# Airbus Service Bulletin A300-32-6111

Copy: Revision 01 ("U.S. DOT/FAA - Service Bulletin A300-32-6111 Revision 01"), 36 pages: PDF https://openairdocs.org/files/sha256/f2/bd/f2bd270152b7d184d94ebda764ccac9dc8b4a4e848d71991f7113eee646c1ec2; text https://openairdocs.org/service-documents/airbus/a300-32-6111/file/f2bd270152b7.md. Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2014-0137; AD 2014-17-07 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Airbus](https://openairdocs.org/service-documents/airbus.md)
- Type: Service bulletin (Service Bulletin)
- Number: A300-32-6111
- Latest revision known: A300-32-6111, Revision 01, dated April 25, 2013 (OpenAirDocs)
- Page: https://openairdocs.org/service-documents/airbus/a300-32-6111

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2014-17-07](https://openairdocs.org/ad/2014-17-07.md), effective Oct 8, 2014: Revision 01

Also cited in [1 proposed AD](https://openairdocs.org/service-documents/airbus/a300-32-6111/proposed.md).

## Text (36 pages)

Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2014-0137; AD 2014-17-07 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

@A300-600
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
MANDATORY
 MANDATORY
 MANDATORY
ATA SYSTEM: 32
TITLE: LANDING GEAR - NORMAL EXTENSION AND RETRACTION -
INSPECTION OF UPLOCK SPRINGS
MODIFICATION No.: None
This page transmits Revision No.01 of Service Bulletin No.A300-32-6111
ADDITIONAL WORK
**CONF ALL
No additional work is required by this revision for aircraft modified by any previous issue.
REASON
Revision No. 01 issued:
- modify table 1 threshold value column and repetitive interval value column.
- modify table 2 threshold value column and repetitive interval value column.
- update figures.
CHANGES
SUMMARY
EFFECTIVITY
 OPERATOR LIST UPDATED
 R
Fig. A-FSAAA
 FIGURE SOLUTION UPDATED
 R
Fig. A-FSAAA Sheet 01
 SHEET UPDATED
 R
Fig. A-FSAAA Sheet 02
 SHEET DELETED
 D
Fig. A-FSCAA
 FIGURE SOLUTION ADDED
 N
Fig. A-FSCAA Sheet 01
 SHEET ADDED
 N
Fig. A-FSBAA
 FIGURE SOLUTION UPDATED
 R
Fig. A-FSBAA Sheet 01
 SHEET UPDATED
 R
Fig. A-FSBAA Sheet 02
 SHEET DELETED
 D
Fig. A-FSDAA
 FIGURE SOLUTION ADDED
 N
Fig. A-FSDAA Sheet 01
 SHEET ADDED
 N
DATE: Jul 20/12 SERVICE BULLETIN No.: A300-32-6111
REVISION No.: 01 - Apr 25/13 Page: 1
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 2

@A300-600
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
PLANNING INFORMATION
EFFECTIVITY
 EFFECTIVITY RELATED INFORMATION
UPDATED
R
Configuration definition
CONF 001
 CONFIGURATION DEFINITION UPDATED
 R
COMPLIANCE
Accomplishment Timescale
 ACCOMPLISHMENT TIMESCALE UPDATED
CONFIGURATION UPDATED
R
ACCOMPLISHMENT INSTRUCTIONS
Fig. A-FBAAA
Fig. A-FBAAA Sheet 01
 SHEET UPDATED
 R
Fig. A-FBAAA Sheet 02
 SHEET UPDATED
 R
Fig. A-FBBAA
Fig. A-FBBAA Sheet 01
 SHEET UPDATED
 R
Fig. A-FBBAA Sheet 02
 SHEET UPDATED
 R
FILLING INSTRUCTIONS
This Service Bulletin has been generated electronically and is reissued as a complete document.
Replace the complete document.
Put this Revision Transmittal Sheet in front of the Service Bulletin.
HISTORY OF PREVIOUS REVISIONS
No previous revision
REVISION SEQUENCE
ORIGINAL: Jul 20/12
REVISION No. : 01 - Apr 25/13
DATE: Jul 20/12 SERVICE BULLETIN No.: A300-32-6111
REVISION No.: 01 - Apr 25/13 Page: 2
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 3

@A300-600
SERVICE BULLETIN
SUMMARY
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
This summary is for information only and is not approved for modification of the aircraft.
MANDATORY
 MANDATORY
 MANDATORY
ATA SYSTEM: 32
TITLE: LANDING GEAR - NORMAL EXTENSION AND RETRACTION -
INSPECTION OF UPLOCK SPRINGS
**CONF ALL
MODIFICATIONS
None
REASON/DESCRIPTION/OPERATIONAL CONSEQUENCES
Airbus has analysed in-service events reported by Messier-Bugatti-Dowty concerning some cases of
NLG and MLG Door and Leg Uplock spring ruptures on A300, A310 or A300-600 aircraft.
Springs within the uplock are used to either lock the gear or the door in the up position or to participate
in emergency mechanical unlocking.
The springs are positioned in pairs and in case of rupture of one spring the other one remains to fulfil
the function.
The rupture of one spring has no consequence on the operation of the uplock whereas the rupture of
both springs will disable the locking function or the emergency unlocking function..
This Service Bulletin is published to advise all operators of the issue of MESSIER-BUGATTI-DOWTY
Service Bulletin No. 470-32-206 and MESSIER-BUGATTI-DOWTY Se rvice Bulletin No. 470-32-880.
This Service Bulletin includes a detailed inspection of the NLG and MLG Door and Leg Uplock springs
and replacement in case of finding.
Accomplishment of this Service Bulletin will ensure correct operation of the NLG and MLG Door and
Leg Uplocks.
GENERAL EVALUATION
EVALUATION TABLE
COMPLIANCE
 MANDATORY (1)
 CANCELS INSPECTION SB
 NO
POTENTIAL AD
 YES
 A/C OPERATION AFFECTED
 NO
RELIABILITY AFFECTED
 NO
 PAX COMFORT AFFECTED
 NO
DATE: Jul 20/12 SERVICE BULLETIN No.: A300-32-6111
REVISION No.: 01 - Apr 25/13 Page: 1
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 4

@A300-600
SERVICE BULLETIN
SUMMARY
EVALUATION TABLE
COST SAVING
 NO
 ETOPS AFFECTED
 NO
STRUCTURAL LIFE EXTN
 NO
 VENDOR SB INVOLVED
 YES
A/C JACKING
 YES
NOTE
 (1)
: Service Bulletin must be accomplished.
NOTE
: A/C jacking is necessary if functional tests are required.
MATERIAL PRICE INFORMATION
No Material
EFFECTIVITY
This Service Bulletin is applicable to this (these) operator(s) :
14S
 34Z 77T ABD ABR
 AHK BCS CES F2I FDX G8E I2L
 IRA
IRM KAC KAL MNB MON MSR MXU OHY QTR RLB
 SUD TAR THA
TMA U1T
 UPS URS UZB
CONCURRENT REQUIREMENTS
None
REFERENCES / REPERCUSSIONS
TFU
 None
OEB
 None
AOT
 None
SIL
 None
LINE MAINTENANCE AFFECTED
 No
LIFE LIMIT
 None
OTHER
 None
NATURE OF THE WORK
AIRCRAFT
 YES
EQUIPMENT
 NO
HARD
 NO
SOFT
 NO
OBRM
 NO
MANPOWER
Task 326111-832-801-001: Inspection
TOTAL MANHOURS
 9.00
ELAPSED TIME (HOURS)
 9.00
Additional manhours relat ed to Vendor SB; refer to:
DATE: Jul 20/12 SERVICE BULLETIN No.: A300-32-6111
REVISION No.: 01 - Apr 25/13 Page: 2
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 5

@A300-600
SERVICE BULLETIN
SUMMARY
Task 326111-832-801-001: Inspection
Do a Detailed Inspection of the MLG and MLG Door
Uplock Springs
MESSIER-BUGATTI-DOWTY
Service Bulletin No. 470-32-206
MESSIER-BUGATTI-DOWTY
Service Bulletin No. 470-32-880
Do a Detailed Inspection of the NLG and NLG Door
Uplock Springs
MESSIER-BUGATTI-DOWTY
Service Bulletin No. 470-32-206
MESSIER-BUGATTI-DOWTY
Service Bulletin No. 470-32-880
APPENDICES
Appendix 01 : Inspection Report
DATE: Jul 20/12 SERVICE BULLETIN No.: A300-32-6111
REVISION No.: 01 - Apr 25/13 Page: 3
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 6

@A300-600
SERVICE BULLETIN
SUMMARY
**CONF ALL
A
LH SIDE SHOWN
RH SIDE SYMMETRICAL
A
A
B
FR47
FR50
FR54
B
B
A A
NOTE:
01
01
DEPENDING ON THE PN, THERE ARE 1 PAIR OF
SPRINGS OR 2 PAIRS OF SPRINGS AT THIS POSITION
FREE FALL SPRINGS
SPRINGS ATTACHED TO THE HOOK
(HOOK SPRINGS)  AND 
SPRINGS ATTACHED TO THE LEVER
A
 − Z147 Z148
(LEVER SPRINGS)
D_SB_326111_5_SAAA_01_09
Figure A-F SAAA - S heet 01
Main Landing Gear Uplock
DATE: Jul 20/12 SERVICE BULLETIN No.: A300-32-6111
REVISION No.: 01 - Apr 25/13 Page: 4
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 7

@A300-600
SERVICE BULLETIN
SUMMARY
**CONF ALL
A
FR47
FR50
FR54
HOOK SPRINGS TO BE INSPECTED
LH SIDE SHOWN
RH SIDE SYMMETRICAL
B
B
B
A A
A
A
A
 − Z147 Z148
D_SB_326111_5_SCAA_01_00
Figure A-FSCAA - Sheet 01
Main Landing Gear Door Uplock
DATE: Jul 20/12 SERVICE BULLETIN No.: A300-32-6111
REVISION No.: 01 - Apr 25/13 Page: 5
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 8

@A300-600
SERVICE BULLETIN
SUMMARY
**CONF ALL
 − Z123 Z124
A
A
A
A
A A
PAIR OF HOOK SPRINGS TO BE INSPECTED
PAIR OF FREE FALL SPRINGS TO BE INSPECTED
D_SB_326111_5_SBAA_01_02
Figure A-F SBAA - S heet 01
Nose Landing Gear Uplock
DATE: Jul 20/12 SERVICE BULLETIN No.: A300-32-6111
REVISION No.: 01 - Apr 25/13 Page: 6
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 9

@A300-600
SERVICE BULLETIN
SUMMARY
**CONF ALL
 − Z123 Z124
HOOK SPRING TO BE INSPECTED
A
A
A
A
A A
D_SB_326111_5_SDAA_01_00
Figure A-FSDAA - Sheet 01
Nose Landing Gear Door Uplock
DATE: Jul 20/12 SERVICE BULLETIN No.: A300-32-6111
REVISION No.: 01 - Apr 25/13 Page: 7
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 10

@A300-600
SERVICE BULLETIN
SUMMARY
This Page Intentionally Left Blank
DATE: Jul 20/12 SERVICE BULLETIN No.: A300-32-6111
REVISION No.: 01 - Apr 25/13 Page: 8
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 11

@A300-600
SERVICE BULLETIN
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
MANDATORY
 MANDATORY
 MANDATORY
ATA SYSTEM: 32
TITLE: LANDING GEAR - NORMAL EXTENSION AND RETRACTION -
INSPECTION OF UPLOCK SPRINGS
MODIFICATION No.: None
This document contains AIRBUS PROPRIETARY INFORMATION and shall at all times remain the
property of AIRBUS; no intellectual property right or licence is granted by AIRBUS in connection with
any information contained in it. It is delivered on the express condition that said document and the
information contained in it shall be treated as confidential, shall not be used for any purpose other than
that for which it is hereby delivered. It shall not be disclosed in whole or in part to third parties and shall
not be duplicated in any manner (except for the purposes of performing the tasks described hereunder
and provided that any recipient of such document shall comply with the conditions herein), without
AIRBUS prior written consent.
1. PLANNING INFORMATION
**CONF ALL
A. EFFECTIVITY
(1) Models
B4-603 B4-605R B4-620 B4-622 B4-622R C4-605R/F C4-620 F4-605R
F4-622R
(2) Effectivity by MSN
0284 0294 0301 0307 0312 0321 0336 0344 0348 0351 0358 0361 0365 0380 0388
0401 0405 0408 0411 0414 0417 0462
 0464-0465
 0477 0479 0505-0506
 0509
 0514
0516
 0518
 0521 0525 0529-0530 0532 0536 0540 0543 0546 0553-0561 0563 0566
0569 0572 0575 0577 0579 0581-0582 0584 0602-0605
 0607-0611
 0613-0614
0617-0618 0621 0623 0625-0633 0635 0637 0641 0643 0657 0659 0662 0664 0666
0668 0670 0673 0677 0679 0681 0683 0685 0688 0692 0694 0696 0699 0701 0703
0705 0707 0709 0711 0713 0715 0717 0719 0721-0746
 0748-0750
 0752-0764
0766-0775 0777-0794 0797 0799-0841 0845-0878
DATE: Jul 20/12 SERVICE BULLETIN No.: A300-32-6111
REVISION No.: 01 - Apr 25/13 Page: 1
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 12

@A300-600
SERVICE BULLETIN
(3) Effectivity by Operator
The Operator/MSN relationship is provided for information only and is correct at the time
of issue in accordance with the information available to AIRBUS. Any future changes
resulting from transfer of an aircraft from one operator to another will not be reflected in
this list unless the Service Bulletin is revised for another reason.
OPERATOR
 MSN
14S
 0609
34Z
 0685 0692 0731
77T
 0838
ABD
 0529
 0557
ABR
 0683
 0770
AHK
 0855 0856 0857 0858 0859 0860 0870 0871
BCS
 0602
 0617
 0621 0637 0641 0670 0679 0703 0711 0724 0729 0730
0737 0740 0753 0783
CES
 0521 0525 0532 0707 0725 0732 0741 0746 0754 0763
F2I
 0284 0294 0301 0307 0312 0321 0336 0348 0351 0518 0610
FDX
 0358 0361 0365 0388 0417 0477 0479 0530 0536 0543 0555 0559
0572 0575 0579 0581 0611 0613 0625 0630 0633 0657 0659 0664
0668 0688 0709 0713 0715 0726 0728 0735 0736 0738 0742 0745
0748 0752 0757 0759 0760 0761 0766 0768 0769 0771 0772 0774
0777 0778 0779 0780 0781 0789 0790 0791 0792 0793 0794 0799
0800 0801 0802 0803 0804 0873 0874 0875 0876 0877 0878
G8E
 0462 0465 0506 0509 0514 0516
I2L
 0677
 0743
IRA
 0632 0696 0723 0727
IRM
 0380 0401 0405 0408 0411 0414 0546 0553 0608 0618 0623 0701
0750 0762 0773
KAC
 0344 0673 0694 0699 0719 0721
KAL
 0582 0627 0631 0662
MNB
 0734 0739 0755 0756 0758
MON
 0540 0556 0604 0605
MSR
 0561 0607
MXU
 0767 0788 0797 0836 0837
OHY
 0584 0603 0744 0749 0764
QTR
 0554 0560 0614
RLB
 0626
 0643
SUD
 0666 0775
TAR
 0505 0558 0563
THA
 0464 0566 0569 0577 0629 0635 0681 0705 0782 0784 0785 0786
0787
TMA
 0872
U1T
 0628
UPS
 0805 0806 0807 0808 0809 0810 0811 0812 0813 0814 0815 0816
0817 0818 0819 0820 0821 0822 0823 0824 0825 0826 0827 0828
0829 0830 0831 0832 0833 0834 0835 0839 0840 0841 0845 0846
0847 0848 0849 0850 0851 0852 0853 0854 0861 0862 0863 0864
0865 0866 0867 0868 0869
DATE: Jul 20/12 SERVICE BULLETIN No.: A300-32-6111
REVISION No.: 01 - Apr 25/13 Page: 2
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 13

@A300-600
SERVICE BULLETIN
OPERATOR
 MSN
URS
 0733
UZB
 0717 0722
(4) Configuration by MSN
MSN
 CONFIGURATION
0284 0294 0301 0307 0312 0321 0336 0344 0348 0351 0358
0361 0365 0380 0388 0401 0405 0408 0411 0414 0417 0462
0464 0465 0477 0479 0505 0506 0509 0514 0516 0518 0521
0525 0529 0530 0532 0536 0540 0543 0546 0553 0554 0555
0556 0557 0558 0559 0560 0561 0563 0566 0569 0572 0575
0577 0579 0581 0582 0584 0602 0603 0604 0605 0607 0608
0609 0610 0611 0613 0614 0617 0618 0621 0623 0625 0626
0627 0628 0629 0630 0631 0632 0633 0635 0637 0641 0643
0657 0659 0662 0664 0666 0668 0670 0673 0677 0679 0681
0683 0685 0688 0692 0694 0696 0699 0701 0703 0705 0707
0709 0711 0713 0715 0717 0719 0721 0722 0723 0724 0725
0726 0727 0728 0729 0730 0731 0732 0733 0734 0735 0736
0737 0738 0739 0740 0741 0742 0743 0744 0745 0746 0748
0749 0750 0752 0753 0754 0755 0756 0757 0758 0759 0760
0761 0762 0763 0764 0766 0767 0768 0769 0770 0771 0772
0773 0774 0775 0777 0778 0779 0780 0781 0782 0783 0784
0785 0786 0787 0788 0789 0790 0791 0792 0793 0794 0797
0799 0800 0801 0802 0803 0804 0805 0806 0807 0808 0809
0810 0811 0812 0813 0814 0815 0816 0817 0818 0819 0820
0821 0822 0823 0824 0825 0826 0827 0828 0829 0830 0831
0832 0833 0834 0835 0836 0837 0838 0839 0840 0841 0845
0846 0847 0848 0849 0850 0851 0852 0853 0854 0855 0856
0857 0858 0859 0860 0861 0862 0863 0864 0865 0866 0867
0868 0869 0870 0871 0872 0873 0874 0875 0876 0877 0878
001
(5) Configuration definition
**CONF 001
Config. 001 is valid for all the aircraft given in the effectivity of this Service Bulletin as a
standard configuration.
(6) Material Effectivity
B. CONCURRENT REQUIREMENTS
None
C. REASON
(1) History
Airbus has analysed in-service events reported by Messier-Bugatti-Dowty concerning
some cases of NLG and MLG Door and Leg Uplock spring ruptures on A300, A310 or
A300-600 aircraft.
DATE: Jul 20/12 SERVICE BULLETIN No.: A300-32-6111
REVISION No.: 01 - Apr 25/13 Page: 3
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 14

@A300-600
SERVICE BULLETIN
Springs within the uplock are used to either lock the gear or the door in the up position
or to participate in emergency mechanical unlocking.
The springs are positioned in pairs and in case of rupture of one spring the other one
remains to fulfil the function.
The rupture of one spring has no consequence on the operation of the uplock whereas
the rupture of both springs will disable the locking function or the emergency unlocking
function..
(2) Objective/Action
This Service Bulletin is published to adv ise all operators of t he issue of MESSIER-
BUGATTI-DOWTY Service Bulletin No. 470-32-206 and M ESSIER-BUGATTI-DOWTY
Service Bulletin No. 470-32-880.
This Service Bulletin includes a detailed inspection of the NLG and MLG Door and Leg
Uplock springs and replacement in case of finding.
(3) Advantages
Accomplishment of this Service Bulletin will ensure correct operation of the NLG and
MLG Door and Leg Uplocks.
(4) Operational/Maintenance Consequences
None
D. DESCRIPTION
To accomplish this Service Bulletin it is necessary to :
Task 326111-832-801-001: Inspection
(1) Do a Detailed Inspection of the MLG and MLG Door Uplock Springs
(2) Do a Detailed Inspection of the NLG and NLG Door Uplock Springs
(3) Replace the involved MLG door uplock
(4) Replace the involved MLG uplock
(5) Replace the involved NLG door uplock
(6) Replace the involved NLG uplock
E. COMPLIANCE
(1) Classification
MANDATORY: Service Bulletin must be accomplished.
DATE: Jul 20/12 SERVICE BULLETIN No.: A300-32-6111
REVISION No.: 01 - Apr 25/13 Page: 4
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 15

@A300-600
SERVICE BULLETIN
(2) Accomplishment Timescale
TABLE 1 : DETAILED INSPECTION OF MLG AND MLG DOOR UPLOCK SPRINGS
COMPLIANCE TIME
Condition
 Action
THRESHOLD (whichever
occurs first)
GRACE PERIOD
Repetitive
Interval
Config.001
 Apply SUBTASK
326111-832-001 001
D oaD e t a i l e d
Inspection of the MLG
and MLG Door Uplock
Springs
18 months from the Service
Bulletin issuance date
None
 Repeat
this
inspection
SB every
18
months
Spring is
not broken
and not
damaged
None
 None
 Repeat
this
inspection
SB every
18
months
Hook
spring is
broken or
damaged
on MLG
door
uplock
Apply SUBTASK
326111-833-001 001
Replace the involved
MLG door uplock
before the next flight
 2 months
 Repeat
this
inspection
SB every
18
months
Free fall
spring is
broken or
damaged
on MLG
uplock
Apply SUBTASK
326111-833-002 001
Replace the involved
MLG uplock
before the next flight
 1,000 FC with
inspection every 50
FC, refer SUBTASK
326111-832-001-001
para. (1).(b)
Repeat
this
inspection
SB every
18
months
Two free
fall springs
are broken
or
damaged
on MLG
uplock
Apply SUBTASK
326111-833-002 001
Replace the involved
MLG uplock
before the next flight
 None
 Repeat
this
inspection
SB every
18
months
Hook
and/or
Lever
springs are
broken or
damaged
on MLG
uplock
Apply SUBTASK
326111-833-002 001
Replace the involved
MLG uplock
before the next flight
 1,000 FC with
inspection every 50
FC, refer SUBTASK
326111-832-001-001
para. (1).(b)
Repeat
this
inspection
SB every
18
months
Table 1
DATE: Jul 20/12 SERVICE BULLETIN No.: A300-32-6111
REVISION No.: 01 - Apr 25/13 Page: 5
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 16

@A300-600
SERVICE BULLETIN
TABLE 2 : DETAILED INSPECTION OF NLG AND NLG DOOR UPLOCK SPRINGS
COMPLIANCE TIME
Condition
 Action
THRESHOLD (whichever
occurs first)
GRACE PERIOD
Repetitive
Interval
Config.001
 Apply SUBTASK
326111-832-002 001
D oaD e t a i l e d
Inspection of the NLG
and NLG Door Uplock
Springs
18 months from the Service
Bulletin issuance date
None
 Repeat
this
inspection
SB every
18 months
Spring is
not broken
and not
damaged
None
 None
 Repeat
this
inspection
SB every
18 months
Hook
spring is
broken or
damaged
on NLG
door
uplock
Apply SUBTASK
326111-833-003 001
Replace the involved
NLG door uplock
before the next flight
 2 months
 Repeat
this
inspection
SB every
18 months
Free fall
spring is
broken or
damaged
on NLG
uplock
Apply SUBTASK
326111-833-004 001
Replace the involved
NLG uplock
before the next flight
 1,000 FC with
inspection every 50 FC,
refer SUBTASK
326111-832-002-001
para. (2).(b)
Repeat
this
inspection
SB every
18 months
Two free
fall springs
are broken
or
damaged
on NLG
uplock
Apply SUBTASK
326111-833-004 001
Replace the involved
NLG uplock
before the next flight
 None
 Repeat
this
inspection
SB every
18 months
Hook
spring is
broken or
damaged
on NLG
uplock
Apply SUBTASK
326111-833-004 001
Replace the involved
NLG uplock
before the next flight
 1,000 FC with
inspection every 50 FC,
refer SUBTASK
326111-832-002-001
para. (2).(b)
Repeat
this
inspection
SB every
18 months
Table 2
This Service Bulletin has been classified Mandatory. It is expected that an Airworthiness
Directive (AD) published by the European Av iation Safety Agenc y (EASA) will be issued
to confirm this classification. It is anticipated that the AD will confirm the (thresholds
and/or intervals and/or date) given above but reference should be made to the AD for
confirmation of the mandated accomplishment timescale.
DATE: Jul 20/12 SERVICE BULLETIN No.: A300-32-6111
REVISION No.: 01 - Apr 25/13 Page: 6
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 17

@A300-600
SERVICE BULLETIN
F. APPROVAL
The technical content of this document is approved under the authority of Design
Organisation Approv al No. EASA. 21J.031.
If an aircraft listed in the effectivity has a modification or repair embodied that is not of
AIRBUS origin, and which affects the content of this Service Bulletin, the operator is
responsible for obtaining approval by its airworthiness authority for any adaptation necessary
before incorporation of the Service Bulletin.
G. MANPOWER
The manpower estimates given in this Service Bulletin are based on the direct labor cost to
do the work. These estimates assume that the work will be done by experienced personnel,
and may need to be revised upwards to suit operator’s circumstances. The estimates do not
include the time to prepare, plan or inspect the work. Manufacture and procurement of parts
and tools, drying times for paints, sealants, etc., and general administration work are also not
included.
Task 326111-832-801-001: Inspection
Get Access
 2.00
On Aircraft
Replace the involved MLG door uplock
 1.00
Replace the involved MLG uplock
 1.00
Replace the involved NLG door uplock
 1.00
Replace the involved NLG uplock
 1.00
Tests
 1.00
Close-Up
 2.00
TOTAL MANHOURS
 9.00
ELAPSED TIME (HOURS)
 9.00
Additional manhours relat ed to Vendor SB; refer to:
Do a Detailed Inspection of the MLG and MLG Door
Uplock Springs
MESSIER-BUGATTI-DOWTY
Service Bulletin No. 470-32-206
MESSIER-BUGATTI-DOWTY
Service Bulletin No. 470-32-880
Do a Detailed Inspection of the NLG and NLG Door
Uplock Springs
MESSIER-BUGATTI-DOWTY
Service Bulletin No. 470-32-206
MESSIER-BUGATTI-DOWTY
Service Bulletin No. 470-32-880
H. WEIGHT AND BALANCE
Not Changed
I. ELECTRICAL LOAD DATA
Not Changed
DATE: Jul 20/12 SERVICE BULLETIN No.: A300-32-6111
REVISION No.: 01 - Apr 25/13 Page: 7
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 18

@A300-600
SERVICE BULLETIN
J. REFERENCES
Aircraft Maintenance Manual (AMM)
 24-00-00 32-12-11 32-22-11
32-31-14 32-31-21 32-31-33
32-31-44
Elec. Std. Practices Manual (ESPM)
 20-55-00
Vendor Service B ulletin (VSB)
 MESSIER-BUGATTI-DOWTY
Service Bulletin No. 470-32-206
MESSIER-BUGATTI-DOWTY
Service Bulletin No. 470-32-880
K. PUBLICATION AFFECTED
Maintenance Planning Document (MPD)
 32-31-14
32-31-33
L. INTERCHANGEABILITY/MIXABILITY
Not Applicable
M. SPARES
None
DATE: Jul 20/12 SERVICE BULLETIN No.: A300-32-6111
REVISION No.: 01 - Apr 25/13 Page: 8
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 19

@A300-600
SERVICE BULLETIN
2. MATERIAL INFORMATION
**CONF ALL
A. MATERIAL - PRICE AND AVAILABILITY
(1) Procurement Addresses
Modification of removed equipment shoul d be negotiated direc tly with MESSIER-
BUGATTI-DOWTY as per instructions given in Service Bulletins No. 470-32-206 and
470-32-880.
(2) Price and Availability
No AIRBUS kit will be provided.
Refer to the Vendor Service Bulletins No. 470-32-206 and 470-32-880 for the equipment
modification sales terms.
B. INDUSTRY SUPPORT INFORMATION
Refer to the MESSIER-BUGA TTI-DOWTY Service Bulleti ns No. 470-32- 206 and 470-32-880
for the industry support terms of the Vendor Service Bulletin parts and labor.
C. LIST OF COMPONENTS
No Kit
D. LIST OF MATERIALS - OPERATOR SUPPLIED
None
E. PARTS TO BE RE-IDENTIFIED BY OPERATOR
None
F. TOOLING
None
DATE: Jul 20/12 SERVICE BULLETIN No.: A300-32-6111
REVISION No.: 01 - Apr 25/13 Page: 9
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 20

@A300-600
SERVICE BULLETIN
This Page Intentionally Left Blank
DATE: Jul 20/12 SERVICE BULLETIN No.: A300-32-6111
REVISION No.: 01 - Apr 25/13 Page: 10
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 21

@A300-600
SERVICE BULLETIN
3. ACCOMPLISHMENT INSTRUCTIONS
Task 326111-832-801-001 - Inspection
WARNING
: MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND ALL THE CAUTIONS
INCLUDED IN THE REFERENCED PROCEDURES.
CAUTION
: ALWAYS OBEY THE PRECAUTIONS THAT FOLLOW TO KEEP
ELECTRICAL WIRING IN A SATISFACTORY CONDITION (ELECTRICALLY
AND MECHANICALLY SERVICEABLE) . WHEN YOU DO MAINTENANCE
WORK, REPAIRS OR MODIFICATIONS, ALWAYS KEEP ELECTRICAL WIRING,
COMPONENTS AND THE WORK AREA AS CLEAN AS POSSIBLE. TO DO
THIS:
- PUT PROTECTION, SUCH AS PLASTIC SHEETING, CLOTHS, ETC; AS
NECESSARY ON WIRING AND COMPONENTS.
- REGULARLY REMOVE ALL SHAVINGS, UNWANTED MATERIAL AND
OTHER CONTAMINATION.
THESE PRECAUTIONS WILL DECREASE THE RISK OF CONTAMINATION
AND DAMAGE TO THE ELECTRICAL WIRING INSTALLATION.
IN CASE OF CONTAMINATION REFER TO ESPM 20-55-00.
Task Associated Data
Zone
123 124 147 148
Manpower
TOTAL MANHOURS
 9.00
ELAPSED TIME (HOURS)
 9.00
Additional manhours related to Vendor SB; refer to:
MESSIER-BUGATTI-DOWTY Se rvice Bulletin No. 470-32-206
MESSIER-BUGATTI-DOWTY Se rvice Bulletin No. 470-32-880
A. GENERAL
(1) Subtask 326111-839-001-001 - Administrative
Manpower Resources
Skills
 NON SPECIFIC
(a) Write in the applicable aircraft records that you have done all the work given in this
Service Bulletin.
DATE: Jul 20/12 SERVICE BULLETIN No.: A300-32-6111
REVISION No.: 01 - Apr 25/13 Page: 11
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 22

@A300-600
SERVICE BULLETIN
B. PREPARATION
(1) Subtask 326111-941-001-001 - Job Set-up
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 24-00-00, Page Block 301
32-12-11, Page Block 301
32-22-11, Page Block 301
32-31-14, Page Block 401
32-31-21, Page Block 401
32-31-33, Page Block 401
32-31-44, Page Block 401
(a) Make sure that the aircraft is electrically grounded (Refer to AMM 24-00-00, Page
Block 301).
(b) Put the access platform(s) in position at zones 147, 148, 123 and 124.
(c) Open the NLG doors (Refer to AMM 32-22-11, Page Block 301).
(d) Open the MLG doors (Refer to AMM 32-12-11, Page Block 301).
(e) Do the preparation procedure as specified in the removal of the MLG uplocks and
door uplocks (Refer to AMM 32-31-44, Page Block 401 and AMM 32-31-33, Page
Block 401).
(f) Do the preparation procedure as specified in the removal of the NLG uplocks and
door uplocks (Refer to AMM 32-31-21, Page Block 401 and AMM 32-31-14, Page
Block 401).
C. PROCEDURE
(1) Subtask 326111-832-001-001 - Do a Detailed Inspection of the MLG and MLG Door
Uplock Springs
Work Zones and Access Panels
Zone
 Access/Work location
147
148
References
Vendor Service B ulletin (VSB)
 MESSIER-BUGATTI-DOWTY 470-32-206
MESSIER-BUGATTI-DOWTY 470-32-880
Fig. A-FBAAA
Area to be Inspected
Sheet 01
Sheet 02
Fig. A-FFAAA
Flow Chart
Sheet 01
At the threshold given in the Planning Information Paragraph E.(2):
DATE: Jul 20/12 SERVICE BULLETIN No.: A300-32-6111
REVISION No.: 01 - Apr 25/13 Page: 12
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 23

@A300-600
SERVICE BULLETIN
(a) Do a detailed inspection of the springs of the main landing gear door uplocks in
accordance with MESSIER-B UGATTI-DOWTY Service B ulletin No. 470-32-206:
refer to Fig. A-FBAAA Sheet 01
 , Fig. A-FBAAA Sheet 02
 and Fig. A-FFAAA Sheet
01
1
 If load check is incorrect:
a
 Apply SUBTASK 326111-833-001 001 Replace the involved MLG door
uplock
b
 Send inspection report to AIRBUS.
c
 Repeat inspection at interval given in planning information paragraph
E.(2).
2
 If load check is correct:
a
 Send inspection report to AIRBUS.
b
 Repeat inspection at interval given in planning information paragraph
E.(2).
(b) Do a detailed visual inspection of the springs of the main landing gear uplocks in
accordance MESSIER-BUG ATTI-DOWTY Service B ulletin No. 470-32-880:
refer to Fig. A-FBAAA Sheet 01
 , Fig. A-FBAAA Sheet 02
 and Fig. A-FFAAA Sheet
01
1
 If spring is damaged:
a
 Apply SUBTASK 326111-833-002 001 Replace the involved MLG uplock
b
 Send inspection report to AIRBUS.
c
 Repeat inspection at interval given in planning information paragraph
E.(2).
2
 If spring is not damaged
a
 Send inspection report to AIRBUS.
b
 Repeat inspection at interval given in planning information paragraph
E.(2).
(2) Subtask 326111-832-002-001 - Do a Detailed Inspection of the NLG and NLG Door
Uplock Springs
Work Zones and Access Panels
Zone
 Access/Work location
123
124
DATE: Jul 20/12 SERVICE BULLETIN No.: A300-32-6111
REVISION No.: 01 - Apr 25/13 Page: 13
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 24

@A300-600
SERVICE BULLETIN
References
Vendor Service B ulletin (VSB)
 MESSIER-BUGATTI-DOWTY 470-32-206
MESSIER-BUGATTI-DOWTY 470-32-880
Fig. A-FBBAA
Area to be Inspected
Sheet 01
Sheet 02
Fig. A-FFAAA
Flow Chart
Sheet 01
At the threshold given in the Planning Information Paragraph E.(2):
(a) Do a detailed inspection of the springs of the nose landing gear door uplocks in
accordance with MESSIER-B UGATTI-DOWTY Service B ulletin No. 470-32-206:
refer to Fig. A-FBBAA Sheet 01
 , Fig. A-FBBAA Sheet 02
 and Fig. A-FFAAA Sheet
01
1
 If load check is incorrect:
a
 Apply SUBTASK 326111-833-003 001 Replace the involved NLG door
uplock
b
 Send inspection report to AIRBUS.
c
 Repeat inspection at interval given in planning information paragraph
E.(2).
2
 If load check is correct:
a
 Send inspection report to AIRBUS.
b
 Repeat inspection at interval given in planning information paragraph
E.(2).
(b) Do a detailed inspection of the springs of the nose landing gear uplocks in
accordance with MESSIER-B UGATTI-DOWTY Service B ulletin No. 470-32-880:
refer to Fig. A-FBBAA Sheet 01
 , Fig. A-FBBAA Sheet 02
 and Fig. A-FFAAA Sheet
01
1
 If spring is damaged:
a
 Apply SUBTASK 326111-833-004 001 Replace the involved NLG uplock
b
 Send inspection report to AIRBUS.
c
 Reinspect at interval given in planning information paragraph E.(2).
2
 If spring is not damaged
a
 Send inspection report to AIRBUS.
b
 Reinspect at interval given in planning information paragraph E.(2).
DATE: Jul 20/12 SERVICE BULLETIN No.: A300-32-6111
REVISION No.: 01 - Apr 25/13 Page: 14
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 25

@A300-600
SERVICE BULLETIN
(3) Subtask 326111-833- 001-001 - Replace the involved MLG door uplock
Work Zones and Access Panels
Zone
 Access/Work location
148
147
Manpower Resources
Manhours
 1.00
Minimum number of person
 1
Subtask elapsed time
 1.00
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 32-31-33, Page Block 401
(a) Remove the involved MLG door uplock (Refer to AMM 32-31-33, Page Block 401.
(b) Send the involved MLG door uplock in shop for repair.
(c) Install a serviceable MLG door uplock (Refer to AMM 32-31-33, Page Block 401.
(4) Subtask 326111-833-002-001 - Replace the involved MLG uplock
Work Zones and Access Panels
Zone
 Access/Work location
147
148
Manpower Resources
Manhours
 1.00
Minimum number of person
 1
Subtask elapsed time
 1.00
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 32-31-44, Page Block 401
(a) Remove the involved MLG gear uplock (Refer to AMM 32-31-44, Page Block 401).
(b) Send the involved MLG gear uplock in shop for repair.
(c) Install a serviceable MLG gear uplock (Refer to AMM 32-31-44, Page Block 401).
(5) Subtask 326111-833- 003-001 - Replace the involved NLG door uplock
Work Zones and Access Panels
Zone
 Access/Work location
123
124
DATE: Jul 20/12 SERVICE BULLETIN No.: A300-32-6111
REVISION No.: 01 - Apr 25/13 Page: 15
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 26

@A300-600
SERVICE BULLETIN
Manpower Resources
Manhours
 1.00
Minimum number of person
 1
Subtask elapsed time
 1.00
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 32-31-14, Page Block 401
(a) Remove the involved NLG door uplock (Refer to AMM 32-31-14, Page Block 401).
(b) Send the involved NLG door uplock in shop for repair.
(c) Install a serviceable NLG door uplock (Refer to AMM 32-31-14, Page Block 401).
(6) Subtask 326111-833-004-001 - Replace the involved NLG uplock
Work Zones and Access Panels
Zone
 Access/Work location
123
124
Manpower Resources
Manhours
 1.00
Minimum number of person
 1
Subtask elapsed time
 1.00
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 32-31-21, Page Block 401
(a) Remove the involved NLG gear uplock (Refer to AMM 32-31-21, Page Block 401).
(b) Send the involved NLG gear uplock in shop for repair.
(c) Install a serviceable NLG gear uplock (Refer to AMM 32-31-21, Page Block 401).
D. TEST
(1) Subtask 326111-700-001-001 - Testing
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 32-31-14, Page Block 401
32-31-21, Page Block 401
32-31-33, Page Block 401
32-31-44, Page Block 401
DATE: Jul 20/12 SERVICE BULLETIN No.: A300-32-6111
REVISION No.: 01 - Apr 25/13 Page: 16
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 27

@A300-600
SERVICE BULLETIN
(a) If a MLG or a MLG door uplock have been replaced:
Do the test procedure as specified after the installation of MLG uplocks and door
uplocks (Refer to AMM 32-31-44, Page Block 401 and AMM 32-31-33, Page Block
401).
(b) If a NLG or a NLG door uplock have been replaced:
Do the test procedure as specified after the installation of NLG uplocks and door
uplocks (Refer to AMM 32-31-21, Page Block 401 and AMM 32-31-14, Page Block
401).
E. CLOSE-UP
(1) Subtask 326111-942-001-001 - Close-up
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 32-12-11, Page Block 301
32-22-11, Page Block 301
32-31-14, Page Block 401
32-31-21, Page Block 401
32-31-33, Page Block 401
32-31-44, Page Block 401
(a) Do the close-up procedure as specified in the installation of the MLG uplocks and
door uplocks (Refer to AMM 32-31-44, Page Block 401 and AMM 32-31-33, Page
Block 401).
(b) Do the close-up procedure as specified in the installation of the NLG uplocks and
door uplocks (Refer to AMM 32-31-21, Page Block 401 and AMM 32-31-14, Page
Block 401).
(c) Close the NLG doors (Refer to AMM 32-22-11, Page Block 301).
(d) Close the MLG doors (Refer to AMM 32-12-11, Page Block 301).
(e) Remove the access platform(s).
(f) Restore the aircraft and the syst ems to normal operating conditions.
DATE: Jul 20/12 SERVICE BULLETIN No.: A300-32-6111
REVISION No.: 01 - Apr 25/13 Page: 17
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 28

@A300-600
SERVICE BULLETIN
**CONF ALL
A
LH SIDE SHOWN
RH SIDE SYMMETRICAL
A
A
B
FR47
FR50
FR54
C
C
B
B
A A
NOTE:
01
01
DEPENDING ON THE PN, THERE ARE 1 PAIR OF
SPRINGS OR 2 PAIRS OF SPRINGS AT THIS POSITION
FREE FALL SPRINGS
SPRINGS ATTACHED TO THE HOOK
(HOOK SPRINGS)  AND 
SPRINGS ATTACHED TO THE LEVER
A
 − Z147 Z148
(LEVER SPRINGS)
D_SB_326111_5_BAAA_01_08
Figure A-F BAAA - S heet 01
Area to be Inspected
DATE: Jul 20/12 SERVICE BULLETIN No.: A300-32-6111
REVISION No.: 01 - Apr 25/13 Page: 18
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 29

@A300-600
SERVICE BULLETIN
**CONF ALL
HOOK SPRINGS TO BE INSPECTED
LH SIDE SHOWN
RH SIDE SYMMETRICAL
B
B
C
B B
D_SB_326111_5_BAAA_02_01
Figure A-F BAAA - S heet 02
Area to be Inspected
DATE: Jul 20/12 SERVICE BULLETIN No.: A300-32-6111
REVISION No.: 01 - Apr 25/13 Page: 19
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 30

@A300-600
SERVICE BULLETIN
**CONF ALL
 − Z123 Z124
A
B
A
A
A
A A
PAIR OF HOOK SPRINGS TO BE INSPECTED
PAIR OF FREE FALL SPRINGS TO BE INSPECTED
D_SB_326111_5_BBAA_01_01
Figure A-F BBAA - S heet 01
Area to be Inspected
DATE: Jul 20/12 SERVICE BULLETIN No.: A300-32-6111
REVISION No.: 01 - Apr 25/13 Page: 20
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 31

@A300-600
SERVICE BULLETIN
**CONF ALL
HOOK SPRING TO BE INSPECTED
B
B
B B
B
D_SB_326111_5_BBAA_02_02
Figure A-F BBAA - S heet 02
Area to be Inspected
DATE: Jul 20/12 SERVICE BULLETIN No.: A300-32-6111
REVISION No.: 01 - Apr 25/13 Page: 21
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 32

@A300-600
SERVICE BULLETIN
**CONF ALL
QUESTION
ACTION
FINDING
YES OR DAMAGEDSPRINGS BROKEN
AS DESCRIBED IN SUBTASKS 326111−832−001−001
NO
SHOP FOR REPAIR AND REPLACE IT
SEND THE INVOLVED UPLOCK IN
AS DESCRIBED IN SUBTASK(S)
326111−833−001−001
AND/OR 326111−833−002−001
AND/OR 326111−833−003−001
AND/OR 326111−833−004−001
AND DOOR UPLOCK SPRINGS
AT THRESHOLD GIVEN IN THE PLANNING INFORMATION PARAGRAPH 1.E.(2).
DO A DETAILED INSPECTION OF THE MLG AND NLG UPLOCK
NLG UPLOCK AND DOOR UPLOCK SPRINGS
DO A DETAILED INSPECTION OF THE MLG AND 
AND 326111−832−002−001
RE−INSPECT AT INTERVAL GIVEN
IN THE PLANNING INFORMATION
PARAGRAPH 1.E.(2).
D_SB_326111_5_FAAA_01_01
Figure A-FFAAA - Sheet 01
Flow Chart
DATE: Jul 20/12 SERVICE BULLETIN No.: A300-32-6111
REVISION No.: 01 - Apr 25/13 Page: 22
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 33

@A300-600
SERVICE BULLETIN
Appendix 01 : Inspection Report
**CONF ALL
The results of the inspection, including no findings, replacement or actions to be done, must be
forwarded to airbus dept . SEEL3, on the attached inspection report.
DATE: Jul 20/12 SERVICE BULLETIN No.: A300-32-6111
REVISION No.: 01 - Apr 25/13 Page: 1
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 34

@A300-600
SERVICE BULLETIN
Appendix 01 : Inspection Report
**CONF ALL
INSPECTION REPORT
SERVICE BULLETIN No. :
A/C MSN :
FLIGHT CYCLES :
FLIGHT HOURS :
A300−32−6111
DATE OF INSPECTION :
RETURN TO :
AIRBUS
CUSTOMER SERVICES ENGINEERING − SEEL3
LANDING GEAR SYSTEMS A330/A340 & WIDE BODY
INSPECTION METHOD :
1 ROND POINT MAURICE BELLONTE
31707 BLAGNAC CEDEX
FRANCE
FAX +33 (0)5 61 36 14
QUESTIONS
UPLOCKS
SPRINGS BROKEN UPLOCK REPLACEDOR DAMAGED
MLG UPLOCK YES NO YES NO
MLG DOOR UPLOCK YES NO YES NO
NLG UPLOCK YES NO YES NO
NLG DOOR UPLOCK YES NO YES NO
WHICH SPRINGS ?
(FREE FALL, HOOK,
LEVER)
D_SB_326111_5_RAAA_01_02
Figure A-FRAAA - Sheet 01
Inspection Report
DATE: Jul 20/12 SERVICE BULLETIN No.: A300-32-6111
REVISION No.: 01 - Apr 25/13 Page: 2
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 35

@A300-600
SERVICE BULLETIN
REPORTING SHEET
TITLE: LANDING GEAR - NORMAL EXTENSION AND RETRACTION -
INSPECTION OF UPLOCK SPRINGS
MODIFICATION No.: None
Please complete the appropriate item (A or B):
A - SB WILL BE
 embodied YES/NO (if NO please comment)
If YES, aircraft concer ned (as per SB effectivity by default) and planned dates (month/year) of
embodiment:
B - SB HAS BEEN
 embodied on aircraft:
Operator comments:
From Airline:
Name/Title:
Signature: Date:
If operational documentation is affected (see Paragraph 1.K of this SB): If information is needed prior to
next normal revision or prior to SB embodiment, please indicate required service(s):
Either: Modification Operational Impact (MOI), if available YES/NO
Or : Intermediate revision YES/NO
Important Information:
 This SB will only be incorporated in your maintenance and operational
documentation if this sheet is returned to Airbus and signed by a duly authorised representative. With
the next feasible revision, this will result in
- Updating of maintenance documentation to show pre and post SB data.
- Updating of maintenance and operational documentation to show post SB data after embodiment.
If this SB requires previous or simultaneous accomplishment of other SBs, Airbus shall automatically
include them in the manual revisions. Refer to SIL 00-037 for detailed information.
Please return this completed sheet to:
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX FRANCE
Attn: SDC32 Technical Data and Documentation Services
F A X :( + 3 3 )56 19 32 80 6
e-mail: sb.reporting@airbus.com
or via your Resident Customer Support Office.
Alternatively, SB lists via letters or fax are also accepted.
DATE: Jul 20/12 SERVICE BULLETIN No.: A300-32-6111
REVISION No.: 01 - Apr 25/13 Page: 1
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 36

@A300-600
SERVICE BULLETIN
QUALITY PERCEPTION FORM
Use this form to tell us what is your perception of the quality of this Service Bulletin. The reported data
that you provide us will be used to analyse areas of difficulties and to take corrective action to further
improve the quality of our Service Bulletins.
We thank you for the time you have taken in completing this form.
(Please rate on a scale of 1 to 4, with 4 being the highest score)
- Quality rating of this SB 4321
- Quality rating of the Accomplishment Instructions 4321
- Quality rating of the Illustrations 4321
- Is this SB easy to understand ? Y/N
If you have had difficulties in the accomplishment of this SB please quote below the area(s) and give a
short description of the issue.
Planning Material Instructions
X Effectivity X Kit content X Preparation
X Reason X List of Materials Operator Supplied X Mod/Inspection
X Manpower X Industry support X Test
X References X Re-identification X Close-Up
X Publication X Tooling X Illustrations
Comments:
Operator: Date:
Name/Title:
Please return this form to:
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX FRANCE
Attn : SEM4 Service Bulletins Management
F A X:( 3 3 )56 19 34 25 1
Or via your Resident Customer Support Office.
DATE: Jul 20/12 SERVICE BULLETIN No.: A300-32-6111
REVISION No.: 01 - Apr 25/13 Page: 1
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.