# Airbus Service Bulletin A300-53-6177

Copy: No revision named ("SB A300-53-6177(2)"), 730 pages: PDF https://openairdocs.org/files/sha256/8d/8a/8d8aca51698d58b0f8718752cf9e9c6eed9d9b8dd8847c61d4f768fd6104eacd; text https://openairdocs.org/service-documents/airbus/a300-53-6177/file/8d8aca51698d.md. Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2014-0143; AD 2016-25-27 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Airbus](https://openairdocs.org/service-documents/airbus.md)
- Type: Service bulletin (Service Bulletin)
- Number: A300-53-6177
- Page: https://openairdocs.org/service-documents/airbus/a300-53-6177

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2016-25-27](https://openairdocs.org/ad/2016-25-27.md), effective Feb 8, 2017: No revision named

Also cited in [1 proposed AD](https://openairdocs.org/service-documents/airbus/a300-53-6177/proposed.md), [20 difficulty reports](https://openairdocs.org/service-documents/airbus/a300-53-6177/reports.md).

## Text (730 pages)

Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2014-0143; AD 2016-25-27 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

@A300-600
SERVICE BULLETIN
SUMMARY
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
This summary is for information only and is not approved for modification of the aircraft.
MANDATORY
 MANDATORY
 MANDATORY
ATA SYSTEM: 53
TITLE: FUSELAGE - CENTER FUSELAGE - INSPECT LOWER FRAME BASE
FITTING BETWEEN FRAMES 41 AND 46
**CONF ALL
MODIFICATIONS
None
REASON/DESCRIPTION/OPERATIONAL CONSEQUENCES
During a routine maintenance on A300-600 aircraft, operators have reported separate instances of
cracks in the Frame feet fittings, connecting the Frame lower positions to the centre wing box (air
conditioning bay).
Since this time, AIRBUS has carried out a sampling inspection program on both aircraft types (A300
and A300-600).
During this sampling program, twenty three A300-600 aircraft were inspected and cracks were found on
the lower Frame fittings of Frame 44 to Frame 46 (LH and RH) on twenty two of the inspected aircraft.
The aircraft with the findings have accumulated between 8000 and 21000 Flight Cycles (FC) and the
lengths of the cracks varied between 12 mm and 18 mm (0.472 in. and 0.709 in.).
Service Bulletin No. A300-53-6111 was created in order to treat the affected areas by repetitive
inspection and also repair in case of crack finding. Repaired Frames were no longer inspected up to
aircraft Limit of Validity (LoV).
Further to new findings on repaired Frame feet, a new detailed Finite Element Model (FEM) study was
performed. Outcomes of this study led Airbus to review the inspection program.
The aim of the Service Bulletin, depending of the accomplishment of Service Bulletin No.
A300-53-6111, is to perform a Detailed Inspection (DET) of the lower Frame feet fittings between
Frame 41 and Frame 46 for the entire fleet.
In case of crack finding, two options are possible:
- The cracked Frame foot is replaced by an identical new one and the Inspection Service Bulletin
(ISB) No. A300-53-6177 is still applicable.
DATE: May 20/15 SERVICE BULLETIN No.: A300-53-6177
REVISION No.: 00 - May 20/15 Page: 1
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 2

@A300-600
SERVICE BULLETIN
SUMMARY
- All Frame feet are replaced by new optimized parts as per Modification Service Bulletin No.
A300-53-6176 (Mod. No. 13721S22901). In this case, no further inspection is necessary.
Any findings (including Nil findings) are to be reported to AIRBUS.
Service Bulletin No. A300-53-6111 is therefore cancelled and superseded by this new ISB. In addition
to this new inspection program, Airbus designed new Frame feet. Their installation is proposed through
a dedicated modification Service Bulletin No. A300-53-6176. Accomplishment of Modification Service
Bulletin No. A300-53-6176 cancels the requirements of this ISB.
Accomplishment of this ISB will allow early detection of cracks in order to avoid possible occurrence of
crack propagation which can lead to costly and time-consuming repairs.
GENERAL EVALUATION
EVALUATION TABLE
COMPLIANCE
 MANDATORY (1)
 CANCELS INSPECTION SB
 NO
POTENTIAL AD
 YES
 A/C OPERATION AFFECTED
 NO
RELIABILITY AFFECTED
 NO
 PAX COMFORT AFFECTED
 NO
COST SAVING
 NO
 ETOPS AFFECTED
 NO
STRUCTURAL LIFE EXTN
 NO
 VENDOR SB INVOLVED
 NO
DE-FUELLING/VENTILATION
 YES
NOTE
 (1)
: Service Bulletin must be accomplished.
MATERIAL PRICE INFORMATION
**CONF 001
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET
 QTY PER
A/C
PRICE PER
A/C (USD)
MAIN PARTS
Kit 536177A03R00
 1
 8,100.00
 Frame foot, Screws, Nuts, Rivets
Kit 536177A06R00
 1
 8,900.00
 Frame foot, Screws, Nuts, Rivets
Kit 536177A09R00
 1
 7,600.00
 Frame foot, Screws, Nuts, Rivets
Kit 536177A12R00
 1
 7,300.00
 Frame foot, Screws, Nuts, Rivets
Kit 536177A15R00
 1
 7,900.00
 Frame foot, Screws, Nuts, Rivets
Kit 536177A18R00
 1
 8,700.00
 Frame foot, Screws, Nuts, Rivets
Kit 536177A21R00
 1
 8,100.00
 Frame foot, Screws, Nuts, Rivets
Kit 536177A24R00
 1
 9,000.00
 Frame foot, Screws, Nuts, Rivets
Kit 536177A27R00
 1
 7,600.00
 Frame foot, Screws, Nuts, Rivets
Kit 536177A30R00
 1
 7,300.00
 Frame foot, Screws, Nuts, Rivets
Kit 536177A33R00
 1
 7,900.00
 Frame foot, Screws, Nuts, Rivets
Kit 536177A36R00
 1
 8,700.00
 Frame foot, Screws, Nuts, Rivets
TOTAL
 97,100.00
Component COMPA01
 2
 See SB
 Screws, Nuts, Rivets
Component COMPA02
 4
 See SB
 Screws, Nuts, Rivets
Component COMPA03
 2
 See SB
 Screws, Nuts, Rivets
DATE: May 20/15 SERVICE BULLETIN No.: A300-53-6177
REVISION No.: 00 - May 20/15 Page: 2
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 3

@A300-600
SERVICE BULLETIN
SUMMARY
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET
 QTY PER
A/C
PRICE PER
A/C (USD)
MAIN PARTS
Component COMPA04
 2
 See SB
 Screws, Nuts, Rivets
Component COMPA05
 2
 See SB
 Screws, Nuts, Rivets
**CONF 002
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET
 QTY PER
A/C
PRICE PER
A/C (USD)
MAIN PARTS
Kit 536177A02R00
 1
 7,600.00
 Frame foot, Screws, Nuts, Rivets
Kit 536177A05R00
 1
 8,200.00
 Frame foot, Screws, Nuts, Rivets
Kit 536177A08R00
 1
 7,100.00
 Frame foot, Screws, Nuts, Rivets
Kit 536177A11R00
 1
 6,700.00
 Frame foot, Screws, Nuts, Rivets
Kit 536177A14R00
 1
 7,300.00
 Frame foot, Screws, Nuts, Rivets
Kit 536177A17R00
 1
 8,200.00
 Frame foot, Screws, Nuts, Rivets
Kit 536177A20R00
 1
 7,600.00
 Frame foot, Screws, Nuts, Rivets
Kit 536177A23R00
 1
 8,200.00
 Frame foot, Screws, Nuts, Rivets
Kit 536177A26R00
 1
 7,100.00
 Frame foot, Screws, Nuts, Rivets
Kit 536177A29R00
 1
 6,700.00
 Frame foot, Screws, Nuts, Rivets
Kit 536177A32R00
 1
 7,300.00
 Frame foot, Screws, Nuts, Rivets
Kit 536177A35R00
 1
 8,200.00
 Frame foot, Screws, Nuts, Rivets
TOTAL
 90,200.00
Component COMPA01
 2
 See SB
 Screws, Nuts, Rivets
Component COMPA02
 4
 See SB
 Screws, Nuts, Rivets
Component COMPA03
 2
 See SB
 Screws, Nuts, Rivets
Component COMPA04
 2
 See SB
 Screws, Nuts, Rivets
Component COMPA05
 2
 See SB
 Screws, Nuts, Rivets
**CONF 003
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET
 QTY PER
A/C
PRICE PER
A/C (USD)
MAIN PARTS
Kit 536177A01R00
 1
 7,400.00
 Frame foot, Screws, Nuts, Rivets
Kit 536177A04R00
 1
 8,100.00
 Frame foot, Screws, Nuts, Rivets
Kit 536177A07R00
 1
 7,000.00
 Frame foot, Screws, Nuts, Rivets
Kit 536177A10R00
 1
 6,600.00
 Frame foot, Screws, Nuts, Rivets
Kit 536177A13R00
 1
 7,200.00
 Frame foot, Screws, Nuts, Rivets
Kit 536177A16R00
 1
 8,200.00
 Frame foot, Screws, Nuts, Rivets
Kit 536177A19R00
 1
 7,400.00
 Frame foot, Screws, Nuts, Rivets
Kit 536177A22R00
 1
 8,100.00
 Frame foot, Screws, Nuts, Rivets
Kit 536177A25R00
 1
 7,000.00
 Frame foot, Screws, Nuts, Rivets
DATE: May 20/15 SERVICE BULLETIN No.: A300-53-6177
REVISION No.: 00 - May 20/15 Page: 3
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 4

@A300-600
SERVICE BULLETIN
SUMMARY
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET
 QTY PER
A/C
PRICE PER
A/C (USD)
MAIN PARTS
Kit 536177A28R00
 1
 6,600.00
 Frame foot, Screws, Nuts, Rivets
Kit 536177A31R00
 1
 7,200.00
 Frame foot, Screws, Nuts, Rivets
Kit 536177A34R00
 1
 8,100.00
 Frame foot, Screws, Nuts, Rivets
TOTAL
 88,900.00
Component COMPA01
 2
 See SB
 Screws, Nuts, Rivets
Component COMPA02
 4
 See SB
 Screws, Nuts, Rivets
Component COMPA03
 2
 See SB
 Screws, Nuts, Rivets
Component COMPA04
 2
 See SB
 Screws, Nuts, Rivets
Component COMPA05
 2
 See SB
 Screws, Nuts, Rivets
**CONF 004
No Material
EFFECTIVITY
**CONF ALL
This Service Bulletin is applicable to this (these) operator(s) :
06P 67Q ABR AHK BCS F2I FDX IRA IRM KAC MNB MRJ MSR
OHY SUD TAR THA UPS UQA URS UTP UZB
CONCURRENT REQUIREMENTS
None
REFERENCES / REPERCUSSIONS
TFU
 None
OEB
 None
AOT
 None
SIL
 None
LINE MAINTENANCE AFFECTED
 No
LIFE LIMIT
 None
OTHER
 None
NATURE OF THE WORK
AIRCRAFT
 YES
EQUIPMENT
 NO
HARD
 NO
SOFT
 NO
OBRM
 NO
DATE: May 20/15 SERVICE BULLETIN No.: A300-53-6177
REVISION No.: 00 - May 20/15 Page: 4
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 5

@A300-600
SERVICE BULLETIN
SUMMARY
MANPOWER
**CONF 001
Task 536177-832-801-001: Detailed Inspection of the Frame foot
TOTAL MANHOURS
 8.00
ELAPSED TIME (HOURS)
 2.50
Task 536177-833-801-001: Repair
TOTAL MANHOURS
 541.00
ELAPSED TIME (HOURS)
 42.00
**CONF 002
Task 536177-832-801-001: Detailed Inspection of the Frame foot
TOTAL MANHOURS
 8.00
ELAPSED TIME (HOURS)
 2.50
Task 536177-833-801-001: Repair
TOTAL MANHOURS
 541.00
ELAPSED TIME (HOURS)
 42.00
**CONF 003
Task 536177-832-801-001: Detailed Inspection of the Frame foot
TOTAL MANHOURS
 8.00
ELAPSED TIME (HOURS)
 2.50
Task 536177-833-801-001: Repair
TOTAL MANHOURS
 541.00
ELAPSED TIME (HOURS)
 42.00
**CONF 004
Task 536177-839-801-001: Contact and Report to AIRBUS
TOTAL MANHOURS
 0.50
ELAPSED TIME (HOURS)
 0.50
APPENDICES
**CONF ALL
Appendix 01 - Elapsed Time Assumptions
DATE: May 20/15 SERVICE BULLETIN No.: A300-53-6177
REVISION No.: 00 - May 20/15 Page: 5
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 6

@A300-600
SERVICE BULLETIN
SUMMARY
**CONF ALL
FR41
FR42
FR43
FR44
FR45
FR46
FR47
FR40
FR46
FR45
FR44
FR43
FR42
FR41
AREAS TO BE INSPECTED
CL
A
B
Z140
A
B
D_SB_536177_5_SAAA_01_01
Figure A-FSAAA - Sheet 01
DATE: May 20/15 SERVICE BULLETIN No.: A300-53-6177
REVISION No.: 00 - May 20/15 Page: 6
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 7

@A300-600
SERVICE BULLETIN
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
MANDATORY
 MANDATORY
 MANDATORY
ATA SYSTEM: 53
TITLE: FUSELAGE - CENTER FUSELAGE - INSPECT LOWER FRAME BASE
FITTING BETWEEN FRAMES 41 AND 46
MODIFICATION No.: None
This document contains AIRBUS PROPRIETARY INFORMATION and shall at all times remain the
property of AIRBUS; no intellectual property right or licence is granted by AIRBUS in connection with
any information contained in it. It is delivered on the express condition that said document and the
information contained in it shall be treated as confidential, shall not be used for any purpose other than
that for which it is hereby delivered. It shall not be disclosed in whole or in part to third parties and shall
not be duplicated in any manner (except for the purposes of performing the tasks described hereunder
and provided that any recipient of such document shall comply with the conditions herein), without
AIRBUS prior written consent.
1. PLANNING INFORMATION
**CONF ALL
A. EFFECTIVITY
(1) Models
B4-603 B4-605R B4-620 B4-622 B4-622R C4-605R/F C4-620 F4-605R
F4-622R
(2) Effectivity by MSN
0294 0344 0358 0361 0365 0380 0388 0401 0405 0408 0411 0414 0417 0477 0479
0505 0521 0525 0529-0530 0532 0536 0543 0546 0553 0555 0557-0559 0561 0563
0572 0575 0579 0581 0584 0602-0603 0607-0608 0611 0613 0617-0618 0621 0623
0625-0626 0629-0630 0632-0633 0637 0641 0643 0657 0659 0664 0666 0668 0670
0673 0677 0679 0683 0688 0694 0696 0699 0701 0703 0707 0709 0711 0713 0715
0717 0719 0721-0730 0732-0750 0752-0764 0766 0768-0775 0777-0794 0797
0799-0840 0845-0878
(3) Effectivity by Operator
The Operator/MSN relationship is provided for information only and is correct at the time
of issue in accordance with the information available to AIRBUS. Any future changes
resulting from transfer of an aircraft from one operator to another will not be reflected in
this list unless the Service Bulletin is revised for another reason.
DATE: May 20/15 SERVICE BULLETIN No.: A300-53-6177
REVISION No.: 00 - May 20/15 Page: 1
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 8

@A300-600
SERVICE BULLETIN
OPERATOR
 MSN
06P
 0788
67Q
 0584 0603 0744 0749 0764
ABR
 0677 0743
AHK
 0683 0770 0855 0856 0857 0858 0859 0860 0870 0871
BCS
 0529 0557 0602 0617 0621 0637 0641 0670 0679 0703 0711 0724
0729 0730 0737 0740 0753 0783 0797 0836 0837 0872
F2I
 0294
FDX
 0358 0361 0365 0388 0417 0477 0479 0530 0536 0543 0555 0559
0572 0575 0579 0581 0611 0613 0625 0630 0633 0657 0659 0664
0668 0688 0709 0713 0715 0726 0728 0735 0736 0738 0742 0745
0748 0752 0757 0759 0760 0761 0766 0768 0769 0771 0772 0774
0777 0778 0779 0780 0781 0789 0790 0791 0792 0793 0794 0799
0800 0801 0802 0803 0804 0873 0874 0875 0876 0877 0878
IRA
 0632 0696 0723 0727
IRM
 0380 0401 0405 0408 0411 0414 0546 0553 0608 0618 0623 0701
0773 0838
KAC
 0344 0673 0694 0699 0719 0721
MNB
 0521 0525 0532 0734 0739 0755 0756 0758
MRJ
 0750 0762
MSR
 0561 0607
OHY
 0747
SUD
 0666 0775
TAR
 0505 0558 0563
THA
 0629 0782 0784 0785 0786 0787
UPS
 0805 0806 0807 0808 0809 0810 0811 0812 0813 0814 0815 0816
0817 0818 0819 0820 0821 0822 0823 0824 0825 0826 0827 0828
0829 0830 0831 0832 0833 0834 0835 0839 0840 0845 0846 0847
0848 0849 0850 0851 0852 0853 0854 0861 0862 0863 0864 0865
0866 0867 0868 0869
UQA
 0626 0643
URS
 0733
UTP
 0707 0725 0732 0741 0746 0754 0763
UZB
 0717 0722
DATE: May 20/15 SERVICE BULLETIN No.: A300-53-6177
REVISION No.: 00 - May 20/15 Page: 2
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 9

@A300-600
SERVICE BULLETIN
(4) Configuration by MSN
MSN
 CONFIGURATION
0294 0344 0358 0361 0365 0380 0388 0401 0405 0408 0411
0414 0417 0477 0479 0505 0521 0525 0529 0530 0532 0536
0543 0546 0553 0555 0557 0558 0559 0561 0563 0572 0575
0579 0581 0584 0602 0603 0607 0608 0611 0613 0617 0618
0621 0623 0625 0626 0629 0630 0632 0633 0637 0641 0643
0657 0659 0664 0666 0668 0670 0673 0677 0679 0683 0688
0694 0696 0699 0701 0703 0707 0709 0711 0713 0715 0717
0719 0721 0722 0723 0724 0725 0726 0727 0728 0729 0730
0732 0733 0734 0735 0736 0737 0738 0739 0740 0741 0742
0743 0744 0745 0746 0747 0748 0749 0750 0752 0753 0754
0755 0756 0757 0758 0759 0760 0761 0762 0763 0764 0766
0768 0769 0770 0771 0772 0773 0774 0775 0777 0778 0779
0780 0781 0782 0783 0784 0785 0786 0787 0788 0789 0790
0791 0792 0793 0794 0797 0799 0800 0801 0802 0803 0804
0805 0806 0807 0808 0809 0810 0811 0812 0813 0814 0815
0816 0817 0818 0819 0820 0821 0822 0823 0824 0825 0826
0827 0828 0829 0830 0831 0832 0833 0834 0835 0836 0837
0838 0839 0840 0845 0846 0847 0848 0849 0850 0851 0852
0853 0854 0855 0856 0857 0858 0859 0860 0861 0862 0863
0864 0865 0866 0867 0868 0869 0870 0871 0872 0873 0874
0875 0876 0877 0878
001 002 003 004
(5) Configuration definition
NOTE
: Each Frame Foot is independent, operator must define which repair has
been applied or not on each frame foot and choose the configuration
defined below that applies for each frame foot.
**CONF 001
Config. 001 is valid for Frame foot never repaired (either already inspected as per
Service Bulletin No. A300-53-6111 or not).
**CONF 002
Config. 002 is valid for Frame foot preventively repaired (no crack) as per Service
Bulletin No. A300-53-6111.
**CONF 003
Config. 003 is valid for Frame foot repaired in Area 1 as per Service Bulletin No.
A300-53-6111 or as per R53810322 or R53810323 or R53810329 or R53810330 or
R53810331 or R53810332.
**CONF 004
Config. 004 is valid for Frame foot in any other situation (not covered by Config. 001,
Config. 002 or Config. 003).
DATE: May 20/15 SERVICE BULLETIN No.: A300-53-6177
REVISION No.: 00 - May 20/15 Page: 3
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 10

@A300-600
SERVICE BULLETIN
(6) Material Effectivity
**CONF 003
MATERIAL
 QTY PER A/C
 SEE NOTES
Consumable CMLA01
 1
Component COMPA01
 2
Component COMPA02
 4
Component COMPA03
 2
Component COMPA04
 2
Component COMPA05
 2
Kit 536177A01R00
 1
Kit 536177A04R00
 1
Kit 536177A07R00
 1
Kit 536177A10R00
 1
Kit 536177A13R00
 1
Kit 536177A16R00
 1
Kit 536177A19R00
 1
Kit 536177A22R00
 1
Kit 536177A25R00
 1
Kit 536177A28R00
 1
Kit 536177A31R00
 1
Kit 536177A34R00
 1
**CONF 002
MATERIAL
 QTY PER A/C
 SEE NOTES
Consumable CMLA01
 1
Component COMPA01
 2
Component COMPA02
 4
Component COMPA03
 2
Component COMPA04
 2
Component COMPA05
 2
Kit 536177A02R00
 1
Kit 536177A05R00
 1
Kit 536177A08R00
 1
Kit 536177A11R00
 1
Kit 536177A14R00
 1
Kit 536177A17R00
 1
Kit 536177A20R00
 1
Kit 536177A23R00
 1
Kit 536177A26R00
 1
Kit 536177A29R00
 1
Kit 536177A32R00
 1
Kit 536177A35R00
 1
DATE: May 20/15 SERVICE BULLETIN No.: A300-53-6177
REVISION No.: 00 - May 20/15 Page: 4
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 11

@A300-600
SERVICE BULLETIN
**CONF 001
MATERIAL
 QTY PER A/C
 SEE NOTES
Consumable CMLA01
 1
Component COMPA01
 2
Component COMPA02
 4
Component COMPA03
 2
Component COMPA04
 2
Component COMPA05
 2
Kit 536177A03R00
 1
Kit 536177A06R00
 1
Kit 536177A09R00
 1
Kit 536177A12R00
 1
Kit 536177A15R00
 1
Kit 536177A18R00
 1
Kit 536177A21R00
 1
Kit 536177A24R00
 1
Kit 536177A27R00
 1
Kit 536177A30R00
 1
Kit 536177A33R00
 1
Kit 536177A36R00
 1
**CONF 004
No Material Set
**CONF ALL
B. CONCURRENT REQUIREMENTS
None
C. REASON
(1) History
During a routine maintenance on A300-600 aircraft, operators have reported separate
instances of cracks in the Frame feet fittings, connecting the Frame lower positions to
the centre wing box (air conditioning bay).
Since this time, AIRBUS has carried out a sampling inspection program on both aircraft
types (A300 and A300-600).
During this sampling program, twenty three A300-600 aircraft were inspected and cracks
were found on the lower Frame fittings of Frame 44 to Frame 46 (LH and RH) on twenty
two of the inspected aircraft. The aircraft with the findings have accumulated between
8000 and 21000 Flight Cycles (FC) and the lengths of the cracks varied between 12 mm
and 18 mm (0.472 in. and 0.709 in.).
DATE: May 20/15 SERVICE BULLETIN No.: A300-53-6177
REVISION No.: 00 - May 20/15 Page: 5
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 12

@A300-600
SERVICE BULLETIN
Service Bulletin No. A300-53-6111 was created in order to treat the affected areas by
repetitive inspection and also repair in case of crack finding. Repaired Frames were no
longer inspected up to aircraft Limit of Validity (LoV).
Further to new findings on repaired Frame feet, a new detailed Finite Element Model
(FEM) study was performed. Outcomes of this study led Airbus to review the inspection
program.
(2) Objective/Action
The aim of the Service Bulletin, depending of the accomplishment of Service Bulletin No.
A300-53-6111, is to perform a Detailed Inspection (DET) of the lower Frame feet fittings
between Frame 41 and Frame 46 for the entire fleet.
In case of crack finding, two options are possible:
- The cracked Frame foot is replaced by an identical new one and the Inspection
Service Bulletin (ISB) No. A300-53-6177 is still applicable.
- All Frame feet are replaced by new optimized parts as per Modification Service
Bulletin No. A300-53-6176 (Mod. No. 13721S22901). In this case, no further
inspection is necessary.
Any findings (including Nil findings) are to be reported to AIRBUS.
Service Bulletin No. A300-53-6111 is therefore cancelled and superseded by this
new ISB. In addition to this new inspection program, Airbus designed new Frame
feet. Their installation is proposed through a dedicated modification Service Bulletin
No. A300-53-6176. Accomplishment of Modification Service Bulletin No. A300-53-6176
cancels the requirements of this ISB.
(3) Advantages
Accomplishment of this ISB will allow early detection of cracks in order to avoid possible
occurrence of crack propagation which can lead to costly and time-consuming repairs.
(4) Operational/Maintenance Consequences
None
D. DESCRIPTION
To accomplish this Service Bulletin it is necessary to :
**CONF 001
Task 536177-832-801-001: Detailed Inspection of the Frame foot
(1) Do a Detailed Inspection of the Frame Foot at FR41 on LH Side
(2) Do a Detailed Inspection of the Frame Foot at FR41 on RH Side
(3) Do a Detailed Inspection of the Frame Foot at FR42 on LH Side
DATE: May 20/15 SERVICE BULLETIN No.: A300-53-6177
REVISION No.: 00 - May 20/15 Page: 6
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 13

@A300-600
SERVICE BULLETIN
(4) Do a Detailed Inspection of the Frame Foot at FR42 on RH Side
(5) Do a Detailed Inspection of the Frame Foot at FR43 on LH Side
(6) Do a Detailed Inspection of the Frame Foot at FR43 on RH Side
(7) Do a Detailed Inspection of the Frame Foot at FR44 on LH Side
(8) Do a Detailed Inspection of the Frame Foot at FR44 on RH Side
(9) Do a Detailed Inspection of the Frame Foot at FR45 on LH Side
(10) Do a Detailed Inspection of the Frame Foot at FR45 on RH Side
(11) Do a Detailed Inspection of the Frame Foot at FR46 on LH Side
(12) Do a Detailed Inspection of the Frame Foot at FR46 on RH Side
Task 536177-833-801-001: Repair
(1) Depending on Inspection results, if necessary, remove the Fasteners from FR41, LH
side
(2) Depending on Inspection results, remove the Gussets from FR41, LH side
(3) Depending on Inspection results, remove the Frame Foot from FR41, LH side
(4) Depending on Inspection results, install an identical Frame Foot at FR41, LH side
(5) Depending on Inspection results, if removed, install the Fasteners at FR41, LH side
(6) Depending on Inspection results, if necessary, remove the Fasteners from FR41, RH
side
(7) Depending on Inspection results, remove the Gussets from FR41, RH side
(8) Depending on Inspection results, remove the Frame Foot from FR41, RH side
(9) Depending on Inspection results, install an identical Frame Foot at FR41, RH side
(10) Depending on Inspection results, if removed, install the Fasteners at FR41, RH side
(11) Depending on Inspection results, if necessary, remove the Fasteners from FR42,
LH side
(12) Depending on Inspection results, remove the Gussets from FR42, LH side
(13) Depending on Inspection results, remove the Frame Foot from FR42, LH side
(14) Depending on Inspection results, install an identical Frame Foot at FR42, LH side
(15) Depending on Inspection results, if removed, install the Fasteners at FR42, LH side
(16) Depending on Inspection results, if necessary, remove the Fasteners from FR42,
DATE: May 20/15 SERVICE BULLETIN No.: A300-53-6177
REVISION No.: 00 - May 20/15 Page: 7
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 14

@A300-600
SERVICE BULLETIN
RH side
(17) Depending on Inspection results, remove the Gussets from FR42, RH side
(18) Depending on Inspection results, remove the Frame Foot from FR42, RH side
(19) Depending on Inspection results, install an identical Frame Foot at FR42, RH side
(20) Depending on Inspection results, if removed, install the Fasteners at FR42, RH side
(21) Depending on Inspection results, if necessary, remove the Fasteners from FR43,
LH side
(22) Depending on Inspection results, remove the Gussets from FR43, LH side
(23) Depending on Inspection results, remove the Frame Foot from FR43, LH side
(24) Depending on Inspection results, install an identical Frame Foot at FR43, LH side
(25) Depending on Inspection results, if removed, install the Fasteners at FR43, LH side
(26) Depending on Inspection results, if necessary, remove the Fasteners from FR43,
RH side
(27) Depending on Inspection results, remove the Gussets from FR43, RH side
(28) Depending on Inspection results, remove the Frame Foot from FR43, RH side
(29) Depending on Inspection results, install an identical Frame Foot at FR43, RH side
(30) Depending on Inspection results, if removed, install the Fasteners at FR43, RH side
(31) Depending on Inspection results, if necessary, remove the Fasteners from FR44,
LH side
(32) Depending on Inspection results, remove the Gussets from FR44, LH side
(33) Depending on Inspection results, remove the Frame Foot from FR44, LH side
(34) Depending on Inspection results, install an identical Frame Foot at FR44, LH side
(35) Depending on Inspection results, if removed, install the Fasteners at FR44, LH side
(36) Depending on Inspection results, if necessary, remove the Fasteners from FR44,
RH side
(37) Depending on Inspection results, remove the Gussets from FR44, RH side
(38) Depending on Inspection results, remove the Frame Foot from FR44, RH side
(39) Depending on Inspection results, install an identical Frame Foot at FR44, RH side
(40) Depending on Inspection results, if removed, install the Fasteners at FR44, RH side
DATE: May 20/15 SERVICE BULLETIN No.: A300-53-6177
REVISION No.: 00 - May 20/15 Page: 8
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 15

@A300-600
SERVICE BULLETIN
(41) Depending on Inspection results, if necessary, remove the Fasteners from FR45,
LH side
(42) Depending on Inspection results, remove the Gussets from FR45, LH side
(43) Depending on Inspection results, remove the Frame Foot from FR45, LH side
(44) Depending on Inspection results, install an identical Frame Foot at FR45, LH side
(45) Depending on Inspection results, if removed, install the Fasteners at FR45, LH side
(46) Depending on Inspection results, if necessary, remove the Fasteners from FR45,
RH side
(47) Depending on Inspection results, remove the Gussets from FR45, RH side
(48) Depending on Inspection results, remove the Frame Foot from FR45, RH side
(49) Depending on Inspection results, install an identical Frame Foot at FR45, RH side
(50) Depending on Inspection results, install the Fasteners at FR45, RH side
(51) Depending on Inspection results, if necessary, remove the Fasteners from FR46,
LH side
(52) Depending on Inspection results, remove the Gussets from FR46, LH side
(53) Depending on Inspection results, remove the Frame Foot from FR46, LH side
(54) Depending on Inspection results, install an identical Frame Foot at FR46, LH side
(55) Depending on Inspection results, if removed, install the Fasteners at FR46, LH side
(56) Depending on Inspection results, if necessary, remove the Fasteners from FR46,
RH side
(57) Depending on Inspection results, remove the Gussets from FR46, RH side
(58) Depending on Inspection results, remove the Frame Foot from FR46, RH side
(59) Depending on Inspection results, install an identical Frame Foot at FR46, RH side
(60) Depending on Inspection results, install the Fasteners at FR46, RH side
**CONF 002
Task 536177-832-801-001: Detailed Inspection of the Frame foot
(1) Do a Detailed Inspection of the Frame Foot at FR41 on LH Side
(2) Do a Detailed Inspection of the Frame Foot at FR41 on RH Side
(3) Do a Detailed Inspection of the Frame Foot at FR42 on LH Side
DATE: May 20/15 SERVICE BULLETIN No.: A300-53-6177
REVISION No.: 00 - May 20/15 Page: 9
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 16

@A300-600
SERVICE BULLETIN
(4) Do a Detailed Inspection of the Frame Foot at FR42 on RH Side
(5) Do a Detailed Inspection of the Frame Foot at FR43 on LH Side
(6) Do a Detailed Inspection of the Frame Foot at FR43 on RH Side
(7) Do a Detailed Inspection of the Frame Foot at FR44 on LH Side
(8) Do a Detailed Inspection of the Frame Foot at FR44 on RH Side
(9) Do a Detailed Inspection of the Frame Foot at FR45 on LH Side
(10) Do a Detailed Inspection of the Frame Foot at FR45 on RH Side
(11) Do a Detailed Inspection of the Frame Foot at FR46 on LH Side
(12) Do a Detailed Inspection of the Frame Foot at FR46 on RH Side
Task 536177-833-801-001: Repair
(1) Depending on Inspection results, if necessary, remove the Fasteners from FR41, LH
side
(2) Depending on Inspection results, remove the Gussets from FR41, LH side
(3) Depending on Inspection results, remove the Frame Foot from FR41, LH side
(4) Depending on Inspection results, install an identical Frame Foot at FR41, LH side
(5) Depending on Inspection results, if removed, install the Fasteners at FR41, LH side
(6) Depending on Inspection results, if necessary, remove the Fasteners from FR41, RH
side
(7) Depending on Inspection results, remove the Gussets from FR41, RH side
(8) Depending on Inspection results, remove the Frame Foot from FR41, RH side
(9) Depending on Inspection results, install an identical Frame Foot at FR41, RH side
(10) Depending on Inspection results, if removed, install the Fasteners at FR41, RH side
(11) Depending on Inspection results, if necessary, remove the Fasteners from FR42,
LH side
(12) Depending on Inspection results, remove the Gussets from FR42, LH side
(13) Depending on Inspection results, remove the Frame Foot from FR42, LH side
(14) Depending on Inspection results, install an identical Frame Foot at FR42, LH side
(15) Depending on Inspection results, if removed, install the Fasteners at FR42, LH side
(16) Depending on Inspection results, if necessary, remove the Fasteners from FR42,
DATE: May 20/15 SERVICE BULLETIN No.: A300-53-6177
REVISION No.: 00 - May 20/15 Page: 10
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 17

@A300-600
SERVICE BULLETIN
RH side
(17) Depending on Inspection results, remove the Gussets from FR42, RH side
(18) Depending on Inspection results, remove the Frame Foot from FR42, RH side
(19) Depending on Inspection results, install an identical Frame Foot at FR42, RH side
(20) Depending on Inspection results, if removed, install the Fasteners at FR42, RH side
(21) Depending on Inspection results, if necessary, remove the Fasteners from FR43,
LH side
(22) Depending on Inspection results, remove the Gussets from FR43, LH side
(23) Depending on Inspection results, remove the Frame Foot from FR43, LH side
(24) Depending on Inspection results, install an identical Frame Foot at FR43, LH side
(25) Depending on Inspection results, if removed, install the Fasteners at FR43, LH side
(26) Depending on Inspection results, if necessary, remove the Fasteners from FR43,
RH side
(27) Depending on Inspection results, remove the Gussets from FR43, RH side
(28) Depending on Inspection results, remove the Frame Foot from FR43, RH side
(29) Depending on Inspection results, install an identical Frame Foot at FR43, RH side
(30) Depending on Inspection results, if removed, install the Fasteners at FR43, RH side
(31) Depending on Inspection results, if necessary, remove the Fasteners from FR44,
LH side
(32) Depending on Inspection results, remove the Gussets from FR44, LH side
(33) Depending on Inspection results, remove the Frame Foot from FR44, LH side
(34) Depending on Inspection results, install an identical Frame Foot at FR44, LH side
(35) Depending on Inspection results, if removed, install the Fasteners at FR44, LH side
(36) Depending on Inspection results, if necessary, remove the Fasteners from FR44,
RH side
(37) Depending on Inspection results, remove the Gussets from FR44, RH side
(38) Depending on Inspection results, remove the Frame Foot from FR44, RH side
(39) Depending on Inspection results, install an identical Frame Foot at FR44, RH side
(40) Depending on Inspection results, if removed, install the Fasteners at FR44, RH side
DATE: May 20/15 SERVICE BULLETIN No.: A300-53-6177
REVISION No.: 00 - May 20/15 Page: 11
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 18

@A300-600
SERVICE BULLETIN
(41) Depending on Inspection results, if necessary, remove the Fasteners from FR45,
LH side
(42) Depending on Inspection results, remove the Gussets from FR45, LH side
(43) Depending on Inspection results, remove the Frame Foot from FR45, LH side
(44) Depending on Inspection results, install an identical Frame Foot at FR45, LH side
(45) Depending on Inspection results, if removed, install the Fasteners at FR45, LH side
(46) Depending on Inspection results, if necessary, remove the Fasteners from FR45,
RH side
(47) Depending on Inspection results, remove the Gussets from FR45, RH side
(48) Depending on Inspection results, remove the Frame Foot from FR45, RH side
(49) Depending on Inspection results, install an identical Frame Foot at FR45, RH side
(50) Depending on Inspection results, install the Fasteners at FR45, RH side
(51) Depending on Inspection results, if necessary, remove the Fasteners from FR46,
LH side
(52) Depending on Inspection results, remove the Gussets from FR46, LH side
(53) Depending on Inspection results, remove the Frame Foot from FR46, LH side
(54) Depending on Inspection results, install an identical Frame Foot at FR46, LH side
(55) Depending on Inspection results, if removed, install the Fasteners at FR46, LH side
(56) Depending on Inspection results, if necessary, remove the Fasteners from FR46,
RH side
(57) Depending on Inspection results, remove the Gussets from FR46, RH side
(58) Depending on Inspection results, remove the Frame Foot from FR46, RH side
(59) Depending on Inspection results, install an identical Frame Foot at FR46, RH side
(60) Depending on Inspection results, install the Fasteners at FR46, RH side
**CONF 003
Task 536177-832-801-001: Detailed Inspection of the Frame foot
(1) Do a Detailed Inspection of the Frame Foot at FR41 on LH Side
(2) Do a Detailed Inspection of the Frame Foot at FR41 on RH Side
(3) Do a Detailed Inspection of the Frame Foot at FR42 on LH Side
DATE: May 20/15 SERVICE BULLETIN No.: A300-53-6177
REVISION No.: 00 - May 20/15 Page: 12
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 19

@A300-600
SERVICE BULLETIN
(4) Do a Detailed Inspection of the Frame Foot at FR42 on RH Side
(5) Do a Detailed Inspection of the Frame Foot at FR43 on LH Side
(6) Do a Detailed Inspection of the Frame Foot at FR43 on RH Side
(7) Do a Detailed Inspection of the Frame Foot at FR44 on LH Side
(8) Do a Detailed Inspection of the Frame Foot at FR44 on RH Side
(9) Do a Detailed Inspection of the Frame Foot at FR45 on LH Side
(10) Do a Detailed Inspection of the Frame Foot at FR45 on RH Side
(11) Do a Detailed Inspection of the Frame Foot at FR46 on LH Side
(12) Do a Detailed Inspection of the Frame Foot at FR46 on RH Side
Task 536177-833-801-001: Repair
(1) Depending on Inspection results, if necessary, remove the Fasteners from FR41, LH
side
(2) Depending on Inspection results, remove the Gussets from FR41, LH side
(3) Depending on Inspection results, remove the Frame Foot from FR41, LH side
(4) Depending on Inspection results, install an identical Frame Foot at FR41, LH side
(5) Depending on Inspection results, if removed, install the Fasteners at FR41, LH side
(6) Depending on Inspection results, if necessary, remove the Fasteners from FR41, RH
side
(7) Depending on Inspection results, remove the Gussets from FR41, RH side
(8) Depending on Inspection results, remove the Frame Foot from FR41, RH side
(9) Depending on Inspection results, install an identical Frame Foot at FR41, RH side
(10) Depending on Inspection results, if removed, install the Fasteners at FR41, RH side
(11) Depending on Inspection results, if necessary, remove the Fasteners from FR42,
LH side
(12) Depending on Inspection results, remove the Gussets from FR42, LH side
(13) Depending on Inspection results, remove the Frame Foot from FR42, LH side
(14) Depending on Inspection results, install an identical Frame Foot at FR42, LH side
(15) Depending on Inspection results, if removed, install the Fasteners at FR42, LH side
(16) Depending on Inspection results, if necessary, remove the Fasteners from FR42,
DATE: May 20/15 SERVICE BULLETIN No.: A300-53-6177
REVISION No.: 00 - May 20/15 Page: 13
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 20

@A300-600
SERVICE BULLETIN
RH side
(17) Depending on Inspection results, remove the Gussets from FR42, RH side
(18) Depending on Inspection results, remove the Frame Foot from FR42, RH side
(19) Depending on Inspection results, install an identical Frame Foot at FR42, RH side
(20) Depending on Inspection results, if removed, install the Fasteners at FR42, RH side
(21) Depending on Inspection results, if necessary, remove the Fasteners from FR43,
LH side
(22) Depending on Inspection results, remove the Gussets from FR43, LH side
(23) Depending on Inspection results, remove the Frame Foot from FR43, LH side
(24) Depending on Inspection results, install an identical Frame Foot at FR43, LH side
(25) Depending on Inspection results, if removed, install the Fasteners at FR43, LH side
(26) Depending on Inspection results, if necessary, remove the Fasteners from FR43,
RH side
(27) Depending on Inspection results, remove the Gussets from FR43, RH side
(28) Depending on Inspection results, remove the Frame Foot from FR43, RH side
(29) Depending on Inspection results, install an identical Frame Foot at FR43, RH side
(30) Depending on Inspection results, if removed, install the Fasteners at FR43, RH side
(31) Depending on Inspection results, if necessary, remove the Fasteners from FR44,
LH side
(32) Depending on Inspection results, remove the Gussets from FR44, LH side
(33) Depending on Inspection results, remove the Frame Foot from FR44, LH side
(34) Depending on Inspection results, install an identical Frame Foot at FR44, LH side
(35) Depending on Inspection results, if removed, install the Fasteners at FR44, LH side
(36) Depending on Inspection results, if necessary, remove the Fasteners from FR44,
RH side
(37) Depending on Inspection results, remove the Gussets from FR44, RH side
(38) Depending on Inspection results, remove the Frame Foot from FR44, RH side
(39) Depending on Inspection results, install an identical Frame Foot at FR44, RH side
(40) Depending on Inspection results, if removed, install the Fasteners at FR44, RH side
DATE: May 20/15 SERVICE BULLETIN No.: A300-53-6177
REVISION No.: 00 - May 20/15 Page: 14
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 21

@A300-600
SERVICE BULLETIN
(41) Depending on Inspection results, if necessary, remove the Fasteners from FR45,
LH side
(42) Depending on Inspection results, remove the Gussets from FR45, LH side
(43) Depending on Inspection results, remove the Frame Foot from FR45, LH side
(44) Depending on Inspection results, install an identical Frame Foot at FR45, LH side
(45) Depending on Inspection results, if removed, install the Fasteners at FR45, LH side
(46) Depending on Inspection results, if necessary, remove the Fasteners from FR45,
RH side
(47) Depending on Inspection results, remove the Gussets from FR45, RH side
(48) Depending on Inspection results, remove the Frame Foot from FR45, RH side
(49) Depending on Inspection results, install an identical Frame Foot at FR45, RH side
(50) Depending on Inspection results, install the Fasteners at FR45, RH side
(51) Depending on Inspection results, if necessary, remove the Fasteners from FR46,
LH side
(52) Depending on Inspection results, remove the Gussets from FR46, LH side
(53) Depending on Inspection results, remove the Frame Foot from FR46, LH side
(54) Depending on Inspection results, install an identical Frame Foot at FR46, LH side
(55) Depending on Inspection results, if removed, install the Fasteners at FR46, LH side
(56) Depending on Inspection results, if necessary, remove the Fasteners from FR46,
RH side
(57) Depending on Inspection results, remove the Gussets from FR46, RH side
(58) Depending on Inspection results, remove the Frame Foot from FR46, RH side
(59) Depending on Inspection results, install an identical Frame Foot at FR46, RH side
(60) Depending on Inspection results, install the Fasteners at FR46, RH side
**CONF 004
Task 536177-839-801-001: Contact and Report to AIRBUS
(1) Contact and Report to AIRBUS
DATE: May 20/15 SERVICE BULLETIN No.: A300-53-6177
REVISION No.: 00 - May 20/15 Page: 15
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 22

@A300-600
SERVICE BULLETIN
**CONF ALL
E. COMPLIANCE
(1) Classification
MANDATORY: Service Bulletin must be accomplished.
(2) Accomplishment Timescale
This Service Bulletin has been classified Mandatory. It is expected that an Airworthiness
Directive (AD) published by the European Aviation Safety Agency (EASA) will be issued
to confirm this classification. It is anticipated that the AD will confirm the thresholds and
intervals given but reference should be made to the AD for confirmation of the mandated
accomplishment timescale.
DATE: May 20/15 SERVICE BULLETIN No.: A300-53-6177
REVISION No.: 00 - May 20/15 Page: 16
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 23

@A300-600
SERVICE BULLETIN
Table 1, Config. 001 - Detailed Inspection of the Frame foot
Compliance time (Whichever
occurs later)
Condition
 Action
Threshold
(Whichever
occurs first)
Grace period
(Whichever
occurs first)
Repetitive
interval
(Whichever
occurs first)
Frame foot not
inspected as
per Service
Bulletin No.
A300-53-6111
-F o r
aircraft (A/C)
with Average
Flight Time
(AFT) higher
than 1.5
hours:
5000 Flight
Cycles (FC) /
10800 Flight
Hours (FH)
-F o r A / C w i t h
AFT lower or
equal to 1.5
hours:
5400 FC /
8100 FH
1000 FC from
issuance of
revision 04 of
Service Bulletin
No.
A300-53-6111
None
All Frame feet
Frame foot
inspected as
per Service
Bulletin No.
A300-53-6111
with nil finding
and thus not
repaired
Do a detailed
inspection of
the area 1 and
the area 2 of
the Frame foot
in accordance
with TASK
536177-832-801
001
-F o r A / C w i t h
AFT higher
than 1.5
hours:
3200 FC
/ 7000 FH
from last
inspection as
per Service
Bulletin No.
A300-53-6111
-F o r A / C w i t h
AFT lower or
equal to 1.5
hours:
3500 FC
/ 5300 FH
from last
inspection as
per Service
Bulletin No.
A300-53-6111
None
 None
DATE: May 20/15 SERVICE BULLETIN No.: A300-53-6177
REVISION No.: 00 - May 20/15 Page: 17
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 24

@A300-600
SERVICE BULLETIN
Table 1, Config. 001 - Detailed Inspection of the Frame foot
Compliance time (Whichever
occurs later)
Condition
 Action
Threshold
(Whichever
occurs first)
Grace period
(Whichever
occurs first)
Repetitive
interval
(Whichever
occurs first)
Apply Service
Bulletin No.
A300-53-6176
See NOTE (**)
And
Before next
flight
None
 None
Send inspection
report to
AIRBUS
And
1 month from
inspection date
None
 None
No further
action
None
 None
 None
OR
Replace the
cracked Frame
foot by a new
identical one in
accordance
with TASK
536177-833-801
001
And
Before next
flight
None
 None
Send inspection
report to
AIRBUS
And
1 month from
inspection date
None
 None
Crack found in area 1 or area 2
See NOTE (*)
Repeat the
inspection of
the replaced
Frame foot in
accordance
with TASK
536177-832-801
001
-F o r A / C w i t h
AFT higher
than 1.5
hours:
5000 FC
/ 10800
FH from
Frame foot
replacement
-F o r A / C w i t h
AFT lower or
equal to 1.5
hours:
5400 FC /
8100 FH from
Frame foot
replacement
None
 -F o r A / C w i t h
AFT higher
than 1.5
hours:
3200 FC /
7000 FH from
Frame foot
replacement
-F o r A / C w i t h
AFT lower or
equal to 1.5
hours:
3500 FC /
5300 FH from
Frame foot
replacement
DATE: May 20/15 SERVICE BULLETIN No.: A300-53-6177
REVISION No.: 00 - May 20/15 Page: 18
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 25

@A300-600
SERVICE BULLETIN
Table 1, Config. 001 - Detailed Inspection of the Frame foot
Compliance time (Whichever
occurs later)
Condition
 Action
Threshold
(Whichever
occurs first)
Grace period
(Whichever
occurs first)
Repetitive
interval
(Whichever
occurs first)
Apply Service
Bulletin No.
A300-53-6176
See NOTE (**)
And
Before next
flight
None
 None
Send inspection
report to
AIRBUS
And
1 month from
inspection date
None
 None
No further
action
None
 None
 None
OR
Send inspection
report to
AIRBUS
And
1 month from
inspection date
None
 None
No crack found in area 1 nor in
area 2
Repeat the
inspection of
the Frame foot
in accordance
with TASK
536177-832-801
001
None
 None
 -F o r A / C w i t h
AFT higher
than 1.5
hours: 3200
FC / 7000 FH
-F o r A / C w i t h
AFT lower or
equal to 1.5
hours:
3500 FC /
5300 FH
NOTE (*): If a crack is longer than 30 mm (1.181 in.), inform AIRBUS and send the affected Frame
foot for laboratory investigation
NOTE (**): The accomplishment of the Service Bulletin No. A300-53-6176 consists in replacing all the
Frame feet (between Frame 41 and Frame 46, LH and RH sides) of the aircraft with optimized Frame
feet.
DATE: May 20/15 SERVICE BULLETIN No.: A300-53-6177
REVISION No.: 00 - May 20/15 Page: 19
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 26

@A300-600
SERVICE BULLETIN
Table 2, Config. 002 - Detailed Inspection of the Frame foot
Compliance time (Whichever occurs
later)
Condition
 Action
Threshold
(Whichever occurs
first)
Grace period
(Whichever occurs
first)
Repetitive interval
(Whichever occurs
first)
All Frame feet
 Do a detailed
inspection of the
area 1 and the
area 2 of the
Frame foot in
accordance with
TASK
536177-832-801
001
- For aircraft (A/C)
with AFT higher
than 1.5 hours:
3200 FC /
7000 FH from
Frame foot repair
embodiment
-F o rA / C w i t hA F T
lower or equal to
1.5 hours:
3500 FC /
5300 FH from
Frame foot repair
embodiment
1000 FC from
issuance of
Service Bulletin
No. A300-53-6177
None
DATE: May 20/15 SERVICE BULLETIN No.: A300-53-6177
REVISION No.: 00 - May 20/15 Page: 20
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 27

@A300-600
SERVICE BULLETIN
Table 2, Config. 002 - Detailed Inspection of the Frame foot
Compliance time (Whichever occurs
later)
Condition
 Action
Threshold
(Whichever occurs
first)
Grace period
(Whichever occurs
first)
Repetitive interval
(Whichever occurs
first)
Apply Service
Bulletin No.
A300-53-6176
See NOTE (**)
And
Before next flight
 None
 None
Send inspection
report to AIRBUS
And
1 month from
inspection date
None
 None
No further action
 None
 None
 None
OR
Replace the
cracked Frame foot
by a new identical
one and do the
cutting-out in
accordance with
TASK
536177-833-801
001
And
Before next flight
 None
 None
Send inspection
report to AIRBUS
And
1 month from
inspection date
None
 None
Crack found in
area 1 or area 2
See NOTE (*)
Repeat the
inspection of the
replaced Frame
foot in accordance
with TASK
536177-832-801
001
-F o rA / C w i t hA F T
higher than 1.5
hours:
5000 FC / 10800
FH from Frame
foot replacement
-F o rA / C w i t hA F T
lower or equal to
1.5 hours:
5400 FC / 8100
FH from Frame
foot replacement
None
 -F o rA / C w i t hA F T
higher than 1.5
hours:
3200 FC / 7000
FH from Frame
foot replacement
-F o rA / C w i t hA F T
lower or equal to
1.5 hours:
3500 FC / 5300
FH from Frame
foot replacement
DATE: May 20/15 SERVICE BULLETIN No.: A300-53-6177
REVISION No.: 00 - May 20/15 Page: 21
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 28

@A300-600
SERVICE BULLETIN
Table 2, Config. 002 - Detailed Inspection of the Frame foot
Compliance time (Whichever occurs
later)
Condition
 Action
Threshold
(Whichever occurs
first)
Grace period
(Whichever occurs
first)
Repetitive interval
(Whichever occurs
first)
Apply Service
Bulletin No.
A300-53-6176
See NOTE (**)
And
Before next flight
 None
 None
Send inspection
report to AIRBUS
And
1 month from
inspection date
None
 None
No further action
 None
 None
 None
OR
Send inspection
report to AIRBUS
And
1 month from
inspection date
None
 None
No crack found in
area 1 nor in area
2
Repeat the
inspection of the
Frame foot in
accordance with
TASK
536177-832-801
001
None
 None
 -F o rA / C w i t hA F T
higher than 1.5
hours: 3200 FC /
7000 FH
-F o rA / C w i t hA F T
lower or equal to
1.5 hours:
3500 FC / 5300
FH
NOTE (*): If a crack is longer than 30 mm (1.181 in.), inform AIRBUS and send the affected Frame
foot for laboratory investigation
NOTE (**): The accomplishment of the Service Bulletin No. A300-53-6176 consists in replacing all the
Frame feet (between Frame 41 and Frame 46, LH and RH sides) of the aircraft with optimized Frame
feet.
DATE: May 20/15 SERVICE BULLETIN No.: A300-53-6177
REVISION No.: 00 - May 20/15 Page: 22
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 29

@A300-600
SERVICE BULLETIN
Table 3, Config. 003 - Detailed Inspection of the Frame foot
Compliance time (Whichever occurs
later)
Condition
 Action
Threshold
(Whichever occurs
first)
Grace period
(Whichever occurs
first)
Repetitive interval
(Whichever occurs
first)
All Frame feet
 Do a detailed
inspection of the
area 2 of the
Frame foot in
accordance with
TASK
536177-832-801
001
- For aircraft (A/C)
with AFT higher
than 1.5 hours:
3200 FC /
7000 FH from
Frame foot repair
embodiment
-F o rA / C w i t hA F T
lower or equal to
1.5 hours:
3500 FC /
5300 FH from
Frame foot repair
embodiment
1000 FC from
issuance of
Service Bulletin
No. A300-53-6177
None
DATE: May 20/15 SERVICE BULLETIN No.: A300-53-6177
REVISION No.: 00 - May 20/15 Page: 23
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 30

@A300-600
SERVICE BULLETIN
Table 3, Config. 003 - Detailed Inspection of the Frame foot
Compliance time (Whichever occurs
later)
Condition
 Action
Threshold
(Whichever occurs
first)
Grace period
(Whichever occurs
first)
Repetitive interval
(Whichever occurs
first)
Apply Service
Bulletin No.
A300-53-6176
See NOTE (**)
And
Before next flight
 None
 None
Send inspection
report to AIRBUS
And
1 month from
inspection date
None
 None
No further action
 None
 None
 None
OR
Replace the
cracked Frame foot
by a new identical
one and do the
cutting-out in
accordance with
TASK
536177-833-801
001
And
Before next flight
 None
 None
Send inspection
report to AIRBUS
And
1 month from
inspection date
None
 None
Crack found in
area 2
See NOTE (*)
Repeat the
inspection of the
replaced Frame
foot, in accordance
with TASK
536177-832-801
001
-F o rA / C w i t hA F T
higher than 1.5
hours:
5000 FC / 10800
FH from Frame
foot replacement
-F o rA / C w i t hA F T
lower or equal to
1.5 hours:
5400 FC / 8100
FH from Frame
foot replacement
None
 -F o rA / C w i t hA F T
higher than 1.5
hours:
3200 FC / 7000
FH from Frame
foot replacement
-F o rA / C w i t hA F T
lower or equal to
1.5 hours:
3500 FC / 5300
FH from Frame
foot replacement
DATE: May 20/15 SERVICE BULLETIN No.: A300-53-6177
REVISION No.: 00 - May 20/15 Page: 24
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 31

@A300-600
SERVICE BULLETIN
Table 3, Config. 003 - Detailed Inspection of the Frame foot
Compliance time (Whichever occurs
later)
Condition
 Action
Threshold
(Whichever occurs
first)
Grace period
(Whichever occurs
first)
Repetitive interval
(Whichever occurs
first)
Apply Service
Bulletin No.
A300-53-6176
See NOTE (**)
And
Before next flight
 None
 None
Send inspection
report to AIRBUS
And
1 month from
inspection date
None
 None
No further action
 None
 None
 None
OR
Send inspection
report to AIRBUS
And
1 month from
inspection date
None
 None
No crack found in
area 2
Repeat the
inspection of the
Frame foot in
accordance with
TASK
536177-832-801
001
None
 None
 -F o rA / C w i t hA F T
higher than 1.5
hours: 3200 FC /
7000 FH
-F o rA / C w i t hA F T
lower or equal to
1.5 hours:
3500 FC / 5300
FH
NOTE (*): If a crack is longer than 30 mm (1.181 in.), inform AIRBUS and send the affected Frame
foot for laboratory investigation
NOTE (**): The accomplishment of the Service Bulletin No. A300-53-6176 consists in replacing all the
Frame feet (between Frame 41 and Frame 46, LH and RH sides) of the aircraft with optimized Frame
feet.
Table 4, Config. 004 - Contact and Report to AIRBUS
Compliance time (Whichever occurs
later)
Condition
 Action
Threshold
(Whichever occurs
first)
Grace period
(Whichever occurs
first)
Repetitive interval
(Whichever occurs
first)
All Frame feet
 Contact and report
to AIRBUS in
accordance with
TASK
536177-839-801
001
6 months from this
Service Bulletin
issuance
None
 None
DATE: May 20/15 SERVICE BULLETIN No.: A300-53-6177
REVISION No.: 00 - May 20/15 Page: 25
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 32

@A300-600
SERVICE BULLETIN
F. APPROVAL
The technical content of this document is approved under the authority of Design
Organisation Approval No. EASA.21J.031.
If an aircraft listed in the effectivity has a modification or repair embodied that is not of
AIRBUS origin, and which affects the content of this Service Bulletin, the operator is
responsible for obtaining approval by its airworthiness authority for any adaptation necessary
before incorporation of the Service Bulletin.
G. MANPOWER
The manpower estimates given in this Service Bulletin are based on the direct labor cost to
do the work. These estimates assume that the work will be done by experienced personnel,
and may need to be revised upwards to suit operator’s circumstances. The estimates do not
include the time to prepare, plan or inspect the work. Manufacture and procurement of parts
and tools, drying times for paints, sealants, etc., and general administration work are also not
included.
**CONF 001
Task 536177-832-801-001: Detailed Inspection of the Frame foot
Get Access
 1.00
On Aircraft
Do a Detailed Inspection of the Frame Foot at FR41 on
LH Side
0.50
Do a Detailed Inspection of the Frame Foot at FR41 on
RH Side
0.50
Do a Detailed Inspection of the Frame Foot at FR42 on
LH Side
0.50
Do a Detailed Inspection of the Frame Foot at FR42 on
RH Side
0.50
Do a Detailed Inspection of the Frame Foot at FR43 on
LH Side
0.50
Do a Detailed Inspection of the Frame Foot at FR43 on
RH Side
0.50
Do a Detailed Inspection of the Frame Foot at FR44 on
LH Side
0.50
Do a Detailed Inspection of the Frame Foot at FR44 on
RH Side
0.50
Do a Detailed Inspection of the Frame Foot at FR45 on
LH Side
0.50
Do a Detailed Inspection of the Frame Foot at FR45 on
RH Side
0.50
Do a Detailed Inspection of the Frame Foot at FR46 on
LH Side
0.50
Do a Detailed Inspection of the Frame Foot at FR46 on
RH Side
0.50
Close-Up
 1.00
TOTAL MANHOURS
 8.00
DATE: May 20/15 SERVICE BULLETIN No.: A300-53-6177
REVISION No.: 00 - May 20/15 Page: 26
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 33

@A300-600
SERVICE BULLETIN
Task 536177-832-801-001: Detailed Inspection of the Frame foot
ELAPSED TIME (HOURS)
 2.50
Task 536177-833-801-001: Repair
Get Access
 12.00
On Aircraft
Depending on Inspection results, if necessary, remove
the Fasteners from FR41, LH side
4.00
Depending on Inspection results, remove the Gussets
from FR41, LH side
1.00
Depending on Inspection results, remove the Frame
Foot from FR41, LH side
16.00
Depending on Inspection results, install an identical
Frame Foot at FR41, LH side
16.00
Depending on Inspection results, if removed, install the
Fasteners at FR41, LH side
6.00
Depending on Inspection results, if necessary, remove
the Fasteners from FR41, RH side
4.00
Depending on Inspection results, remove the Gussets
from FR41, RH side
1.00
Depending on Inspection results, remove the Frame
Foot from FR41, RH side
16.00
Depending on Inspection results, install an identical
Frame Foot at FR41, RH side
16.00
Depending on Inspection results, if removed, install the
Fasteners at FR41, RH side
6.00
Depending on Inspection results, if necessary, remove
the Fasteners from FR42, LH side
4.00
Depending on Inspection results, remove the Gussets
from FR42, LH side
1.00
Depending on Inspection results, remove the Frame
Foot from FR42, LH side
16.00
Depending on Inspection results, install an identical
Frame Foot at FR42, LH side
16.00
Depending on Inspection results, if removed, install the
Fasteners at FR42, LH side
6.00
Depending on Inspection results, if necessary, remove
the Fasteners from FR42, RH side
4.00
Depending on Inspection results, remove the Gussets
from FR42, RH side
1.00
Depending on Inspection results, remove the Frame
Foot from FR42, RH side
16.00
Depending on Inspection results, install an identical
Frame Foot at FR42, RH side
16.00
Depending on Inspection results, if removed, install the
Fasteners at FR42, RH side
6.00
DATE: May 20/15 SERVICE BULLETIN No.: A300-53-6177
REVISION No.: 00 - May 20/15 Page: 27
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 34

@A300-600
SERVICE BULLETIN
Task 536177-833-801-001: Repair
Depending on Inspection results, if necessary, remove
the Fasteners from FR43, LH side
4.00
Depending on Inspection results, remove the Gussets
from FR43, LH side
1.00
Depending on Inspection results, remove the Frame
Foot from FR43, LH side
16.00
Depending on Inspection results, install an identical
Frame Foot at FR43, LH side
16.00
Depending on Inspection results, if removed, install the
Fasteners at FR43, LH side
6.00
Depending on Inspection results, if necessary, remove
the Fasteners from FR43, RH side
4.00
Depending on Inspection results, remove the Gussets
from FR43, RH side
1.00
Depending on Inspection results, remove the Frame
Foot from FR43, RH side
16.00
Depending on Inspection results, install an identical
Frame Foot at FR43, RH side
16.00
Depending on Inspection results, if removed, install the
Fasteners at FR43, RH side
6.00
Depending on Inspection results, if necessary, remove
the Fasteners from FR44, LH side
4.00
Depending on Inspection results, remove the Gussets
from FR44, LH side
1.00
Depending on Inspection results, remove the Frame
Foot from FR44, LH side
16.00
Depending on Inspection results, install an identical
Frame Foot at FR44, LH side
16.00
Depending on Inspection results, if removed, install the
Fasteners at FR44, LH side
6.00
Depending on Inspection results, if necessary, remove
the Fasteners from FR44, RH side
4.00
Depending on Inspection results, remove the Gussets
from FR44, RH side
1.00
Depending on Inspection results, remove the Frame
Foot from FR44, RH side
16.00
Depending on Inspection results, install an identical
Frame Foot at FR44, RH side
16.00
Depending on Inspection results, if removed, install the
Fasteners at FR44, RH side
6.00
Depending on Inspection results, if necessary, remove
the Fasteners from FR45, LH side
4.00
Depending on Inspection results, remove the Gussets
from FR45, LH side
1.00
Depending on Inspection results, remove the Frame
Foot from FR45, LH side
16.00
DATE: May 20/15 SERVICE BULLETIN No.: A300-53-6177
REVISION No.: 00 - May 20/15 Page: 28
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 35

@A300-600
SERVICE BULLETIN
Task 536177-833-801-001: Repair
Depending on Inspection results, install an identical
Frame Foot at FR45, LH side
16.00
Depending on Inspection results, if removed, install the
Fasteners at FR45, LH side
6.00
Depending on Inspection results, if necessary, remove
the Fasteners from FR45, RH side
4.00
Depending on Inspection results, remove the Gussets
from FR45, RH side
1.00
Depending on Inspection results, remove the Frame
Foot from FR45, RH side
16.00
Depending on Inspection results, install an identical
Frame Foot at FR45, RH side
16.00
Depending on Inspection results, install the Fasteners
at FR45, RH side
6.00
Depending on Inspection results, if necessary, remove
the Fasteners from FR46, LH side
4.00
Depending on Inspection results, remove the Gussets
from FR46, LH side
1.00
Depending on Inspection results, remove the Frame
Foot from FR46, LH side
16.00
Depending on Inspection results, install an identical
Frame Foot at FR46, LH side
16.00
Depending on Inspection results, if removed, install the
Fasteners at FR46, LH side
6.00
Depending on Inspection results, if necessary, remove
the Fasteners from FR46, RH side
4.00
Depending on Inspection results, remove the Gussets
from FR46, RH side
1.00
Depending on Inspection results, remove the Frame
Foot from FR46, RH side
16.00
Depending on Inspection results, install an identical
Frame Foot at FR46, RH side
16.00
Depending on Inspection results, install the Fasteners
at FR46, RH side
6.00
Close-Up
 13.00
TOTAL MANHOURS
 541.00
ELAPSED TIME (HOURS)
 42.00
NOTE
: For an explanation of the manhours and elapsed time, refer to the Gantt
Chart, Fig. A-FAAAA
 given in Appendix 01 - Elapsed Time Assumptions .
NOTE
: The minimum manhours necessary to accomplish this Service Bulletin are
those for the Inspection. Depending on the inspection result, additional
manhours can apply.
DATE: May 20/15 SERVICE BULLETIN No.: A300-53-6177
REVISION No.: 00 - May 20/15 Page: 29
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 36

@A300-600
SERVICE BULLETIN
**CONF 002
Task 536177-832-801-001: Detailed Inspection of the Frame foot
Get Access
 1.00
On Aircraft
Do a Detailed Inspection of the Frame Foot at FR41 on
LH Side
0.50
Do a Detailed Inspection of the Frame Foot at FR41 on
RH Side
0.50
Do a Detailed Inspection of the Frame Foot at FR42 on
LH Side
0.50
Do a Detailed Inspection of the Frame Foot at FR42 on
RH Side
0.50
Do a Detailed Inspection of the Frame Foot at FR43 on
LH Side
0.50
Do a Detailed Inspection of the Frame Foot at FR43 on
RH Side
0.50
Do a Detailed Inspection of the Frame Foot at FR44 on
LH Side
0.50
Do a Detailed Inspection of the Frame Foot at FR44 on
RH Side
0.50
Do a Detailed Inspection of the Frame Foot at FR45 on
LH Side
0.50
Do a Detailed Inspection of the Frame Foot at FR45 on
RH Side
0.50
Do a Detailed Inspection of the Frame Foot at FR46 on
LH Side
0.50
Do a Detailed Inspection of the Frame Foot at FR46 on
RH Side
0.50
Close-Up
 1.00
TOTAL MANHOURS
 8.00
ELAPSED TIME (HOURS)
 2.50
Task 536177-833-801-001: Repair
Get Access
 12.00
On Aircraft
Depending on Inspection results, if necessary, remove
the Fasteners from FR41, LH side
4.00
Depending on Inspection results, remove the Gussets
from FR41, LH side
1.00
Depending on Inspection results, remove the Frame
Foot from FR41, LH side
16.00
Depending on Inspection results, install an identical
Frame Foot at FR41, LH side
16.00
Depending on Inspection results, if removed, install the
Fasteners at FR41, LH side
6.00
Depending on Inspection results, if necessary, remove
the Fasteners from FR41, RH side
4.00
DATE: May 20/15 SERVICE BULLETIN No.: A300-53-6177
REVISION No.: 00 - May 20/15 Page: 30
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 37

@A300-600
SERVICE BULLETIN
Task 536177-833-801-001: Repair
Depending on Inspection results, remove the Gussets
from FR41, RH side
1.00
Depending on Inspection results, remove the Frame
Foot from FR41, RH side
16.00
Depending on Inspection results, install an identical
Frame Foot at FR41, RH side
16.00
Depending on Inspection results, if removed, install the
Fasteners at FR41, RH side
6.00
Depending on Inspection results, if necessary, remove
the Fasteners from FR42, LH side
4.00
Depending on Inspection results, remove the Gussets
from FR42, LH side
1.00
Depending on Inspection results, remove the Frame
Foot from FR42, LH side
16.00
Depending on Inspection results, install an identical
Frame Foot at FR42, LH side
16.00
Depending on Inspection results, if removed, install the
Fasteners at FR42, LH side
6.00
Depending on Inspection results, if necessary, remove
the Fasteners from FR42, RH side
4.00
Depending on Inspection results, remove the Gussets
from FR42, RH side
1.00
Depending on Inspection results, remove the Frame
Foot from FR42, RH side
16.00
Depending on Inspection results, install an identical
Frame Foot at FR42, RH side
16.00
Depending on Inspection results, if removed, install the
Fasteners at FR42, RH side
6.00
Depending on Inspection results, if necessary, remove
the Fasteners from FR43, LH side
4.00
Depending on Inspection results, remove the Gussets
from FR43, LH side
1.00
Depending on Inspection results, remove the Frame
Foot from FR43, LH side
16.00
Depending on Inspection results, install an identical
Frame Foot at FR43, LH side
16.00
Depending on Inspection results, if removed, install the
Fasteners at FR43, LH side
6.00
Depending on Inspection results, if necessary, remove
the Fasteners from FR43, RH side
4.00
Depending on Inspection results, remove the Gussets
from FR43, RH side
1.00
Depending on Inspection results, remove the Frame
Foot from FR43, RH side
16.00
Depending on Inspection results, install an identical
Frame Foot at FR43, RH side
16.00
DATE: May 20/15 SERVICE BULLETIN No.: A300-53-6177
REVISION No.: 00 - May 20/15 Page: 31
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 38

@A300-600
SERVICE BULLETIN
Task 536177-833-801-001: Repair
Depending on Inspection results, if removed, install the
Fasteners at FR43, RH side
6.00
Depending on Inspection results, if necessary, remove
the Fasteners from FR44, LH side
4.00
Depending on Inspection results, remove the Gussets
from FR44, LH side
1.00
Depending on Inspection results, remove the Frame
Foot from FR44, LH side
16.00
Depending on Inspection results, install an identical
Frame Foot at FR44, LH side
16.00
Depending on Inspection results, if removed, install the
Fasteners at FR44, LH side
6.00
Depending on Inspection results, if necessary, remove
the Fasteners from FR44, RH side
4.00
Depending on Inspection results, remove the Gussets
from FR44, RH side
1.00
Depending on Inspection results, remove the Frame
Foot from FR44, RH side
16.00
Depending on Inspection results, install an identical
Frame Foot at FR44, RH side
16.00
Depending on Inspection results, if removed, install the
Fasteners at FR44, RH side
6.00
Depending on Inspection results, if necessary, remove
the Fasteners from FR45, LH side
4.00
Depending on Inspection results, remove the Gussets
from FR45, LH side
1.00
Depending on Inspection results, remove the Frame
Foot from FR45, LH side
16.00
Depending on Inspection results, install an identical
Frame Foot at FR45, LH side
16.00
Depending on Inspection results, if removed, install the
Fasteners at FR45, LH side
6.00
Depending on Inspection results, if necessary, remove
the Fasteners from FR45, RH side
4.00
Depending on Inspection results, remove the Gussets
from FR45, RH side
1.00
Depending on Inspection results, remove the Frame
Foot from FR45, RH side
16.00
Depending on Inspection results, install an identical
Frame Foot at FR45, RH side
16.00
Depending on Inspection results, install the Fasteners
at FR45, RH side
6.00
Depending on Inspection results, if necessary, remove
the Fasteners from FR46, LH side
4.00
Depending on Inspection results, remove the Gussets
from FR46, LH side
1.00
DATE: May 20/15 SERVICE BULLETIN No.: A300-53-6177
REVISION No.: 00 - May 20/15 Page: 32
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 39

@A300-600
SERVICE BULLETIN
Task 536177-833-801-001: Repair
Depending on Inspection results, remove the Frame
Foot from FR46, LH side
16.00
Depending on Inspection results, install an identical
Frame Foot at FR46, LH side
16.00
Depending on Inspection results, if removed, install the
Fasteners at FR46, LH side
6.00
Depending on Inspection results, if necessary, remove
the Fasteners from FR46, RH side
4.00
Depending on Inspection results, remove the Gussets
from FR46, RH side
1.00
Depending on Inspection results, remove the Frame
Foot from FR46, RH side
16.00
Depending on Inspection results, install an identical
Frame Foot at FR46, RH side
16.00
Depending on Inspection results, install the Fasteners
at FR46, RH side
6.00
Close-Up
 13.00
TOTAL MANHOURS
 541.00
ELAPSED TIME (HOURS)
 42.00
NOTE
: For an explanation of the manhours and elapsed time, refer to the Gantt
Chart, Fig. A-FAAAA
 given in Appendix 01 - Elapsed Time Assumptions .
NOTE
: The minimum manhours necessary to accomplish this Service Bulletin are
those for the Inspection. Depending on the inspection result, additional
manhours can apply.
**CONF 003
Task 536177-832-801-001: Detailed Inspection of the Frame foot
Get Access
 1.00
On Aircraft
Do a Detailed Inspection of the Frame Foot at FR41 on
LH Side
0.50
Do a Detailed Inspection of the Frame Foot at FR41 on
RH Side
0.50
Do a Detailed Inspection of the Frame Foot at FR42 on
LH Side
0.50
Do a Detailed Inspection of the Frame Foot at FR42 on
RH Side
0.50
Do a Detailed Inspection of the Frame Foot at FR43 on
LH Side
0.50
Do a Detailed Inspection of the Frame Foot at FR43 on
RH Side
0.50
Do a Detailed Inspection of the Frame Foot at FR44 on
LH Side
0.50
Do a Detailed Inspection of the Frame Foot at FR44 on
RH Side
0.50
DATE: May 20/15 SERVICE BULLETIN No.: A300-53-6177
REVISION No.: 00 - May 20/15 Page: 33
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 40

@A300-600
SERVICE BULLETIN
Task 536177-832-801-001: Detailed Inspection of the Frame foot
Do a Detailed Inspection of the Frame Foot at FR45 on
LH Side
0.50
Do a Detailed Inspection of the Frame Foot at FR45 on
RH Side
0.50
Do a Detailed Inspection of the Frame Foot at FR46 on
LH Side
0.50
Do a Detailed Inspection of the Frame Foot at FR46 on
RH Side
0.50
Close-Up
 1.00
TOTAL MANHOURS
 8.00
ELAPSED TIME (HOURS)
 2.50
Task 536177-833-801-001: Repair
Get Access
 12.00
On Aircraft
Depending on Inspection results, if necessary, remove
the Fasteners from FR41, LH side
4.00
Depending on Inspection results, remove the Gussets
from FR41, LH side
1.00
Depending on Inspection results, remove the Frame
Foot from FR41, LH side
16.00
Depending on Inspection results, install an identical
Frame Foot at FR41, LH side
16.00
Depending on Inspection results, if removed, install the
Fasteners at FR41, LH side
6.00
Depending on Inspection results, if necessary, remove
the Fasteners from FR41, RH side
4.00
Depending on Inspection results, remove the Gussets
from FR41, RH side
1.00
Depending on Inspection results, remove the Frame
Foot from FR41, RH side
16.00
Depending on Inspection results, install an identical
Frame Foot at FR41, RH side
16.00
Depending on Inspection results, if removed, install the
Fasteners at FR41, RH side
6.00
Depending on Inspection results, if necessary, remove
the Fasteners from FR42, LH side
4.00
Depending on Inspection results, remove the Gussets
from FR42, LH side
1.00
Depending on Inspection results, remove the Frame
Foot from FR42, LH side
16.00
Depending on Inspection results, install an identical
Frame Foot at FR42, LH side
16.00
Depending on Inspection results, if removed, install the
Fasteners at FR42, LH side
6.00
DATE: May 20/15 SERVICE BULLETIN No.: A300-53-6177
REVISION No.: 00 - May 20/15 Page: 34
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 41

@A300-600
SERVICE BULLETIN
Task 536177-833-801-001: Repair
Depending on Inspection results, if necessary, remove
the Fasteners from FR42, RH side
4.00
Depending on Inspection results, remove the Gussets
from FR42, RH side
1.00
Depending on Inspection results, remove the Frame
Foot from FR42, RH side
16.00
Depending on Inspection results, install an identical
Frame Foot at FR42, RH side
16.00
Depending on Inspection results, if removed, install the
Fasteners at FR42, RH side
6.00
Depending on Inspection results, if necessary, remove
the Fasteners from FR43, LH side
4.00
Depending on Inspection results, remove the Gussets
from FR43, LH side
1.00
Depending on Inspection results, remove the Frame
Foot from FR43, LH side
16.00
Depending on Inspection results, install an identical
Frame Foot at FR43, LH side
16.00
Depending on Inspection results, if removed, install the
Fasteners at FR43, LH side
6.00
Depending on Inspection results, if necessary, remove
the Fasteners from FR43, RH side
4.00
Depending on Inspection results, remove the Gussets
from FR43, RH side
1.00
Depending on Inspection results, remove the Frame
Foot from FR43, RH side
16.00
Depending on Inspection results, install an identical
Frame Foot at FR43, RH side
16.00
Depending on Inspection results, if removed, install the
Fasteners at FR43, RH side
6.00
Depending on Inspection results, if necessary, remove
the Fasteners from FR44, LH side
4.00
Depending on Inspection results, remove the Gussets
from FR44, LH side
1.00
Depending on Inspection results, remove the Frame
Foot from FR44, LH side
16.00
Depending on Inspection results, install an identical
Frame Foot at FR44, LH side
16.00
Depending on Inspection results, if removed, install the
Fasteners at FR44, LH side
6.00
Depending on Inspection results, if necessary, remove
the Fasteners from FR44, RH side
4.00
Depending on Inspection results, remove the Gussets
from FR44, RH side
1.00
Depending on Inspection results, remove the Frame
Foot from FR44, RH side
16.00
DATE: May 20/15 SERVICE BULLETIN No.: A300-53-6177
REVISION No.: 00 - May 20/15 Page: 35
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 42

@A300-600
SERVICE BULLETIN
Task 536177-833-801-001: Repair
Depending on Inspection results, install an identical
Frame Foot at FR44, RH side
16.00
Depending on Inspection results, if removed, install the
Fasteners at FR44, RH side
6.00
Depending on Inspection results, if necessary, remove
the Fasteners from FR45, LH side
4.00
Depending on Inspection results, remove the Gussets
from FR45, LH side
1.00
Depending on Inspection results, remove the Frame
Foot from FR45, LH side
16.00
Depending on Inspection results, install an identical
Frame Foot at FR45, LH side
16.00
Depending on Inspection results, if removed, install the
Fasteners at FR45, LH side
6.00
Depending on Inspection results, if necessary, remove
the Fasteners from FR45, RH side
4.00
Depending on Inspection results, remove the Gussets
from FR45, RH side
1.00
Depending on Inspection results, remove the Frame
Foot from FR45, RH side
16.00
Depending on Inspection results, install an identical
Frame Foot at FR45, RH side
16.00
Depending on Inspection results, install the Fasteners
at FR45, RH side
6.00
Depending on Inspection results, if necessary, remove
the Fasteners from FR46, LH side
4.00
Depending on Inspection results, remove the Gussets
from FR46, LH side
1.00
Depending on Inspection results, remove the Frame
Foot from FR46, LH side
16.00
Depending on Inspection results, install an identical
Frame Foot at FR46, LH side
16.00
Depending on Inspection results, if removed, install the
Fasteners at FR46, LH side
6.00
Depending on Inspection results, if necessary, remove
the Fasteners from FR46, RH side
4.00
Depending on Inspection results, remove the Gussets
from FR46, RH side
1.00
Depending on Inspection results, remove the Frame
Foot from FR46, RH side
16.00
Depending on Inspection results, install an identical
Frame Foot at FR46, RH side
16.00
Depending on Inspection results, install the Fasteners
at FR46, RH side
6.00
Close-Up
 13.00
TOTAL MANHOURS
 541.00
DATE: May 20/15 SERVICE BULLETIN No.: A300-53-6177
REVISION No.: 00 - May 20/15 Page: 36
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 43

@A300-600
SERVICE BULLETIN
Task 536177-833-801-001: Repair
ELAPSED TIME (HOURS)
 42.00
NOTE
: For an explanation of the manhours and elapsed time, refer to the Gantt
Chart, Fig. A-FAAAA
 given in Appendix 01 - Elapsed Time Assumptions .
NOTE
: The minimum manhours necessary to accomplish this Service Bulletin are
those for the Inspection. Depending on the inspection result, additional
manhours can apply.
**CONF 004
Task 536177-839-801-001: Contact and Report to AIRBUS
On Aircraft
Contact and Report to AIRBUS
 0.50
TOTAL MANHOURS
 0.50
ELAPSED TIME (HOURS)
 0.50
**CONF ALL
H. WEIGHT AND BALANCE
Not Changed
I. ELECTRICAL LOAD DATA
Not Changed
J. REFERENCES
**CONF 001
Aircraft Maintenance Manual (AMM)
 06-21-00 06-31-53 06-41-00
06-41-53 20-21-12 20-28-11
24-00-00 28-00-00 28-10-00
28-11-00 28-11-29 28-13-21
28-25-00 32-12-11
Consumable Material List (CML)
Drawing
 R53810322
R53810323
R53810329
R53810330
R53810331
R53810332
Elec. Std. Practices Manual (ESPM)
 20-51-20 20-55-00
Service Bulletin (SB)
 A300-53-6111
A300-53-6176
Standards Manual (SM)
Structural Repair Manual (SRM)
 51-24-00 51-40-00 51-40-20
51-40-30 51-40-40
DATE: May 20/15 SERVICE BULLETIN No.: A300-53-6177
REVISION No.: 00 - May 20/15 Page: 37
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 44

@A300-600
SERVICE BULLETIN
**CONF 002
Aircraft Maintenance Manual (AMM)
 06-21-00 06-31-53 06-41-00
06-41-53 20-21-12 20-28-11
24-00-00 28-00-00 28-10-00
28-11-00 28-11-29 28-13-21
28-25-00 32-12-11
Consumable Material List (CML)
Elec. Std. Practices Manual (ESPM)
 20-51-20 20-55-00
Service Bulletin (SB)
 A300-53-6111
A300-53-6176
Standards Manual (SM)
Structural Repair Manual (SRM)
 51-24-00 51-40-00 51-40-20
51-40-30 51-40-40
**CONF 003
Aircraft Maintenance Manual (AMM)
 06-21-00 06-31-53 06-41-00
06-41-53 20-21-12 20-28-11
24-00-00 28-00-00 28-10-00
28-11-00 28-11-29 28-13-21
28-25-00 32-12-11
Consumable Material List (CML)
Drawing
 R53810322
R53810323
R53810329
R53810330
R53810331
R53810332
Elec. Std. Practices Manual (ESPM)
 20-51-20 20-55-00
Service Bulletin (SB)
 A300-53-6111
A300-53-6176
Standards Manual (SM)
Structural Repair Manual (SRM)
 51-24-00 51-40-00 51-40-20
51-40-30 51-40-40
**CONF 004
Elec. Std. Practices Manual (ESPM)
 20-55-00
**CONF ALL
K. PUBLICATION AFFECTED
Maintenance Planning Document (MPD)
 531541-01-1
L. INTERCHANGEABILITY/MIXABILITY
Not Applicable
M. SPARES
None
DATE: May 20/15 SERVICE BULLETIN No.: A300-53-6177
REVISION No.: 00 - May 20/15 Page: 38
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 45

@A300-600
SERVICE BULLETIN
2. MATERIAL INFORMATION
**CONF ALL
A. MATERIAL - PRICE AND AVAILABILITY
(1) Procurement Addresses
AIRBUS Material, Logistics and Suppliers do not stock standard hardware as competitive
multiple suppliers ensure access to minimum prices. AIRBUS recommends Customers
with aircraft shown in the effectivity of this Service Bulletin to send a purchase order to
KLX Aerospace Solutions. The address is:
Component COMPA01
Component COMPA02
Component COMPA03
Component COMPA04
Component COMPA05
KLX Aerospace Solutions.
10000 NW 15th Terrace Miami
FL 33172
USA
Tel EMEA: +49 (0) 40 822 285 31500
Tel US: +1 305 925 2600
Tel ASIA: +1 310 900 1300
Fax EMEA: +49 (0) 40 822 285 31010
Fax US: +1 305 507 7191
Fax ASIA: +1 310 819 1200
SITA: MIAMMCR
E-Mail: AOGdesk@klx.com
internet: http://www.KLXaerospace.com
or, alternatively any other source on the open
market.
Customers with aircraft shown in the effectivity of this Service Bulletin should send a
purchase order to AIRBUS. Quote the number of this Service Bulletin. The address is:
DATE: May 20/15 SERVICE BULLETIN No.: A300-53-6177
REVISION No.: 00 - May 20/15 Page: 39
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 46

@A300-600
SERVICE BULLETIN
Kit 536177A01R00
Kit 536177A02R00
Kit 536177A03R00
Kit 536177A04R00
Kit 536177A05R00
Kit 536177A06R00
Kit 536177A07R00
Kit 536177A08R00
Kit 536177A09R00
Kit 536177A10R00
Kit 536177A11R00
Kit 536177A12R00
Kit 536177A13R00
Kit 536177A14R00
Kit 536177A15R00
Kit 536177A16R00
Kit 536177A17R00
Kit 536177A18R00
Kit 536177A19R00
Kit 536177A20R00
Kit 536177A21R00
Kit 536177A22R00
Kit 536177A23R00
Kit 536177A24R00
Kit 536177A25R00
Kit 536177A26R00
Kit 536177A27R00
Kit 536177A28R00
Kit 536177A29R00
Kit 536177A30R00
Kit 536177A31R00
Kit 536177A32R00
Kit 536177A33R00
Kit 536177A34R00
Kit 536177A35R00
Kit 536177A36R00
AIRBUS Material, Logistics and Suppliers
Weg beim Jaeger 150
D-22335 HAMBURG
GERMANY
For ordering by internet:
http://spares.airbus.com
For ordering by fax: +49 40 50 76 2590
For ordering by E-mail: airbus.kit@airbus.com
(2) Price and Availability
Kit 536177A01R00
Cost
 7,400.00 USD
Availability
 180 calendar days from receipt of order
The availability given above is the standard lead time from the date of your purchase
order. If items are required before this time, please include a retrofit planning schedule
with your order so that we can try to comply with your requirements. The sales terms
(costs and availability) are estimated in relation to economic conditions. The latest valid
price and lead time for ordering purposes shall be obtained through the AirbusSpares
portal or through a request for quotation to airbus.kit@airbus.com.
DATE: May 20/15 SERVICE BULLETIN No.: A300-53-6177
REVISION No.: 00 - May 20/15 Page: 40
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 47

@A300-600
SERVICE BULLETIN
Kit 536177A02R00
Cost
 7,600.00 USD
Availability
 180 calendar days from receipt of order
The availability given above is the standard lead time from the date of your purchase
order. If items are required before this time, please include a retrofit planning schedule
with your order so that we can try to comply with your requirements. The sales terms
(costs and availability) are estimated in relation to economic conditions. The latest valid
price and lead time for ordering purposes shall be obtained through the AirbusSpares
portal or through a request for quotation to airbus.kit@airbus.com.
Kit 536177A03R00
Cost
 8,100.00 USD
Availability
 180 calendar days from receipt of order
The availability given above is the standard lead time from the date of your purchase
order. If items are required before this time, please include a retrofit planning schedule
with your order so that we can try to comply with your requirements. The sales terms
(costs and availability) are estimated in relation to economic conditions. The latest valid
price and lead time for ordering purposes shall be obtained through the AirbusSpares
portal or through a request for quotation to airbus.kit@airbus.com.
Kit 536177A04R00
Cost
 8,100.00 USD
Availability
 180 calendar days from receipt of order
The availability given above is the standard lead time from the date of your purchase
order. If items are required before this time, please include a retrofit planning schedule
with your order so that we can try to comply with your requirements. The sales terms
(costs and availability) are estimated in relation to economic conditions. The latest valid
price and lead time for ordering purposes shall be obtained through the AirbusSpares
portal or through a request for quotation to airbus.kit@airbus.com.
Kit 536177A05R00
Cost
 8,200.00 USD
Availability
 180 calendar days from receipt of order
The availability given above is the standard lead time from the date of your purchase
order. If items are required before this time, please include a retrofit planning schedule
with your order so that we can try to comply with your requirements. The sales terms
(costs and availability) are estimated in relation to economic conditions. The latest valid
price and lead time for ordering purposes shall be obtained through the AirbusSpares
portal or through a request for quotation to airbus.kit@airbus.com.
Kit 536177A06R00
Cost
 8,900.00 USD
Availability
 180 calendar days from receipt of order
DATE: May 20/15 SERVICE BULLETIN No.: A300-53-6177
REVISION No.: 00 - May 20/15 Page: 41
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 48

@A300-600
SERVICE BULLETIN
The availability given above is the standard lead time from the date of your purchase
order. If items are required before this time, please include a retrofit planning schedule
with your order so that we can try to comply with your requirements. The sales terms
(costs and availability) are estimated in relation to economic conditions. The latest valid
price and lead time for ordering purposes shall be obtained through the AirbusSpares
portal or through a request for quotation to airbus.kit@airbus.com.
Kit 536177A07R00
Cost
 7,000.00 USD
Availability
 180 calendar days from receipt of order
The availability given above is the standard lead time from the date of your purchase
order. If items are required before this time, please include a retrofit planning schedule
with your order so that we can try to comply with your requirements. The sales terms
(costs and availability) are estimated in relation to economic conditions. The latest valid
price and lead time for ordering purposes shall be obtained through the AirbusSpares
portal or through a request for quotation to airbus.kit@airbus.com.
Kit 536177A08R00
Cost
 7,100.00 USD
Availability
 180 calendar days from receipt of order
The availability given above is the standard lead time from the date of your purchase
order. If items are required before this time, please include a retrofit planning schedule
with your order so that we can try to comply with your requirements. The sales terms
(costs and availability) are estimated in relation to economic conditions. The latest valid
price and lead time for ordering purposes shall be obtained through the AirbusSpares
portal or through a request for quotation to airbus.kit@airbus.com.
Kit 536177A09R00
Cost
 7,600.00 USD
Availability
 180 calendar days from receipt of order
The availability given above is the standard lead time from the date of your purchase
order. If items are required before this time, please include a retrofit planning schedule
with your order so that we can try to comply with your requirements. The sales terms
(costs and availability) are estimated in relation to economic conditions. The latest valid
price and lead time for ordering purposes shall be obtained through the AirbusSpares
portal or through a request for quotation to airbus.kit@airbus.com.
Kit 536177A10R00
Cost
 6,600.00 USD
Availability
 180 calendar days from receipt of order
The availability given above is the standard lead time from the date of your purchase
order. If items are required before this time, please include a retrofit planning schedule
with your order so that we can try to comply with your requirements. The sales terms
(costs and availability) are estimated in relation to economic conditions. The latest valid
price and lead time for ordering purposes shall be obtained through the AirbusSpares
portal or through a request for quotation to airbus.kit@airbus.com.
DATE: May 20/15 SERVICE BULLETIN No.: A300-53-6177
REVISION No.: 00 - May 20/15 Page: 42
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 49

@A300-600
SERVICE BULLETIN
Kit 536177A11R00
Cost
 6,700.00 USD
Availability
 180 calendar days from receipt of order
The availability given above is the standard lead time from the date of your purchase
order. If items are required before this time, please include a retrofit planning schedule
with your order so that we can try to comply with your requirements. The sales terms
(costs and availability) are estimated in relation to economic conditions. The latest valid
price and lead time for ordering purposes shall be obtained through the AirbusSpares
portal or through a request for quotation to airbus.kit@airbus.com.
Kit 536177A12R00
Cost
 7,300.00 USD
Availability
 180 calendar days from receipt of order
The availability given above is the standard lead time from the date of your purchase
order. If items are required before this time, please include a retrofit planning schedule
with your order so that we can try to comply with your requirements. The sales terms
(costs and availability) are estimated in relation to economic conditions. The latest valid
price and lead time for ordering purposes shall be obtained through the AirbusSpares
portal or through a request for quotation to airbus.kit@airbus.com.
Kit 536177A13R00
Cost
 7,200.00 USD
Availability
 180 calendar days from receipt of order
The availability given above is the standard lead time from the date of your purchase
order. If items are required before this time, please include a retrofit planning schedule
with your order so that we can try to comply with your requirements. The sales terms
(costs and availability) are estimated in relation to economic conditions. The latest valid
price and lead time for ordering purposes shall be obtained through the AirbusSpares
portal or through a request for quotation to airbus.kit@airbus.com.
Kit 536177A14R00
Cost
 7,300.00 USD
Availability
 180 calendar days from receipt of order
The availability given above is the standard lead time from the date of your purchase
order. If items are required before this time, please include a retrofit planning schedule
with your order so that we can try to comply with your requirements. The sales terms
(costs and availability) are estimated in relation to economic conditions. The latest valid
price and lead time for ordering purposes shall be obtained through the AirbusSpares
portal or through a request for quotation to airbus.kit@airbus.com.
Kit 536177A15R00
Cost
 7,900.00 USD
Availability
 180 calendar days from receipt of order
DATE: May 20/15 SERVICE BULLETIN No.: A300-53-6177
REVISION No.: 00 - May 20/15 Page: 43
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 50

@A300-600
SERVICE BULLETIN
The availability given above is the standard lead time from the date of your purchase
order. If items are required before this time, please include a retrofit planning schedule
with your order so that we can try to comply with your requirements. The sales terms
(costs and availability) are estimated in relation to economic conditions. The latest valid
price and lead time for ordering purposes shall be obtained through the AirbusSpares
portal or through a request for quotation to airbus.kit@airbus.com.
Kit 536177A16R00
Cost
 8,200.00 USD
Availability
 180 calendar days from receipt of order
The availability given above is the standard lead time from the date of your purchase
order. If items are required before this time, please include a retrofit planning schedule
with your order so that we can try to comply with your requirements. The sales terms
(costs and availability) are estimated in relation to economic conditions. The latest valid
price and lead time for ordering purposes shall be obtained through the AirbusSpares
portal or through a request for quotation to airbus.kit@airbus.com.
Kit 536177A17R00
Cost
 8,200.00 USD
Availability
 180 calendar days from receipt of order
The availability given above is the standard lead time from the date of your purchase
order. If items are required before this time, please include a retrofit planning schedule
with your order so that we can try to comply with your requirements. The sales terms
(costs and availability) are estimated in relation to economic conditions. The latest valid
price and lead time for ordering purposes shall be obtained through the AirbusSpares
portal or through a request for quotation to airbus.kit@airbus.com.
Kit 536177A18R00
Cost
 8,700.00 USD
Availability
 180 calendar days from receipt of order
The availability given above is the standard lead time from the date of your purchase
order. If items are required before this time, please include a retrofit planning schedule
with your order so that we can try to comply with your requirements. The sales terms
(costs and availability) are estimated in relation to economic conditions. The latest valid
price and lead time for ordering purposes shall be obtained through the AirbusSpares
portal or through a request for quotation to airbus.kit@airbus.com.
Kit 536177A19R00
Cost
 7,400.00 USD
Availability
 180 calendar days from receipt of order
The availability given above is the standard lead time from the date of your purchase
order. If items are required before this time, please include a retrofit planning schedule
with your order so that we can try to comply with your requirements. The sales terms
(costs and availability) are estimated in relation to economic conditions. The latest valid
price and lead time for ordering purposes shall be obtained through the AirbusSpares
portal or through a request for quotation to airbus.kit@airbus.com.
DATE: May 20/15 SERVICE BULLETIN No.: A300-53-6177
REVISION No.: 00 - May 20/15 Page: 44
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 51

@A300-600
SERVICE BULLETIN
Kit 536177A20R00
Cost
 7,600.00 USD
Availability
 180 calendar days from receipt of order
The availability given above is the standard lead time from the date of your purchase
order. If items are required before this time, please include a retrofit planning schedule
with your order so that we can try to comply with your requirements. The sales terms
(costs and availability) are estimated in relation to economic conditions. The latest valid
price and lead time for ordering purposes shall be obtained through the AirbusSpares
portal or through a request for quotation to airbus.kit@airbus.com.
Kit 536177A21R00
Cost
 8,100.00 USD
Availability
 180 calendar days from receipt of order
The availability given above is the standard lead time from the date of your purchase
order. If items are required before this time, please include a retrofit planning schedule
with your order so that we can try to comply with your requirements. The sales terms
(costs and availability) are estimated in relation to economic conditions. The latest valid
price and lead time for ordering purposes shall be obtained through the AirbusSpares
portal or through a request for quotation to airbus.kit@airbus.com.
Kit 536177A22R00
Cost
 8,100.00 USD
Availability
 180 calendar days from receipt of order
The availability given above is the standard lead time from the date of your purchase
order. If items are required before this time, please include a retrofit planning schedule
with your order so that we can try to comply with your requirements. The sales terms
(costs and availability) are estimated in relation to economic conditions. The latest valid
price and lead time for ordering purposes shall be obtained through the AirbusSpares
portal or through a request for quotation to airbus.kit@airbus.com.
Kit 536177A23R00
Cost
 8,200.00 USD
Availability
 180 calendar days from receipt of order
The availability given above is the standard lead time from the date of your purchase
order. If items are required before this time, please include a retrofit planning schedule
with your order so that we can try to comply with your requirements. The sales terms
(costs and availability) are estimated in relation to economic conditions. The latest valid
price and lead time for ordering purposes shall be obtained through the AirbusSpares
portal or through a request for quotation to airbus.kit@airbus.com.
Kit 536177A24R00
Cost
 9,000.00 USD
Availability
 180 calendar days from receipt of order
DATE: May 20/15 SERVICE BULLETIN No.: A300-53-6177
REVISION No.: 00 - May 20/15 Page: 45
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 52

@A300-600
SERVICE BULLETIN
The availability given above is the standard lead time from the date of your purchase
order. If items are required before this time, please include a retrofit planning schedule
with your order so that we can try to comply with your requirements. The sales terms
(costs and availability) are estimated in relation to economic conditions. The latest valid
price and lead time for ordering purposes shall be obtained through the AirbusSpares
portal or through a request for quotation to airbus.kit@airbus.com.
Kit 536177A25R00
Cost
 7,000.00 USD
Availability
 180 calendar days from receipt of order
The availability given above is the standard lead time from the date of your purchase
order. If items are required before this time, please include a retrofit planning schedule
with your order so that we can try to comply with your requirements. The sales terms
(costs and availability) are estimated in relation to economic conditions. The latest valid
price and lead time for ordering purposes shall be obtained through the AirbusSpares
portal or through a request for quotation to airbus.kit@airbus.com.
Kit 536177A26R00
Cost
 7,100.00 USD
Availability
 180 calendar days from receipt of order
The availability given above is the standard lead time from the date of your purchase
order. If items are required before this time, please include a retrofit planning schedule
with your order so that we can try to comply with your requirements. The sales terms
(costs and availability) are estimated in relation to economic conditions. The latest valid
price and lead time for ordering purposes shall be obtained through the AirbusSpares
portal or through a request for quotation to airbus.kit@airbus.com.
Kit 536177A27R00
Cost
 7,600.00 USD
Availability
 180 calendar days from receipt of order
The availability given above is the standard lead time from the date of your purchase
order. If items are required before this time, please include a retrofit planning schedule
with your order so that we can try to comply with your requirements. The sales terms
(costs and availability) are estimated in relation to economic conditions. The latest valid
price and lead time for ordering purposes shall be obtained through the AirbusSpares
portal or through a request for quotation to airbus.kit@airbus.com.
Kit 536177A28R00
Cost
 6,600.00 USD
Availability
 180 calendar days from receipt of order
The availability given above is the standard lead time from the date of your purchase
order. If items are required before this time, please include a retrofit planning schedule
with your order so that we can try to comply with your requirements. The sales terms
(costs and availability) are estimated in relation to economic conditions. The latest valid
price and lead time for ordering purposes shall be obtained through the AirbusSpares
portal or through a request for quotation to airbus.kit@airbus.com.
DATE: May 20/15 SERVICE BULLETIN No.: A300-53-6177
REVISION No.: 00 - May 20/15 Page: 46
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 53

@A300-600
SERVICE BULLETIN
Kit 536177A29R00
Cost
 6,700.00 USD
Availability
 180 calendar days from receipt of order
The availability given above is the standard lead time from the date of your purchase
order. If items are required before this time, please include a retrofit planning schedule
with your order so that we can try to comply with your requirements. The sales terms
(costs and availability) are estimated in relation to economic conditions. The latest valid
price and lead time for ordering purposes shall be obtained through the AirbusSpares
portal or through a request for quotation to airbus.kit@airbus.com.
Kit 536177A30R00
Cost
 7,300.00 USD
Availability
 180 calendar days from receipt of order
The availability given above is the standard lead time from the date of your purchase
order. If items are required before this time, please include a retrofit planning schedule
with your order so that we can try to comply with your requirements. The sales terms
(costs and availability) are estimated in relation to economic conditions. The latest valid
price and lead time for ordering purposes shall be obtained through the AirbusSpares
portal or through a request for quotation to airbus.kit@airbus.com.
Kit 536177A31R00
Cost
 7,200.00 USD
Availability
 180 calendar days from receipt of order
The availability given above is the standard lead time from the date of your purchase
order. If items are required before this time, please include a retrofit planning schedule
with your order so that we can try to comply with your requirements. The sales terms
(costs and availability) are estimated in relation to economic conditions. The latest valid
price and lead time for ordering purposes shall be obtained through the AirbusSpares
portal or through a request for quotation to airbus.kit@airbus.com.
Kit 536177A32R00
Cost
 7,300.00 USD
Availability
 180 calendar days from receipt of order
The availability given above is the standard lead time from the date of your purchase
order. If items are required before this time, please include a retrofit planning schedule
with your order so that we can try to comply with your requirements. The sales terms
(costs and availability) are estimated in relation to economic conditions. The latest valid
price and lead time for ordering purposes shall be obtained through the AirbusSpares
portal or through a request for quotation to airbus.kit@airbus.com.
Kit 536177A33R00
Cost
 7,900.00 USD
Availability
 180 calendar days from receipt of order
DATE: May 20/15 SERVICE BULLETIN No.: A300-53-6177
REVISION No.: 00 - May 20/15 Page: 47
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 54

@A300-600
SERVICE BULLETIN
The availability given above is the standard lead time from the date of your purchase
order. If items are required before this time, please include a retrofit planning schedule
with your order so that we can try to comply with your requirements. The sales terms
(costs and availability) are estimated in relation to economic conditions. The latest valid
price and lead time for ordering purposes shall be obtained through the AirbusSpares
portal or through a request for quotation to airbus.kit@airbus.com.
Kit 536177A34R00
Cost
 8,100.00 USD
Availability
 180 calendar days from receipt of order
The availability given above is the standard lead time from the date of your purchase
order. If items are required before this time, please include a retrofit planning schedule
with your order so that we can try to comply with your requirements. The sales terms
(costs and availability) are estimated in relation to economic conditions. The latest valid
price and lead time for ordering purposes shall be obtained through the AirbusSpares
portal or through a request for quotation to airbus.kit@airbus.com.
Kit 536177A35R00
Cost
 8,200.00 USD
Availability
 180 calendar days from receipt of order
The availability given above is the standard lead time from the date of your purchase
order. If items are required before this time, please include a retrofit planning schedule
with your order so that we can try to comply with your requirements. The sales terms
(costs and availability) are estimated in relation to economic conditions. The latest valid
price and lead time for ordering purposes shall be obtained through the AirbusSpares
portal or through a request for quotation to airbus.kit@airbus.com.
Kit 536177A36R00
Cost
 8,700.00 USD
Availability
 180 calendar days from receipt of order
The availability given above is the standard lead time from the date of your purchase
order. If items are required before this time, please include a retrofit planning schedule
with your order so that we can try to comply with your requirements. The sales terms
(costs and availability) are estimated in relation to economic conditions. The latest valid
price and lead time for ordering purposes shall be obtained through the AirbusSpares
portal or through a request for quotation to airbus.kit@airbus.com.
Component COMPA01
Operator supplied standard hardware parts required to accomplish this Service Bulletin,
are to be supplied from the operator’s stock.
Component COMPA02
Operator supplied standard hardware parts required to accomplish this Service Bulletin,
are to be supplied from the operator’s stock.
Component COMPA03
DATE: May 20/15 SERVICE BULLETIN No.: A300-53-6177
REVISION No.: 00 - May 20/15 Page: 48
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 55

@A300-600
SERVICE BULLETIN
Operator supplied standard hardware parts required to accomplish this Service Bulletin,
are to be supplied from the operator’s stock.
Component COMPA04
Operator supplied standard hardware parts required to accomplish this Service Bulletin,
are to be supplied from the operator’s stock.
Component COMPA05
Operator supplied standard hardware parts required to accomplish this Service Bulletin,
are to be supplied from the operator’s stock.
B. INDUSTRY SUPPORT INFORMATION
AIRBUS will not provide industry support for accomplishment of this Service Bulletin.
C. LIST OF COMPONENTS
Kit 536177A01R00
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 ITEM
 OLD PART N˚
 INT
 SEE
NOTES
8
 EN6115V3A7
 15
 SCREW
9
 ASNA2529-3
 36
 NUT
10
 EN6115V3A6
 9
 SCREW
12
 ASNA2529-6
 2
 NUT
13
 ASNA2001V5-8Y
 2
 SCREW
14
 NAS1726-5E
 2
 NUT
15
 EN6114V5Y8
 4
 SCREW
16
 ASNA2529-5
 4
 NUT
17
 EN6115V3A5
 10
 SCREW
18
 EN6115V3A4
 2
 SCREW
19
 ASNA2050DXJ4020
 2
 RIVET
21
 ASNA2529-4
 2
 NUT
26
 EN6114V6X14
 2
 SCREW
30
 EN6114V4X8
 1
 SCREW
31
 EN6114V4X10
 1
 SCREW
56
 NSA5057-6
 4
 NUT
100
 A5711112920095
 1
 FOOT
NOTE
: If you find part numbers of hardware components in the related kit(s) which
you cannot identify in the LIST OF COMPONENTS of this Service Bulletin,
refer to Standards Manual (SM). The SM will give you the correct part number
to part number relationship.
Kit 536177A02R00
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 ITEM
 OLD PART N˚
 INT
 SEE
NOTES
8
 EN6115V3A7
 15
 SCREW
DATE: May 20/15 SERVICE BULLETIN No.: A300-53-6177
REVISION No.: 00 - May 20/15 Page: 49
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 56

@A300-600
SERVICE BULLETIN
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 ITEM
 OLD PART N˚
 INT
 SEE
NOTES
9
 ASNA2529-3
 36
 NUT
10
 EN6115V3A6
 9
 SCREW
11
 EN6114V6Y14
 4
 SCREW
12
 ASNA2529-6
 4
 NUT
13
 ASNA2001V5-8Y
 2
 SCREW
14
 NAS1726-5E
 2
 NUT
15
 EN6114V5Y8
 4
 SCREW
16
 ASNA2529-5
 4
 NUT
17
 EN6115V3A5
 10
 SCREW
18
 EN6115V3A4
 2
 SCREW
19
 ASNA2050DXJ4020
 2
 RIVET
20
 EN6114V4Y9
 1
 SCREW
21
 ASNA2529-4
 2
 NUT
22
 EN6114V4Y10
 1
 SCREW
56
 NSA5057-6
 4
 NUT
100
 A5711112920095
 1
 FOOT
NOTE
: If you find part numbers of hardware components in the related kit(s) which
you cannot identify in the LIST OF COMPONENTS of this Service Bulletin,
refer to Standards Manual (SM). The SM will give you the correct part number
to part number relationship.
Kit 536177A03R00
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 ITEM
 OLD PART N˚
 INT
 SEE
NOTES
9
 ASNA2529-3
 36
 NUT
12
 ASNA2529-6
 2
 NUT
14
 NAS1726-5E
 2
 NUT
16
 ASNA2529-5
 4
 NUT
19
 ASNA2050DXJ4020
 2
 RIVET
21
 ASNA2529-4
 2
 NUT
23
 EN6115V3X5
 15
 SCREW
24
 EN6115V3X7
 6
 SCREW
25
 EN6115V3X6
 13
 SCREW
26
 EN6114V6X14
 2
 SCREW
27
 ASNA2001V5-8X
 2
 SCREW
28
 EN6114V5X8
 4
 SCREW
29
 EN6115V3X4
 2
 SCREW
30
 EN6114V4X8
 1
 SCREW
31
 EN6114V4X10
 1
 SCREW
56
 NSA5057-6
 4
 NUT
100
 A5711112920095
 1
 FOOT
NOTE
: If you find part numbers of hardware components in the related kit(s) which
you cannot identify in the LIST OF COMPONENTS of this Service Bulletin,
refer to Standards Manual (SM). The SM will give you the correct part number
to part number relationship.
DATE: May 20/15 SERVICE BULLETIN No.: A300-53-6177
REVISION No.: 00 - May 20/15 Page: 50
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 57

@A300-600
SERVICE BULLETIN
Kit 536177A04R00
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 ITEM
 OLD PART N˚
 INT
 SEE
NOTES
8
 EN6115V3A7
 1
 SCREW
9
 ASNA2529-3
 53
 NUT
10
 EN6115V3A6
 11
 SCREW
12
 ASNA2529-6
 2
 NUT
13
 ASNA2001V5-8Y
 2
 SCREW
14
 NAS1726-5E
 2
 NUT
15
 EN6114V5Y8
 8
 SCREW
16
 ASNA2529-5
 8
 NUT
17
 EN6115V3A5
 10
 SCREW
18
 EN6115V3A4
 4
 SCREW
19
 ASNA2050DXJ4020
 4
 RIVET
21
 ASNA2529-4
 2
 NUT
30
 EN6114V4X8
 1
 SCREW
31
 EN6114V4X10
 1
 SCREW
32
 EN6115V3A8
 14
 SCREW
33
 EN6115V3A9
 11
 SCREW
35
 EN6114V6X13
 2
 SCREW
56
 NSA5057-6
 4
 NUT
102
 A5711113020095
 1
 FOOT
NOTE
: If you find part numbers of hardware components in the related kit(s) which
you cannot identify in the LIST OF COMPONENTS of this Service Bulletin,
refer to Standards Manual (SM). The SM will give you the correct part number
to part number relationship.
Kit 536177A05R00
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 ITEM
 OLD PART N˚
 INT
 SEE
NOTES
8
 EN6115V3A7
 1
 SCREW
9
 ASNA2529-3
 53
 NUT
10
 EN6115V3A6
 11
 SCREW
12
 ASNA2529-6
 2
 NUT
13
 ASNA2001V5-8Y
 2
 SCREW
14
 NAS1726-5E
 2
 NUT
15
 EN6114V5Y8
 8
 SCREW
16
 ASNA2529-5
 8
 NUT
17
 EN6115V3A5
 10
 SCREW
18
 EN6115V3A4
 4
 SCREW
19
 ASNA2050DXJ4020
 4
 RIVET
20
 EN6114V4Y9
 1
 SCREW
21
 ASNA2529-4
 2
 NUT
22
 EN6114V4Y10
 1
 SCREW
32
 EN6115V3A8
 14
 SCREW
33
 EN6115V3A9
 11
 SCREW
DATE: May 20/15 SERVICE BULLETIN No.: A300-53-6177
REVISION No.: 00 - May 20/15 Page: 51
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 58

@A300-600
SERVICE BULLETIN
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 ITEM
 OLD PART N˚
 INT
 SEE
NOTES
34
 EN6114V6Y13
 2
 SCREW
56
 NSA5057-6
 4
 NUT
102
 A5711113020095
 1
 FOOT
NOTE
: If you find part numbers of hardware components in the related kit(s) which
you cannot identify in the LIST OF COMPONENTS of this Service Bulletin,
refer to Standards Manual (SM). The SM will give you the correct part number
to part number relationship.
Kit 536177A06R00
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 ITEM
 OLD PART N˚
 INT
 SEE
NOTES
9
 ASNA2529-3
 48
 NUT
12
 ASNA2529-6
 2
 NUT
14
 NAS1726-5E
 2
 NUT
16
 ASNA2529-5
 8
 NUT
19
 ASNA2050DXJ4020
 4
 RIVET
21
 ASNA2529-4
 2
 NUT
23
 EN6115V3X5
 15
 SCREW
24
 EN6115V3X7
 5
 SCREW
25
 EN6115V3X6
 24
 SCREW
27
 ASNA2001V5-8X
 2
 SCREW
28
 EN6114V5X8
 8
 SCREW
29
 EN6115V3X4
 4
 SCREW
30
 EN6114V4X8
 1
 SCREW
31
 EN6114V4X10
 1
 SCREW
35
 EN6114V6X13
 2
 SCREW
56
 NSA5057-6
 4
 NUT
102
 A5711113020095
 1
 FOOT
NOTE
: If you find part numbers of hardware components in the related kit(s) which
you cannot identify in the LIST OF COMPONENTS of this Service Bulletin,
refer to Standards Manual (SM). The SM will give you the correct part number
to part number relationship.
Kit 536177A07R00
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 ITEM
 OLD PART N˚
 INT
 SEE
NOTES
8
 EN6115V3A7
 7
 SCREW
9
 ASNA2529-3
 39
 NUT
10
 EN6115V3A6
 10
 SCREW
12
 ASNA2529-6
 2
 NUT
13
 ASNA2001V5-8Y
 2
 SCREW
14
 NAS1726-5E
 2
 NUT
15
 EN6114V5Y8
 4
 SCREW
16
 ASNA2529-5
 5
 NUT
DATE: May 20/15 SERVICE BULLETIN No.: A300-53-6177
REVISION No.: 00 - May 20/15 Page: 52
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 59

@A300-600
SERVICE BULLETIN
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 ITEM
 OLD PART N˚
 INT
 SEE
NOTES
17
 EN6115V3A5
 9
 SCREW
19
 ASNA2050DXJ4020
 2
 RIVET
21
 ASNA2529-4
 1
 NUT
26
 EN6114V6X14
 2
 SCREW
30
 EN6114V4X8
 1
 SCREW
32
 EN6115V3A8
 11
 SCREW
33
 EN6115V3A9
 1
 SCREW
36
 EN6115V3A3
 5
 SCREW
41
 EN6114V5X10
 1
 SCREW
56
 NSA5057-6
 4
 NUT
104
 A5711113120095
 1
 FOOT
NOTE
: If you find part numbers of hardware components in the related kit(s) which
you cannot identify in the LIST OF COMPONENTS of this Service Bulletin,
refer to Standards Manual (SM). The SM will give you the correct part number
to part number relationship.
Kit 536177A08R00
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 ITEM
 OLD PART N˚
 INT
 SEE
NOTES
8
 EN6115V3A7
 7
 SCREW
9
 ASNA2529-3
 39
 NUT
10
 EN6115V3A6
 10
 SCREW
11
 EN6114V6Y14
 2
 SCREW
12
 ASNA2529-6
 2
 NUT
13
 ASNA2001V5-8Y
 2
 SCREW
14
 NAS1726-5E
 2
 NUT
15
 EN6114V5Y8
 4
 SCREW
16
 ASNA2529-5
 5
 NUT
17
 EN6115V3A5
 9
 SCREW
19
 ASNA2050DXJ4020
 2
 RIVET
20
 EN6114V4Y9
 1
 SCREW
21
 ASNA2529-4
 1
 NUT
32
 EN6115V3A8
 11
 SCREW
33
 EN6115V3A9
 1
 SCREW
36
 EN6115V3A3
 5
 SCREW
37
 EN6114V5Y10
 1
 SCREW
56
 NSA5057-6
 4
 NUT
104
 A5711113120095
 1
 FOOT
NOTE
: If you find part numbers of hardware components in the related kit(s) which
you cannot identify in the LIST OF COMPONENTS of this Service Bulletin,
refer to Standards Manual (SM). The SM will give you the correct part number
to part number relationship.
DATE: May 20/15 SERVICE BULLETIN No.: A300-53-6177
REVISION No.: 00 - May 20/15 Page: 53
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 60

@A300-600
SERVICE BULLETIN
Kit 536177A09R00
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 ITEM
 OLD PART N˚
 INT
 SEE
NOTES
9
 ASNA2529-3
 39
 NUT
12
 ASNA2529-6
 2
 NUT
14
 NAS1726-5E
 2
 NUT
16
 ASNA2529-5
 5
 NUT
19
 ASNA2050DXJ4020
 2
 RIVET
21
 ASNA2529-4
 1
 NUT
23
 EN6115V3X5
 9
 SCREW
24
 EN6115V3X7
 4
 SCREW
25
 EN6115V3X6
 11
 SCREW
26
 EN6114V6X14
 2
 SCREW
27
 ASNA2001V5-8X
 2
 SCREW
28
 EN6114V5X8
 4
 SCREW
30
 EN6114V4X8
 1
 SCREW
39
 EN6115V3X9
 3
 SCREW
40
 EN6115V3X8
 11
 SCREW
41
 EN6114V5X10
 1
 SCREW
56
 NSA5057-6
 4
 NUT
104
 A5711113120095
 1
 FOOT
NOTE
: If you find part numbers of hardware components in the related kit(s) which
you cannot identify in the LIST OF COMPONENTS of this Service Bulletin,
refer to Standards Manual (SM). The SM will give you the correct part number
to part number relationship.
Kit 536177A10R00
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 ITEM
 OLD PART N˚
 INT
 SEE
NOTES
8
 EN6115V3A7
 11
 SCREW
9
 ASNA2529-3
 35
 NUT
10
 EN6115V3A6
 12
 SCREW
12
 ASNA2529-6
 2
 NUT
13
 ASNA2001V5-8Y
 2
 SCREW
14
 NAS1726-5E
 2
 NUT
15
 EN6114V5Y8
 2
 SCREW
16
 ASNA2529-5
 4
 NUT
17
 EN6115V3A5
 9
 SCREW
18
 EN6115V3A4
 2
 SCREW
19
 ASNA2050DXJ4020
 2
 RIVET
26
 EN6114V6X14
 2
 SCREW
28
 EN6114V5X8
 1
 SCREW
36
 EN6115V3A3
 1
 SCREW
41
 EN6114V5X10
 1
 SCREW
56
 NSA5057-6
 4
 NUT
106
 A5711113220095
 1
 FOOT
DATE: May 20/15 SERVICE BULLETIN No.: A300-53-6177
REVISION No.: 00 - May 20/15 Page: 54
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

The text continues at https://openairdocs.org/service-documents/airbus/a300-53-6177/file/8d8aca51698d.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.