# Airbus Service Bulletin A300-57-6049

Copy: Revision 07 ("U.S. DOT/FAA - Service Bulletin A300-57-6049 Revision 07"), 89 pages: PDF https://openairdocs.org/files/sha256/b6/c5/b6c590234fb5a44f1374db6f21e5af89462107d208bd68f7254be4cb031a2dfd; text https://openairdocs.org/service-documents/airbus/a300-57-6049/file/b6c590234fb5.md. Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2013-1064; AD 2014-20-18 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Airbus](https://openairdocs.org/service-documents/airbus.md)
- Type: Service bulletin (Service Bulletin)
- Number: A300-57-6049
- Latest revision known: A300-57-6049, Revision 8, dated July 4, 2017 (OpenAirDocs)
- Page: https://openairdocs.org/service-documents/airbus/a300-57-6049

## ADs that cite it (5) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2018-19-18](https://openairdocs.org/ad/2018-19-18.md), effective Nov 7, 2018: Revision 8
- [AD 2014-20-18](https://openairdocs.org/ad/2014-20-18.md), effective Dec 11, 2014: Revisions 06 and 07
- [AD 2005-23-08](https://openairdocs.org/ad/2005-23-08.md), effective Dec 19, 2005: Revision 06
- [AD 2002-11-04](https://openairdocs.org/ad/2002-11-04.md), effective Jul 8, 2002: Revision 4
- [AD 97-16-06](https://openairdocs.org/ad/97-16-06.md), effective Sep 5, 1997: No revision named

Also cited in [5 proposed ADs](https://openairdocs.org/service-documents/airbus/a300-57-6049/proposed.md), [7 difficulty reports](https://openairdocs.org/service-documents/airbus/a300-57-6049/reports.md).

## Text (89 pages)

Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2013-1064; AD 2014-20-18 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

@ A300-600
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
5 DATE : Sep 09/94 SERVICE BULLETIN No. : A300—57—6049
REVISION No. : 07 — Dec 22/06 Page : 1 of 3
Printed in FRANCE © AIRBUS, 2006 All rights reserved
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX FRANCE
Tel : (33) 5 61 93 33 33
Telex : AIRBU 530526F
Fax : (33) 5 61 93 42 51
MANDATORY MANDATORY MANDATORY
ATA SYSTEM : 57
TITLE : WINGS-SECTION 21-INSPECTION OF HOLES "H"AND "I" OF THE CORNER ANGLE
FITTING.
MODIFICATION No. :  None
This page transmits Revision No. 07 of Service Bulletin No. A300-57-6049.
ADDITIONAL WORK
No additional work is required by this revision for aircraft modified by any
previous issue.
REASON
Accomplishment of Service Bulletin No. A300-57-6069 cancels the requirement
of inspection of holes H and I of the corner angle fitting defined in this
Service Bulletin and cancels the requirement of inspection of the rear spar
and bottom panel at junction with fuselage defined in Service Bulletin No.
A300-57-6086.
CHANGES
SUMMARY :
— REASON/DESCRIPTION/OPERATIONAL CONSEQUENCES
.  Sentence Concerning the Airworthiness Directive (Consigne de
Navigabilite) deleted. Sentence added. In the EVALUATION TABLE,
Airworthiness Directive number deleted.
— EFFECTIVITY
.  Operators updated.
PLANNING INFORMATION :
— EFFECTIVITY
. 1.A. Effectivity updated.
— REASON

### Page 2

@ A300-600
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
DATE : Sep 09/94 SERVICE BULLETIN No. : A300—57—6049
REVISION No. : 07 — Dec 22/06 Page :
Printed in FRANCE © AIRBUS, 2006 All rights reserved
. 1.C. Sentence concerning the Airworthiness Directive (Consigne de
Navigabilite) deleted. Sentence added.
— COMPLIANCE
. 1.E. Sentence concerning the Airworthiness Directive updated.
— APPROVAL
. 1.F. Sentence updated.
— REFERENCES
. 1.J. Reference to Service Bulletins No. A300-57-6069 and A300-57-6086
added. Reference to Airworthiness Directive No. 2000-533-328(B) deleted.
MATERIAL INFORMATION :
— MATERIAL - PRICE AND AVAILABILITY
. 2.A. Address updated.
ACCOMPLISHMENT INSTRUCTIONS :
— GENERAL
. 3.A. Warning updated.
FILING INSTRUCTIONS
This Service Bulletin has been generated electronically and is reissued as a
complete document. Replace the complete document.
Put this Revision Transmittal Sheet in front of the Service Bulletin.
HISTORY OF PREVIOUS REVISIONS
This is only applicable for Revision No. 05 and subsequent. If information
is required for Revisions issued previous to this, please check your copies
of Revision Transmittal Sheets or contact AIRBUS.
Revision No. 05 issued to create a Kit A08 valid for A/C post Service
Bulletin No. A300-57-6050. Fasteners length updated to match fasteners of
Service Bulletin No. A300-57-6050. Fastener hole H added in Kit A07.
Revision No. 06 issued to update the thresholds and intervals, to inform the
operators that the Airworthiness Directive/Consigne de Navigabilite No.
1999-147-279 becomes No. 2000-533-328(B), the Para. EFFECTIVITY is updated
and new inspection of holes U, V, W, X, Y for configurations No. 01, 02 and
03 added.
This Service Bulletin has been entirely re-written, in order to have an
easier understanding of the inspection to be carried out.
2

### Page 3

@ A300-600
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
DATE : Sep 09/94 SERVICE BULLETIN No. : A300—57—6049
REVISION No. : 07 — Dec 22/06 Page :
Printed in FRANCE © AIRBUS, 2006 All rights reserved
REVISION SEQUENCE
ORIGINAL : Sep 09/94
REVISION No. : 01 — Sep 08/95
REVISION No. : 02 — Jul 25/96
REVISION No. : 03 — Dec 15/98
REVISION No. : 04 — Jul 27/00
REVISION No. : 05 — Sep 14/01
REVISION No. : 06 — Jul 15/04
REVISION No. : 07 — Dec 22/06
3

### Page 4

@ A300-600
SERVICE BULLETIN
SUMMARY
5 DATE : Sep 09/94 SERVICE BULLETIN No. : A300—57—6049
REVISION No. : 07 — Dec 22/06 Page : 1 of 4
Printed in FRANCE © AIRBUS, 2006 All rights reserved
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX FRANCE
Tel : (33) 5 61 93 33 33
Telex : AIRBU 530526F
Fax : (33) 5 61 93 42 51
This summary is for information only
and is not approved for modification of the aircraft
MANDATORY MANDATORY MANDATORY
ATA SYSTEM : 57
TITLE : WINGS-SECTION 21-INSPECTION OF HOLES "H"AND "I" OF THE CORNER ANGLE
FITTING.
MODIFICATION No. :  None
REASON/DESCRIPTION/OPERATIONAL CONSEQUENCES
Cracks have been found on A300 B2/B4 fleet at about 20,000 flights on FR47
forward fitting at the level of last fastener of external angle fitting.
Cracks if undetected can increase in magnitude in rear spar and panel, thus
reducing the residual strength capacity of the structure and requiring and
extensive structural repair.
The in-service experience from the application of inspection on the A300 and
A300-600 fleets shows that:
— Cracks have been found before reaching the threshold.
— Cracks have been found in other holes (basically holes H and I were inspected)
during accomplishment of modification Service Bulletins No. A300-53-0298 and
A300-57-6050.
Revision No.03 of this Service Bulletin takes this new data into account.
From Revision No.03 of this SB, further in service experience have shown that
cracks have been found in other holes than holes H, I, K, L, M and N. This is
why Revision No.06 request to inspect new holes U, V, W, X and Y in order to
take these new findings into account.
The aim of this Service Bulletin is to call for eddy current inspection of holes
H, I, K, L, M, N and U, V, W, X, Y in LH and RH internal angles of wing center
box.
This inspection will make it possible to detect crack propagation at an early
stage, thus avoiding an extensive repair.
Accomplishment of Service Bulletin No. A300-57-6069 cancels the requirement of
inspection of holes H and I of the corner angle fitting defined in this Service

### Page 5

@ A300-600
SERVICE BULLETIN
SUMMARY
DATE : Sep 09/94 SERVICE BULLETIN No. : A300—57—6049
REVISION No. : 07 — Dec 22/06 Page :
Printed in FRANCE © AIRBUS, 2006 All rights reserved
Bulletin and cancels the requirement of inspection of the rear spar and bottom
panel at junction with fuselage defined in Service Bulletin No. A300-57-6086.
EFFECTIVITY
This Service Bulletin is applicable to these operators :
51Y 90X AAL ABD AWW CAL CES CSN DLH FDX HLF I2L IRA JLJ KAC KAL LAA MON MSR NVJ
OAL OHY QTR SUD SVA TAR THA
CONCURRENT REQUIREMENTS
None
REFERENCES/REPERCUSSIONS
TFU : 57.10.00.003
OEB : None
AOT : None
SIL : 53-057
LIFE LIMIT : None
LINE MAINTENANCE AFFECTED : No
OTHERS : None
NATURE OF THE WORK
AIRCRAFT : YES
EQUIPMENT : NO
HARD : NO
SOFT : NO
OBRM : NO
MANPOWER
Inspection LH and RH sides, Config. 01 or 02 or 03 or 04
EVALUATION TABLE
COMPLIANCE Mandatory CANCELS INSPECTION SB Yes
AD Yes A/C OPERATION AFFECTED No
RELIABILITY AFFECTED No PAX COMFORT AFFECTED No
COST SAVING No ETOPS AFFECTED No
STRUCTURAL LIFE EXTN No VENDOR SB INVOLVED No
KIT PRICE (USD) See SB
TOTAL MANHOURS 47.0
ELAPSED TIME (HOURS) 23.0
2

### Page 6

@ A300-600
SERVICE BULLETIN
SUMMARY
DATE : Sep 09/94 SERVICE BULLETIN No. : A300—57—6049
REVISION No. : 07 — Dec 22/06 Page :
Printed in FRANCE © AIRBUS, 2006 All rights reserved
Rework for one hole
Cut out one fitting
MATERIAL INFORMATION
AIRCRAFT DATA
Kit 576049A01R05 : 4 bolts
Kit 576049A02R06 : 4 bolts
Kit 576049A03R09 : 6 bolts
Kit 576049A04R06 : 12 bolts
Kit 576049A05R06 : 12 bolts
Kit 576049A06R04 : 16 bolts
Kit 576049A07R03 : 56 bolts
Kit 576049A08R01 : 12 bolts
Kit 576049A09R00 : 20 bolts
Kit 576049A10R00 : 10 bolts
APPENDICES
Yes: see Appendix 01
TOTAL MANHOURS 2.0
ELAPSED TIME (HOURS) 2.0
TOTAL MANHOURS 8.0
ELAPSED TIME (HOURS) 8.0
3

### Page 7

@ A300-600
SERVICE BULLETIN
SUMMARY
DATE : Sep 09/94 SERVICE BULLETIN No. : A300—57—6049
REVISION No. : 07 — Dec 22/06 Page :
Printed in FRANCE © AIRBUS, 2006 All rights reserved
4

### Page 8

@ A300-600
SERVICE BULLETIN
5 DATE : Sep 09/94 SERVICE BULLETIN No. : A300—57—6049
REVISION No. : 07 — Dec 22/06 Page : 1 of 77
Printed in FRANCE © AIRBUS, 2006 All rights reserved
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX FRANCE
Tel : (33) 5 61 93 33 33
Telex : AIRBU 530526F
Fax : (33) 5 61 93 42 51
MANDATORY MANDATORY MANDATORY
ATA SYSTEM : 57
TITLE : WINGS-SECTION 21-INSPECTION OF HOLES "H"AND "I" OF THE CORNER ANGLE
FITTING.
MODIFICATION No. :  None
This document contains Airbus PROPRIETARY INFORMATION and shall at all times
remain the property of Airbus; no intellectual property right or licence is
granted by Airbus in connection with any information contained in it. It is
delivered on the express condition that said document and the information
contained in it shall be treated as confidential, shall not be used for any
purpose other than that for which it is hereby delivered. It shall not be
disclosed in whole or in part to third parties and shall not be duplicated in
any manner (except for the purposes of performing the tasks described hereunder
and provided that any recipient of such document shall comply with the
conditions herein), without Airbus's prior written consent.
1. PLANNING INFORMATION
A. EFFECTIVITY
(1) Models
B4-601 B4-603 B4-605R B4-620 B4-622 B4-622R C4-605R/F C4-620
F4-605R
(2) Aircraft
(a) Effectivity by MSN
This Service Bulletin is applicable to aircraft MSN :
0252 0284 0294 0301 0307 0312 0317 0321 0336 0341 0344 0348
0351 0354 0358 0361 0365 0368 0371 0377 0380 0384 0388 0391
0395 0398 0401 0405 0408 0411 0414 0417 0423 0459-0466
0469-0471 0474 0477 0479 0505-0518 0521 0525 0529 0530 0532
0533 0536 0540 0543 0546 0553-0561 0563 0566 0569 0572 0575
0577 0579 0581 0582 0584 0601-0619 0621 0623 0625-0633 0635
0637 0639 0641 0643 0645 0657 0659 0662 0664 0666 0668 0670
0673 0675 0677 0679 0681 0683 0685 0688 0690 0692 0694 0696
0699 0701 0703 0705 0707 0709 0711 0713 0715 0717 0719
0721-0750 0752-0764 0766-0775 0777-0794 0797 0799-0804

### Page 9

@ A300-600
SERVICE BULLETIN
DATE : Sep 09/94 SERVICE BULLETIN No. : A300—57—6049
REVISION No. : 07 — Dec 22/06 Page :
Printed in FRANCE © AIRBUS, 2006 All rights reserved
NOTE : The aircraft with Mod. No. 12171S21827 (PLATES SKIN -
REINFORCE FR47) or Mod. No. 12249S21912 (CENTER
FUSELAGE/WING - REINFORCE FR47) embodied in production
are not concerned by this Service Bulletin.
(b) Effectivity by Operator
The Operator/MSN relationship is provided for information only
and is correct at the time of issue in accordance with the
information available to Airbus. Any future changes resulting
from transfer of an aircraft from one operator to another will
not be reflected in this list unless the Service Bulletin is
revised for another reason.
OPERATOR MSN
51Y 0533
90X 0666
AAL 0423 0459 0460 0461 0462 0463 0465 0466 0469 0470
0471 0474 0506 0507 0508 0509 0510 0511 0512 0513
0514 0515 0516 0517 0606 0610 0612 0615 0619 0626
0639 0643 0645 0675
ABD 0529 0557 0755 0758 0775
AWW 0633
CAL 0536 0555 0625 0743 0767 0788
CES 0521 0525 0532 0707 0709 0713 0715 0725 0732 0741
0746 0754 0763
CSN 0733 0734 0739 0750 0756 0762
DLH 0380 0391 0401 0405 0408 0411 0414 0546 0553 0608
0618 0623 0701
FDX 0358 0361 0365 0388 0417 0477 0479 0530 0543 0559
0572 0579 0581 0657 0659 0726 0728 0735 0736 0738
0742 0745 0748 0752 0757 0759 0760 0761 0766 0768
0769 0771 0772 0774 0777 0778 0779 0780 0781 0789
0790 0791 0792 0793 0794 0799 0800 0801 0802 0803
0804
HLF 0773
I2L 0677
IRA 0632 0696 0723 0727
JLJ 0602 0617 0621 0637 0641 0670 0679 0683 0703 0711
0724 0729 0730 0737 0740 0753 0770 0783 0797
KAC 0344 0673 0694 0699 0719 0721
KAL 0582 0609 0627 0631 0662 0685 0692 0717 0722 0731
LAA 0601 0616
MON 0540 0556 0604 0605
MSR 0561 0575 0607
2

### Page 10

@ A300-600
SERVICE BULLETIN
DATE : Sep 09/94 SERVICE BULLETIN No. : A300—57—6049
REVISION No. : 07 — Dec 22/06 Page :
Printed in FRANCE © AIRBUS, 2006 All rights reserved
(c) Effectivity by MSN and Kit/Configuration
The kits and configurations applicable to these MSNs are given
at the end of this list:
0252 0284 0294 0301 0307 0312 0317 0321 0336 0341 0344 0348
0351 0354 0358 0361 0365 0368 0371 0377 0380 0384 0388 0391
0395 0398 0401 0405 0408 0411 0414 0417
NOTE (01) For each Kit, read Config. 01 or 02.
The kits and configurations applicable to these MSNs are given
at the end of this list:
0423 0459-0466 0469-0471 0474 0477 0479 0505-0518 0521 0525
0529-0530 0532-0533 0536 0540 0543 0546 0553-0561 0563 0566
NVJ 0354
OAL 0603
OHY 0584 0744 0747 0749 0764
QTR 0554 0560 0611 0613 0614 0630 0664 0668 0688 0690
SUD 0252
SVA 0284 0294 0301 0307 0312 0317 0321 0336 0341 0348
0351
TAR 0505 0558 0563
THA 0368 0371 0377 0384 0395 0398 0464 0518 0566 0569
0577 0628 0629 0635 0681 0705 0782 0784 0785 0786
0787
KIT No. QTY PER A/C CONFIGURATION
576049A01R05 1 01
02
576049A03R09 1 01
02
576049A04R06 1 01
02
576049A06R04 1 01
02
576049A08R01 1 01
02
576049A09R00 1 01
02
576049A10R00 1 01
02
OPERATOR MSN
3

### Page 11

@ A300-600
SERVICE BULLETIN
DATE : Sep 09/94 SERVICE BULLETIN No. : A300—57—6049
REVISION No. : 07 — Dec 22/06 Page :
Printed in FRANCE © AIRBUS, 2006 All rights reserved
0569 0572 0575 0577 0579 0581-0582 0584 0601-0619 0621 0623
0625-0633 0635 0637 0639 0641 0643 0645 0657 0659 0662 0664
0666 0668 0670 0673 0675 0677 0679 0681 0683 0685 0688 0690
0692 0694 0696 0699 0701 0703 0705 0707 0709 0711 0713 0715
0717 0719 0721-0725
NOTE (01) For each Kit, read Config. 01 or 02.
The kits and configurations applicable to these MSNs are given
at the end of this list:
0797 0799-0804
The kits and configurations applicable to these MSNs are given
at the end of this list:
0726-0750 0752-0764 0766-0775 0777-0794
KIT No. QTY PER A/C CONFIGURATION
576049A02R06 1 01
02
576049A03R09 1 01
02
576049A05R06 1 01
02
576049A06R04 1 01
02
576049A08R01 1 01
02
576049A09R00 1 01
02
576049A10R00 1 01
02
KIT No. QTY PER A/C CONFIGURATION
576049A02R06 1 03
576049A03R09 1 03
576049A05R06 1 03
576049A06R04 1 03
576049A09R00 1 03
KIT No. QTY PER A/C CONFIGURATION
576049A07R03 1 04
4

### Page 12

@ A300-600
SERVICE BULLETIN
DATE : Sep 09/94 SERVICE BULLETIN No. : A300—57—6049
REVISION No. : 07 — Dec 22/06 Page :
Printed in FRANCE © AIRBUS, 2006 All rights reserved
NOTE : When the airplane model designation is or has been
changed from one of the following simplified airplane
model designation B4-600, the value quoted may have to
be revised. In such a case, AIRBUS must be contacted to
implement changes.
NOTE : Kit 576049A01R05 : Hole H with crack.
- valid aircraft MSN 0252 thru 0417 (without Service
Bulletin No. A300-57-6050 embodied).
NOTE : Kit 576049A02R06 : Hole H with crack.
- Valid aircraft MSN 0420 thru 0725 (without Service
Bulletin No. A300-57-6050 embodied).
- Valid aircraft MSN 0797 and subsequent (Mod. No.
10155S20321 embodied in production line).
NOTE : Kit 576049A03R09 : Hole I with crack.
- Valid aircraft MSN 0252 thru 0725 (without Service
Bulletin No. A300-57-6050 embodied).
- Valid aircraft MSN 0797 and subsequent (Mod. No.
10155S20321 embodied in production line).
NOTE : Kit 576049A04R06 : Holes H and I without crack.
- Valid aircraft MSN 0252 thru 0417 (without Service
Bulletin No. A300-57-6050 embodied).
NOTE : Kit 576049A05R06 : Holes H and I without crack.
- Valid aircraft MSN 0420 thru 0725 (without Service
Bulletin No. A300-57-6050 embodied).
- Valid aircraft MSN 0797 and subsequent (Mod. No.
10155S20321 embodied in production line).
CONFIGURATION
No.
Pre Mod.10454
(SB
No.57-6050)
Post Mod.10454
(SB
No.57-6050)
Post Mod.
10155 (Serial
Solution)
Mod. 10155
partly
embodied
01 *
02 *
03 *
04 *
5

### Page 13

@ A300-600
SERVICE BULLETIN
DATE : Sep 09/94 SERVICE BULLETIN No. : A300—57—6049
REVISION No. : 07 — Dec 22/06 Page :
Printed in FRANCE © AIRBUS, 2006 All rights reserved
NOTE : Kit 576049A06R04 : Holes K, L, M, N with or without
crack.
- Valid aircraft MSN 0252 thru 0725 (without Service
Bulletin No. A300-57-6050 embodied).
- valid aircraft MSN 0797 and subsequent (Mod. No.
10155S20321 embodied in production line).
NOTE : Kit 576049A07R03 : Holes H, I, K, L, M, N, Y, U, V, W,
X with or without crack.
- Valid aircraft MSN 0726 thru 0794 (Mod. No.
10155S20321 partly embodied in production line).
NOTE : Kit 576049A08R01 : Holes H, I, K, L, M, N without
crack.
- Valid aircraft MSN 0252 thru 0725 (with Service
Bulletin No. A300-57-6050 embodied).
NOTE : Kit 576049A09R00 : Holes U, V, W, X, Y with or without
crack.
- Valid aircraft MSN 0252 thru 0725 (without Service
Bulletin No. A300-57-6050 embodied).
- valid aircraft MSN 0797 and subsequent (Mod. No.
10155S20321 embodied in production line).
NOTE : Kit 576049A10R00 : Holes U, V, W, X, Y without crack.
- Valid aircraft MSN 0252 thru 0725 (with Service
Bulletin No. A300-57-6050 embodied).
NOTE : Config. 01 and 02 concerns B4/600 type, B4-601, B4-603,
B4-605R, B4-620, B4-622, B4-622R, C4-605R, C4-620
models.
NOTE : Config. 03 and 04 concerns B4/600 type, B4-622R,
B4-605R, C4-605R/F, F4-605R models.
(3) Spares
None
B. CONCURRENT REQUIREMENTS
None
6

### Page 14

@ A300-600
SERVICE BULLETIN
DATE : Sep 09/94 SERVICE BULLETIN No. : A300—57—6049
REVISION No. : 07 — Dec 22/06 Page :
Printed in FRANCE © AIRBUS, 2006 All rights reserved
C. REASON
(1) History
Cracks have been found on A300 B2/B4 fleet at about 20,000 flights
on FR47 forward fitting at the level of last fastener of external
angle fitting.
Cracks if undetected can increase in magnitude in rear spar and
panel, thus reducing the residual strength capacity of the
structure and requiring and extensive structural repair.
The in-service experience from the application of inspection on the
A300 and A300-600 fleets shows that:
— Cracks have been found before reaching the threshold.
— Cracks have been found in other holes (basically holes H and I
were inspected) during accomplishment of modification Service
Bulletins No. A300-53-0298 and A300-57-6050.
Revision No.03 of this Service Bulletin takes this new data into
account.
From Revision No.03 of this SB, further in service experience have
shown that cracks have been found in other holes than holes H, I,
K, L, M and N. This is why Revision No.06 request to inspect new
holes U, V, W, X and Y in order to take these new findings into
account.
(2) Objective/Action
The aim of this Service Bulletin is to call for eddy current
inspection of holes H, I, K, L, M, N and U, V, W, X, Y in LH and RH
internal angles of wing center box.
(3) Advantages
This inspection will make it possible to detect crack propagation
at an early stage, thus avoiding an extensive repair.
Accomplishment of Service Bulletin No. A300-57-6069 cancels the
requirement of inspection of holes H and I of the corner angle
fitting defined in this Service Bulletin and cancels the
requirement of inspection of the rear spar and bottom panel at
junction with fuselage defined in Service Bulletin No.
A300-57-6086.
(4) Operational/Maintenance Consequences
None
D. DESCRIPTION
To accomplish this Service Bulletin it is necessary to :
7

### Page 15

@ A300-600
SERVICE BULLETIN
DATE : Sep 09/94 SERVICE BULLETIN No. : A300—57—6049
REVISION No. : 07 — Dec 22/06 Page :
Printed in FRANCE © AIRBUS, 2006 All rights reserved
On LH and RH rear internal angles of wing center box
— Gaining acces to the working areas.
— Removing PR sealant.
— Removing fasteners H, I, K, L, M, N, Y, U, V, W, X (all
configuration).
— Performing rotating probe inspection.
— Reinstalling fasteners.
— Applying PR sealant.
— Test.
— Close-up.
E. COMPLIANCE
(1) Classification
Mandatory
(2) Accomplishment Timescale
Accomplishment of this Service Bulletin has been rendered mandatory
by the issue of an Airworthiness Directive (AD) published by the
European Aviation Safety Agency (EASA). The AD must be used as the
reference document for the mandatory accomplishment timescale.
This Service Bulletin is mandatory at the following thresholds and
intervals, whichever occurs first.
HOLES H, I, K, L, M, N, U, V, W, X, Y
AFT: Average Flight Time
CONFIG.No. THRESHOLD THRESHOLD INTERVAL INTERVAL
** Flight
Cycles
Flight Hours Flight
Cycles
Flight Hours
01 10400 22450 4500 9700
02 14200* 30650 4500 9700
03 14200 30650 4500 9700
01AFT<=1,5FH/FC 11250 16850 4850 7300
02AFT<=1,5FH/FC 15350* 23000 4850 7300
03AFT<=1,5FH/FC 15350 23000 4850 7300
8

### Page 16

@ A300-600
SERVICE BULLETIN
DATE : Sep 09/94 SERVICE BULLETIN No. : A300—57—6049
REVISION No. : 07 — Dec 22/06 Page :
Printed in FRANCE © AIRBUS, 2006 All rights reserved
* Counted starting from the Service Bulletin No. A300-57-6050
embodiment time.
** For customers who have already retrofitted the Service Bulletin
(Inspection of holes H and I), the new threshold value, equal to
the basic "grace period", must be used for holes K, L, M, N, U, V,
W, X, Y.
HOLES H, I, K, L, M, N, U, V, W, X, Y
AFT: Average Flight Time
Grace Period:
— Where A/C are between 1400 FC/3500 FH less than threshold or have
exceeded the threshold by less than 1900 FC/4600 FH flights, the
first inspection is to be performed within 1400 FC/3500 FH after
receipt of this Service Bulletin.
— For A/C which have exceeded the threshold by more than 1900
FC/4600 FH flights, the first inspection is to be performed
within 700 FC/1700 FH after receipt of this Service Bulletin.
NOTE : The number of touch and go flights can be neglected when
they are less than five percent of the total number of
flights between two consecutive inspections.
When the percentage of touch and go flights is more than
five percent of total number of flights between two
consecutive inspections, each touch and go flight beyond
five percent has to be counted as a flight cycle.
A touch and go is a landing in which an airplane touches the
runway and does not come to a full stop prior to commencing
an additional flight.
F. APPROVAL
Approved under EASA Design Organisation Approval No. EASA 21J.031.
If an aircraft listed in the effectivity has a modification or repair
embodied that is not of AIRBUS origin, and which affects the content of
this Service Bulletin, the operator is responsible for obtaining
approval by its airworthiness authority for any adaptation necessary
before incorporation of the Service Bulletin.
CONFIG.No. THRESHOLD THRESHOLD INTERVAL INTERVAL
Flight
Cycles
Flight Hours Flight
Cycles
Flight Hours
04 12300 26550 4500 9700
04AFT<=1,5FH/FC 13300 19950 4850 7300
9

### Page 17

@ A300-600
SERVICE BULLETIN
DATE : Sep 09/94 SERVICE BULLETIN No. : A300—57—6049
REVISION No. : 07 — Dec 22/06 Page :
Printed in FRANCE © AIRBUS, 2006 All rights reserved
G. MANPOWER
The manpower estimates given in this Service Bulletin are based on the
direct labor cost to do the work. These estimates assume that the work
will be done by experienced personnel, and may need to be revised
upwards to suit operator's circumstances. The estimates do not include
the time to prepare, plan or inspect the work. Manufacture and
procurement of parts and tools, drying times for paints, sealants, etc,
and general administration work are also not included.
Inspection LH and RH sides, Config.01 or 02 or 03 or 04
Rework the hole
Rework the fitting
H. WEIGHT AND BALANCE
Not changed
I. ELECTRICAL LOAD DATA
Not changed
J. REFERENCES
Get access 14.0
Rotating probe inspection 13.0
Test 8.0
Close-up 12.0
TOTAL MANHOURS 47.0
ELAPSED TIME (HOURS) 23.0
Rework for one hole 2.0
TOTAL MANHOURS 2.0
ELAPSED TIME (HOURS) 2.0
Cut out fitting (for one
fitting)
8.0
TOTAL MANHOURS 8.0
ELAPSED TIME (HOURS) 8.0
Aircraft Maintenance Manual (AMM) : 06-41-53 20-21-12 24-40-00
24-41-00 28-00-00 28-10-00
28-11-00 28-11-29 28-11-41
28-21-00 28-22-00 28-25-00
29-14-00 29-25-00 29-31-00
29-33-00 33-42-00 51-23-10
Consumable Material List (CML)
10

### Page 18

@ A300-600
SERVICE BULLETIN
DATE : Sep 09/94 SERVICE BULLETIN No. : A300—57—6049
REVISION No. : 07 — Dec 22/06 Page :
Printed in FRANCE © AIRBUS, 2006 All rights reserved
Non-Destructive Testing Manual (NTM) 57-10-50, Part 6, Procedures A and
B
Maintenance Review Board Document (MRB) Section 5
Service Bulletin No. A300-28-6028
Service Bulletin No. A300-57-6050
Service Bulletin No. A300-57-6069
Service Bulletin No. A300-57-6086
Appendix 1
K. PUBLICATIONS AFFECTED
None
L. INTERCHANGEABILITY/MIXABILITY
None
Elec. Std. Practices Manual (ESPM) : 20-55-00
Service Information Letter (SIL) : 53-057
Structural Repair Manual (SRM) : 51-40-31 51-40-32 51-40-40
51-40-47 51-40-50 51-43-00
51-76-10
11

### Page 19

@ A300-600
SERVICE BULLETIN
DATE : Sep 09/94 SERVICE BULLETIN No. : A300—57—6049
REVISION No. : 07 — Dec 22/06 Page :
Printed in FRANCE © AIRBUS, 2006 All rights reserved
This Page Intentionally Left Blank
12

### Page 20

@ A300-600
SERVICE BULLETIN
DATE : Sep 09/94 SERVICE BULLETIN No. : A300—57—6049
REVISION No. : 07 — Dec 22/06 Page :
Printed in FRANCE © AIRBUS, 2006 All rights reserved
2. MATERIAL INFORMATION
A. MATERIAL — PRICE AND AVAILABILITY
(1) Material
Customers with aircraft shown in the effectivity of this Service
Bulletin should send a purchase order to AIRBUS. Quote the number
of this Service Bulletin. The address is :
Airbus Spares Support and Services
Weg beim Jaeger 150
D-22335 Hamburg
Germany
For ordering by internet: http://spares.airbus.com
For ordering by fax: +49 40 50 76 25 90
(2) Price and Availability
Kit 576049A01R05
Cost : 727.00 US Dollars
Availability : 90 calendar days from receipt of order
The Kit availability given above is the standard lead time from the
date of your purchase order. If you require the Kit(s) before this
time, please include a retrofit planning schedule with your order
so that we can try to comply with your requirements.
The sales terms (costs and availability) are estimated in relation
to economic conditions at the issue date of the Service Bulletin.
Kit 576049A02R06
Cost : 2,080.00 US Dollars
Availability : 90 calendar days from receipt of order
The Kit availability given above is the standard lead time from the
date of your purchase order. If you require the Kit(s) before this
time, please include a retrofit planning schedule with your order
so that we can try to comply with your requirements.
The sales terms (costs and availability) are estimated in relation
to economic conditions at the issue date of the Service Bulletin.
Kit 576049A03R09
Cost : 2,998.00 US Dollars
Availability : 150 calendar days from receipt of order
13

### Page 21

@ A300-600
SERVICE BULLETIN
DATE : Sep 09/94 SERVICE BULLETIN No. : A300—57—6049
REVISION No. : 07 — Dec 22/06 Page :
Printed in FRANCE © AIRBUS, 2006 All rights reserved
The Kit availability given above is the standard lead time from the
date of your purchase order. If you require the Kit(s) before this
time, please include a retrofit planning schedule with your order
so that we can try to comply with your requirements.
The sales terms (costs and availability) are estimated in relation
to economic conditions at the issue date of the Service Bulletin.
Kit 576049A04R06
Cost : 1,140.00 US Dollars
Availability : 120 calendar days from receipt of order
The Kit availability given above is the standard lead time from the
date of your purchase order. If you require the Kit(s) before this
time, please include a retrofit planning schedule with your order
so that we can try to comply with your requirements.
The sales terms (costs and availability) are estimated in relation
to economic conditions at the issue date of the Service Bulletin.
Kit 576049A05R06
Cost : 1,270.00 US Dollars
Availability : 150 calendar days from receipt of order
The Kit availability given above is the standard lead time from the
date of your purchase order. If you require the Kit(s) before this
time, please include a retrofit planning schedule with your order
so that we can try to comply with your requirements.
The sales terms (costs and availability) are estimated in relation
to economic conditions at the issue date of the Service Bulletin.
Kit 576049A06R04
Cost : 2,090.00 US Dollars
Availability : 120 calendar days from receipt of order
The Kit availability given above is the standard lead time from the
date of your purchase order. If you require the Kit(s) before this
time, please include a retrofit planning schedule with your order
so that we can try to comply with your requirements.
The sales terms (costs and availability) are estimated in relation
to economic conditions at the issue date of the Service Bulletin.
Kit 576049A07R03
Cost : 5,780.00 US Dollars
Availability : 120 calendar days from receipt of order
14

### Page 22

@ A300-600
SERVICE BULLETIN
DATE : Sep 09/94 SERVICE BULLETIN No. : A300—57—6049
REVISION No. : 07 — Dec 22/06 Page :
Printed in FRANCE © AIRBUS, 2006 All rights reserved
The Kit availability given above is the standard lead time from the
date of your purchase order. If you require the Kit(s) before this
time, please include a retrofit planning schedule with your order
so that we can try to comply with your requirements.
The sales terms (costs and availability) are estimated in relation
to economic conditions at the issue date of the Service Bulletin.
Kit 576049A08R01
Cost : 1,600.00 US Dollars
Availability : 120 calendar days from receipt of order
The Kit availability given above is the standard lead time from the
date of your purchase order. If you require the Kit(s) before this
time, please include a retrofit planning schedule with your order
so that we can try to comply with your requirements.
The sales terms (costs and availability) are estimated in relation
to economic conditions at the issue date of the Service Bulletin.
Kit 576049A09R00
Cost : 4,198.00 US Dollars
Availability : 99 calendar days from receipt of order
The Kit availability given above is the standard lead time from the
date of your purchase order. If you require the Kit(s) before this
time, please include a retrofit planning schedule with your order
so that we can try to comply with your requirements.
Kit 576049A10R00
Cost : 3,602.00 US Dollars
Availability : 99 calendar days from receipt of order
The Kit availability given above is the standard lead time from the
date of your purchase order. If you require the Kit(s) before this
time, please include a retrofit planning schedule with your order
so that we can try to comply with your requirements.
B. INDUSTRY SUPPORT INFORMATION
Airbus will not provide industrial support for accomplishment of this
Service Bulletin.
C. LIST OF COMPONENTS
Kit 576049A01R05
15

### Page 23

@ A300-600
SERVICE BULLETIN
DATE : Sep 09/94 SERVICE BULLETIN No. : A300—57—6049
REVISION No. : 07 — Dec 22/06 Page :
Printed in FRANCE © AIRBUS, 2006 All rights reserved
NOTE : Refer to the AIRBUS Standards Manual (SM) if you find part
numbers of hardware components in the related kit(s) which you
cannot identify in the LIST OF COMPONENTS of this Service
Bulletin. The SM will give you the correct part number to part
number relationship.
Kit 576049A02R06
NOTE : Refer to the AIRBUS Standards Manual (SM) if you find part
numbers of hardware components in the related kit(s) which you
cannot identify in the LIST OF COMPONENTS of this Service
Bulletin. The SM will give you the correct part number to part
number relationship.
Kit 576049A03R09
ITEM NEW PART No. QTY UM KEYWORD ITEM OLD PART No. INT INST DISP
5 NSA5351V7-36 2 Bolt
10 NSA5351V8-36 2 Bolt
35 NSA5050-7 2 Nut
36 NSA5050-8 2 Nut
ITEM NEW PART No. QTY UM KEYWORD ITEM OLD PART No. INT INST DISP
2 ASNA0093-7-36 2 Bolt
3 ASNA0093-8-36 2 Bolt
42 NAS1726-7E 2 Nut
43 NAS1726-8E 2 Nut
ITEM NEW PART No. QTY UM KEYWORD ITEM OLD PART No. INT INST DISP
7 NSA5351V8-28 2 Bolt
16 NSA5357-8-28 2 Pin
31 NSA5359-8-28 2 Bolt
36 NSA5050-8 2 Nut
38 NSA5059-4 2 Nut
39 NSA5059-5 4 Nut
40 NSA5060-4 1 Nut
43 NAS1726-8E 2 Nut
47 MS24665-152 6 Pin
48 MS24665-153 1 Pin
49 NSA5368PD616B 5 Washer
50 NSA5368PD716B 10 Washer
51 NSA5368PD816B 10 Washer
52 NSA5368PD916B 2 Washer
16

### Page 24

@ A300-600
SERVICE BULLETIN
DATE : Sep 09/94 SERVICE BULLETIN No. : A300—57—6049
REVISION No. : 07 — Dec 22/06 Page :
Printed in FRANCE © AIRBUS, 2006 All rights reserved
NOTE : Refer to the AIRBUS Standards Manual (SM) if you find part
numbers of hardware components in the related kit(s) which you
cannot identify in the LIST OF COMPONENTS of this Service
Bulletin. The SM will give you the correct part number to part
number relationship.
Kit 576049A04R06
NOTE : Refer to the AIRBUS Standards Manual (SM) if you find part
numbers of hardware components in the related kit(s) which you
cannot identify in the LIST OF COMPONENTS of this Service
Bulletin. The SM will give you the correct part number to part
number relationship.
Kit 576049A05R06
NOTE : Refer to the AIRBUS Standards Manual (SM) if you find part
numbers of hardware components in the related kit(s) which you
cannot identify in the LIST OF COMPONENTS of this Service
Bulletin. The SM will give you the correct part number to part
number relationship.
Kit 576049A06R04
ITEM NEW PART No. QTY UM KEYWORD ITEM OLD PART No. INT INST DISP
4 NSA5351V6-36 2 Bolt
5 NSA5351V7-36 2 Bolt
9 NSA5351V8-34 2 Bolt
10 NSA5351V8-36 2 Bolt
19 NSA5357-8-34 2 Bolt
30 NSA5359-8-34 2 Bolt
34 NSA5050-6 2 Nut
35 NSA5050-7 2 Nut
36 NSA5050-8 4 Nut
43 NAS1726-8E 4 Nut
ITEM NEW PART No. QTY UM KEYWORD ITEM OLD PART No. INT INST DISP
1 ASNA0093-6-36 2 Bolt
2 ASNA0093-7-36 2 Bolt
3 ASNA0093-8-36 2 Bolt
9 NSA5351V8-34 2 Bolt
19 NSA5357-8-34 2 Bolt
30 NSA5359-8-34 2 Bolt
36 NSA5050-8 2 Nut
41 NAS1726-6E 2 Nut
42 NAS1726-7E 2 Nut
43 NAS1726-8E 6 Nut
17

### Page 25

@ A300-600
SERVICE BULLETIN
DATE : Sep 09/94 SERVICE BULLETIN No. : A300—57—6049
REVISION No. : 07 — Dec 22/06 Page :
Printed in FRANCE © AIRBUS, 2006 All rights reserved
NOTE : Refer to the AIRBUS Standards Manual (SM) if you find part
numbers of hardware components in the related kit(s) which you
cannot identify in the LIST OF COMPONENTS of this Service
Bulletin. The SM will give you the correct part number to part
number relationship.
Kit 576049A07R03
ITEM NEW PART No. QTY UM KEYWORD ITEM OLD PART No. INT INST DISP
6 NSA5351V8-25 4 Bolt
8 NSA5351V8-30 2 Bolt
11 NSA5351V9-25 2 Bolt
12 NSA5351V9-30 2 Bolt
21 NSA5359-8-25 2 Pin
29 NSA5359-8-31 2 Bolt
32 NSA5351V8-31 2 Bolt
36 NSA5050-8 8 Nut
37 NSA5050-9 4 Nut
43 NAS1726-8E 4 Nut
ITEM NEW PART No. QTY UM KEYWORD ITEM OLD PART No. INT INST DISP
4 NSA5351V6-36 2 Bolt
5 NSA5351V7-36 2 Bolt
7 NSA5351V8-28 2 Bolt
10 NSA5351V8-36 2 Bolt
11 NSA5351V9-25 2 Bolt
12 NSA5351V9-30 2 Bolt
13 NSA5357-8-25 10 Bolt
14 NSA5357-8-26 2 Pin
15 NSA5357-8-27 2 Pin
16 NSA5357-8-28 2 Pin
17 NSA5357-8-30 2 Bolt
18 NSA5357-8-31 2 Bolt
19 NSA5357-8-34 2 Bolt
21 NSA5359-8-25 10 Pin
26 NSA5359-8-26 2 Pin
27 NSA5359-8-27 2 Pin
28 NSA5359-8-30 2 Bolt
29 NSA5359-8-31 2 Bolt
30 NSA5359-8-34 2 Bolt
31 NSA5359-8-28 2 Bolt
34 NSA5050-6 2 Nut
35 NSA5050-7 2 Nut
36 NSA5050-8 4 Nut
18

### Page 26

@ A300-600
SERVICE BULLETIN
DATE : Sep 09/94 SERVICE BULLETIN No. : A300—57—6049
REVISION No. : 07 — Dec 22/06 Page :
Printed in FRANCE © AIRBUS, 2006 All rights reserved
NOTE : Refer to the AIRBUS Standards Manual (SM) if you find part
numbers of hardware components in the related kit(s) which you
cannot identify in the LIST OF COMPONENTS of this Service
Bulletin. The SM will give you the correct part number to part
number relationship.
Kit 576049A08R01
NOTE : Refer to the AIRBUS Standards Manual (SM) if you find part
numbers of hardware components in the related kit(s) which you
cannot identify in the LIST OF COMPONENTS of this Service
Bulletin. The SM will give you the correct part number to part
number relationship.
Kit 576049A09R00
37 NSA5050-9 4 Nut
38 NSA5059-4 2 Nut
39 NSA5059-5 4 Nut
40 NSA5060-4 1 Nut
43 NAS1726-8E 24 Nut
47 MS24665-152 6 Pin
48 MS24665-153 1 Pin
49 NSA5368PD616B 5 Washer
50 NSA5368PD716B 10 Washer
51 NSA5368PD816B 10 Washer
52 NSA5368PD916B 2 Washer
ITEM NEW PART No. QTY UM KEYWORD ITEM OLD PART No. INT INST DISP
20 NSA5359-6-36 2 Bolt
21 NSA5359-8-25 4 Pin
28 NSA5359-8-30 2 Bolt
29 NSA5359-8-31 2 Bolt
30 NSA5359-8-34 2 Bolt
41 NAS1726-6E 2 Nut
43 NAS1726-8E 10 Nut
ITEM NEW PART No. QTY UM KEYWORD ITEM OLD PART No. INT INST DISP
6 NSA5351V8-25 6 Bolt
13 NSA5357-8-25 6 Bolt
14 NSA5357-8-26 2 Pin
15 NSA5357-8-27 2 Pin
22 NSA5351V8-26 2 Bolt
23 NSA5351V8-27 2 Bolt
ITEM NEW PART No. QTY UM KEYWORD ITEM OLD PART No. INT INST DISP
19

### Page 27

@ A300-600
SERVICE BULLETIN
DATE : Sep 09/94 SERVICE BULLETIN No. : A300—57—6049
REVISION No. : 07 — Dec 22/06 Page :
Printed in FRANCE © AIRBUS, 2006 All rights reserved
NOTE : Refer to the AIRBUS Standards Manual (SM) if you find part
numbers of hardware components in the related kit(s) which you
cannot identify in the LIST OF COMPONENTS of this Service
Bulletin. The SM will give you the correct part number to part
number relationship.
Kit 576049A10R00
NOTE : Refer to the AIRBUS Standards Manual (SM) if you find part
numbers of hardware components in the related kit(s) which you
cannot identify in the LIST OF COMPONENTS of this Service
Bulletin. The SM will give you the correct part number to part
number relationship.
D. LIST OF MATERIALS — OPERATOR SUPPLIED
(1) Consumable Materials
(2) Components
None
E. PARTS TO BE RE—IDENTIFIED BY THE OPERATOR
None
36 NSA5050-8 10 Nut
43 NAS1726-8E 10 Nut
ITEM NEW PART No. QTY UM KEYWORD ITEM OLD PART No. INT INST DISP
21 NSA5359-8-25 6 Pin
26 NSA5359-8-26 2 Pin
27 NSA5359-8-27 2 Pin
43 NAS1726-8E 10 Nut
DESCRIPTION REFERENCE TO CML
MAT. No.
QTY PER A/C INST DISP
Fuel Tank Sealant
Polysulfide
09-001 As required
Corrosion Interfay Sealant 09-005 As required
Solvant General Purpose 11-026 As required
Chemical Conversion Coating
Yellow Aluminum
13-002 As required
Anti-Corrosion Primer
(Epoxy-Imprvdadhesion)
16-006 As required
External Top Coat
(Polyurethane)
16-018 As required
ITEM NEW PART No. QTY UM KEYWORD ITEM OLD PART No. INT INST DISP
20

### Page 28

@ A300-600
SERVICE BULLETIN
DATE : Sep 09/94 SERVICE BULLETIN No. : A300—57—6049
REVISION No. : 07 — Dec 22/06 Page :
Printed in FRANCE © AIRBUS, 2006 All rights reserved
F. TOOLING — PRICE AND AVAILABILITY
To acomplish this Servive Bulletin it is necessary to use the following
tools and equipment
— Equipment and materials for check of holes as per Non-Destructive
Testing Manual (NTM) 57-10-50, Part 6, Procedures A and B
G. SPECIAL TOOLS
None
21

### Page 29

@ A300-600
SERVICE BULLETIN
DATE : Sep 09/94 SERVICE BULLETIN No. : A300—57—6049
REVISION No. : 07 — Dec 22/06 Page :
Printed in FRANCE © AIRBUS, 2006 All rights reserved
This Page Intentionally Left Blank
22

### Page 30

@ A300-600
SERVICE BULLETIN
DATE : Sep 09/94 SERVICE BULLETIN No. : A300—57—6049
REVISION No. : 07 — Dec 22/06 Page :
Printed in FRANCE © AIRBUS, 2006 All rights reserved
3. ACCOMPLISHMENT INSTRUCTIONS
A. GENERAL
WARNING : MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND ALL THE CAUTIONS
INCLUDED IN THE REFERENCED PROCEDURES.
CAUTION : ALWAYS OBEY THE PRECAUTIONS THAT FOLLOW TO KEEP ELECTRICAL
WIRING IN A SATISFACTORY CONDITION (ELECTRICALLY AND
MECHANICALLY SERVICEABLE). WHEN YOU DO MAINTENANCE WORK,
REPAIRS OR MODIFICATIONS, ALWAYS KEEP ELECTRICAL WIRING,
COMPONENTS AND THE WORK AREA AS CLEAN AS POSSIBLE. TO DO THIS:
PUT PROTECTION, SUCH AS PLASTIC SHEETING, CLOTHS, ETC; AS
NECESSARY ON WIRING AND COMPONENTS.
REGULARLY REMOVE ALL SHAVINGS, UNWANTED MATERIAL AND OTHER
CONTAMINATION.
THESE PRECAUTIONS WILL DECREASE THE RISK OF CONTAMINATION AND
DAMAGE TO THE ELECTRICAL WIRING INSTALLATION.
IN CASE OF CONTAMINATION REFER TO ESPM 20-55-00.
(1) Preparation
(a) Electrically ground the aircraft (Refer to AMM 24-40-00 Page
block 301).
(b) Put the access platforms in position.
(c) Defuel center fuel tank (Refer to AMM 28-25-00 Page block
301).
(d) Perform degassing of center fuel tank (Refer to AMM 28-00-00
Page block 301) and (Refer to AMM 28-10-00 Page block 301).
NOTE : Make certain that safety precautions regarding access
to, and working in, center fuel tank are strictly adhered to.
(e) Open the access doors 147AZ and 148AZ (Refer to AMM 06-41-53)
and (Refer to AMM 28-11-29 Page block 401).
(f) Open, safety and tag these circuit breakers:
PANEL DESIGNATION FIN LOCATION
132VU LIGHTING-EXRERIOR LT-LAND L
SUPPLY
1LB N 80
132VU LIGHTING-EXRERIOR LT-LAND R
SUPPLY
2LB M 78
132VU LIGHTING-EXRERIOR LT-LAND L
SUPPLY
3LB M 81
132VU LIGHTING-EXRERIOR LT-LAND R CTL 4LB M 77
23

### Page 31

@ A300-600
SERVICE BULLETIN
DATE : Sep 09/94 SERVICE BULLETIN No. : A300—57—6049
REVISION No. : 07 — Dec 22/06 Page :
Printed in FRANCE © AIRBUS, 2006 All rights reserved
(2) Standard Practices
(a) For inspection
1 For the specification of the material numbers (Mat. No.),
refer to CML.
2 To clean the surface to be sealed with Solvant General
Purpose (Mat No. 11-026) .
3 Do the sealing processes (Refer to SRM 51-76-10).
4 Torque the standard threaded fasteners (Refer to AMM
20-21-12) and (Refer to SRM 51-43-00).
5 For alternative and substitute fasteners, (Refer to SRM
51-40-32).
6 Install the fasteners with Corrosion Interfay Sealant (Mat
No. 09-005)  and encapsulate exposed parts of fasteners
with Fuel Tank Sealant   Polysulfide (Mat No. 09-001) .
(b) For repair
1 Drill fastener holes (Refer to SRM 51-40-40).
2 For oversized fasteners (Refer to SRM 51-40-31).
3 For fastener spacing and margin data (Refer to SRM
51-40-50).
4 For alternative and substitute fasteners, (Refer to SRM
51-40-32).
5 To countersink data (Refer to SRM 51-40-47).
133VU RSVR/WARN 1GR 333/T 58
133VU ENG1/PUMP CTL/G 99GK 331/U 58
133VU ENG2/PUMP CTL/G 100GK 332/U 58
133VU ELEC/PUMPS/WARN 4GE 331/V 60
133VU PTU CTL/G/B 1GL 332/U 59
133VU ENG1/PUMP CTL/B 31GJ 331/V 57
133VU PTU CTL/G/Y 6GL 332/U 60
133VU ENG2/PUMP CTL/Y 1GD 332/U 57
133VU RAT/TEST 1GF 331/V 59
133VU ACCU PRESS/CTL &/CARGO DOOR/PUMP 7GX 333/T 51
101VU ELEC/HYD/PUMP 23GX GEN2/B 8
133VU RSVR/WARN 1GQ 333/T 59
PANEL DESIGNATION FIN LOCATION
24

### Page 32

@ A300-600
SERVICE BULLETIN
DATE : Sep 09/94 SERVICE BULLETIN No. : A300—57—6049
REVISION No. : 07 — Dec 22/06 Page :
Printed in FRANCE © AIRBUS, 2006 All rights reserved
6 To renew protective finish (Refer to AMM 51-23-10) using
Chemical Conversion Coating Yellow Aluminum (Mat No.
13-002) , Anti-Corrosion Primer (Epoxy-Imprvdadhesion) (Mat
No. 16-006)  (for fuel tank), External Top Coat
(Polyurethane) (Mat No. 16-018)  (for external
applications).
B. INSPECTION
(1) Get access to the inspection area.
Refer to figures 4 , 5 , 6 , 7
(a) Removal of LH hydraulic panel.
1 Remove Fairings (refer to figure 4 )
2 In zone 542, disconnect plugs 43QA-A and 49QA-A.
3 In zone 571, remove ties and disconnect plugs 3GHA, 11QB-A,
11QQ-A,24GQ-A, 33GR-A, 51QA-A, 57QA-A, 1935VC-A, 1937VC-A
and ground connections 536VN and 538VN.
NOTE : Plugs 11QQ-A and 12QQ-A:
Available only on A/C with Mod. No. 08679, 08680
(Service Bulletin No. A300-28-6028 ).
4 Remove hydraulic panel (refer to figure 5 )
(b) Removal of RAT (Ram Air Turbine) panel
1 Remove fairings (refer to figure 4 )
2 Fairings Item (60) Retain
4 Inserts Item (61) Retain
2 Bushes Item (62) Retain
2 Fairings Item (63) Retain
2 Bolts Item (64) Retain
2 Bolts Item (65) Retain
4 Nuts Item (66) Retain
1 Hydraulic panel
assy
Item (59) Retain
6 Guides Item (67) Retain
6 Bolts Item (68) Retain
1 Bolt Item (69) Retain
2 Bolts Item (70) Retain
2 Washers Item (71) Retain
1 Washer Item (72) Retain
1 Nut Item (38) Discard
2 Nut Item (39) Discard
3 Cotter pins Item (47) Discard
25

### Page 33

@ A300-600
SERVICE BULLETIN
DATE : Sep 09/94 SERVICE BULLETIN No. : A300—57—6049
REVISION No. : 07 — Dec 22/06 Page :
Printed in FRANCE © AIRBUS, 2006 All rights reserved
2 Remove hydraulic lines
CAUTION: PLUG/CAP PORTS AND ALL OPEN LINE ENDS.
— Return filter line
— Pressurization line
— Overflow line
— Return line
3 Remove adjustable rod/crank link of RAT (refer to figure 6
)
WARNING : BEFORE PROCEEDING WITH ANY WORK ON RAT, MAKE
CERTAIN THAT UPLOCK UNIT ACTUATING LEVER RIGGING
PIN IS CORRECTLY INSERTED.
4 In zone 671, remove ties and disconnect plugs 12QB-A,
12QQ-A, 52QA-A, 58QA-A, 1936VC-A, 1983VC-A.
5 Remove RAT panel, refer to figure 7
(2) For the inspection area and holes location, refer to figure 1 ,
sheets 1  and 2 .
2 Fairings Item (60) Retain
4 Inserts Item (61) Retain
2 Bushes Item (62) Retain
2 Fairings Item (63) Retain
2 Bolts Item (64) Retain
2 Bolts Item (65) Retain
4 Nuts Item (66) Retain
1 Bolt Item (74) Retain
1 Nut Item (40) Discard
1 Sleeve Item (75) Retain
1 Washer Item (76) Retain
1 Cotter pin Item (48) Discard
1 Hydraulic panel
assy
Item (58) Retain
3 Guides Item (67) Retain
3 Guides Item (73) Retain
6 Bolts Item (68) Retain
1 Bolt Item (69) Retain
2 Bolts Item (70) Retain
2 Washers Item (71) Retain
1 Washer Item (72) Retain
1 Nut Item (38) Discard
2 Nuts Item (39) Discard
3 Cotter pin Item (47) Discard
26

### Page 34

@ A300-600
SERVICE BULLETIN
DATE : Sep 09/94 SERVICE BULLETIN No. : A300—57—6049
REVISION No. : 07 — Dec 22/06 Page :
Printed in FRANCE © AIRBUS, 2006 All rights reserved
(3) Do a rotating probe inspection
(a) Config. No. 01 or 02 or 03
Refer to figure 2 , sheets 1  thru 9 .
(b) Config. No. 04
Refer to figure 3 , sheets 1  thru 9 .
(4) For the Inspection Report, refer to Appendix 01 .
C. REPAIR
(1) Replace fasteners, hole H (config.No 01 or 02 or 03).
Refer to figure 8  and figure 9 .
NOTE : During the installation, if the fasteners are too long,
+1.6mm(0.063in.), it is possible to add one washer NSA5368
(for oversize bolt) with a new nut the reference of which
must be the same as the reference of removed nut.
(a) Kit 576049A04R06
(b) Kit 576049A05R06
(c) Kit 576049A08R01
(d) Kit 576049A01R05
(e) Kit 576049A02R06
2 Bolt NSA5351V6-36 Item 4
2 Bolt NSA5351V7-36 Item 5
2 Bolt NSA5351V8-36 Item 10
2 Nut NSA5050-6 Item 34
2 Nut NSA5050-7 Item 35
2 Nut NSA5050-8 Item 36
2 Bolt ASNA0093-6-36 Item 1
2 Bolt ASNA0093-7-36 Item 2
2 Bolt ASNA0093-8-36 Item 3
2 Nut NAS1726-6E Item 41
2 Nut NAS1726-7E Item 42
2 Nut NAS1726-8E Item 43
2 Bolt NSA5359-6-36 Item 20
2 Nut NAS1726-6E Item 41
2 Bolt NSA5351V7-36 Item 5
2 Bolt NSA5351V8-36 Item 10
2 Nut NSA5050-7 Item 35
2 Nut NSA5050-8 Item 36
27

### Page 35

@ A300-600
SERVICE BULLETIN
DATE : Sep 09/94 SERVICE BULLETIN No. : A300—57—6049
REVISION No. : 07 — Dec 22/06 Page :
Printed in FRANCE © AIRBUS, 2006 All rights reserved
(2) Replace fasteners, hole I (config.No 01 or 02 or 03).
Refer to figure 8  and figure 10 .
NOTE : During the installation, if the fasteners are too long,
+1.6mm(0.063in.), it is possible to add one washer NSA5368
(for oversize bolt) with a new nut the reference of which
must be the same as the reference of removed nut.
(a) Kit 576049A04R06
(b) Kit 576049A08R01
(c) Kit 576049A04R06
(d) Kit 576049A03R09
(3) Replace fasteners, holes K and N (config.No 01 or 02 or 03)
Refer to figure 8 , figure 11  and figure 14 .
NOTE : During the installation, if the fasteners are too long,
+1.6mm(0.063in.), it is possible to add one washer NSA5368
(for oversize bolt) with a new nut the reference of which
must be the same as the reference of removed nut.
(a) Kit 576049A06R04
2 Bolt ASNA0093-7-36 Item 2
2 Bolt ASNA0093-8-36 Item 3
2 Nut NAS1726-7E Item 42
2 Nut NAS1726-8E Item 43
2 Bolt NSA5351V8-34 Item 9
2 Bolt NSA5357-8-34 Item 19
2 Nut NSA5050-8 Item 36
2 Nut NAS1726-8E Item 43
2 Bolt NSA5359-8-34 Item 30
2 Nut NAS1726-8E Item 43
2 Bolt NSA5359-8-34 Item 30
2 Nut NAS1726-8E Item 43
2 Bolt NSA5351V8-28 Item 7
2 Bolt NSA5357-8-28 Item 16
2 Bolt NSA5359-8-28 Item 31
2 Nut NSA5050-8 Item 36
2 Nut NAS1726-8E Item 43
5 Washer NSA5368PD616B Item 49
10 Washer NSA5368PD716B Item 50
10 Washer NSA5368PD816B Item 51
2 Washer NSA5368PD916B Item 52
28

### Page 36

@ A300-600
SERVICE BULLETIN
DATE : Sep 09/94 SERVICE BULLETIN No. : A300—57—6049
REVISION No. : 07 — Dec 22/06 Page :
Printed in FRANCE © AIRBUS, 2006 All rights reserved
(b) Kit 576049A08R01
(c) Kit 576049A06R04
(4) Replace fasteners, holes L and M (config.No 01 or 02 or 03).
Refer to figure 8 , figure 11  and figure 14 .
NOTE : During the installation, if the fasteners are too long,
+1.6mm(0.063in.), it is possible to add one washer NSA5368
(for oversize bolt) with a new nut the reference of which
must be the same as the reference of removed nut.
(a) Kit 576049A06R04
(b) Kit 576049A08R01
(c) Kit 576049A06R04
(5) Replace the fasteners of the holes U, V, W, X and Y (config. No.01
or 02 or 03).
Refer to figure 8 , figure 12 , sheets 1  and 2 .
NOTE : During the installation, if the fasteners are too long,
+1.6mm(0.063in.), it is possible to add one washer NSA5368
(for oversize bolt) with a new nut the reference of which
must be the same as the reference of removed nut.
(a) Kit 576049A09R00
2 Bolt NSA5351V8-25 Item 6
2 Bolt NSA5351V8-30 Item 8
4 Nut NSA5050-8 Item 36
2 Bolt NSA5359-8-25 Item 21
2 Bolt NSA5359-8-30 Item 28
4 Nut NAS1726-8E Item 43
2 Bolt NSA5351V9-25 Item 11
2 Bolt NSA5351V9-30 Item 12
4 Nut NSA5050-9 Item 37
2 Bolt NSA5351V8-25 Item 6
2 Bolt NSA5351V8-31 Item 32
4 Nut NSA5050-8 Item 36
2 Bolt NSA5359-8-25 Item 21
2 Bolt NSA5359-8-31 Item 29
4 Nut NAS1726-8E Item 43
2 Bolt NSA5359-8-31 Item 29
2 Bolt NSA5359-8-25 Item 21
4 Nut NAS1726-8E Item 43
29

### Page 37

@ A300-600
SERVICE BULLETIN
DATE : Sep 09/94 SERVICE BULLETIN No. : A300—57—6049
REVISION No. : 07 — Dec 22/06 Page :
Printed in FRANCE © AIRBUS, 2006 All rights reserved
(b) Kit 576049A10R00
(6) Replace fasteners, hole H (config. No.04).
Refer to figure 8  and figure 13
NOTE : During the installation, if the fasteners are too long,
+1.6mm(0.063in.), it is possible to add one washer NSA5368
(for oversize bolt) with a new nut the reference of which
must be the same as the reference of removed nut.
(a) Kit 576049A07R03
(b) Kit 576049A07R03
(7) Replace fasteners, hole I (config. No.04).
Refer to figure 8  and figure 13 .
NOTE : During the installation, if the fasteners are too long,
+1.6mm(0.063in.), it is possible to add one washer NSA5368
(for oversize bolt) with a new nut the reference of which
must be the same as the reference of removed nut.
(a) Kit 576049A07R03
6 Bolt NSA5351V8-25 Item 6
2 Bolt NSA5351V8-26 Item 22
2 Bolt NSA5351V8-27 Item 23
6 Bolt NSA5357-8-25 Item 13
2 Bolt NSA5357-8-26 Item 14
2 Bolt NSA5357-8-27 Item 15
10 Nut NSA5050-8 Item 36
10 Nut NAS1726-8E Item 43
6 Bolt NSA5359-8-25 Item 21
2 Bolt NSA5359-8-26 Item 26
2 Bolt NSA5359-8-27 Item 27
10 Nut NAS1726-8E Item 43
2 Bolt NSA5351V6-36 Item 4
2 Bolt NSA5351V7-36 Item 5
2 Bolt NSA5351V8-36 Item 10
2 Nut NSA5050-6 Item 34
2 Nut NSA5050-7 Item 35
2 Nut NSA5050-8 Item 36
2 Bolt NSA5351V7-36 Item 5
2 Bolt NSA5351V8-36 Item 10
2 Nut NSA5050-7 Item 35
2 Nut NSA5050-8 Item 36
2 Bolt NSA5357-8-34 Item 19
2 Nut NAS1726-8E Item 43
30

### Page 38

@ A300-600
SERVICE BULLETIN
DATE : Sep 09/94 SERVICE BULLETIN No. : A300—57—6049
REVISION No. : 07 — Dec 22/06 Page :
Printed in FRANCE © AIRBUS, 2006 All rights reserved
(b) Kit 576049A07R03
(c) Kit 576049A07R03
(8) Replace fasteners, holes K and N (config. No.04).
Refer to figure 8  and figure 13 .
NOTE : During the installation, if the fasteners are too long,
+1.6mm(0.063in.), it is possible to add one washer NSA5368
(for oversize bolt) with a new nut the reference of which
must be the same as the reference of removed nut.
(a) Kit 576049A07R03
(b) Kit 576049A07R03
(9) Replace fasteners, holes L and M (config. No.04).
Refer to figure 8  and figure 13 .
NOTE : During the installation, if the fasteners are too long,
+1.6mm(0.063in.), it is possible to add one washer NSA5368
(for oversize bolt) with a new nut the reference of which
must be the same as the reference of removed nut.
(a) Kit 576049A07R03
(b) Kit 576049A07R03
2 Bolt NSA5359-8-34 Item 30
2 Nut NAS1726-8E Item 43
2 Bolt NSA5351V8-28 Item 7
2 Bolt NSA5357-8-28 Item 16
2 Bolt NSA5359-8-28 Item 31
2 Nut NSA5050-8 Item 36
2 Nut NAS1726-8E Item 43
2 Bolt NSA5357-8-25 Item 13
2 Bolt NSA5359-8-25 Item 21
2 Bolt NSA5357-8-30 Item 17
2 Bolt NSA5359-8-30 Item 28
4 Nut NAS1726-8E Item 43
2 Bolt NSA5351V9-25 Item 11
2 Bolt NSA5351V9-30 Item 12
4 Nut NSA5050-9 Item 37
2 Bolt NSA5357-8-25 Item 13
2 Bolt NSA5359-8-25 Item 21
2 Bolt NSA5357-8-31 Item 18
2 Bolt NSA5359-8-31 Item 29
4 Nut NAS1726-8E Item 43
31

### Page 39

@ A300-600
SERVICE BULLETIN
DATE : Sep 09/94 SERVICE BULLETIN No. : A300—57—6049
REVISION No. : 07 — Dec 22/06 Page :
Printed in FRANCE © AIRBUS, 2006 All rights reserved
(10) Replace fasteners, holes U, V, W, X, Y (config. No.04).
Refer to figure 8  and figure 13 .
NOTE : During the installation, if the fasteners are too long,
+1.6mm(0.063in.), it is possible to add one washer NSA5368
(for oversize bolt) with a new nut the reference of which
must be the same as the reference of removed nut.
(a) Kit 576049A07R03
(11) Install RAT panel assembly
Refer to figures 6  and 7
(a) Install panel (Refer to figure 7)
NOTE : Items (58), (67), (73), (68), (69), (70), (71), (72)
were retained at removal.
(b) In zone 671, install ties and connect plugs 12QB-A, 12QQ-A,
52QA-A, 58QA-A, 1936VC-A, 1938VC-A.
(c) Install adjustable rod/crank link of RAT (refer to figure 6)
2 Bolt NSA5359-8-25 Item 21
2 Bolt NSA5359-8-31 Item 29
4 Nut NAS1726-8E Item 43
6 Bolt NSA5357-8-25 Item 13
6 Bolt NSA5359-8-25 Item 21
2 Bolt NSA5357-8-26 Item 14
2 Bolt NSA5359-8-26 Item 26
2 Bolt NSA5357-8-27 Item 15
2 Bolt NSA5359-8-27 Item 27
10 Nut NAS1726-8E Item 43
1 Panel assy Item (58)
3 Guides Item (67)
3 Guides Item (73)
6 Bolts Item (68)
1 Bolt Item (69)
2 Bolts Item (70)
2 Washer Item (71)
1 Washer Item (72)
1 Nut NSA5059-4 Item 38
2 Nuts NSA5059-5 Item 39
3 Cotter pin MS24665-152 Item 47
1 Bolt Item (74)
1 Nut NSA5060-4 Item 40
32

### Page 40

@ A300-600
SERVICE BULLETIN
DATE : Sep 09/94 SERVICE BULLETIN No. : A300—57—6049
REVISION No. : 07 — Dec 22/06 Page :
Printed in FRANCE © AIRBUS, 2006 All rights reserved
NOTE : Items (74), (75), (76) were retained et removal.
(d) Install hydraulic lines:
— Return filter line
— Pressurization line
— Overflow line
— Return line.
(12) Installation of LH hydraulic panel
Refer to figure 5
(a) Install hydraulic panel
NOTE : Items (59), (67), (68), (69), (70), (71), (72) were
retained at removal.
(b) In zone 571, install ties and connect plugs 3GH-A, 11QB-A,
11QQ-A, 24GQ-A, 33GR-A, 51QA-A, 57QA-A, 1935VC-A, 1937VC-A and
ground connections 536VN and 538VN.
(13) Install fairings, on LH and RH sides.
Refer to figure 4
(a) Install on LH side
1 Sleeve Item (75)
1 Washer Item (76)
1 Cotter pin MS24665-153 Item 48
1 Hydraulic panel
assy
Item (59)
6 Guides Item (67)
6 Bolt Item (68)
1 Bolt Item (69)
2 Bolt Item (70)
2 Washer Item (71)
1 Washer Item (72)
1 Nut NSA5059-4 Item 38
2 Nuts NSA5059-5 Item 39
3 Cotter pin MS24665-152 Item 47
2 Fairing Item (60)
4 Insert Item (61)
2 Bushes Item (62)
2 Fairing Item (63)
2 Bolt Item (64)
33

### Page 41

@ A300-600
SERVICE BULLETIN
DATE : Sep 09/94 SERVICE BULLETIN No. : A300—57—6049
REVISION No. : 07 — Dec 22/06 Page :
Printed in FRANCE © AIRBUS, 2006 All rights reserved
NOTE : Items (60), (61), (62), (63), (64), (65), (66) were
retained at removal.
(b) Install on RH side
NOTE : Items (60), (61), (62), (63), (64), (65), (66) were
retained at removal.
(c) In zone 542, connect plugs 43QA-A and 49QA-A.
D. TEST
(1) Job set-up
(a) Connect electrical ground power unit and energize the aircraft
electrical network and make certain that electronics racks are
ventilated (Refer to AMM 24-41-00 Page block 301).
(b) Close access doors 147AZ, 148AZ (Refer to AMM 28-11-29 Page
block 401).
(c) Refuel center tank (Refer to AMM 28-25-00 Page block 301).
(2) Test
(a) Perform operational test of landing lights (Refer to AMM
33-42-00 Page block 501).
(b) Perform functional test of hydraulic fluid tank pressurizing
system (Refer to AMM 29-14-00 Page block 501).
(c) Perform operational test of hydraulic fluid temperature
indicating system (Refer to AMM 29-33-00 Page block 501).
(d) Perform adjustment of rod/crank of RAT (Refer to AMM 29-25-00
Page block 501).
(e) Perform functional test of yellow auxiliary power (RAT) (Refer
to AMM 29-25-00 Page block 501).
(f) Perform functional test of hydraulic fluid indicating system
(Refer to AMM 29-31-00 Page block 501).
2 Bolt Item (65)
4 Nut Item (66)
2 Fairing Item (60)
4 Insert Item (61)
2 Bushes Item (62)
2 Fairing Item (63)
2 Bolt Item (64)
2 Bolt Item (65)
4 Nut Item (66)
34

### Page 42

@ A300-600
SERVICE BULLETIN
DATE : Sep 09/94 SERVICE BULLETIN No. : A300—57—6049
REVISION No. : 07 — Dec 22/06 Page :
Printed in FRANCE © AIRBUS, 2006 All rights reserved
(g) Perform leak test (Refer to AMM 28-11-00 Page block 501).
(h) Perform operational test of pressure switch booster pumps 1
and 2, LH and RH inner tank (Refer to AMM 28-21-00 Page block
501).
(i) Perform operational test of actuator isolation valves, LH and
RH inner tank (Refer to AMM 28-22-00 Page block 501).
(j) Perform test procedure of fuel pump water scavenge, LH and RH
inner tank, described below.
NOTE (01) This test is only required on aircraft yhat have
Mod. No.08679, No.08680 or Service Bulletin No.
A300-28-6028 accomplished.
NOTE (02) Plugs 11QQ-A and 12QQ-A: available A/C only with
Mod. No.08679, No.08680 or Service Bulletin No.
A300-28-6028 accomplished.
(k) Open, safety and tag these circuit breakers:
(l) Make sure that these circuit breakers are closed.
— Energize the aircraft electrical circuits (Refer to AMM
24-41-00 Page block 301).
— On the panel 9VU, make sure that the ENG1 and ENG2 HP valve
control levers are in OFF position.
— Refuel the aircraft to get a minimum fuel quantity between
1500 kgs (3300 lbs) and 2000 kgs (4400 lbs) (Refer to AMM
28-11-41 Page block 501).
PANEL DESIGNATION FIN LOCATION
101VU FUEL/L INNER TK/PUMP 2/SUPPLY 1QA ESS1/B 01
101VU FUEL/R INNER TK/PUMP 1/SUPPLY 2QA ESS1/A 01
101VU FUEL/L INNER TK/PUMP 1/SUPPLY 7QA GEN2/A 20
101VU FUEL/R INNER TK/PUMP 2/SUPPLY 8QA GEN2/A 17
101VU FUEL/CTR TK/L PUMP SUPPLY 99BA ESS/B 04
101VU FUEL/CTR TK/R PUMP SUPPLY 100QA GEN2/B 14
132VU SCAVENGE SYSTEM/PUMP/INNER L 1QQ 325/K 60
132VU SCAVENGE SYSTEM/PUMP/INNER R 2QQ 325/K 61
132VU SCAVENGE SYSTEM/PUMP/TT 3QQ 325/K 62
PANEL DESIGNATION FIN LOCATION
132VU SCAVENGE SYSTEM/PUMP/CONTROL 13QQ 325/K 63
132VU FUEL/AUTO FEED CTL 65QA 323M 55
132VU LIGHTING/MAINT PANEL/ANN & MFA 1WB 324/L 78
132VU LIGHTING/MAINT PANEL/ANN & MFA 22WB 324/L 79
35

### Page 43

@ A300-600
SERVICE BULLETIN
DATE : Sep 09/94 SERVICE BULLETIN No. : A300—57—6049
REVISION No. : 07 — Dec 22/06 Page :
Printed in FRANCE © AIRBUS, 2006 All rights reserved
— On the overhead panel 430VU, mak sure that the fuel pump
switches that follow are in the OFF position:L outer tank
pump 1,L outer tank pump 2,R outer tank pump 1,R outer tank
pump 2,Trim tank pump 1,Trim tank pump 2.
— On the over head 430VU, make sure that the trim TK MODE
oushbutton switch is in AUTO position.
— Do this test:
ACTION RESULT
1. On the maintenance panel 472VU:
— Put the ANN LT switch in the TEST
position.
— The fault light on the scavenge
system annunciator comes ON.
— Put the ANN LT switch in the READ
position.
— Push in the MFA RESET switch. — The fault light on the scavenge
system annunciator goes OFF.
2. On the overhead panel 430VU:
— Press (in) all the INR TK pump
pushbutton switshes (p/bsw).
— The OFF lights on the INR TK PUMP
p/bsw go OFF.
— Press (in) both the CTR TK PUMP
p/bsw.
— The OFF lights on both the CTR TK
PUMP p/bsw go OFF.
3. On the maintenance panel 472VU:
— ANN LT switch which is in READ
position from above.
— The fault light on the scavenge
system annunciator comes ON.
4. On the overhead panel 430VU:
— Release (out) both the CTR TK PUMP
p/bsw.
— The OFF lights on the CTR TK PUMP
p/bsw come ON.
5. On the maintenance panel 472VU:
— Push in the MFA RESET switch. — The FAULT light on the scavenge
system annunciator goes OFF.
6. On the panel 132VU:
— Remove the tags and close circuit
breakers 1QQ, 2QQ and 3QQ.
7. On the overhead panel 430VU:
— Push (in) both the the CTR TK PUMP
p/bsw.
— The OFF lights on the CTR TK PUMP
p/bsw go OFF.
8. On the maintenance panel 472VU:
— With the ANN LT switch still in the
READ position.
— The FAULT light on the scavenge
system annunciator stays OFF.
36

### Page 44

@ A300-600
SERVICE BULLETIN
DATE : Sep 09/94 SERVICE BULLETIN No. : A300—57—6049
REVISION No. : 07 — Dec 22/06 Page :
Printed in FRANCE © AIRBUS, 2006 All rights reserved
— De-energize the aircraft electrical circuits (Refer to AMM
24-41-00 Page block 301).
— Remove the tag and close these circuit breakers:
9. On the panel 132VU:
— Open, safety and tag circuit breaker
1QQ.
— L INR scavenge pump stops running.
10. On the maintenance panel 472VU:
— With the ANN LT switch still in the
READ position.
— The FAULT light on the scavenge
system annunciator comes ON.
11. On the panel 132VU:
— Remove the tags and close circuit
breakers 1QQ.
12. On the maintenance panel 472VU:
— Push in the MFA RESET switch. — The FAULT light on the scavenge
system annunciator goes OFF.
13. On the panel 132VU:
— Open, safety and tag circuit breaker
2QQ.
— R INR scavenge pump stops running.
14. On the maintenance panel 472VU:
— With the ANN LT switch in the READ
position.
— The FAULT light on the scavenge
system annunciator comes ON.
15. On the panel 132VU:
— Remove the tags and close circuit
breakers 2QQ.
16. On the maintenance panel 472VU:
— Push in the MFA RESET switch. — The FAULT light on the scavenge
system annunciator goes OFF.
— Put the ANN LT switch in the OFF
position.
PANEL DESIGNATION FIN LOCATION
101VU FUEL/L INNER TK PUMP2/SUPPLY 1QA ESS1/B 01
101VU FUEL/R INNER TK PUMP1/SUPPLY 2QA ESS1/A 01
101VU FUEL/L INNER TK PUMP1/SUPPLY 7QA GEN2/A 20
101VU FUEL/R INNER TK PUMP2/SUPPLY 8QA GEN2/A 17
101VU FUEL/CTR TK/L PUMP SUPPLY 99QA ESS/B 04
101VU FUEL/CTR TK/L PUMP SUPPLY 100QA GEN2/B 14
37

### Page 45

@ A300-600
SERVICE BULLETIN
DATE : Sep 09/94 SERVICE BULLETIN No. : A300—57—6049
REVISION No. : 07 — Dec 22/06 Page :
Printed in FRANCE © AIRBUS, 2006 All rights reserved
E. CLOSE UP
(1) Make sure that the work areas are clean and clear of tools and
other items.
(2) Remove the access platforms.
(3) Restore the systems and the aircraft to normal operating condition.
F. DOCUMENTATION
Write in the applicable aircraft records that you have done all the work
given in the Service Bulletin.
38

### Page 46

@ A300-600
SERVICE BULLETIN
DATE : Sep 09/94 SERVICE BULLETIN No. : A300—57—6049
REVISION No. : 07 — Dec 22/06 Page :
Printed in FRANCE © AIRBUS, 2006 All rights reserved
Figure 1 Sheet 1
Location
39

### Page 47 (OCR)

A300-600
SERVICE BULLETIN
RIB1
WING CENTER BOX  WING SPAR BOX
HOLE M HOLE Y  HOLE U  HOLE V
HOLE L
A
- HOLE K
HOLE H  HOLE I HOLE N HOLE W HOLE X
WING CENTER BOX - INTERNAL VIEW
LEFT SIDE SHOWN
RIGHT SIDE SYMMETRICAL
SECTION A-A
HOLE I
FR47 DATUM
FRONT FITTING FR47 •
ASB5 576049 AC 00 d  INTERNAL ANGLE  SHIM
VALID ALL CONFIG.
Figure 1 Sheet 2
Location
DATE : Sep 09/94  SERVICE BULLETIN No. : A300-57-6049
REVISION No. : 07 - Dec 22/06  Page : 40
Printed in FRANCE © AIRBUS, 2006 All rights reserved

### Page 48 (OCR)

A300-600
SERVICE BULLETIN
Hole H:  INSPECTION  • OF  HOLE H
do  the  rotating  probe inspection  ON FR47.
NTM  57-10-50.  Part  6. procedure  of  THIS  VIEW  SHOWS ONLY
hole  H,  on  internal  threshold  ONE  LAYER
and  intervals  per  1.E. (2)  or  (L1  =  L2)
apply  Service  Bulletin  No.  A300-57-6050
(Mod.  No.  10454520572).
Remove PR  sealant  around fastener,
use  exclusively  non-metallic
spatula  in  the  event  of scratches,
polish  surface  and  perform  protection.
CRACK
Remove  fast emat. 11-026.  and  clean  QUESTION
bore  with
ACTION
Check bore  diameter  FINDING
(nominal  diameter
or R1 or  R2  oversize).
Contact  AI
Perform rotating  probe  inspection  Before
in all  the  layers  of  hole  H.  next  flight
DIA (0.499in}}  12.7mm
Cracks
GO  to
sheet  2
If  nominal fastener removed is
not  damaged,  this  fastener  can
be  re-installed.
If  the  fastener  is damaged,
replace  it 2 fastener is removed,  new  same  fastener.
If  R1 or R2
ASB5 576049 AD 00 d  install  next  nominal  fastener
Ref. Para. 3.C.(1).(a)or (b) or(c)
Do  subsequent inspections
in Para.  intervals  1.E. (2)  Perform PR sealing
Figure 2 Sheet 1
Flow Chart (Config. 01 or 02 or 03)
DATE : Sep 09/94  SERVICE BULLETIN No. : A300-57-6049
REVISION No. : 07 - Dec 22/06  Page : 41
Printed in FRANCE © AIRBUS, 2006 All rights reserved

### Page 49 (OCR)

A300-600
SERVICE BULLETIN
* For A/C  SB A300-57-6050  config  No. 02  Continuation of sheet 1
Mod.  10454520572
accomplished):
contact  AI  es  Cracks
DIA. ≥  12.7mm
yes  (0.499in.)
Contact Al
Before  no
next  flight
Crack L2 > 1.6mm  Crack L2 ≤ 1.6mm
(0.062in.)  (0.062in.)
Ream hole, step by
Contact Al  Before  dimension: (0.499in.)  12.7mm  step  oversize  max.  dia.
next flight  and  rotating  do a inspection  87-18-50A.  as
Part 6. procedure  NTM
Residual crack
Install
oversize  fasteners
Ref  Far a  3. C.
(1). (d) or (e)
ASB5 576049 AE 00 d  Do  Perform PR sealing  subsequent inspections
SEE A SHEET 1  at  intervals  giver
in Para.  1.E. (2
Figure 2 Sheet 2
Flow Chart (Config. 01 or 02 or 03)
DATE : Sep 09/94  SERVICE BULLETIN No. : A300-57-6049
REVISION No. : 07 - Dec 22/06  Page : 42
Printed in FRANCE © AIRBUS, 2006 All rights reserved

### Page 50 (OCR)

A300-600
SERVICE BULLETIN
Hole I:
do  the  rotating  probe  inspection
NTM  57-10-50  Part  6. procedure  A  ot
hole  interna para.  at  threshold  INSPECTION OF HOLE I
apply  and  Service  intervals  (Mod. No.  Bulletin  10454520572).  per  No.  A300-57-6050  1.E. (2)  or  THIS  FITTING  ON  VIEW  FR47  SHOWS  REMOVED  WITH  ONLY
ONE LAYER.
Remove PR  sealant  around fastener,
use  exclusively a  non-metallic
spatula  in  the  event  of  scratches,
polish  surface  and  perform  protection.
CRACK
Remove  fastener and  clean
bore  with  Mat.  11-026.
* For A/C  config  No. 02
(SB  А300-57-6050
Check  bore  diameter  Mod. 10454S20572
(nominal  diameter  accomplished):
or  R1 or  R2  oversize).  contact  AI
Perform  rotating  probe  inspection
in all  the  layers  of  hole
during  the  inspection  Contact  AI
the  possibility  have  Before
wrong  value.  figure 8).  next  flight
Cracks  DIA.  13.5mm
(0.531in.)
DIA (0?531іп.)  13.5mm
Contact Al
ASB5 576049 AF 00 d  no  next  Before  flight  If  Install new fastener of same type  the  removed  fastener  IS  not
Ref.  damaged, this  ara.  3.c. (2) (0) or (6)  re-installed
GO  to
sheet
Do  subsequent  Inspections
at  intervals  JIver  Perform PR sealing
in Para.  I.E.(2
Figure 2 Sheet 3
Flow Chart (Config. 01 or 02 or 03)
DATE : Sep 09/94  SERVICE BULLETIN No. : A300-57-6049
REVISION No. : 07 - Dec 22/06  Page : 43
Printed in FRANCE © AIRBUS, 2006 All rights reserved

### Page 51 (OCR)

A300-600
SERVICE BULLETIN
Continuation of sheet 3
DIA (0?531in.)  13.5mm
Crack L2 > 0.4mm  Crack L2 ≤ 0.4mm
(0.016in.)  (0.016in.)
Cut  fitting as  out external  per  Drill  815mm (0539)  • max.
Fig; thru  15
sheets  3  and  do  rotating probe
L1 ≤ 5mm  inspection  as  per
(0.196in.)  NTM  57-10-50
L2  5mm  Part 6. procedure  A.
(0.196in.)
L1 > 5mm
(0.196in.)  No  crack
Chamfering  Residual
10x10mm  max.  crack
Contact  AI  (0.393x0.393in.)  Install  oversize
for  inspection  as  per  fastener
program  and  sheet  Ref.  Para.  3.C. (2) (c)
repair  action
Do  inspection  • as  per  Perform  PR  sealing
NTM  57-10-50,
Part 6,  procedure  B
DO  subsequent
inspections  at
intervals  give
Residual crack  in  Para.  = 12
Contact  AI
Before
next  flight
See B  sheet
Install  fasteners  and  conical
ring  with  Mat.  No.  09-005.
Ref.  Fig.  133 C. (2). (d)  sheet
and  para.
Do  subsequent
Inspections  at
intervals  Iven
Do  subsequent  inspection  in  Para.  1.E. (2)
at  intervals  Para. 1.E. (2) per
ASB5 576049 AG 00 d  Perform  PR  sealing
Crack  No  crack  If  the removed fastener
is  not  damaged,  this
can  be  new instered of
Contact  AI  install  new  fastener
Before  same  type. 3. C.(2)(d)
next  flight  Ref.  Para.
Figure 2 Sheet 4
Flow Chart (Config. 01 or 02 or 03)
DATE : Sep 09/94  SERVICE BULLETIN No. : A300-57-6049
REVISION No. : 07 - Dec 22/06  Page : 44
Printed in FRANCE © AIRBUS, 2006 All rights reserved

### Page 52 (OCR)

A300-600
SERVICE BULLETIN
Hole K and N:
do  the rotating probe  inspection
NTM  57-10-50.  Part  procedure  A of
apply  and  holes,  Service  intervals  (Mod. No.  on  artern angle at  Bulletin  as  per  10454520572).  No.  at threshold  A300-57-6050  1.E. (2)  or  THIS  INSPECTION OF HOLE K  AND N ON FR47  VIEW  ONE LAYER  SHOWS  ONLY
(L]  = L2)
Remove PR  sealant around fastener,
use  exclusively a  non-metallic
spatula  in  the  event  of  scratches,
polish  surface  and  perform  protection.
Remove  fastener and  clean  CRACK
bore  with Mat. 11-026.
* For A/C  config  No. 02
(SB  A300-57-6050
Check bore  diameter  Mod. 10454S20572
(nominal  diameter  accomplished):
or  R1 or  R2  oversize).  contact  AI
Contact  AI
Perform rotating  oprables spection  Before
in  all  the  layers  and  next  flight
DIA:  14.3mm
Cracks  no
(0.562in.)
DIA (0.562in.)  14.3mm
Contact  AI
Before  nominal fastener  removed is
next  flight  not damaged,  this fastener can
be  re-installed.
GO  to  If  replace  the  fastener  it 3.C.(3) (a) or (b)  new  is damaged,  same  fastener.
sheet  6  Ref.  Para.
ASB5 576049 AH 00 d  subsequent inspections
intervals  gIven  Perform PR sealing
in Para.  1.E. (2)
Figure 2 Sheet 5
Flow Chart (Config. 01 or 02 or 03)
DATE : Sep 09/94  SERVICE BULLETIN No. : A300-57-6049
REVISION No. : 07 - Dec 22/06  Page : 45
Printed in FRANCE © AIRBUS, 2006 All rights reserved

### Page 53 (OCR)

© A300-600
SERVICE BULLETIN
Continuation of sheet 5
DIA 00.5621.3mm
Crack L2 > 0.8mm  Crack L2 ≤ 0.8mm
(0.031in.)  (0.031in.)
Ream hole,  step  by
Contact Al  dimension, (0.562in.)  step  to  oversize  max.  dia.
next flight  Before  and  per  tain 51-10-50  14.3mm  do a inspection
Part  6.  procedure
Residual crack  no
Install
oversize  fasteners
Ref.  Para  3.C.
(3) (c)
Perform  PR sealing
ASB5 576049 AI 00 d  DO  subsequent inspections
SEE C SHEET 5  at  intervals  given
in Para.  1.E. (2)
Figure 2 Sheet 6
Flow Chart (Config. 01 or 02 or 03)
DATE : Sep 09/94  SERVICE BULLETIN No. : A300-57-6049
REVISION No. : 07 - Dec 22/06  Page : 46
Printed in FRANCE © AIRBUS, 2006 All rights reserved

### Page 54 (OCR)

A300-600
SERVICE BULLETIN
Hole L  and M:
do  the rotating  probe  inspection
NTM  57-10-50.  Part  6.  procedure  A of
apply  and  holes,  Service  intervals  (Mod. No.  on  artern angle at  Bulletin  as  per  10454520572).  No.  at threshold  A300-57-6050  1.E. (2)  or  THIS  INSPECTION OF HOLE L  AND M  VIEW  ONE LAYER  ON FR47  SHOWS  ONLY
(L]  = L2)
Remove PR  sealant  around fastener,
D  use  exclusively a  non-metallic
spatula  in  the  event  of  scratches,
polish  surface  and  perform  protection.
Remove  fastener and  clean  CRACK
bore  with Mat. 11-026.
* For A/C  config  No. 02
(SB  A300-57-6050
Check bore  diameter  Mod. 10454S20572
(nominal  diameter  accomplished):
or  R1 or  R2  oversize).  contact  AI
Contact  AI
Perform rotating  oprable inspection  Before
in  all  the  layers  and  next  flight
Cracks  no  DIA.  ≥ 13.5mm
(0.531in.)
DIA (0?531іn.)  13.5mm
Contact  AI
Before  nominal fastener  removed is
next  flight  not damaged,  this  fastener  can
be  re-installed.
If  the  fastener  is damaged
GO  to  replace  Caro. 3.c.(4).(8)0r (b)  new  same  fastener.
sheet  8  Ref.
ASB5 576049 AJ 00 d  subsequent inspections
intervals  giver  Perform PR sealing
in Para.  1.E. (2
Figure 2 Sheet 7
Flow Chart (Config. 01 or 02 or 03)
DATE : Sep 09/94  SERVICE BULLETIN No. : A300-57-6049
REVISION No. : 07 - Dec 22/06  Page : 47
Printed in FRANCE © AIRBUS, 2006 All rights reserved

### Page 55 (OCR)

© A300-600
SERVICE BULLETIN
Continuation of sheet 7
DIA.  (0.531in.)  13.5mm
Crack L2 > 0.4mm  Crack L2 ≤ 0.4mm
(0.016in.)  (0.016in.)
Ream hole,  step  by
Contact Al  dimension, (0.531in.)  step  to  oversize  max.  dia.
13.5mm
next flight  Before  and  -otatino  do a inspection
per
Part  procedure
Residual crack  no
Install
oversize  fasteners
Ref.  Par a  3.C
(4). (c)
Perform  PR sealing
ASB5 576049 AK 00 d  Do  subsequent inspections
SEE D SHEET 7  at  intervals  given
in Para.  1.E.(2)
Figure 2 Sheet 8
Flow Chart (Config. 01 or 02 or 03)
DATE : Sep 09/94  SERVICE BULLETIN No. : A300-57-6049
REVISION No. : 07 - Dec 22/06  Page : 48
Printed in FRANCE © AIRBUS, 2006 All rights reserved

### Page 56 (OCR)

A300-600
SERVICE BULLETIN
Hole U:  V. W, X' inspection  Y:
do  the  rotating  probe
NTM  57-10-50.  Part  6.  procedure  A of
holes,  on  artern an eat  at threshold
and  intervals  as  per  1.E. (2)  or
apply  Service  Bulletin  No.  A300-57-6050
(Mod. No.  10454520572).
Remove PR  sealant  around fastener,
use  exclusively a  non-metallic
spatula  in  the  event  of  scratches,
polish  surface  and  perform  protection.
Remove  fastener  and  clean
bore  with  Mat. 11-026.
Check  bore  diameter
(nominal  diameter
or  R1 or  R2  oversize).
Perform  in  all  the  rotating  v.  W.  layers  X and  probe  of  Y.  inspection  holes  U.  Contact Al  next  Before  flight
Cracks  DIA (0 531in.)  13.5mm
Contact
Before
next  flight
nominal fastener  removed  is
not damaged,  this  fastener  can
be  re-installed.
If  the fastener is damaged,
ASB5 576049 BO 00 d  replace  it by  new  same  fastener.
Ref. Para. 3.C.(5). (a)or (b)
Do  subsequent inspections
at  intervals  giver  Perform PR sealing
in Para.  1.E. (2)
Figure 2 Sheet 9
Flow Chart (Config. 01 or 02 or 03)
DATE : Sep 09/94  SERVICE BULLETIN No. : A300-57-6049
REVISION No. : 07 - Dec 22/06  Page : 49
Printed in FRANCE © AIRBUS, 2006 All rights reserved

### Page 57 (OCR)

A300-600
SERVICE BULLETIN
do  the  rotating  Part Probe inspection  Hole H:
NTM  57-10-50.  procedure  of  INSPECTION OF  HOLE H
hole  Hintervals  internal  angle  threshold  ON  FR47.
and  as  per  Para. 1.E. (2).  THIS VIEW  SHOWS ONLY
ONE LAYER.
(L1  L2)
_L1
Remove  PR sealant  around fastener,
use  exclusively  non-metallic
spatula  in  the  event  of  scratches,
polish  surface  and  perform  protection.
Remore with eat. and  clean  CRACK
bore  with  11-026.
Check bore  diameter
(nominal  diameter
or R1 or  R2 oversize).
Contact Al
Perform  rotating  probe  inspection  Before
in all  the  layers of  hole H  next  flight
Cracks  DIA (0.499іп.)  12.7mm
Go  to
sheet  2
nominal fastener  removed is
not damaged,  this  fastener  can
De re-installed.
the  fastener  is damaged,
replace it  by fastener  new  same  fastener.
R1 or R2  is  removed,
ASB5 576049 AL 00 d  Ref. Paro. 3.C. (6) (a) Fastener.  Ref. Para.
Do  subsequent inspections
at  intervals  given  Perform PR sealing
Para.  1.E. (2)
Figure 3 Sheet 1
Flow Chart (Config. 04)
DATE : Sep 09/94  SERVICE BULLETIN No. : A300-57-6049
REVISION No. : 07 - Dec 22/06  Page : 50
Printed in FRANCE © AIRBUS, 2006 All rights reserved

### Page 58 (OCR)

A300-600
SERVICE BULLETIN
Continuation of sheet 1
es  Cracks
ye:  DIA. ≥ 12.7mm
(0.499in.)
Contact  AI
Before
next  flight
Crack L2 > 1.6mm  Crack L2 ≤ 1.6mm
(0.062in.)  (0.062in.)
Ream hole, step by
Contact AIB  dimension, (0.499in.)  step  oversize  max.  dia.
next flight  Before  and  12.7mm  rotating  do a inspection  probe  as
Part 6. procedure  NTM  ocedure A
Residual crack
Install
oversize  fasteners
Ref. (6)(b)  paro  3.C.
ASB5 576049 AM 00 d  Do  Perform PR sealing  subsequent  inspections
SEE A SHEET 1  at  intervals  giver
in Para.  1.E. (2)
Figure 3 Sheet 2
Flow Chart (Config. 04)
DATE : Sep 09/94  SERVICE BULLETIN No. : A300-57-6049
REVISION No. : 07 - Dec 22/06  Page : 51
Printed in FRANCE © AIRBUS, 2006 All rights reserved

### Page 59 (OCR)

A300-600
SERVICE BULLETIN
Hole I:  INSPECTION OF  HOLE I
the  rotating  probe  inspection  ON  FR47  WITH
NTM  57-10-50.  Part  procedure A of  FITTING  REMOVED
hole  'intervals  internal  angle  threshold  THIS  VIEW  SHOWS  ONLY
and  per  Para. 1.E.(2).  ONE  LAYER
Remove  sealant  around fastener,
use  exclusively  non-metallic
spatula  the  event  of  scratches,
polish  surface  and  perform protection.
CRACK
Remove  fastener and clean
bore  with  Mat. 11-026.
Check bore  diameter
(nominal  diameter
or  R1 or  oversize).
Perform rotating  probe  inspection
in  all  the  layers  of  hole
Take  care during  the inspection of the  Contact  AI
hole  due  to  the possibility  to  have  a  Before
wrong  value.  (see  figure  8).  next  flight
Cracks  DIA (Ở.529in.)  13.44mm  es
DIA: (Ó.529in.)  13.44mm
Contact Al  Except for the first time  of this
Before  inspection  accomplishment, a new  same
next  flight  fastener  can  first spection  be
ASB5 576049 AN 00 d  GO  to  If  drill oversize hole direand  it is the  higher  on  the  with  aircraft,
sheet  4  moderate  Interterence  9000  tolerance.
Install  fastener Ref. Para.  3.C.(7)(a)
Do  subsequent  inspections
at  in Para.  intervals  S.E. (2)г  Perform PR sealing
Figure 3 Sheet 3
Flow Chart (Config. 04)
DATE : Sep 09/94  SERVICE BULLETIN No. : A300-57-6049
REVISION No. : 07 - Dec 22/06  Page : 52
Printed in FRANCE © AIRBUS, 2006 All rights reserved

### Page 60 (OCR)

A300-600
SERVICE BULLETIN
Continuation of sheet 3
DIA. (0.529 in.)  13:44mm
Crack L2 > 0.4mm  Crack L2 ≤ 0.4mm
(0.016in.)  (0.016in.)
Cut  out external  Drill  oversize stelia
fitting as  per  step  to  • max.
Fig; thru  15  13.44mm (0.529in.)
sheets  3  and  do  rotating probe
L1 ≤ 5mm  inspection  as  per
(0.196in.)  NTM 57-10-50
L2  5mm  Part 6. proceduré A
(0.196in.)
L1 > 5mm
(0.196in.)  No  crack
Chamfering  Residual
10x10mm  max  crack
for  Contact  inspection  (0.393x0.393in.)  as  per  Install  fastener  oversize
program  and  sheet  Ref.  Para.  3.C. (7)(b)
repair  action
Do  inspection  as  per  Perform  PR  sealing
NTM  57-10-50,
Part 6, procedure  B
DO  subsequent
inspections  at
intervals  giver
Residual crack  in  Para.  = 12
Contact  AI
Before
next  flight
See B  sheet
Install  ringpet.  with  fasteners  Mat.  No.  and  09-005.  conical
Fig.  15  sheet
and  Para.  3.C.(7) (c)
Do  subsequent
Inspections  at
intervals  Iven
Do  subsequent  inspection  in  Para.  1.E. (2)
at  intervals  Paro. I.E.(2) per
ASB5 576049 AO 00 d  Perform  PR  sealing
Crack  No  crack  If  the removed fastener
is  not  damaged,  this
can  be  re-installed, of
Contact Al  install  new  fastener
Before  same  type. 3. C. (7)(c)
next  flight  Ref.  Para.
Figure 3 Sheet 4
Flow Chart (Config. 04)
DATE : Sep 09/94  SERVICE BULLETIN No. : A300-57-6049
REVISION No. : 07 - Dec 22/06  Page : 53
Printed in FRANCE © AIRBUS, 2006 All rights reserved

The text continues at https://openairdocs.org/service-documents/airbus/a300-57-6049/file/b6c590234fb5.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
