# Airbus Service Bulletin A300-53-0395

Copy: No revision named ("FAA-2015-0243_SB A300-53-0395"), 37 pages: PDF https://openairdocs.org/files/sha256/90/25/90255855e452b4ac580fae72059825f83913c5139c7aebd3ca42c42988ee4a2c; text https://openairdocs.org/service-documents/airbus/a300-53-0395/file/90255855e452.md. Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2015-0243; AD 2016-05-05 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Airbus](https://openairdocs.org/service-documents/airbus.md)
- Type: Service bulletin (Service Bulletin)
- Number: A300-53-0395
- Page: https://openairdocs.org/service-documents/airbus/a300-53-0395

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2016-05-05](https://openairdocs.org/ad/2016-05-05.md), effective Apr 13, 2016: No revision named

Also cited in [1 proposed AD](https://openairdocs.org/service-documents/airbus/a300-53-0395/proposed.md).

## Text (37 pages)

Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2015-0243; AD 2016-05-05 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

@A300
SERVICE BULLETIN
SUMMARY
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
This summary is for information only and is not approved for modification of the aircraft.
MANDATORY
 MANDATORY
 MANDATORY
ATA SYSTEM: 53
TITLE: FUSELAGE - TAIL CONE - THS SUPPORT STRUTS AT FR91 -
INSPECTION FOR CRACKS
**CONF ALL
MODIFICATIONS
None
REASON/DESCRIPTION/OPERATIONAL CONSEQUENCES
The Trimmable Horizontal Stabilizer (THS) is supported and articulated at Frame (FR)91. Any lateral
movement is prevented by four diagonal support struts.
During routine maintenance done on several aircraft in this area, support struts have been found
cracked.
The affected area is the strut end and typical cracks are longitudinal. On some aircraft several cracks
per support strut and support strut end have been found.
This Service Bulletin gives the instruction to do a repetitive inspection of the affected area on all A300
aircraft, to prevent a support strut rupture.
After the inspection (depending on aircraft records and general visual inspection results), it is necessary
to install a clamping device which will ensure the rod body end insert is kept in place.
This installation is temporary pending the definition of a new strut which will be introduced through
another Mandatory Modification Service Bulletin.
The accomplishment of this Service Bulletin will detect potential damage at the support strut end and
limit the risk of THS lateral movement.
GENERAL EVALUATION
EVALUATION TABLE
COMPLIANCE
 MANDATORY (1)
 CANCELS INSPECTION SB
 NO
POTENTIAL AD
 YES
 A/C OPERATION AFFECTED
 NO
RELIABILITY AFFECTED
 NO
 PAX COMFORT AFFECTED
 NO
DATE: Feb 14/14 SERVICE BULLETIN No.: A300-53-0395
REVISION No.: 00 - Feb 14/14 Page: 1
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 2

@A300
SERVICE BULLETIN
SUMMARY
EVALUATION TABLE
COST SAVING
 NO
 ETOPS AFFECTED
 NO
STRUCTURAL LIFE EXTN
 NO
 VENDOR SB INVOLVED
 NO
NOTE
 (1)
: Service Bulletin must be accomplished.
MATERIAL PRICE INFORMATION
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET
 QTY PER
A/C
PRICE PER
A/C (USD)
MAIN PARTS
Component COMPD01
 1
 See SB
 Strut
Component COMPD02
 1
 See SB
 Cotter-pin
EFFECTIVITY
This Service Bulletin is applicable to this (these) operator(s) :
001 50W 81T ABR AFG F2I IAW IRA IRM KZU MNB MSR RUN
SOP TIW TNO TSY
CONCURRENT REQUIREMENTS
None
REFERENCES / REPERCUSSIONS
TFU
 53.19.89.001
OEB
 None
AOT
 None
SIL
 None
LINE MAINTENANCE AFFECTED
 No
LIFE LIMIT
 None
OTHER
 None
NATURE OF THE WORK
AIRCRAFT
 YES
EQUIPMENT
 NO
HARD
 NO
SOFT
 NO
OBRM
 NO
MANPOWER
Task 530395-832-848-001: Inspection
TOTAL MANHOURS
 7.50
ELAPSED TIME (HOURS)
 5.00
APPENDICES
Appendix 01 - Elapsed Time Assumptions
DATE: Feb 14/14 SERVICE BULLETIN No.: A300-53-0395
REVISION No.: 00 - Feb 14/14 Page: 2
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 3

@A300
SERVICE BULLETIN
SUMMARY
**CONF ALL
FR91
Z310
A
B
B
B
B
A
TYPICAL
B
AREA TO BE
INSPECTED
AREA TO BE
INSPECTED
A_SB_530395_6_SAAA_01_01
Figure A-GSAAA - Sheet 01
DATE: Feb 14/14 SERVICE BULLETIN No.: A300-53-0395
REVISION No.: 00 - Feb 14/14 Page: 3
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 4

@A300
SERVICE BULLETIN
SUMMARY
This Page Intentionally Left Blank
DATE: Feb 14/14 SERVICE BULLETIN No.: A300-53-0395
REVISION No.: 00 - Feb 14/14 Page: 4
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 5

@A300
SERVICE BULLETIN
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
MANDATORY
 MANDATORY
 MANDATORY
ATA SYSTEM: 53
TITLE: FUSELAGE - TAIL CONE - THS SUPPORT STRUTS AT FR91 -
INSPECTION FOR CRACKS
MODIFICATION No.: None
This document contains AIRBUS PROPRIETARY INFORMATION and shall at all times remain the
property of AIRBUS; no intellectual property right or licence is granted by AIRBUS in connection with
any information contained in it. It is delivered on the express condition that said document and the
information contained in it shall be treated as confidential, shall not be used for any purpose other than
that for which it is hereby delivered. It shall not be disclosed in whole or in part to third parties and shall
not be duplicated in any manner (except for the purposes of performing the tasks described hereunder
and provided that any recipient of such document shall comply with the conditions herein), without
AIRBUS prior written consent.
1. PLANNING INFORMATION
**CONF ALL
A. EFFECTIVITY
(1) Models
B2-1C B2-203 B2K-3C B4-103 B4-203 B4-2C C4-203 F4-203
(2) Effectivity by MSN
0003 0041 0045 0055 0075 0080 0090 0101 0105 0107 0117 0123 0126 0129 0139
0151-0152 0154 0157 0160 0173 0175 0180 0183 0185 0187 0200 0203-0204 0210
0212 0218 0220 0226-0227 0234-0236 0239 0244 0247 0255-0256 0259 0261 0274
0277 0292 0299 0302 0304
(3) Effectivity by Operator
The Operator/MSN relationship is provided for information only and is correct at the time
of issue in accordance with the information available to AIRBUS. Any future changes
resulting from transfer of an aircraft from one operator to another will not be reflected in
this list unless the Service Bulletin is revised for another reason.
OPERATOR
 MSN
001
 0203 0218
DATE: Feb 14/14 SERVICE BULLETIN No.: A300-53-0395
REVISION No.: 00 - Feb 14/14 Page: 1
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 6

@A300
SERVICE BULLETIN
OPERATOR
 MSN
50W
 0003
81T
 0157 0277 0292
ABR
 0152 0220 0234 0236 0259 0274
AFG
 0180
F2I
 0235
IAW
 0239
IRA
 0080 0139 0151 0173 0185 0187 0226 0256 0299 0302
IRM
 0055 0090 0160 0175 0204 0244
KZU
 0041 0101 0117
MNB
 0123 0212 0304
MSR
 0200 0255
RUN
 0075 0105 0107 0154 0183
SOP
 0126
TIW
 0261
TNO
 0045 0210 0227 0247
TSY
 0129
(4) Configuration by MSN
MSN
 CONFIGURATION
0003 0041 0045 0055 0075 0080 0090 0101 0105 0107 0117
0123 0126 0129 0139 0151 0152 0154 0157 0160 0173 0175
0180 0183 0185 0187 0200 0203 0204 0210 0212 0218 0220
0226 0227 0234 0235 0236 0239 0244 0247 0255 0256 0259
0261 0274 0277 0292 0299 0302 0304
001
(5) Configuration definition
**CONF 001
Config. 001 is valid for all the aircraft given in the effectivity of this Service Bulletin as a
standard configuration.
(6) Material Effectivity
MATERIAL
 QTY PER A/C
 SEE NOTES
Consumable CMLD01
 1
Component COMPD01
 1
Component COMPD02
 1
B. CONCURRENT REQUIREMENTS
None
C. REASON
(1) History
The Trimmable Horizontal Stabilizer (THS) is supported and articulated at Frame (FR)91.
Any lateral movement is prevented by four diagonal support struts.
DATE: Feb 14/14 SERVICE BULLETIN No.: A300-53-0395
REVISION No.: 00 - Feb 14/14 Page: 2
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 7

@A300
SERVICE BULLETIN
During routine maintenance done on several aircraft in this area, support struts have
been found cracked.
The affected area is the strut end and typical cracks are longitudinal. On some aircraft
several cracks per support strut and support strut end have been found.
(2) Objective/Action
This Service Bulletin gives the instruction to do a repetitive inspection of the affected
area on all A300 aircraft, to prevent a support strut rupture.
After the inspection (depending on aircraft records and general visual inspection results),
it is necessary to install a clamping device which will ensure the rod body end insert is
kept in place.
This installation is temporary pending the definition of a new strut which will be
introduced through another Mandatory Modification Service Bulletin.
(3) Advantages
The accomplishment of this Service Bulletin will detect potential damage at the support
strut end and limit the risk of THS lateral movement.
(4) Operational/Maintenance Consequences
None
D. DESCRIPTION
To accomplish this Service Bulletin it is necessary to :
Task 530395-832-848-001: Inspection
(1) Identify the support struts installed
(2) Do a High Frequency Eddy Current (HFEC) inspection of the THS support strut ends
(3) Do an HFEC inspection of the strut ends after removal of the clamps
(4) Remove the clamps from the THS support struts
(5) Install the clamps on the THS support struts
(6) Replace the THS support struts
E. COMPLIANCE
(1) Classification
MANDATORY: Service Bulletin must be accomplished.
DATE: Feb 14/14 SERVICE BULLETIN No.: A300-53-0395
REVISION No.: 00 - Feb 14/14 Page: 3
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 8

@A300
SERVICE BULLETIN
(2) Accomplishment Timescale
Table 1, Config. 001 - High Frequency Eddy Current (HFEC) inspection of the THS support strut ends
Condition
 Action
 Compliance time
 Repetitive interval
All aircraft
 High Frequency Eddy
Current (HFEC)
inspection of the THS
support strut ends
24 months from SB
issuance date
NOTE
:D o t h e
GVI of
the struts
within 12
months
from SB
issuance
date
24 months
This Service Bulletin has been classified Mandatory. It is expected that an Airworthiness
Directive (AD) published by the European Av iation Safety Agenc y (EASA) will be issued
to confirm this classification. It is anticipated that the AD will confirm the thresholds and
intervals given above but reference should be made to the AD for confirmation of the
mandated accomplishment timescale.
F. APPROVAL
The technical content of this document is approved under the authority of Design
Organisation Approval No. EASA.21J.031.
If an aircraft listed in the effectivity has a modification or repair embodied that is not of
AIRBUS origin, and which affects the content of this Service Bulletin, the operator is
responsible for obtaining approval by its airworthiness authority for any adaptation necessary
before incorporation of the Service Bulletin.
G. MANPOWER
The manpower estimates given in this Service Bulletin are based on the direct labor cost to
do the work. These estimates assume that the work will be done by experienced personnel,
and may need to be revised upwards to suit operator’s circumstances. The estimates do not
include the time to prepare, plan or inspect the work. Manufacture and procurement of parts
and tools, drying times for paints, sealants, etc., and general administration work are also not
included.
For an explanation of the manhours and elapsed time, refer to the Gantt Chart given in
Appendix 01 - Elapsed Time Assumptions .
NOTE
: The minimum manhours necessary to accomplish this Service Bulletin are
those for the Inspection. Depending on the inspection result, additional
manhours can apply.
Task 530395-832-848-001: Inspection
Get Access
 0.50
On Aircraft
Identify the support struts installed
 0.50
DATE: Feb 14/14 SERVICE BULLETIN No.: A300-53-0395
REVISION No.: 00 - Feb 14/14 Page: 4
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 9

@A300
SERVICE BULLETIN
Task 530395-832-848-001: Inspection
Do a High Frequency Eddy Current (HFEC) inspection
of the THS support strut ends
2.00
Do an HFEC inspection of the strut ends after removal
of the clamps
2.00
Remove the clamps from the THS support struts
 0.50
Install the clamps on the THS support struts
 0.50
Replace the THS support struts
 1.00
Close-Up
 0.50
TOTAL MANHOURS
 7.50
ELAPSED TIME (HOURS)
 5.00
H. WEIGHT AND BALANCE
Not Changed
I. ELECTRICAL LOAD DATA
Not Changed
J. REFERENCES
Aircraft Maintenance Manual (AMM)
 06-21-00 06-21-53 20-21-12
24-00-00 53-00-00 53-22-14
55-11-14
Consumable Material List (CML)
Elec. Std. Practices Manual (ESPM)
 20-55-00
Illustrated Parts Catalog (IPC)
 53-46-04
Non Destructive Test Manual (NTM)
 53-19-47
Service Bulletin (SB)
 A300-53-0394
Standards Manual (SM)
Structural Repair Manual (SRM)
 51-30-29 51-40-20
K. PUBLICATION AFFECTED
Impact on scheduled maintenance: Refer to MPD
L. INTERCHANGEABILITY/MIXABILITY
Not Applicable
M. SPARES
None
DATE: Feb 14/14 SERVICE BULLETIN No.: A300-53-0395
REVISION No.: 00 - Feb 14/14 Page: 5
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 10

@A300
SERVICE BULLETIN
This Page Intentionally Left Blank
DATE: Feb 14/14 SERVICE BULLETIN No.: A300-53-0395
REVISION No.: 00 - Feb 14/14 Page: 6
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 11

@A300
SERVICE BULLETIN
2. MATERIAL INFORMATION
**CONF ALL
A. MATERIAL - PRICE AND AVAILABILITY
(1) Procurement Addresses
This Service Bulletin is the subject of an AIRBUS monitored retrofit campaign.
Customers with aircraft shown in the effectivity of this Service Bulletin should send a
purchase order to AIRBUS. Quote the number of this Service Bulletin. The address is:
Component COMPD01
 AIRBUS Material, Logistics and Suppliers
IFD - In Flight Desk
Weg beim Jaeger 150
D-22335 HAMBURG
GERMANY
For ordering by internet:
http://spares.airbus.com
For ordering by fax: +49 40 50 76 4012
For ordering by E-mail:
ifd.spares@airbus.com
AIRBUS Material, Logistics and Suppliers do not stock standard hardware as competitive
multiple suppliers ensure access to minimum prices. AIRBUS recommends Customers
with aircraft shown in the effectivity of this Service Bulletin to send a purchase order to
B/E Aerospace. The address is:
Component COMPD02
 B/E AEROSPACE INC.
CONSUMABLES MANAGEMENT
10000 NW 15th Terrace Miami
FL 33172
USA
Tel EMEA: +49 (0) 40 822 285 31500
Tel US: +1 305 925 2600
Tel ASIA: +1 310 900 1300
Fax EMEA: +49 (0) 40 822 285 31010
Fax US: +1 305 507 7191
Fax ASIA: +1 310 819 1200
SITA: MIAMMCR
E-Mail: AOGdesk_CMG@beaerospace.com
internet: http://www.beconsumables.com
or, alternatively any other source on the open
market.
(2) Price and Availability
No AIRBUS kit will be provided.
Operator supplied AIRBUS parts required to accomplish this Service Bulletin are to be
purchased by a spares purchase order.
DATE: Feb 14/14 SERVICE BULLETIN No.: A300-53-0395
REVISION No.: 00 - Feb 14/14 Page: 7
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 12

@A300
SERVICE BULLETIN
Operator supplied standard hardware parts required to accomplish this Service Bulletin
are to be supplied from the Operator’s stock.
B. INDUSTRY SUPPORT INFORMATION
AIRBUS will not provide industry support for accomplishment of this Service Bulletin.
For the organisation of this retrofit, you are kindly requested to contact AIRBUS retrofit
management department.
AIRBUS CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
France
E-mail : monitored.retrofit@airbus.com
T e l:( 3 3 )56 71 90 62 2
F a x:( 3 3 )56 19 32 74 5
C. LIST OF COMPONENTS
No Kit
D. LIST OF MATERIALS - OPERATOR SUPPLIED
(1) Consumable Materials
NOTE
: To accomplish this Service Bulletin, and in case of strut replacement, it is
necessary to use the expendable parts listed in AMM 53-22-14, Page
Block 401.
Consumable CMLD01
ITEM
 DESCRIPTION
 REFERENCE TO CML
MAT. No.
QTY PER A/C
 SEE
NOTES
Coating - Flexible Structure
 04QAB2
 As required
Polysulfide Sealant-Low Adhesion
Fillet Structure
06AEB2
 As required
Non Hardening Jointing Putty-High
Temp. Area Str
06LDG2
 As required
Non Aqueous Cleaner-General
 08BAA9
 As required
Corrosion Preventive Compound-
Water Displacing
12ADB1
 As required
Textile-Lint Free Cotton
 14SBA1
 As required
(2) Components
Component COMPD01
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 ITEM
 OLD PART N˚
 INT
 SEE
NOTES
R21449H
 1
 ROD
DATE: Feb 14/14 SERVICE BULLETIN No.: A300-53-0395
REVISION No.: 00 - Feb 14/14 Page: 8
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 13

@A300
SERVICE BULLETIN
NOTE
: Alternatively, it is possible to install PN R21449, PN R21449D, PN
R21449G or PN R21449H, refer to IPC 53-46-04.
NOTE
: The components listed above are only required if the replacement of a
support strut is necessary. The quantity of these items are to be ordered
as required.
NOTE
: The above list of components is not an AIRBUS Kit, the required parts
shall be ordered as necessary through the given channel.
Component COMPD02
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 ITEM
 OLD PART N˚
 INT
 SEE
NOTES
MS24665-374
 2
 PIN
NOTE
: If you find part numbers of hardware components in the related kit(s)
which you cannot identify in the LIST OF COMPONENTS of this Service
Bulletin, refer to Standards Manual (SM). The SM will give you the
correct part number to part number relationship.
NOTE
: The components listed above are only required if the replacement of a
support strut is necessary. The quantity of these items are to be ordered
as required.
NOTE
: The above list of components is not an AIRBUS Kit, the required parts
shall be ordered as necessary through the given channel.
(3) Equipment
None
E. PARTS TO BE RE-IDENTIFIED BY OPERATOR
None
F. TOOLING
(1) Tooling - Price and Availability
None
(2) Tools
If it is required to replace a support strut to accomplish this Service Bulletin it is
necessary to use the tools listed in AMM 53-22-14, Page Block 401.
(3) Special Tools
None
DATE: Feb 14/14 SERVICE BULLETIN No.: A300-53-0395
REVISION No.: 00 - Feb 14/14 Page: 9
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 14

@A300
SERVICE BULLETIN
This Page Intentionally Left Blank
DATE: Feb 14/14 SERVICE BULLETIN No.: A300-53-0395
REVISION No.: 00 - Feb 14/14 Page: 10
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 15

@A300
SERVICE BULLETIN
3. ACCOMPLISHMENT INSTRUCTIONS
Task 530395-832-848-001 - Inspection
WARNING
: MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND ALL THE CAUTIONS
INCLUDED IN THE REFERENCED PROCEDURES.
CAUTION
: ALWAYS OBEY THE PRECAUTIONS THAT FOLLOW TO KEEP
ELECTRICAL WIRING IN A SATISFACTORY CONDITION (ELECTRICALLY
AND MECHANICALLY SERVICEABLE) . WHEN YOU DO MAINTENANCE
WORK, REPAIRS OR MODIFICATIONS, ALWAYS KEEP ELECTRICAL WIRING,
COMPONENTS AND THE WORK AREA AS CLEAN AS POSSIBLE. TO DO
THIS:
- PUT PROTECTION, SUCH AS PLASTIC SHEETING, CLOTHS, ETC; AS
NECESSARY ON WIRING AND COMPONENTS.
- REGULARLY REMOVE ALL SHAVINGS, UNWANTED MATERIAL AND
OTHER CONTAMINATION.
THESE PRECAUTIONS WILL DECREASE THE RISK OF CONTAMINATION
AND DAMAGE TO THE ELECTRICAL WIRING INSTALLATION.
IF THERE IS CONTAMINATION REFER TO ESPM 20-55-00.
CAUTION
: ONLY ONE SUPPORT STRUT MAY BE REMOVED AT ONE TIME.
CAUTION
: IF ALL SUPPORT STRUTS ARE TO BE REMOVED, TWO STRUTS P/N
98A27407568000 MUST BE INSTALLED, REFER TO AMM 53-22-14, Page Block
401.
NOTE
: The accomplishment instructions of this Service Bulletin refer to procedures
included in other AIRBUS documents. When the words ’refer to’ are used and the
operator has an accepted alternative procedure, the accepted alternative procedure
can be used. When the words ’in accordance with’ are included in the instruction,
the procedure in the AIRBUS document must be used.
NOTE
: The access and close-up instructions, not comprising return to service tests, in this
Service Bulletin do not constitute or affect the technical intent of the Service
Bulletin. Operators can therefore, as deemed necessary, omit or add access and/or
close-up steps to add flexibility to their maintenance operations as long as the
technical intent of the Service Bulletin is met within the set parameters.
NOTE
: Manual titles given in the accomplishment instructions are referred to by acronyms.
Refer to paragraph 1.J., References, for the definition of acronyms.
NOTE
: This Service Bulletin is classified mandatory or expected to be classified mandatory
by an Airworthiness Directive (AD). The paragraphs 3.C. and 3.D. in these
accomplishment instructions are Required for Compliance (RC) and must be done
to comply with the AD. Other paragraphs are recommended and may be deviated
from, done as part of other actions or done with accepted methods different from
those given in the Service Bulletin, as long as the RC paragraphs can be done and
the aircraft can be put back into a serviceable condition.
DATE: Feb 14/14 SERVICE BULLETIN No.: A300-53-0395
REVISION No.: 00 - Feb 14/14 Page: 11
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 16

@A300
SERVICE BULLETIN
NOTE
: The purpose of flow charts is to supplement the information given in the Procedure
and Compliance paragraphs and not to serve as the primary source for tasks or
compliance times given in this Service Bulletin.
NOTE
: If necessary, you can lift the THS by using slings to ease the strut removal, refer to
AMM 55-11-14, Page Block 401.
Task Associated Data
Zone
310
Access
Door
 313AL
Panel
 313AL
Manpower
TOTAL MANHOURS
 7.50
ELAPSED TIME (HOURS)
 5.00
A. GENERAL
(1) Subtask 530395-910-201-001 - Standard Practices
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 06-21-00, Page Block 001
06-21-53, Page Block 001
20-21-12, Page Block 001
53-00-00, Page Block 001
Consumable Material List (CML)
Structural Repair Manual (SRM)
 51-30-29
51-40-20
(a) For the specification of materials (Mat. No.) given in this Service Bulletin, refer to
the Consumable Materials List (CML).
(b) For the Frame (FR) identification , refer to AMM 53-00-00, Page Block 001.
(c) For the identification of zones, refer to AMM 06-21-00, Page Block 001.
(d) For the identification of access panels, refer to AMM 06-21-53, Page Block 001.
(e) Torque tighten the standard threaded fasteners, refer to AMM 20-21-12, Page
Block 001.
(f) Remove and install fasteners in accordance with SRM 51-30-29.
(g) Apply sealant in accordance with SRM 51-40-20.
DATE: Feb 14/14 SERVICE BULLETIN No.: A300-53-0395
REVISION No.: 00 - Feb 14/14 Page: 12
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 17

@A300
SERVICE BULLETIN
(2) Subtask 530395-839-201-001 - Administrative
Manpower Resources
Skills
 NON SPECIFIC
Write in the applicable aircraft records that you have done all the work given in this
Service Bulletin.
B. PREPARATION
(1) Subtask 530395-941-201-001 - Job Set-up
Work Zones and Access Panels
Zone
 Access/Work location
310
 Access
 Door 313AL
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 24-00-00, Page Block 301
(a) The following items shall be considered as the basic Aircraft configuration before
you start a maintenance task:
- Aircraft on the ground resting on landing gear (the ground safety locks and the
wheel chocks are in position on the landing gear).
- Engine shut down, thrust reversers closed and locked.
- Aircraft in clean configuration.
- Parking brake applied.
- Aircraft electrical network de-energized.
- Hydraulic systems depressurized.
- Access to the cockpit and cabin is available.
- All circuit breakers are in closed position.
- All controls in NORM, AUTO or OFF position.
(b) Make sure that the aircraft is electrically grounded, refer to AMM 24-00-00, Page
Block 301.
(c) Put the access platform(s) in position below the access door 313AL.
(d) Open the access door 313AL.
DATE: Feb 14/14 SERVICE BULLETIN No.: A300-53-0395
REVISION No.: 00 - Feb 14/14 Page: 13
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 18

@A300
SERVICE BULLETIN
C. PROCEDURE
(1) Subtask 530395-832- 201-001 - Identify the s upport struts installed
Work Zones and Access Panels
Zone
 Access/Work location
310
Manpower Resources
Manhours
 0.50
Minimum number of person
 1
Subtask elapsed time
 0.50
Skills
 NON SPECIFIC
References
Fig. A-GBAAA
Inspection Area
Sheet 01
Fig. A-GFAAA
Inspection Flow Chart
Sheet 01
Sheet 02
Sheet 03
(a) Check the records of the THS support struts located at FR91 in tail cone, if struts
replacement is recorded since aircraft Entry Into Service (EIS), within 12 months
from Service Bulletin issuance date.
Refer to Fig. A-GFAAA Sheet 01
 .
1
 If the complete records are not available since aircraft EIS:
a
 Do a General Visual Inspection (GVI) of the struts on aircraft within 12
months from Service Bulletin issuance date.
<1> If the installed struts are not in accordance with the one given in Fig.
A-GBAAA Sheet 01
,V i e wB .
<a> Report the inspection results to Airbus within 1 month.
<b> No further action.
<2> If the installed struts are in accordance with the one given in Fig. A-
GBAAA Sheet 01
,V i e wB .
<a> If clamps are installed, continue with SUBTASK
530395-280-202 001 Do an HFEC inspection of the strut ends
after removal of the clamps
<b> If clamps are not installed, continue with SUBTASK
530395-280-201 001 Do a High Frequency Eddy Current
(HFEC) inspection of the THS support strut ends
DATE: Feb 14/14 SERVICE BULLETIN No.: A300-53-0395
REVISION No.: 00 - Feb 14/14 Page: 14
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 19

@A300
SERVICE BULLETIN
2
 If the complete records are available since aircraft EIS:
a
 If the struts were replaced since aircraft EIS.
<1> Do a GVI of the struts on aircraft within 12 months from Service
Bulletin issuance date.
<a> If the installed struts are not in accordance with the one given
in Fig. A-GBAAA Sheet 01
 ,V i e wB .
[1] Report the inspection results to Airbus within 1 month.
[2] No further action.
<b> If the installed struts are in accordance with the one given in
Fig. A-GBAAA Sheet 01
 ,V i e wB .
[1] If clamps are installed, continue with SUBTASK
530395-280-202 001 Do an HFEC inspection of the strut
ends after removal of the clamps .
[2] If clamps are not installed, continue with SUBTASK
530395-280-201 001 Do a High Frequency Eddy Current
(HFEC) inspection of the THS support strut ends .
b
 If the struts were not replaced since aircraft EIS.
<a> Report the info to Airbus within 1 month.
<b> No further action.
(2) Subtask 530395-280-201-001 - Do a High Frequency Eddy Current (HFEC)
inspection of the THS support strut ends
Work Zones and Access Panels
Zone
 Access/Work location
310
Manpower Resources
Manhours
 2.00
Minimum number of person
 1
Subtask elapsed time
 2.00
Skills
 NON SPECIFIC
Material necessary to do the job
Consumable CMLD01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Non Aqueous Cleaner-
General
08BAA9
 As required
DATE: Feb 14/14 SERVICE BULLETIN No.: A300-53-0395
REVISION No.: 00 - Feb 14/14 Page: 15
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 20

@A300
SERVICE BULLETIN
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Textile-Lint Free Cotton
 14SBA1
 As required
References
Aircraft Maintenance Manual (AMM)
 53-22-14, Page Block 401
Non Destructive Test Manual (NTM)
 53-19-47 -Part 6
Service Bulletin (SB)
 A300-53-0394
Fig. A-GBAAA
Inspection Area
Sheet 01
Fig. A-GFAAA
Inspection Flow Chart
Sheet 01
Sheet 02
Sheet 03
(a) Clean the THS support struts with:
Non Aqueous
Cleaner-General
08BAA9 As required
and
Textile-Lint Free
Cotton
14SBA1 As required
(b) Do an HFEC inspection of each strut end as given in NTM 53-19-47 -Part 6, before
next flight located at FR91 in tail cone at Threshold given in para 1.E.(2), refer to
Fig. A-GBAAA Sheet 01
 ,V i e wB .
Refer to Fig. A-GFAAA Sheet 02
 .
1
 If there is/are no crack(s) found on strut ends, refer to Fig. A-GBAAA Sheet
01
,V i e wC .
a
 Accomplish Service Bulletin No. A300-53-0394 before next flight.
b
 Report the inspection results to Airbus within 1 month.
c
 Do SUBTASK 530395-280-202 001 Do an HFEC inspection of the strut
ends after removal of the clamps every 24 months.
2
 If there is/are crack(s) found on at least one strut end, refer to Fig. A-GBAAA
Sheet 01
,V i e wC .
a
 If the individual maximum crack length is more than 15.0 mm (0.591 in),
or more than 4 cracks per strut end are equal or less than 15.0 mm
(0.591 in).
<1> Replace the damaged strut by a new one before next flight, refer to
SUBTASK 530395-831-201 001 Replace the THS support struts .
<2> Accomplish Service Bulletin No. A300-53-0394 before next flight.
DATE: Feb 14/14 SERVICE BULLETIN No.: A300-53-0395
REVISION No.: 00 - Feb 14/14 Page: 16
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 21

@A300
SERVICE BULLETIN
<3> Report the inspection results to Airbus within 10 days.
<4> Do SUBTASK 530395-280-202 001 Do an HFEC inspection of the
strut ends after removal of the clamps every 24 months.
b
 If the individual maximum crack length is equal or less than 15.0 mm
(0.591 in), or not more than 4 cracks per strut end are equal or less than
15.0 mm (0.591 in).
<1> Accomplish Service Bulletin No. A300-53-0394 before next flight.
<2> Report the inspection results to Airbus within 10 days.
<3> Do SUBTASK 530395-280-202 001 Do an HFEC inspection of the
strut ends after removal of the clamps every 24 months.
(3) Subtask 530395-280-202-001 - Do an HFEC inspection of the strut ends after
removal of the clamps
Work Zones and Access Panels
Zone
 Access/Work location
310
Manpower Resources
Manhours
 2.00
Minimum number of person
 1
Subtask elapsed time
 2.00
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 53-22-14, Page Block 401
Non Destructive Test Manual (NTM)
 53-19-47 , Part 6
Service Bulletin (SB)
 A300-53-0394
Fig. A-GBAAA
Inspection Area
Sheet 01
Fig. A-GFAAA
Inspection Flow Chart
Sheet 01
Sheet 02
Sheet 03
(a) Remove clamp from each support strut end at interval given in para 1.E.(2) and
refer to SUBTASK 530395-020-201 001 Remove the clamps from the THS support
struts .
(b) Do an HFEC inspection of each strut end where clamps were installed before next
flight, refer to NTM 53-19-47 , Part 6, refer to Fig. A-GBAAA Sheet 01
 ,V i e wBa n d
Fig. A-GFAAA Sheet 03
 .
1
 If no crack(s) found on strut end(s), refer to Fig. A-GBAAA Sheet 01
 ,V i e wC .
a
 Install clamp on each strut end before next flight, refer to SUBTASK
530395-420-201 001 Install the clamps on the THS support struts .
DATE: Feb 14/14 SERVICE BULLETIN No.: A300-53-0395
REVISION No.: 00 - Feb 14/14 Page: 17
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 22

@A300
SERVICE BULLETIN
b
 Report the inspection results to Airbus within 1 month.
c
 Do the work steps C.(3)(a) to C.(3)(b) again every 24 months.
2
 If crack(s) found on at least one strut end, refer to Fig. A-GBAAA Sheet 01
 ,
View C.
a
 If the individual maximum crack length is more than 15.0 mm (0.591 in),
or more than 4 cracks per strut end are equal or less than 15.0 mm
(0.591 in).
<1> Replace the damaged strut by a new one before next flight, refer to
SUBTASK 530395-831-201 001 Replace the THS support struts .
<2> Install clamp on each strut end before next flight, refer to SUBTASK
530395-420-201 001 Install the clamps on the THS support struts .
<3> Report the inspection results to Airbus within 10 days.
<4> Do the work steps C.(3)(a) to C.(3)(b) again every 24 months.
b
 If the individual maximum crack length is equal or less than 15.0 mm
(0.591 in), or not more than 4 cracks per strut end are equal or less than
15.0 mm (0.591 in).
<1> Install clamp on each strut end before next flight, refer to SUBTASK
530395-420-201 001 Install the clamps on the THS support struts .
<2> Report the inspection results to Airbus within 10 days.
<3> Do the work steps C.(3)(a) to C.(3)(b) again every 24 months.
(4) Subtask 530395-020-201- 001 - Remove the clamps from the THS support struts
Work Zones and Access Panels
Zone
 Access/Work location
310
Manpower Resources
Manhours
 0.50
Minimum number of person
 1
Subtask elapsed time
 0.50
Skills
 NON SPECIFIC
Material necessary to do the job
Consumable CMLD01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Non Aqueous Cleaner-
General
08BAA9
 As required
DATE: Feb 14/14 SERVICE BULLETIN No.: A300-53-0395
REVISION No.: 00 - Feb 14/14 Page: 18
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 23

@A300
SERVICE BULLETIN
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Textile-Lint Free Cotton
 14SBA1
 As required
References
Fig. A-GBBAA
Removal/Installation of the Clamps
Sheet 01
(a) From each support strut, remove:
Refer to Fig. A-GBBAA Sheet 01
 ,V i e w sAt oD .
2 Nut NAS1726-5E Item (4) Retain
2 Washer NAS1149D0563K Item (3) Retain
2 Bolt NSA5031-5-38 Item (2) Retain
2 Clamp A5347310320000 Item (1) Retain
(b) Remove the remaining sealant from the support struts and clean them with:
Refer to Fig. A-GBBAA Sheet 01
 ,V i e w sAt oD .
Non Aqueous
Cleaner-General
08BAA9 As required
Textile-Lint Free
Cotton
14SBA1 As required
(5) Subtask 530395-420-201-001 - Install th e clamps on the THS support struts
Work Zones and Access Panels
Zone
 Access/Work location
310
Manpower Resources
Manhours
 0.50
Minimum number of person
 1
Subtask elapsed time
 0.50
Skills
 NON SPECIFIC
Material necessary to do the job
Consumable CMLD01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Coating - Flexible Structure
 04QAB2
Polysulfide Sealant-Low
Adhesion Fillet Structure
06AEB2
 As required
DATE: Feb 14/14 SERVICE BULLETIN No.: A300-53-0395
REVISION No.: 00 - Feb 14/14 Page: 19
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 24

@A300
SERVICE BULLETIN
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Non Hardening Jointing
Putty-High Temp. Area Str
06LDG2
 As required
Corrosion Preventive
Compound-Water
Displacing
12ADB1
 As required
References
Fig. A-GBBAA
Removal/Installation of the Clamps
Sheet 01
(a) To the interface surfaces of the clamps, Item (1), apply:
Refer to Fig. A-GBBAA Sheet 01
 ,V i e w sAt oD .
Polysulfide Sealant-
Low Adhesion Fillet
Structure
06AEB2 As required
NOTE
: Application of the sealant is required at the interfaces between the
two clamp halves and at the interfaces between the clamps and the
support struts.
(b) To the bolts, item (2), apply:
Refer to Fig. A-GBBAA Sheet 01
 ,V i e w sAt oD .
Non Hardening
Jointing Putty-High
Temp. Area Str
06LDG2 As required
(c) On each support strut, install:
Refer to Fig. A-GBBAA Sheet 01
 ,V i e w sBt oD .
NOTE
: Consider that the clamps must be installed within the cylindrical
area only.
NOTE
: Make sure that the dimension of the gap is between 3.0 mm and
3.5 mm (0.118 in and 0.138 in).
NOTE
: Before installation of the clamp, mark the correct position with a
pen.
2 Nut NAS1726-5E Item (4) Retained at
removal
2 Washer NAS1149D0563K Item (3) Retained at
removal
DATE: Feb 14/14 SERVICE BULLETIN No.: A300-53-0395
REVISION No.: 00 - Feb 14/14 Page: 20
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 25

@A300
SERVICE BULLETIN
2 Bolt NSA5031-5-38 Item (2) Retained at
removal
2 Clamp A5347310320000 Item (1) Retained at
removal
(d) Protect the visible edges of the sealant with:
Refer to Fig. A-GBBAA Sheet 01
 , Views C and D.
Coating - Flexible
Structure
04QAB2 As required
(e) On the clamps and fasteners which you have installed, apply:
Refer to Fig. A-GBBAA Sheet 01
 , Views C and D.
Corrosion
Preventive
Compound-Water
Displacing
12ADB1 As required
(6) Subtask 530395-831-201- 001 - Replace the THS support struts
Work Zones and Access Panels
Zone
 Access/Work location
310
Manpower Resources
Manhours
 1.00
Minimum number of person
 1
Subtask elapsed time
 1.00
Skills
 NON SPECIFIC
Material necessary to do the job
Component COMPD01
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 SEE
NOTES
R21449H
 1
 ROD
NOTE
: Alternatively, it is possible to install PN R21449, PN R21449D, PN
R21449G or PN R21449H, refer to IPC 53-46-04.
NOTE
: The components listed above are only required if the replacement of a
support strut is necessary. The quantity of these items are to be ordered
as required.
NOTE
: The above list of components is not an AIRBUS Kit, the required parts
shall be ordered as necessary through the given channel.
DATE: Feb 14/14 SERVICE BULLETIN No.: A300-53-0395
REVISION No.: 00 - Feb 14/14 Page: 21
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 26

@A300
SERVICE BULLETIN
Component COMPD02
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 SEE
NOTES
MS24665-374
 2
 PIN
NOTE
: The components listed above are only required if the replacement of a
support strut is necessary. The quantity of these items are to be ordered
as required.
NOTE
: The above list of components is not an AIRBUS Kit, the required parts
shall be ordered as necessary through the given channel.
References
Aircraft Maintenance Manual (AMM)
 53-22-14, Page Block 401
55-11-14, Page Block 401
Illustrated Parts Catalog (IPC)
 53-46-04
(a)
CAUTION
: ONLY ONE SUPPORT STRUT MAY BE REMOVED AT ONE
TIME.
CAUTION
: IF ALL SUPPORT STRUTS ARE TO BE REMOVED, TWO
STRUTS P/N 98A27407568000 MUST BE INSTALLED, REFER
TO AMM 53-22-14, Page Block 401.
NOTE
: If necessary, you can lift the THS by using slings to ease the strut
removal, refer to AMM 55-11-14, Page Block 401.
Remove the affected THS support strut, refer to AMM 53-22-14, Page Block 401.
(b) Install the affected THS support strut, refer to AMM 53-22-14, Page Block 401 and
use these parts:
1 Rod Assy R21449H
NOTE
: Alternatively, it is possible to install PN R21449, PN R21449D, PN
R21449G or PN R21449H, refer to IPC 53-46-04.
and
2 Pin-Cotter MS24665-374
D. TEST
None
DATE: Feb 14/14 SERVICE BULLETIN No.: A300-53-0395
REVISION No.: 00 - Feb 14/14 Page: 22
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 27

@A300
SERVICE BULLETIN
E. CLOSE-UP
(1) Subtask 530395-942-201-001 - Close-up
Work Zones and Access Panels
Zone
 Access/Work location
310
 Access
 Panel 313AL
Manpower Resources
Skills
 NON SPECIFIC
(a) Make sure that the work areas are clean and clear of tools and other items of
equipment.
(b) Close the access door 313AL.
(c) Remove the access platform(s).
DATE: Feb 14/14 SERVICE BULLETIN No.: A300-53-0395
REVISION No.: 00 - Feb 14/14 Page: 23
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 28

@A300
SERVICE BULLETIN
**CONF ALL
COMPLETE
RECORDS
AVAILABLE SINCE
AIRCRAFT EIS
DO A  GENERAL VISUAL INSPECTION
OF STRUTS ON AIRCRAFT
STRUT(S)
REPLACED SINCE
AIRCRAFT
REPORT THE
INSPECTION
RESULTS TO AIRBUS
WITHIN 1 MONTH
NO FURTHER ACTION
CLAMPS INSTALLED
CONTINUE ON
SHEET 02
CONTINUE ON
SHEET 03
NO YES
YES NO
NO YES
REPORT THE
INSPECTION
RESULTS TO AIRBUS
WITHIN 1 MONTH
NO FURTHER ACTION
NO YES
EIS
STRUT(S) AFFECTED
INSTALLED
THE PURPOSE OF FLOW CHARTS IS TO SUPPLEMENT THE INFORMATION
GIVEN IN THE PROCEDURE AND COMPLIANCE PARAGRAPHS AND NOT TO
SERVE AS THE PRIMARY SOURCE FOR TASKS OR COMPLIANCE TIMES
GIVEN IN THIS SERVICE BULLETIN
NOTE:
CHECK, IF STRUTS REPLACEMENT IS RECORDED
SINCE AIRCRAFT ENTRY INTO SERVICE (EIS)
A_SB_530395_6_FAAA_01_03
Figure A-GFAAA - Sheet 01
Inspection Flow Chart
DATE: Feb 14/14 SERVICE BULLETIN No.: A300-53-0395
REVISION No.: 00 - Feb 14/14 Page: 24
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 29

@A300
SERVICE BULLETIN
**CONF ALL
BULLETIN NO. A300−53−0394
CONTINUED FROM
SHEET 01
CRACK(S) FOUND
ON AT LEAST ONE
STRUT END
NO YES
ACCOMPLISH SERVICE
YES
NO
REPLACE THE DAMAGED
STRUT BY A NEW ONE
CRACKS WITHIN
THE GIVEN LIMITS
REPORT THE INSPECTION
RESULTS TO AIRBUS:
−WITHIN 10 DAYS WHEN FINDING
−WITHIN 1 MONTH WHEN NIL FINDING
DO A HIGH FREQUENCY EDDY CURRENT
(HFEC) INSPECTION OF EACH STRUT END
AT THRESHOLD GIVEN IN PARA 1.E.(2)
OF THIS SERVICE BULLETIN
REPEAT THE INSPECTION
AT INTERVALS GIVEN IN
PARA 1.E.(2)
BEFORE NEXT FLIGHT
BEFORE NEXT FLIGHT
A_SB_530395_6_FAAA_02_04
Figure A-GFAAA - Sheet 02
Inspection Flow Chart
DATE: Feb 14/14 SERVICE BULLETIN No.: A300-53-0395
REVISION No.: 00 - Feb 14/14 Page: 25
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 30

@A300
SERVICE BULLETIN
**CONF ALL
CONTINUED FROM
SHEET 01
REMOVE CLAMP FROM EACH SUPPORT
STRUT END AT INTERVAL GIVEN IN
PARA 1.E.(2) OF THIS SERVICE BULLETIN
DO A HFEC INSPECTION OF EACH STRUT
END WHERE CLAMPS WERE INSTALLED
CRACK(S) FOUND
ON AT LEAST ONE
STRUT END
NO YES
NO
REPLACE THE DAMAGED
STRUT BY A NEW ONE
RE−INSTALL
CLAMP ON EACH
STRUT END
YES CRACKS WITHINTHE GIVEN LIMITS
REPORT THE INSPECTION
RESULTS TO AIRBUS:
−WITHIN 10 DAYS WHEN FINDING
−WITHIN 1 MONTH WHEN NIL FINDING
REPEAT THE INSPECTION
AT INTERVALS GIVEN IN
PARA 1.E.(2)
BEFORE NEXT FLIGHT
BEFORE NEXT FLIGHT
BEFORE NEXT FLIGHT
A_SB_530395_6_FAAA_03_02
Figure A-GFAAA - Sheet 03
Inspection Flow Chart
DATE: Feb 14/14 SERVICE BULLETIN No.: A300-53-0395
REVISION No.: 00 - Feb 14/14 Page: 26
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 31

@A300
SERVICE BULLETIN
**CONF ALL
FR91
B
B
B
AREA TO BE INSPECTED
C C
B
TYPICAL
STRUT TO BE
INSPECTED
PN R21449
PN R21449D
PN R21449G
OR
PN R21449H
C
TYPICAL
TYPICAL
CRACKS
B
Z310
A
A
A_SB_530395_6_BAAA_01_01
Figure A-GBAAA - Sheet 01
Inspection Area
DATE: Feb 14/14 SERVICE BULLETIN No.: A300-53-0395
REVISION No.: 00 - Feb 14/14 Page: 27
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 32

@A300
SERVICE BULLETIN
**CONF ALL
C
C
FR91
3.0 mm TO 3.5 mm
TYPICAL
D
(0.118 in TO 0.138 in)
(1)
(2)
(3)
(4) C
D
B
A
D
(2)
(3)
(4)
(1)
B
B
B
B
Z310
A
PROTECT WITH COMPOUND (MAT. NO. 12ADB1)01
CONSIDER THAT THE CLAMPS MUST BE INSTALLED02
NOTE:
01
02
WITHIN THE CYLINDRICAL AREA ONLY A_SB_530395_6_BBAA_01_02
Figure A-GBBAA - Sheet 01
Removal/Installation of the Clamps
DATE: Feb 14/14 SERVICE BULLETIN No.: A300-53-0395
REVISION No.: 00 - Feb 14/14 Page: 28
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 33

@A300
SERVICE BULLETIN
**CONF ALL
FR91
Z310
A
A
INSPECTION REPORT
SERVICE BULLETIN NO:
DATE OF INSPECTION:
AIRCRAFT MSN:
FLIGHT CYCLES:
FLIGHT HOURS:
PLEASE SEND REPORTING SHEET TO:
 AIRBUS CUSTOMER SERVICES ENGINEERING
1 ROND POINT MAURICE BELLONTE
31707 BLAGNAC CEDEX
FRANCE
E−MAIL: structure.sbinspectionresult@airbus.com
A300−53−0395
SEES1
YES NOFINDINGS:
INSPECTION METHOD: SPECIAL DETAILED INSPECTION
FAX: +33(0)561 93 36 14
TYPICAL
AREA TO BE
INSPECTED
AREA TO BE
INSPECTED
A
B
B
A
A
B
B
A
B
B
B
B
B
4
3
1
2
A_SB_530395_6_AAAA_01_02
Figure A-GAAAA - Sheet 01
Inspection Report
DATE: Feb 14/14 SERVICE BULLETIN No.: A300-53-0395
REVISION No.: 00 - Feb 14/14 Page: 29
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 34

@A300
SERVICE BULLETIN
**CONF ALL
INSPECTION REPORT
STRUT
NUMBER
RECORDS
COMPLETE
SINCE
AIRCRAFT
EIS
STRUT
REPLACED
SINCE
AIRCRAFT
EIS
STRUT
AFFECTED
CLAMPS
INSTALLED
YES
NO
YES
NO
YES
NO
YES
NO
1
YES
NO
YES
NO
YES
NO
YES
NO
2
YES
NO
YES
NO
YES
NO
YES
NO
3
YES
NO
YES
NO
YES
NO
YES
NO
4
STRUT
NUMBER
1
2
3
4
CRACK
QUANTITY
LENGTH
CRACK 1
LENGTH
CRACK 2
LENGTH
CRACK 3
LENGTH
CRACK 4
STRUT
REPLACED
INSTALLED 
PARTNUMBER
YES
NO
YES
NO
YES
NO
YES
NO
A
B
END
POS
A
B
A
B
A
B
LENGTH
CRACK 5
A_SB_530395_6_AAAA_02_02
Figure A-GAAAA - Sheet 02
Inspection Report
DATE: Feb 14/14 SERVICE BULLETIN No.: A300-53-0395
REVISION No.: 00 - Feb 14/14 Page: 30
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 35

@A300
SERVICE BULLETIN
Appendix 01 - Elapsed Time Assumptions
**CONF ALL
ELAPSED TIME ASSUMPTIONS SERVICE BULLETIN No. A300−53−0395
GET ACCESS
MH ET/S
TOTAL MANHOURS
SB ELAPSED TIME
7.50
5.00
STEPS
0.50 0.50
50
0.50 0.50
2.00 2.00
MH
ET/S:
PER
MANHOURS
ELAPSED TIME PER STEP
NUMBER OF PERSONS
01
02
THIS CHART IS ONLY A PROPOSAL.
OPERATORS MAY DETERMINE THAT ANOTHER WAY
TO DO THE WORK IS MORE SUITABLE FOR THEM.
ARE NOT REFLECTED IN THIS GANTT CHART.
01
02
NOTES:
PER
1
1
1
:
:
SB ELAPSED TIME
(HOURS)
123 4 6
IF A VSB IS INVOLVED, THE ASSOCIATED MANHOURS
IDENTIFY THE SUPPORT
STRUTS INSTALLED
DO A HFEC INSPECTION OF
78
ENDS
2.00 2.001DO A HFEC INSPECTION OF
THE STRUT ENDS AFTER
REMOVAL OF THE CLAMPS
0.50 0.501REMOVE THE CLAMPS FROM
THE THS SUPPORT STRUTS
0.50 0.501INSTALL THE CLAMPS ON 
THE THS SUPPORT STRUTS
1.00 1.00 1REPLACE THE THS SUPPORT
STRUTS
0.50 0.501CLOSE−UP
THE THS SUPPORT STRUT
A_SB_530395_6_ABAA_01_01
Figure A-GABAA - Sheet 01
Gantt Chart
DATE: Feb 14/14 SERVICE BULLETIN No.: A300-53-0395
REVISION No.: 00 - Feb 14/14 Page: 1
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 36

@A300
SERVICE BULLETIN
REPORTING SHEET
TITLE: FUSELAGE - TAIL CONE - THS SUPPORT STRUTS AT FR91 -
INSPECTION FOR CRACKS
MODIFICATION No.: None
Please complete the appropriate item (A or B):
A - SB WILL BE
 embodied YES/NO (if NO please comment)
If YES, aircraft concer ned (as per SB effectivity by default) and planned dates (month/year) of
embodiment:
B - SB HAS BEEN
 embodied on aircraft:
Operator comments:
From Airline:
Name/Title:
Signature: Date:
If operational documentation is affected (see Paragraph 1.K of this SB): If information is needed prior to
next normal revision or prior to SB embodiment, please indicate required service(s):
Either: Modification Operational Impact (MOI), if available YES/NO
Or : Intermediate revision YES/NO
Important Information:
 This SB will only be incorporated in your maintenance and operational
documentation if this sheet is returned to Airbus and signed by a duly authorised representative. With
the next feasible revision, this will result in
- Updating of maintenance documentation to show pre and post SB data.
- Updating of maintenance and operational documentation to show post SB data after embodiment.
If this SB requires previous or simultaneous accomplishment of other SBs, Airbus shall automatically
include them in the manual revisions. Refer to SIL 00-037 for detailed information.
Please return this completed sheet to:
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX FRANCE
Attn: SDC32 Technical Data and Documentation Services
F A X :( + 3 3 )56 19 32 80 6
e-mail: sb.reporting@airbus.com
or via your Resident Customer Support Office.
Alternatively, SB lists via letters or fax are also accepted.
DATE: Feb 14/14 SERVICE BULLETIN No.: A300-53-0395
REVISION No.: 00 - Feb 14/14 Page: 1
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 37

@A300
SERVICE BULLETIN
QUALITY PERCEPTION FORM
Use this form to tell us what is your perception of the quality of this Service Bulletin. The reported data
that you provide us will be used to analyse areas of difficulties and to take corrective action to further
improve the quality of our Service Bulletins.
We thank you for the time you have taken in completing this form.
(Please rate on a scale of 1 to 4, with 4 being the highest score)
- Quality rating of this SB 4321
- Quality rating of the Accomplishment Instructions 4321
- Quality rating of the Illustrations 4321
- Is this SB easy to understand ? Y/N
If you have had difficulties in the accomplishment of this SB please quote below the area(s) and give a
short description of the issue.
Planning Material Instructions
X Effectivity X Kit content X Preparation
X Reason X List of Materials Operator Supplied X Mod/Inspection
X Manpower X Industry support X Test
X References X Re-identification X Close-Up
X Publication X Tooling X Illustrations
Comments:
Operator: Date:
Name/Title:
Please return this form to:
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX FRANCE
Attn : SEM4 Service Bulletins Management
F A X:( 3 3 )56 19 34 25 1
Or via your Resident Customer Support Office.
DATE: Feb 14/14 SERVICE BULLETIN No.: A300-53-0395
REVISION No.: 00 - Feb 14/14 Page: 1
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
