTION -
INSPECTION OF UPLOCK SPRINGS
MODIFICATION No.: None
This page transmits Revision No.01 of Service Bulletin No.A300-32-0465
ADDITIONAL WORK
**CONF ALL
No additional work is required by this revision for aircraft modified by any previous issue.
REASON
Revision No. 01 issued:
- modify table 1 threshold value column and repetitive interval value column.
- modify table 2 threshold value column and repetitive interval value column.
- update figures.
CHANGES
SUMMARY
EFFECTIVITY
 OPERATOR LIST UPDATED
 R
Fig. A-FSAAA
 FIGURE SOLUTION UPDATED
 R
Fig. A-FSAAA Sheet 01
 SHEET UPDATED
 R
Fig. A-FSAAA Sheet 02
 SHEET DELETED
 D
Fig. A-FSCAA
 FIGURE SOLUTION ADDED
 N
Fig. A-FSCAA Sheet 01
 SHEET ADDED
 N
Fig. A-FSBAA
 FIGURE SOLUTION UPDATED
 R
Fig. A-FSBAA Sheet 01
 SHEET UPDATED
 R
Fig. A-FSBAA Sheet 02
 SHEET DELETED
 D
Fig. A-FSDAA
 FIGURE SOLUTION ADDED
 N
Fig. A-FSDAA Sheet 01
 SHEET ADDED
 N
DATE: Jul 20/12 SERVICE BULLETIN No.: A300-32-0465
REVISION No.: 01 - Apr 25/13 Page: 1
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 2

@A300
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
PLANNING INFORMATION
EFFECTIVITY
 EFFECTIVITY RELATED INFORMATION
UPDATED
R
Configuration definition
CONF 001
 CONFIGURATION DEFINITION UPDATED
 R
COMPLIANCE
Accomplishment Timescale
 ACCOMPLISHMENT TIMESCALE UPDATED
CONFIGURATION UPDATED
R
ACCOMPLISHMENT INSTRUCTIONS
Fig. A-FBAAA
Fig. A-FBAAA Sheet 01
 SHEET UPDATED
 R
Fig. A-FBAAA Sheet 02
 SHEET UPDATED
 R
Fig. A-FBBAA
Fig. A-FBBAA Sheet 01
 SHEET UPDATED
 R
Fig. A-FBBAA Sheet 02
 SHEET UPDATED
 R
FILLING INSTRUCTIONS
This Service Bulletin has been generated electronically and is reissued as a complete document.
Replace the complete document.
Put this Revision Transmittal Sheet in front of the Service Bulletin.
HISTORY OF PREVIOUS REVISIONS
No previous revision
REVISION SEQUENCE
ORIGINAL: Jul 20/12
REVISION No. : 01 - Apr 25/13
DATE: Jul 20/12 SERVICE BULLETIN No.: A300-32-0465
REVISION No.: 01 - Apr 25/13 Page: 2
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 3

@A300
SERVICE BULLETIN
SUMMARY
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
This summary is for information only and is not approved for modification of the aircraft.
MANDATORY
 MANDATORY
 MANDATORY
ATA SYSTEM: 32
TITLE: LANDING GEAR - NORMAL EXTENSION AND RETRACTION -
INSPECTION OF UPLOCK SPRINGS
**CONF ALL
MODIFICATIONS
None
REASON/DESCRIPTION/OPERATIONAL CONSEQUENCES
Airbus has analysed in-service events reported by Messier-Bugatti-Dowty concerning some cases of
NLG and MLG Door and Leg Uplock spring ruptures on A300, A310 or A300-600 aircraft.
Springs within the uplock are used to either lock the gear or the door in the up position or to participate
in emergency mechanical unlocking.
The springs are positioned in pairs and in case of rupture of one spring the other one remains to fulfil
the function.
The rupture of one spring has no consequence on the operation of the uplock whereas the rupture of
both springs will disable the locking function or the emergency unlocking function..
This Service Bulletin is published to advise all operators of the issue of MESSIER-BUGATTI-DOWTY
Service Bulletin No. 470-32-206 and MESSIER-BUGATTI-DOWTY Se rvice Bulletin No. 470-32-880.
This Service Bulletin includes a detailed inspection of the NLG and MLG Door and Leg Uplock springs
and replacement in case of finding.
Accomplishment of this Service Bulletin will ensure correct operation of the NLG and MLG Door and
Leg Uplocks.
GENERAL EVALUATION
EVALUATION TABLE
COMPLIANCE
 MANDATORY (1)
 CANCELS INSPECTION SB
 NO
POTENTIAL AD
 YES
 A/C OPERATION AFFECTED
 NO
RELIABILITY AFFECTED
 NO
 PAX COMFORT AFFECTED
 NO
DATE: Jul 20/12 SERVICE BULLETIN No.: A300-32-0465
REVISION No.: 01 - Apr 25/13 Page: 1
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 4

@A300
SERVICE BULLETIN
SUMMARY
EVALUATION TABLE
COST SAVING
 NO
 ETOPS AFFECTED
 NO
STRUCTURAL LIFE EXTN
 NO
 VENDOR SB INVOLVED
 YES
A/C JACKING
 YES
NOTE
 (1)
: Service Bulletin must be accomplished.
NOTE
: A/C jacking is necessary if functional tests are required.
MATERIAL PRICE INFORMATION
No Material
EFFECTIVITY
This Service Bulletin is applicable to this (these) operator(s) :
001 50W 69X 72U 81T
 ABR AFG DHL F2I FLM IAW IRA IRM
KYE KZU MNB MNG MSR NTR P2A RUN SOP TIW
 TNO TSY
CONCURRENT REQUIREMENTS
None
REFERENCES / REPERCUSSIONS
TFU
 None
OEB
 None
AOT
 None
SIL
 None
LINE MAINTENANCE AFFECTED
 No
LIFE LIMIT
 None
OTHER
 None
NATURE OF THE WORK
AIRCRAFT
 YES
EQUIPMENT
 NO
HARD
 NO
SOFT
 NO
OBRM
 NO
MANPOWER
Task 320465-832-801-001: Inspection
TOTAL MANHOURS
 9.00
ELAPSED TIME (HOURS)
 9.00
Additional manhours relat ed to Vendor SB; refer to:
DATE: Jul 20/12 SERVICE BULLETIN No.: A300-32-0465
REVISION No.: 01 - Apr 25/13 Page: 2
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 5

@A300
SERVICE BULLETIN
SUMMARY
Task 320465-832-801-001: Inspection
Do a Detailed Inspection of the MLG and MLG Door
Uplock Springs
MESSIER-BUGATTI-DOWTY
Service Bulletin No. 470-32-206
MESSIER-BUGATTI-DOWTY
Service Bulletin No. 470-32-880
Do a Detailed Inspection of the NLG and NLG Door
Uplock Springs
MESSIER-BUGATTI-DOWTY
Service Bulletin No. 470-32-206
MESSIER-BUGATTI-DOWTY
Service Bulletin No. 470-32-880
APPENDICES
Appendix 01 : Inspection Report
DATE: Jul 20/12 SERVICE BULLETIN No.: A300-32-0465
REVISION No.: 01 - Apr 25/13 Page: 3
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 6

@A300
SERVICE BULLETIN
SUMMARY
**CONF ALL
A
LH SIDE SHOWN
RH SIDE SYMMETRICAL
A
A
B
FR47
FR50
FR54
B
B
A A
NOTE:
01
01
DEPENDING ON THE PN, THERE ARE 1 PAIR OF
SPRINGS OR 2 PAIRS OF SPRINGS AT THIS POSITION
FREE FALL SPRINGS
SPRINGS ATTACHED TO THE HOOK
(HOOK SPRINGS)  AND 
SPRINGS ATTACHED TO THE LEVER
A
 − Z147 Z148
(LEVER SPRINGS)
A_SB_320465_5_SAAA_01_09
Figure A-F SAAA - S heet 01
Main Landing Gear Uplock
DATE: Jul 20/12 SERVICE BULLETIN No.: A300-32-0465
REVISION No.: 01 - Apr 25/13 Page: 4
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 7

@A300
SERVICE BULLETIN
SUMMARY
**CONF ALL
A
FR47
FR50
FR54
HOOK SPRINGS TO BE INSPECTED
LH SIDE SHOWN
RH SIDE SYMMETRICAL
B
B
B
A A
A
A
A
 − Z147 Z148
A_SB_320465_5_SCAA_01_00
Figure A-FSCAA - Sheet 01
Main Landing Gear Door Uplock
DATE: Jul 20/12 SERVICE BULLETIN No.: A300-32-0465
REVISION No.: 01 - Apr 25/13 Page: 5
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 8

@A300
SERVICE BULLETIN
SUMMARY
**CONF ALL
 − Z123 Z124
A
A
A
A
A A
PAIR OF HOOK SPRINGS TO BE INSPECTED
PAIR OF FREE FALL SPRINGS TO BE INSPECTED
A_SB_320465_5_SBAA_01_02
Figure A-F SBAA - S heet 01
Nose Landing Gear Uplock
DATE: Jul 20/12 SERVICE BULLETIN No.: A300-32-0465
REVISION No.: 01 - Apr 25/13 Page: 6
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 9

@A300
SERVICE BULLETIN
SUMMARY
**CONF ALL
 − Z123 Z124
HOOK SPRING TO BE INSPECTED
A
A
A
A
A A
A_SB_320465_5_SDAA_01_00
Figure A-FSDAA - Sheet 01
Nose Landing Gear Door Uplock
DATE: Jul 20/12 SERVICE BULLETIN No.: A300-32-0465
REVISION No.: 01 - Apr 25/13 Page: 7
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 10

@A300
SERVICE BULLETIN
SUMMARY
This Page Intentionally Left Blank
DATE: Jul 20/12 SERVICE BULLETIN No.: A300-32-0465
REVISION No.: 01 - Apr 25/13 Page: 8
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 11

@A300
SERVICE BULLETIN
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
MANDATORY
 MANDATORY
 MANDATORY
ATA SYSTEM: 32
TITLE: LANDING GEAR - NORMAL EXTENSION AND RETRACTION -
INSPECTION OF UPLOCK SPRINGS
MODIFICATION No.: None
This document contains AIRBUS PROPRIETARY INFORMATION and shall at all times remain the
property of AIRBUS; no intellectual property right or licence is granted by AIRBUS in connection with
any information contained in it. It is delivered on the express condition that said document and the
information contained in it shall be treated as confidential, shall not be used for any purpose other than
that for which it is hereby delivered. It shall not be disclosed in whole or in part to third parties and shall
not be duplicated in any manner (except for the purposes of performing the tasks described hereunder
and provided that any recipient of such document shall comply with the conditions herein), without
AIRBUS prior written consent.
1. PLANNING INFORMATION
**CONF ALL
A. EFFECTIVITY
(1) Models
B2-1C B2-203 B2K-3C B4-103 B4-120 B4-203 B4-2C C4-203
F4-203
(2) Effectivity by MSN
0003 0041 0045 0047 0053 0055 0075 0079-0080 0082-0085 0090 0094-0095 0101
0105 0107 0116-0117 0123-0126 0128-0129 0133 0135-0137 0139 0141 0149-0152
0154-0157 0160 0170 0173 0175-0176 0180 0183-0185 0187 0189 0199-0200
0203-0204 0210-0212 0218-0220 0226-0227 0234-0236 0239 0243-0244 0247
0249-0250 0255-0256 0259 0261 0265 0274 0277 0289 0292 0299 0302 0304
(3) Effectivity by Operator
The Operator/MSN relationship is provided for information only and is correct at the time
of issue in accordance with the information available to AIRBUS. Any future changes
resulting from transfer of an aircraft from one operator to another will not be reflected in
this list unless the Service Bulletin is revised for another reason.
DATE: Jul 20/12 SERVICE BULLETIN No.: A300-32-0465
REVISION No.: 01 - Apr 25/13 Page: 1
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 12

@A300
SERVICE BULLETIN
OPERATOR
 MSN
001
 0125 0157
 0203
 0218
50W
 0003
69X
 0095
72U
 0079
81T
 0277
 0292
ABR
 0152 0184 0189 0199 0219 0220 0234 0236 0250 0259 0274 0289
AFG
 0180
DHL
 0084 0085 0141 0149 0249 0265
F2I
 0083 0094 0128 0133 0135 0136 0137 0156 0170 0235 0243
FLM
 0082 0176
IAW
 0239
IRA
 0080 0139 0151 0173 0185 0187 0226 0256 0299 0302
IRM
 0055 0090 0160 0175 0204 0244
KYE
 0053 0211
KZU
 0041 0101 0117
MNB
 0123 0212 0304
MNG
 0047
MSR
 0200 0255
NTR
 0124 0155
P2A
 0116 0150
RUN
 0075 0105 0107 0154 0183
SOP
 0126
TIW
 0261
TNO
 0045 0210 0227 0247
TSY
 0129
(4) Configuration by MSN
MSN
 CONFIGURATION
0003 0041 0045 0047 0053 0055 0075 0079 0080 0082 0083
0084 0085 0090 0094 0095 0101 0105 0107 0116 0117 0123
0124 0125 0126 0128 0129 0133 0135 0136 0137 0139 0141
0149 0150 0151 0152 0154 0155 0156 0157 0160 0170 0173
0175 0176 0180 0183 0184 0185 0187 0189 0199 0200 0203
0204 0210 0211 0212 0218 0219 0220 0226 0227 0234 0235
0236 0239 0243 0244 0247 0249 0250 0255 0256 0259 0261
0265 0274 0277 0289 0292 0299 0302 0304
001
(5) Configuration definition
**CONF 001
Config. 001 is valid for all the aircraft given in the effectivity of this Service Bulletin as a
standard configuration.
(6) Material Effectivity
B. CONCURRENT REQUIREMENTS
None
DATE: Jul 20/12 SERVICE BULLETIN No.: A300-32-0465
REVISION No.: 01 - Apr 25/13 Page: 2
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 13

@A300
SERVICE BULLETIN
C. REASON
(1) History
Airbus has analysed in-service events reported by Messier-Bugatti-Dowty concerning
some cases of NLG and MLG Door and Leg Uplock spring ruptures on A300, A310 or
A300-600 aircraft.
Springs within the uplock are used to either lock the gear or the door in the up position
or to participate in emergency mechanical unlocking.
The springs are positioned in pairs and in case of rupture of one spring the other one
remains to fulfil the function.
The rupture of one spring has no consequence on the operation of the uplock whereas
the rupture of both springs will disable the locking function or the emergency unlocking
function..
(2) Objective/Action
This Service Bulletin is published to adv ise all operators of t he issue of MESSIER-
BUGATTI-DOWTY Service Bulletin No. 470-32-206 and M ESSIER-BUGATTI-DOWTY
Service Bulletin No. 470-32-880.
This Service Bulletin includes a detailed inspection of the NLG and MLG Door and Leg
Uplock springs and replacement in case of finding.
(3) Advantages
Accomplishment of this Service Bulletin will ensure correct operation of the NLG and
MLG Door and Leg Uplocks.
(4) Operational/Maintenance Consequences
None
D. DESCRIPTION
To accomplish this Service Bulletin it is necessary to :
Task 320465-832-801-001: Inspection
(1) Do a Detailed Inspection of the MLG and MLG Door Uplock Springs
(2) Do a Detailed Inspection of the NLG and NLG Door Uplock Springs
(3) Replace the involved MLG door uplock
(4) Replace the involved MLG uplock
(5) Replace the involved NLG door uplock
(6) Replace the involved NLG uplock
DATE: Jul 20/12 SERVICE BULLETIN No.: A300-32-0465
REVISION No.: 01 - Apr 25/13 Page: 3
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 14

@A300
SERVICE BULLETIN
E. COMPLIANCE
(1) Classification
MANDATORY: Service Bulletin must be accomplished.
(2) Accomplishment Timescale
TABLE 1 : DETAILED INSPECTION OF MLG AND MLG DOOR UPLOCK SPRINGS
COMPLIANCE TIME
Condition
 Action
THRESHOLD (whichever
occurs first)
GRACE PERIOD
Repetitive
Interval
Config.001
 Apply SUBTASK
320465-832-001 001
Do a Detailed
Inspection of the
MLG and MLG Door
Uplock Springs
18 months from the Service
Bulletin issuance date
None
 Repeat
this
inspection
SB every
18 months
Spring is
not broken
and not
damaged
None
 None
 Repeat
this
inspection
SB every
18 months
Hook
spring is
broken or
damaged
on MLG
door
uplock
Apply SUBTASK
320465-833-001 001
Replace the involved
MLG door uplock
before the next flight
 2 months
 Repeat
this
inspection
SB every
18 months
Free fall
spring is
broken or
damaged
on MLG
uplock
Apply SUBTASK
320465-833-002 001
Replace the involved
MLG uplock
before the next flight
 1,000 FC with
inspection every 50
FC, refer to SUBTASK
320465-832-001-001
para. (1).(b).
Repeat
this
inspection
SB every
18 months
Two free
fall springs
are broken
or
damaged
on MLG
uplock
Apply SUBTASK
320465-833-002 001
Replace the involved
MLG uplock
before the next flight
 None
 Repeat
this
inspection
SB every
18 months
DATE: Jul 20/12 SERVICE BULLETIN No.: A300-32-0465
REVISION No.: 01 - Apr 25/13 Page: 4
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 15

@A300
SERVICE BULLETIN
TABLE 1 : DETAILED INSPECTION OF MLG AND MLG DOOR UPLOCK SPRINGS
COMPLIANCE TIME
Condition
 Action
THRESHOLD (whichever
occurs first)
GRACE PERIOD
Repetitive
Interval
Hook
and/or
Lever
springs are
broken or
damaged
on MLG
uplock
Apply SUBTASK
320465-833-002 001
Replace the involved
MLG uplock
before the next flight
 1,000 FC with
inspection every 50
FC, refer to SUBTASK
320465-832-001-001
para. (1).(b).
Repeat
this
inspection
SB every
18 months
Table 1
TABLE 2 : DETAILED INSPECTION OF NLG AND NLG DOOR UPLOCK SPRINGS
COMPLIANCE TIME
Condition
 Action
THRESHOLD (whichever
occurs first)
GRACE PERIOD
Repetitive
Interval
Config.001
 Apply SUBTASK
320465-832-002 001
Do a Detailed
Inspection of the NLG
and NLG Door
Uplock Springs
18 months from the Service
Bulletin issuance date
None
 Repeat
this
inspection
SB every
18 months
Spring is
not broken
and not
damaged
None
 None
 Repeat
this
inspection
SB every
18 months
Hook
spring is
broken or
damaged
on NLG
door
uplock
Apply SUBTASK
320465-833-003 001
Replace the involved
NLG door uplock
before the next flight
 2 months
 Repeat
this
inspection
SB every
18 months
Free fall
spring is
broken or
damaged
on NLG
uplock
Apply SUBTASK
320465-833-004 001
Replace the involved
NLG uplock
before the next flight
 1,000 FC with
inspection every 50 FC,
refer to SUBTASK
320465-832-002-001
para. (2).(b).
Repeat
this
inspection
SB every
18 months
Two free
fall springs
broken or
damaged
on NLG
uplock
Apply SUBTASK
320465-833-004 001
Replace the involved
NLG uplock
before the next flight
 None
 Repeat
this
inspection
SB every
18 months
DATE: Jul 20/12 SERVICE BULLETIN No.: A300-32-0465
REVISION No.: 01 - Apr 25/13 Page: 5
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 16

@A300
SERVICE BULLETIN
TABLE 2 : DETAILED INSPECTION OF NLG AND NLG DOOR UPLOCK SPRINGS
COMPLIANCE TIME
Condition
 Action
THRESHOLD (whichever
occurs first)
GRACE PERIOD
Repetitive
Interval
Hook
spring is
broken or
damaged
on NLG
uplock
Apply SUBTASK
320465-833-004 001
Replace the involved
NLG uplock
before the next flight
 1,000 FC with
inspection every 50 FC,
refer to SUBTASK
320465-832-002-001
para. (2).(b).
Repeat
this
inspection
SB every
18 months
Table 2
This Service Bulletin has been classified Mandatory. It is expected that an Airworthiness
Directive (AD) published by the European Av iation Safety Agenc y (EASA) will be issued
to confirm this classification. It is anticipated that the AD will confirm the (thresholds
and/or intervals and/or date) given above but reference should be made to the AD for
confirmation of the mandated accomplishment timescale.
F. APPROVAL
The technical content of this document is approved under the authority of Design
Organisation Approv al No. EASA. 21J.031.
If an aircraft listed in the effectivity has a modification or repair embodied that is not of
AIRBUS origin, and which affects the content of this Service Bulletin, the operator is
responsible for obtaining approval by its airworthiness authority for any adaptation necessary
before incorporation of the Service Bulletin.
G. MANPOWER
The manpower estimates given in this Service Bulletin are based on the direct labor cost to
do the work. These estimates assume that the work will be done by experienced personnel,
and may need to be revised upwards to suit operator’s circumstances. The estimates do not
include the time to prepare, plan or inspect the work. Manufacture and procurement of parts
and tools, drying times for paints, sealants, etc., and general administration work are also not
included.
Task 320465-832-801-001: Inspection
Get Access
 2.00
On Aircraft
Replace the involved MLG door uplock
 1.00
Replace the involved MLG uplock
 1.00
Replace the involved NLG door uplock
 1.00
Replace the involved NLG uplock
 1.00
Tests
 1.00
Close-Up
 2.00
TOTAL MANHOURS
 9.00
ELAPSED TIME (HOURS)
 9.00
DATE: Jul 20/12 SERVICE BULLETIN No.: A300-32-0465
REVISION No.: 01 - Apr 25/13 Page: 6
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 17

@A300
SERVICE BULLETIN
Task 320465-832-801-001: Inspection
Additional manhours relat ed to Vendor SB; refer to:
Do a Detailed Inspection of the MLG and MLG Door
Uplock Springs
MESSIER-BUGATTI-DOWTY
Service Bulletin No. 470-32-206
MESSIER-BUGATTI-DOWTY
Service Bulletin No. 470-32-880
Do a Detailed Inspection of the NLG and NLG Door
Uplock Springs
MESSIER-BUGATTI-DOWTY
Service Bulletin No. 470-32-206
MESSIER-BUGATTI-DOWTY
Service Bulletin No. 470-32-880
H. WEIGHT AND BALANCE
Not Changed
I. ELECTRICAL LOAD DATA
Not Changed
J. REFERENCES
Aircraft Maintenance Manual (AMM)
 24-00-00 32-12-11 32-22-11
32-31-14 32-31-21 32-31-33
32-31-44
Elec. Std. Practices Manual (ESPM)
 20-55-00
Vendor Service B ulletin (VSB)
 MESSIER-BUGATTI-DOWTY
Service Bulletin No. 470-32-206
MESSIER-BUGATTI-DOWTY
Service Bulletin No. 470-32-880
K. PUBLICATION AFFECTED
Maintenance Planning Document (MPD)
 32-31-14
32-31-33
L. INTERCHANGEABILITY/MIXABILITY
Not Applicable
M. SPARES
None
DATE: Jul 20/12 SERVICE BULLETIN No.: A300-32-0465
REVISION No.: 01 - Apr 25/13 Page: 7
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 18

@A300
SERVICE BULLETIN
This Page Intentionally Left Blank
DATE: Jul 20/12 SERVICE BULLETIN No.: A300-32-0465
REVISION No.: 01 - Apr 25/13 Page: 8
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 19

@A300
SERVICE BULLETIN
2. MATERIAL INFORMATION
**CONF ALL
A. MATERIAL - PRICE AND AVAILABILITY
(1) Procurement Addresses
Modification of removed equipment shoul d be negotiated direc tly with MESSIER-
BUGATTI-DOWTY as per instructions given in Service Bulletins No. 470-32-206 and
470-32-880.
(2) Price and Availability
No AIRBUS kit will be provided.
Refer to the Vendor Service Bulletins No. 470-32-206 and 470-32-880 for the equipment
modification sales terms.
B. INDUSTRY SUPPORT INFORMATION
Refer to the MESSIER-BUGA TTI-DOWTY Service Bulleti ns No. 470-32- 206 and 470-32-880
for the industry support terms of the Vendor Service Bulletin parts and labor.
C. LIST OF COMPONENTS
No Kit
D. LIST OF MATERIALS - OPERATOR SUPPLIED
None
E. PARTS TO BE RE-IDENTIFIED BY OPERATOR
None
F. TOOLING
None
DATE: Jul 20/12 SERVICE BULLETIN No.: A300-32-0465
REVISION No.: 01 - Apr 25/13 Page: 9
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 20

@A300
SERVICE BULLETIN
This Page Intentionally Left Blank
DATE: Jul 20/12 SERVICE BULLETIN No.: A300-32-0465
REVISION No.: 01 - Apr 25/13 Page: 10
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 21

@A300
SERVICE BULLETIN
3. ACCOMPLISHMENT INSTRUCTIONS
Task 320465-832-801-001 - Inspection
WARNING
: MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND ALL THE CAUTIONS
INCLUDED IN THE REFERENCED PROCEDURES.
CAUTION
: ALWAYS OBEY THE PRECAUTIONS THAT FOLLOW TO KEEP
ELECTRICAL WIRING IN A SATISFACTORY CONDITION (ELECTRICALLY
AND MECHANICALLY SERVICEABLE) . WHEN YOU DO MAINTENANCE
WORK, REPAIRS OR MODIFICATIONS, ALWAYS KEEP ELECTRICAL WIRING,
COMPONENTS AND THE WORK AREA AS CLEAN AS POSSIBLE. TO DO
THIS:
- PUT PROTECTION, SUCH AS PLASTIC SHEETING, CLOTHS, ETC; AS
NECESSARY ON WIRING AND COMPONENTS.
- REGULARLY REMOVE ALL SHAVINGS, UNWANTED MATERIAL AND
OTHER CONTAMINATION.
THESE PRECAUTIONS WILL DECREASE THE RISK OF CONTAMINATION
AND DAMAGE TO THE ELECTRICAL WIRING INSTALLATION.
IN CASE OF CONTAMINATION REFER TO ESPM 20-55-00.
Task Associated Data
Zone
123 124 147 148
Manpower
TOTAL MANHOURS
 9.00
ELAPSED TIME (HOURS)
 9.00
Additional manhours related to Vendor SB; refer to:
MESSIER-BUGATTI-DOWTY Se rvice Bulletin No. 470-32-206
MESSIER-BUGATTI-DOWTY Se rvice Bulletin No. 470-32-880
A. GENERAL
(1) Subtask 320465-839-001-001 - Administrative
Manpower Resources
Skills
 NON SPECIFIC
(a) Write in the applicable aircraft records that you have done all the work given in this
Service Bulletin.
DATE: Jul 20/12 SERVICE BULLETIN No.: A300-32-0465
REVISION No.: 01 - Apr 25/13 Page: 11
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 22

@A300
SERVICE BULLETIN
B. PREPARATION
(1) Subtask 320465-941-001-001 - Job Set-up
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 24-00-00, Page Block 301
32-12-11, Page Block 301
32-22-11, Page Block 301
32-31-14, Page Block 401
32-31-21, Page Block 401
32-31-33, Page Block 401
32-31-44, Page Block 401
(a) Make sure that the aircraft is electrically grounded (Refer to AMM 24-00-00, Page
Block 301).
(b) Put the access platform(s) in position at zones 147, 148, 123 and 124.
(c) Open the NLG doors (Refer to AMM 32-22-11, Page Block 301).
(d) Open the MLG doors (Refer to AMM 32-12-11, Page Block 301).
(e) Do the preparation procedure as specified in the removal of the MLG uplocks and
door uplocks (Refer to AMM 32-31-44, Page Block 401 and AMM 32-31-33, Page
Block 401).
(f) Do the preparation procedure as specified in the removal of the NLG uplocks and
door uplocks (Refer to AMM 32-31-21, Page Block 401 and AMM 32-31-14, Page
Block 401).
C. PROCEDURE
(1) Subtask 320465-832-001-001 - Do a Detailed Inspection of the MLG and MLG Door
Uplock Springs
Work Zones and Access Panels
Zone
 Access/Work location
147
148
References
Vendor Service B ulletin (VSB)
 MESSIER-BUGATTI-DOWTY 470-32-206
MESSIER-BUGATTI-DOWTY 470-32-880
Fig. A-FBAAA
Area to be Inspected
Sheet 01
Sheet 02
Fig. A-FFAAA
Flow Chart
Sheet 01
At the threshold given in the Planning Information Paragraph E.(2):
DATE: Jul 20/12 SERVICE BULLETIN No.: A300-32-0465
REVISION No.: 01 - Apr 25/13 Page: 12
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 23

@A300
SERVICE BULLETIN
(a) Do a detailed inspection of the springs of the main landing gear door uplocks in
accordance with MESSIER-B UGATTI-DOWTY Service B ulletin No. 470-32-206:
refer to Fig. A-FBAAA Sheet 01
 , Fig. A-FBAAA Sheet 02
 and Fig. A-FFAAA Sheet
01
1
 If load check is incorrect:
a
 Apply SUBTASK 320465-833-001 001 Replace the involved MLG door
uplock
b
 Send inspection report to AIRBUS.
c
 Repeat inspection at interval given in planning information paragraph
E.(2).
2
 If load check is correct:
a
 Send inspection report to AIRBUS.
b
 Repeat inspection at interval given in planning information paragraph
E.(2).
(b) Do a detailed visual inspection of the springs of the main landing gear uplocks in
accordance MESSIER-BUG ATTI-DOWTY Service B ulletin No. 470-32-880:
refer to Fig. A-FBAAA Sheet 01
 , Fig. A-FBAAA Sheet 02
 and Fig. A-FFAAA Sheet
01
1
 If spring is damaged:
a
 Apply SUBTASK 320465-833-002 001 Replace the involved MLG uplock
b
 Send inspection report to AIRBUS.
c
 Repeat inspection at interval given in planning information paragraph
E.(2).
2
 If spring is not damaged
a
 Send inspection report to AIRBUS.
b
 Repeat inspection at interval given in planning information paragraph
E.(2).
(2) Subtask 320465-832-002-001 - Do a Detailed Inspection of the NLG and NLG Door
Uplock Springs
Work Zones and Access Panels
Zone
 Access/Work location
123
124
DATE: Jul 20/12 SERVICE BULLETIN No.: A300-32-0465
REVISION No.: 01 - Apr 25/13 Page: 13
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 24

@A300
SERVICE BULLETIN
References
Vendor Service B ulletin (VSB)
 MESSIER-BUGATTI-DOWTY 470-32-206
MESSIER-BUGATTI-DOWTY 470-32-880
Fig. A-FBBAA
Area to be Inspected
Sheet 01
Sheet 02
Fig. A-FFAAA
Flow Chart
Sheet 01
At the threshold given in the Planning Information Paragraph E.(2):
(a) Do a detailed inspection of the springs of the nose landing gear door uplocks in
accordance with MESSIER-B UGATTI-DOWTY Service B ulletin No. 470-32-206:
refer to Fig. A-FBBAA Sheet 01
 , Fig. A-FBBAA Sheet 02
 and Fig. A-FFAAA Sheet
01
1
 If load check is incorrect:
a
 Apply SUBTASK 320465-833-003 001 Replace the involved NLG door
uplock
b
 Send inspection report to AIRBUS.
c
 Repeat inspection at interval given in planning information paragraph
E.(2).
2
 If load check is correct:
a
 Send inspection report to AIRBUS.
b
 Repeat inspection at interval given in planning information paragraph
E.(2).
(b) Do a detailed inspection of the springs of the nose landing gear uplocks in
accordance with MESSIER-B UGATTI-DOWTY Service B ulletin No. 470-32-880:
refer to Fig. A-FBBAA Sheet 01
 , Fig. A-FBBAA Sheet 02
 and Fig. A-FFAAA Sheet
01
1
 If spring is damaged:
a
 Apply SUBTASK 320465-833-004 001 Replace the involved NLG uplock
b
 Send inspection report to AIRBUS.
c
 Reinspect at interval given in planning information paragraph E.(2).
2
 If spring is not damaged
a
 Send inspection report to AIRBUS.
b
 Reinspect at interval given in planning information paragraph E.(2).
DATE: Jul 20/12 SERVICE BULLETIN No.: A300-32-0465
REVISION No.: 01 - Apr 25/13 Page: 14
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 25

@A300
SERVICE BULLETIN
(3) Subtask 320465-833- 001-001 - Replace the involved MLG door uplock
Work Zones and Access Panels
Zone
 Access/Work location
148
147
Manpower Resources
Manhours
 1.00
Minimum number of person
 1
Subtask elapsed time
 1.00
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 32-31-33, Page Block 401
(a) Remove the involved MLG door uplock (Refer to AMM 32-31-33, Page Block 401.
(b) Send the involved MLG door uplock in shop for repair.
(c) Install a serviceable MLG door uplock (Refer to AMM 32-31-33, Page Block 401.
(4) Subtask 320465-833-002-001 - Replace the involved MLG uplock
Work Zones and Access Panels
Zone
 Access/Work location
147
148
Manpower Resources
Manhours
 1.00
Minimum number of person
 1
Subtask elapsed time
 1.00
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 32-31-44, Page Block 401
(a) Remove the involved MLG gear uplock (Refer to AMM 32-31-44, Page Block 401).
(b) Send the involved MLG gear uplock in shop for repair.
(c) Install a serviceable MLG gear uplock (Refer to AMM 32-31-44, Page Block 401).
(5) Subtask 320465-833- 003-001 - Replace the involved NLG door uplock
Work Zones and Access Panels
Zone
 Access/Work location
123
124
DATE: Jul 20/12 SERVICE BULLETIN No.: A300-32-0465
REVISION No.: 01 - Apr 25/13 Page: 15
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 26

@A300
SERVICE BULLETIN
Manpower Resources
Manhours
 1.00
Minimum number of person
 1
Subtask elapsed time
 1.00
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 32-31-14, Page Block 401
(a) Remove the involved NLG door uplock (Refer to AMM 32-31-14, Page Block 401).
(b) Send the involved NLG door uplock in shop for repair.
(c) Install a serviceable NLG door uplock (Refer to AMM 32-31-14, Page Block 401).
(6) Subtask 320465-833-004-001 - Replace the involved NLG uplock
Work Zones and Access Panels
Zone
 Access/Work location
123
124
Manpower Resources
Manhours
 1.00
Minimum number of person
 1
Subtask elapsed time
 1.00
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 32-31-21, Page Block 401
(a) Remove the involved NLG gear uplock (Refer to AMM 32-31-21, Page Block 401).
(b) Send the involved NLG gear uplock in shop for repair.
(c) Install a serviceable NLG gear uplock (Refer to AMM 32-31-21, Page Block 401).
D. TEST
(1) Subtask 320465-700-001-001 - Testing
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 32-31-14, Page Block 401
32-31-21, Page Block 401
32-31-33, Page Block 401
32-31-44, Page Block 401
DATE: Jul 20/12 SERVICE BULLETIN No.: A300-32-0465
REVISION No.: 01 - Apr 25/13 Page: 16
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 27

@A300
SERVICE BULLETIN
(a) If a MLG or a MLG door uplock have been replaced:
Do the test procedure as specified after the installation of MLG uplocks and door
uplocks (Refer to AMM 32-31-44, Page Block 401 and AMM 32-31-33, Page Block
401).
(b) If a NLG or a NLG door uplock have been replaced:
Do the test procedure as specified after the installation of NLG uplocks and door
uplocks (Refer to AMM 32-31-21, Page Block 401 and AMM 32-31-14, Page Block
401).
E. CLOSE-UP
(1) Subtask 320465-942-001-001 - Close-up
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 32-12-11, Page Block 301
32-22-11, Page Block 301
32-31-14, Page Block 401
32-31-21, Page Block 401
32-31-33, Page Block 401
32-31-44, Page Block 401
(a) Do the close-up procedure as specified in the installation of the MLG uplocks and
door uplocks (Refer to AMM 32-31-44, Page Block 401 and AMM 32-31-33, Page
Block 401).
(b) Do the close-up procedure as specified in the installation of the NLG uplocks and
door uplocks (Refer to AMM 32-31-21, Page Block 401 and AMM 32-31-14, Page
Block 401).
(c) Close the NLG doors (Refer to AMM 32-22-11, Page Block 301).
(d) Close the MLG doors (Refer to AMM 32-12-11, Page Block 301).
(e) Remove the access platform(s).
(f) Restore the aircraft and the syst ems to normal operating conditions.
DATE: Jul 20/12 SERVICE BULLETIN No.: A300-32-0465
REVISION No.: 01 - Apr 25/13 Page: 17
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 28

@A300
SERVICE BULLETIN
**CONF ALL
A
LH SIDE SHOWN
RH SIDE SYMMETRICAL
A
A
B
FR47
FR50
FR54
C
C
B
B
A A
NOTE:
01
01
DEPENDING ON THE PN, THERE ARE 1 PAIR OF
SPRINGS OR 2 PAIRS OF SPRINGS AT THIS POSITION
FREE FALL SPRINGS
SPRINGS ATTACHED TO THE HOOK
(HOOK SPRINGS)  AND 
SPRINGS ATTACHED TO THE LEVER
A
 − Z147 Z148
(LEVER SPRINGS)
A_SB_320465_5_BAAA_01_08
Figure A-F BAAA - S heet 01
Area to be Inspected
DATE: Jul 20/12 SERVICE BULLETIN No.: A300-32-0465
REVISION No.: 01 - Apr 25/13 Page: 18
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 29

@A300
SERVICE BULLETIN
**CONF ALL
HOOK SPRINGS TO BE INSPECTED
LH SIDE SHOWN
RH SIDE SYMMETRICAL
B
B
C
B B
A_SB_320465_5_BAAA_02_01
Figure A-F BAAA - S heet 02
Area to be Inspected
DATE: Jul 20/12 SERVICE BULLETIN No.: A300-32-0465
REVISION No.: 01 - Apr 25/13 Page: 19
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 30

@A300
SERVICE BULLETIN
**CONF ALL
 − Z123 Z124
A
B
A
A
A
A A
PAIR OF HOOK SPRINGS TO BE INSPECTED
PAIR OF FREE FALL SPRINGS TO BE INSPECTED
A_SB_320465_5_BBAA_01_01
Figure A-F BBAA - S heet 01
Area to be Inspected
DATE: Jul 20/12 SERVICE BULLETIN No.: A300-32-0465
REVISION No.: 01 - Apr 25/13 Page: 20
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 31

@A300
SERVICE BULLETIN
**CONF ALL
HOOK SPRING TO BE INSPECTED
B
B
B B
B
A_SB_320465_5_BBAA_02_02
Figure A-F BBAA - S heet 02
Area to be Inspected
DATE: Jul 20/12 SERVICE BULLETIN No.: A300-32-0465
REVISION No.: 01 - Apr 25/13 Page: 21
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 32

@A300
SERVICE BULLETIN
**CONF ALL
QUESTION
ACTION
FINDING
YES OR DAMAGEDSPRINGS BROKEN
AS DESCRIBED IN SUBTASKS 320465−832−001−001
NO
SHOP FOR REPAIR AND REPLACE IT
SEND THE INVOLVED UPLOCK IN
AS DESCRIBED IN SUBTASK(S)
320465−833−001−001
AND/OR 320465−833−002−001
AND/OR 320465−833−003−001
AND/OR 320465−833−004−001
AND DOOR UPLOCK SPRINGS
AT THRESHOLD GIVEN IN THE PLANNING INFORMATION PARAGRAPH 1.E.(2).
DO A DETAILED INSPECTION OF THE MLG AND NLG UPLOCK
NLG UPLOCK AND DOOR UPLOCK SPRINGS
DO A DETAILED INSPECTION OF THE MLG AND 
AND 320465−832−002−001
RE−INSPECT AT INTERVAL GIVEN
IN THE PLANNING INFORMATION
PARAGRAPH 1.E.(2).
A_SB_320465_5_FAAA_01_01
Figure A-FFAAA - Sheet 01
Flow Chart
DATE: Jul 20/12 SERVICE BULLETIN No.: A300-32-0465
REVISION No.: 01 - Apr 25/13 Page: 22
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 33

@A300
SERVICE BULLETIN
Appendix 01 : Inspection Report
**CONF ALL
The results of the inspection, including no findings, replacement or actions to be done, must be
forwarded to airbus dept . SEEL3, on the attached inspection report.
DATE: Jul 20/12 SERVICE BULLETIN No.: A300-32-0465
REVISION No.: 01 - Apr 25/13 Page: 1
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 34

@A300
SERVICE BULLETIN
Appendix 01 : Inspection Report
**CONF ALL
INSPECTION REPORT
SERVICE BULLETIN No. :
A/C MSN :
FLIGHT CYCLES :
FLIGHT HOURS :
A300−32−0465
DATE OF INSPECTION :
RETURN TO :
AIRBUS
CUSTOMER SERVICES ENGINEERING − SEEL3
LANDING GEAR SYSTEMS A330/A340 & WIDE BODY
INSPECTION METHOD :
1 ROND POINT MAURICE BELLONTE
31707 BLAGNAC CEDEX
FRANCE
FAX +33 (0)5 61 36 14
QUESTIONS
UPLOCKS
SPRINGS BROKEN UPLOCK REPLACEDOR DAMAGED
MLG UPLOCK YES NO YES NO
MLG DOOR UPLOCK YES NO YES NO
NLG UPLOCK YES NO YES NO
NLG DOOR UPLOCK YES NO YES NO
WHICH SPRING ?
(FREE FALL, HOOK,
LEVER)
A_SB_320465_5_RAAA_01_02
Figure A-FRAAA - Sheet 01
Inspection Report
DATE: Jul 20/12 SERVICE BULLETIN No.: A300-32-0465
REVISION No.: 01 - Apr 25/13 Page: 2
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 35

@A300
SERVICE BULLETIN
REPORTING SHEET
TITLE: LANDING GEAR - NORMAL EXTENSION AND RETRACTION -
INSPECTION OF UPLOCK SPRINGS
MODIFICATION No.: None
Please complete the appropriate item (A or B):
A - SB WILL BE
 embodied YES/NO (if NO please comment)
If YES, aircraft concer ned (as per SB effectivity by default) and planned dates (month/year) of
embodiment:
B - SB HAS BEEN
 embodied on aircraft:
Operator comments:
From Airline:
Name/Title:
Signature: Date:
If operational documentation is affected (see Paragraph 1.K of this SB): If information is needed prior to
next normal revision or prior to SB embodiment, please indicate required service(s):
Either: Modification Operational Impact (MOI), if available YES/NO
Or : Intermediate revision YES/NO
Important Information:
 This SB will only be incorporated in your maintenance and operational
documentation if this sheet is returned to Airbus and signed by a duly authorised representative. With
the next feasible revision, this will result in
- Updating of maintenance documentation to show pre and post SB data.
- Updating of maintenance and operational documentation to show post SB data after embodiment.
If this SB requires previous or simultaneous accomplishment of other SBs, Airbus shall automatically
include them in the manual revisions. Refer to SIL 00-037 for detailed information.
Please return this completed sheet to:
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX FRANCE
Attn: SDC32 Technical Data and Documentation Services
F A X :( + 3 3 )56 19 32 80 6
e-mail: sb.reporting@airbus.com
or via your Resident Customer Support Office.
Alternatively, SB lists via letters or fax are also accepted.
DATE: Jul 20/12 SERVICE BULLETIN No.: A300-32-0465
REVISION No.: 01 - Apr 25/13 Page: 1
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 36

@A300
SERVICE BULLETIN
QUALITY PERCEPTION FORM
Use this form to tell us what is your perception of the quality of this Service Bulletin. The reported data
that you provide us will be used to analyse areas of difficulties and to take corrective action to further
improve the quality of our Service Bulletins.
We thank you for the time you have taken in completing this form.
(Please rate on a scale of 1 to 4, with 4 being the highest score)
- Quality rating of this SB 4321
- Quality rating of the Accomplishment Instructions 4321
- Quality rating of the Illustrations 4321
- Is this SB easy to understand ? Y/N
If you have had difficulties in the accomplishment of this SB please quote below the area(s) and give a
short description of the issue.
Planning Material Instructions
X Effectivity X Kit content X Preparation
X Reason X List of Materials Operator Supplied X Mod/Inspection
X Manpower X Industry support X Test
X References X Re-identification X Close-Up
X Publication X Tooling X Illustrations
Comments:
Operator: Date:
Name/Title:
Please return this form to:
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX FRANCE
Attn : SEM4 Service Bulletins Management
F A X:( 3 3 )56 19 34 25 1
Or via your Resident Customer Support Office.
DATE: Jul 20/12 SERVICE BULLETIN No.: A300-32-0465
REVISION No.: 01 - Apr 25/13 Page: 1
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
