# Airbus Service Bulletin A300-54-0073

Copy: Revision 03 ("FAA-2016-5039_SB A300-54-0073_Rev03"), 263 pages: PDF https://openairdocs.org/files/sha256/aa/0b/aa0b42e86d5c2605f4c80671bfd36fa4e6ad7b1587c3de91dd13566af2faf947; text https://openairdocs.org/service-documents/airbus/a300-54-0073/file/aa0b42e86d5c.md. Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2016-5039; AD 2016-19-10 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Airbus](https://openairdocs.org/service-documents/airbus.md)
- Type: Service bulletin (Service Bulletin)
- Number: A300-54-0073
- Latest revision known: A300-54-0073, Revision 03, dated October 11, 2012 (OpenAirDocs)
- Page: https://openairdocs.org/service-documents/airbus/a300-54-0073

## ADs that cite it (3) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2016-19-10](https://openairdocs.org/ad/2016-19-10.md), effective Oct 31, 2016: Revisions 1, 02 and 03
- [AD 2000-10-18](https://openairdocs.org/ad/2000-10-18.md), effective Jun 30, 2000: Revision 1, and with none named
- [AD 96-11-05](https://openairdocs.org/ad/96-11-05.md), effective Jun 28, 1996: Revision 1

Also cited in [2 proposed ADs](https://openairdocs.org/service-documents/airbus/a300-54-0073/proposed.md).

## Text (263 pages)

Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2016-5039; AD 2016-19-10 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

@A300
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
MANDATORY
 MANDATORY
 MANDATORY
ATA SYSTEM: 54
TITLE: NACELLES/PYLON - INSPECT PYLON LOWER SPAR BETWEEN RIBS
6 AND 7
MODIFICATION No.: None
This page transmits Revision No.03 of Service Bulletin No.A300-54-0073
ADDITIONAL WORK
**CONF ALL
No additional work is required by this revision for aircraft modified by any previous issue.
REASON
Revision No. 03 issued to update the threshold and intervals analysis improvement and in-service crack
findings consistency.
CHANGES
SUMMARY
MODIFICATIONS
 Minor editorial or document structure change
 N
REASON/DESCRIPTION/OPERATIONAL
CONSEQUENCES
Minor editorial or document structure change
 N
GENERAL EVALUATION
 Minor editorial or document structure change
 N
MATERIAL PRICE INFORMATION
 Minor editorial or document structure change
 N
Minor editorial or document structure change
 N
Minor editorial or document structure change
 N
Minor editorial or document structure change
 N
Minor editorial or document structure change
 N
Minor editorial or document structure change
 N
Minor editorial or document structure change
 N
EFFECTIVITY
 Minor editorial or document structure change
 N
CONCURRENT REQUIREMENTS
 Minor editorial or document structure change
 N
REFERENCES / REPERCUSSIONS
 Minor editorial or document structure change
 N
NATURE OF THE WORK
 Minor editorial or document structure change
 N
DATE: Oct 15/93 SERVICE BULLETIN No.: A300-54-0073
REVISION No.: 03 - Oct 11/12 Page: 1
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 2

@A300
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
MANPOWER
 Minor editorial or document structure change
 N
Minor editorial or document structure change
 N
Minor editorial or document structure change
 N
Minor editorial or document structure change
 N
Minor editorial or document structure change
 N
Minor editorial or document structure change
 N
Minor editorial or document structure change
 N
APPENDICES
 Minor editorial or document structure change
 N
Fig. A-FSAAA
 Minor editorial or document structure change
 N
Fig. A-FSAAA Sheet 01
 Minor editorial or document structure change
 N
PLANNING INFORMATION
EFFECTIVITY
 Minor editorial or document structure change
 N
Configuration definition
 Minor editorial or document structure change
 N
CONF 001
 Minor editorial or document structure change
 N
CONF 002
 Minor editorial or document structure change
 N
CONF 003
 Minor editorial or document structure change
 N
CONF 004
 Minor editorial or document structure change
 N
CONF 005
 Minor editorial or document structure change
 N
CONF 006
 Minor editorial or document structure change
 N
CONF 007
 Minor editorial or document structure change
 N
Material Effectivity
 Minor editorial or document structure change
 N
Minor editorial or document structure change
 N
Minor editorial or document structure change
 N
Minor editorial or document structure change
 N
CONCURRENT REQUIREMENTS
 Minor editorial or document structure change
 N
REASON
 Minor editorial or document structure change
 N
History
 Minor editorial or document structure change
 N
Objective/Action
 Minor editorial or document structure change
 N
Advantages
 Minor editorial or document structure change
 N
Operational/Maintenance
Consequences
Minor editorial or document structure change
 N
DESCRIPTION
 Minor editorial or document structure change
 N
COMPLIANCE
 Minor editorial or document structure change
 N
Classification
 Minor editorial or document structure change
 N
Accomplishment Timescale
 Minor editorial or document structure change
 N
Accomplishment Timescale
 Minor editorial or document structure change
 N
Accomplishment Timescale
 Minor editorial or document structure change
 N
Accomplishment Timescale
 Minor editorial or document structure change
 N
Accomplishment Timescale
 Minor editorial or document structure change
 N
Accomplishment Timescale
 Minor editorial or document structure change
 N
Accomplishment Timescale
 Minor editorial or document structure change
 N
DATE: Oct 15/93 SERVICE BULLETIN No.: A300-54-0073
REVISION No.: 03 - Oct 11/12 Page: 2
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 3

@A300
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
APPROVAL
 Minor editorial or document structure change
 N
Minor editorial or document structure change
 N
MANPOWER
 Minor editorial or document structure change
 N
Minor editorial or document structure change
 N
Minor editorial or document structure change
 N
Minor editorial or document structure change
 N
Minor editorial or document structure change
 N
Minor editorial or document structure change
 N
Minor editorial or document structure change
 N
Minor editorial or document structure change
 N
WEIGHT AND BALANCE
 Minor editorial or document structure change
 N
Minor editorial or document structure change
 N
ELECTRICAL LOAD DATA
 Minor editorial or document structure change
 N
REFERENCES
 Minor editorial or document structure change
 N
Minor editorial or document structure change
 N
Minor editorial or document structure change
 N
Minor editorial or document structure change
 N
Minor editorial or document structure change
 N
Minor editorial or document structure change
 N
Minor editorial or document structure change
 N
Minor editorial or document structure change
 N
PUBLICATION AFFECTED
 Minor editorial or document structure change
 N
Minor editorial or document structure change
 N
INTERCHANGEABILITY/MIXABILITY
 Minor editorial or document structure change
 N
SPARES
 Minor editorial or document structure change
 N
MATERIAL INFORMATION
MATERIAL - PRICE AND AVAILABILITY
 Minor editorial or document structure change
 N
Procurement Addresses
 Minor editorial or document structure change
 N
Price and Availability
 Minor editorial or document structure change
 N
INDUSTRY SUPPORT INFORMATION
 Minor editorial or document structure change
 N
LIST OF COMPONENTS
 Minor editorial or document structure change
 N
Kit 540073A01R03
 Minor editorial or document structure change
 N
Kit 540073A02R02
 Minor editorial or document structure change
 N
Kit 540073A03R00
 Minor editorial or document structure change
 N
LIST OF MATERIALS - OPERATOR
SUPPLIED
Minor editorial or document structure change
 N
Consumable Materials
 Minor editorial or document structure change
 N
Consumable CMLA01
 Minor editorial or document structure change
 N
Components
 Minor editorial or document structure change
 N
Equipment
 Minor editorial or document structure change
 N
DATE: Oct 15/93 SERVICE BULLETIN No.: A300-54-0073
REVISION No.: 03 - Oct 11/12 Page: 3
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 4

@A300
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
PARTS TO BE RE-IDENTIFIED BY
OPERATOR
Minor editorial or document structure change
 N
TOOLING
 Minor editorial or document structure change
 N
Tooling - Price and Availability
 Minor editorial or document structure change
 N
Tools
 Minor editorial or document structure change
 N
Special Tools
 Minor editorial or document structure change
 N
ACCOMPLISHMENT INSTRUCTIONS
TASK 540073- 832-801-001-Inspection
Pre Repair and Pre Service Bulletin
No.A300-54-0080
Minor editorial or document structure change
 N
Task associated data - 001
 Minor editorial or document structure change
 N
Task associated data - 002
 Minor editorial or document structure change
 N
Task associated data - 003
 Minor editorial or document structure change
 N
Task associated data - 004
 Minor editorial or document structure change
 N
Task associated data - 005
 Minor editorial or document structure change
 N
Task associated data - 006
 Minor editorial or document structure change
 N
Task associated data - 007
 Minor editorial or document structure change
 N
Subtask 540073-910-001-001
 Minor editorial or document structure change
 N
Subtask 540073-839-001-001
 Minor editorial or document structure change
 N
Subtask 540073-910-001-001
 Minor editorial or document structure change
 N
Subtask 540073-839-001-001
 Minor editorial or document structure change
 N
Subtask 540073-910-001-001
 Minor editorial or document structure change
 N
Subtask 540073-839-001-001
 Minor editorial or document structure change
 N
Subtask 540073-910-001-001
 Minor editorial or document structure change
 N
Subtask 540073-839-001-001
 Minor editorial or document structure change
 N
Subtask 540073-910-001-001
 Minor editorial or document structure change
 N
Subtask 540073-839-001-001
 Minor editorial or document structure change
 N
Subtask 540073-910-001-001
 Minor editorial or document structure change
 N
Subtask 540073-839-001-001
 Minor editorial or document structure change
 N
Subtask 540073-910-001-001
 Minor editorial or document structure change
 N
Subtask 540073-839-001-001
 Minor editorial or document structure change
 N
Subtask 540073-941-001-001
 Minor editorial or document structure change
 N
Subtask 540073-010-001-001
 Minor editorial or document structure change
 N
Subtask 540073-941-001-001
 Minor editorial or document structure change
 N
Subtask 540073-010-001-001
 Minor editorial or document structure change
 N
Subtask 540073-941-001-001
 Minor editorial or document structure change
 N
Subtask 540073-010-001-001
 Minor editorial or document structure change
 N
Subtask 540073-941-001-001
 Minor editorial or document structure change
 N
Subtask 540073-010-001-002
 Minor editorial or document structure change
 N
Subtask 540073-941-001-001
 Minor editorial or document structure change
 N
Subtask 540073-010-001-002
 Minor editorial or document structure change
 N
Subtask 540073-941-001-001
 Minor editorial or document structure change
 N
DATE: Oct 15/93 SERVICE BULLETIN No.: A300-54-0073
REVISION No.: 03 - Oct 11/12 Page: 4
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 5

@A300
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
Subtask 540073-010-001-002
 Minor editorial or document structure change
 N
Subtask 540073-941-001-001
 Minor editorial or document structure change
 N
Subtask 540073-010-001-002
 Minor editorial or document structure change
 N
Subtask 540073-832-001-001
 Minor editorial or document structure change
 N
Subtask 540073-832-005-001
 Minor editorial or document structure change
 N
Subtask 540073-832-001-001
 Minor editorial or document structure change
 N
Subtask 540073-832-005-001
 Minor editorial or document structure change
 N
Subtask 540073-832-001-001
 Minor editorial or document structure change
 N
Subtask 540073-832-005-001
 Minor editorial or document structure change
 N
Subtask 540073-832-001-001
 Minor editorial or document structure change
 N
Subtask 540073-832-005-002
 Minor editorial or document structure change
 N
Subtask 540073-832-001-001
 Minor editorial or document structure change
 N
Subtask 540073-832-005-002
 Minor editorial or document structure change
 N
Subtask 540073-832-001-001
 Minor editorial or document structure change
 N
Subtask 540073-832-005-002
 Minor editorial or document structure change
 N
Subtask 540073-832-001-003
 Minor editorial or document structure change
 N
Subtask 540073-832-005-003
 Minor editorial or document structure change
 N
Subtask 540073-700-002-001
 Minor editorial or document structure change
 N
Subtask 540073-700-002-001
 Minor editorial or document structure change
 N
Subtask 540073-700-002-001
 Minor editorial or document structure change
 N
Subtask 540073-700-002-001
 Minor editorial or document structure change
 N
Subtask 540073-700-002-001
 Minor editorial or document structure change
 N
Subtask 540073-700-002-001
 Minor editorial or document structure change
 N
Subtask 540073-700-002-001
 Minor editorial or document structure change
 N
Subtask 540073-410-001-001
 Minor editorial or document structure change
 N
Subtask 540073-942-002-001
 Minor editorial or document structure change
 N
Subtask 540073-410-001-001
 Minor editorial or document structure change
 N
Subtask 540073-942-002-001
 Minor editorial or document structure change
 N
Subtask 540073-410-001-001
 Minor editorial or document structure change
 N
Subtask 540073-942-002-001
 Minor editorial or document structure change
 N
Subtask 540073-410-001-002
 Minor editorial or document structure change
 N
Subtask 540073-942-002-001
 Minor editorial or document structure change
 N
Subtask 540073-410-001-002
 Minor editorial or document structure change
 N
Subtask 540073-942-002-001
 Minor editorial or document structure change
 N
Subtask 540073-410-001-002
 Minor editorial or document structure change
 N
Subtask 540073-942-002-001
 Minor editorial or document structure change
 N
Subtask 540073-410-001-002
 Minor editorial or document structure change
 N
Subtask 540073-942-002-001
 Minor editorial or document structure change
 N
TASK 540073- 832-804-001-Inspection
Post Repair
Minor editorial or document structure change
 N
Task associated data - 001
 Minor editorial or document structure change
 N
DATE: Oct 15/93 SERVICE BULLETIN No.: A300-54-0073
REVISION No.: 03 - Oct 11/12 Page: 5
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 6

@A300
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
Task associated data - 002
 Minor editorial or document structure change
 N
Task associated data - 003
 Minor editorial or document structure change
 N
Task associated data - 004
 Minor editorial or document structure change
 N
Task associated data - 005
 Minor editorial or document structure change
 N
Task associated data - 006
 Minor editorial or document structure change
 N
Task associated data - 007
 Minor editorial or document structure change
 N
Subtask 540073-910-003-001
 Minor editorial or document structure change
 N
Subtask 540073-839-003-001
 Minor editorial or document structure change
 N
Subtask 540073-910-003-001
 Minor editorial or document structure change
 N
Subtask 540073-839-003-001
 Minor editorial or document structure change
 N
Subtask 540073-910-003-001
 Minor editorial or document structure change
 N
Subtask 540073-839-003-001
 Minor editorial or document structure change
 N
Subtask 540073-910-003-001
 Minor editorial or document structure change
 N
Subtask 540073-839-003-001
 Minor editorial or document structure change
 N
Subtask 540073-910-003-001
 Minor editorial or document structure change
 N
Subtask 540073-839-003-001
 Minor editorial or document structure change
 N
Subtask 540073-910-003-001
 Minor editorial or document structure change
 N
Subtask 540073-839-003-001
 Minor editorial or document structure change
 N
Subtask 540073-910-003-001
 Minor editorial or document structure change
 N
Subtask 540073-839-003-001
 Minor editorial or document structure change
 N
Subtask 540073-941-002-001
 Minor editorial or document structure change
 N
Subtask 540073-010-005-001
 Minor editorial or document structure change
 N
Subtask 540073-941-002-001
 Minor editorial or document structure change
 N
Subtask 540073-010-005-001
 Minor editorial or document structure change
 N
Subtask 540073-941-002-001
 Minor editorial or document structure change
 N
Subtask 540073-010-005-001
 Minor editorial or document structure change
 N
Subtask 540073-941-002-001
 Minor editorial or document structure change
 N
Subtask 540073-010-005-002
 Minor editorial or document structure change
 N
Subtask 540073-941-002-001
 Minor editorial or document structure change
 N
Subtask 540073-010-005-002
 Minor editorial or document structure change
 N
Subtask 540073-941-002-001
 Minor editorial or document structure change
 N
Subtask 540073-010-005-002
 Minor editorial or document structure change
 N
Subtask 540073-941-002-001
 Minor editorial or document structure change
 N
Subtask 540073-010-005-002
 Minor editorial or document structure change
 N
Subtask 540073-832-008-001
 Minor editorial or document structure change
 N
Subtask 540073-832-008-001
 Minor editorial or document structure change
 N
Subtask 540073-832-008-001
 Minor editorial or document structure change
 N
Subtask 540073-832-008-001
 Minor editorial or document structure change
 N
Subtask 540073-832-008-001
 Minor editorial or document structure change
 N
Subtask 540073-832-008-001
 Minor editorial or document structure change
 N
Subtask 540073-832-008-002
 Minor editorial or document structure change
 N
DATE: Oct 15/93 SERVICE BULLETIN No.: A300-54-0073
REVISION No.: 03 - Oct 11/12 Page: 6
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 7

@A300
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
Subtask 540073-700-003-001
 Minor editorial or document structure change
 N
Subtask 540073-700-003-001
 Minor editorial or document structure change
 N
Subtask 540073-700-003-001
 Minor editorial or document structure change
 N
Subtask 540073-700-003-001
 Minor editorial or document structure change
 N
Subtask 540073-700-003-001
 Minor editorial or document structure change
 N
Subtask 540073-700-003-001
 Minor editorial or document structure change
 N
Subtask 540073-700-003-001
 Minor editorial or document structure change
 N
Subtask 540073-410-003-001
 Minor editorial or document structure change
 N
Subtask 540073-942-004-001
 Minor editorial or document structure change
 N
Subtask 540073-410-003-001
 Minor editorial or document structure change
 N
Subtask 540073-942-004-001
 Minor editorial or document structure change
 N
Subtask 540073-410-003-001
 Minor editorial or document structure change
 N
Subtask 540073-942-004-001
 Minor editorial or document structure change
 N
Subtask 540073-410-003-002
 Minor editorial or document structure change
 N
Subtask 540073-942-004-001
 Minor editorial or document structure change
 N
Subtask 540073-410-003-002
 Minor editorial or document structure change
 N
Subtask 540073-942-004-001
 Minor editorial or document structure change
 N
Subtask 540073-410-003-002
 Minor editorial or document structure change
 N
Subtask 540073-942-004-001
 Minor editorial or document structure change
 N
Subtask 540073-410-003-002
 Minor editorial or document structure change
 N
Subtask 540073-942-004-001
 Minor editorial or document structure change
 N
TASK 540073- 832-805-001-Inspection
Post Service Bulletin No.A300-54-0080
Minor editorial or document structure change
 N
Task associated data - 001
 Minor editorial or document structure change
 N
Task associated data - 002
 Minor editorial or document structure change
 N
Task associated data - 003
 Minor editorial or document structure change
 N
Task associated data - 004
 Minor editorial or document structure change
 N
Task associated data - 005
 Minor editorial or document structure change
 N
Task associated data - 006
 Minor editorial or document structure change
 N
Task associated data - 007
 Minor editorial or document structure change
 N
Subtask 540073-910-004-001
 Minor editorial or document structure change
 N
Subtask 540073-839-004-001
 Minor editorial or document structure change
 N
Subtask 540073-910-004-001
 Minor editorial or document structure change
 N
Subtask 540073-839-004-001
 Minor editorial or document structure change
 N
Subtask 540073-910-004-001
 Minor editorial or document structure change
 N
Subtask 540073-839-004-001
 Minor editorial or document structure change
 N
Subtask 540073-910-004-001
 Minor editorial or document structure change
 N
Subtask 540073-839-004-001
 Minor editorial or document structure change
 N
Subtask 540073-910-004-001
 Minor editorial or document structure change
 N
Subtask 540073-839-004-001
 Minor editorial or document structure change
 N
Subtask 540073-910-004-001
 Minor editorial or document structure change
 N
DATE: Oct 15/93 SERVICE BULLETIN No.: A300-54-0073
REVISION No.: 03 - Oct 11/12 Page: 7
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 8

@A300
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
Subtask 540073-839-004-001
 Minor editorial or document structure change
 N
Subtask 540073-910-004-001
 Minor editorial or document structure change
 N
Subtask 540073-839-004-001
 Minor editorial or document structure change
 N
Subtask 540073-941-003-001
 Minor editorial or document structure change
 N
Subtask 540073-010-006-001
 Minor editorial or document structure change
 N
Subtask 540073-941-003-001
 Minor editorial or document structure change
 N
Subtask 540073-010-006-001
 Minor editorial or document structure change
 N
Subtask 540073-941-003-001
 Minor editorial or document structure change
 N
Subtask 540073-010-006-001
 Minor editorial or document structure change
 N
Subtask 540073-941-003-001
 Minor editorial or document structure change
 N
Subtask 540073-010-006-002
 Minor editorial or document structure change
 N
Subtask 540073-941-003-001
 Minor editorial or document structure change
 N
Subtask 540073-010-006-002
 Minor editorial or document structure change
 N
Subtask 540073-941-003-001
 Minor editorial or document structure change
 N
Subtask 540073-010-006-002
 Minor editorial or document structure change
 N
Subtask 540073-941-003-001
 Minor editorial or document structure change
 N
Subtask 540073-010-006-002
 Minor editorial or document structure change
 N
Subtask 540073-832-009-001
 Minor editorial or document structure change
 N
Subtask 540073-832-009-001
 Minor editorial or document structure change
 N
Subtask 540073-832-009-001
 Minor editorial or document structure change
 N
Subtask 540073-832-009-001
 Minor editorial or document structure change
 N
Subtask 540073-832-009-001
 Minor editorial or document structure change
 N
Subtask 540073-832-009-001
 Minor editorial or document structure change
 N
Subtask 540073-832-009-003
 Minor editorial or document structure change
 N
Subtask 540073-700-004-001
 Minor editorial or document structure change
 N
Subtask 540073-700-004-001
 Minor editorial or document structure change
 N
Subtask 540073-700-004-001
 Minor editorial or document structure change
 N
Subtask 540073-700-004-001
 Minor editorial or document structure change
 N
Subtask 540073-700-004-001
 Minor editorial or document structure change
 N
Subtask 540073-700-004-001
 Minor editorial or document structure change
 N
Subtask 540073-700-004-001
 Minor editorial or document structure change
 N
Subtask 540073-410-004-001
 Minor editorial or document structure change
 N
Subtask 540073-942-005-001
 Minor editorial or document structure change
 N
Subtask 540073-410-004-001
 Minor editorial or document structure change
 N
Subtask 540073-942-005-001
 Minor editorial or document structure change
 N
Subtask 540073-410-004-001
 Minor editorial or document structure change
 N
Subtask 540073-942-005-001
 Minor editorial or document structure change
 N
Subtask 540073-410-004-002
 Minor editorial or document structure change
 N
Subtask 540073-942-005-001
 Minor editorial or document structure change
 N
Subtask 540073-410-004-002
 Minor editorial or document structure change
 N
Subtask 540073-942-005-001
 Minor editorial or document structure change
 N
DATE: Oct 15/93 SERVICE BULLETIN No.: A300-54-0073
REVISION No.: 03 - Oct 11/12 Page: 8
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 9

@A300
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
Subtask 540073-410-004-002
 Minor editorial or document structure change
 N
Subtask 540073-942-005-001
 Minor editorial or document structure change
 N
Subtask 540073-410-004-002
 Minor editorial or document structure change
 N
Subtask 540073-942-005-001
 Minor editorial or document structure change
 N
TASK 540073- 833-801-001-Repair
 Minor editorial or document structure change
 N
Task associated data - 001
 Minor editorial or document structure change
 N
Task associated data - 002
 Minor editorial or document structure change
 N
Task associated data - 003
 Minor editorial or document structure change
 N
Task associated data - 004
 Minor editorial or document structure change
 N
Task associated data - 005
 Minor editorial or document structure change
 N
Task associated data - 006
 Minor editorial or document structure change
 N
Task associated data - 007
 Minor editorial or document structure change
 N
Subtask 540073-910-002-001
 Minor editorial or document structure change
 N
Subtask 540073-839-002-001
 Minor editorial or document structure change
 N
Subtask 540073-910-002-001
 Minor editorial or document structure change
 N
Subtask 540073-839-002-001
 Minor editorial or document structure change
 N
Subtask 540073-910-002-001
 Minor editorial or document structure change
 N
Subtask 540073-839-002-001
 Minor editorial or document structure change
 N
Subtask 540073-910-002-001
 Minor editorial or document structure change
 N
Subtask 540073-839-002-001
 Minor editorial or document structure change
 N
Subtask 540073-910-002-001
 Minor editorial or document structure change
 N
Subtask 540073-839-002-001
 Minor editorial or document structure change
 N
Subtask 540073-910-002-001
 Minor editorial or document structure change
 N
Subtask 540073-839-002-001
 Minor editorial or document structure change
 N
Subtask 540073-910-002-001
 Minor editorial or document structure change
 N
Subtask 540073-839-002-001
 Minor editorial or document structure change
 N
Subtask 540073-010-003-001
 Minor editorial or document structure change
 N
Subtask 540073-010-004-001
 Minor editorial or document structure change
 N
Subtask 540073-010-003-001
 Minor editorial or document structure change
 N
Subtask 540073-010-004-001
 Minor editorial or document structure change
 N
Subtask 540073-010-003-001
 Minor editorial or document structure change
 N
Subtask 540073-010-004-001
 Minor editorial or document structure change
 N
Subtask 540073-010-003-001
 Minor editorial or document structure change
 N
Subtask 540073-010-004-001
 Minor editorial or document structure change
 N
Subtask 540073-010-003-001
 Minor editorial or document structure change
 N
Subtask 540073-010-004-001
 Minor editorial or document structure change
 N
Subtask 540073-010-003-001
 Minor editorial or document structure change
 N
Subtask 540073-010-004-001
 Minor editorial or document structure change
 N
Subtask 540073-010-003-001
 Minor editorial or document structure change
 N
Subtask 540073-010-004-001
 Minor editorial or document structure change
 N
Subtask 540073-833-001-001
 Minor editorial or document structure change
 N
DATE: Oct 15/93 SERVICE BULLETIN No.: A300-54-0073
REVISION No.: 03 - Oct 11/12 Page: 9
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 10

@A300
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
Subtask 540073-833-002-001
 Minor editorial or document structure change
 N
Subtask 540073-833-001-001
 Minor editorial or document structure change
 N
Subtask 540073-833-002-001
 Minor editorial or document structure change
 N
Subtask 540073-833-001-001
 Minor editorial or document structure change
 N
Subtask 540073-833-002-001
 Minor editorial or document structure change
 N
Subtask 540073-833-001-003
 Minor editorial or document structure change
 N
Subtask 540073-833-002-002
 Minor editorial or document structure change
 N
Subtask 540073-833-001-003
 Minor editorial or document structure change
 N
Subtask 540073-833-002-002
 Minor editorial or document structure change
 N
Subtask 540073-833-001-003
 Minor editorial or document structure change
 N
Subtask 540073-833-002-002
 Minor editorial or document structure change
 N
Subtask 540073-833-001-002
 Minor editorial or document structure change
 N
Subtask 540073-833-002-003
 Minor editorial or document structure change
 N
Subtask 540073-700-001-001
 Minor editorial or document structure change
 N
Subtask 540073-700-001-001
 Minor editorial or document structure change
 N
Subtask 540073-700-001-001
 Minor editorial or document structure change
 N
Subtask 540073-700-001-001
 Minor editorial or document structure change
 N
Subtask 540073-700-001-001
 Minor editorial or document structure change
 N
Subtask 540073-700-001-001
 Minor editorial or document structure change
 N
Subtask 540073-700-001-001
 Minor editorial or document structure change
 N
Subtask 540073-942-001-001
 Minor editorial or document structure change
 N
Subtask 540073-942-003-001
 Minor editorial or document structure change
 N
Subtask 540073-942-001-001
 Minor editorial or document structure change
 N
Subtask 540073-942-003-001
 Minor editorial or document structure change
 N
Subtask 540073-942-001-001
 Minor editorial or document structure change
 N
Subtask 540073-942-003-001
 Minor editorial or document structure change
 N
Subtask 540073-942-001-001
 Minor editorial or document structure change
 N
Subtask 540073-942-003-001
 Minor editorial or document structure change
 N
Subtask 540073-942-001-001
 Minor editorial or document structure change
 N
Subtask 540073-942-003-001
 Minor editorial or document structure change
 N
Subtask 540073-942-001-001
 Minor editorial or document structure change
 N
Subtask 540073-942-003-001
 Minor editorial or document structure change
 N
Subtask 540073-942-001-001
 Minor editorial or document structure change
 N
Subtask 540073-942-003-001
 Minor editorial or document structure change
 N
Fig. A-FBAAA
 Minor editorial or document structure change
 N
Fig. A-FBAAA Sheet 01
 Minor editorial or document structure change
 N
Fig. A-FBCAA
 Minor editorial or document structure change
 N
Fig. A-FBCAA Sheet 01
 Minor editorial or document structure change
 N
Fig. A-FBBAA
 Minor editorial or document structure change
 N
Fig. A-FBBAA Sheet 01
 Minor editorial or document structure change
 N
Fig. A-FBDAA
 Minor editorial or document structure change
 N
DATE: Oct 15/93 SERVICE BULLETIN No.: A300-54-0073
REVISION No.: 03 - Oct 11/12 Page: 10
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 11

@A300
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
Fig. A-FBDAA Sheet 01
 Minor editorial or document structure change
 N
Fig. A-FBFAA
 Minor editorial or document structure change
 N
Fig. A-FBFAA Sheet 01
 Minor editorial or document structure change
 N
Fig. A-FBEAA
 Minor editorial or document structure change
 N
Fig. A-FBEAA Sheet 01
 Minor editorial or document structure change
 N
Fig. A-FFAAA
 Minor editorial or document structure change
 N
Fig. A-FFAAA Sheet 01
 Minor editorial or document structure change
 N
Fig. A-FFBAA
 Minor editorial or document structure change
 N
Fig. A-FFBAA Sheet 01
 Minor editorial or document structure change
 N
Fig. A-FBGAA
 Minor editorial or document structure change
 N
Fig. A-FBGAA Sheet 01
 Minor editorial or document structure change
 N
Fig. A-FBGAA Sheet 02
 Minor editorial or document structure change
 N
Fig. A-FBHAA
 Minor editorial or document structure change
 N
Fig. A-FBHAA Sheet 01
 Minor editorial or document structure change
 N
Fig. A-FBHAA Sheet 02
 Minor editorial or document structure change
 N
Appendix 01- Inspection Report
APPENDIX CONTENT
 Minor editorial or document structure change
 N
Fig. A-FRAAA
 Minor editorial or document structure change
 N
Fig. A-FRAAA Sheet 01
 Minor editorial or document structure change
 N
Fig. A-FRAAA Sheet 02
 Minor editorial or document structure change
 N
Fig. A-FRAAA Sheet 03
 Minor editorial or document structure change
 N
Fig. A-FRBAA
 Minor editorial or document structure change
 N
Fig. A-FRBAA Sheet 01
 Minor editorial or document structure change
 N
Fig. A-FRBAA Sheet 02
 Minor editorial or document structure change
 N
Fig. A-FRBAA Sheet 03
 Minor editorial or document structure change
 N
FILLING INSTRUCTIONS
This Service Bulletin has been generated electronically and is reissued as a complete document.
Replace the complete document.
Put this Revision Transmittal Sheet in front of the Service Bulletin.
HISTORY OF PREVIOUS REVISIONS
Revision No. 01 issued to inform the operators of Airworthiness Directive (AD) number.
Revision No. 02 issued to add a liquid penetrant Inspection as an alternative to the eddy current
Inspection, and to update the effectivity.
REVISION SEQUENCE
ORIGINAL: Oct 15/93
REVISION No.: 01 - Mar 28/94
DATE: Oct 15/93 SERVICE BULLETIN No.: A300-54-0073
REVISION No.: 03 - Oct 11/12 Page: 11
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 12

@A300
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
REVISION No.: 02 - Jul 09/02
REVISION No. : 03 - Oct 11/12
DATE: Oct 15/93 SERVICE BULLETIN No.: A300-54-0073
REVISION No.: 03 - Oct 11/12 Page: 12
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 13

@A300
SERVICE BULLETIN
SUMMARY
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
This summary is for information only and is not approved for modification of the aircraft.
MANDATORY
 MANDATORY
 MANDATORY
ATA SYSTEM: 54
TITLE: NACELLES/PYLON - INSPECT PYLON LOWER SPAR BETWEEN RIBS
6 AND 7
**CONF ALL
MODIFICATIONS
None
REASON/DESCRIPTION/OPERATIONAL CONSEQUENCES
On A/C fitted with GE pylon and PW, crack has been reported on pylon lower spar.
The crack is running between ribs 6 and 7 and is starting on the center stiffener after the flat area.
Some cracks have been reported re-initiating even after Service Bulletin embodiment. Hence a deeper
investigation has been performed in order to propose the best solution possible to the operators.
The aim of this Service Bulletin is to call for Eddy Current Inspection or Liquid Penetrant Inspection of
the pylon lower spar in order to detect any crack.
This inspection will make it possible to detect crack propagation at an early stage, thus avoiding a
significant repair and reduction of the structural capacity.
New FC/FH figures of Thresholds and Intervals, due to improvement of analyses and also consistent
with in-service crack findings, were acknowledged by Airworthiness Authorities.
GENERAL EVALUATION
EVALUATION TABLE
COMPLIANCE
 MANDATORY (1)
 CANCELS INSPECTION SB
 NO
POTENTIAL AD
 YES
 A/C OPERATION AFFECTED
 NO
RELIABILITY AFFECTED
 NO
 PAX COMFORT AFFECTED
 NO
COST SAVING
 NO
 ETOPS AFFECTED
 NO
STRUCTURAL LIFE EXTN
 NO
 VENDOR SB INVOLVED
 NO
NOTE
 (1)
: Service Bulletin must be accomplished.
DATE: Oct 15/93 SERVICE BULLETIN No.: A300-54-0073
REVISION No.: 03 - Oct 11/12 Page: 1
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 14

@A300
SERVICE BULLETIN
SUMMARY
MATERIAL PRICE INFORMATION
**CONF 001
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET
 QTY PER
A/C
PRICE PER
A/C (USD)
MAIN PARTS
Kit 540073A01R03
 2
 2,880.00
 Doubler
**CONF 002
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET
 QTY PER
A/C
PRICE PER
A/C (USD)
MAIN PARTS
Kit 540073A01R03
 2
 2,880.00
 Doubler
**CONF 003
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET
 QTY PER
A/C
PRICE PER
A/C (USD)
MAIN PARTS
Kit 540073A01R03
 2
 2,880.00
 Doubler
**CONF 004
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET
 QTY PER
A/C
PRICE PER
A/C (USD)
MAIN PARTS
Kit 540073A03R00
 2
 2,880.00
 Doubler
**CONF 005
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET
 QTY PER
A/C
PRICE PER
A/C (USD)
MAIN PARTS
Kit 540073A03R00
 2
 2,880.00
 Doubler
**CONF 006
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET
 QTY PER
A/C
PRICE PER
A/C (USD)
MAIN PARTS
Kit 540073A03R00
 2
 2,880.00
 Doubler
DATE: Oct 15/93 SERVICE BULLETIN No.: A300-54-0073
REVISION No.: 03 - Oct 11/12 Page: 2
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 15

@A300
SERVICE BULLETIN
SUMMARY
**CONF 007
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET
 QTY PER
A/C
PRICE PER
A/C (USD)
MAIN PARTS
Kit 540073A02R02
 2
 2,840.00
 Doubler
EFFECTIVITY
**CONF ALL
This Service Bulletin is applicable to this (these) operator(s) :
001 50W 69X 72U ABR AFG C2A DHL F2I FLM GST IAW IRA
IRM KYE KZU MIX MNB MNG MSR NTR P2A RUN SOP TNO TSY
CONCURRENT REQUIREMENTS
None
REFERENCES / REPERCUSSIONS
TFU
 54.51.41.002
OEB
 None
AOT
 None
SIL
 None
LINE MAINTENANCE AFFECTED
 No
LIFE LIMIT
 None
OTHER
 None
NATURE OF THE WORK
AIRCRAFT
 YES
EQUIPMENT
 NO
HARD
 NO
SOFT
 NO
OBRM
 NO
MANPOWER
**CONF 001
Task 540073-832-801-001: Inspection Pre Repair and Pre Service Bulletin No.A300-54-0080
TOTAL MANHOURS
 7.00
ELAPSED TIME (HOURS)
 7.00
Task 540073-832-804-001: Inspection Post Repair
TOTAL MANHOURS
 5.00
ELAPSED TIME (HOURS)
 5.00
DATE: Oct 15/93 SERVICE BULLETIN No.: A300-54-0073
REVISION No.: 03 - Oct 11/12 Page: 3
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 16

@A300
SERVICE BULLETIN
SUMMARY
Task 540073-832-805-001: Inspection Post Service Bulletin No.A300-54-0080
TOTAL MANHOURS
 5.00
ELAPSED TIME (HOURS)
 5.00
Task 540073-833-801-001: Repair
TOTAL MANHOURS
 60.50
ELAPSED TIME (HOURS)
 53.00
**CONF 002
Task 540073-832-801-001: Inspection Pre Repair and Pre Service Bulletin No.A300-54-0080
TOTAL MANHOURS
 7.00
ELAPSED TIME (HOURS)
 7.00
Task 540073-832-804-001: Inspection Post Repair
TOTAL MANHOURS
 5.00
ELAPSED TIME (HOURS)
 5.00
Task 540073-832-805-001: Inspection Post Service Bulletin No.A300-54-0080
TOTAL MANHOURS
 5.00
ELAPSED TIME (HOURS)
 5.00
Task 540073-833-801-001: Repair
TOTAL MANHOURS
 60.50
ELAPSED TIME (HOURS)
 53.00
**CONF 003
Task 540073-832-801-001: Inspection Pre Repair and Pre Service Bulletin No.A300-54-0080
TOTAL MANHOURS
 7.00
ELAPSED TIME (HOURS)
 7.00
Task 540073-832-804-001: Inspection Post Repair
TOTAL MANHOURS
 5.00
ELAPSED TIME (HOURS)
 5.00
Task 540073-832-805-001: Inspection Post Service Bulletin No.A300-54-0080
TOTAL MANHOURS
 5.00
ELAPSED TIME (HOURS)
 5.00
Task 540073-833-801-001: Repair
TOTAL MANHOURS
 60.50
ELAPSED TIME (HOURS)
 53.00
DATE: Oct 15/93 SERVICE BULLETIN No.: A300-54-0073
REVISION No.: 03 - Oct 11/12 Page: 4
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 17

@A300
SERVICE BULLETIN
SUMMARY
**CONF 004
Task 540073-832-801-001: Inspection Pre Repair and Pre Service Bulletin No.A300-54-0080
TOTAL MANHOURS
 7.00
ELAPSED TIME (HOURS)
 7.00
Task 540073-832-804-001: Inspection Post Repair
TOTAL MANHOURS
 5.00
ELAPSED TIME (HOURS)
 5.00
Task 540073-832-805-001: Inspection Post Service Bulletin No.A300-54-0080
TOTAL MANHOURS
 5.00
ELAPSED TIME (HOURS)
 5.00
Task 540073-833-801-001: Repair
TOTAL MANHOURS
 60.50
ELAPSED TIME (HOURS)
 53.00
**CONF 005
Task 540073-832-801-001: Inspection Pre Repair and Pre Service Bulletin No.A300-54-0080
TOTAL MANHOURS
 7.00
ELAPSED TIME (HOURS)
 7.00
Task 540073-832-804-001: Inspection Post Repair
TOTAL MANHOURS
 5.00
ELAPSED TIME (HOURS)
 5.00
Task 540073-832-805-001: Inspection Post Service Bulletin No.A300-54-0080
TOTAL MANHOURS
 5.00
ELAPSED TIME (HOURS)
 5.00
Task 540073-833-801-001: Repair
TOTAL MANHOURS
 60.50
ELAPSED TIME (HOURS)
 53.00
**CONF 006
Task 540073-832-801-001: Inspection Pre Repair and Pre Service Bulletin No.A300-54-0080
TOTAL MANHOURS
 7.00
ELAPSED TIME (HOURS)
 7.00
Task 540073-832-804-001: Inspection Post Repair
TOTAL MANHOURS
 5.00
ELAPSED TIME (HOURS)
 5.00
DATE: Oct 15/93 SERVICE BULLETIN No.: A300-54-0073
REVISION No.: 03 - Oct 11/12 Page: 5
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 18

@A300
SERVICE BULLETIN
SUMMARY
Task 540073-832-805-001: Inspection Post Service Bulletin No.A300-54-0080
TOTAL MANHOURS
 5.00
ELAPSED TIME (HOURS)
 5.00
Task 540073-833-801-001: Repair
TOTAL MANHOURS
 60.50
ELAPSED TIME (HOURS)
 53.00
**CONF 007
Task 540073-832-801-001: Inspection Pre Repair and Pre Service Bulletin No.A300-54-0080
TOTAL MANHOURS
 7.00
ELAPSED TIME (HOURS)
 7.00
Task 540073-832-804-001: Inspection Post Repair
TOTAL MANHOURS
 5.00
ELAPSED TIME (HOURS)
 5.00
Task 540073-832-805-001: Inspection Post Service Bulletin No.A300-54-0080
TOTAL MANHOURS
 5.00
ELAPSED TIME (HOURS)
 5.00
Task 540073-833-801-001: Repair
TOTAL MANHOURS
 60.50
ELAPSED TIME (HOURS)
 53.00
APPENDICES
**CONF ALL
Appendix 01- Inspection Report
DATE: Oct 15/93 SERVICE BULLETIN No.: A300-54-0073
REVISION No.: 03 - Oct 11/12 Page: 6
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 19

@A300
SERVICE BULLETIN
SUMMARY
**CONF ALL
LOWER SPAR
LOOKING OUTBOARD
RIB1 RIB6 RIB7 RIB10
FWD
A_SB_540073_5_SAAA_01_00
B
A
B
A
AREAS TO BE INSPECTED
NOTE:
Figure A-FSAAA - Sheet 01
DATE: Oct 15/93 SERVICE BULLETIN No.: A300-54-0073
REVISION No.: 03 - Oct 11/12 Page: 7
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 20

@A300
SERVICE BULLETIN
SUMMARY
This Page Intentionally Left Blank
DATE: Oct 15/93 SERVICE BULLETIN No.: A300-54-0073
REVISION No.: 03 - Oct 11/12 Page: 8
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 21

@A300
SERVICE BULLETIN
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
MANDATORY
 MANDATORY
 MANDATORY
ATA SYSTEM: 54
TITLE: NACELLES/PYLON - INSPECT PYLON LOWER SPAR BETWEEN RIBS
6 AND 7
MODIFICATION No.: None
This document contains AIRBUS PROPRIETARY INFORMATION and shall at all times remain the
property of AIRBUS; no intellectual property right or licence is granted by AIRBUS in connection with
any information contained in it. It is delivered on the express condition that said document and the
information contained in it shall be treated as confidential, shall not be used for any purpose other than
that for which it is hereby delivered. It shall not be disclosed in whole or in part to third parties and shall
not be duplicated in any manner (except for the purposes of performing the tasks described hereunder
and provided that any recipient of such document shall comply with the conditions herein), without
AIRBUS prior written consent.
1. PLANNING INFORMATION
**CONF ALL
A. EFFECTIVITY
NOTE
: This Service Bulletin is only applicable to aircraft on which Mod. No.
10149S20315 is not embodied.
(1) Models
B2-1C B2-203 B2K-3C B4-103 B4-120 B4-203 B4-2C C4-203
F4-203
(2) Effectivity by MSN
0003 0041 0045 0047 0053 0055 0075 0079-0080 0082-0085 0090 0094-0095 0101
0105 0107 0116-0117 0123-0126 0128-0129 0133 0135-0137 0139 0141 0147
0149-0152 0154-0157 0160 0170 0173 0175-0176 0180 0183-0185 0187 0189
0199-0200 0203-0204 0210-0212 0218-0220 0226-0227 0234-0236 0239 0243-0244
0247 0249-0250 0255-0256 0259 0261 0265 0274 0277 0289 0292 0299 0302 0304
DATE: Oct 15/93 SERVICE BULLETIN No.: A300-54-0073
REVISION No.: 03 - Oct 11/12 Page: 1
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 22

@A300
SERVICE BULLETIN
(3) Effectivity by Operator
The Operator/MSN relationship is provided for information only and is correct at the time
of issue in accordance with the information available to AIRBUS. Any future changes
resulting from transfer of an aircraft from one operator to another will not be reflected in
this list unless the Service Bulletin is revised for another reason.
OPERATOR
 MSN
001
 0125
50W
 0003
69X
 0095
72U
 0079
ABR
 0152 0184 0189 0199 0219 0220 0234 0236 0250 0259 0274 0289
AFG
 0180
C2A
 0261
DHL
 0084 0085 0141 0149 0249 0265
F2I
 0083 0094 0128 0133 0135 0136 0137 0156 0170 0235 0243
FLM
 0082 0176
GST
 0277 0292
IAW
 0239
IRA
 0080 0139 0151 0173 0185 0187 0226 0256 0299 0302
IRM
 0055 0090 0160 0175 0204 0244
KYE
 0053 0211
KZU
 0041 0101 0117
MIX
 0157 0203 0218
MNB
 0123 0212 0304
MNG
 0047
MSR
 0200 0255
NTR
 0124 0155
P2A
 0116 0150
RUN
 0075 0105 0107 0147 0154 0183
SOP
 0126
TNO
 0045 0210 0227 0247
TSY
 0129
(4) Configuration by MSN
MSN
 CONFIGURATION
0003 0160 0176 0185 0187 0226 0244
 004
0041 0045 0047 0055 0084 0085 0105 0124 0151
 002
0053 0075 0083 0095 0101 0107 0116 0117 0123 0126 0129
0137 0139 0141 0147 0149 0150 0152
003
0079 0094 0128 0133 0135 0136 0156 0170
 007
0080 0082 0090
 001
0125 0184 0189 0239 0256
 005
0154 0155 0157 0173 0175 0180 0183 0199 0200 0203 0204
0210 0211 0212 0218 0219 0220 0227 0234 0235 0236 0243
0247 0249 0250 0255 0259 0261 0265 0274 0277 0289 0292
0299 0302 0304
006
DATE: Oct 15/93 SERVICE BULLETIN No.: A300-54-0073
REVISION No.: 03 - Oct 11/12 Page: 2
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 23

@A300
SERVICE BULLETIN
(5) Configuration definition
**CONF 001
Config. 001 is valid for the models A300 B2-1C, B2-203 and B2K-3C equipped with the
Basic Pylon and GE CF6-50 pylons.
**CONF 002
Config. 002 is valid for the models A300 B4-2C, B4-103 and B4-120 equipped with the
Basic Pylon and GE CF6-50 pylons.
**CONF 003
Config. 003 is valid for the models A300 B4-203, B4-220, C4-203 and F4-203 equipped
with the Basic Pylon and GE CF6-50 pylons.
**CONF 004
Config. 004 is valid for the models A300 B2-1C, B2-203 and B2K-3C equipped with the
General Electric engine and the Polyvalent Pylon.
**CONF 005
Config. 005 is valid for the models A300 B4-2C, B4-103 and B4-120 equipped with the
General Electric engine and the Polyvalent Pylon.
**CONF 006
Config. 006 is valid for the models A300 B4-203, B4-220, C4-203 and F4-203 equipped
with the General Electric engine and the Polyvalent Pylon.
**CONF 007
Config. 007 is valid for the models A300 B4-2C, B4-103 and B4-120 equipped with the
Pratt and Witney engine and the Polyvalent Pylon.
(6) Material Effectivity
**CONF 001 thru 003
MATERIAL
 QTY PER A/C
 SEE NOTES
Kit 540073A01R03
 2
Consumable CMLA01
 1
NOTE
: The kit No. 540073A01 is valid for one pylon.
**CONF 004 thru 006
MATERIAL
 QTY PER A/C
 SEE NOTES
Kit 540073A03R00
 2
Consumable CMLA01
 1
NOTE
: The kit No. 540073A02 is valid for one pylon.
**CONF 007
MATERIAL
 QTY PER A/C
 SEE NOTES
Kit 540073A02R02
 2
Consumable CMLA01
 1
DATE: Oct 15/93 SERVICE BULLETIN No.: A300-54-0073
REVISION No.: 03 - Oct 11/12 Page: 3
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 24

@A300
SERVICE BULLETIN
NOTE
: The kit No. 540073A03 is valid for one pylon.
**CONF ALL
B. CONCURRENT REQUIREMENTS
None
C. REASON
(1) History
On A/C fitted with GE pylon and PW, crack has been reported on pylon lower spar.
The crack is running between ribs 6 and 7 and is starting on the center stiffener after the
flat area.
Some cracks have been reported re-initiating even after Service Bulletin embodiment.
Hence a deeper investigation has been performed in order to propose the best solution
possible to the operators.
(2) Objective/Action
The aim of this Service Bulletin is to call for Eddy Current Inspection or Liquid Penetrant
Inspection of the pylon lower spar in order to detect any crack.
(3) Advantages
This inspection will make it possible to detect crack propagation at an early stage, thus
avoiding a significant repair and reduction of the structural capacity.
New FC/FH figures of Thresholds and Intervals, due to improvement of analyses and
also consistent with in-service crack findings, were acknowledged by Airworthiness
Authorities.
(4) Operational/Maintenance Consequences
None
D. DESCRIPTION
To accomplish this Service Bulletin it is necessary to :
**CONF 001
Task 540073-832-801-001: Inspection Pre Repair and Pre Service Bulletin No.A300-54-0080
(1) Do a Special Detailed Inspection of the LH / RH Engine Pylon Pre-repair and Pre-SB
54-0080.
(2) Do a Special Detailed Inspection of the LH / RH Engine Pylon without protection.
DATE: Oct 15/93 SERVICE BULLETIN No.: A300-54-0073
REVISION No.: 03 - Oct 11/12 Page: 4
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 25

@A300
SERVICE BULLETIN
Task 540073-832-804-001: Inspection Post Repair
(1) Do a Special Detailed Inspection of the LH / RH Engine Pylon Post repair.
Task 540073-832-805-001: Inspection Post Service Bulletin No.A300-54-0080
(1) Do a Special Detailed Inspection of the LH / RH Engine Pylon Post-SB 54-0080.
Task 540073-833-801-001: Repair
(1) Install the doubler on the LH Pylon
(2) Install the doubler on the RH Pylon
**CONF 002
Task 540073-832-801-001: Inspection Pre Repair and Pre Service Bulletin No.A300-54-0080
(1) Do a Special Detailed Inspection of the LH / RH Engine Pylon Pre-repair and Pre-SB
54-0080.
(2) Do a Special Detailed Inspection of the LH / RH Engine Pylon without protection.
Task 540073-832-804-001: Inspection Post Repair
(1) Do a Special Detailed Inspection of the LH / RH Engine Pylon Post repair.
Task 540073-832-805-001: Inspection Post Service Bulletin No.A300-54-0080
(1) Do a Special Detailed Inspection of the LH / RH Engine Pylon Post-SB 54-0080.
Task 540073-833-801-001: Repair
(1) Install the doubler on the LH Pylon
(2) Install the doubler on the RH Pylon
**CONF 003
Task 540073-832-801-001: Inspection Pre Repair and Pre Service Bulletin No.A300-54-0080
(1) Do a Special Detailed Inspection of the LH / RH Engine Pylon Pre-repair and Pre-SB
54-0080.
(2) Do a Special Detailed Inspection of the LH / RH Engine Pylon without protection.
Task 540073-832-804-001: Inspection Post Repair
(1) Do a Special Detailed Inspection of the LH / RH Engine Pylon Post repair.
Task 540073-832-805-001: Inspection Post Service Bulletin No.A300-54-0080
(1) Do a Special Detailed Inspection of the LH / RH Engine Pylon Post-SB 54-0080.
DATE: Oct 15/93 SERVICE BULLETIN No.: A300-54-0073
REVISION No.: 03 - Oct 11/12 Page: 5
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 26

@A300
SERVICE BULLETIN
Task 540073-833-801-001: Repair
(1) Install the doubler on the LH Pylon
(2) Install the doubler on the RH Pylon
**CONF 004
Task 540073-832-801-001: Inspection Pre Repair and Pre Service Bulletin No.A300-54-0080
(1) Do a Special Detailed Inspection of the LH / RH Engine Pylon Pre-repair and Pre-SB
54-0080.
(2) Do a Special Detailed Inspection of the LH / RH Engine Pylon without protection.
Task 540073-832-804-001: Inspection Post Repair
(1) Do a Special Detailed Inspection of the LH / RH Engine Pylon Post repair.
Task 540073-832-805-001: Inspection Post Service Bulletin No.A300-54-0080
(1) Do a Special Detailed Inspection of the LH / RH Engine Pylon Post-SB 54-0080.
Task 540073-833-801-001: Repair
(1) Install the doubler on the LH Pylon
(2) Install the doubler on the RH Pylon
**CONF 005
Task 540073-832-801-001: Inspection Pre Repair and Pre Service Bulletin No.A300-54-0080
(1) Do a Special Detailed Inspection of the LH / RH Engine Pylon Pre-repair and Pre-SB
54-0080.
(2) Do a Special Detailed Inspection of the LH / RH Engine Pylon without protection.
Task 540073-832-804-001: Inspection Post Repair
(1) Do a Special Detailed Inspection of the LH / RH Engine Pylon Post repair.
Task 540073-832-805-001: Inspection Post Service Bulletin No.A300-54-0080
(1) Do a Special Detailed Inspection of the LH / RH Engine Pylon Post-SB 54-0080.
Task 540073-833-801-001: Repair
(1) Install the doubler on the LH Pylon
(2) Install the doubler on the RH Pylon
DATE: Oct 15/93 SERVICE BULLETIN No.: A300-54-0073
REVISION No.: 03 - Oct 11/12 Page: 6
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 27

@A300
SERVICE BULLETIN
**CONF 006
Task 540073-832-801-001: Inspection Pre Repair and Pre Service Bulletin No.A300-54-0080
(1) Do a Special Detailed Inspection of the LH / RH Engine Pylon Pre-repair and Pre-SB
54-0080.
(2) Do a Special Detailed Inspection of the LH / RH Engine Pylon without protection.
Task 540073-832-804-001: Inspection Post Repair
(1) Do a Special Detailed Inspection of the LH / RH Engine Pylon Post repair.
Task 540073-832-805-001: Inspection Post Service Bulletin No.A300-54-0080
(1) Do a Special Detailed Inspection of the LH / RH Engine Pylon Post-SB 54-0080.
Task 540073-833-801-001: Repair
(1) Install the doubler on the LH Pylon
(2) Install the doubler on the RH Pylon
**CONF 007
Task 540073-832-801-001: Inspection Pre Repair and Pre Service Bulletin No.A300-54-0080
(1) Do a Special Detailed Inspection of the LH / RH Engine Pylon Pre-repair and Pre-SB
54-0080.
(2) Do a Special Detailed Inspection of the LH / RH Engine Pylon without protection.
Task 540073-832-804-001: Inspection Post Repair
(1) Do a Special Detailed Inspection of the LH / RH Engine Pylon Post repair.
Task 540073-832-805-001: Inspection Post Service Bulletin No.A300-54-0080
(1) Do a Special Detailed Inspection of the LH / RH Engine Pylon Post-SB 54-0080.
Task 540073-833-801-001: Repair
(1) Install the doubler on the LH Pylon
(2) Install the doubler on the RH Pylon
**CONF ALL
E. COMPLIANCE
(1) Classification
MANDATORY: Service Bulletin must be accomplished.
DATE: Oct 15/93 SERVICE BULLETIN No.: A300-54-0073
REVISION No.: 03 - Oct 11/12 Page: 7
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 28

@A300
SERVICE BULLETIN
(2) Accomplishment Timescale
**CONF 001
This Service Bulletin has been classified Mandatory by the issue of an Airworthiness
Directive (AD) published by the European Av iation Safety Agenc y (EASA). The AD must
be used as the reference document for the mandated accomplishment timescale.
Compliance Time
Condition
 Action
Threshold
 Grace period
Repetitive
Interval
Config . 001
 Do a Special Detailed
Inspection of the
LH/RH Engine Pylon
Pre-repair and Pre-SB
54-0080 Refer to
Subtask
540073-832-001-001
10,900 FC
 None
 None
Do Re-Inspection of
the LH/RH Engine
Pylon Pre-repair and
Pre-SB 54-0080 Refer
to Subtask
540073-832-001-001
None
 None
 6,700 FC
Or
Apply the SB 54-0080
 Before next
flight
None
 None
And
No crack found
Do a Special Detailed
Inspection of the
LH/RH Engine Pylon
Post SB 54-0080
Refer to Subtask
540073-832-009-001
(Task
540073-832-805-001)
Refer to table 2
Crack found
 Do a special Detailed
Inspection of the
LH/RH Engine Pylon
without the aluminium
spray protection Refer
to Subtask
540073-832-005-001
Before next
flight
None
 None
DATE: Oct 15/93 SERVICE BULLETIN No.: A300-54-0073
REVISION No.: 03 - Oct 11/12 Page: 8
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 29

@A300
SERVICE BULLETIN
Compliance Time
Condition
 Action
Threshold
 Grace period
Repetitive
Interval
Do Re-Inspection of
the LH/RH Engine
Pylon Pre-repair and
Pre-SB 54-0080 Refer
to Subtask
540073-832-001-001
None
 None
 6,700 FC
Or
Apply the SB 54-0080
 Before next
flight
None
 None
And
No crack found (After
embodiement of
Subtask
540073-832-005-001)
Do a Special Detailed
Inspection of the
LH/RH Engine Pylon
Post SB 54-0080
Refer to Subtask
540073-832-009-001
(Task
540073-832-805-001)
Refer to table 2
Install the doubler on
the LH and/or RH
Pylon Refer to
Subtask
540073-833-001-001
and/or Refer to
Subtask
540073-833-002-001
(Task
540073-833-801-001)
500 FC
 None
 None
And
Crack found =< 20
mm (0.787in.) (After
embodiement of
Subtask
540073-832-005-001)
Do a Special Detailed
Inspection of the
LH/RH Engine Pylon
Post repair Refer to
Subtask
540073-832-008-001
(Task
540073-832-804-001)
Refer to table 3
DATE: Oct 15/93 SERVICE BULLETIN No.: A300-54-0073
REVISION No.: 03 - Oct 11/12 Page: 9
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 30

@A300
SERVICE BULLETIN
Compliance Time
Condition
 Action
Threshold
 Grace period
Repetitive
Interval
Install the doubler on
the LH and/or RH
Pylon Refer to
Subtask
540073-833-001-001
and/or Refer to
Subtask
540073-833-002-001
(Task
540073-833-801-001)
250 FC
 None
 None
And
Crack found between
20 mm (0.787in.) and
25 mm (0.984in.)
(After embodiement of
Subtask
540073-832-005-001)
Do a Special Detailed
Inspection of the
LH/RH Engine Pylon
Post repair Refer to
Subtask
540073-832-008-001
(Task
540073-832-804-001)
Refer to table 3
Crack found > 25 mm
(0.984in.) (After
embodiement of
Subtask
540073-832-005-001)
Contact AIRBUS
 Before next
flight
None
 None
Table 1, Special Detailed Inspection between RIB6 and RIB7 Pre-repair and Pre-SB 54-0080.
Compliance Time
Condition
 Action
Threshold (FC or
FH whichever
occurs first)
Grace period (FC or
FH whichever occurs
first)
Repetitive
Interval (FC or
FH whichever
occurs first)
Conf . 001
SB 54-0080 is
accomplished.
Do a Special Detailed
Inspection of the LH/RH
Engine Pylon Post SB
54-0080 Refer to Subtask
540073-832-009-001
12,000 FC /
13,500 FH
500 FC see note (1)
1,000 FC see note (2)
None
Crack found.
 Contact AIRBUS
 Before next flight
 None
 None
No crack
found
Do Re-Inspection of the
LH/RH Engine Pylon Post
SB 54-0080 Refer to
Subtask
540073-832-009-001
None
 500 FC see note (1)
1,000 FC see note (2)
7,600 FC /
8,600 FH
Table 2, Special Detailed Inspection between RIB6 and RIB7 Post SB 54-0080.
DATE: Oct 15/93 SERVICE BULLETIN No.: A300-54-0073
REVISION No.: 03 - Oct 11/12 Page: 10
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 31

@A300
SERVICE BULLETIN
Compliance Time
Condition
 Action
Threshold (FC or
FH whichever
occurs first)
Grace period (FC or
FH whichever occurs
first)
Repetitive
Interval (FC or
FH whichever
occurs first)
Conf . 001
The
Installation of
the doubler
on the LH /
RH Pylon is
accomplished.
Do a Special Detailed
Inspection of the LH /RH
Engine Pylon Post repair
Refer to Subtask
540073-832-008-001.
5.200 FC /
5,900FH
500 FC see note (1)
1,000 FC see note (2)
None
Crack found
 Contact AIRBUS
 Before next flight
 None
 None
No crack
found
Do Re-Inspection of the
LH /RH Engine Pylon
Post repair Refer to
Subtask
540073-832-008-001.
None
 500 FC see note (1)
1,000 FC see note (2)
2,200 FC / 2,500
FH
Table 3, Special Detailed Inspection between RIB6 and RIB7 Post repair.
NOTE
 (1)
: For A300 GE basic pylon post SB 54-0080 with more than 31.700 FC
from first flight:
For aircraft that have already exceeded or are close to exceed the
threshold or the scheduled interval, the inspection is to be accomplished
within 500 FC after receipt of this Inspection Service Bulletin without
exceeding the requirements of previous issue of this ISB.
NOTE
 (2)
: Other Configurations of A300 GE basic pylon post SB 54-0080 or post
repair:
For aircraft that have already exceeded or are close to exceed the
threshold or the scheduled interval, the inspection is to be accomplished
within 1000 FC after receipt of this Inspection Service Bulletin without
exceeding the requirements of previous issue of this ISB.
**CONF 002
This Service Bulletin has been classified Mandatory by the issue of an Airworthiness
Directive (AD) published by the European Av iation Safety Agenc y (EASA). The AD must
be used as the reference document for the mandated accomplishment timescale.
Compliance Time
Condition
 Action
Threshold
 Grace period
Repetitive
Interval
Config . 002
 Do a Special Detailed
Inspection of the
LH/RH Engine Pylon
Pre-repair and Pre-SB
54-0080 Refer to
Subtask
540073-832-001-001
10,900 FC
 None
 None
DATE: Oct 15/93 SERVICE BULLETIN No.: A300-54-0073
REVISION No.: 03 - Oct 11/12 Page: 11
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 32

@A300
SERVICE BULLETIN
Compliance Time
Condition
 Action
Threshold
 Grace period
Repetitive
Interval
Do Re-Inspection of
the LH/RH Engine
Pylon Pre-repair and
Pre-SB 54-0080 Refer
to Subtask
540073-832-001-001
None
 None
 6,700 FC
Or
Apply the SB 54-0080
 Before next
flight
None
 None
And
No crack found
Do a Special Detailed
Inspection of the
LH/RH Engine Pylon
Post SB 54-0080
Refer to Subtask
540073-832-009-001
(Task
540073-832-805-001)
Refer to table 2
Crack found
 Do a special Detailed
Inspection of the
LH/RH Engine Pylon
without the aluminium
spray protection Refer
to Subtask
540073-832-005-001
Before next
flight
None
 None
Do Re-Inspection of
the LH/RH Engine
Pylon Pre-repair and
Pre-SB 54-0080 Refer
to Subtask
540073-832-001-001
None
 None
 6,700 FC
Or
Apply the SB 54-0080
 Before next
flight
None
 None
And
No crack found (After
embodiement of
Subtask
540073-832-005-001)
Do a Special Detailed
Inspection of the
LH/RH Engine Pylon
Post SB 54-0080
Refer to Subtask
540073-832-009-001
(Task
540073-832-805-001)
Refer to table 2
DATE: Oct 15/93 SERVICE BULLETIN No.: A300-54-0073
REVISION No.: 03 - Oct 11/12 Page: 12
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 33

@A300
SERVICE BULLETIN
Compliance Time
Condition
 Action
Threshold
 Grace period
Repetitive
Interval
Install the doubler on
the LH and/or RH
Pylon Refer to
Subtask
540073-833-001-001
and/or Refer to
Subtask
540073-833-002-001
(Task
540073-833-801-001)
500 FC
 None
 None
And
Crack found =< 20
mm (0.787in.) (After
embodiement of
Subtask
540073-832-005-001)
Do a Special Detailed
Inspection of the
LH/RH Engine Pylon
Post repair Refer to
Subtask
540073-832-008-001
(Task
540073-832-804-001)
Refer to table 3
Install the doubler on
the LH and/or RH
Pylon Refer to
Subtask
540073-833-001-001
and/or Refer to
Subtask
540073-833-002-001
(Task
540073-833-801-001)
250 FC
 None
 None
And
Crack found between
20 mm (0.787in.) and
25 mm (0.984in.)
(After embodiement of
Subtask
540073-832-005-001)
Do a Special Detailed
Inspection of the
LH/RH Engine Pylon
Post repair Refer to
Subtask
540073-832-008-001
(Task
540073-832-804-001)
Refer to table 3
Crack found > 25 mm
(0.984in.) (After
embodiement of
Subtask
540073-832-005-001)
Contact AIRBUS
 Before next
flight
None
 None
Table 1, Special Detailed Inspection between RIB6 and RIB7 Pre-repair and Pre-SB 54-0080.
DATE: Oct 15/93 SERVICE BULLETIN No.: A300-54-0073
REVISION No.: 03 - Oct 11/12 Page: 13
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 34

@A300
SERVICE BULLETIN
Compliance Time
Condition
 Action
Threshold (FC or
FH whichever
occurs first)
Grace period (FC or
FH whichever occurs
first)
Repetitive
Interval (FC or
FH whichever
occurs first)
Conf . 002
SB 54-0080 is
accomplished.
Do a Special Detailed
Inspection of the LH/RH
Engine Pylon Post SB
54-0080 Refer to Subtask
540073-832-009-001
12,000 FC /
16,300 FH
500 FC see note (1)
1,000 FC see note (2)
None
Crack found.
 Contact AIRBUS
 Before next flight
 None
 None
No crack
found
Do Re-Inspection of the
LH/RH Engine Pylon Post
SB 54-0080 Refer to
Subtask
540073-832-009-001
None
 500 FC see note (1)
1,000 FC see note (2)
7,600 FC /
10,400 FH
Table 2, Special Detailed Inspection between RIB6 and RIB7 Post SB 54-0080.
Compliance Time
Condition
 Action
Threshold (FC or
FH whichever
occurs first)
Grace period (FC or
FH whichever occurs
first)
Repetitive
Interval (FC or
FH whichever
occurs first)
Conf . 002
The
Installation of
the doubler
on the LH /
RH Pylon is
accomplished.
Do a Special Detailed
Inspection of the LH /RH
Engine Pylon Post repair
Refer to Subtask
540073-832-008-001
5,200 FC / 7,100
FH
500 FC see note (1)
1,000 FC see note (2)
None
Crack found
 Contact AIRBUS
 Before next flight
 None
 None
No crack
found
Do Re-Inspection of the
LH /RH Engine Pylon
Post repair Refer to
Subtask
540073-832-008-001
None
 500 FC see note (1)
1,000 FC see note (2)
2,200 FC / 3.100
FH
Table 3, Special Detailed Inspection between RIB6 and RIB7 Post repair.
NOTE
 (1)
: For A300 GE basic pylon post SB 54-0080 with more than 31.700 FC
from first flight:
For aircraft that have already exceeded or are close to exceed the
threshold or the scheduled interval, the inspection is to be accomplished
within 500 FC after receipt of this Inspection Service Bulletin without
exceeding the requirements of previous issue of this ISB.
NOTE
 (2)
: Other Configurations of A300 GE basic pylon post SB 54-0080 or post
repair:
DATE: Oct 15/93 SERVICE BULLETIN No.: A300-54-0073
REVISION No.: 03 - Oct 11/12 Page: 14
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 35

@A300
SERVICE BULLETIN
For aircraft that have already exceeded or are close to exceed the
threshold or the scheduled interval, the inspection is to be accomplished
within 1000 FC after receipt of this Inspection Service Bulletin without
exceeding the requirements of previous issue of this ISB.
**CONF 003
This Service Bulletin has been classified Mandatory by the issue of an Airworthiness
Directive (AD) published by the European Av iation Safety Agenc y (EASA). The AD must
be used as the reference document for the mandated accomplishment timescale.
Compliance Time
Condition
 Action
Threshold
 Grace period
Repetitive
Interval
Config . 003
 Do a Special Detailed
Inspection of the
LH/RH Engine Pylon
Pre-repair and Pre-SB
54-0080 Refer to
Subtask
540073-832-001-001
10,900 FC
 None
 None
Do Re-Inspection of
the LH/RH Engine
Pylon Pre-repair and
Pre-SB 54-0080 Refer
to Subtask
540073-832-001-001
None
 None
 6,700 FC
Or
Apply the SB 54-0080
 Before next
flight
None
 None
And
No crack found
Do a Special Detailed
Inspection of the
LH/RH Engine Pylon
Post SB 54-0080
Refer to Subtask
540073-832-009-001
(Task
540073-832-805-001)
Refer to table 2
Crack found
 Do a special Detailed
Inspection of the
LH/RH Engine Pylon
without the aluminium
spray protection Refer
to Subtask
540073-832-005-001
Before next
flight
None
 None
DATE: Oct 15/93 SERVICE BULLETIN No.: A300-54-0073
REVISION No.: 03 - Oct 11/12 Page: 15
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 36

@A300
SERVICE BULLETIN
Compliance Time
Condition
 Action
Threshold
 Grace period
Repetitive
Interval
Do Re-Inspection of
the LH/RH Engine
Pylon Pre-repair and
Pre-SB 54-0080 Refer
to Subtask
540073-832-001-001
None
 None
 6,700 FC
Or
Apply the SB 54-0080
 Before next
flight
None
 None
And
No crack found (After
embodiement of
Subtask
540073-832-005-001)
Do a Special Detailed
Inspection of the
LH/RH Engine Pylon
Post SB 54-0080
Refer to Subtask
540073-832-009-001
(Task
540073-832-805-001)
Refer to table 2
Install the doubler on
the LH and/or RH
Pylon Refer to
Subtask
540073-833-001-001
and/or Refer to
Subtask
540073-833-002-001
(Task
540073-833-801-001).
500 FC
 None
 None
And
Crack found =< 20
mm (0.787in.) (After
embodiement of
Subtask
540073-832-005-001)
Do a Special Detailed
Inspection of the
LH/RH Engine Pylon
Post repair Refer to
Subtask
540073-832-008-001
(Task
540073-832-805-001)
Refer to table 3
DATE: Oct 15/93 SERVICE BULLETIN No.: A300-54-0073
REVISION No.: 03 - Oct 11/12 Page: 16
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 37

@A300
SERVICE BULLETIN
Compliance Time
Condition
 Action
Threshold
 Grace period
Repetitive
Interval
Install the doubler on
the LH and/or RH
Pylon Refer to
Subtask
540073-833-001-001
and/or Refer to
Subtask
540073-833-002-001
(Task
540073-833-801-001)
250 FC
 None
 None
And
Crack found between
20 mm (0.787in.) and
25 mm (0.984in.)
(After embodiement of
Subtask
540073-832-005-001)
D oaS p e c i a l
Inspection of the
LH/RH Engine Pylon
Post repair Refer to
Subtask
540073-832-008-001
(Task
540073-832-805-001).
Refer to table 3
Crack found > 25 mm
(0.984in.) (After
embodiement of
Subtask
540073-832-005-001)
Contact AIRBUS
 Before next
flight
None
 None
Table 1, Special Detailed Inspection between RIB6 and RIB7 Pre-repair and Pre-SB 54-0080.
Compliance Time
Condition
 Action
Threshold (FC or
FH whichever
occurs first)
Grace period (FC or
FH whichever occurs
first)
Repetitive
Interval (FC or
FH whichever
occurs first)
SR:
12,000 FC /
26,500 FH
Conf . 003
SB 54-0080 is
accomplished.
Do a Special Detailed
Inspection of the LH/RH
Engine Pylon Post SB
54-0080 Refer to Subtask
540073-832-009-001.
LR:
13,200 FC /
19,200 FH
500 FC see note (1)
1,000 FC see note (2)
None
Crack found.
 Contact AIRBUS
 Before next flight
 None
 None
SR:
7,600 FC /
16,900 FH
No crack
found
Do Re-Inspection of the
LH/RH Engine Pylon Post
SB 54-0080 Refer to
Subtask
540073-832-009-001.
None
 500 FC see note (1)
1,000 FC see note (2)
LR:
8,400 FC /
12,200 FH
Table 2, Special Detailed Inspection between RIB6 and RIB7 Post SB 54-0080.
DATE: Oct 15/93 SERVICE BULLETIN No.: A300-54-0073
REVISION No.: 03 - Oct 11/12 Page: 17
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 38

@A300
SERVICE BULLETIN
Compliance Time
Condition
 Action
Threshold (FC or
FH whichever
occurs first)
Grace period (FC or
FH whichever occurs
first)
Repetitive
Interval (FC or
FH whichever
occurs first)
SR:
5,200 FC /
11,600FH
Conf . 003
The
Installation of
the doubler
on the LH /
RH Pylon is
accomplished.
Do a Special Detailed
Inspection of the LH /RH
Engine Pylon Post repair
Refer to Subtask
540073-832-008-001.
LR:
5,800 FC / 8,400
FH
500 FC see note (1)
1,000 FC see note (2)
None
Crack found
 Contact AIRBUS
 Before next flight
 None
 None
SR:
2,200 FC / 5,000
FH
No crack
found
Do Re-Inspection of the
LH /RH Engine Pylon
Post repair Refer to
Subtask
540073-832-008-001.
None
 500 FC see note (1)
1,000 FC see note (2)
LR:
2,500 FC / 3,600
FH
Table 3, Special Detailed Inspection between RIB6 and RIB7 Post repair.
NOTE
: For Average Flight Time (AFT - limit between Short Range (SR) and
Long Range (LR)) configuration refer to Airworthiness Limitation Item
Documentation Section B.
NOTE
 (1)
: For A300 GE basic pylon post SB 54-0080 with more than 31.700 FC
from first flight:
For aircraft that have already exceeded or are close to exceed the
threshold or the scheduled interval, the inspection is to be accomplished
within 500 FC after receipt of this Inspection Service Bulletin without
exceeding the requirements of previous issue of this ISB.
NOTE
 (2)
: Other Configurations of A300 GE basic pylon post SB 54-0080 or post
repair:
For aircraft that have already exceeded or are close to exceed the
threshold or the scheduled interval, the inspection is to be accomplished
within 1000 FC after receipt of this Inspection Service Bulletin without
exceeding the requirements of previous issue of this ISB.
**CONF 004
This Service Bulletin has been classified Mandatory by the issue of an Airworthiness
Directive (AD) published by the European Av iation Safety Agenc y (EASA). The AD must
be used as the reference document for the mandated accomplishment timescale.
DATE: Oct 15/93 SERVICE BULLETIN No.: A300-54-0073
REVISION No.: 03 - Oct 11/12 Page: 18
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 39

@A300
SERVICE BULLETIN
Compliance Time
Condition
 Action
Threshold
 Grace period
Repetitive
Interval
Config . 004
 Do a Special Detailed
Inspection of the
LH/RH Engine Pylon
Pre-repair and Pre-SB
54-0080 Refer to
Subtask
540073-832-001-001
10,900 FC
 None
 None
Do Re-Inspection of
the LH/RH Engine
Pylon Pre-repair and
Pre-SB 54-0080 Refer
to Subtask
540073-832-001-001
None
 None
 6,700 FC
Or
Apply the SB 54-0080
 Before next
flight
None
 None
And
No crack found
Do a Special Detailed
Inspection of the
LH/RH Engine Pylon
Post SB 54-0080
Refer to Subtask
540073-832-009-001
(Task
540073-832-805-001)
Refer to table 2
Crack found
 Do a special Detailed
Inspection of the
LH/RH Engine Pylon
without the aluminium
spray protection Refer
to Subtask
540073-832-005-001.
Before next
flight
None
 None
DATE: Oct 15/93 SERVICE BULLETIN No.: A300-54-0073
REVISION No.: 03 - Oct 11/12 Page: 19
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 40

@A300
SERVICE BULLETIN
Compliance Time
Condition
 Action
Threshold
 Grace period
Repetitive
Interval
Do Re-Inspection of
the LH/RH Engine
Pylon Pre-repair and
Pre-SB 54-0080 Refer
to Subtask
540073-832-001-001
None
 None
 6,700 FC
Or
Apply the SB 54-0080
 Before next
flight
None
 None
And
No crack found (After
embodiement of
Subtask
540073-832-005-001)
Do a Special Detailed
Inspection of the
LH/RH Engine Pylon
Post SB 54-0080
Refer to Subtask
540073-832-009-001
(Task
540073-832-805-001)
Refer to table 2
Install the doubler on
the LH and/or RH
Pylon Refer to
Subtask
540073-833-001-001
and/or Refer to
Subtask
540073-833-002-001
(Task
540073-833-801-001)
500 FC
 None
 None
And
Crack found =< 30
mm (1.181in.) (After
embodiement of
Subtask
540073-832-005-001)
Do a Special Detailed
Inspection of the
LH/RH Engine Pylon
Post repair Refer to
Subtask
540073-832-008-001
(Task
540073-832-804-001)
Refer to table 3
DATE: Oct 15/93 SERVICE BULLETIN No.: A300-54-0073
REVISION No.: 03 - Oct 11/12 Page: 20
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 41

@A300
SERVICE BULLETIN
Compliance Time
Condition
 Action
Threshold
 Grace period
Repetitive
Interval
Install the doubler on
the LH and/or RH
Pylon Refer to
Subtask
540073-833-001-001
and/or Refer to
Subtask
540073-833-002-001
(Task
540073-833-801-001)
250 FC
 None
 None
And
Crack found between
30 mm (1.181in.) and
35 mm (1.378in.)
(After embodiement of
Subtask
540073-832-005-001)
Do a Special Detailed
Inspection of the
LH/RH Engine Pylon
Post repair Refer to
Subtask
540073-832-008-001
(Task
540073-832-804-001)
Refer to table 3
Crack found > 35 mm
(1.378in.) (After
embodiement of
Subtask
540073-832-005-001)
Contact AIRBUS
 Before next
flight
None
 None
Table 1, Special Detailed Inspection between RIB6 and RIB7 Pre-repair and Pre-SB 54-0080.
Compliance Time
Condition
 Action
Threshold (FC or
FH whichever
occurs first)
Grace period (FC or
FH whichever occurs
first)
Repetitive
Interval (FC or
FH whichever
occurs first)
Conf . 004
SB 54-0080 is
accomplished.
Do a Special Detailed
Inspection of the LH/RH
Engine Pylon Post SB
54-0080 Refer to Subtask
540073-832-009-001.
12,200 FC /
13,800 FH
500 FC see note (1)
1,000 FC see note (2)
None
Crack found.
 Contact AIRBUS
 Before next flight
 None
 None
No crack
found
Do Re-Inspection of the
LH/RH Engine Pylon Post
SB 54-0080 Refer to
Subtask
540073-832-009-001.
None
 500 FC see note (1)
1,000 FC see note (2)
7,200 FC /
8,200 FH
Table 2, Special Detailed Inspection between RIB6 and RIB7 Post SB 54-0080.
DATE: Oct 15/93 SERVICE BULLETIN No.: A300-54-0073
REVISION No.: 03 - Oct 11/12 Page: 21
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 42

@A300
SERVICE BULLETIN
Compliance Time
Condition
 Action
Threshold (FC or
FH whichever
occurs first)
Grace period (FC or
FH whichever occurs
first)
Repetitive
Interval (FC or
FH whichever
occurs first)
Conf . 004
The
Installation of
the doubler
on the LH /
RH Pylon is
accomplished.
Do a Special Detailed
Inspection of the LH /RH
Engine Pylon Post repair
Refer to Subtask
540073-832-008-001.
6,000 FC /
6,800FH
500 FC see note (1)
1,000 FC see note (2)
None
Crack found
 Contact AIRBUS
 Before next flight
 None
 None
No crack
found
Do Re-Inspection of the
LH /RH Engine Pylon
Post repair Refer to
Subtask
540073-832-008-001.
None
 500 FC see note (1)
1,000 FC see note (2)
3,100 FC / 3,500
FH
Table 3, Special Detailed Inspection between RIB6 and RIB7 Post repair.
NOTE
 (1)
: For repaired A300 GE polyvalent pylon with more than 33.100 FC from
repair embodiment:
For aircraft that have already exceeded or are close to exceed the
threshold or the scheduled interval, the inspection is to be accomplished
within 500 FC after receipt of this Inspection Service Bulletin without
exceeding the requirements of previous issue of this ISB.
NOTE
 (2)
: Other Configurations of A300 GE basic pylon post SB 54-0080 or post
repair:
For aircraft that have already exceeded or are close to exceed the
threshold or the scheduled interval, the inspection is to be accomplished
within 1000 FC after receipt of this Inspection Service Bulletin without
exceeding the requirements of previous issue of this ISB.
**CONF 005
This Service Bulletin has been classified Mandatory by the issue of an Airworthiness
Directive (AD) published by the European Av iation Safety Agenc y (EASA). The AD must
be used as the reference document for the mandated accomplishment timescale.
Compliance Time
Condition
 Action
Threshold
 Grace period
Repetitive
Interval
Config . 005
 Do a Special Detailed
Inspection of the
LH/RH Engine Pylon
Pre-repair and Pre-SB
54-0080 Refer to
Subtask
540073-832-001-001
10,900 FC
 None
 None
DATE: Oct 15/93 SERVICE BULLETIN No.: A300-54-0073
REVISION No.: 03 - Oct 11/12 Page: 22
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 43

@A300
SERVICE BULLETIN
Compliance Time
Condition
 Action
Threshold
 Grace period
Repetitive
Interval
Do Re-Inspection of
the LH/RH Engine
Pylon Pre-repair and
Pre-SB 54-0080 Refer
to Subtask
540073-832-001-001
None
 None
 6,700 FC
Or
Apply the SB 54-0080
 Before next
flight
None
 None
And
No crack found
Do a Special Detailed
Inspection of the
LH/RH Engine Pylon
Post SB 54-0080
Refer to Subtask
540073-832-009-001
(Task
540073-832-805-001)
Refer to table 2
Crack found
 Do a special Detailed
Inspection of the
LH/RH Engine Pylon
without the aluminium
spray protection Refer
to Subtask
540073-832-005-001
Before next
flight
None
 None
Do Re-Inspection of
the LH/RH Engine
Pylon Pre-repair and
Pre-SB 54-0080 Refer
to Subtask
540073-832-001-001
None
 None
 6,700 FC
Or
Apply the SB 54-0080
 Before next
flight
None
 None
And
No crack found (After
embodiement of
Subtask
540073-832-005-001)
D oaS p e c i a l
Inspection of the
LH/RH Engine Pylon
Post SB 54-0080
Refer to Subtask
540073-832-009-001
(Task
540073-832-805-001)
Refer to table 2
DATE: Oct 15/93 SERVICE BULLETIN No.: A300-54-0073
REVISION No.: 03 - Oct 11/12 Page: 23
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 44

@A300
SERVICE BULLETIN
Compliance Time
Condition
 Action
Threshold
 Grace period
Repetitive
Interval
Install the doubler on
the LH and/or RH
Pylon Refer to
Subtask
540073-833-001-001
and/or Refer to
Subtask
540073-833-002-001
(Task
540073-833-801-001)
500 FC
 None
 None
And
Crack found =< 30
mm (1.181in.) (After
embodiement of
Subtask
540073-832-005-001)
Do a Special Detailed
Inspection of the
LH/RH Engine Pylon
Post repair Refer to
Subtask
540073-832-008-001
(Task
540073-832-804-001)
Refer to table 3
Install the doubler on
the LH and/or RH
Pylon Refer to
Subtask
540073-833-001-001
and/or Refer to
Subtask
540073-833-002-001
(Task
540073-833-801-001)
250 FC
 None
 None
And
Crack found between
30 mm (1.181in.) and
35 mm (1.378in.)
(After embodiement of
Subtask
540073-832-005-001)
Do a Special Detailed
Inspection of the
LH/RH Engine Pylon
Post repair Refer to
Subtask
540073-832-008-001
(Task
540073-832-804-001)
Refer to table 3
Crack found > 35 mm
(1.378in.) (After
embodiement of
Subtask
540073-832-005-001)
Contact AIRBUS
 Before next
flight
None
 None
Table 1, Special Detailed Inspection between RIB6 and RIB7 Pre-repair and Pre-SB 54-0080.
DATE: Oct 15/93 SERVICE BULLETIN No.: A300-54-0073
REVISION No.: 03 - Oct 11/12 Page: 24
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 45

@A300
SERVICE BULLETIN
Compliance Time
Condition
 Action
Threshold (FC or
FH whichever
occurs first)
Grace period (FC or
FH whichever occurs
first)
Repetitive
Interval (FC or
FH whichever
occurs first)
Conf . 005
SB 54-0080 is
accomplished.
Do a Special Detailed
Inspection of the LH/RH
Engine Pylon Post SB
54-0080 Refer to Subtask
540073-832-009-001
12,200 FC /
16,700 FH
500 FC see note (1)
1,000 FC see note (2)
None
Crack found.
 Contact AIRBUS
 Before next flight
 None
 None
No crack
found
Do Re-Inspection of the
LH/RH Engine Pylon Post
SB 54-0080 Refer to
Subtask
540073-832-009-001
None
 500 FC see note (1)
1,000 FC see note (2)
7,200 FC /
9,800 FH
Table 2, Special Detailed Inspection between RIB6 and RIB7 Post SB 54-0080.
Compliance Time
Condition
 Action
Threshold (FC or
FH whichever
occurs first)
Grace period (FC or
FH whichever occurs
first)
Repetitive
Interval (FC or
FH whichever
occurs first)
Conf . 005
The
Installation of
the doubler
on the LH /
RH Pylon is
accomplished.
Do a Special Detailed
Inspection of the LH /RH
Engine Pylon Post repair
Refer to Subtask
540073-832-008-001
6,000 FC /
8,200FH
500 FC see note (1)
1,000 FC see note (2)
None
Crack found
 Contact AIRBUS
 Before next flight
 None
 None
No crack
found
Do Re-Inspection of the
LH /RH Engine Pylon
Post repair Refer to
Subtask
540073-832-008-001
None
 500 FC see note (1)
1,000 FC see note (2)
3,100 FC / 4,200
FH
Table 3, Special Detailed Inspection between RIB6 and RIB7 Post repair.
NOTE
 (1)
: For repaired A300 GE polyvalent pylon with more than 33.100 FC from
repair embodiment:
For aircraft that have already exceeded or are close to exceed the
threshold or the scheduled interval, the inspection is to be accomplished
within 500 FC after receipt of this Inspection Service Bulletin without
exceeding the requirements of previous issue of this ISB.
NOTE
 (2)
: Other Configurations of A300 GE basic pylon post SB 54-0080 or post
repair:
DATE: Oct 15/93 SERVICE BULLETIN No.: A300-54-0073
REVISION No.: 03 - Oct 11/12 Page: 25
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 46

@A300
SERVICE BULLETIN
For aircraft that have already exceeded or are close to exceed the
threshold or the scheduled interval, the inspection is to be accomplished
within 1000 FC after receipt of this Inspection Service Bulletin without
exceeding the requirements of previous issue of this ISB.
**CONF 006
This Service Bulletin has been classified Mandatory by the issue of an Airworthiness
Directive (AD) published by the European Av iation Safety Agenc y (EASA). The AD must
be used as the reference document for the mandated accomplishment timescale.
Compliance Time
Condition
 Action
Threshold
 Grace period
Repetitive
Interval
Config . 006
 Do a Special Detailed
Inspection of the
LH/RH Engine Pylon
Pre-repair and Pre-SB
54-0080 Refer to
Subtask
540073-832-001-001
10,900 FC
 None
 None
Do Re-Inspection of
the LH/RH Engine
Pylon Pre-repair and
Pre-SB 54-0080 Refer
to Subtask
540073-832-001-001
None
 None
 6,700 FC
Or
Apply the SB 54-0080
 Before next
flight
None
 None
And
No crack found
Do a Special Detailed
Inspection of the
LH/RH Engine Pylon
Post SB 54-0080
Refer to Subtask
540073-832-009-001
(Task
540073-832-805-001)
Refer to table 2
Crack found
 Do a special Detailed
Inspection of the
LH/RH Engine Pylon
without the aluminium
spray protection Refer
to Subtask
540073-832-005-001.
Before next
flight
None
 None
DATE: Oct 15/93 SERVICE BULLETIN No.: A300-54-0073
REVISION No.: 03 - Oct 11/12 Page: 26
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 47

@A300
SERVICE BULLETIN
Compliance Time
Condition
 Action
Threshold
 Grace period
Repetitive
Interval
Do Re-Inspection of
the LH/RH Engine
Pylon Pre-repair and
Pre-SB 54-0080 Refer
to Subtask
540073-832-001-001
None
 None
 6,700 FC
Or
Apply the SB 54-0080
 Before next
flight
None
 None
And
No crack found (After
embodiement of
Subtask
540073-832-005-001)
Do a Special Detailed
Inspection of the
LH/RH Engine Pylon
Post SB 54-0080
Refer to Subtask
540073-832-009-001.
Refer to table 2
Install the doubler on
the LH and/or RH
Pylon Refer to
Subtask
540073-833-001-001
and/or Refer to
Subtask
540073-833-002-001
(Task
540073-833-801-001)
500 FC
 None
 None
And
Crack found =< 30
mm (1.181in.) (After
embodiement of
Subtask
540073-832-005-001)
Do a Special Detailed
Inspection of the
LH/RH Engine Pylon
Post repair Refer to
Subtask
540073-832-008-001.
Refer to table 3
DATE: Oct 15/93 SERVICE BULLETIN No.: A300-54-0073
REVISION No.: 03 - Oct 11/12 Page: 27
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 48

@A300
SERVICE BULLETIN
Compliance Time
Condition
 Action
Threshold
 Grace period
Repetitive
Interval
Install the doubler on
the LH and/or RH
Pylon Refer to
Subtask
540073-833-001-001
and/or Refer to
Subtask
540073-833-002-001
(Task
540073-833-801-001)
250 FC
 None
 None
And
Crack found between
30 mm (1.181in.) and
35 mm (1.378in.)
(After embodiement of
Subtask
540073-832-005-001)
Do a Special Detailed
Inspection of the
LH/RH Engine Pylon
Post repair Refer to
Subtask
540073-832-008-001.
Refer to table 3
Crack found > 35 mm
(1.378in.) (After
embodiement of
Subtask
540073-832-005-001)
Contact AIRBUS
 Before next
flight
None
 None
Table 1, Special Detailed Inspection between RIB6 and RIB7 Pre-repair and Pre-SB 54-0080.
Compliance Time
Condition
 Action
Threshold (FC or
FH whichever
occurs first)
Grace period (FC or
FH whichever occurs
first)
Repetitive
Interval (FC or
FH whichever
occurs first)
SR:
12,200 FC /
27,100 FH
Conf . 006
SB 54-0080 is
accomplished.
Do a Special Detailed
Inspection of the LH/RH
Engine Pylon Post SB
54-0080 Refer to Subtask
540073-832-009-001.
LR:
13,500 FC /
19,600 FH
500 FC see note (1)
1,000 FC see note (2)
None
Crack found.
 Contact AIRBUS
 Before next flight
 None
 None
SR:
7,200 FC /
16,000 FH
No crack
found
Do Re-Inspection of the
LH/RH Engine Pylon Post
SB 54-0080 Refer to
Subtask
540073-832-009-001.
None
 500 FC see note (1)
1,000 FC see note (2)
LR:
7,900 FC /
11,600 FH
Table 2, Special Detailed Inspection between RIB6 and RIB7 Post SB 54-0080.
DATE: Oct 15/93 SERVICE BULLETIN No.: A300-54-0073
REVISION No.: 03 - Oct 11/12 Page: 28
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 49

@A300
SERVICE BULLETIN
Compliance Time
Condition
 Action
Threshold (FC or
FH whichever
occurs first)
Grace period (FC or
FH whichever occurs
first)
Repetitive
Interval (FC or
FH whichever
occurs first)
SR:
6,000 FC /
13,400FH
Conf . 006
The
Installation of
the doubler
on the LH /
RH Pylon is
accomplished.
Do a Special Detailed
Inspection of the LH /RH
Engine Pylon Post repair
Refer to Subtask
540073-832-008-001.
LR:
6,600 FC / 9,700
FH
500 FC see note (1)
1,000 FC see note (2)
None
Crack found
 Contact AIRBUS
 Before next flight
 None
 None
SR:
3,100 FC / 6,900
FH
No crack
found
Do Re-Inspection of the
LH /RH Engine Pylon
Post repair Refer to
Subtask
540073-832-008-001.
None
 500 FC see note (1)
1,000 FC see note (2)
LR:
3,400 FC / 5,000
FH
Table 3, Special Detailed Inspection between RIB6 and RIB7 Post repair.
NOTE
: For Average Flight Time (AFT - limit between Short Range (SR) and
Long Range (LR)) configuration refer to Airworthiness Limitation Item
Documentation Section B.
NOTE
 (1)
: For repaired A300 GE polyvalent pylon with more than 33.100 FC from
repair embodiment:
For aircraft that have already exceeded or are close to exceed the
threshold or the scheduled interval, the inspection is to be accomplished
within 500 FC after receipt of this Inspection Service Bulletin without
exceeding the requirements of previous issue of this ISB.
NOTE
 (2)
: Other Configurations of A300 GE basic pylon post SB 54-0080 or post
repair:
For aircraft that have already exceeded or are close to exceed the
threshold or the scheduled interval, the inspection is to be accomplished
within 1000 FC after receipt of this Inspection Service Bulletin without
exceeding the requirements of previous issue of this ISB.
**CONF 007
This Service Bulletin has been classified Mandatory by the issue of an Airworthiness
Directive (AD) published by the European Av iation Safety Agenc y (EASA). The AD must
be used as the reference document for the mandated accomplishment timescale.
DATE: Oct 15/93 SERVICE BULLETIN No.: A300-54-0073
REVISION No.: 03 - Oct 11/12 Page: 29
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 50

@A300
SERVICE BULLETIN
Compliance Time
Condition
 Action
Threshold
 Grace period
Repetitive
Interval
Config . 007
 Do a Special Detailed
Inspection of the
LH/RH Engine Pylon
Pre-repair and Pre-SB
54-0080 Refer to
Subtask
540073-832-001-001
8,600 FC
 None
 None
Do Re-Inspection of
the LH/RH Engine
Pylon Pre-repair and
Pre-SB 54-0080 Refer
to Subtask
540073-832-001-001
None
 None
 5,700 FC
Or
Apply the SB 54-0080
 Before next
flight
None
 None
And
No crack found
Do a Special Detailed
Inspection of the
LH/RH Engine Pylon
Post SB 54-0080
Refer to Subtask
540073-832-009-001
(Task
540073-832-805-001)
Refer to table 2
Crack found
 Do a special Detailed
Inspection of the
LH/RH Engine Pylon
without the aluminium
spray protection Refer
to Subtask
540073-832-005-001
Before next
flight
None
 None
DATE: Oct 15/93 SERVICE BULLETIN No.: A300-54-0073
REVISION No.: 03 - Oct 11/12 Page: 30
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 51

@A300
SERVICE BULLETIN
Compliance Time
Condition
 Action
Threshold
 Grace period
Repetitive
Interval
Do Re-Inspection of
the LH/RH Engine
Pylon Pre-repair and
Pre-SB 54-0080 Refer
to Subtask
540073-832-001-001
None
 None
 5,700 FC
Or
Apply the SB 54-0080
 Before next
flight
None
 None
And
No crack found (After
embodiement of
Subtask
540073-832-005-001)
Do a Special Detailed
Inspection of the
LH/RH Engine Pylon
Post SB 54-0080
Refer to Subtask
540073-832-009-001
(Task
540073-832-805-001)
Refer to table 2
Install the doubler on
the LH and/or RH
Pylon Refer to
Subtask
540073-833-001-001
and/or Refer to
Subtask
540073-833-002-001
(Task
540073-833-801-001)
500 FC
 None
 None
And
Crack found =< 30
mm (1.181in.) (After
embodiement of
Subtask
540073-832-005-001)
Do a Special Detailed
Inspection of the
LH/RH Engine Pylon
Post repair Refer to
Subtask
540073-832-008-001.
Refer to table 3
DATE: Oct 15/93 SERVICE BULLETIN No.: A300-54-0073
REVISION No.: 03 - Oct 11/12 Page: 31
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 52

@A300
SERVICE BULLETIN
Compliance Time
Condition
 Action
Threshold
 Grace period
Repetitive
Interval
Install the doubler on
the LH and/or RH
Pylon Refer to
Subtask
540073-833-001-001
and/or Refer to
Subtask
540073-833-002-001
(Task
540073-833-801-001)
250 FC
 None
 None
And
Crack found between
30 mm (1.181in.) and
35 mm (1.378in.)
(After embodiement of
Subtask
540073-832-005-001)
Do a Special Detailed
Inspection of the
LH/RH Engine Pylon
Post repair Refer to
Subtask
540073-832-008-001
Refer to table 3
Crack found > 35 mm
(1.378in.) (After
embodiement of
Subtask
540073-832-005-001)
Contact AIRBUS
 Before next
flight
None
 None
Table 1, Special Detailed Inspection between RIB6 and RIB7 Pre-repair and Pre-SB 54-0080.
Compliance Time
Condition
 Action
Threshold (FC or
FH whichever
occurs first)
Grace period (FC or
FH whichever occurs
first)
Repetitive
Interval (FC or
FH whichever
occurs first)
Conf . 007
SB 54-0080 is
accomplished.
Do a Special Detailed
Inspection of the LH/RH
Engine Pylon Post SB
54-0080 Refer to Subtask
540073-832-009-001.
13,000 FC /
17,800 FH
500 FC see note (1)
1,000 FC see note (2)
None
Crack found.
 Contact AIRBUS
 Before next flight
 None
 None
No crack
found
Do Re-Inspection of the
LH/RH Engine Pylon Post
SB 54-0080 Refer to
Subtask
540073-832-009-001.
None
 500 FC see note (1)
1,000 FC see note (2)
7,700 FC /
10,500 FH
Table 2, Special Detailed Inspection between RIB6 and RIB7 Post SB 54-0080.
DATE: Oct 15/93 SERVICE BULLETIN No.: A300-54-0073
REVISION No.: 03 - Oct 11/12 Page: 32
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 53

@A300
SERVICE BULLETIN
Compliance Time
Condition
 Action
Threshold (FC or
FH whichever
occurs first)
Grace period (FC or
FH whichever occurs
first)
Repetitive
Interval (FC or
FH whichever
occurs first)
Conf . 007
The
Installation of
the doubler
on the LH /
RH Pylon is
accomplished.
Do a Special Detailed
Inspection of the LH /RH
Engine Pylon Post repair
Refer to Subtask
540073-832-008-001.
6,400 FC / 8,700
FH
500 FC see note (1)
1,000 FC see note (2)
None
Crack found
 Contact AIRBUS
 Before next flight
 None
 None
No crack
found
Do Re-Inspection of the
LH /RH Engine Pylon
Post repair Refer to
Subtask
540073-832-008-001.
None
 500 FC see note (1)
1,000 FC see note (2)
3,300 FC / 4,500
FH
Table 3, Special Detailed Inspection between RIB6 and RIB7 Post repair.
NOTE
 (1)
: For repaired A300 PW polyvalent pylon with more than 33.100 FC from
repair embodiment:
For aircraft that have already exceeded or are close to exceed the
threshold or the scheduled interval, the inspection is to be accomplished
within 500 FC after receipt of this Inspection Service Bulletin without
exceeding the requirements of previous issue of this ISB.
NOTE
 (2)
: Other Configurations of A300 GE basic pylon post SB 54-0080 or post
repair:
For aircraft that have already exceeded or are close to exceed the
threshold or the scheduled interval, the inspection is to be accomplished
within 1000 FC after receipt of this Inspection Service Bulletin without
exceeding the requirements of previous issue of this ISB.
**CONF ALL
F. APPROVAL
The technical content of this document is approved under the authority of Design
Organisation Approval No. EASA.21J.031.
If an aircraft listed in the effectivity has a modification or repair embodied that is not of
AIRBUS origin, and which affects the content of this Service Bulletin, the operator is
responsible for obtaining approval by its airworthiness authority for any adaptation necessary
before incorporation of the Service Bulletin.
DATE: Oct 15/93 SERVICE BULLETIN No.: A300-54-0073
REVISION No.: 03 - Oct 11/12 Page: 33
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 54

@A300
SERVICE BULLETIN
G. MANPOWER
The manpower estimates given in this Service Bulletin are based on the direct labor cost to
do the work. These estimates assume that the work will be done by experienced personnel,
and may need to be revised upwards to suit operator’s circumstances. The estimates do not
include the time to prepare, plan or inspect the work. Manufacture and procurement of parts
and tools, drying times for paints, sealants, etc., and general administration work are also not
included.
**CONF 001
Task 540073-832-801-001: Inspection Pre Repair and Pre Service Bulletin No.A300-54-0080
Get Access
 1.50
On Aircraft
Do a Special Detailed Inspection of the LH / RH
Engine Pylon Pre-repair and Pre-SB 54-0080.
1.00
Do a Special Detailed Inspection of the LH / RH
Engine Pylon without protection.
2.00
Tests
 1.00
Close-Up
 1.50
TOTAL MANHOURS
 7.00
ELAPSED TIME (HOURS)
 7.00
NOTE
: These values are valid only for one pylon.
Task 540073-832-804-001: Inspection Post Repair
Get Access
 1.50
On Aircraft
Do a Special Detailed Inspection of the LH / RH
Engine Pylon Post repair.
1.00
Tests
 1.00
Close-Up
 1.50
TOTAL MANHOURS
 5.00
ELAPSED TIME (HOURS)
 5.00
NOTE
: These values are valid only for one pylon.
Task 540073-832-805-001: Inspection Post Service Bulletin No.A300-54-0080
Get Access
 1.50
On Aircraft
Do a Special Detailed Inspection of the LH / RH
Engine Pylon Post-SB 54-0080.
1.00
Tests
 1.00
Close-Up
 1.50
TOTAL MANHOURS
 5.00
ELAPSED TIME (HOURS)
 5.00
NOTE
: These values are valid only for one pylon.
DATE: Oct 15/93 SERVICE BULLETIN No.: A300-54-0073
REVISION No.: 03 - Oct 11/12 Page: 34
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 55

@A300
SERVICE BULLETIN
Task 540073-833-801-001: Repair
Get Access
 17.50
On Aircraft
Install the doubler on the LH Pylon
 7.50
Install the doubler on the RH Pylon
 7.50
Tests
 5.00
Close-Up
 23.00
TOTAL MANHOURS
 60.50
ELAPSED TIME (HOURS)
 53.00
NOTE
: These values are valid only for one pylon.
**CONF 002
Task 540073-832-801-001: Inspection Pre Repair and Pre Service Bulletin No.A300-54-0080
Get Access
 1.50
On Aircraft
Do a Special Detailed Inspection of the LH / RH
Engine Pylon Pre-repair and Pre-SB 54-0080.
1.00
Do a Special Detailed Inspection of the LH / RH
Engine Pylon without protection.
2.00
Tests
 1.00
Close-Up
 1.50
TOTAL MANHOURS
 7.00
ELAPSED TIME (HOURS)
 7.00
NOTE
: These values are valid only for one pylon.
Task 540073-832-804-001: Inspection Post Repair
Get Access
 1.50
On Aircraft
Do a Special Detailed Inspection of the LH / RH
Engine Pylon Post repair.
1.00
Tests
 1.00
Close-Up
 1.50
TOTAL MANHOURS
 5.00
ELAPSED TIME (HOURS)
 5.00
NOTE
: These values are valid only for one pylon.
Task 540073-832-805-001: Inspection Post Service Bulletin No.A300-54-0080
Get Access
 1.50
On Aircraft
Do a Special Detailed Inspection of the LH / RH
Engine Pylon Post-SB 54-0080.
1.00
Tests
 1.00
Close-Up
 1.50
DATE: Oct 15/93 SERVICE BULLETIN No.: A300-54-0073
REVISION No.: 03 - Oct 11/12 Page: 35
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 56

@A300
SERVICE BULLETIN
Task 540073-832-805-001: Inspection Post Service Bulletin No.A300-54-0080
TOTAL MANHOURS
 5.00
ELAPSED TIME (HOURS)
 5.00
NOTE
: These values are valid only for one pylon.
Task 540073-833-801-001: Repair
Get Access
 17.50
On Aircraft
Install the doubler on the LH Pylon
 7.50
Install the doubler on the RH Pylon
 7.50
Tests
 5.00
Close-Up
 23.00
TOTAL MANHOURS
 60.50
ELAPSED TIME (HOURS)
 53.00
NOTE
: These values are valid only for one pylon.
**CONF 003
Task 540073-832-801-001: Inspection Pre Repair and Pre Service Bulletin No.A300-54-0080
Get Access
 1.50
On Aircraft
Do a Special Detailed Inspection of the LH / RH
Engine Pylon Pre-repair and Pre-SB 54-0080.
1.00
Do a Special Detailed Inspection of the LH / RH
Engine Pylon without protection.
2.00
Tests
 1.00
Close-Up
 1.50
TOTAL MANHOURS
 7.00
ELAPSED TIME (HOURS)
 7.00
NOTE
: These values are valid only for one pylon.
Task 540073-832-804-001: Inspection Post Repair
Get Access
 1.50
On Aircraft
Do a Special Detailed Inspection of the LH / RH
Engine Pylon Post repair.
1.00
Tests
 1.00
Close-Up
 1.50
TOTAL MANHOURS
 5.00
ELAPSED TIME (HOURS)
 5.00
NOTE
: These values are valid only for one pylon.
Task 540073-832-805-001: Inspection Post Service Bulletin No.A300-54-0080
Get Access
 1.50
DATE: Oct 15/93 SERVICE BULLETIN No.: A300-54-0073
REVISION No.: 03 - Oct 11/12 Page: 36
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 57

@A300
SERVICE BULLETIN
Task 540073-832-805-001: Inspection Post Service Bulletin No.A300-54-0080
On Aircraft
Do a Special Detailed Inspection of the LH / RH
Engine Pylon Post-SB 54-0080.
1.00
Tests
 1.00
Close-Up
 1.50
TOTAL MANHOURS
 5.00
ELAPSED TIME (HOURS)
 5.00
NOTE
: These values are valid only for one pylon.
Task 540073-833-801-001: Repair
Get Access
 17.50
On Aircraft
Install the doubler on the LH Pylon
 7.50
Install the doubler on the RH Pylon
 7.50
Tests
 5.00
Close-Up
 23.00
TOTAL MANHOURS
 60.50
ELAPSED TIME (HOURS)
 53.00
NOTE
: These values are valid only for one pylon.
**CONF 004
Task 540073-832-801-001: Inspection Pre Repair and Pre Service Bulletin No.A300-54-0080
Get Access
 1.50
On Aircraft
Do a Special Detailed Inspection of the LH / RH
Engine Pylon Pre-repair and Pre-SB 54-0080.
1.00
Do a Special Detailed Inspection of the LH / RH
Engine Pylon without protection.
2.00
Tests
 1.00
Close-Up
 1.50
TOTAL MANHOURS
 7.00
ELAPSED TIME (HOURS)
 7.00
NOTE
: These values are valid only for one pylon.
Task 540073-832-804-001: Inspection Post Repair
Get Access
 1.50
On Aircraft
Do a Special Detailed Inspection of the LH / RH
Engine Pylon Post repair.
1.00
Tests
 1.00
Close-Up
 1.50
TOTAL MANHOURS
 5.00
DATE: Oct 15/93 SERVICE BULLETIN No.: A300-54-0073
REVISION No.: 03 - Oct 11/12 Page: 37
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 58

@A300
SERVICE BULLETIN
Task 540073-832-804-001: Inspection Post Repair
ELAPSED TIME (HOURS)
 5.00
NOTE
: These values are valid only for one pylon.
Task 540073-832-805-001: Inspection Post Service Bulletin No.A300-54-0080
Get Access
 1.50
On Aircraft
Do a Special Detailed Inspection of the LH / RH
Engine Pylon Post-SB 54-0080.
1.00
Tests
 1.00
Close-Up
 1.50
TOTAL MANHOURS
 5.00
ELAPSED TIME (HOURS)
 5.00
NOTE
: These values are valid only for one pylon.
Task 540073-833-801-001: Repair
Get Access
 17.50
On Aircraft
Install the doubler on the LH Pylon
 7.50
Install the doubler on the RH Pylon
 7.50
Tests
 5.00
Close-Up
 23.00
TOTAL MANHOURS
 60.50
ELAPSED TIME (HOURS)
 53.00
NOTE
: These values are valid only for one pylon.
**CONF 005
Task 540073-832-801-001: Inspection Pre Repair and Pre Service Bulletin No.A300-54-0080
Get Access
 1.50
On Aircraft
Do a Special Detailed Inspection of the LH / RH
Engine Pylon Pre-repair and Pre-SB 54-0080.
1.00
Do a Special Detailed Inspection of the LH / RH
Engine Pylon without protection.
2.00
Tests
 1.00
Close-Up
 1.50
TOTAL MANHOURS
 7.00
ELAPSED TIME (HOURS)
 7.00
NOTE
: These values are valid only for one pylon.
Task 540073-832-804-001: Inspection Post Repair
Get Access
 1.50
On Aircraft
DATE: Oct 15/93 SERVICE BULLETIN No.: A300-54-0073
REVISION No.: 03 - Oct 11/12 Page: 38
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 59

@A300
SERVICE BULLETIN
Task 540073-832-804-001: Inspection Post Repair
Do a Special Detailed Inspection of the LH / RH
Engine Pylon Post repair.
1.00
Tests
 1.00
Close-Up
 1.50
TOTAL MANHOURS
 5.00
ELAPSED TIME (HOURS)
 5.00
NOTE
: These values are valid only for one pylon.
Task 540073-832-805-001: Inspection Post Service Bulletin No.A300-54-0080
Get Access
 1.50
On Aircraft
Do a Special Detailed Inspection of the LH / RH
Engine Pylon Post-SB 54-0080.
1.00
Tests
 1.00
Close-Up
 1.50
TOTAL MANHOURS
 5.00
ELAPSED TIME (HOURS)
 5.00
NOTE
: These values are valid only for one pylon.
Task 540073-833-801-001: Repair
Get Access
 17.50
On Aircraft
Install the doubler on the LH Pylon
 7.50
Install the doubler on the RH Pylon
 7.50
Tests
 5.00
Close-Up
 23.00
TOTAL MANHOURS
 60.50
ELAPSED TIME (HOURS)
 53.00
NOTE
: These values are valid only for one pylon.
**CONF 006
Task 540073-832-801-001: Inspection Pre Repair and Pre Service Bulletin No.A300-54-0080
Get Access
 1.50
On Aircraft
Do a Special Detailed Inspection of the LH / RH
Engine Pylon Pre-repair and Pre-SB 54-0080.
1.00
Do a Special Detailed Inspection of the LH / RH
Engine Pylon without protection.
2.00
Tests
 1.00
Close-Up
 1.50
TOTAL MANHOURS
 7.00
ELAPSED TIME (HOURS)
 7.00
DATE: Oct 15/93 SERVICE BULLETIN No.: A300-54-0073
REVISION No.: 03 - Oct 11/12 Page: 39
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 60

@A300
SERVICE BULLETIN
NOTE
: These values are valid only for one pylon.
Task 540073-832-804-001: Inspection Post Repair
Get Access
 1.50
On Aircraft
Do a Special Detailed Inspection of the LH / RH
Engine Pylon Post repair.
1.00
Tests
 1.00
Close-Up
 1.50
TOTAL MANHOURS
 5.00
ELAPSED TIME (HOURS)
 5.00
NOTE
: These values are valid only for one pylon.
Task 540073-832-805-001: Inspection Post Service Bulletin No.A300-54-0080
Get Access
 1.50
On Aircraft
Do a Special Detailed Inspection of the LH / RH
Engine Pylon Post-SB 54-0080.
1.00
Tests
 1.00
Close-Up
 1.50
TOTAL MANHOURS
 5.00
ELAPSED TIME (HOURS)
 5.00
NOTE
: These values are valid only for one pylon.
Task 540073-833-801-001: Repair
Get Access
 17.50
On Aircraft
Install the doubler on the LH Pylon
 7.50
Install the doubler on the RH Pylon
 7.50
Tests
 5.00
Close-Up
 23.00
TOTAL MANHOURS
 60.50
ELAPSED TIME (HOURS)
 53.00
NOTE
: These values are valid only for one pylon.
**CONF 007
Task 540073-832-801-001: Inspection Pre Repair and Pre Service Bulletin No.A300-54-0080
Get Access
 1.50
On Aircraft
Do a Special Detailed Inspection of the LH / RH
Engine Pylon Pre-repair and Pre-SB 54-0080.
1.00
Do a Special Detailed Inspection of the LH / RH
Engine Pylon without protection.
2.00
Tests
 1.00
DATE: Oct 15/93 SERVICE BULLETIN No.: A300-54-0073
REVISION No.: 03 - Oct 11/12 Page: 40
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

The text continues at https://openairdocs.org/service-documents/airbus/a300-54-0073/file/aa0b42e86d5c.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
