# Airbus Service Bulletin A300-32-6110

Copy: No revision named ("U.S. DOT/FAA - Service Bulletin A300-32-6110 Rev00"), 36 pages: PDF https://openairdocs.org/files/sha256/37/04/37047aa8cf278f96bfc3f9096866279a56c5c84d7536f0a9b86df0bfff19f564; text https://openairdocs.org/service-documents/airbus/a300-32-6110/file/37047aa8cf27.md. Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2014-0448; AD 2014-25-06 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Airbus](https://openairdocs.org/service-documents/airbus.md)
- Type: Service bulletin (Service Bulletin)
- Number: A300-32-6110
- Page: https://openairdocs.org/service-documents/airbus/a300-32-6110

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2014-25-06](https://openairdocs.org/ad/2014-25-06.md), effective Jan 20, 2015: No revision named

Also cited in [1 proposed AD](https://openairdocs.org/service-documents/airbus/a300-32-6110/proposed.md).

## Text (36 pages)

Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2014-0448; AD 2014-25-06 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

@A300-600
SERVICE BULLETIN
SUMMARY
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
This summary is for information only and is not approved for modification of the aircraft.
MANDATORY
 MANDATORY
 MANDATORY
ATA SYSTEM: 32
TITLE: LANDING GEAR - NORMAL EXTENSION AND RETRACTION -
INSPECTION OF NLG AND MLG SEQUENCE VALVES
**CONF ALL
MODIFICATIONS
None
REASON/DESCRIPTION/OPERATIONAL CONSEQUENCES
In the scope of the Wide Body life extension exercise, Airbus has analyzed the in-service experience
feedback from Messier-Bugatti-Dowty who has reported five cases of early ruptures on levers of the
Nose Landing Gear (NLG) Sequence Valve.
Analysis of the root cause lead to consider that these fatigue ruptures were most probably due to initial
mis-rigging and not directly linked to ageing.
For the time being, even if the design of the Main Landing Gear (MLG) sequence valve lever is similar
with the one of NLG sequence valve lever, no case of lever rupture has been reported on MLG
sequence valve.
Incorrect adjustment of the mechanical linkages can cause rupture of the sequence valve lever and
subsequent potential inhibition of leg extension/retraction or interference between the Leg and Door
during operation.
This Service Bulletin details a one-time inspection of the control lever and correct adjustment of the
control rod between Doors and NLG and MLG Sequence valves (FIN 321255, 321262, 321214 and
321215).
Accomplishment of this Service Bulletin will contribute to ensure the reliability of the NLG and MLG
Sequence Valves.
GENERAL EVALUATION
EVALUATION TABLE
COMPLIANCE
 MANDATORY (1)
 CANCELS INSPECTION SB
 NO
POTENTIAL AD
 YES
 A/C OPERATION AFFECTED
 NO
DATE: Jul 17/12 SERVICE BULLETIN No.: A300-32-6110
REVISION No.: 00 - Jul 17/12 Page: 1
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 2

@A300-600
SERVICE BULLETIN
SUMMARY
EVALUATION TABLE
RELIABILITY AFFECTED
 NO
 PAX COMFORT AFFECTED
 NO
COST SAVING
 NO
 ETOPS AFFECTED
 NO
STRUCTURAL LIFE EXTN
 NO
 VENDOR SB INVOLVED
 NO
NORMAL JACKING
 YES
NOTE
 (1)
: Service Bulletin must be accomplished.
NOTE
: Normal Jacking is required only if functional test is required.
MATERIAL PRICE INFORMATION
No Material
EFFECTIVITY
This Service Bulletin is applicable to this (these) operator(s) :
34Z 77T 83V AAL ABD AHK AIB BCS CES F2I FDX G8E GBG
IRA IRM JAL KAC KAL MNB MON MSR MXU OHY QTR RUN SUD
TAR THA TMA UPS URS UZB
CONCURRENT REQUIREMENTS
None
REFERENCES / REPERCUSSIONS
TFU
 None
OEB
 None
AOT
 None
SIL
 None
LINE MAINTENANCE AFFECTED
 No
LIFE LIMIT
 None
OTHER
 None
NATURE OF THE WORK
AIRCRAFT
 NO
EQUIPMENT
 YES
HARD
 NO
SOFT
 NO
OBRM
 NO
MANPOWER
Task 326110-832-801-001: Inspection
TOTAL MANHOURS
 9.50
ELAPSED TIME (HOURS)
 5.00
DATE: Jul 17/12 SERVICE BULLETIN No.: A300-32-6110
REVISION No.: 00 - Jul 17/12 Page: 2
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 3

@A300-600
SERVICE BULLETIN
SUMMARY
APPENDICES
Appendix 01 - Elapsed Time Assumption
Appendix 02 - Inspection Report - NLG and MLG Sequence Valve
DATE: Jul 17/12 SERVICE BULLETIN No.: A300-32-6110
REVISION No.: 00 - Jul 17/12 Page: 3
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 4

@A300-600
SERVICE BULLETIN
SUMMARY
**CONF ALL
Z711
A
A
B
C
AREA TO BE INSPECTED
LH SIDE SHOWN
RH SIDE SYMMETRICAL
B C
LH
RH
321255
321262
PIN SHEARING INDICATING AREA
LEVER AREA
D_SB_326110_5_SAAA_01_03
Figure A-F SAAA - S heet 01
DATE: Jul 17/12 SERVICE BULLETIN No.: A300-32-6110
REVISION No.: 00 - Jul 17/12 Page: 4
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 5

@A300-600
SERVICE BULLETIN
SUMMARY
**CONF ALL
Z741
Z731
C
LH SIDE SHOWN
RH SIDE SYMMETRICAL
A B
A
B
FWD
AREA TO BE INSPECTED
LH SIDE SHOWN
RH SIDE SYMMETRICAL
C
LH
RH
321214
321215
PIN SHEARING
INDICATING AREA
LEVER AREA
D_SB_326110_5_SBAA_01_03
Figure A-F SBAA - S heet 01
DATE: Jul 17/12 SERVICE BULLETIN No.: A300-32-6110
REVISION No.: 00 - Jul 17/12 Page: 5
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 6

@A300-600
SERVICE BULLETIN
SUMMARY
This Page Intentionally Left Blank
DATE: Jul 17/12 SERVICE BULLETIN No.: A300-32-6110
REVISION No.: 00 - Jul 17/12 Page: 6
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 7

@A300-600
SERVICE BULLETIN
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
MANDATORY
 MANDATORY
 MANDATORY
ATA SYSTEM: 32
TITLE: LANDING GEAR - NORMAL EXTENSION AND RETRACTION -
INSPECTION OF NLG AND MLG SEQUENCE VALVES
MODIFICATION No.: None
This document contains AIRBUS PROPRIETARY INFORMATION and shall at all times remain the
property of AIRBUS; no intellectual property right or licence is granted by AIRBUS in connection with
any information contained in it. It is delivered on the express condition that said document and the
information contained in it shall be treated as confidential, shall not be used for any purpose other than
that for which it is hereby delivered. It shall not be disclosed in whole or in part to third parties and shall
not be duplicated in any manner (except for the purposes of performing the tasks described hereunder
and provided that any recipient of such document shall comply with the conditions herein), without
AIRBUS prior written consent.
1. PLANNING INFORMATION
**CONF ALL
A. EFFECTIVITY
(1) Models
B4-603 B4-605R B4-620 B4-622 B4-622R C4-605R/F C4-620 F4-605R
F4-622R
(2) Effectivity by MSN
0284 0294 0301 0307 0312 0317 0321 0336 0344 0348 0351 0358 0361 0365 0380
0388 0401 0405 0408 0411 0414 0417 0423 0459-0466 0469-0470 0474 0477 0479
0505-0518 0521 0525 0529-0530 0532 0536 0540 0543 0546 0553-0561 0563 0566
0569 0572 0575 0577 0579 0581-0582 0584 0602-0615 0617-0618 0621 0623
0625-0633 0635 0637 0639 0641 0643 0645 0657 0659 0662 0664 0666 0668 0670
0673 0675 0677 0679 0681 0683 0685 0688 0692 0694 0696 0699 0701 0703 0705
0707 0709 0711 0713 0715 0717 0719 0721-0750 0752-0764 0766-0775 0777-0794
0797 0799-0841 0845-0878
DATE: Jul 17/12 SERVICE BULLETIN No.: A300-32-6110
REVISION No.: 00 - Jul 17/12 Page: 1
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 8

@A300-600
SERVICE BULLETIN
(3) Effectivity by Operator
The Operator/MSN relationship is provided for information only and is correct at the time
of issue in accordance with the information available to AIRBUS. Any future changes
resulting from transfer of an aircraft from one operator to another will not be reflected in
this list unless the Service Bulletin is revised for another reason.
OPERATOR
 MSN
34Z
 0685
77T
 0838
83V
 0423 0459 0460 0463 0466 0470 0474 0510 0511 0512 0615 0639
0675
AAL
 0517 0612
ABD
 0529 0557
AHK
 0855 0856 0857 0858 0859 0860 0870 0871
AIB
 0507 0508 0515
BCS
 0621 0637 0641 0670 0679 0703 0711 0724 0729 0730 0737 0740
0753 0770
CES
 0521 0525 0532 0707 0725 0732 0741 0746 0754 0763
F2I
 0284 0294 0301 0307 0312 0317 0321 0336 0348 0351 0461 0518
0606 0610 0645
FDX
 0358 0361 0365 0388 0417 0477 0479 0530 0536 0543 0555 0559
0572 0575 0579 0581 0611 0613 0625 0630 0633 0657 0659 0664
0668 0688 0709 0713 0715 0726 0728 0735 0736 0738 0742 0745
0748 0752 0757 0759 0760 0761 0766 0768 0769 0771 0772 0774
0777 0778 0779 0780 0781 0789 0790 0791 0792 0793 0794 0799
0800 0801 0802 0803 0804 0873 0874 0875 0876 0877 0878
G8E
 0462 0465 0469 0506 0509 0513 0514 0516
GBG
 0626 0643
IRA
 0632 0696 0723 0727
IRM
 0380 0401 0405 0408 0411 0414 0546 0553 0608 0618 0623 0701
0750 0762 0773
JAL
 0602 0617 0683 0783
KAC
 0344 0673 0694 0699 0719 0721
KAL
 0582 0609 0627 0631 0662 0692 0731
MNB
 0734 0739 0755 0756 0758
MON
 0540 0556 0604 0605
MSR
 0561 0607
MXU
 0767 0788 0797 0836 0837
OHY
 0584 0603 0744 0747 0749 0764
QTR
 0554 0560 0614
RUN
 0677 0743
SUD
 0666 0775
TAR
 0505 0558 0563
THA
 0464 0566 0569 0577 0628 0629 0635 0681 0705 0782 0784 0785
0786 0787
TMA
 0872
DATE: Jul 17/12 SERVICE BULLETIN No.: A300-32-6110
REVISION No.: 00 - Jul 17/12 Page: 2
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 9

@A300-600
SERVICE BULLETIN
OPERATOR
 MSN
UPS
 0805 0806 0807 0808 0809 0810 0811 0812 0813 0814 0815 0816
0817 0818 0819 0820 0821 0822 0823 0824 0825 0826 0827 0828
0829 0830 0831 0832 0833 0834 0835 0839 0840 0841 0845 0846
0847 0848 0849 0850 0851 0852 0853 0854 0861 0862 0863 0864
0865 0866 0867 0868 0869
URS
 0733
UZB
 0717 0722
(4) Configuration by MSN
MSN
 CONFIGURATION
0284 0294 0301 0307 0312 0317 0321 0336 0344 0348 0351
0358 0361 0365 0380 0388 0401 0405 0408 0411 0414 0417
0423 0459 0460 0461 0462 0463 0464 0465 0466 0469 0470
0474 0477 0479 0505 0506 0507 0508 0509 0510 0511 0512
0513 0514 0515 0516 0517 0518 0521 0525 0529 0530 0532
0536 0540 0543 0546 0553 0554 0555 0556 0557 0558 0559
0560 0561 0563 0566 0569 0572 0575 0577 0579 0581 0582
0584 0602 0603 0604 0605 0606 0607 0608 0609 0610 0611
0612 0613 0614 0615 0617 0618 0621 0623 0625 0626 0627
0628 0629 0630 0631 0632 0633 0635 0637 0639 0641 0643
0645 0657 0659 0662 0664 0666 0668 0670 0673 0675 0677
0679 0681 0683 0685 0688 0692 0694 0696 0699 0701 0703
0705 0707 0709 0711 0713 0715 0717 0719 0721 0722 0723
0724 0725 0726 0727 0728 0729 0730 0731 0732 0733 0734
0735 0736 0737 0738 0739 0740 0741 0742 0743 0744 0745
0746 0747 0748 0749 0750 0752 0753 0754 0755 0756 0757
0758 0759 0760 0761 0762 0763 0764 0766 0767 0768 0769
0770 0771 0772 0773 0774 0775 0777 0778 0779 0780 0781
0782 0783 0784 0785 0786 0787 0788 0789 0790 0791 0792
0793 0794 0797 0799 0800 0801 0802 0803 0804 0805 0806
0807 0808 0809 0810 0811 0812 0813 0814 0815 0816 0817
0818 0819 0820 0821 0822 0823 0824 0825 0826 0827 0828
0829 0830 0831 0832 0833 0834 0835 0836 0837 0838 0839
0840 0841 0845 0846 0847 0848 0849 0850 0851 0852 0853
0854 0855 0856 0857 0858 0859 0860 0861 0862 0863 0864
0865 0866 0867 0868 0869 0870 0871 0872 0873 0874 0875
0876 0877 0878
001
(5) Configuration definition
**CONF 001
Config. 001 is valid for all the aircraft given in the effectivity of this Service Bulletin as a
standard configuration.
(6) Material Effectivity
No Material Set
B. CONCURRENT REQUIREMENTS
None
DATE: Jul 17/12 SERVICE BULLETIN No.: A300-32-6110
REVISION No.: 00 - Jul 17/12 Page: 3
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 10

@A300-600
SERVICE BULLETIN
C. REASON
(1) History
In the scope of the Wide Body life extension exercise, Airbus has analyzed the in-
service experience feedback from Messier-Bugatti-Dowty who has reported five cases of
early ruptures on levers of the Nose Landing Gear (NLG) Sequence Valve.
Analysis of the root cause lead to consider that these fatigue ruptures were most
probably due to initial mis-rigging and not directly linked to ageing.
For the time being, even if the design of the Main Landing Gear (MLG) sequence valve
lever is similar with the one of NLG sequence valve lever, no case of lever rupture has
been reported on MLG sequence valve.
Incorrect adjustment of the mechanical linkages can cause rupture of the sequence
valve lever and subsequent potential inhibition of leg extension/retraction or interference
between the Leg and Door during operation.
(2) Objective/Action
This Service Bulletin details a one-time inspection of the control lever and correct
adjustment of the control rod between Doors and NLG and MLG Sequence valves (FIN
321255, 321262, 321214 and 321215).
(3) Advantages
Accomplishment of this Service Bulletin will contribute to ensure the reliability of the NLG
and MLG Sequence Valves.
(4) Operational/Maintenance Consequences
None
D. DESCRIPTION
To accomplish this Service Bulletin it is necessary to :
Task 326110-832-801-001: Inspection
(1) Do a Detailed Inspection of the NLG Sequence Valve lever and the Pin shearing
indicating area
(2) Do a Detailed Inspection of the MLG Sequence Valve lever and the Pin shearing
indicating area
(3) Do a Detailed Inspection of the adjustment of the control rod between Door and NLG
Sequence Valve
(4) Do a Detailed Inspection of the adjustment of the control rod between Doors and
MLG Sequence Valve
(5) Adjust the control rod between Doors and the NLG Sequence Valve
DATE: Jul 17/12 SERVICE BULLETIN No.: A300-32-6110
REVISION No.: 00 - Jul 17/12 Page: 4
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 11

@A300-600
SERVICE BULLETIN
(6) Adjust the control rod between Doors and the MLG Sequence Valve
(7) Install a Serviceable NLG Sequence Valve and Lever
(8) Install a Serviceable MLG Sequence Valve and Lever
E. COMPLIANCE
(1) Classification
MANDATORY: Service Bulletin must be accomplished.
(2) Accomplishment Timescale
Table 1: Accomplishment Timescale Table
Compliance time
Condition
 Action
Threshold (whichever
occurs first)
Grace period
(whichever occurs
first)
Repetitive
interval
All aircraft
 Apply SUBTASK
326110-832-001 001 Do a
Detailed Inspection of the NLG
Sequence Valve lever and the
Pin shearing indicating area
and
apply SUBTASK
326110-832-002 001 Do a
Detailed Inspection of the MLG
Sequence Valve lever and the
Pin shearing indicating area
At the next maintenance
opportunity after SB
receipt
4,000 FC/6,000
FH/30 months
None
Damage
found
Apply SUBTASK
326110-833-003 001 Install a
Serviceable NLG Sequence
Valve and Lever
and/or
apply SUBTASK
326110-833-004 001 Install a
Serviceable MLG Sequence
Valve and Lever
Before next flight
 None
 None
DATE: Jul 17/12 SERVICE BULLETIN No.: A300-32-6110
REVISION No.: 00 - Jul 17/12 Page: 5
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 12

@A300-600
SERVICE BULLETIN
Table 1: Accomplishment Timescale Table
Compliance time
Condition
 Action
Threshold (whichever
occurs first)
Grace period
(whichever occurs
first)
Repetitive
interval
No
damage
found
Apply SUBTASK
326110-832-003 001 Do a
Detailed Inspection of the
adjustment of the control rod
between Door and NLG
Sequence Valve
and/or
apply SUBTASK
326110-832-004 001 Do a
Detailed Inspection of the
adjustment of the control rod
between Doors and MLG
Sequence Valve
Before next flight
 None
 None
Possible
to insert
the rigging
pin(s)
freely
No further action
 None
 None
 None
Not
possible to
insert the
rigging
pin(s)
freely
and
Possible
to insert a
pin of 7.1
mm (0,279
in)
See note
(*)
Apply SUBTASK
326110-833-005 001 Adjust
the control rod between Doors
and the NLG Sequence Valve
and/or
apply SUBTASK
326110-833-006 001 Adjust
the control rod between Doors
and the MLG Sequence Valve
Before next flight
 None
 None
DATE: Jul 17/12 SERVICE BULLETIN No.: A300-32-6110
REVISION No.: 00 - Jul 17/12 Page: 6
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 13

@A300-600
SERVICE BULLETIN
Table 1: Accomplishment Timescale Table
Compliance time
Condition
 Action
Threshold (whichever
occurs first)
Grace period
(whichever occurs
first)
Repetitive
interval
Apply SUBTASK
326110-833-005 001 Adjust
the control rod between Doors
and the NLG Sequence Valve
Before next flight
 None
and/or
apply SUBTASK
326110-833-006 001 Adjust
the control rod between Doors
and the MLG Sequence Valve
and
Before next flight
 None
Apply SUBTASK
326110-833-003 001 Install a
Serviceable NLG Sequence
Valve and Lever
Before next flight
 500 FC
 none
and/or
Not
possible to
insert the
rigging
pin(s)
freely
and
Not
possible to
insert a
pin of 7.1
mm (0,279
in)
See note
(*)
 apply SUBTASK
326110-833-004 001 Install a
Serviceable MLG Sequence
Valve and Lever
Before next flight
 500 FC
 None
Note (*): This pin of 7.1 mm (0.279 in) diameter is valid only for hole 1 for NLG and MLG.
This Service Bulletin has been classified Mandatory. It is expected that an Airworthiness
Directive (AD) published by the European Av iation Safety Agenc y (EASA) will be issued
to confirm this classification. It is anticipated that the AD will confirm the thresholds
and/or intervals and/or date given above but reference should be made to the AD for
confirmation of the mandated accomplishment timescale.
F. APPROVAL
The technical content of this document is approved under the authority of Design
Organisation Approv al No. EASA. 21J.031.
If an aircraft listed in the effectivity has a modification or repair embodied that is not of
AIRBUS origin, and which affects the content of this Service Bulletin, the operator is
responsible for obtaining approval by its airworthiness authority for any adaptation necessary
before incorporation of the Service Bulletin.
DATE: Jul 17/12 SERVICE BULLETIN No.: A300-32-6110
REVISION No.: 00 - Jul 17/12 Page: 7
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 14

@A300-600
SERVICE BULLETIN
G. MANPOWER
The manpower estimates given in this Service Bulletin are based on the direct labor cost to
do the work. These estimates assume that the work will be done by experienced personnel,
and may need to be revised upwards to suit operator’s circumstances. The estimates do not
include the time to prepare, plan or inspect the work. Manufacture and procurement of parts
and tools, drying times for paints, sealants, etc., and general administration work are also not
included.
Task 326110-832-801-001: Inspection
Get Access
 1.00
On Aircraft
Do a Detailed Inspection of the NLG Sequence Valve
lever and the Pin shearing indicating area
0.25
Do a Detailed Inspection of the MLG Sequence Valve
lever and the Pin shearing indicating area
0.25
Do a Detailed Inspection of the adjustment of the
control rod between Door and NLG Sequence Valve
0.50
Do a Detailed Inspection of the adjustment of the
control rod between Doors and MLG Sequence Valve
0.50
Adjust the control rod between Doors and the NLG
Sequence Valve
1.00
Adjust the control rod between Doors and the MLG
Sequence Valve
1.00
Install a Serviceable NLG Sequence Valve and Lever
 1.50
Install a Serviceable MLG Sequence Valve and Lever
 1.50
Tests
 1.00
Close-Up
 1.00
TOTAL MANHOURS
 9.50
ELAPSED TIME (HOURS)
 5.00
NOTE
: For details concerning the elapsed time assumption, refer to Appendix 01 -
Elapsed Time Assumption
H. WEIGHT AND BALANCE
Not Changed
I. ELECTRICAL LOAD DATA
Not Changed
J. REFERENCES
Aircraft Maintenance Manual (AMM)
 06-21-00 12-12-29 24-00-00
29-10-00 29-14-00 32-12-11
32-22-11 32-31-00 32-31-18
32-31-37
Elec. Std. Practices Manual (ESPM)
 20-55-00
DATE: Jul 17/12 SERVICE BULLETIN No.: A300-32-6110
REVISION No.: 00 - Jul 17/12 Page: 8
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 15

@A300-600
SERVICE BULLETIN
K. PUBLICATION AFFECTED
None
L. INTERCHANGEABILITY/MIXABILITY
Not Applicable
M. SPARES
None
DATE: Jul 17/12 SERVICE BULLETIN No.: A300-32-6110
REVISION No.: 00 - Jul 17/12 Page: 9
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 16

@A300-600
SERVICE BULLETIN
This Page Intentionally Left Blank
DATE: Jul 17/12 SERVICE BULLETIN No.: A300-32-6110
REVISION No.: 00 - Jul 17/12 Page: 10
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 17

@A300-600
SERVICE BULLETIN
2. MATERIAL INFORMATION
**CONF ALL
A. MATERIAL - PRICE AND AVAILABILITY
(1) Procurement Addresses
Vendor parts are to be procured from:
Messier-Bugatti-Dowty
Sales and Administration Dpt.
Inovel Parc Sud
78142 Velizy Cedex
France
For ordering by fax (Commercial) : +33 (0)1 46 29 88
For ordering by fax (Technical Spec 2000):+33 (0)1 46 29 88
(2) Price and Availability
No AIRBUS kit will be provided.
Procurement terms for the equipment must be negotiated with the equipment supplier.
B. INDUSTRY SUPPORT INFORMATION
Industry support terms for the equipment must be negotiated with the equipment supplier.
C. LIST OF COMPONENTS
No Kit
D. LIST OF MATERIALS - OPERATOR SUPPLIED
None
E. PARTS TO BE RE-IDENTIFIED BY OPERATOR
None
F. TOOLING
(1) Tooling - Price and Availability
None
(2) Tools
NOTE
: To accomplish the detailed inspection it is necessary to use the tools PN:
- Rigging Pin - Nose Gear Sequence Valve Control: 98A32301012000
- Rigging Pin - Main Gear Selector Control: 98A32301018000 and
98A32303002000
DATE: Jul 17/12 SERVICE BULLETIN No.: A300-32-6110
REVISION No.: 00 - Jul 17/12 Page: 11
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 18

@A300-600
SERVICE BULLETIN
- Pin of diameter 7.1 mm (0.279 in)
(3) Special Tools
None
DATE: Jul 17/12 SERVICE BULLETIN No.: A300-32-6110
REVISION No.: 00 - Jul 17/12 Page: 12
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 19

@A300-600
SERVICE BULLETIN
3. ACCOMPLISHMENT INSTRUCTIONS
Task 326110-832-801-001 - Inspection
WARNING
: MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND ALL THE CAUTIONS
INCLUDED IN THE REFERENCED PROCEDURES.
CAUTION
: ALWAYS OBEY THE PRECAUTIONS THAT FOLLOW TO KEEP
ELECTRICAL WIRING IN A SATISFACTORY CONDITION (ELECTRICALLY
AND MECHANICALLY SERVICEABLE) . WHEN YOU DO MAINTENANCE
WORK, REPAIRS OR MODIFICATIONS, ALWAYS KEEP ELECTRICAL WIRING,
COMPONENTS AND THE WORK AREA AS CLEAN AS POSSIBLE. TO DO
THIS:
- PUT PROTECTION, SUCH AS PLASTIC SHEETING, CLOTHS, ETC; AS
NECESSARY ON WIRING AND COMPONENTS.
- REGULARLY REMOVE ALL SHAVINGS, UNWANTED MATERIAL AND
OTHER CONTAMINATION.
THESE PRECAUTIONS WILL DECREASE THE RISK OF CONTAMINATION
AND DAMAGE TO THE ELECTRICAL WIRING INSTALLATION.
IN CASE OF CONTAMINATION REFER TO ESPM 20-55-00.
NOTE
: The purpose of flow charts are for information only to show the various
Inspection/Repair phases described in this Service Bulletin.
Task Associated Data
Zone
711 731 741
Manpower
TOTAL MANHOURS
 9.50
ELAPSED TIME (HOURS)
 5.00
A. GENERAL
(1) Subtask 326110-910-001-001 - Standard Practices
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 06-21-00, Page Block 001
(a) For the identification of zones (Refer to AMM 06-21-00, Page Block 001).
(2) Subtask 326110-839-001-001 - Administrative
Manpower Resources
Skills
 NON SPECIFIC
DATE: Jul 17/12 SERVICE BULLETIN No.: A300-32-6110
REVISION No.: 00 - Jul 17/12 Page: 13
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 20

@A300-600
SERVICE BULLETIN
(a) Write in the applicable aircraft records that you have done all the work given in this
Service Bulletin.
B. PREPARATION
(1) Subtask 326110-941-001-001 - Job Set-up
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 24-00-00, Page Block 301
29-10-00, Page Block 301
29-14-00, Page Block 301
32-12-11, Page Block 301
32-22-11, Page Block 301
(a) Make sure that the aircraft is electrically grounded (Refer to AMM 24-00-00 Page
Block 301).
(b) Put the access platform(s) in position.
(c) Open the NLG doors (Refer to AMM 32-22-11, Page Block 301).
(d) Open the MLG doors (Refer to AMM 32-12-11, Page Block 301).
(e) Depressurize green hydraulic system (R efer to AMM 29-10-00, Page Block 301).
(f) Depressurize green hydraulic reservoir (Refer to AMM 29-14-00, Page Block 301).
C. PROCEDURE
(1) Subtask 326110-832-001-001 - Do a Detailed Inspection of the NLG Sequence Valve
lever and the Pin shearing indicating area
Work Zones and Access Panels
Zone
 Access/Work location
711
Manpower Resources
Manhours
 0.25
Minimum number of person
 1
Subtask elapsed time
 0.25
Skills
 NON SPECIFIC
References
Fig. A-FBAAA
Inspection of the NLG Door Sequence
Valve
Sheet 01
Fig. A-FFAAA
Flow Chart
Sheet 01
DATE: Jul 17/12 SERVICE BULLETIN No.: A300-32-6110
REVISION No.: 00 - Jul 17/12 Page: 14
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 21

@A300-600
SERVICE BULLETIN
(a) At the threshold given in the Planning Information Paragraph E.(2):
Do a detailed inspection of the NLG sequence valve lever and the pin shearing
indicating area.
Refer to Fig. A-FBAAA Sheet 01
 and Fig. A-FFAAA Sheet 01
1
 If deformation, crack or damage is found:
- Apply SUBTASK 326110-833-003 001 Install a Serviceable NLG
Sequence Valve and Lever before next flight.
2
 If no deformation, crack or damage is found:
- Apply SUBTASK 326110-832-003 001 Do a Detailed Inspection of the
adjustment of the control rod between Door and NLG Sequence Valve
before next flight.
(b) Send inspection report to AIRBUS, (Refer to Appendix 02 - Inspection Report -
NLG and MLG Sequence Valve ).
(2) Subtask 326110-832-002-001 - Do a Detailed Inspection of the MLG Sequence
Valve lever and the Pin shearing indicating area
Work Zones and Access Panels
Zone
 Access/Work location
731
741
Manpower Resources
Manhours
 0.25
Minimum number of person
 1
Subtask elapsed time
 0.25
Skills
 NON SPECIFIC
References
Fig. A-FBBAA
Inspection of the MLG Door Sequence
Valve
Sheet 01
Fig. A-FFAAA
Flow Chart
Sheet 01
(a) At the threshold given in the Planning Information Paragraph E.(2):
Do a detailed inspection of the MLG sequence valve lever and the pin shearing
indicating area.
Refer to Fig. A-FBBAA Sheet 01
 and Fig. A-FFAAA Sheet 01
DATE: Jul 17/12 SERVICE BULLETIN No.: A300-32-6110
REVISION No.: 00 - Jul 17/12 Page: 15
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 22

@A300-600
SERVICE BULLETIN
1
 If deformation, crack or damage is found:
- Apply SUBTASK 326110-833-004 001 Install a Serviceable MLG
Sequence Valve and Lever before next flight.
2
 If no deformation, crack or damage is found:
- Apply SUBTASK 326110-832-004 001 Do a Detailed Inspection of the
adjustment of the control rod between Doors and MLG Sequence Valve
before next flight.
(b) Send inspection report to AIRBUS, (Refer to Appendix 02 - Inspection Report -
NLG and MLG Sequence Valve ).
(3) Subtask 326110-832-003-001 - Do a Detailed Inspection of the adjustment of the
control rod between Door and NLG Sequence Valve
Work Zones and Access Panels
Zone
 Access/Work location
711
Manpower Resources
Manhours
 0.50
Minimum number of person
 1
Subtask elapsed time
 0.50
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 32-31-18, Page Block 401
Fig. A-FBAAA
Inspection of the NLG Door Sequence
Valve
Sheet 01
(a) Check the correct adjustment of the control rod between doors and NLG sequence
valve by insertion of the rigging pin or the pin of diameter 7.1 mm (0.279 in) in
rigging hole 1.
Refer to Fig. A-FBAAA Sheet 01
1
 If it is possible to insert freely the rigging pin 98A32301012000 in rigging hole
1:
- No further action.
2
 If it is not possible to insert freely the rigging pin 98A32301012000 in rigging
hole 1 but possible to insert a pin of diameter 7.1 mm (0,279 in):
- Apply SUBTASK 326110-833-005 001 Adjust the control rod between
Doors and the NLG Sequence Valve before next flight.
DATE: Jul 17/12 SERVICE BULLETIN No.: A300-32-6110
REVISION No.: 00 - Jul 17/12 Page: 16
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 23

@A300-600
SERVICE BULLETIN
3
 If it is not possible to insert freely the rigging pin 98A32301012000 in rigging
hole 1 and not possible to insert a pin of diameter 7.1 mm (0,279 in):
- Adjust the mechanical linkages before next flight, (Refer to SUBTASK
326110-833-005 001 Adjust the control rod between Doors and the NLG
Sequence Valve ).
and
- Apply SUBTASK 326110-833-003 001 Install a Serviceable NLG
Sequence Valve and Lever within the compliance time given in the
Planning Information Paragraph E.(2).
(b) Send inspection report to AIRBUS, (Refer to Appendix 02 - Inspection Report -
NLG and MLG Sequence Valve ).
(4) Subtask 326110-832-004-001 - Do a Detailed Inspection of the adjustment of the
control rod between Doors and MLG Sequence Valve
Work Zones and Access Panels
Zone
 Access/Work location
731
741
Manpower Resources
Manhours
 0.50
Minimum number of person
 1
Subtask elapsed time
 0.50
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 32-31-37, Page Block 401
Fig. A-FBBAA
Inspection of the MLG Door Sequence
Valve
Sheet 01
(a) Check the correct adjustment of the control rod between doors and MLG sequence
valve by insertion of a rigging pin or pin of diameter 7.1 mm (0.279 in) in rigging
hole 1 and by installation of the rigging pin on the hole 2.
Refer to Fig. A-FBBAA Sheet 01
1
 If it is possible to insert freely the rigging pins 98A32301018000 and
98A32303002000 in rigging holes 1 and 2:
- No further action.
DATE: Jul 17/12 SERVICE BULLETIN No.: A300-32-6110
REVISION No.: 00 - Jul 17/12 Page: 17
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 24

@A300-600
SERVICE BULLETIN
2
 If it is not possible to insert freely the rigging pin 98A32301018000 in rigging
hole 1 but possible to insert a pin of diameter 7.1 mm (0,279 in) and possible
to insert freely the rigging pin 98A32303002000 in rigging hole 2:
- Apply SUBTASK 326110-833-006 001 Adjust the control rod between
Doors and the MLG Sequence Valve before next flight.
3
 If it is not possible to insert freely the rigging pin 98A32301018000 in rigging
hole 1 and not possible to insert a pin of diameter 7.1 mm (0,279 in) or not
possible to insert freely the rigging pin 98A32303002000 in rigging hole 2:
- Adjust the mechanical linkages before next flight, (Refer to SUBTASK
326110-833-006 001 Adjust the control rod between Doors and the MLG
Sequence Valve ).
and
- Apply SUBTASK 326110-833-004 001 Install a Serviceable MLG
Sequence Valve and Lever within the compliance time given in the
Planning Information Paragraph E.(2).
(b) Send inspection report to AIRBUS, (Refer to Appendix 02 - Inspection Report -
NLG and MLG Sequence Valve ).
(5) Subtask 326110-833-005-001 - Adjust the control rod between Doors and the NLG
Sequence Valve
Work Zones and Access Panels
Zone
 Access/Work location
711
Manpower Resources
Manhours
 1.00
Minimum number of person
 1
Subtask elapsed time
 1.00
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 32-31-18, Page Block 401
(a) Adjust the control rod between door and the NLG sequence valve, (Refer to AMM
32-31-18, Page Block 401).
NOTE
: There is no need at this stage to do the test procedure described in
AMM 32-31-18, Page Block 401.
(6) Subtask 326110-833-006-001 - Adjust the control rod between Doors and the MLG
Sequence Valve
Work Zones and Access Panels
Zone
 Access/Work location
731
DATE: Jul 17/12 SERVICE BULLETIN No.: A300-32-6110
REVISION No.: 00 - Jul 17/12 Page: 18
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 25

@A300-600
SERVICE BULLETIN
741
Manpower Resources
Manhours
 1.00
Minimum number of person
 1
Subtask elapsed time
 1.00
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 32-31-37, Page Block 401
(a) Adjust the control rod between doors and the MLG sequence valve, (Refer to AMM
32-31-37, Page Block 401).
NOTE
: There is no need at this stage to do the test procedure described in
AMM 32-31-37, Page Block 401.
(7) Subtask 326110-833-003-001 - Install a Serviceable NLG Sequence Valve and Lever
Work Zones and Access Panels
Zone
 Access/Work location
711
Manpower Resources
Manhours
 1.50
Minimum number of person
 1
Subtask elapsed time
 1.50
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 32-31-18, Page Block 401
(a) Remove the NLG sequence valve, (Refer to AMM 32-31-18, Page Block 401).
(b) Scrap the lever on the removed sequence valve and send the removed sequence
valve in shop.
(c) Install a serviceable NLG sequence valve (including lever), (Refer to AMM
32-31-18, Page Block 401).
(8) Subtask 326110-833-004-001 - Install a Serviceable MLG Sequence Valve and Lever
Work Zones and Access Panels
Zone
 Access/Work location
731
741
DATE: Jul 17/12 SERVICE BULLETIN No.: A300-32-6110
REVISION No.: 00 - Jul 17/12 Page: 19
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 26

@A300-600
SERVICE BULLETIN
Manpower Resources
Manhours
 1.50
Minimum number of person
 1
Subtask elapsed time
 1.50
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 32-31-37, Page Block 401
(a) Remove the MLG sequence valve, (Refer to AMM 32-31-37, Page Block 401).
(b) Scrap the lever on the removed sequence valve and send the removed sequence
valve in shop.
(c) Install a serviceable MLG sequence valve (including lever), (Refer to AMM
32-31-37, Page Block 401).
D. TEST
(1) Subtask 326110-700-001-001 - Test
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 32-31-00, Page Block 501
(a) If only NLG sequence valve(s) have been replaced:
1
 Do a Nose Gear Functional test Main Gear on ground (Refer to AMM
32-31-00, Page Block 501).
(b) If MLG sequence valve(s) have been replaced:
1
 Do a gear Normal Extension and Retraction functional test (Refer to AMM
32-31-00, Page Block 501).
NOTE
: Landing Gear tests are not required if adjustment only has
been performed.
E. CLOSE-UP
(1) Subtask 326110-942-001-001 - Close-up
Manpower Resources
Skills
 NON SPECIFIC
DATE: Jul 17/12 SERVICE BULLETIN No.: A300-32-6110
REVISION No.: 00 - Jul 17/12 Page: 20
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 27

@A300-600
SERVICE BULLETIN
References
Aircraft Maintenance Manual (AMM)
 12-12-29, Page Block 001
29-10-00, Page Block 301
29-14-00, Page Block 301
32-12-11, Page Block 301
32-22-11, Page Block 301
(a) Pressurize green hydraulic system (R efer to AMM 29-10-00, Page Block 301).
(b) Pressurize green hydraulic reservoir (Refer to AMM 29-14-00, Page Block 301).
(c) Close the MLG doors (Refer to AMM 32-12-11, Page Block 301).
(d) Close the NLG doors (Refer to AMM 32-22-11, Page Block 301).
(e) Replenish hydraulic reservoirs as necessary if not already done in Test procedure
(Refer to AMM 12-12-29, Page Block 001).
(f) Remove access platforms.
(g) Restore the systems and the aircraft to normal operating condition.
DATE: Jul 17/12 SERVICE BULLETIN No.: A300-32-6110
REVISION No.: 00 - Jul 17/12 Page: 21
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 28

@A300-600
SERVICE BULLETIN
**CONF ALL
A
Z711
A B
C
NLG SEQUENCE VALVE
SEQUENCE VALVE LEVER
RIGGING PIN
P/N: 98A−3230−1012−000
OR
PIN OF 7.1 mm (0.279 in) DIAMETER
HOLE 1
LH SIDE SHOWN
B C
PIN SHEARING INDICATING AREA
D_SB_326110_5_BAAA_01_03
Figure A-F BAAA - S heet 01
Inspection of the NLG Door Sequence Valve
DATE: Jul 17/12 SERVICE BULLETIN No.: A300-32-6110
REVISION No.: 00 - Jul 17/12 Page: 22
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 29

@A300-600
SERVICE BULLETIN
**CONF ALL
Z741
Z731
C
LH SIDE SHOWN
RH SIDE SYMMETRICAL
A B
A
B
FWD
RIGGING HOLE FOR RIGGING PIN 98A−3230−1018−000 OR
PIN OF 7.1 mm (0.279 in) DIAMETER
MLG SEQUENCE
VALVE
RIGGING HOLE
FOR RIGGING PIN
98A−3230−3002−000
PIN SHEARING
LH SIDE SHOWN
RH SIDE SYMMETRICAL
HOLE 1
HOLE 2
C
LEVER AREAINDICATING AREA
D_SB_326110_5_BBAA_01_03
Figure A-F BBAA - S heet 01
Inspection of the MLG Door Sequence Valve
DATE: Jul 17/12 SERVICE BULLETIN No.: A300-32-6110
REVISION No.: 00 - Jul 17/12 Page: 23
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 30

@A300-600
SERVICE BULLETIN
**CONF ALL
QUESTION
ACTION
FINDING
AND THE PIN SHEARING INDICATING AREA
AT THRESHOLD GIVEN IN PLANNING INFORMATION PARAGRAPH E.(2).
YES
DO A DETAILED INSPECTION OF THE SEQUENCE VALVE LEVER
FINDING
DAMAGE
FREELY/EASILY THE
TO INSERT
POSSIBILITY
RIGGING PIN
REFER TO SUBTASK 326110−832−001−001 AND 326110−832−002−001
NO
MECHANICAL LINKAGES BETWEEN DOORS AND NLG (NOSE LANDING
DO A DETAILED INSPECTION OF THE ADJUSTMENT OF THE
GEAR) AND MLG (MAIN LANDING GEAR) SEQUENCE VALVES
REFER TO SUBTASK 326110−832−003−001 AND 326110−832−004−001
YESNO
NO FURTHER
ACTION
7.1 mm (0.279 in)
TO INSERT A PIN OF
POSSIBILITY
DIAMETER
YESNO
ADJUST THE MECHANICAL LINKAGES
REFER TO SUBTASK
326110−833−005−001 AND
NO FURTHER ACTION
326110−833−006−001
*
ADJUST THE MECHANICAL LINKAGES
REFER TO SUBTASK
326110−833−005−001 AND
326110−833−006−001
NOTE:
THE PIN OF 7.1 mm (0.279 in) DIAMETER IS VALID ONLY FOR HOLE 1 FOR NLG AND MLG*
NO FURTHER ACTION
AND
SEQUENCE VALVE
(INCLUDING LEVER)
INSTALL A SERVICEABLE
326110−833−003−001
AND/OR 326110−833−004−001
SEND THE INVOLVED
 SEQUENCE VALVE IN SHOP
(SCRAP THE LEVER)
REFER TO SUBTASKS
D_SB_326110_5_FAAA_01_05
Figure A-FFAAA - Sheet 01
Flow Chart
DATE: Jul 17/12 SERVICE BULLETIN No.: A300-32-6110
REVISION No.: 00 - Jul 17/12 Page: 24
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 31

@A300-600
SERVICE BULLETIN
Appendix 01 - Elapsed Time Assumption
**CONF ALL
(1) The following chart is only a proposal operators may determine that another way to do the work is
more suitable for them.
DATE: Jul 17/12 SERVICE BULLETIN No.: A300-32-6110
REVISION No.: 00 - Jul 17/12 Page: 1
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 32

@A300-600
SERVICE BULLETIN
Appendix 01 - Elapsed Time Assumption
**CONF ALL
ELAPSED TIME ASSUMPTION SERVICE BULLETIN No. A300−32−6110
SB ELAPSED TIME
(HOURS)
GET ACCESS
MH ET/S
TOTAL MANHOURS
SB ELAPSED TIME
10.00
5.00
STEPS
1.00 0.50
1 2 3 4 50
INSPECTION OF THE NLG SEQUENCE VALVE LEVER AREA AND THE PIN SHEARING AREA 0.25 0.25
INSPECTION OF THE MLG SEQUENCE VALVE LEVER AREA AND THE PIN SHEARING AREA 0.25 0.25
INSPECTION OF THE ADJUSTEMENT OF THE MECHANICAL LINKS BETWEEN DOORS 0.50 0.50
INSPECTION OF THE ADJUSTEMENT OF THE MECHANICAL LINKS BETWEEN DOORS 0.50 0.50
TEST 1.00 0.50
CLOSE−UP 1.00 0.50
MH
ET/S:
PER
MANHOURS
ELAPSED TIME PER STEP
NUMBER OF PERSONS
01
02
THIS CHART IS ONLY A PROPOSAL.
OPERATORS MAY DETERMINE THAT ANOTHER WAY
TO DO THE WORK IS MORE SUITABLE FOR THEM.
01
02
NOTES:
PER
2
1
1
1
1
2
2
ADJUST THE MECHANICAL LINKS BETWEEN DOORS AND THE INVOLVED 1.00 1.00 1
:
:
IF A VSB IS INVOLVED, THE ASSOCIATED MANHOURS
ARE NOT REFLECTED IN THIS GANTT CHART.
AND NLG SEQUENCE VALVE
AND MLG SEQUENCE VALVE
NLG SEQQUENCE VALVES
ADJUST THE MECHANICAL LINKS BETWEEN DOORS AND THE INVOLVED 1.00 1.00 1
MLG SEQQUENCE VALVES
SEND THE INVOLVED NLG SEQUENCE VALVE 0.25 0.251
INSTALL A SERVICEABLE NLG SEQUENCE VALVE 1.50 1.50 1
SEND THE INVOLVED MLG SEQUENCE VALVE 0.25 0.251
INSTALL A SERVICEABLE MLG SEQUENCE VALVE 1.50 1.50 1
D_SB_326110_5_AAAA_01_00
Figure A-F AAAA - S heet 01
Elapsed Time Assumption
DATE: Jul 17/12 SERVICE BULLETIN No.: A300-32-6110
REVISION No.: 00 - Jul 17/12 Page: 2
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 33

@A300-600
SERVICE BULLETIN
Appendix 02 - Inspection Report - NLG and MLG Sequence Valve
**CONF ALL
The results of the inspection, including no findings, replacement or action to be done, must be
forwarded to AIRBUS Depar tment SEEL3, on the attached inspec tion report sheet.
DATE: Jul 17/12 SERVICE BULLETIN No.: A300-32-6110
REVISION No.: 00 - Jul 17/12 Page: 1
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 34

@A300-600
SERVICE BULLETIN
Appendix 02 - Inspection Report - NLG and MLG Sequence Valve
**CONF ALL
INSPECTION REPORT
SERVICE BULLETIN No. :
A/C MSN :
FLIGHT CYCLES :
FLIGHT HOURS :
A300−32−6110
DATE OF INSPECTION :
RETURN TO :
AIRBUS
CUSTOMER SERVICES ENGINEERING − SEEL3
LANDING GEAR SYSTEMS A330/A340 & WIDE BODY
INSPECTION METHOD : DETAILED INSPECTION
1 ROND POINT MAURICE BELLONTE
31707 BLAGNAC CEDEX
FRANCE
FAX +33 (0)5 61 93 32 73
DETAILED INSPECTION
DAMAGE FOUND
DETAILED INSPECTION
RIGGING PIN INSERTED
FREELY/EASILY
PIN OF 7.1 mm (0.279 in)
DIAMETER INSERTED
LH
RH
NLG SEQUENCE VALVE
DETAILED INSPECTION
DAMAGE FOUND
DETAILED INSPECTION
RIGGING PIN INSERTED
FREELY/EASILY
PIN OF 7.1 mm (0.279 in)
DIAMETER INSERTED
LH
RH
MLG SEQUENCE VALVE
D_SB_326110_5_RAAA_01_02
Figure A-FRAAA - Sheet 01
Inspection Report - NLG and MLG Sequence Valve
DATE: Jul 17/12 SERVICE BULLETIN No.: A300-32-6110
REVISION No.: 00 - Jul 17/12 Page: 2
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 35

@A300-600
SERVICE BULLETIN
REPORTING SHEET
TITLE: LANDING GEAR - NORMAL EXTENSION AND RETRACTION -
INSPECTION OF NLG AND MLG SEQUENCE VALVES
MODIFICATION No.: None
Please complete the appropriate item (A or B):
A - SB WILL BE
 embodied YES/NO (if NO please comment)
If YES, aircraft concer ned (as per SB effectivity by default) and planned dates (month/year) of
embodiment:
B - SB HAS BEEN
 embodied on aircraft:
Operator comments:
From Airline:
Name/Title:
Signature: Date:
If operational documentation is affected (see Paragraph 1.K of this SB): If information is needed prior to
next normal revision or prior to SB embodiment, please indicate required service(s):
Either: Modification Operational Impact (MOI), if available YES/NO
Or : Intermediate revision YES/NO
Important Information:
 This SB will only be incorporated in your maintenance and operational
documentation if this sheet is returned to Airbus and signed by a duly authorised representative. With
the next feasible revision, this will result in
- Updating of maintenance documentation to show pre and post SB data.
- Updating of maintenance and operational documentation to show post SB data after embodiment.
If this SB requires previous or simultaneous accomplishment of other SBs, Airbus shall automatically
include them in the manual revisions. Refer to SIL 00-037 for detailed information.
Please return this completed sheet to:
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX FRANCE
Attn: SDC32 Technical Data and Documentation Services
F A X :( + 3 3 )56 19 32 80 6
e-mail: sb.reporting@airbus.com
or via your Resident Customer Support Office.
Alternatively, SB lists via letters or fax are also accepted.
DATE: Jul 17/12 SERVICE BULLETIN No.: A300-32-6110
REVISION No.: 00 - Jul 17/12 Page: 1
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 36

@A300-600
SERVICE BULLETIN
QUALITY PERCEPTION FORM
Use this form to tell us what is your perception of the quality of this Service Bulletin. The reported data
that you provide us will be used to analyse areas of difficulties and to take corrective action to further
improve the quality of our Service Bulletins.
We thank you for the time you have taken in completing this form.
(Please rate on a scale of 1 to 4, with 4 being the highest score)
- Quality rating of this SB 4321
- Quality rating of the Accomplishment Instructions 4321
- Quality rating of the Illustrations 4321
- Is this SB easy to understand ? Y/N
If you have had difficulties in the accomplishment of this SB please quote below the area(s) and give a
short description of the issue.
Planning Material Instructions
X Effectivity X Kit content X Preparation
X Reason X List of Materials Operator Supplied X Mod/Inspection
X Manpower X Industry support X Test
X References X Re-identification X Close-Up
X Publication X Tooling X Illustrations
Comments:
Operator: Date:
Name/Title:
Please return this form to:
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX FRANCE
Attn : SEM4 Service Bulletins Management
F A X:( 3 3 )56 19 34 25 1
Or via your Resident Customer Support Office.
DATE: Jul 17/12 SERVICE BULLETIN No.: A300-32-6110
REVISION No.: 00 - Jul 17/12 Page: 1
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
