Copy: No revision named ("SB A300-53-6190_r00"), 123 pages: PDF https://openairdocs.org/files/sha256/18/af/18af088caad83ed9affd2314e57ac3b6738f3b21919533d80de0b25a89f7818b; text https://openairdocs.org/service-documents/airbus/a300-53-6190/file/18af088caad8.md. Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2020-0347, the docket of AD 2020-21-04. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Airbus](https://openairdocs.org/service-documents/airbus.md)
- Type: Service bulletin (Service Bulletin)
- Number: A300-53-6190
- Page: https://openairdocs.org/service-documents/airbus/a300-53-6190

## Text (123 pages)

Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2020-0347, the docket of AD 2020-21-04. Not covered by OpenAirDocs’ CC0 dedication. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

A300-600
SERVICE BULLETIN
REV 00 Dec 18/19 A300-53-6190
Page 1
CONF ALL
AIRBUS
2, ROND POINT EMILE DEWOITINE
31700 BLAGNAC
FRANCE
 
The content of this document is the property of Airbus. All rights including copyrights are reserved.
It is supplied in confidence and commercial security on its contents must be maintained.
It must not be used for any purpose other than that for which it is supplied, nor may information
contained in it be disclosed to unauthorized persons.
It must not be reproduced in whole or in part without permission in writing from the owners of the
copyright. Requests for reproduction of any data in this document and the media authorized for it must
be addressed to Airbus.
ATA SYSTEM: 53
TITLE: FUSELAGE - FUSELAGE CENTER SECTION - REPLACEMENT OF
CROSSBEAMS FROM FR48 TO FR54 ON MAIN DECK CARGO ON RH
SIDE
MODIFICATION No.:
13864S22958

### Page 2

A300-600
SERVICE BULLETIN
SUMMARY
REV 00 Dec 18/19 A300-53-6190
Page 2
ATA SYSTEM: 53
TITLE: FUSELAGE - FUSELAGE CENTER SECTION - REPLACEMENT OF
CROSSBEAMS FROM FR48 TO FR54 ON MAIN DECK CARGO ON RH
SIDE
SUMMARY
This summary is for information only and is not approved for modification of the aircraft.
A. MODIFICATIONS
CONF 001
MODIFICATION CLASSIFICATION
MAJOR None
MINOR 13864S22958
NOTE: As per EASA IR 21, a minor change is one that has no appreciable effect on the
mass, balance, structural strength, reliability, operational characteristics affecting
the airworthiness of the product. All other changes are major changes.
CONF 002
MODIFICATION CLASSIFICATION
MAJOR None
MINOR 13864S22958
NOTE: As per EASA IR 21, a minor change is one that has no appreciable effect on the
mass, balance, structural strength, reliability, operational characteristics affecting
the airworthiness of the product. All other changes are major changes.
CONF ALL
B. REASON
(1) History
One operator reported in-service findings following maintenance visit of the main
cargo floor structure. The typical damage description is a bent/curved and even
cracked crossbeam located from Frame 48 to Frame 54 on Right Hand (RH) side.
(2) Objective/Action
The intent of this Service Bulletin is to replace crossbeams from Frame 48 to Frame 54
by a set of new crossbeams with reinforced machined design.
Prior to Service Bulletin accomplishment, specific attention must be paid to the
preparation, refer to paragraph 3.B Preparation.
(3) Advantages
Accomplishment of this Service Bulletin cancels the requirements of Inspection Service
Bulletin Ref. SB A300-53-6191.
(4) Operational/Maintenance Consequences
None
C. GENERAL EVALUATION

### Page 3

A300-600
SERVICE BULLETIN
SUMMARY
REV 00 Dec 18/19 A300-53-6190
Page 3
EVALUATION TABLE
COMPLIANCE RECOMMENDED COST SAVING NO
A/C OPERATION
AFFECTED
NO VENDOR SB NO
CANCELS INSPECTION SB YES ETOPS AFFECTED NO
PAX COMFORT AFFECTED NO POTENTIAL AD NO
RELIABILITY AFFECTED NO STRUCTURAL LIFE EXTENSION NO
LIFE LIMIT NO LINE MAINTENANCE AFFECTED NO
VALIDATION ON AIRCRAFT NO BOOKLET AVAILABLE NO
NOTE: Service Bulletin recommended to be accomplished to prevent significant
operational disruptions.
D. MAINTENANCE CONFIGURATION
CONF 001
No specific aircraft maintenance configuration required.
CONF 002
No specific aircraft maintenance configuration required.
CONF ALL
E. MATERIAL PRICE INFORMATION
CONF 001
(1) Modification
(a) T ask set A300-A-53-XX-6190-01000-93AA-A Modification
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET QTYPER A/C PRICE PER A/C MAIN PARTS
Components See SB See Note Cotter Pin, crossbeams
NOTE: Price information to be obtained from the given supplier.
CONF 002
(1) Modification
(a) T ask set A300-A-53-XX-6190-01000-93AA-A Modification
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET QTYPER A/C PRICE PER A/C MAIN PARTS
Components See SB See Note Cotter Pin, crossbeams
NOTE: Price information to be obtained from the given supplier.
CONF ALL
F. APPLICABILITY
This Service Bulletin is applicable to this (these) operator(s):
AHK BCS UPS

### Page 4

A300-600
SERVICE BULLETIN
SUMMARY
REV 00 Dec 18/19 A300-53-6190
Page 4
G. CONCURRENT REQUIREMENTS
Accomplishment of this Service Bulletin requires simultaneous accomplishment of the
following Service Bulletin(s) before next flight.
Service Bulletin(s) Modification(s)
Ref. SB A300-53-6191  
NOTE: Service Bulletin No. Ref. SB A300-53-6191 (FUSELAGE - FUSELAGE CENTER SECTION
- INSPECTION OF CROSSBEAMS FROM FR48 TO FR54 ON MAIN DECK CARGO).
H. NATURE OF THE WORK
CONF 001
(1) Modification
(a) T ask set A300-A-53-XX-6190-01000-93AA-A Modification
AIRCRAFT YES
EQUIPMENT NO
CONF 002
(1) Modification
(a) T ask set A300-A-53-XX-6190-01000-93AA-A Modification
AIRCRAFT YES
EQUIPMENT NO
CONF ALL
I. MANPOWER
CONF 001
(1) Modification
(a) T ask set A300-A-53-XX-6190-01000-93AA-A Modification
MANPOWER
TOTAL MAN-HOURS 17.30 h
ELAPSED TIME (HOURS) 7.80 h
CONF 002
(1) Modification
(a) T ask set A300-A-53-XX-6190-01000-93AA-A Modification
MANPOWER
TOTAL MAN-HOURS 17.30 h
ELAPSED TIME (HOURS) 7.80 h

### Page 5

A300-600
SERVICE BULLETIN
SUMMARY
Figure ICN-A300-A-53XX6190-A-FAPE3-004MP-A-002-01 SHEET 1/1
REV 00 Dec 18/19 A300-53-6190General Overview
Page 5
CONF ALL
J. GENERAL OVERVIEW
CONF ALL
FR54
FR53
FR52
FR51
FR50
FR49
FR48
FR39
FR40
Y -953
Y -450
Z140
A
A
REPLACEMENT OF THE CROSSBEAMS
ON THE MAIN DECK CARGO ON RH SIDE
ICN-A300-A-53XX6190-A-FAPE3-004MP-A-002-01

### Page 6

A300-600
SERVICE BULLETIN
REV 00 Dec 18/19 A300-53-6190
Page 6
ATA SYSTEM: 53
TITLE: FUSELAGE - FUSELAGE CENTER SECTION - REPLACEMENT OF
CROSSBEAMS FROM FR48 TO FR54 ON MAIN DECK CARGO ON RH
SIDE
1. PLANNING INFORMATION
A. APPLICABILITY
NOTE: This modification is applicable by Service Bulletin only.
(1) Models
ON A/C 0855-0860, 0870, 0871
F4-605R
ON A/C 0805-0835, 0839, 0840, 0845-0854, 0861-0869, 0872
F4-622R
CONF ALL
(2) Applicability by MSN
0805-0835 0839 0840 0845-0872
(3) MSN by configuration
CONF 001
MSN CONFIGURATION
0855 0856 0857 0858 0859 0860 0870 0871 0872 001
CONF 002
MSN CONFIGURATION
0805 0806 0807 0808 0809 0810 0811 0812 0813 0814 0815
0816 0817 0818 0819 0820 0821 0822 0823 0824 0825 0826
0827 0828 0829 0830 0831 0832 0833 0834 0835 0839 0840
0845 0846 0847 0848 0849 0850 0851 0852 0853 0854 0861
0862 0863 0864 0865 0866 0867 0868 0869
002
CONF ALL
(4) Configuration definition
CONF 001
Configuration 001
CONF 001 regards the specific PRE-SB status of the related aircraft.
CONF 001 retrofits following modifications: 13864S22958.
CONF 002
Configuration 002
CONF 002 regards the specific PRE-SB status of the related aircraft.
CONF 002 retrofits following modifications: 13864S22958.
CONF ALL
B. CONCURRENT REQUIREMENTS
Accomplishment of this Service Bulletin requires simultaneous accomplishment of the
following Service Bulletin(s) before next flight.

### Page 7

A300-600
SERVICE BULLETIN
REV 00 Dec 18/19 A300-53-6190
Page 7
Service Bulletin(s) Modification(s)
Ref. SB A300-53-6191  
NOTE: Service Bulletin No. Ref. SB A300-53-6191 (FUSELAGE - FUSELAGE CENTER SECTION
- INSPECTION OF CROSSBEAMS FROM FR48 TO FR54 ON MAIN DECK CARGO).
C. REASON
(1) History
One operator reported in-service findings following maintenance visit of the main
cargo floor structure. The typical damage description is a bent/curved and even
cracked crossbeam located from Frame 48 to Frame 54 on Right Hand (RH) side.
(2) Objective/Action
The intent of this Service Bulletin is to replace crossbeams from Frame 48 to Frame 54
by a set of new crossbeams with reinforced machined design.
Prior to Service Bulletin accomplishment, specific attention must be paid to the
preparation, refer to paragraph 3.B Preparation.
(3) Advantages
Accomplishment of this Service Bulletin cancels the requirements of Inspection Service
Bulletin Ref. SB A300-53-6191.
(4) Operational/Maintenance Consequences
None
D. DESCRIPTION
T o accomplish this Service Bulletin it is necessary to:
(1) Modification
(a) T ask set A300-A-53-XX-6190-01000-93AA-A Modification
CONF 001
1 Remove the Crossbeam at Frame 48
CONF 002
1 Remove the Crossbeam at Frame 48
CONF ALL
2 Install the Crossbeam at Frame 48
CONF 001
3 Remove the Crossbeam at Frame 49
CONF 002
3 Remove the Crossbeam at Frame 49
CONF ALL
4 Install the Crossbeam at Frame 49
CONF 001
5 Remove the Crossbeam at Frame 50
CONF 002
5 Remove the Crossbeam at Frame 50
CONF ALL
6 Install the Crossbeam at Frame 50
CONF 001

### Page 8

A300-600
SERVICE BULLETIN
REV 00 Dec 18/19 A300-53-6190
Page 8
7 Remove the Crossbeam at Frame 51
CONF 002
7 Remove the Crossbeam at Frame 51
CONF ALL
8 Install the Crossbeam at Frame 51
CONF 001
9 Remove the Crossbeam at Frame 52
CONF 002
9 Remove the Crossbeam at Frame 52
CONF ALL
10 Install the Crossbeam at Frame 52
CONF 001
11 Remove the Crossbeam at Frame 53
CONF 002
11 Remove the Crossbeam at Frame 53
CONF ALL
12 Install the Crossbeam at Frame 53
CONF 001
13 Remove the Crossbeam at Frame 54
CONF 002
13 Remove the Crossbeam at Frame 54
CONF ALL
14 Install the Crossbeam at Frame 54
E. COMPLIANCE
(1) Classification
RECOMMENDED: Service Bulletin recommended to be accomplished to prevent
significant operational disruptions.
(2) Accomplishment Timescale
Accomplishment of this Service Bulletin is recommended at the earliest opportunity
where manpower and facilities are available.
F. APPROVAL
The technical content of this document is approved under the authority of Design
Organisation Approval No. EASA.21J.031.
If an aircraft listed in the applicability has a modification or repair embodied that is not
of AIRBUS origin, and which affects the content of this Service Bulletin, the operator
is responsible for obtaining approval by its airworthiness authority for any adaptation
necessary before incorporation of the Service Bulletin.
G. MANPOWER
CONF 001
The manpower estimates given in this Service Bulletin are based on the direct labor cost to
do the work. These estimates assume that the work will be done by experienced personnel,
and may need to be revised upwards to suit operator’s circumstances. The estimates do not
include the time to prepare, plan or inspect the work. Manufacture and procurement of parts
and tools, drying times for paints, sealants, etc., and general administration work are also
not included.

### Page 9

A300-600
SERVICE BULLETIN
REV 00 Dec 18/19 A300-53-6190
Page 9
(1) Modification
(a) T ask set A300-A-53-XX-6190-01000-93AA-A Modification
PREPARATION
Job Set-up 2.00 h
PROCEDURE
Remove the Crossbeam at Frame 48 0.65 h
Install the Crossbeam at Frame 48 1.25 h
Remove the Crossbeam at Frame 49 0.65 h
Install the Crossbeam at Frame 49 1.25 h
Remove the Crossbeam at Frame 50 0.65 h
Install the Crossbeam at Frame 50 1.25 h
Remove the Crossbeam at Frame 51 0.65 h
Install the Crossbeam at Frame 51 1.25 h
Remove the Crossbeam at Frame 52 0.65 h
Install the Crossbeam at Frame 52 1.25 h
Remove the Crossbeam at Frame 53 0.65 h
Install the Crossbeam at Frame 53 1.25 h
Remove the Crossbeam at Frame 54 0.65 h
Install the Crossbeam at Frame 54 1.25 h
PREPARATION FOR TEST
None
TEST
None
CLOSE-UP
Close-up 2.00 h
TOTAL MAN-HOURS 17.30 h
ELAPSED TIME (HOURS) 7.80 h
NOTE: For an explanation of the man-hours and elapsed time, refer to the
Gantt Chart given in Appendix 01 - MANPOWER GANTT CHART.
CONF 002
The manpower estimates given in this Service Bulletin are based on the direct labor cost to
do the work. These estimates assume that the work will be done by experienced personnel,
and may need to be revised upwards to suit operator’s circumstances. The estimates do not
include the time to prepare, plan or inspect the work. Manufacture and procurement of parts
and tools, drying times for paints, sealants, etc., and general administration work are also
not included.
(1) Modification
(a) T ask set A300-A-53-XX-6190-01000-93AA-A Modification
PREPARATION
Job Set-up 2.00 h
PROCEDURE
Remove the Crossbeam at Frame 48 0.65 h

### Page 10

A300-600
SERVICE BULLETIN
REV 00 Dec 18/19 A300-53-6190
Page 10
Install the Crossbeam at Frame 48 1.25 h
Remove the Crossbeam at Frame 49 0.65 h
Install the Crossbeam at Frame 49 1.25 h
Remove the Crossbeam at Frame 50 0.65 h
Install the Crossbeam at Frame 50 1.25 h
Remove the Crossbeam at Frame 51 0.65 h
Install the Crossbeam at Frame 51 1.25 h
Remove the Crossbeam at Frame 52 0.65 h
Install the Crossbeam at Frame 52 1.25 h
Remove the Crossbeam at Frame 53 0.65 h
Install the Crossbeam at Frame 53 1.25 h
Remove the Crossbeam at Frame 54 0.65 h
Install the Crossbeam at Frame 54 1.25 h
PREPARATION FOR TEST
None
TEST
None
CLOSE-UP
Close-up 2.00 h
TOTAL MAN-HOURS 17.30 h
ELAPSED TIME (HOURS) 7.80 h
NOTE: For an explanation of the man-hours and elapsed time, refer to the
Gantt Chart given in Appendix 01 - MANPOWER GANTT CHART.
CONF ALL
H. WEIGHT AND BALANCE
The weight and balance estimates given in this Service Bulletin are based on the
Manufacturer's Empty Weight (MEW) and do not include operator's items. The definition of
MEW and operator's items is given in the Weight and Balance Manual (WBM), Ref. WBM.
Manufacturer's Empty Weight +1.313 kg (+2.895 lb)
Effect on Balance +42.06 kg.m (+304.220 lb.ft)
I. ELECTRICAL LOAD DATA
Not changed
J. REFERENCES
CONCURRENT SERVICE BULLETIN (SB)
A300-53-6191
CONF 001
(1) Modification
(a) T ask set A300-A-53-XX-6190-01000-93AA-A Modification
AIRCRAFT MAINTENANCE MANUAL (AMM)
06-21-00, Page Block 001 06-31-53, Page Block 001

### Page 11

A300-600
SERVICE BULLETIN
REV 00 Dec 18/19 A300-53-6190
Page 11
AIRCRAFT MAINTENANCE MANUAL (AMM)
24-00-00, Page Block 301 53-10-25, Page Block 401
ELECTRICAL STANDARD PRACTICES MANUAL (ESPM)
20-55-00
SERVICE BULLETIN (SB)
A300-53-6191
STRUCTURAL REPAIR MANUAL (SRM)
51-40-20 51-40-30
51-40-40
TECHNICAL FOLLOW UP (TFU)
53.15.00.050
WEIGHT AND BALANCE MANUAL (WBM)
STANDARDS MANUAL (SM)
CONSUMABLE MATERIAL LIST (CML)
CONF 002
(1) Modification
(a) T ask set A300-A-53-XX-6190-01000-93AA-A Modification
AIRCRAFT MAINTENANCE MANUAL (AMM)
06-21-00, Page Block 001 06-31-53, Page Block 001
24-00-00, Page Block 301 53-10-25, Page Block 401
ELECTRICAL STANDARD PRACTICES MANUAL (ESPM)
20-55-00
SERVICE BULLETIN (SB)
A300-53-6191
STRUCTURAL REPAIR MANUAL (SRM)
51-40-20 51-40-30
51-40-40
TECHNICAL FOLLOW UP (TFU)
53.15.00.050
WEIGHT AND BALANCE MANUAL (WBM)
STANDARDS MANUAL (SM)
CONSUMABLE MATERIAL LIST (CML)
CONF ALL
K. PUBLICATION AFFECTED
ILLUSTRATED PARTS CATALOG (IPC)

### Page 12

A300-600
SERVICE BULLETIN
REV 00 Dec 18/19 A300-53-6190
Page 12
L. INDUSTRY SUPPORT INFORMATION
This Service Bulletin is the subject of an AIRBUS monitored retrofit campaign.
For the organization of this retrofit, you are kindly requested to contact AIRBUS retrofit
management department: monitored.retrofit@airbus.com.
Refer to RIL C53M19002888 for the industry support terms of this Service Bulletin parts and
labor.

### Page 13

A300-600
SERVICE BULLETIN
REV 00 Dec 18/19 A300-53-6190
Page 13
2. MATERIAL INFORMATION
A. MATERIAL APPLICABILITY
CONF 001
Material for task set A300-A-53-XX-6190-01000-93AA-A Modification
MATERIAL QTY SEE NOTES
Consumables See SB
Components See SB
Interchangeable parts See SB
Spare parts See SB
CONF 002
Material for task set A300-A-53-XX-6190-01000-93AA-A Modification
MATERIAL QTY SEE NOTES
Consumables See SB
Components See SB
Interchangeable parts See SB
Spare parts See SB
CONF ALL
B. TOOLING
No tools
C. CONSUMABLES
CONF 001
Consumables for task set A300-A-53-XX-6190-01000-93AA-A Modification
ITEM REFERENCE CML DESCRIPTION DRAWING SEE NOTES
03GBC1
Synthetic Oil base Grease
- General Purpose Lithium
Thickened Low T emp
04DAB2
Primer Epoxy Paint -
- Corrosion Inhibiting
Structure
08BAA9 Non Aqueous Cleaner -General
14SBA1 T extile - Lint free Cotton
CONF 002
Consumables for task set A300-A-53-XX-6190-01000-93AA-A Modification
ITEM REFERENCE CML DESCRIPTION DRAWING SEE NOTES
03GBC1
Synthetic Oil base Grease
- General Purpose Lithium
Thickened Low T emp
04DAB2
Primer Epoxy Paint -
- Corrosion Inhibiting
Structure
08BAA9 Non Aqueous Cleaner -General

### Page 14

A300-600
SERVICE BULLETIN
REV 00 Dec 18/19 A300-53-6190
Page 14
ITEM REFERENCE CML DESCRIPTION DRAWING SEE NOTES
14SBA1 T extile - Lint free Cotton
CONF ALL
D. LIST OF NEW PARTS
CONF 001
Components for task set A300-A-53-XX-6190-01000-93AA-A Modification
Procurement address
D4296
AIRBUS Material, Logistics and Suppliers
Customer Order Fulfilment
Weg beim Jaeger 150
D-22335 HAMBURG
GERMANY
Phone: +49 (0) 40 50 76 40 02
E-mail: Please contact your Single Point Of Contact
(SPOC)
Internet: http://spares.airbus.com
D4296
AIRBUS Material, Logistics and Suppliers Standard
Parts
Customer Order Fulfilment
Phone: +49 (0) 40 50 76 40 02
E-mail: Please contact your Single Point Of Contact
(SPOC)
Internet: http://spares.airbus.com or via SPEC2000
NOTE(S)
Customers with aircraft shown in the applicability of this Service Bulletin should send
a purchase order to AIRBUS at the address given above and quote the number of this
Service Bulletin.
For standard hardware the purchase order must be addressed to AIRBUS at the
address given above. Quote the number of this Service Bulletin, the MSN and, if
applicable the Retrofit Information Letter (RIL) reference.
ITEM PART No. QTY (UM) KEYWORD DRAWING SEE NOTES
1 A5382000920000(D4296) 7 CROSSBEM (1) (2)
5 MS24665-153(D4296) 14 PIN (1) (3)
NOTE(S)
Refer to the AIRBUS Ref. SM if you find part numbers of hardware components which
you cannot identify. The SM will give you the correct part number to part number
relationship.
(1): The components listed above are not an AIRBUS Kit, the required parts must be
ordered as necessary through the given channel.
(2): Operator supplied AIRBUS parts required to accomplish this Service Bulletin are to be
purchased by a spares purchase order.
(3): Operator supplied standard hardware parts, required to accomplish this Service
Bulletin, are to be supplied from the operator's stock.
CONF 002
Components for task set A300-A-53-XX-6190-01000-93AA-A Modification
Procurement address D4296 AIRBUS Material, Logistics and Suppliers

### Page 15

A300-600
SERVICE BULLETIN
REV 00 Dec 18/19 A300-53-6190
Page 15
Customer Order Fulfilment
Weg beim Jaeger 150
D-22335 HAMBURG
GERMANY
Phone: +49 (0) 40 50 76 40 02
E-mail: Please contact your Single Point Of Contact
(SPOC)
Internet: http://spares.airbus.com
D4296
AIRBUS Material, Logistics and Suppliers Standard
Parts
Customer Order Fulfilment
Phone: +49 (0) 40 50 76 40 02
E-mail: Please contact your Single Point Of Contact
(SPOC)
Internet: http://spares.airbus.com or via SPEC2000
NOTE(S)
Customers with aircraft shown in the applicability of this Service Bulletin should send
a purchase order to AIRBUS at the address given above and quote the number of this
Service Bulletin.
For standard hardware the purchase order must be addressed to AIRBUS at the
address given above. Quote the number of this Service Bulletin, the MSN and, if
applicable the Retrofit Information Letter (RIL) reference.
ITEM PART No. QTY (UM) KEYWORD DRAWING SEE NOTES
1 A5382000920000(D4296) 7 CROSSBEM (1) (2)
5 MS24665-153(D4296) 14 PIN (1) (3)
NOTE(S)
Refer to the AIRBUS Ref. SM if you find part numbers of hardware components which
you cannot identify. The SM will give you the correct part number to part number
relationship.
(1): The components listed above are not an AIRBUS Kit, the required parts must be
ordered as necessary through the given channel.
(2): Operator supplied AIRBUS parts required to accomplish this Service Bulletin are to be
purchased by a spares purchase order.
(3): Operator supplied standard hardware parts, required to accomplish this Service
Bulletin, are to be supplied from the operator's stock.
CONF ALL
E. LIST OF EXISTING PARTS
CONF 001
Interchangeable parts for task set A300-A-53-XX-6190-01000-93AA-A Modification
DESCRIPTION OLD PART No. NEW PART No. INT SEE NOTES
CROSSBEAM A5381387800000 A5382000920000 03 (1) (2)
CROSSBEAM A5381389100000 A5382000920000 03 (1) (2)
NOTE(S)
For definitions of interchangeability codes in column INT. refer to ATA (CSDD Chapter
2).
(1): You can replace the old part number by new part number only as a complete set.

### Page 16

A300-600
SERVICE BULLETIN
REV 00 Dec 18/19 A300-53-6190
Page 16
DESCRIPTION OLD PART No. NEW PART No. INT SEE NOTES
(2): The interchangeability possibilities are for new or modified parts introduced by the
accomplishment of this Service Bulletin.
CONF 002
Interchangeable parts for task set A300-A-53-XX-6190-01000-93AA-A Modification
DESCRIPTION OLD PART No. NEW PART No. INT SEE NOTES
CROSSBEAM A5381337800000 A5382000920000 03 (1) (2)
CROSSBEAM A5381337900000 A5382000920000 03 (1) (2)
NOTE(S)
For definitions of interchangeability codes in column INT. refer to ATA (CSDD Chapter
2).
(1): You can replace the old part number by new part number only as a complete set.
(2): The interchangeability possibilities are for new or modified parts introduced by the
accomplishment of this Service Bulletin.
CONF 001
Spare parts for task set A300-A-53-XX-6190-01000-93AA-A Modification
DESCRIPTION OLD PART No. SEE NOTES
CROSSBEAM A5381387800000 (1)
CROSSBEAM A5381389100000 (1)
NOTE(S)
(1): The parts listed here must not be installed anymore on aircraft which have
accomplished this Service Bulletin or which have the equivalent production
modification embodied.
CONF 002
Spare parts for task set A300-A-53-XX-6190-01000-93AA-A Modification
DESCRIPTION OLD PART No. SEE NOTES
CROSSBEAM A5381337800000 (1)
CROSSBEAM A5381337900000 (1)
NOTE(S)
(1): The parts listed here must not be installed anymore on aircraft which have
accomplished this Service Bulletin or which have the equivalent production
modification embodied.

### Page 17

A300-600
SERVICE BULLETIN
REV 00 Dec 18/19 A300-53-6190
Page 17
CONF ALL
3. ACCOMPLISHMENT INSTRUCTIONS
Task set A300-A-53-XX-6190-01000-93AA-A
Modification
WARNING: MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND ALL THE CAUTIONS
INCLUDED IN THE REFERENCED PROCEDURES.
CAUTION: ALWAYS OBEY THE PRECAUTIONS THAT FOLLOW TO KEEP ELECTRICAL
WIRING IN A SATISFACTORY CONDITION (ELECTRICALLY AND MECHANICALLY
SERVICEABLE). WHEN YOU DO MAINTENANCE WORK, REPAIRS OR
MODIFICATIONS, ALWAYS KEEP ELECTRICAL WIRING, COMPONENTS AND
THE WORK AREA AS CLEAN AS POSSIBLE. TO DO THIS:
- PUT PROTECTION, SUCH AS PLASTIC SHEETING, CLOTHS, ETC., AS
NECESSARY ON WIRING AND COMPONENTS.
- REGULARLY REMOVE ALL SHAVINGS, UNWANTED MATERIAL AND
OTHER CONTAMINATION.
THESE PRECAUTIONS WILL DECREASE THE RISK OF CONTAMINATION AND
DAMAGE TO THE ELECTRICAL WIRING INSTALLATION.
IF THERE IS CONTAMINATION, REFER TO Ref. ESPM 20-55-00.
CAUTION: TO ENSURE THE STRUCTURE INTEGRITY DO NOT REPLACE TWO ADJACENT
CROSSBEAMS AT THE SAME TIME.
NOTE: The accomplishment instructions of this Service Bulletin include procedures given in
other documents or in other sections of the Service Bulletin. When the words “refer to”
are used and the operator has a procedure accepted by the local authority he belongs to,
the accepted alternative procedure can be used. When the words “in accordance with”
are used then the given procedure must be followed.
NOTE: The access and close-up instructions, not comprising return to service tests, in this
Service Bulletin do not constitute or affect the technical intent of the Service Bulletin.
Operators can therefore, as deemed necessary, omit or add access and/or close-up steps
to add flexibility to their maintenance operations as long as the technical intent of the
Service Bulletin is met within the set parameters.
NOTE: Manual titles given in the accomplishment instructions are referred to by acronyms. Refer
to paragraph 1.J., References, for the definition of acronyms.
NOTE: This Service Bulletin contains the instructions for the on-aircraft maintenance necessary
to ensure the continued airworthiness of the aircraft.
For any deviations to the instructions, contact AIRBUS for further instructions and
approval.
NOTE: Discarded parts must be managed at the operator's discretion.
A. TASK SET ASSOCIATED INFORMATION
Task Manpower
CONF 001
TOTAL MAN-HOURS 17.30 h
CONF 002
TOTAL MAN-HOURS 17.30 h
CONF 001
ELAPSED TIME (HOURS) 7.80 h
CONF 002
ELAPSED TIME (HOURS) 7.80 h

### Page 18

A300-600
SERVICE BULLETIN
REV 00 Dec 18/19 A300-53-6190
Page 18
CONF ALL
B. PREPARATION
(1) Task A300-A-53-XX-6190-01001-540A-A - Job Set-up
Job Set-Up Information
Manpower/Resources/Skills
Man-hours 2.00 h
Minimum Number of person 1
Elapsed Time 2.00 h
Skills Airframe
Referenced Information
Manuals/Drawings References/Sheets
AMM 24-00-00, Page Block 30153-10-25, Page Block 401
Procedure
NOTE: For the basic Aircraft configuration, refer to AMM Chapter “Introduction -
Aircraft status for maintenance" in Manual Front Matter section.
(a) This Service Bulletin is based on the aircraft configuration as known by AIRBUS
(first aircraft delivery configuration and modified by the reported incorporation of
AIRBUS Service Bulletins).
Prior to Service Bulletin accomplishment, specific attention must be paid to
structural damage which may exist and to repairs which were performed on the
area defined, refer to Ref. Fig. Area to be Modified SHEET 1, because they may
be affected by the Service Bulletin. If any repairs were performed and prevent
accomplishment of this Service Bulletin, contact AIRBUS Customer Services
Repair Engineering Support department for instructions on how to proceed.
AIRBUS disclaims any liability for the effect which the Service Bulletin may
have on repairs performed on the aircraft before accomplishment of the Service
Bulletin.
If the post Service Bulletin repair status is not covered by the (ASR and for
repairs outside of the ASR) (or) (SRM and for repairs outside of the SRM) covered
by an RDAS issued by AIRBUS, AIRBUS Customer Services Repair, Engineering
Support department should be contacted. Repair review will be done by AIRBUS
at conditions of the Customer Services Catalogue.
(b) Make sure that the aircraft is electrically grounded, refer to Ref. AMM 24-00-00,
Page Block 301.
(c) Remove the main deck cargo compartment floor panels to access the area
between Frame 48 and Frame 54 and from Y -450 to Y -953, refer to Ref. AMM
53-10-25, Page Block 401.

### Page 19

A300-600
SERVICE BULLETIN
Figure ICN-A300-A-53XX6190-A-FAPE3-0058X-A-001-01 SHEET 1/1
REV 00 Dec 18/19 A300-53-6190Area to be Modified
Page 19
CONF ALL
FR54
FR53
FR52
FR51
FR50
FR49
FR48
FR39
FR40
Y -953
Y -450
A
NOTE:
AREA IMPACTED BY THE STRUCTURAL MODIFICATION
A
Z146
ICN-A300-A-53XX6190-A-FAPE3-0058X-A-001-01

### Page 20

A300-600
SERVICE BULLETIN
REV 00 Dec 18/19 A300-53-6190
Page 20
C. PROCEDURE
CONF 001
(1) Task A300-A-53-XX-6190-01001-520A-A - Remove the Crossbeam at Frame 48
Job Set-Up Information
Working Area
Impacted Zone Access / Work Location
146 Work location Frame 48From TRACK 2 RH (Y -450) to TRACK 3 RH (Y -953)
Manpower/Resources/Skills
Man-hours 0.65 h
Minimum Number of person 1
Elapsed Time 0.65 h
Skills Airframe
Material necessary to do the job
Consumables
ITEM REFERENCE CML DESCRIPTION DRAWING SEE NOTES
08BAA9 Non Aqueous Cleaner -General
14SBA1 T extile - Lint free Cotton
Referenced Information
Manuals/Drawings References/Sheets
AMM 06-21-00, Page Block 00106-31-53, Page Block 001
CML CONSUMABLE MATERIAL LIST (CML)
SRM 51-40-20
Procedure
NOTE: T wo non-adjacent crossbeams can be replaced at the same time.
(a) Standard Practices given in this procedure:
1 For the Frame (FR) identification, refer to Ref. AMM 06-31-53, Page Block
001.
2 For the identification of zones, refer to Ref. AMM 06-21-00, Page Block 001.
3 Remove and install fasteners in accordance with Ref. SRM 51-40-20.
4 For the specification of Material application codes given in this Service
Bulletin, refer to the Ref. CML.
5 T ag all the parts you must remove and retain to make the subsequent
installation easier.
6 Put all the retained hardware in identified plastic bags and attach the bags
to the related unit.
(b) Remove, refer to Ref. Fig. Removal of Crossbeam at Frame 48 SHEET 1 and Ref.
Fig. Removal of Crossbeam at Frame 48 SHEET 2.
2 PIN   Item (5) Discard

### Page 21

A300-600
SERVICE BULLETIN
REV 00 Dec 18/19 A300-53-6190
Page 21
2 NUT   Item (4) Retain
2 WASHER   Item (3) Retain
2 BOLT   Item (6) Retain
1 CROSSBEAM A5381387800000 Item (1) Discard
NOTE: Fasteners can be replaced in case of any fretting and/or deformation
found on the fasteners.
(c) Remove the old sealant with a non-metallic spatula.
(d) Clean the work area with:
  T extile - Lint free Cotton14SBA1  
and
  Non Aqueous Cleaner -
General
08BAA9

### Page 22

A300-600
SERVICE BULLETIN
Figure ICN-A300-A-53XX6190-A-FAPE3-004O3-A-002-01 SHEET 1/2
REV 00 Dec 18/19 A300-53-6190Removal of Crossbeam at Frame 48
Page 22
CONF 001
FR54
FR53
FR52
FR51
FR50
FR49
FR48
FR39
FR40
Y -953
Y -450
Z140
A
A
B
ICN-A300-A-53XX6190-A-FAPE3-004O3-A-002-01

### Page 23

A300-600
SERVICE BULLETIN
Figure ICN-A300-A-53XX6190-A-FAPE3-004O4-A-004-01 SHEET 2/2
REV 00 Dec 18/19 A300-53-6190Removal of Crossbeam at Frame 48
Page 23
CONF 001
C
FWD B
VIEW LOOKING DOWN
FR48 FR49
(6) (3)
(4)
(5)
(4)
(5)
(6)
C
(1)
Y -953
Y -450
(3)
ICN-A300-A-53XX6190-A-FAPE3-004O4-A-004-01

### Page 24

A300-600
SERVICE BULLETIN
REV 00 Dec 18/19 A300-53-6190
Page 24
CONF 002
(1) Task A300-A-53-XX-6190-01002-520A-A - Remove the Crossbeam at Frame 48
Job Set-Up Information
Working Area
Impacted Zone Access / Work Location
146 Work location Frame 48From TRACK 2 RH (Y -450) to TRACK 3 RH (Y -953)
Manpower/Resources/Skills
Man-hours 0.65 h
Minimum Number of person 1
Elapsed Time 0.65 h
Skills Airframe
Material necessary to do the job
Consumables
ITEM REFERENCE CML DESCRIPTION DRAWING SEE NOTES
08BAA9 Non Aqueous Cleaner -General
14SBA1 T extile - Lint free Cotton
Referenced Information
Manuals/Drawings References/Sheets
AMM 06-21-00, Page Block 00106-31-53, Page Block 001
CML CONSUMABLE MATERIAL LIST (CML)
SRM 51-40-20
Procedure
NOTE: T wo non-adjacent crossbeams can be replaced at the same time.
(a) Standard Practices given in this procedure:
1 For the Frame (FR) identification, refer to Ref. AMM 06-31-53, Page Block
001.
2 For the identification of zones, refer to Ref. AMM 06-21-00, Page Block 001.
3 Remove and install fasteners in accordance with Ref. SRM 51-40-20.
4 For the specification of Material application codes given in this Service
Bulletin, refer to the Ref. CML.
5 T ag all the parts you must remove and retain to make the subsequent
installation easier.
6 Put all the retained hardware in identified plastic bags and attach the bags
to the related unit.
(b) Remove, refer to Ref. Fig. Removal of Crossbeam at Frame 48 SHEET 1 and Ref.
Fig. Removal of Crossbeam at Frame 48 SHEET 2.
2 PIN   Item (5) Discard

### Page 25

A300-600
SERVICE BULLETIN
REV 00 Dec 18/19 A300-53-6190
Page 25
2 NUT   Item (4) Retain
2 WASHER   Item (3) Retain
2 BOLT   Item (6) Retain
1 CROSSBEAM A5381337800000 Item (7) Discard
NOTE: Fasteners can be replaced in case of any fretting and/or deformation
found on the fasteners.
(c) Remove the old sealant with a non-metallic spatula.
(d) Clean the work area with:
  T extile - Lint free Cotton14SBA1  
and
  Non Aqueous Cleaner -
General
08BAA9

### Page 26

A300-600
SERVICE BULLETIN
Figure ICN-A300-A-53XX6190-A-FAPE3-004P1-A-002-01 SHEET 1/2
REV 00 Dec 18/19 A300-53-6190Removal of Crossbeam at Frame 48
Page 26
CONF 002
FR54
FR53
FR52
FR51
FR50
FR49
FR48
FR39
FR40
Y -953
Y -450
Z140
A
A
B
ICN-A300-A-53XX6190-A-FAPE3-004P1-A-002-01

### Page 27

A300-600
SERVICE BULLETIN
Figure ICN-A300-A-53XX6190-A-FAPE3-004P2-A-004-01 SHEET 2/2
REV 00 Dec 18/19 A300-53-6190Removal of Crossbeam at Frame 48
Page 27
CONF 002
C
FWD B
VIEW LOOKING DOWN
FR48 FR49
(6) (3)
(4)
(5)
(4)
(5)
(6)C
(7)
Y -953
Y -450
(3)
ICN-A300-A-53XX6190-A-FAPE3-004P2-A-004-01

### Page 28

A300-600
SERVICE BULLETIN
REV 00 Dec 18/19 A300-53-6190
Page 28
CONF ALL
(2) Task A300-A-53-XX-6190-01001-720A-A - Install the Crossbeam at Frame 48
Job Set-Up Information
Working Area
Impacted Zone Access / Work Location
146 Work location Frame 48From TRACK 2 RH (Y -450) to TRACK 3 RH (Y -953)
Manpower/Resources/Skills
Man-hours 1.25 h
Minimum Number of person 1
Elapsed Time 1.25 h
Skills Airframe
Material necessary to do the job
Consumables
ITEM REFERENCE CML DESCRIPTION DRAWING SEE NOTES
03GBC1
Synthetic Oil base Grease
- General Purpose Lithium
Thickened Low T emp
04DAB2
Primer Epoxy Paint -
- Corrosion Inhibiting
Structure
08BAA9 Non Aqueous Cleaner -General
14SBA1 T extile - Lint free Cotton
Components
ITEM PART No. QTY (UM) KEYWORD DRAWING SEE NOTES
1 A5382000920000 1 CROSSBEM (1)
5 MS24665-153 2 PIN (2)
NOTE(S)
(1): Operator supplied AIRBUS parts required to accomplish this Service Bulletin are to be
purchased by a spares purchase order.
(2): Operator supplied standard hardware parts, required to accomplish this Service
Bulletin, are to be supplied from the operator's stock.
Referenced Information
Manuals/Drawings References/Sheets
AMM
06-21-00, Page Block 001
06-31-53, Page Block 001
53-10-25, Page Block 401
CML CONSUMABLE MATERIAL LIST (CML)
SRM
51-40-20
51-40-30
51-40-40
Procedure

### Page 29

A300-600
SERVICE BULLETIN
REV 00 Dec 18/19 A300-53-6190
Page 29
NOTE: T wo non-adjacent crossbeams can be replaced at the same time.
(a) Standard Practices given in this procedure:
1 For the FR identification, refer to Ref. AMM 06-31-53, Page Block 001.
2 For the identification of zones, refer to Ref. AMM 06-21-00, Page Block 001.
3 Remove and install fasteners in accordance with Ref. SRM 51-40-20.
4 Get fastener hole diameters and drill data in accordance with Ref. SRM
51-40-40.
5 For the specification of Material application codes given in this Service
Bulletin, refer to the Ref. CML.
6 Get alternative and substitute fastener data in accordance with Ref. SRM
51-40-30.
(b) T emporarily put in position the crossbeam, item 1, refer to Ref. Fig. Installation of
Crossbeam at Frame 48 SHEET 2 and ensure the level between the crossbeam
and the seat-track to have a correct floor panel installation.
1 CROSSBEAM A5382000920000 Item 1
(c) Transfer the existing hole from the aircraft structure to the end of the crossbeam,
item 1 with no hole, refer to Ref. Fig. Installation of Crossbeam at Frame 48
SHEET 2.
(d) Drill the hole to final diameter on the crossbeam, item 1, refer to Ref. Fig.
Installation of Crossbeam at Frame 48 SHEET 2.
(e) Remove the temporarily installed crossbeam, item 1.
(f) Deburr and clean the fastener holes with:
  T extile - Lint free Cotton14SBA1  
 
and
 
  Non Aqueous Cleaner -
General
08BAA9  
(g) Install the foam layer, refer to Ref. AMM 53-10-25, Page Block 401.
(h) Install, refer to Ref. Fig. Installation of Crossbeam at Frame 48 SHEET 3.
1 CROSSBEAM A5382000920000 Item 1
2 NUT   Item (4) Retained
2 WASHER   Item (3) Retained
2 BOLT   Item (6) Retained
2 PIN-COTTER MS24665-153 Item 5
with:
  Synthetic Oil base
Grease - General
Purpose Lithium
Thickened Low T emp
03GBC1

### Page 30

A300-600
SERVICE BULLETIN
REV 00 Dec 18/19 A300-53-6190
Page 30
(i) Apply the protective finish:
  Primer Epoxy Paint -
- Corrosion Inhibiting
Structure
04DAB2  
on the head of the fasteners and nuts.

### Page 31

A300-600
SERVICE BULLETIN
Figure ICN-A300-A-53XX6190-A-FAPE3-004OP-A-002-01 SHEET 1/3
REV 00 Dec 18/19 A300-53-6190Installation of Crossbeam at Frame 48
Page 31
CONF ALL
FR54
FR53
FR52
FR51
FR50
FR49
FR48
FR39
FR40
Y -953
Y -450
Z140
A
A
B
ICN-A300-A-53XX6190-A-FAPE3-004OP-A-002-01

### Page 32

A300-600
SERVICE BULLETIN
Figure ICN-A300-A-53XX6190-A-FAPE3-004OQ-A-003-01 SHEET 2/3
REV 00 Dec 18/19 A300-53-6190Installation of Crossbeam at Frame 48
Page 32
CONF ALL
C
FR48 FR49
A
A
FWD B
VIEW LOOKING DOWN
I
N
B
D
VIEW LOOKING FWD
INBD A A
HOLE 
SYMBOL
HOLE DIAMETER
MIN MAX
7.915 mm
(0.3117 in)
7.935 mm
(0.3124 in)
Y -953
Y -450
1
VIEW ROTATED
Y -450NOTE:
FASTENER NOT AFFECTED
ICN-A300-A-53XX6190-A-FAPE3-004OQ-A-003-01

### Page 33

A300-600
SERVICE BULLETIN
Figure ICN-A300-A-53XX6190-A-FAPE3-004OR-A-004-01 SHEET 3/3
REV 00 Dec 18/19 A300-53-6190Installation of Crossbeam at Frame 48
Page 33
CONF ALL
(4)
5
(6)
02
0102
1
(6) (3)
(4)
5
02
INSTALL THE  FASTENERS WITH MATERIAL No 03GBC1.01
APPLY MATERIAL No 04DAB2 ON THE HEAD OF THE BOLTS AND NUTS.02
NOTE:
C
0102
03
(3) 03
03
CLEARANCE BETWEEN FITTING AND WASHER, ITEM (3), MUST BE 0.10 mm (0.004 in) TO 0.30 mm (0.011 in). ICN-A300-A-53XX6190-A-FAPE3-004OR-A-004-01

### Page 34

A300-600
SERVICE BULLETIN
REV 00 Dec 18/19 A300-53-6190
Page 34
CONF 001
(3) Task A300-A-53-XX-6190-02001-520A-A - Remove the Crossbeam at Frame 49
Job Set-Up Information
Working Area
Impacted Zone Access / Work Location
146 Work location Frame 49From TRACK 2 RH (Y -450) to TRACK 3 RH (Y -953)
Manpower/Resources/Skills
Man-hours 0.65 h
Minimum Number of person 1
Elapsed Time 0.65 h
Skills Airframe
Material necessary to do the job
Consumables
ITEM REFERENCE CML DESCRIPTION DRAWING SEE NOTES
08BAA9 Non Aqueous Cleaner -General
14SBA1 T extile - Lint free Cotton
Referenced Information
Manuals/Drawings References/Sheets
AMM 06-21-00, Page Block 00106-31-53, Page Block 001
CML CONSUMABLE MATERIAL LIST (CML)
SRM 51-40-20
Procedure
NOTE: T wo non-adjacent crossbeams can be replaced at the same time.
(a) Standard Practices given in this procedure:
1 For the FR identification, refer to Ref. AMM 06-31-53, Page Block 001.
2 For the identification of zones, refer to Ref. AMM 06-21-00, Page Block 001.
3 Remove and install fasteners in accordance with Ref. SRM 51-40-20.
4 For the specification of Material application codes given in this Service
Bulletin, refer to the Ref. CML.
5 T ag all the parts you must remove and retain to make the subsequent
installation easier.
6 Put all the retained hardware in identified plastic bags and attach the bags
to the related unit.
(b) Remove, refer to Ref. Fig. Removal of Crossbeam at Frame 49 SHEET 1 and Ref.
Fig. Removal of Crossbeam at Frame 49 SHEET 2.
2 PIN   Item (5) Discard
2 NUT   Item (4) Retain

### Page 35

A300-600
SERVICE BULLETIN
REV 00 Dec 18/19 A300-53-6190
Page 35
2 WASHER   Item (3) Retain
2 BOLT   Item (6) Retain
1 CROSSBEAM A5381387800000 Item (1) Discard
NOTE: Fasteners can be replaced in case of any fretting and/or deformation
found on the fasteners.
(c) Remove the old sealant with a non-metallic spatula.
(d) Clean the work area with:
  T extile - Lint free Cotton14SBA1  
and
  Non Aqueous Cleaner -
General
08BAA9

### Page 36

A300-600
SERVICE BULLETIN
Figure ICN-A300-A-53XX6190-A-FAPE3-004OA-A-002-01 SHEET 1/2
REV 00 Dec 18/19 A300-53-6190Removal of Crossbeam at Frame 49
Page 36
CONF 001
FR54
FR53
FR52
FR51
FR50
FR49
FR48
FR39
FR40
Y -953
Y -450
Z140
A
A
B
ICN-A300-A-53XX6190-A-FAPE3-004OA-A-002-01

### Page 37

A300-600
SERVICE BULLETIN
Figure ICN-A300-A-53XX6190-A-FAPE3-004OB-A-004-01 SHEET 2/2
REV 00 Dec 18/19 A300-53-6190Removal of Crossbeam at Frame 49
Page 37
CONF 001
C
FWD B
VIEW LOOKING DOWN
FR49 FR50
(6) (3)
(4)
(5)
(4)
(5)
(6)
C
(1)
Y -953
Y -450
(3)
ICN-A300-A-53XX6190-A-FAPE3-004OB-A-004-01

### Page 38

A300-600
SERVICE BULLETIN
REV 00 Dec 18/19 A300-53-6190
Page 38
CONF 002
(3) Task A300-A-53-XX-6190-02002-520A-A - Remove the Crossbeam at Frame 49
Job Set-Up Information
Working Area
Impacted Zone Access / Work Location
146 Work location Frame 49From TRACK 2 RH (Y -450) to TRACK 3 RH (Y -953)
Manpower/Resources/Skills
Man-hours 0.65 h
Minimum Number of person 1
Elapsed Time 0.65 h
Skills Airframe
Material necessary to do the job
Consumables
ITEM REFERENCE CML DESCRIPTION DRAWING SEE NOTES
08BAA9 Non Aqueous Cleaner -General
14SBA1 T extile - Lint free Cotton
Referenced Information
Manuals/Drawings References/Sheets
AMM 06-21-00, Page Block 00106-31-53, Page Block 001
CML CONSUMABLE MATERIAL LIST (CML)
SRM 51-40-20
Procedure
NOTE: T wo non-adjacent crossbeams can be replaced at the same time.
(a) Standard Practices given in this procedure:
1 For the FR identification, refer to Ref. AMM 06-31-53, Page Block 001.
2 For the identification of zones, refer to Ref. AMM 06-21-00, Page Block 001.
3 Remove and install fasteners in accordance with Ref. SRM 51-40-20.
4 For the specification of Material application codes given in this Service
Bulletin, refer to the Ref. CML.
5 T ag all the parts you must remove and retain to make the subsequent
installation easier.
6 Put all the retained hardware in identified plastic bags and attach the bags
to the related unit.
(b) Remove, refer to Ref. Fig. Removal of Crossbeam at Frame 49 SHEET 1 and Ref.
Fig. Removal of Crossbeam at Frame 49 SHEET 2.
2 PIN   Item (5) Discard
2 NUT   Item (4) Retain

### Page 39

A300-600
SERVICE BULLETIN
REV 00 Dec 18/19 A300-53-6190
Page 39
2 WASHER   Item (3) Retain
2 BOLT   Item (6) Retain
1 CROSSBEAM A5381337800000 Item (7) Discard
NOTE: Fasteners can be replaced in case of any fretting and/or deformation
found on the fasteners.
(c) Remove the old sealant with a non-metallic spatula.
(d) Clean the work area with:
  T extile - Lint free Cotton14SBA1  
and
  Non Aqueous Cleaner -
General
08BAA9

### Page 40

A300-600
SERVICE BULLETIN
Figure ICN-A300-A-53XX6190-A-FAPE3-004P5-A-002-01 SHEET 1/2
REV 00 Dec 18/19 A300-53-6190Removal of Crossbeam at Frame 49
Page 40
CONF 002
FR54
FR53
FR52
FR51
FR50
FR49
FR48
FR39
FR40
Y -953
Y -450
Z140
A
A
B
ICN-A300-A-53XX6190-A-FAPE3-004P5-A-002-01

### Page 41

A300-600
SERVICE BULLETIN
Figure ICN-A300-A-53XX6190-A-FAPE3-004P6-A-004-01 SHEET 2/2
REV 00 Dec 18/19 A300-53-6190Removal of Crossbeam at Frame 49
Page 41
CONF 002
C
FWD B
VIEW LOOKING DOWN
FR49 FR50
(6) (3)
(4)
(5)
(4)
(5)
(6)C
(7)
Y -953
Y -450
(3)
ICN-A300-A-53XX6190-A-FAPE3-004P6-A-004-01

### Page 42

A300-600
SERVICE BULLETIN
REV 00 Dec 18/19 A300-53-6190
Page 42
CONF ALL
(4) Task A300-A-53-XX-6190-02001-720A-A - Install the Crossbeam at Frame 49
Job Set-Up Information
Working Area
Impacted Zone Access / Work Location
146 Work location Frame 49From TRACK 2 RH (Y -450) to TRACK 3 RH (Y -953)
Manpower/Resources/Skills
Man-hours 1.25 h
Minimum Number of person 1
Elapsed Time 1.25 h
Skills Airframe
Material necessary to do the job
Consumables
ITEM REFERENCE CML DESCRIPTION DRAWING SEE NOTES
03GBC1
Synthetic Oil base Grease
- General Purpose Lithium
Thickened Low T emp
04DAB2
Primer Epoxy Paint -
- Corrosion Inhibiting
Structure
08BAA9 Non Aqueous Cleaner -General
14SBA1 T extile - Lint free Cotton
Components
ITEM PART No. QTY (UM) KEYWORD DRAWING SEE NOTES
1 A5382000920000 1 CROSSBEM (1)
5 MS24665-153 2 PIN (2)
NOTE(S)
(1): Operator supplied AIRBUS parts required to accomplish this Service Bulletin are to be
purchased by a spares purchase order.
(2): Operator supplied standard hardware parts, required to accomplish this Service
Bulletin, are to be supplied from the operator's stock.
Referenced Information
Manuals/Drawings References/Sheets
AMM
06-21-00, Page Block 001
06-31-53, Page Block 001
53-10-25, Page Block 401
CML CONSUMABLE MATERIAL LIST (CML)
SRM
51-40-20
51-40-30
51-40-40
Procedure

### Page 43

A300-600
SERVICE BULLETIN
REV 00 Dec 18/19 A300-53-6190
Page 43
NOTE: T wo non-adjacent crossbeams can be replaced at the same time.
(a) Standard Practices given in this procedure:
1 For the FR identification, refer to Ref. AMM 06-31-53, Page Block 001.
2 For the identification of zones, refer to Ref. AMM 06-21-00, Page Block 001.
3 Remove and install fasteners in accordance with Ref. SRM 51-40-20.
4 Get fastener hole diameters and drill data in accordance with Ref. SRM
51-40-40.
5 For the specification of Material application codes given in this Service
Bulletin, refer to the Ref. CML.
6 Get alternative and substitute fastener data in accordance with Ref. SRM
51-40-30.
(b) T emporarily put in position the crossbeam, item 1, refer to Ref. Fig. Installation of
Crossbeam at Frame 49 SHEET 2 and ensure the level between the crossbeam
and the seat-track to have a correct floor panel installation.
1 CROSSBEAM A5382000920000 Item 1
(c) Transfer the existing hole from the aircraft structure to the end of the crossbeam,
item 1 with no hole, refer to Ref. Fig. Installation of Crossbeam at Frame 49
SHEET 2.
(d) Drill the hole to final diameter on the crossbeam, item 1, refer to Ref. Fig.
Installation of Crossbeam at Frame 49 SHEET 2.
(e) Remove the temporarily installed crossbeam, item 1.
(f) Deburr and clean the fastener holes with:
  T extile - Lint free Cotton14SBA1  
 
and
 
  Non Aqueous Cleaner -
General
08BAA9  
(g) Install the foam layer, refer to Ref. AMM 53-10-25, Page Block 401.
(h) Install, refer to Ref. Fig. Installation of Crossbeam at Frame 49 SHEET 3.
1 CROSSBEAM A5382000920000 Item 1
2 NUT   Item (4) Retained
2 WASHER   Item (3) Retained
2 BOLT   Item (6) Retained
2 PIN-COTTER MS24665-153 Item 5
with:
  Synthetic Oil base
Grease - General
Purpose Lithium
Thickened Low T emp
03GBC1

### Page 44

A300-600
SERVICE BULLETIN
REV 00 Dec 18/19 A300-53-6190
Page 44
(i) Apply the protective finish:
  Primer Epoxy Paint -
- Corrosion Inhibiting
Structure
04DAB2  
on the head of the fasteners and nuts.

### Page 45

A300-600
SERVICE BULLETIN
Figure ICN-A300-A-53XX6190-A-FAPE3-004O7-A-002-01 SHEET 1/3
REV 00 Dec 18/19 A300-53-6190Installation of Crossbeam at Frame 49
Page 45
CONF ALL
FR54
FR53
FR52
FR51
FR50
FR49
FR48
FR39
FR40
Y -953
Y -450
Z140
A
A
B
ICN-A300-A-53XX6190-A-FAPE3-004O7-A-002-01

### Page 46

A300-600
SERVICE BULLETIN
Figure ICN-A300-A-53XX6190-A-FAPE3-004O8-A-003-01 SHEET 2/3
REV 00 Dec 18/19 A300-53-6190Installation of Crossbeam at Frame 49
Page 46
CONF ALL
C
FR49 FR50
FWD B
VIEW LOOKING DOWN
I
N
B
D
HOLE 
SYMBOL
HOLE DIAMETER
MIN MAX
7.915 mm
(0.3117 in)
7.935 mm
(0.3124 in)
Y -953
Y -450
VIEW LOOKING FWD
INBD A A
1
VIEW ROTATED
A
A
Y -450NOTE:
FASTENER NOT AFFECTED
ICN-A300-A-53XX6190-A-FAPE3-004O8-A-003-01

### Page 47

A300-600
SERVICE BULLETIN
Figure ICN-A300-A-53XX6190-A-FAPE3-004O9-A-004-01 SHEET 3/3
REV 00 Dec 18/19 A300-53-6190Installation of Crossbeam at Frame 49
Page 47
CONF ALL
1
5
5
C (4)
(6)
02
0102
(6)
(4) 02
0102 (3)
INSTALL THE  FASTENERS WITH MATERIAL No 03GBC1.01
APPLY MATERIAL No 04DAB2 ON THE HEAD OF THE BOLTS AND NUTS.02
NOTE:
03
(3) 03
03
CLEARANCE BETWEEN FITTING AND WASHER, ITEM (3), MUST BE 0.10 mm (0.004 in) TO 0.30 mm (0.011 in). ICN-A300-A-53XX6190-A-FAPE3-004O9-A-004-01

### Page 48

A300-600
SERVICE BULLETIN
REV 00 Dec 18/19 A300-53-6190
Page 48
CONF 001
(5) Task A300-A-53-XX-6190-03001-520A-A - Remove the Crossbeam at Frame 50
Job Set-Up Information
Working Area
Impacted Zone Access / Work Location
146 Work location Frame 50From TRACK 2 RH (Y -450) to TRACK 3 RH (Y -953)
Manpower/Resources/Skills
Man-hours 0.65 h
Minimum Number of person 1
Elapsed Time 0.65 h
Skills Airframe
Material necessary to do the job
Consumables
ITEM REFERENCE CML DESCRIPTION DRAWING SEE NOTES
08BAA9 Non Aqueous Cleaner -General
14SBA1 T extile - Lint free Cotton
Referenced Information
Manuals/Drawings References/Sheets
AMM 06-21-00, Page Block 00106-31-53, Page Block 001
CML CONSUMABLE MATERIAL LIST (CML)
SRM 51-40-20
Procedure
NOTE: T wo non-adjacent crossbeams can be replaced at the same time.
(a) Standard Practices given in this procedure:
1 For the FR identification, refer to Ref. AMM 06-31-53, Page Block 001.
2 For the identification of zones, refer to Ref. AMM 06-21-00, Page Block 001.
3 Remove and install fasteners in accordance with Ref. SRM 51-40-20.
4 For the specification of Material application codes given in this Service
Bulletin, refer to the Ref. CML.
5 T ag all the parts you must remove and retain to make the subsequent
installation easier.
6 Put all the retained hardware in identified plastic bags and attach the bags
to the related unit.
(b) Remove, refer to Ref. Fig. Removal of Crossbeam at Frame 50 SHEET 1 and Ref.
Fig. Removal of Crossbeam at Frame 50 SHEET 2.
2 PIN   Item (5) Discard
2 NUT   Item (4) Retain

### Page 49

A300-600
SERVICE BULLETIN
REV 00 Dec 18/19 A300-53-6190
Page 49
2 WASHER   Item (3) Retain
2 BOLT   Item (6) Retain
1 CROSSBEAM A5381387800000 Item (1) Discard
NOTE: Fasteners can be replaced in case of any fretting and/or deformation
found on the fasteners.
(c) Remove the old sealant with a non-metallic spatula.
(d) Clean the work area with:
  T extile - Lint free Cotton14SBA1  
and
  Non Aqueous Cleaner -
General
08BAA9

### Page 50

A300-600
SERVICE BULLETIN
Figure ICN-A300-A-53XX6190-A-FAPE3-004O5-A-002-01 SHEET 1/2
REV 00 Dec 18/19 A300-53-6190Removal of Crossbeam at Frame 50
Page 50
CONF 001
FR54
FR53
FR52
FR51
FR50
FR49
FR48
FR39
FR40
Y -953
Y -450
Z140
A
A
B
ICN-A300-A-53XX6190-A-FAPE3-004O5-A-002-01

### Page 51

A300-600
SERVICE BULLETIN
Figure ICN-A300-A-53XX6190-A-FAPE3-004O6-A-004-01 SHEET 2/2
REV 00 Dec 18/19 A300-53-6190Removal of Crossbeam at Frame 50
Page 51
CONF 001
C
FWD B
VIEW LOOKING DOWN (6) (3)
(4)
(5)
(4)
(5)
(6)C
(1)
FR50 FR51
Y -953
Y -450
(3)
ICN-A300-A-53XX6190-A-FAPE3-004O6-A-004-01

### Page 52

A300-600
SERVICE BULLETIN
REV 00 Dec 18/19 A300-53-6190
Page 52
CONF 002
(5) Task A300-A-53-XX-6190-03002-520A-A - Remove the Crossbeam at Frame 50
Job Set-Up Information
Working Area
Impacted Zone Access / Work Location
146 Work location Frame 50From TRACK 2 RH (Y -450) to TRACK 3 RH (Y -953)
Manpower/Resources/Skills
Man-hours 0.65 h
Minimum Number of person 1
Elapsed Time 0.65 h
Skills Airframe
Material necessary to do the job
Consumables
ITEM REFERENCE CML DESCRIPTION DRAWING SEE NOTES
08BAA9 Non Aqueous Cleaner -General
14SBA1 T extile - Lint free Cotton
Referenced Information
Manuals/Drawings References/Sheets
AMM 06-21-00, Page Block 00106-31-53, Page Block 001
CML CONSUMABLE MATERIAL LIST (CML)
SRM 51-40-20
Procedure
NOTE: T wo non-adjacent crossbeams can be replaced at the same time.
(a) Standard Practices given in this procedure:
1 For the FR identification, refer to Ref. AMM 06-31-53, Page Block 001.
2 For the identification of zones, refer to Ref. AMM 06-21-00, Page Block 001.
3 Remove and install fasteners in accordance with Ref. SRM 51-40-20.
4 For the specification of Material application codes given in this Service
Bulletin, refer to the Ref. CML.
5 T ag all the parts you must remove and retain to make the subsequent
installation easier.
6 Put all the retained hardware in identified plastic bags and attach the bags
to the related unit.
(b) Remove, refer to Ref. Fig. Removal of Crossbeam at Frame 50 SHEET 1 and Ref.
Fig. Removal of Crossbeam at Frame 50 SHEET 2.
2 PIN   Item (5) Discard
2 NUT   Item (4) Retain

### Page 53

A300-600
SERVICE BULLETIN
REV 00 Dec 18/19 A300-53-6190
Page 53
2 WASHER   Item (3) Retain
2 BOLT   Item (6) Retain
1 CROSSBEAM A5381337800000 Item (7) Discard
NOTE: Fasteners can be replaced in case of any fretting and/or deformation
found on the fasteners.
(c) Remove the old sealant with a non-metallic spatula.
(d) Clean the work area with:
  T extile - Lint free Cotton14SBA1  
and
  Non Aqueous Cleaner -
General
08BAA9

### Page 54

A300-600
SERVICE BULLETIN
Figure ICN-A300-A-53XX6190-A-FAPE3-004OS-A-002-01 SHEET 1/2
REV 00 Dec 18/19 A300-53-6190Removal of Crossbeam at Frame 50
Page 54
CONF 002
FR54
FR53
FR52
FR51
FR50
FR49
FR48
FR39
FR40
Y -953
Y -450
Z140
A
A
B
ICN-A300-A-53XX6190-A-FAPE3-004OS-A-002-01

### Page 55

A300-600
SERVICE BULLETIN
Figure ICN-A300-A-53XX6190-A-FAPE3-004OT-A-004-01 SHEET 2/2
REV 00 Dec 18/19 A300-53-6190Removal of Crossbeam at Frame 50
Page 55
CONF 002
C
FWD B
VIEW LOOKING DOWN (6) (3)
(4)
(5)
(4)
(5)
(6)
C
(7)
FR50 FR51
Y -953
Y -450
(3)
ICN-A300-A-53XX6190-A-FAPE3-004OT-A-004-01

### Page 56

A300-600
SERVICE BULLETIN
REV 00 Dec 18/19 A300-53-6190
Page 56
CONF ALL
(6) Task A300-A-53-XX-6190-03001-720A-A - Install the Crossbeam at Frame 50
Job Set-Up Information
Working Area
Impacted Zone Access / Work Location
146 Work location Frame 50From TRACK 2 RH (Y -450) to TRACK 3 RH (Y -953)
Manpower/Resources/Skills
Man-hours 1.25 h
Minimum Number of person 1
Elapsed Time 1.25 h
Skills Airframe
Material necessary to do the job
Consumables
ITEM REFERENCE CML DESCRIPTION DRAWING SEE NOTES
03GBC1
Synthetic Oil base Grease
- General Purpose Lithium
Thickened Low T emp
04DAB2
Primer Epoxy Paint -
- Corrosion Inhibiting
Structure
08BAA9 Non Aqueous Cleaner -General
14SBA1 T extile - Lint free Cotton
Components
ITEM PART No. QTY (UM) KEYWORD DRAWING SEE NOTES
1 A5382000920000 1 CROSSBEM (1)
5 MS24665-153 2 PIN (2)
NOTE(S)
(1): Operator supplied AIRBUS parts required to accomplish this Service Bulletin are to be
purchased by a spares purchase order.
(2): Operator supplied standard hardware parts, required to accomplish this Service
Bulletin, are to be supplied from the operator's stock.
Referenced Information
Manuals/Drawings References/Sheets
AMM
06-21-00, Page Block 001
06-31-53, Page Block 001
53-10-25, Page Block 401
CML CONSUMABLE MATERIAL LIST (CML)
SRM
51-40-20
51-40-30
51-40-40
Procedure

### Page 57

A300-600
SERVICE BULLETIN
REV 00 Dec 18/19 A300-53-6190
Page 57
NOTE: T wo non-adjacent crossbeams can be replaced at the same time.
(a) Standard Practices given in this procedure:
1 For the FR identification, refer to Ref. AMM 06-31-53, Page Block 001.
2 For the identification of zones, refer to Ref. AMM 06-21-00, Page Block 001.
3 Remove and install fasteners in accordance with Ref. SRM 51-40-20.
4 Get fastener hole diameters and drill data in accordance with Ref. SRM
51-40-40.
5 For the specification of Material application codes given in this Service
Bulletin, refer to the Ref. CML.
6 Get alternative and substitute fastener data in accordance with Ref. SRM
51-40-30.
(b) T emporarily put in position the crossbeam, item 1, refer to Ref. Fig. Installation of
Crossbeam at Frame 50 SHEET 2 and ensure the level between the crossbeam
and the seat-track to have a correct floor panel installation.
1 CROSSBEAM A5382000920000 Item 1
(c) Transfer the existing hole from the aircraft structure to the end of the crossbeam,
item 1 with no hole, refer to Ref. Fig. Installation of Crossbeam at Frame 50
SHEET 2.
(d) Drill the hole to final diameter on the crossbeam, item 1, refer to Ref. Fig.
Installation of Crossbeam at Frame 50 SHEET 2.
(e) Remove the temporarily installed crossbeam, item 1.
(f) Deburr and clean the fastener holes with:
  T extile - Lint free Cotton14SBA1  
 
and
 
  Non Aqueous Cleaner -
General
08BAA9  
(g) Install the foam layer, refer to Ref. AMM 53-10-25, Page Block 401.
(h) Install, refer to Ref. Fig. Installation of Crossbeam at Frame 50 SHEET 3.
1 CROSSBEAM A5382000920000 Item 1
2 NUT   Item (4) Retained
2 WASHER   Item (3) Retained
2 BOLT   Item (6) Retained
2 PIN-COTTER MS24665-153 Item 5
with:
  Synthetic Oil base
Grease - General
Purpose Lithium
Thickened Low T emp
03GBC1

### Page 58

A300-600
SERVICE BULLETIN
REV 00 Dec 18/19 A300-53-6190
Page 58
(i) Apply the protective finish:
  Primer Epoxy Paint -
- Corrosion Inhibiting
Structure
04DAB2  
on the head of the fasteners and nuts.

### Page 59

A300-600
SERVICE BULLETIN
Figure ICN-A300-A-53XX6190-A-FAPE3-004NU-A-002-01 SHEET 1/3
REV 00 Dec 18/19 A300-53-6190Installation of Crossbeam at Frame 50
Page 59
CONF ALL
FR54
FR53
FR52
FR51
FR50
FR49
FR48
FR39
FR40
Y -953
Y -450
Z140
A
A
B
ICN-A300-A-53XX6190-A-FAPE3-004NU-A-002-01

### Page 60

A300-600
SERVICE BULLETIN
Figure ICN-A300-A-53XX6190-A-FAPE3-004NV-A-003-01 SHEET 2/3
REV 00 Dec 18/19 A300-53-6190Installation of Crossbeam at Frame 50
Page 60
CONF ALL
C
FR50 FR51
FWD B
VIEW LOOKING DOWN
I
N
B
D
Y -953
Y -450
A
A
HOLE 
SYMBOL
HOLE DIAMETER
MIN MAX
7.915 mm
(0.3117 in)
7.935 mm
(0.3124 in)
VIEW LOOKING FWD
INBD A A
1
VIEW ROTATED
Y -450NOTE:
FASTENER NOT AFFECTED
ICN-A300-A-53XX6190-A-FAPE3-004NV-A-003-01

The text continues at https://openairdocs.org/service-documents/airbus/a300-53-6190/file/18af088caad8.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.