# Airbus Service Bulletin A300-54-0081

## Copies (2)

Copies the FAA filed in AD dockets on regulations.gov, newest revision first. A newer revision may exist.

- No revision named ("SB A300-54-0081"), 16 pages: PDF https://openairdocs.org/files/sha256/d6/96/d69623d207955db129b3089856e51f252161c06c9122c416ce0787f5c169d628; text https://openairdocs.org/service-documents/airbus/a300-54-0081/file/d69623d20795.md. Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2016-6671; AD 2016-18-12 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- No revision named ("SB-54-0081"), 16 pages: PDF https://openairdocs.org/files/sha256/cb/54/cb545c08123184b7d86bfa9f71ffb9e373b92dcbc57b88d8515759fdad4de073; text https://openairdocs.org/service-documents/airbus/a300-54-0081/file/cb545c081231.md. Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2014-0648; AD 2015-25-06 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Airbus](https://openairdocs.org/service-documents/airbus.md)
- Type: Service bulletin (Service Bulletin)
- Number: A300-54-0081
- Page: https://openairdocs.org/service-documents/airbus/a300-54-0081

## ADs that cite it (2) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2016-18-12](https://openairdocs.org/ad/2016-18-12.md), effective Oct 13, 2016: No revision named
- [AD 2015-25-06](https://openairdocs.org/ad/2015-25-06.md), effective Feb 2, 2016: No revision named

Also cited in [2 proposed ADs](https://openairdocs.org/service-documents/airbus/a300-54-0081/proposed.md).

## Text (16 pages)

No revision named, the newest copy. Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2016-6671; AD 2016-18-12 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. This text is OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1 (OCR)

CUSTOMER SERVICES DIRECTORATE  AIRBUS INDUSTRIE  • A300
TECHNICAL PUBLICATIONS
1 Rond Point Maurice BELLONTE
31707 BLAGNAC CEDEX FRANCE
Tel: (33) 61-93-33-33
Telex : AIRBUS 530526 F
SERVICE BULLETIN CHANGE NOTICE
S.B. No. A300-54-0081  REV_  DATED : May 05/95
Mod. No. 10431S20462
TITLE : NACELLES/PYLONS - PANELS IN THE UPPER CORNER AT RIB 8 - ADD A
DOUBLER.
MODEL: ALL models Listed on S.B.
DESCRIPTION :
This notice is issued to inform the affected operators that subject
Service Bulletin is changed as stated below.
SERVICE BULLETIN
Page 8 - Para. 2.B. (3), Page 11-12 : Figure 1 and
Page 13 - Para. 3.A. LIST OF COMPONENTS
Should read : Item 6 : ASNA2314-4-13
Item 7 : ASNA2314-6-16
Item 9 : NAS1154-13
Instead of : Item 6 : ASNA2314-4-14
Item 7 : ASNA2314-6-18
Item 9 : NAS1154-14
This change will be incorporated in the next Revision of this Service
Bulletin; however no revision is planned at the present time.
FILING INSTRUCTIONS
Put this Change Notice in front of the Service Bulletin.
SERVICE BULLETIN No. : A300-54-0081
5 DATE : May 23/95  CHANGE NOTICE No. : O.A.
Printed in France

### Page 2 (OCR)

AIRBUS INDUSTRIE  $ A300
PRODUCT SUPPORT DIRECTORATE
1 Rond Point Maurice BELLONTE
31707 BLAGNAC CEDEX FRANCE  SERVICE BULLETIN SUMMARY
Tel: (33) 61-93-33-33
Telex : AIRBU 530526 F
This summary is for information only and is not approved for
modification of the aircraft.
MODIFICATION No. 10431S20462  ATA SYSTEM : 54
TITLE : NACELLES/PYLONS - PANELS IN THE UPPER CORNER AT RIB 8 - ADD A
DOUBLER.
REASON/DESCRIPTION/OPERATIONAL CONSEQUENCES
On A/C fitted with GE pylon, cracks
have been reported on pylon side
panels (upper section) at Rib 8. The
crack is starting from the top edge of
the panel and running down to the
fastener hole and in some cases is
going beyond the hole.
For aircraft equipped with common GE
and PW pylons, this Service Bulletin
recommends the installation of an
outer doubler on the undamaged
structure of pylon side panels  B
(upper section) at Rib 8.
After accomplishment of this Service
Bulletin, do an inspection program as  per Service Bulletin No. A300-54-0075.  STA726/RIB8
EFFECTIVITY  DOUBLER
This Service Bulletin is applicable to  FWD
the following operators :
AFR, AIC, AUS, AZA, CAL, COA, EAL,
FIN, GIA, IAC, IBE, IRA, JAS, KAL,
LGL, MSR, OAL, PAA, PAL, PIA, RKA,
SAA, SAS, TAR, THA, VSP.
SERVICE BULLETIN/MODIFICATION TO BE
ACCOMPLISHED PREVIOUSLY OR
SIMULTANEOUSLY
None.
5 DATE : Aug 11/93  SERVICE BULLETIN No. : A300-54-0081
REVISION No. :  PAGE : 1 of 3
Printed in France

### Page 3 (OCR)

$ A300
SERVICE BULLETIN SUMMARY
REFERENCES/ REPERCUSSIONS
TFU  54-51-31-001  LIFE LIMIT  None
OEB  None  LINE MAINTENANCE AFFECTED
AOT  None  NO
SIL  None  OTHERS  None
NATURE OF THE MODIFICATION
AIRCRAFT  YES
EQUIPMENT  NO
HARD  NO
SOFT  NO
OBRM  NO
COMPLIANCE
Recommended.
MANPOWER
(Per A/C)
Manhours  48.0
Elapsed Time (Hours)  24.0
SERVICE BULLETIN No. : A300-54-0081
PAGE : 2
Printed in trance

### Page 4 (OCR)

$ A300
SERVICE BULLETIN SUMMARY
Equipment Data
None.
APPENDICES
None -
DATE : Aug 11/93  SERVICE BULLETIN No. : A300-54-0081
REVISION No. :  PAGE : 3
Printed in france

### Page 5 (OCR)

AIRBUS INDUSTRIE  $ A300
PRODUCT SUPPORT DIRECTORATE
1 Rond Point Maurice BELLONTE
31707 BLAGNAC CEDEX FRANCE  SERVICE BULLETIN
Tel: (33) 61-93-33-33
Telex : AIRBU 530526 F
MODIFICATION No. 10431S20462  ATA SYSTEM : 54
TITLE : NACELLES/PYLONS - PANELS IN THE UPPER CORNER AT RIB 8 - ADD A
DOUBLER.
1. PLANNING INFORMATION
A. EFFECTIVITY
(1) Aircraft models : B2-203, B2K-3C, B4-2C, B4-103, B4-120, B4-203,
B4-220, C4-203, F4-203.
(2)  Aircraft
Customer and  MSN  Kit No.  Qty
Fleet No.  540081  of Kits
AFRO62,064  175,183  A01  04
AIC101-103  177,180,190  A01  06
AUS004,005  196,218  A01  04
AZA158  173  A01  02
CAL001-006  193,197,221,232,179,171  A01  12
COA970-972  250,262,289  A01  06
EAL223-225  154,155,158  A01  06
EAL226-231  161,204,207,211,216,220  A01  12
EAL232-235  259,261,271,274  A01  08
FIN001,002  299,302  A01  04
GIA001-006  159,164,165, 166,167,168  A01  12
GIA007-009  213,214,215  A01  06
IAC051,052  181,182  A01  04
IBE251-256  130,133,135,136,156,170  A01  12
IRA003  185  A01  02
DATE : Aug 11/93  SERVICE BULLETIN No. : A300-54-0081
REVISION No. :  PAGE : 1 of 14
Printed in France

### Page 6 (OCR)

$ A300
SERVICE BULLETIN
Customer and  MSN  Kit No-  Qty
Fleet No.  540081  of Kits
IRA005,006  187,226  A01  04
JAS004-006  160,163,176  A01  06
JAS007-009  209,244,253  A01  06
JAS101,103  256,169  A01  04
JAS104,106  174,194  A01  04
JAS107,108  239,178  A01  04
KAL101,102  277,292  A01  04
LGL001  269  A01  02
MSR004,005  199,200  A01  04
MSR007,008  240,255  A01  04
OAL007,008  184,189  A01  04
PAA001-006  195,227,198,247,234,236  A01  12
PAA007-012  304,305,238,235,208,210  A01  12
PALO03  125*  A01  01
PAL004,005  203,219  A01  04
PIA003  099*  A01  01
PIA012  268  A01  02
RKA552,553  243,282  A01  04
SAA052,053  192,222  A01  04
SAA101  212  A01  02
SAS201,202  079,094  A01  04
SAS204  128  A01  02
TAR001  188  A01  02
THA010,012  249,265  A01  04
DATE : Aug 11/93  SERVICE BULLETIN No. : A300-54-0081
REVISION No. :  PAGE : 2
Printed in France

### Page 7 (OCR)

• A300
SERVICE BULLETIN
customer  and  MSN  Kit No. Qty
Fleet No.  540081  of Kits
VSP001-003  202,205,225  A01  06
This modification (retrofit scheme) is applicable by Service
Bulletin only on aircraft listed above fitted with common pylon.
* A/C 099, 125 : Modification of the right pylon only.
NOTE: Kit No. 540081A01 is valid for one pylon.
Modification of one aircraft requires :
2 Kits No. 540081A01.
(3) Spares
None -
B. REASON
(1)  History
On A/C fitted with GE pylon, cracks have been reported on pylon
side panels (upper section) at Rib 8. The crack is starting from
the top edge of the panel and running down to the fastener hole and
in some cases is going beyond the hole.
(2) Objective/Action
For aircraft fitted with common GE and PW pylon, this Service
Bulletin recommends the installation of a doubler on left pylon 1
and right pylon 2, on pylon side panels (upper section) at Rib 8.
(3) Advantages
After accomplishment of this Service Bulletin, do an inspection
program as per Service Bulletin No. A300-54-0075.
(4) Accomplishment Timescale
Accomplishment at the earliest opportunity where manpower and
facilities are available.
DATE : Aug 11/93  SERVICE BULLETIN No. : A300-54-0081
REVISION No. :  PAGE : 3
Printed in trance

### Page 8 (OCR)

G A300
SERVICE BULLETIN
C. DESCRIPTION
Accomplishment of this Service Bulletin consists in carrying out the
following jobs on the aircraft :
On left pylon 1 and right pylon 2, on pylon side panels (upper section),
at Rib 8.
(1) Gain access to the working area.
(2) Installation of the doubler on pylon side panels (upper section) at
Rib 8.
(3) Close-up-
(4) Inspection program after accomplishment of this Service Bulletin as
per Service Bulletin No. A300-54-0075.
D. APPROVAL
This Service Bulletin relates to the change(s) referenced on page 1
which has (have) been approved under the authority of DGAC Design
Organisation Approval No. C 01.
The technical information contained in this Service Bulletin has been
approved under the authority of DGAC Design Organisation Approval
NO. C 01.
E. MANPOWER
Manhours
(Per A/C)
Gain access  8-0
Doubler installation  30.0
close-up  10.0
TOTAL MANHOURS  48.0
ELAPSED TIME (HOURS)  24-0
NOTE: This Service Bulletin assumes that the aircraft has been placed
in a maintenance status. The manhours/elapsed time estimates do
not include preparation for the modification, non-productive
elapsed time, or administrative functions.
DATE : Aug 11/93  SERVICE BULLETIN No. : A300-54-0081
REVISION NO. :  PAGE : 4
Printed in France

### Page 9 (OCR)

$ A300
SERVICE BULLETIN
F. MATERIAL - COST AND AVAILABILITY
(1) Material
Operators with aircraft listed under paragraph 1.A. (2) above should
submit a purchase order quoting this Service Bulletin to :
AIRBUS INDUSTRIE
SPARES SUPPORT CENTER
WEG BEIM JAEGER 150
D2000 HAMBURG 63
GERMANY
(2) Cost and availability
Kit No.  Cost  Availability *
(US Dollars)
540081A01  1,004.00  180
The sales terms (cost and availability) are estimated in relation
to economic conditions at the issue date of the Service Bulletin.
* Calendar days from receipt of order
G. TOOLING - PRICE AND AVAILABILITY
None.
H. WEIGHT AND BALANCE
MEW  : + 1.7 Kg (+ 3.74 (b)
Effect on balance : + 46.3 Kgm (+ 334.92 lb.ft.)
I. REFERENCES
Aircraft Maintenance Manual  : 06-21-54, 20-21-12, 20-31-00, 24-00-00,
24-41-00, 36-00-00, 36-11-15
Service Bulletin No. A300-54-0075
J. PUBLICATIONS AFFECTED
Structural Repair Manual : 54-10-00
DATE : Aug 11/93  SERVICE BULLETIN No. : A300-54-0081
REVISION No. :  PAGE : 5-6
Printed in France

### Page 10 (OCR)

$ A300
SERVICE BULLETIN
2. ACCOMPLISHMENT INSTRUCTIONS
A. GENERAL
(1) Preparation
(a) De-energize the aircraft electrical circuits
(Ref. AMM 24-41-00, P. Block 301) and electrically ground the
aircraft (Ref. AMM 24-00-00, P. Block 301).
(b) Install access platform for access to engine pylons.
(c) Remove access doors (Ref. AMM 06-21-54) :
For L pylon
GE engines : 413DL, 413EL, 413GL, 415AL, 414DR, 414ER, 416AR
PW engines : 413DL, 413EL, 413GL, 415AL, 414DR, 414ER, 476AR
For R pylon with GE and PW engines :
423DL, 423EL, 423GL, 425AL, 424ER, 424DR, 426AR.
(d) Remove bleed air precooler cold air inlet duct
(Ref. AMM 36-11-15, P. Block 401 and AMM 36-00-00,
P. Block 401).
(2) Standard procedures
(a) To clean the surface to be sealed using Mat. No. 11-003
(Ref. AMM 20-31-00).
(b) To apply sealant Mat. No. 09-013 (Ref. AMM 20-31-00).
(c) To renew the protection finish with Mat. No. 16-001, 16-018 and
16-020 (Ref. AMM 20-31-00).
(d) To torque standard fasteners (Ref. AMM 20-21-12).
DATE : Aug 11/93  SERVICE BULLETIN No. : A300-54-0081
REVISION No. :  PAGE : 7
Printed in France

### Page 11 (OCR)

$ 4300
SERVICE BULLETIN
B. MODIFICATION
Installation of the doubler on left pylon 1 and right pylon 2, on pylon
side panels (upper section), at Rib 8.
NOTE: The description is given for the left pylon. The right pylon is
equivalent.
Refer to Figure 1
(1) Remove rivets and bolts in the area of the doubler to be installed.
(a) Remove :
8 + 8 rivets  Item (12) (discard)
3 + 3 bolts  Item  (6) (discard)
3 + 3 nuts  Item (10) (discard)
2 + 2 bolts  Item  (8) (discard)
4 + 4 bolts  Item  (7) (discard)
4 + 4 nuts  Item (11) (discard)
(2) Offer-up and put in position on panels at Rib 8 :
1 doubler  A5461255220000  Item 1
1 doubler  A5461255220100  Item 2
Drill, ream, deburr and attach the doublers Item 1 and Item 2 with
interfay of Mat. No. 09-013 (Ret. AMM 20-31-00) and :
3 + 3 washers  A5461255420000  Item 3
3 + 3 bolts  ASNA2314-4-14  Item 6
3 + 3 nuts  NAS 1726-4E  Item 10
2 + 2 washers  A5461255520000  Item 5
2 + 2 bolts  NAS1153E3  Item 8
1 + 1 bolt  NAS1154-14  Item 9
1 + 1 nut  NAS1726-4E  Item 10
8 + 8 rivets  NSA5414-36-20  Item 12
4 + 4 washers  A5461255320000  Item 4
4 + 4 bolts  ASNA2314-6-18  Item 7
4 + 4 nuts  NAS1726-6E  Item 11
C. INSPECTION PROGRAM
(1)  Do the inspection program after accomplishment of this modification
as per Service Bulletin No. A300-54-0075.
DATE : Aug 11/93  SERVICE BULLETIN No. : A300-54-0081
REVISION No. :  PAGE : 8
Printed in France

### Page 12 (OCR)

G A300
SERVICE BULLETIN
D. TESTS
None.
E_ CLOSE-UP
(1) Make certain that the work areas are clean and clear of tools and
miscellaneous items of equipment.
(2) Install bleed air precooler cold air inlet duct
(Ref. AMM 36-11-15, P. Block 401 and AMM 36-00-00, P. Block 401).
(3) Install access doors (Ref. AMM 06-21-54) :
For L pylon
GE engines : 413DL, 413EL, 413GL, 415AL, 414DR, 414ER, 416AR
PW engines : 413DL, 413EL, 413GL, 415AL, 414DR, 414ER, 476AR
For R pylon with GE and PW engines :
423DL, 423EL, 423GL, 425AL, 424ER, 424DR, 426AR.
(4)  Remove access platforms.
(5)  Disconnect the aircraft electrical ground connection
(Ref. AMM 24-00-00).
F. DOCUMENTATION
Write in the applicable aircraft record that you have done all the work
in this Service Bulletin.
DATE : Aug 11/93  SERVICE BULLETIN No. : A300-54-0081
REVISION No. :  PAGE: 9-10
Printed in France

### Page 13 (OCR)

A300
SERVICE BULLETIN
(12›
SECTION A A
A726/RIB8
SECTION B B
2 RIGHT
- 6 (6)
10(10)
3
6 (6)
10(10)
SECTION CC
•7 (7)
RIGHT NACELLE SHOWN  19(11)
LEFT NACELLE SYNMETRICAL
REPAIR IDENTICAL FOR GE PYLON
• EXISTING HOLE  FINAL REAMING
ITEM  QTY  BOLT  ITEM  QTY  WASHER  ITEM  QTY  NUT
MINI  MAXI
• NEW HOLE  ASNA2314 - 4 - 14  6.72mm  (0.264in.)  (6,255.)  3  A5461255420000  10  NAS1726 • 4E
ASNA2314 - 6 - 18  0.389in.)  90mг  0.SSuIn  .93m  A5461255320000  11  NAS1726 - 6E
NAS1153E3  (0.189in.)  4.81mm  (0.3im.,)  5  A5461255520000
NAS1154 - 14  (0.248in.)  6.32mm  0.250in  .35m  10  NAS1726 • 4E
RIVET
12  NSA5414 - 36 - 20  3.68mm  (3.736і.)
Removal of Fasteners and Installation of Doublers at Rib 8
Figure 1
DATE : Aug 11/93  SERVICE BULLETIN No. : A300-54-0081
REVISION No. :  PAGE : 11-12

### Page 14 (OCR)

• A300
SERVICE BULLETIN
3. MATERIAL INFORMATION
A. LIST OF COMPONENTS
T  NEW PART No.  QTY  DESCRIPTION  OLD PART No.
E
M
Kit No. 540081  A01
1 A5461255220000  1  Doubler
2 A5461255220100  1  Doubler
3 A5461255420000  6  Washer
4 A5461255320000  Washer
5 A5461255520000  Washer
6 ASNA2314-4-14  Bolt  (6)  NAS1154E10  *
ASNA2314-6-18  Bolt  (7)  NAS1156-13  *
8 NAS1153E3  Bolt  (8)  NAS1153E3  *
9 NAS1154-14  Bolt
10 NAS1726-4E  Nut  (10)  NAS1726-4E  *
11 NAS1726-6E  Nut  (11)  NAS1726-6E  *
12 NSA5414-36-20  Rivet  (12)  NSA5414-32-15  *
* Discard
NOTE: Kit No. 540081A01 is valid for one pylon.
Modification of one aircraft requires : 2 Kits No. 540081A01.
B. SPECIAL TOOLS
None-
C. LIST OF MATERIALS - OPERATOR SUPPLIED
DESCRIPTION  REFERENCE  QTY PER A/C
AMM 20-31-00
Sealant  Mat. No. 09-013  As required
M_E_K.  Mat. No. 11-003  As required
Polyurethane primer  Mat. No. 16-001  As required
Polyurethane finish paint  Mat. No. 16-018  As required
Wash primer  Mat. No. 16-020  As required
DATE : Aug 11/93  SERVICE BULLETIN No. : A300-54-0081
REVISION No. :  PAGE : 13
Printed in France

### Page 15 (OCR)

$ A300
SERVICE BULLETIN
D. PARTS TO BE RE-IDENTIFIED BY OPERATOR
None.
DATE : Aug 11/93  SERVICE BULLETIN No. : A300-54-0081
REVISION No. :  PAGE : 14
Printed in France

### Page 16 (OCR)

AIRBUS INDUSTRIE  $ A300
PRODUCT SUPPORT DIRECTORATE
1 Rond Point Maurice BELLONTE
31707 BLAGNAC CEDEX FRANCE  SERVICE BULLETIN
Tel: (33) 61-93-33-33
Telex : AIRBU 530526 F
MODIFICATION No. 10431S20462  ATA SYSTEM : 54
TITLE : NACELLES/PYLONS - PANELS IN THE UPPER CORNER AT RIB 8 - ADD A
DOUBLER.
IS BEING HEREWITH SUBMITTED TO YOU FOR REVIEW
Please fill :  -.. REJECTED
... WILL BE EMBODIED
... EFFECTIVITY
This SB can only be incorporated in your "customized" documentation within
the agreed time schedule in so far as this sheet is returned to us on
purchase date and signed by a duly authorized and empowered officer or
representative.
FROM :  Please return to :
AIRLINE :  AIRBUS INDUSTRIE
PRODUCT SUPPORT DIRECTORATE
1 Rond Point Maurice BELLONTE
31707 BLAGNAC CEDEX FRANCE
Att. : AI/SP - Technical Publications
Department
DATE :
- 19..
5 DATE : Aug 11/93  SERVICE BULLETIN No. : A300-54-0081
REVISION No. :  PAGE : 1 of 1
Printed in France

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.