# Airbus Service Bulletin A300-32-6119

Copy: No revision named ("A300-32-6119 R00"), 48 pages: PDF https://openairdocs.org/files/sha256/14/27/1427e499b36c7bdeb4fc8333e6d66410031c31422a981e90e79524cd08addf73; text https://openairdocs.org/service-documents/airbus/a300-32-6119/file/1427e499b36c.md. Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2020-1113, the docket of AD 2021-11-18. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Airbus](https://openairdocs.org/service-documents/airbus.md)
- Type: Service bulletin (Service Bulletin)
- Number: A300-32-6119
- Page: https://openairdocs.org/service-documents/airbus/a300-32-6119

## Text (48 pages)

Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2020-1113, the docket of AD 2021-11-18. Not covered by OpenAirDocs’ CC0 dedication. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

@A300-600
SERVICE BULLETIN
SUMMARY
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
This summary is for information only and is not approved for modification of the aircraft.
MANDATORY
 MANDATORY
 MANDATORY
ATA SYSTEM: 32
TITLE: MAIN LANDING GEAR - INSPECTION OF THE HINGE ARM/BARREL
PIN
**CONF ALL
MODIFICATIONS
None
REASON/DESCRIPTION/OPERATIONAL CONSEQUENCES
Three cases of cracks on Main Landing Gear (MLG) Hinge Arm / Barrel Pin have been reported to
AIRBUS. These cracks initiated on the inner diameter of the Hinge Arm / Barrel Pin following an
overload leading to the connecting rod bushings fracture.
Corrective actions are done in two steps:
- A clean-up of the fleet through MOD No. 13859S22952 (Service Bulletin No. A300-32-6120) for
used pins replacement by a brand new pin with primer paint.
- A new repetitive inspection described in this Inspection Service Bulletin (ISB) that will be performed
on the new pin with primer paint post MOD No. 13859S22952 (Service Bulletin No. A300-32-6120).
The aim of this procedure is to perform following inspection / maintenance actions on the aircraft on
which MOD No. 13859S22952 (Service Bulletin No. A300-32-6120) is embodied:
- Remove MLG Hinge Arm / Barrel Pin with dedicated tooling
- Visually inspect MLG Hinge Arm / Barrel Pin and associated connecting rod bushings
. In case connecting rod bushings are found cracked, distorted or fractured, or the MLG Hinge
Arm / Barrel Pin is found cracked, MLG Leg shall be removed and sent to MRO for inspection
with the MLG Hinge Arm / Barrel Pin, other side MLG leg should be inspected before next
flight (as per this ISB)
. If the MLG Hinge Arm / Barrel Pin is found wi th damage (chrome damage, corrosion, cracks),
send it to Safran Landing Systems for investigation
DATE: Sep 24/19 SERVICE BULLETIN No.: A300-32-6119
REVISION No.: 00 - Sep 24/19 Page: 1
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 2

@A300-600
SERVICE BULLETIN
SUMMARY
. In case of nil findings, re-install the same MLG Hinge Arm / Barrel Pin on aircraft.
- Repeat inspection within the defined compliance time.
The accomplishment of this Service Bulletin will prevent failures on the MLG Hinge Arm / Barrel Pin.
The MLG Hinge Arm / Barrel Pin is a safe life item listed in ALS Part 1. Failure of the Hinge Arm /
Barrel Pin could result in a MLG collapse.
GENERAL EVALUATION
EVALUATION TABLE
COMPLIANCE
 MANDATORY (1)
 CANCELS INSPECTION SB
 NO
POTENTIAL AD
 YES
 A/C OPERATION AFFECTED
 NO
RELIABILITY AFFECTED
 NO
 PAX COMFORT AFFECTED
 NO
COST SAVING
 NO
 ETOPS AFFECTED
 NO
STRUCTURAL LIFE EXTN
 NO
 VENDOR SB INVOLVED
 NO
AIRCRAFT JACKING
 YES
NOTE
 (1)
: Service Bulletin must be accomplished.
MATERIAL PRICE INFORMATION
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET
 QTY PER
A/C
PRICE PER
A/C (USD)
MAIN PARTS
Equipment BFEB01
 See SB
 Pin, MLG Leg Assemblies
EFFECTIVITY
This Service Bulletin is applicable to this (these) operator(s) :
14S AAW ABR AHK BCS FDX IRA IRM KAC MNB MRJ MSR QSM
SOP SUD TAR TNO UPS URS UTP
CONCURRENT REQUIREMENTS
Accomplishment of this Service Bulletin requires the prior accomplishment of the following Service
Bulletin:
Service Bulletin No. A300-32-6120
NOTE
: Service Bulletin No. A300-32-6120 LANDING GEAR - MAIN GEAR - CHANGE BARREL
HINGE / ARM PIN WITH NEW WET PRIMER-IMPREGNATED PIN
REFERENCES / REPERCUSSIONS
TFU
 32.11.00.023
OEB
 None
AOT
 None
SIL
 None
ISI
 None
LINE MAINTENANCE AFFECTED
 No
DATE: Sep 24/19 SERVICE BULLETIN No.: A300-32-6119
REVISION No.: 00 - Sep 24/19 Page: 2
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 3

@A300-600
SERVICE BULLETIN
SUMMARY
LIFE LIMIT
 None
OTHER
 None
NATURE OF THE WORK
AIRCRAFT
 YES
EQUIPMENT
 YES
MANPOWER
Task 326119-832-896-001: Inspect the RH / LH Hinge Arm / Barrel Pins and Connecting Rod
Bushings
TOTAL MANHOURS
 22.25
ELAPSED TIME (HOURS)
 9.75
Task 326119-831-895-001: Replace the RH / LH MLG Leg and Hinge Arm / Barrel Pin
(Depending on Inspection Results)
TOTAL MANHOURS
 89.25
ELAPSED TIME (HOURS)
 45.25
APPENDICES
Appendix 01 - Manpower Gantt Chart
Appendix 02 - Inspection Report
DATE: Sep 24/19 SERVICE BULLETIN No.: A300-32-6119
REVISION No.: 00 - Sep 24/19 Page: 3
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 4

@A300-600
SERVICE BULLETIN
SUMMARY
**CONF ALL
LH SHOWN
RH SYMMETRICAL
Z731
Z741
A
A
B
LH SHOWN
RH SYMMETRICAL
INSPECTION AREA
NOTE:
B
D_SB_326119_7_SAAA_01_00
Figure A-USAAA - Sheet 01
DATE: Sep 24/19 SERVICE BULLETIN No.: A300-32-6119
REVISION No.: 00 - Sep 24/19 Page: 4
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 5

@A300-600
SERVICE BULLETIN
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
MANDATORY
 MANDATORY
 MANDATORY
ATA SYSTEM: 32
TITLE: MAIN LANDING GEAR - INSPECTION OF THE HINGE ARM/BARREL
PIN
MODIFICATION No.: None
This document contains AIRBUS PROPRIETARY INFORMATION and shall at all times remain the
property of AIRBUS; no intellectual property right or licence is granted by AIRBUS in connection with
any information contained in it. It is delivered on the express condition that said document and the
information contained in it shall be treated as confidential, shall not be used for any purpose other than
that for which it is hereby delivered. It shall not be disclosed in whole or in part to third parties and shall
not be duplicated in any manner (except for the purposes of performing the tasks described hereunder
and provided that any recipient of such document shall comply with the conditions herein), without
AIRBUS prior written consent.
1. PLANNING INFORMATION
**CONF ALL
A. EFFECTIVITY
(1) Models
B4-603 B4-605R B4-622 B4-622R C4-605R/FC4-620 F4-605R F4-622R
(2) Effectivity by MSN
0344 0358 0361 0365 0380 0388 0401 0405 0408 0411 0414 0417 0477 0479 0505
0518 0521 0525 0530 0532 0536 0543 0546 0553 0555 0557-0559 0561 0563 0572
0575 0579 0581 0584 0602-0603 0607-0608 0611 0613 0617-0618 0621 0623
0625-0626 0630 0632-0633 0637 0641 0643 0657 0659 0664 0666 0668 0670 0677
0679 0683 0688 0694 0696 0699 0701 0703 0707 0709 0711 0713 0715 0717 0719
0721-0730 0732-0746 0748-0750 0752-0764 0766 0768-0775 0777-0794 0797
0799-0840 0845-0878
(3) Effectivity by Operator
The Operator/MSN relationship is provided for information only and is correct at the time
of issue in accordance with the information available to AIRBUS. Any future changes
resulting from transfer of an aircraft from one operator to another will not be reflected in
this list unless the Service Bulletin is revised for another reason.
DATE: Sep 24/19 SERVICE BULLETIN No.: A300-32-6119
REVISION No.: 00 - Sep 24/19 Page: 1
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 6

@A300-600
SERVICE BULLETIN
OPERATOR
 MSN
14S
 0694 0699 0719 0721 0782 0784 0785 0786 0787
AAW
 0788
ABR
 0557 0677 0717 0722
AHK
 0683 0770 0855 0856 0857 0858 0859 0860 0870 0871
BCS
 0602 0617 0621 0637 0641 0670 0679 0703 0711 0724 0729 0730
0737 0740 0743 0753 0783 0797 0836 0837 0872
FDX
 0358 0361 0365 0388 0417 0477 0479 0530 0536 0543 0555 0559
0572 0575 0579 0581 0611 0613 0625 0630 0633 0657 0659 0664
0668 0688 0709 0713 0715 0726 0728 0735 0736 0738 0742 0745
0748 0752 0757 0759 0760 0761 0766 0768 0769 0771 0772 0774
0777 0778 0779 0780 0781 0789 0790 0791 0792 0793 0794 0799
0800 0801 0802 0803 0804 0873 0874 0875 0876 0877 0878
IRA
 0632 0696 0723 0727
IRM
 0380 0401 0405 0408 0411 0414 0518 0546 0553 0608 0618 0623
0701 0773 0838
KAC
 0344
MNB
 0521 0525 0734 0739 0758
MRJ
 0750 0762
MSR
 0561 0607
QSM
 0584 0603 0744 0749 0764
SOP
 0532 0756
SUD
 0666 0775
TAR
 0505 0558 0563
TNO
 0626 0643 0755
UPS
 0805 0806 0807 0808 0809 0810 0811 0812 0813 0814 0815 0816
0817 0818 0819 0820 0821 0822 0823 0824 0825 0826 0827 0828
0829 0830 0831 0832 0833 0834 0835 0839 0840 0845 0846 0847
0848 0849 0850 0851 0852 0853 0854 0861 0862 0863 0864 0865
0866 0867 0868 0869
URS
 0733
UTP
 0707 0725 0732 0741 0746 0754 0763
DATE: Sep 24/19 SERVICE BULLETIN No.: A300-32-6119
REVISION No.: 00 - Sep 24/19 Page: 2
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 7

@A300-600
SERVICE BULLETIN
(4) Configuration by MSN
MSN
 CONFIGURATION
0344 0358 0361 0365 0380 0388 0401 0405 0408 0411 0414
0417 0477 0479 0505 0518 0521 0525 0530 0532 0536 0543
0546 0553 0555 0557 0558 0559 0561 0563 0572 0575 0579
0581 0584 0602 0603 0607 0608 0611 0613 0617 0618 0621
0623 0625 0626 0630 0632 0633 0637 0641 0643 0657 0659
0664 0666 0668 0670 0677 0679 0683 0688 0694 0696 0699
0701 0703 0707 0709 0711 0713 0715 0717 0719 0721 0722
0723 0724 0725 0726 0727 0728 0729 0730 0732 0733 0734
0735 0736 0737 0738 0739 0740 0741 0742 0743 0744 0745
0746 0748 0749 0750 0752 0753 0754 0755 0756 0757 0758
0759 0760 0761 0762 0763 0764 0766 0768 0769 0770 0771
0772 0773 0774 0775 0777 0778 0779 0780 0781 0782 0783
0784 0785 0786 0787 0788 0789 0790 0791 0792 0793 0794
0797 0799 0800 0801 0802 0803 0804 0805 0806 0807 0808
0809 0810 0811 0812 0813 0814 0815 0816 0817 0818 0819
0820 0821 0822 0823 0824 0825 0826 0827 0828 0829 0830
0831 0832 0833 0834 0835 0836 0837 0838 0839 0840 0845
0846 0847 0848 0849 0850 0851 0852 0853 0854 0855 0856
0857 0858 0859 0860 0861 0862 0863 0864 0865 0866 0867
0868 0869 0870 0871 0872 0873 0874 0875 0876 0877 0878
001
(5) Configuration definition
**CONF 001
Config. 001 is valid for all the aircraft given in the effectivity of this Service Bulletin as a
standard configuration.
(6) Material Effectivity
MATERIAL
 QTY PER A/C
 SEE NOTES
Equipment BFEB01
 As required
Consumable CMLB01
 1
NOTE
: For Materials you cannot identify in the CML, please contact:
KLX Aerospace Solutions
10000 N.W. 15th Terrace
Miami, FL 33172
USA
Phone: +1.305.925.2600
Fax:+1.305.507.2600
Email: AOGdesk@KLX.com
Internet: http://www.klxaerospace.com
B. CONCURRENT REQUIREMENTS
Accomplishment of this Service Bulletin requires the prior accomplishment of the following
Service Bulletin:
Service Bulletin No. A300-32-6120
DATE: Sep 24/19 SERVICE BULLETIN No.: A300-32-6119
REVISION No.: 00 - Sep 24/19 Page: 3
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 8

@A300-600
SERVICE BULLETIN
NOTE
: Service Bulletin No. A300-32-6120 LANDING GEAR - MAIN GEAR -
CHANGE BARREL HINGE / ARM PIN WITH NEW WET PRIMER-
IMPREGNATED PIN
C. REASON
(1) History
Three cases of cracks on Main Landing Gear (MLG) Hinge Arm / Barrel Pin have been
reported to AIRBUS. These cracks initiated on the inner diameter of the Hinge Arm /
Barrel Pin following an overload leading to the connecting rod bushings fracture.
Corrective actions are done in two steps:
- A clean-up of the fleet through MOD No. 13859S22952 (Service Bulletin No.
A300-32-6120) for used pins replacement by a brand new pin with primer paint.
- A new repetitive inspection described in this Inspection Service Bulletin (ISB) that
will be performed on the new pin with primer paint post MOD No. 13859S22952
(Service Bulletin No. A300-32-6120).
(2) Objective/Action
The aim of this procedure is to perform following inspection / maintenance actions on
the aircraft on which MOD No. 13859S22952 (Service Bulletin No. A300-32-6120) is
embodied:
- Remove MLG Hinge Arm / Barrel Pin with dedicated tooling
- Visually inspect MLG Hinge Arm / Barrel Pin and associated connecting rod
bushings
. In case connecting rod bushings are found cracked, distorted or fractured, or
the MLG Hinge Arm / Barrel Pin is found cracked, MLG Leg shall be removed
and sent to MRO for inspection with the MLG Hinge Arm / Barrel Pin, other side
MLG leg should be inspected before next flight (as per this ISB)
. If the MLG Hinge Arm / Barrel Pin is found with damage (chrome damage,
corrosion, cracks), send it to Safran Landing Systems for investigation
. In case of nil findings, re-install the same MLG Hinge Arm / Barrel Pin on
aircraft.
- Repeat inspection within the defined compliance time.
(3) Advantages
The accomplishment of this Service Bulletin will prevent failures on the MLG Hinge Arm /
Barrel Pin. The MLG Hinge Arm / Barrel Pin is a safe life item listed in ALS Part 1.
Failure of the Hinge Arm / Barrel Pin could result in a MLG collapse.
(4) Operational/Maintenance Consequences
None
DATE: Sep 24/19 SERVICE BULLETIN No.: A300-32-6119
REVISION No.: 00 - Sep 24/19 Page: 4
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 9

@A300-600
SERVICE BULLETIN
D. DESCRIPTION
To accomplish this Service Bulletin it is necessary to :
Task 326119-832-896-001: Inspect the RH / LH Hinge Arm / Barrel Pins and Connecting Rod
Bushings
(1) Remove the RH Hinge Arm / Barrel Pin
(2) Inspect the RH Hinge Arm / Barrel Pin and Connecting Rod Bushings
(3) Install the RH Hinge Arm / Barrel Pin
(4) Remove the LH Hinge Arm / Barrel Pin
(5) Inspect the LH Hinge Arm / Barrel Pin and Connecting Rod Bushings
(6) Install the LH Hinge Arm / Barrel Pin
Task 326119-831-895-001: Replace the RH / LH MLG Leg and Hinge Arm / Barrel Pin
(Depending on Inspection Results)
(1) Replace the Existing RH MLG Leg and Hinge Arm / Barrel Pin (Depending on
Inspection Result)
(2) Replace the Existing LH MLG Leg and Hinge Arm / Barrel Pin (Depending on
Inspection Result)
E. COMPLIANCE
(1) Classification
MANDATORY: Service Bulletin must be accomplished.
(2) Accomplishment Timescale
Accomplishment of this Service Bulletin must be done at the threshold and interval given
in the table below.
This Service Bulletin has been classified Mandatory it is expected that an Airworthiness
Directive (AD) published by the European Av iation Safety Agenc y (EASA) will be issued
to confirm this classification. It is anticipated that the AD will confirm the thresholds
given but reference should be made to the AD for confirmation of the mandated
accomplishment timescale.
Table 1, Config. 001 - Special Detailed Inspection of Bushings
Compliance Time
Condition
 Action
Threshold
Repetitive Interval
DATE: Sep 24/19 SERVICE BULLETIN No.: A300-32-6119
REVISION No.: 00 - Sep 24/19 Page: 5
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 10

@A300-600
SERVICE BULLETIN
All MLG on which MOD
No. 13859S22952 has
been embodied
Remove the Hinge Arm
/ Barrel Pin from the
MLG and perform a
Special Detailed
Inspection of the MLG
Connecting Rod
Bushings, refer to TASK
326119-832-896 001
Inspect the RH / LH
Hinge Arm / Barrel Pins
and Connecting Rod
Bushings
30 Months following the
implementation of MOD
No. 13859S22952
30 Months
Replace the affected
MLG Leg including the
Hinge Arm / Barrel Pin,
refer to TASK
326119-831-895 001
Replace the RH / LH
MLG Leg and Hinge
Arm / Barrel Pin
(Depending on
Inspection Results)
Before next flight
 None
AND
Send the removed
Hinge Arm / Barrel Pin
to Safran Landing
Systems for
investigation
Upon completion of
removal
None
AND
Send the removed MLG
to the MRO for
inspection
Upon completion of
removal
None
AND
Inspect the opposite
side MLG leg, refer to
TASK 326119-832-896
001 Inspect the RH / LH
Hinge Arm / Barrel Pins
and Connecting Rod
Bushings
Before next flight
 30 Months
AND
MLG with cracked,
distorted, or fractured
bushings
Report to AIRBUS
 Before next flight
 None
MLG with corroded
bushings or bushings
showing wear or
discoloration
Contact Safran Landing
Systems for instructions
Before next flight
 None
DATE: Sep 24/19 SERVICE BULLETIN No.: A300-32-6119
REVISION No.: 00 - Sep 24/19 Page: 6
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 11

@A300-600
SERVICE BULLETIN
MLG without cracked,
distorted, or fractured
bushings that do not
show corrosion, wear,
or discoloration
Continue to Table 2
 Before next flight
 None
Table 2, Config. 001 - Detailed Visual Inspection of the MLG Hinge Arm / Barrel Pin
Compliance Time
Condition
 Action
Threshold
Repetitive Interval
MLG without cracked,
distorted, or fractured
bushings that do not
show corrosion, wear,
discoloration
Perform Detailed Visual
Inspection of MLG
Hinge Arm / Barrel Pin,
refer to TASK
326119-832-896 001
Inspect the RH / LH
Hinge Arm / Barrel Pins
and Connecting Rod
Bushings
Before next flight
 None
Replace the affected
MLG Leg including the
Hinge / Arm Barrel Pin,
refer to TASK
326119-831-895 001
Replace the RH / LH
MLG Leg and Hinge
Arm / Barrel Pin
(Depending on
Inspection Results)
Before next flight
 None
AND
Send the removed
Hinge Arm / Barrel Pin
to Safran Landing
Systems for
investigation
Upon completion of
removal
None
AND
Send the removed MLG
to the MRO for
inspection
Upon completion of
removal
None
AND
Inspect the opposite
side MLG leg, refer to
TASK 326119-832-896
001 Inspect the RH / LH
Hinge Arm / Barrel Pins
and Connecting Rod
Bushings
Before next flight
 30 Months
AND
MLG with cracked
Hinge Arm / Barrel Pins
Report to AIRBUS
 Before next flight
 None
DATE: Sep 24/19 SERVICE BULLETIN No.: A300-32-6119
REVISION No.: 00 - Sep 24/19 Page: 7
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 12

@A300-600
SERVICE BULLETIN
Install a serviceable
Hinge Arm / Barrel Pin,
refer to SUBTASK
326119-420-401 001
Install the RH Hinge
Arm / Barrel Pin and / or
SUBTASK
326119-420-402 001
Install the LH Hinge Arm
/ Barrel Pin
Before next flight
 None
AND
Send the removed
Hinge Arm / Barrel Pin
to Safran Landing
Systems for
investigation
Upon completion of
removal
None
AND
MLG with Hinge Arm /
Barrel Pins showing OD
Chrome Damage and /
or corrosion
Report to AIRBUS
 Before next flight
 None
MLG with Hinge Arm /
Barrel Pins with no
findings
Re-install the removed
Hinge Arm / Barrel Pin
SUBTASK
326119-420-401 001
Install the RH Hinge
Arm / Barrel Pin and / or
SUBTASK
326119-420-402 001
Install the LH Hinge Arm
/ Barrel Pin
Before next flight
 None
F. APPROVAL
The technical content of this document is approved under the authority of Design
Organisation Approval No. EASA.21J.031.
If an aircraft listed in the effectivity has a modification or repair embodied that is not of
AIRBUS origin, and which affects the content of this Service Bulletin, the operator is
responsible for obtaining approval by its airworthiness authority for any adaptation necessary
before incorporation of the Service Bulletin.
G. MANPOWER
The manpower estimates given in this Service Bulletin are based on the direct labor cost to
do the work. These estimates assume that the work will be done by experienced personnel,
and may need to be revised upwards to suit operator’s circumstances. The estimates do not
include the time to prepare, plan or inspect the work. Manufacture and procurement of parts
and tools, drying times for paints, sealants, etc., and general administration work are also not
included.
Task 326119-832-896-001: Inspect the RH / LH Hinge Arm / Barrel Pins and Connecting Rod
Bushings
Get Access
 2.00
On Aircraft
DATE: Sep 24/19 SERVICE BULLETIN No.: A300-32-6119
REVISION No.: 00 - Sep 24/19 Page: 8
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 13

@A300-600
SERVICE BULLETIN
Task 326119-832-896-001: Inspect the RH / LH Hinge Arm / Barrel Pins and Connecting Rod
Bushings
Remove the RH Hinge Arm / Barrel Pin
 5.75
Inspect the RH Hinge Arm / Barrel Pin and Connecting
Rod Bushings
0.50
Install the RH Hinge Arm / Barrel Pin
 2.25
Remove the LH Hinge Arm / Barrel Pin
 5.75
Inspect the LH Hinge Arm / Barrel Pin and Connecting
Rod Bushings
0.50
Install the LH Hinge Arm / Barrel Pin
 2.25
Close-Up
 3.25
TOTAL MANHOURS
 22.25
ELAPSED TIME (HOURS)
 9.75
NOTE
: The minimum man-hours necessary to accomplish this Service Bulletin are
those for the Inspection. Depending on the inspection result, additional man-
hours can apply.
NOTE
: For an explanation of the man-hours and elapsed time, refer to the Gantt
Chart Fig. A-UAAAA
, given in Appendix 01.
Task 326119-831-895-001: Replace the RH / LH MLG Leg and Hinge Arm / Barrel Pin
(Depending on Inspection Results)
Get Access
 27.25
On Aircraft
Replace the Existing RH MLG Leg and Hinge Arm /
Barrel Pin (Depending on Inspection Result)
26.25
Replace the Existing LH MLG Leg and Hinge Arm /
Barrel Pin (Depending on Inspection Result)
26.25
Tests
 4.00
Close-Up
 5.50
TOTAL MANHOURS
 89.25
ELAPSED TIME (HOURS)
 45.25
H. WEIGHT AND BALANCE
Not Changed
I. ELECTRICAL LOAD DATA
Not Changed
J. REFERENCES
Aircraft Maintenance Manual (AMM)
 06-21-00 20-21-12 24-41-00
32-11-11 32-31-00
Elec. Std. Practices Manual (ESPM)
 20-55-00
In Service Information (ISI)
 00.00.00179
Service Bulletin (SB)
 A300-32-6120
DATE: Sep 24/19 SERVICE BULLETIN No.: A300-32-6119
REVISION No.: 00 - Sep 24/19 Page: 9
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 14

@A300-600
SERVICE BULLETIN
K. PUBLICATION AFFECTED
None
L. INTERCHANGEABILITY/MIXABILITY
Not Applicable
M. SPARES
None
DATE: Sep 24/19 SERVICE BULLETIN No.: A300-32-6119
REVISION No.: 00 - Sep 24/19 Page: 10
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 15

@A300-600
SERVICE BULLETIN
2. MATERIAL INFORMATION
**CONF ALL
A. MATERIAL - PRICE AND AVAILABILITY
(1) Procurement Addresses
Equipment BFEB01
 SAFRAN LANDING SYSTEMS
7 RUE DU GENERAL VALERIE ANDRE
78140 VELIZY-VILLACOUBLAY
FRANCE
T e l :+ 3 3( 0 ) 14 62 91 80 0
F a x :+ 3 3( 0 ) 14 62 98 77 0
(2) Price and Availability
Equipment BFEB01
Procurement terms for the equipment must be negotiated with the equipment supplier.
B. INDUSTRY SUPPORT INFORMATION
AIRBUS will not provide industry support for accomplishment of this Service Bulletin.
This Service Bulletin is the subject of an AIRBUS monitored retrofit campaign.
For the organization of this retrofit, you are kindly requested to contact AIRBUS retrofit
management department: monitored.retrofit@airbus.com.
C. LIST OF COMPONENTS
No Kit
D. LIST OF MATERIALS - OPERATOR SUPPLIED
(1) Consumable Materials
NOTE
: To accomplish this Service Bulletin it is necessary to use the
Consumable Materials listed i n the subsequent re ferenced tasks:
AMM 32-11-11, Page Block 401
Consumable CMLB01
ITEM
 DESCRIPTION
 REFERENCE TO CML
MAT. No.
QTY PER A/C
 SEE
NOTES
Non Aqueous Cleaner-General
 08BAA9
 As required
Textile-Lint Free Cotton
 14SBA1
 As required
(2) Components
NOTE
: To accomplish this Service Bulletin it is necessary to use the expendable
DATE: Sep 24/19 SERVICE BULLETIN No.: A300-32-6119
REVISION No.: 00 - Sep 24/19 Page: 11
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 16

@A300-600
SERVICE BULLETIN
parts listed in the subs equent referenced tasks:
AMM 32-11-11, Page Block 401
AMM 32-11-11, Page Block 601
(3) Equipment
Equipment BFEB01
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 ITEM
 OLD PART N˚
 INT
 SEE
NOTES
C66441-200
 As
required
PIN
D22497010-11
 As
required
LEG
D22497011-4
 As
required
LEG
D22497015-10
 As
required
LEG
D22497020-9
 As
required
LEG
D22497025-10
 As
required
LEG
D22497030-6
 As
required
LEG
D22497040-3
 As
required
LEG
D22497145-6
 As
required
LEG
D22497150-6
 As
required
LEG
D22497250-5
 As
required
LEG
D22498010-11
 As
required
LEG
D22498011-4
 As
required
LEG
D22498015-10
 As
required
LEG
D22498020-9
 As
required
LEG
D22498025-10
 As
required
LEG
D22498030-6
 As
required
LEG
D22498040-3
 As
required
LEG
DATE: Sep 24/19 SERVICE BULLETIN No.: A300-32-6119
REVISION No.: 00 - Sep 24/19 Page: 12
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 17

@A300-600
SERVICE BULLETIN
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 ITEM
 OLD PART N˚
 INT
 SEE
NOTES
D22498145-6
 As
required
LEG
D22498150-6
 As
required
LEG
D22498250-5
 As
required
LEG
D23243000-6
 As
required
LEG
D23244000-6
 As
required
LEG
NOTE
: The above list of components is not an AIRBUS Kit, the required parts
shall be ordered as necessary through the given channel.
E. PARTS TO BE RE-IDENTIFIED BY OPERATOR
None
F. TOOLING
(1) Tooling - Price and Availability
None
(2) Tools
To accomplish this Service Bulletin it is necessary to use the tools listed in the
subsequent referenced tasks:
AMM 32-11-11, Page Block 401
AMM 32-11-11, Page Block 601
AMM 32-31-00, Page Block 501
(3) Special Tools
None
DATE: Sep 24/19 SERVICE BULLETIN No.: A300-32-6119
REVISION No.: 00 - Sep 24/19 Page: 13
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 18

@A300-600
SERVICE BULLETIN
This Page Intentionally Left Blank
DATE: Sep 24/19 SERVICE BULLETIN No.: A300-32-6119
REVISION No.: 00 - Sep 24/19 Page: 14
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 19

@A300-600
SERVICE BULLETIN
3. ACCOMPLISHMENT INSTRUCTIONS
Task 326119-832-896-001 - Ins pect the RH / LH Hinge Arm / Barrel Pins and Connecting Rod
Bushings
WARNING
: MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND ALL THE CAUTIONS
INCLUDED IN THE REFERENCED PROCEDURES.
CAUTION
: ALWAYS OBEY THE PRECAUTIONS THAT FOLLOW TO KEEP
ELECTRICAL WIRING IN A SATISFACTORY CONDITION (ELECTRICALLY
AND MECHANICALLY SERVICEABLE) . WHEN YOU DO MAINTENANCE
WORK, REPAIRS OR MODIFICATIONS, ALWAYS KEEP ELECTRICAL WIRING,
COMPONENTS AND THE WORK AREA AS CLEAN AS POSSIBLE. TO DO
THIS:
- PUT PROTECTION, SUCH AS PLASTIC SHEETING, CLOTHS, ETC., AS
NECESSARY ON WIRING AND COMPONENTS.
- REGULARLY REMOVE ALL SHAVINGS, UNWANTED MATERIAL AND
OTHER CONTAMINATION.
THESE PRECAUTIONS WILL DECREASE THE RISK OF CONTAMINATION
AND DAMAGE TO THE ELECTRICAL WIRING INSTALLATION.
IF THERE IS CONTAMINATION, REFER TO ESPM 20-55-00.
NOTE
: The accomplishment instructions of this Service Bulletin include procedures given
in other documents or in other sections of the Service Bulletin. When the words
’refer to’ are used and the operator has a procedure accepted by the local authority
he belongs to, the accepted alternative procedure can be used. When the words ’in
accordance with’ are used then the given procedure must be followed.
NOTE
: The access and close-up instructions, not comprising return to service tests, in this
Service Bulletin do not constitute or affect the technical intent of the Service
Bulletin. Operators can therefore, as deemed necessary, omit or add access and/or
close-up steps to add flexibility to their maintenance operations as long as the
technical intent of the Service Bulletin is met within the set parameters.
NOTE
: Manual titles given in the accomplishment instructions are referred to by acronyms.
Refer to paragraph 1.J., References, for the definition of acronyms.
NOTE
: This Service Bulletin contains the instructions for the on-aircraft maintenance
necessary to ensure the continued airworthiness of the aircraft.
For any deviations to the instructions, including RC paragraph contained herein,
contact AIRBUS for further instructions and approval.
NOTE
: This Service Bulletin is classified mandatory or expected to be classified mandatory
by an Airworthiness Directive (AD). The paragraphs 3.C. and 3.D. in these
accomplishment instructions are Required for Compliance (RC) and must be done
to comply with the AD. To allow more flexibility, the rule "refer to" and "in
accordance with" will apply to these paragraphs 3.C. and 3.D. Other paragraphs
are recommended and may be deviated from, done as part of other actions or
DATE: Sep 24/19 SERVICE BULLETIN No.: A300-32-6119
REVISION No.: 00 - Sep 24/19 Page: 15
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 20

@A300-600
SERVICE BULLETIN
done with accepted methods different from those given in the Service Bulletin, as
long as the RC paragraphs can be done and the aircraft can be put back into a
serviceable condition.
NOTE
: The purpose of flowcharts is to supplement the information given in the Procedure
and Compliance paragraphs and not to serve as the primary source for tasks or
compliance times given in this Service Bulletin.
NOTE
: Discarded parts must be managed at the operator’s discretion.
Task Associated Data
Zone
731 741
Manpower
TOTAL MANHOURS
 22.25
ELAPSED TIME (HOURS)
 9.75
A. GENERAL
(1) Subtask 326119-910-401-001 - Standard Practices
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 06-21-00, Page Block 001
20-21-12, Page Block 001
(a) To torque tighten the standard threaded fasteners, refer to AMM 20-21-12, Page
Block 001.
(b) For the identification of access panels, refer to AMM 06-21-00, Page Block 001.
(c) For the specification of materials (Mat. No.) given in this Service Bulletin, refer to
the Consumable Materials List (CML).
(d) For the identification of Zones, refer to AMM 06-21-00, Page Block 001.
(e) Put all the retained hardware in identified plastic bags and attach the bags to the
related unit.
(f) Tag all the parts you must remove and retain to make the subsequent installation
easier.
(2) Subtask 326119-839-401-001 - Administrative
Manpower Resources
Skills
 NON SPECIFIC
Write in the applicable aircraft records that you have done all the work given in the
Service Bulletin.
DATE: Sep 24/19 SERVICE BULLETIN No.: A300-32-6119
REVISION No.: 00 - Sep 24/19 Page: 16
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 21

@A300-600
SERVICE BULLETIN
B. PREPARATION
(1) Subtask 326119-941-401-001 - Job Set-up
Work Zones and Access Panels
Zone
 Access/Work location
741
731
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 24-41-00, Page Block 301
32-11-11, Page Block 601
NOTE
: For the basic Aircraft configuration, refer to AMM Chapter "Introduction -
Aircraft status for maintenance" in Manual Front Matter section.
(a) Make sure that the aircraft is electrically grounded, refer to AMM 24-41-00, Page
Block 301.
(b) Do the Job Set-up for the RH / LH MLG as specified in LEG (Main Gear) -
Inspection/Check, refer to AMM 32-11-11, Page Block 601.
C. PROCEDURE
(1) Subtask 326119-020-401-001 - Remove the RH Hinge Arm / Barrel Pin
Work Zones and Access Panels
Zone
 Access/Work location
741
Manpower Resources
Manhours
 5.75
Minimum number of person
 5
Subtask elapsed time
 3.75
Skills
 AIRFRAME
References
Aircraft Maintenance Manual (AMM)
 32-11-11, Page Block 601
(a) Remove the RH MLG Hinge Arm / Barrel Pin, refer to AMM 32-11-11, Page Block
601:
As
required
Pin C66441-200 Retain
DATE: Sep 24/19 SERVICE BULLETIN No.: A300-32-6119
REVISION No.: 00 - Sep 24/19 Page: 17
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 22

@A300-600
SERVICE BULLETIN
(2) Subtask 326119-832-401-001 - Inspect the RH Hinge Arm / Barrel Pin and
Connecting Rod Bushings
Work Zones and Access Panels
Zone
 Access/Work location
741
Manpower Resources
Manhours
 0.50
Minimum number of person
 1
Subtask elapsed time
 0.50
Skills
 AIRFRAME
Material necessary to do the job
Consumable CMLB01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Non Aqueous Cleaner-
General
08BAA9
 As required
Textile-Lint Free Cotton
 14SBA1
 As required
References
Aircraft Maintenance Manual (AMM)
 32-11-11, Page Block 601
In Service Information (ISI)
 00.00.00179
Fig. A-UCAAA
Barrel / Hinge Arm Pin Inspection
Sheet 01
(a) Do a Special Detailed Inspection of the bushings of the connecting rod, using the
window in the dummy pin, refer to AMM 32-11-11, Page Block 601.
1
 If the bushings are found fractured, cracked, or distorted:
a
 Replace the associated MLG Leg and Hinge Arm / Barrel Pin. Proceed to
TASK 326119-831-895 001 Replace the RH / LH MLG Leg and Hinge
Arm / Barrel Pin (Depending on Inspection Results) .
b
 Upload the completed Inspection Report sheet given in Appendix 02 -
Inspection Report in accordance with ISI 00.00.00179.
c
 Inspect the opposite side MLG leg, refer to SUBTASK 326119-832-402
001 Inspect the LH Hinge Arm / Barrel Pin and Connecting Rod Bushings
, at the thresholds given in the accomplishment timescale paragraph
1.E.(2).
d
 Send the removed MLG Leg to MRO for inspection in accordance with
the thresholds given in the planning information paragraph 1.E.(2).
DATE: Sep 24/19 SERVICE BULLETIN No.: A300-32-6119
REVISION No.: 00 - Sep 24/19 Page: 18
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 23

@A300-600
SERVICE BULLETIN
e
 Send the removed Hinge Arm / Barrel Pin to Safran Landing Systems for
investigation in accordance with the thresholds given in the planning
information paragraph 1.E.(2).
f
 Repeat the inspection within the required intervals in accordance with the
thresholds given in the planning information paragraph 1.E.(2).
2
 If the bushings are found with corrosion, wear, or discoloration on the inner
face of the bushings:
a
 Contact Safran Landing Systems for instructions.
3
 If no damage is found:
a
 Clean the inner and outer surfaces of the removed Hinge Arm / Barrel
Pin with:
Non Aqueous
Cleaner-General
08BAA9 As required
Textile-Lint Free
Cotton
14SBA1 As required
b
 Do a Detailed Visual Inspection of both inner and outer surfaces of the
removed Hinge Arm / Barrel Pin for presence of crack, chrome damage,
or corrosion, refer to AMM 32-11-11, Page Block 601.
<1> If a crack is found:
<a> Replace the associated MLG Leg. Proceed to TASK
326119-831-895 001 Replace the RH / LH MLG Leg and Hinge
Arm / Barrel Pin (Depending on Inspection Results) .
<b> Upload the completed Inspection Report sheet given in
Appendix 02 - Inspection Report in accordance with ISI
00.00.00179.
<c> Inspect the opposite side MLG leg, refer to SUBTASK
326119-832-402 001 Inspect the LH Hinge Arm / Barrel Pin
and Connecting Rod Bushings , at the thresholds given in the
accomplishment timescale paragraph 1.E.(2).
<d> Send the removed MLG Leg to MRO for inspection
in accordance with the thresholds given in the planning
information paragraph 1.E.(2).
<e> Send the removed Hinge Arm / Barrel Pin to Safran Landing
Systems for investigation in accordance with the thresholds
given in the planning information paragraph 1.E.(2).
<f> Repeat the inspection within the required intervals in
accordance with the thresholds given in the planning
information paragraph 1.E.(2).
DATE: Sep 24/19 SERVICE BULLETIN No.: A300-32-6119
REVISION No.: 00 - Sep 24/19 Page: 19
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 24

@A300-600
SERVICE BULLETIN
<2> If no crack is found but outer surface has chrome damage and/or
corrosion:
<a> Install a serviceable Hinge Arm / Barrel Pin, refer to SUBTASK
326119-420-401 001 Install the RH Hinge Arm / Barrel Pin .
<b> Send the removed Hinge Arm / Barrel Pin to Safran Landing
Systems for investigation in accordance with the thresholds
given in the planning information paragraph 1.E.(2).
<c> Upload the completed Inspection Report sheet given in
Appendix 02 - Inspection Report in accordance with ISI
00.00.00179.
<d> Repeat the inspection within the required intervals in
accordance with the thresholds given in the planning
information paragraph 1.E.(2).
<3> If no crack is found and outer surface has no chrome damage or
corrosion:
<a> Install the retained Hinge Arm / Barrel Pin refer to SUBTASK
326119-420-401 001 Install the RH Hinge Arm / Barrel Pin .
<b> Repeat the inspection within the required intervals in
accordance with the thresholds given in the planning
information paragraph 1.E.(2).
(3) Subtask 326119-420-401-001 - Install the RH Hinge Arm / Barrel Pin
Work Zones and Access Panels
Zone
 Access/Work location
741
Manpower Resources
Manhours
 2.25
Minimum number of person
 1
Subtask elapsed time
 2.25
Skills
 AIRFRAME
Material necessary to do the job
Equipment BFEB01
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 SEE
NOTES
C66441-200
 As required
 PIN
NOTE
: The above list of components is not an AIRBUS Kit, the required parts
shall be ordered as necessary through the given channel.
DATE: Sep 24/19 SERVICE BULLETIN No.: A300-32-6119
REVISION No.: 00 - Sep 24/19 Page: 20
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 25

@A300-600
SERVICE BULLETIN
References
Aircraft Maintenance Manual (AMM)
 32-11-11, Page Block 601
In Service Information (ISI)
 00.00.00179
(a) Refer to the RH Hinge Arm / Barrel Pin inspection results:
1
 If no crack was found but outer surface had chrome damage and / or
corrosion:
a
 Install a serviceable Hinge Arm / Barrel Pin, refer to AMM 32-11-11,
Page Block 601:
As
required
Pin C66441-200
2
 If no crack was found and outer surface had no chrome damage or corrosion:
a
 Install the retained Hinge Arm / Barrel Pin, refer to AMM 32-11-11, Page
Block 601:
As
required
Pin C66441-200 Retained at
removal
(4) Subtask 326119-020-402-001 - Remove the LH Hinge Arm / Barrel Pin
Work Zones and Access Panels
Zone
 Access/Work location
731
Manpower Resources
Manhours
 5.75
Minimum number of person
 5
Subtask elapsed time
 3.75
Skills
 AIRFRAME
References
Aircraft Maintenance Manual (AMM)
 32-11-11, Page Block 601
(a) Remove the LH MLG Hinge Arm / Barrel Pin, refer to AMM 32-11-11, Page Block
601:
As
required
Pin C66441-200 Retain
(5) Subtask 326119-832-402-001 - Inspect the LH Hinge Arm / Barrel Pin and
Connecting Rod Bushings
Work Zones and Access Panels
Zone
 Access/Work location
731
DATE: Sep 24/19 SERVICE BULLETIN No.: A300-32-6119
REVISION No.: 00 - Sep 24/19 Page: 21
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 26

@A300-600
SERVICE BULLETIN
Manpower Resources
Manhours
 0.50
Minimum number of person
 1
Subtask elapsed time
 0.50
Skills
 AIRFRAME
Material necessary to do the job
Consumable CMLB01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Non Aqueous Cleaner-
General
08BAA9
 As required
Textile-Lint Free Cotton
 14SBA1
 As required
References
Aircraft Maintenance Manual (AMM)
 32-11-11, Page Block 601
In Service Information (ISI)
 00.00.00179
Fig. A-UCAAA
Barrel / Hinge Arm Pin Inspection
Sheet 01
(a) Do a Special Detailed Inspection of the bushings of the connecting rod, using the
window in the dummy pin, refer to AMM 32-11-11, Page Block 601.
1
 If the bushings are found fractured, cracked, or distorted:
a
 Replace the associated MLG Leg and Hinge Arm / Barrel Pin. Proceed to
TASK 326119-831-895 001 Replace the RH / LH MLG Leg and Hinge
Arm / Barrel Pin (Depending on Inspection Results) .
b
 Upload the completed Inspection Report sheet given in Appendix 02 -
Inspection Report in accordance with ISI 00.00.00179.
c
 Inspect the opposite side MLG leg, refer to SUBTASK 326119-832-401
001 Inspect the RH Hinge Arm / Barrel Pin and Connecting Rod
Bushings , at the thresholds given in the accomplishment timescale
paragraph 1.E.(2).
d
 Send the removed MLG Leg to MRO for inspection in accordance with
the thresholds given in the planning information paragraph 1.E.(2).
e
 Send the removed Hinge Arm / Barrel Pin to Safran Landing Systems for
investigation in accordance with the thresholds given in the planning
information paragraph 1.E.(2).
f
 Repeat the inspection within the required intervals in accordance with the
thresholds given in the planning information paragraph 1.E.(2).
DATE: Sep 24/19 SERVICE BULLETIN No.: A300-32-6119
REVISION No.: 00 - Sep 24/19 Page: 22
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 27

@A300-600
SERVICE BULLETIN
2
 If the bushings are found with corrosion, wear, or discoloration on the inner
face of the bushings:
a
 Contact Safran Landing Systems for instructions.
3
 If no damage is found:
a
 Clean the inner and outer diameter of the removed Hinge Arm / Barrel
Pin with:
Non Aqueous
Cleaner-General
08BAA9 As required
Textile-Lint Free
Cotton
14SBA1 As required
b
 Do a Detailed Visual Inspection of both inner and outer surfaces of the
removed Hinge Arm / Barrel Pin for presence of crack, chrome damage,
or corrosion, refer to AMM 32-11-11, Page Block 601.
<1> If a crack is found:
<a> Replace the associated MLG Leg. Proceed to TASK
326119-831-895 001 Replace the RH / LH MLG Leg and Hinge
Arm / Barrel Pin (Depending on Inspection Results) .
<b> Upload the completed Inspection Report sheet given in
Appendix 02 - Inspection Report in accordance with ISI
00.00.00179.
<c> Inspect the opposite side MLG leg, refer to SUBTASK
326119-832-401 001 Inspect the RH Hinge Arm / Barrel Pin
and Connecting Rod Bushings , at the thresholds given in the
accomplishment timescale paragraph 1.E.(2).
<d> Send the removed MLG Leg to MRO for inspection
in accordance with the thresholds given in the planning
information paragraph 1.E.(2).
<e> Send the removed Hinge Arm / Barrel Pin to Safran Landing
Systems for investigation in accordance with the thresholds
given in the planning information paragraph 1.E.(2).
<f> Repeat the inspection within the required intervals in
accordance with the thresholds given in the planning
information paragraph 1.E.(2).
<2> If no crack is found but outer surface has chrome damage and/or
corrosion:
<a> Install a serviceable Hinge Arm / Barrel Pin, refer to SUBTASK
326119-420-402 001 Install the LH Hinge Arm / Barrel Pin .
DATE: Sep 24/19 SERVICE BULLETIN No.: A300-32-6119
REVISION No.: 00 - Sep 24/19 Page: 23
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 28

@A300-600
SERVICE BULLETIN
<b> Send the removed Hinge Arm / Barrel pin to Safran Landing
Systems for investigation in accordance with the thresholds
given in the planning information paragraph 1.E.(2).
<c> Upload the completed Inspection Report sheet given in
Appendix 02 - Inspection Report in accordance with ISI
00.00.00179.
<d> Repeat the inspection within the required intervals in
accordance with the thresholds given in the planning
information paragraph 1.E.(2).
<3> If no crack is found and outer surface has no chrome damage or
corrosion:
<a> Install the retained Hinge Arm / Barrel Pin, refer to SUBTASK
326119-420-402 001 Install the LH Hinge Arm / Barrel Pin .
<b> Repeat the inspection within the required intervals in
accordance with the thresholds given in the planning
information paragraph 1.E.(2).
(6) Subtask 326119-420-402-001 - Install the LH Hinge Arm / Barrel Pin
Work Zones and Access Panels
Zone
 Access/Work location
731
Manpower Resources
Manhours
 2.25
Minimum number of person
 1
Subtask elapsed time
 2.25
Skills
 AIRFRAME
Material necessary to do the job
Equipment BFEB01
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 SEE
NOTES
C66441-200
 As required
 PIN
NOTE
: The above list of components is not an AIRBUS Kit, the required parts
shall be ordered as necessary through the given channel.
References
Aircraft Maintenance Manual (AMM)
 32-11-11, Page Block 601
In Service Information (ISI)
 00.00.00179
Fig. A-UCAAA
Barrel / Hinge Arm Pin Inspection
Sheet 01
DATE: Sep 24/19 SERVICE BULLETIN No.: A300-32-6119
REVISION No.: 00 - Sep 24/19 Page: 24
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 29

@A300-600
SERVICE BULLETIN
(a) Refer to the LH Hinge Arm / Barrel Pin inspection results:
1
 If no crack was found but outer surface had chrome damage and / or
corrosion:
a
 Install a serviceable Hinge Arm / Barrel Pin, refer to AMM 32-11-11,
Page Block 601:
As
required
Pin C66441-200
2
 If no crack was found and outer surface had no chrome damage or corrosion:
a
 Install the retained Hinge Arm / Barrel Pin, refer to AMM 32-11-11, Page
Block 601:
As
required
Pin C66441-200 Retained at
removal
D. TEST
None
E. CLOSE-UP
(1) Subtask 326119-942-401-001 - Close-up
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 32-11-11, Page Block 601
NOTE
: If you intend to accomplish an associated Repair Task during the same
layover period, the subsequent Close-up procedure is not necessary.
(a) Make sure that the work areas are clean and clear of tools and other items of
equipment.
(b) Do the Close-up as specified in the LEG (Main Gear) - Inspection/Check, refer to
AMM 32-11-11, Page Block 601.
(c) Put the aircraft back to its initial configuration.
DATE: Sep 24/19 SERVICE BULLETIN No.: A300-32-6119
REVISION No.: 00 - Sep 24/19 Page: 25
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 30

@A300-600
SERVICE BULLETIN
This Page Intentionally Left Blank
DATE: Sep 24/19 SERVICE BULLETIN No.: A300-32-6119
REVISION No.: 00 - Sep 24/19 Page: 26
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 31

@A300-600
SERVICE BULLETIN
Task 326119-831-895-001 - Replace the RH / LH MLG Leg and Hinge Arm / Barrel Pin
(Depending on Inspection Results)
WARNING
: MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND ALL THE CAUTIONS
INCLUDED IN THE REFERENCED PROCEDURES.
CAUTION
: ALWAYS OBEY THE PRECAUTIONS THAT FOLLOW TO KEEP
ELECTRICAL WIRING IN A SATISFACTORY CONDITION (ELECTRICALLY
AND MECHANICALLY SERVICEABLE) . WHEN YOU DO MAINTENANCE
WORK, REPAIRS OR MODIFICATIONS, ALWAYS KEEP ELECTRICAL WIRING,
COMPONENTS AND THE WORK AREA AS CLEAN AS POSSIBLE. TO DO
THIS:
- PUT PROTECTION, SUCH AS PLASTIC SHEETING, CLOTHS, ETC., AS
NECESSARY ON WIRING AND COMPONENTS.
- REGULARLY REMOVE ALL SHAVINGS, UNWANTED MATERIAL AND
OTHER CONTAMINATION.
THESE PRECAUTIONS WILL DECREASE THE RISK OF CONTAMINATION
AND DAMAGE TO THE ELECTRICAL WIRING INSTALLATION.
IF THERE IS CONTAMINATION, REFER TO ESPM 20-55-00.
NOTE
: The accomplishment instructions of this Service Bulletin include procedures given
in other documents or in other sections of the Service Bulletin. When the words
’refer to’ are used and the operator has a procedure accepted by the local authority
he belongs to, the accepted alternative procedure can be used. When the words ’in
accordance with’ are used then the given procedure must be followed.
NOTE
: The access and close-up instructions, not comprising return to service tests, in this
Service Bulletin do not constitute or affect the technical intent of the Service
Bulletin. Operators can therefore, as deemed necessary, omit or add access and/or
close-up steps to add flexibility to their maintenance operations as long as the
technical intent of the Service Bulletin is met within the set parameters.
NOTE
: Manual titles given in the accomplishment instructions are referred to by acronyms.
Refer to paragraph 1.J., References, for the definition of acronyms.
NOTE
: This Service Bulletin contains the instructions for the on-aircraft maintenance
necessary to ensure the continued airworthiness of the aircraft.
For any deviations to the instructions, including RC paragraph contained herein,
contact AIRBUS for further instructions and approval.
NOTE
: This Service Bulletin is classified mandatory or expected to be classified mandatory
by an Airworthiness Directive (AD). The paragraphs 3.C. and 3.D. in these
accomplishment instructions are Required for Compliance (RC) and must be done
to comply with the AD. To allow more flexibility, the rule "refer to" and "in
accordance with" will apply to these paragraphs 3.C. and 3.D. Other paragraphs
are recommended and may be deviated from, done as part of other actions or
done with accepted methods different from those given in the Service Bulletin, as
long as the RC paragraphs can be done and the aircraft can be put back into a
DATE: Sep 24/19 SERVICE BULLETIN No.: A300-32-6119
REVISION No.: 00 - Sep 24/19 Page: 27
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 32

@A300-600
SERVICE BULLETIN
serviceable condition.
NOTE
: Discarded parts must be managed at the operator’s discretion.
Task Associated Data
Zone
731 741
Manpower
TOTAL MANHOURS
 89.25
ELAPSED TIME (HOURS)
 45.25
A. GENERAL
(1) Subtask 326119-910-402-001 - Standard Practices
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 06-21-00, Page Block 001
20-21-12, Page Block 001
(a) To torque tighten the standard threaded fasteners, refer to AMM 20-21-12, Page
Block 001.
(b) For the identification of access panels, refer to AMM 06-21-00, Page Block 001.
(c) For the specification of materials (Mat. No.) given in this Service Bulletin, refer to
the Consumable Materials List (CML).
(d) For the identification of Zones, refer to AMM 06-21-00, Page Block 001.
(e) Put all the retained hardware in identified plastic bags and attach the bags to the
related unit.
(f) Tag all the parts you must remove and retain to make the subsequent installation
easier.
(2) Subtask 326119-839-402-001 - Administrative
Manpower Resources
Skills
 NON SPECIFIC
Write in the applicable aircraft records that you have done all the work given in the
Service Bulletin.
DATE: Sep 24/19 SERVICE BULLETIN No.: A300-32-6119
REVISION No.: 00 - Sep 24/19 Page: 28
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 33

@A300-600
SERVICE BULLETIN
B. PREPARATION
(1) Subtask 326119-941-402-001 - Job Set-up for the RH MLG
Work Zones and Access Panels
Zone
 Access/Work location
741
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 32-11-11, Page Block 401
NOTE
: For the basic Aircraft configuration, refer to AMM Chapter "Introduction -
Aircraft status for maintenance" in Manual Front Matter section.
(a) Do the Job Set-up as specified in LEG (Main Gear) - Removal/Installation, refer to
AMM 32-11-11, Page Block 401.
(2) Subtask 326119-941-403-001 - Job Set-up for the LH MLG
Work Zones and Access Panels
Zone
 Access/Work location
731
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 32-11-11, Page Block 401
NOTE
: For the basic Aircraft configuration, refer to AMM Chapter "Introduction -
Aircraft status for maintenance" in Manual Front Matter section.
(a) Do the Job Set-up as specified in LEG (Main Gear) - Removal/Installation, refer to
AMM 32-11-11, Page Block 401.
C. PROCEDURE
(1) Subtask 326119-960-401-001 - Replace the Existing RH MLG Leg and Hinge Arm /
Barrel Pin (Depending on Inspection Result)
Work Zones and Access Panels
Zone
 Access/Work location
741
DATE: Sep 24/19 SERVICE BULLETIN No.: A300-32-6119
REVISION No.: 00 - Sep 24/19 Page: 29
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 34

@A300-600
SERVICE BULLETIN
Manpower Resources
Manhours
 26.25
Minimum number of person
 2
Subtask elapsed time
 23.25
Skills
 AIRFRAME
Material necessary to do the job
Equipment BFEB01
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 SEE
NOTES
D22498010-11
 As required
 LEG
D22498011-4
 As required
 LEG
D22498015-10
 As required
 LEG
D22498020-9
 As required
 LEG
D22498025-10
 As required
 LEG
D22498030-6
 As required
 LEG
D22498040-3
 As required
 LEG
D22498145-6
 As required
 LEG
D22498150-6
 As required
 LEG
D22498250-5
 As required
 LEG
D23244000-6
 As required
 LEG
NOTE
: The above list of components is not an AIRBUS Kit, the required parts
shall be ordered as necessary through the given channel.
References
Aircraft Maintenance Manual (AMM)
 32-11-11, Page Block 401
(a) Replace existing RH MLG Leg with a serviceable one, refer to AMM 32-11-11,
Page Block 401:
As
required
LEG ASSY-MLG D 22498010-11 Retain
WITH:
As
required
LEG ASSY-MLG D22498010-11
OR
As
required
LEG ASSY-MLG D 22498011-4 Retain
WITH:
As
required
LEG ASSY-MLG D22498011-4
DATE: Sep 24/19 SERVICE BULLETIN No.: A300-32-6119
REVISION No.: 00 - Sep 24/19 Page: 30
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 35

@A300-600
SERVICE BULLETIN
OR
As
required
LEG ASSY-MLG D 22498015-10 Retain
WITH:
As
required
LEG ASSY-MLG D22498015-10
OR
As
required
LEG ASSY-MLG D 22498020-9 Retain
WITH:
As
required
LEG ASSY-MLG D22498020-9
OR
As
required
LEG ASSY-MLG D 22498025-10 Retain
WITH:
As
required
LEG ASSY-MLG D22498025-10
OR
As
required
LEG ASSY-MLG D 22498030-6 Retain
WITH:
As
required
LEG ASSY-MLG D22498030-6
OR
As
required
LEG ASSY-MLG D 22498040-3 Retain
WITH:
As
required
LEG ASSY-MLG D22498040-3
OR
As
required
LEG ASSY-MLG D 22498145-6 Retain
DATE: Sep 24/19 SERVICE BULLETIN No.: A300-32-6119
REVISION No.: 00 - Sep 24/19 Page: 31
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 36

@A300-600
SERVICE BULLETIN
WITH:
As
required
LEG ASSY-MLG D22498145-6
OR
As
required
LEG ASSY-MLG D 22498150-6 Retain
WITH:
As
required
LEG ASSY-MLG D22498150-6
OR
As
required
LEG ASSY-MLG D 22498250-5 Retain
WITH:
As
required
LEG ASSY-MLG D22498250-5
OR
As
required
LEG ASSY-MLG D 23244000-6 Retain
WITH:
As
required
LEG ASSY-MLG D23244000-6
NOTE
: Retained MLG Leg to be sent to MRO for inspection.
NOTE
: Install the same MLG Leg part number that was removed.
(2) Subtask 326119-960-402-001 - Replace the Existing LH MLG Leg and Hinge Arm /
Barrel Pin (Depending on Inspection Result)
Work Zones and Access Panels
Zone
 Access/Work location
731
Manpower Resources
Manhours
 26.25
Minimum number of person
 2
Subtask elapsed time
 23.25
Skills
 AIRFRAME
DATE: Sep 24/19 SERVICE BULLETIN No.: A300-32-6119
REVISION No.: 00 - Sep 24/19 Page: 32
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 37

@A300-600
SERVICE BULLETIN
Material necessary to do the job
Equipment BFEB01
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 SEE
NOTES
D22497010-11
 As required
 LEG
D22497011-4
 As required
 LEG
D22497015-10
 As required
 LEG
D22497020-9
 As required
 LEG
D22497025-10
 As required
 LEG
D22497030-6
 As required
 LEG
D22497040-3
 As required
 LEG
D22497145-6
 As required
 LEG
D22497150-6
 As required
 LEG
D22497250-5
 As required
 LEG
D23243000-6
 As required
 LEG
NOTE
: The above list of components is not an AIRBUS Kit, the required parts
shall be ordered as necessary through the given channel.
References
Aircraft Maintenance Manual (AMM)
 32-11-11, Page Block 401
(a) Replace existing LH MLG Leg with a serviceable one, refer to AMM 32-11-11, Page
Block 401:
As
required
LEG ASSY-MLG D 22497010-11 Retain
WITH:
As
required
LEG ASSY-MLG D22497010-11
OR
As
required
LEG ASSY-MLG D 22497011-4 Retain
WITH:
As
required
LEG ASSY-MLG D22497011-4
OR
As
required
LEG ASSY-MLG D 22497015-10 Retain
WITH:
DATE: Sep 24/19 SERVICE BULLETIN No.: A300-32-6119
REVISION No.: 00 - Sep 24/19 Page: 33
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 38

@A300-600
SERVICE BULLETIN
As
required
LEG ASSY-MLG D22497015-10
OR
As
required
LEG ASSY-MLG D 22497020-9 Retain
WITH:
As
required
LEG ASSY-MLG D22497020-9
OR
As
required
LEG ASSY-MLG D 22497025-10 Retain
WITH:
As
required
LEG ASSY-MLG D22497025-10
OR
As
required
LEG ASSY-MLG D 22497030-6 Retain
WITH:
As
required
LEG ASSY-MLG D22497030-6
OR
As
required
LEG ASSY-MLG D 22497040-3 Retain
WITH:
As
required
LEG ASSY-MLG D22497040-3
OR
As
required
LEG ASSY-MLG D 22497145-6 Retain
WITH:
As
required
LEG ASSY-MLG D22497145-6
OR
DATE: Sep 24/19 SERVICE BULLETIN No.: A300-32-6119
REVISION No.: 00 - Sep 24/19 Page: 34
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 39

@A300-600
SERVICE BULLETIN
As
required
LEG ASSY-MLG D 22497150-6 Retain
WITH:
As
required
LEG ASSY-MLG D22497150-6
OR
As
required
LEG ASSY-MLG D 22497250-5 Retain
WITH:
As
required
LEG ASSY-MLG D22497250-5
OR
As
required
LEG ASSY-MLG D 23243000-6 Retain
WITH:
As
required
LEG ASSY-MLG D23243000-6
NOTE
: Retained MLG Leg to be sent to MRO for inspection.
NOTE
: Install the same MLG Leg part number that was removed.
D. TEST
(1) Subtask 326119-720-402-001 - Test
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 32-11-11, Page Block 401
(a) Do the test procedure as specified after the installation of the MLG (LH and RH
sides), refer to AMM 32-11-11, Page Block 401.
E. CLOSE-UP
(1) Subtask 326119-942-402-001 - Close-up
Work Zones and Access Panels
Zone
 Access/Work location
741
731
DATE: Sep 24/19 SERVICE BULLETIN No.: A300-32-6119
REVISION No.: 00 - Sep 24/19 Page: 35
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 40

@A300-600
SERVICE BULLETIN
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 32-11-11, Page Block 401
(a) Make sure that the work areas are clean and clear of tools and other items of
equipment.
(b) Do the Close-Up as specified in the LEG (Main Gear) - Removal/Installation, refer
to AMM 32-11-11, Page Block 401.
(c) Put the aircraft back to its initial configuration.
DATE: Sep 24/19 SERVICE BULLETIN No.: A300-32-6119
REVISION No.: 00 - Sep 24/19 Page: 36
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 41

@A300-600
SERVICE BULLETIN
**CONF ALL
B
LH SHOWN
RH SYMMETRICAL
Z731
Z741
A
A
B
LH SHOWN
RH SYMMETRICAL
A A
LH SHOWN
RH SYMMETRICAL
INSPECT THE INNER AND OUTER
SURFACES OF THE PIN
A
A
D_SB_326119_7_CAAA_01_00
Figure A-UCAAA - Sheet 01
Barrel / Hinge Arm Pin Inspection
DATE: Sep 24/19 SERVICE BULLETIN No.: A300-32-6119
REVISION No.: 00 - Sep 24/19 Page: 37
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 42

@A300-600
SERVICE BULLETIN
**CONF ALL
NOYES
ARE THE
BUSHINGS CRACKED,
DISTORTED, OR
FRACTURED?
NOTE:
THE PURPOSE OF FLOWCHARTS IS TO SUPPLEMENT
THE INFORMATION GIVEN IN THE PROCEDURE AND 
COMPLIANCE PARAGRAPHS AND NOT TO SERVE AS
THE PRIMARY SOURCE FOR TASKS OR COMPLIANCE
TIMES GIVEN IN THE SERVICE BULLETIN.
REMOVE THE HINGE ARM / BARREL PIN FROM THE MAIN LANDING GEAR
DO A SPECIAL DETAILED INSPECTION OF THE CONNECTING ROD BUSHINGS
DO A DETAILED VISUAL
INSPECTION OF THE
HINGE ARM / BARREL PIN
IS THE
HINGE ARM /
BARREL PIN
CRACKED?
NO
YES
DO THE
BUSHINGS SHOW SIGNS
OF CORROSION, WEAR, OR
DISCOLORATION?
NO
YES
CONTACT SAFRAN LANDING
SYSTEMS FOR
FURTHER INSTRUCTION
DOES THE
HINGE ARM / BARREL PIN
SHOW OD CHROME DAMAGE
AND OR CORROSION?
YES
RE−INSTALL THE HINGE
ARM / BARREL PIN
NO
REPEAT INSPECTION WITHIN
THE REQUIRED INTERVALS
IN ACCORDANCE WITH
THRESHOLDS GIVEN IN
PLANNING INFORMATION
PARAGRAPH 1.E.(2)
SEND THE REMOVED HINGE ARM / BARREL PIN
TO SAFRAN LANDING SYSTEMS FOR INVESTIGATION
IF APPLICABLE, SEND THE REMOVED MAIN
LANDING GEAR TO THE MRO FOR INSPECTION
INSPECT THE
OPPOSITE SIDE LEG
IN ACCORDANCE WITH
THRESHOLDS GIVEN
IN PLANNING
INFORMATION
PARAGRAPH 1.E.(2)
REPLACE THE MAIN LANDING GEAR
 LEG INCLUDING THE HINGE ARM /
BARREL PIN IN ACCORDANCE WITH
THRESHOLDS GIVEN IN PLANNING
INFORMATION PARAGRAPH 1.E.(2)
REPORT TO
AIRBUS
INSTALL A SERVICEABLE
HINGE ARM / BARREL PIN
AND REPORT TO AIRBUS
D_SB_326119_7_FAAA_01_06
Figure A-UFAAA - Sheet 01
Flowchart
DATE: Sep 24/19 SERVICE BULLETIN No.: A300-32-6119
REVISION No.: 00 - Sep 24/19 Page: 38
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 43

@A300-600
SERVICE BULLETIN
Appendix 01 - Manpower Gantt Chart
**CONF ALL
For an explanation of the man-hours and elapsed time, refer to the next page.
DATE: Sep 24/19 SERVICE BULLETIN No.: A300-32-6119
REVISION No.: 00 - Sep 24/19 Page: 1
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 44

@A300-600
SERVICE BULLETIN
Appendix 01 - Manpower Gantt Chart
**CONF ALL
ELAPSED TIME ASSUMPTION SERVICE BULLETIN No A300−32−6119
SB ELAPSED TIME
(HOURS)
MH ET/S
TOTAL MANHOURS
SB ELAPSED TIME
22.25
9.75
STEPS
10
INSPECT THE RH HINGE ARM / BARREL PIN 0.50 0.50
0.50 0.50
CLOSE−UP 3.25 1.25
MH
ET/S:
PER
MANHOURS
ELAPSED TIME PER STEP
NUMBER OF PERSONS
01
02
THIS CHART IS ONLY A PROPOSAL.
OPERATORS MAY DETERMINE THAT ANOTHER WAY
TO DO THE WORK IS MORE SUITABLE FOR THEM.
01
02
NOTE:
PER
1
1
5
:
:
IF A VSB IS INVOLVED, THE ASSOCIATED MANHOURS
ARE NOT REFLECTED IN THIS GANTT CHART.
2 3 4 5 6 7 8 9 10
INSPECT THE LH HINGE ARM / BARREL PIN
JOB SET−UP 2.00 2.001
REMOVE THE RH HINGE ARM / BARREL PIN 5.75 3.755
REMOVE THE LH HINGE ARM / BARREL PIN 5.75 3.755
AND CONNECTING ROD BUSHINGS
AND CONNECTING ROD BUSHINGS
INSTALL THE RH HINGE ARM / BARREL PIN 2.25 2.251
2.25 2.251INSTALL THE LH HINGE ARM / BARREL PIN
D_SB_326119_7_AAAA_01_03
Figure A-UAAAA - Sheet 01
Appendix 01 - Manpower Gantt Chart
DATE: Sep 24/19 SERVICE BULLETIN No.: A300-32-6119
REVISION No.: 00 - Sep 24/19 Page: 2
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 45

@A300-600
SERVICE BULLETIN
Appendix 02 - Inspection Report
**CONF ALL
The results of the inspection, including no findings, replacement or actions to be done, must be
uploaded in accordance with ISI 00.00.00179 using the on-line reporting application in AIRBUSworld.
DATE: Sep 24/19 SERVICE BULLETIN No.: A300-32-6119
REVISION No.: 00 - Sep 24/19 Page: 1
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 46

@A300-600
SERVICE BULLETIN
Appendix 02 - Inspection Report
**CONF ALL
INSPECTION REPORT
SERVICE BULLETIN No :
A/C MSN :
FLIGHT CYCLES :
FLIGHT HOURS :
A300−32−6119
DATE OF INSPECTION :
INSPECTION METHOD : SPECIAL DETAILED
INSPECTION
UPLOAD THE COMPLETED INSPECTION REPORT
SHEET IN ACCORDANCE WITH ISI 00.00.00179
INSPECTED MLG LEG LOCATION:
INSPECTED MLG ASSEMBLY NUMBER:
INSPECTED MLG LEG SERIAL NUMBER:
RH LH
CRACK
DISTORTION
BROKEN INTO PARTS
CORROSION
WEAR
DISCOLORATION
NO DAMAGE
NOYES
BUSHING INSPECTION RESULTS:
PIN INSPECTION RESULTS:
N/A (BUSHING INSPECTION LED TO MLG REPLACEMENT)
CRACK ON EXTERNAL DIAMETER
CRACK ON INTERNAL DIAMETER
CHROME DAMAGE / CORROSION
DISCOLORATION
NO DAMAGE
NOYES
MLG LEG REPLACEMENT:
REPLACEMENT NOT NECESSARY:
REPLACEMENT NECESSARY:
NEW MLG LEG LOCATION:
INSTALLED MLG LEG ASSEMBLY NUMBER:
INSTALLED MLG LEG SERIAL NUMBER:
RH LH
D_SB_326119_7_AEAA_01_00
Figure A-UAEAA - Sheet 01
Appendix 02 - Inspection Report
DATE: Sep 24/19 SERVICE BULLETIN No.: A300-32-6119
REVISION No.: 00 - Sep 24/19 Page: 2
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 47

@A300-600
SERVICE BULLETIN
Service Bulletin REPORTING
TITLE: MAIN LANDING GEAR - INSPECTION OF THE HINGE ARM/BARREL
PIN
MODIFICATION No.: None
SB Reporting status
This Service Bulletin will only be incorporated into affected customized Maintenance and Flight
Operations Products if it is duly reported to Airbus.
General information
The SB Reporting policy is published in ISI 00.00.00135. This document provides information regarding:
the SB Reporting means and benefits, the update of customized Maintenance Products and customized
Flight Operations Products.
If this Service Bulletin has an operational impact, refer to paragraph "Flight Operations Products" for
further information on the update of affected Flight Operations Products.
SB Reporting procedure
Standard practice to report SB is to use the online reporting application on AirbusWorld.
Refer to ISI 00.00.00179:
- For complete information on reporting means to Airbus. Question 2 "What are the standard
practices for SB reporting?"
- If this SB requires previous or simultaneous accomplishment of other SBs, Question 3 "What about
the reporting of prerequisite Service Bulletin?"
NOTE:
 ISI 00.00.00179 covers all the frequently asked questions about SB Reporting. It is revised on a
regular basis.
DATE: Sep 24/19 SERVICE BULLETIN No.: A300-32-6119
REVISION No.: 00 - Sep 24/19 Page: 1
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 48

@A300-600
SERVICE BULLETIN
QUALITY PERCEPTION FORM
Use this form to tell us what is your perception of the quality of this Service Bulletin. The reported data
that you provide us will be used to analyse areas of difficulties and to take corrective action to further
improve the quality of our Service Bulletins.
We thank you for the time you have taken in completing this form.
(Please rate on a scale of 1 to 4, with 4 being the highest score)
- Quality rating of this SB 4321
- Quality rating of the Accomplishment Instructions 4321
- Quality rating of the Illustrations 4321
- Is this SB easy to understand ? Y/N
If you have had difficulties in the accomplishment of this SB please quote below the area(s) and give a
short description of the issue.
Planning Material Instructions
X Effectivity X Kit content X Preparation
X Reason X List of Materials Operator Supplied X Mod/Inspection
X Manpower X Industry support X Test
X References X Re-identification X Close-Up
X Publication X Tooling X Illustrations
Comments:
Operator: Date:
Name/Title:
Please return this form to:
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX FRANCE
Attn : SEM4 Service Bulletins Management
F A X:( 3 3 )56 19 34 25 1
Or via your Resident Customer Support Office.
DATE: Sep 24/19 SERVICE BULLETIN No.: A300-32-6119
REVISION No.: 00 - Sep 24/19 Page: 1
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.