# Airbus Service Bulletin A300-57-6114

Copy: Revision 01 ("A300-57-6114 R01"), 86 pages: PDF https://openairdocs.org/files/sha256/1f/d7/1fd7f348bf994368e8a364724e646c22942105570f0dd0859209a38f000e093c; text https://openairdocs.org/service-documents/airbus/a300-57-6114/file/1fd7f348bf99.md. Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2017-0554; AD 2018-17-16 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Airbus](https://openairdocs.org/service-documents/airbus.md)
- Type: Service bulletin (Service Bulletin)
- Number: A300-57-6114
- Latest revision known: A300-57-6114, Revision 01, dated June 19, 2018 (OpenAirDocs)
- Page: https://openairdocs.org/service-documents/airbus/a300-57-6114

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2018-17-16](https://openairdocs.org/ad/2018-17-16.md), effective Oct 2, 2018: Revision 01

Also cited in [1 proposed AD](https://openairdocs.org/service-documents/airbus/a300-57-6114/proposed.md).

## Text (86 pages)

Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2017-0554; AD 2018-17-16 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

@A300-600
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
MANDATORY
 MANDATORY
 MANDATORY
ATA SYSTEM: 57
TITLE: WINGS - CHANGES TO ALLOWABLE DAMAGE LIMITATIONS IN SRM
FOR A300-600
MODIFICATION No.: None
This page transmits Revision No.01 of Service Bulletin No.A300-57-6114
ADDITIONAL WORK
**CONF ALL
Additional work is required by this revision for aircraft concerned by Config. 003 which have
accomplished this Service Bulletin at the original issue.
The Additional Work describes the Detailed Inspection of the lower skin area between ribs 26-27 from
the front spar to the rear spar.
Unless otherwise stated by an Airworthiness Directive, AIRBUS recommends the additional work to be
accomplished within the current published compliance timescale.
REASON
Revision No. 01 issued to:
- Add Config 003 for A300-600 freighter aircraft that were incorrectly listed in Config 001 at initial
issue
- Correct the inspection requirements for the Freighter aircraft.
CHANGES
The main changes of this revision are:
- Config. 003 and associated data added for A300-600 freighter aircraft that were incorrectly listed in
Config. 001 at initial issue
- Effectivity by operator updated
- Structural Repair Manual (SRM) page block reference removed
- Tables 1 and 2 in Config. 002 updated
DATE: Aug 03/15 SERVICE BULLETIN No.: A300-57-6114
REVISION No.: 01 - Jun 19/18 Page: 1
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 2

@A300-600
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
- Additional work added for Config. 003.
FRONT MATTER
WINGS - CHANGES TO ALLOWABLE
DAMAGE LIMITATIONS IN SRM FOR
A300-600
CONFIGURATION UPDATED
 R
SUMMARY
EFFECTIVITY
 OPERATOR LIST UPDATED
 R
REFERENCES / REPERCUSSIONS
 REFERENCES/REPERCUSSIONS TABLE
UPDATED
R
MANPOWER
 MANPOWER ADDED
 N
Fig. A-USDAA
 FIGURE SOLUTION UPDATED
CONFIGURATION UPDATED
R
PLANNING INFORMATION
EFFECTIVITY
 EFFECTIVITY RELATED INFORMATION
UPDATED
R
Configuration definition
 CONFIGURATION LIST UPDATED
 R
CONF 001
 CONFIGURATION DEFINITION UPDATED
 R
CONF 003
 CONFIGURATION ADDED
 N
DESCRIPTION
 DESCRIPTION UPDATED
 R
COMPLIANCE
Accomplishment Timescale
 ACCOMPLISHMENT TIMESCALE UPDATED
 R
MANPOWER
 MANPOWER ADDED
 N
REFERENCES
 REFERENCED DOCUMENTATION UPDATED
 R
REFERENCED DOCUMENTATION UPDATED
 R
REFERENCED DOCUMENTATION ADDED
 N
PUBLICATION AFFECTED
 PUBLICATIONS AFFECTED UPDATED
CONFIGURATION UPDATED
R
ACCOMPLISHMENT INSTRUCTIONS
TASK 576114- 839-895-001-Administrative
 TASK SOLUTION UPDATED
 R
Task associated data - 003
 TASK ASSOCIATED DATA ADDED
 N
Subtask 576114-839-404-002
 SUBTASK SOLUTION UPDATED
CONFIGURATION UPDATED
FIGURE REFERENCE UPDATED
R
Subtask 576114-839-404-002
 SUBTASK SOLUTION ADDED
 N
TASK 576114- 832-895-001-Inspection
 TASK SOLUTION UPDATED
NOTE UPDATED
R
Task associated data - 003
 TASK ASSOCIATED DATA ADDED
 N
Subtask 576114-910-401-001
 SUBTASK SOLUTION ADDED
 N
Subtask 576114-839-401-001
 SUBTASK SOLUTION ADDED
 N
Subtask 576114-941-401-001
 SUBTASK SOLUTION ADDED
 N
Subtask 576114-010-401-001
 SUBTASK SOLUTION ADDED
 N
Subtask 576114-220-401-001
 SUBTASK SOLUTION UPDATED
REFERENCED DOCUMENTATION UPDATED
CONFIGURATION UPDATED
REFERENCES UPDATED
FIGURE REFERENCE UPDATED
R
DATE: Aug 03/15 SERVICE BULLETIN No.: A300-57-6114
REVISION No.: 01 - Jun 19/18 Page: 2
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 3

@A300-600
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
Subtask 576114-220-405-001
 SUBTASK SOLUTION UPDATED
REFERENCED DOCUMENTATION UPDATED
CONFIGURATION UPDATED
REFERENCES UPDATED
FIGURE REFERENCE UPDATED
R
Subtask 576114-220-402-001
 SUBTASK SOLUTION UPDATED
REFERENCED DOCUMENTATION UPDATED
CONFIGURATION UPDATED
REFERENCES UPDATED
FIGURE REFERENCE UPDATED
R
Subtask 576114-220-406-001
 SUBTASK SOLUTION UPDATED
REFERENCED DOCUMENTATION UPDATED
CONFIGURATION UPDATED
REFERENCES UPDATED
FIGURE REFERENCE UPDATED
R
Subtask 576114-220-404-001
 SUBTASK SOLUTION UPDATED
REFERENCED DOCUMENTATION UPDATED
REFERENCES UPDATED
NOTE UPDATED
R
Subtask 576114-220-408-001
 SUBTASK SOLUTION UPDATED
REFERENCED DOCUMENTATION UPDATED
REFERENCES UPDATED
NOTE UPDATED
R
Subtask 576114-220-401-003
 SUBTASK SOLUTION ADDED
 N
Subtask 576114-220-405-003
 SUBTASK SOLUTION ADDED
 N
Subtask 576114-220-402-003
 SUBTASK SOLUTION ADDED
 N
Subtask 576114-220-406-003
 SUBTASK SOLUTION ADDED
 N
Subtask 576114-220-401-001
 SUBTASK SOLUTION DELETED FOR
APPLICABLE MSN
D
Subtask 576114-220-405-001
 SUBTASK SOLUTION DELETED FOR
APPLICABLE MSN
D
Subtask 576114-220-402-001
 SUBTASK SOLUTION DELETED FOR
APPLICABLE MSN
D
Subtask 576114-220-406-001
 SUBTASK SOLUTION DELETED FOR
APPLICABLE MSN
D
Subtask 576114-220-403-001
 SUBTASK SOLUTION UPDATED
CONFIGURATION UPDATED
LOCATION UPDATED
FIGURE REFERENCE UPDATED
R
Subtask 576114-220-407-001
 SUBTASK SOLUTION UPDATED
CONFIGURATION UPDATED
LOCATION UPDATED
FIGURE REFERENCE UPDATED
R
Subtask 576114-220-404-001
 SUBTASK SOLUTION UPDATED
REFERENCED DOCUMENTATION UPDATED
REFERENCES UPDATED
NOTE UPDATED
R
DATE: Aug 03/15 SERVICE BULLETIN No.: A300-57-6114
REVISION No.: 01 - Jun 19/18 Page: 3
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 4

@A300-600
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
Subtask 576114-220-408-001
 SUBTASK SOLUTION UPDATED
REFERENCED DOCUMENTATION UPDATED
REFERENCES UPDATED
NOTE UPDATED
R
Subtask 576114-220-401-003
 SUBTASK SOLUTION ADDED
 N
Subtask 576114-220-405-003
 SUBTASK SOLUTION ADDED
 N
Subtask 576114-220-402-003
 SUBTASK SOLUTION ADDED
 N
Subtask 576114-220-406-003
 SUBTASK SOLUTION ADDED
 N
Subtask 576114-220-403-001
 SUBTASK SOLUTION ADDED
 N
Subtask 576114-220-407-001
 SUBTASK SOLUTION ADDED
 N
Subtask 576114-220-404-001
 SUBTASK SOLUTION ADDED
 N
Subtask 576114-220-408-001
 SUBTASK SOLUTION ADDED
 N
Subtask 576114-790-401-001
 SUBTASK SOLUTION ADDED
 N
Subtask 576114-410-401-001
 SUBTASK SOLUTION ADDED
 N
Subtask 576114-942-401-001
 SUBTASK SOLUTION ADDED
 N
TASK 576114- 832-896-001-Inspection -
Additional Work for Aircraft Inspected by
Revision No. 00
TASK SOLUTION ADDED
 N
Task associated data - 001
 TASK ASSOCIATED DATA ADDED
 N
Task associated data - 002
 TASK ASSOCIATED DATA ADDED
 N
Task associated data - 003
 TASK ASSOCIATED DATA ADDED
 N
Subtask 576114-910-402-001
 SUBTASK SOLUTION ADDED
 N
Subtask 576114-941-402-001
 SUBTASK SOLUTION ADDED
 N
Subtask 576114-220-411-001
 SUBTASK SOLUTION ADDED
 N
Subtask 576114-220-412-001
 SUBTASK SOLUTION ADDED
 N
Subtask 576114-942-402-001
 SUBTASK SOLUTION ADDED
 N
Fig. A-UBDAA
 FIGURE SOLUTION UPDATED
CONFIGURATION UPDATED
R
FILING INSTRUCTIONS
This Service Bulletin has been generated electronically and is reissued as a complete document.
Replace the complete document.
Put this Revision Transmittal Sheet in front of the Service Bulletin.
HISTORY OF PREVIOUS REVISIONS
No previous revision
REVISION SEQUENCE
ORIGINAL: Aug 03/15
REVISION No. : 01 - Jun 19/18
DATE: Aug 03/15 SERVICE BULLETIN No.: A300-57-6114
REVISION No.: 01 - Jun 19/18 Page: 4
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 5

@A300-600
SERVICE BULLETIN
SUMMARY
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
This summary is for information only and is not approved for modification of the aircraft.
MANDATORY
 MANDATORY
 MANDATORY
ATA SYSTEM: 57
TITLE: WINGS - CHANGES TO ALLOWABLE DAMAGE LIMITATIONS IN SRM
FOR A300-600
**CONF ALL
MODIFICATIONS
None
REASON/DESCRIPTION/OPERATIONAL CONSEQUENCES
Recent static analysis has shown that some areas of the A300-600 wing structure cannot sustain the
damage previously published in the A300-600 Structural Repair Manual (SRM). The SRM has been
amended to reduce the amount of damage permitted and indicate the areas of the wing structure where
damage is no longer permitted.
Operators will be required to check the areas identified in this Service Bulletin and compare against the
current SRM issue (including temporary revisions) to determine if the new requirements are met.
The accomplishment of this Service Bulletin will make sure that areas of the wing structure identified in
this Service Bulletin that have been damaged beyond the limits that are specified in the SRM are
identified and addressed.
GENERAL EVALUATION
EVALUATION TABLE
COMPLIANCE
 MANDATORY (1)
 CANCELS INSPECTION SB
 NO
POTENTIAL AD
 YES
 A/C OPERATION AFFECTED
 NO
RELIABILITY AFFECTED
 NO
 PAX COMFORT AFFECTED
 NO
COST SAVING
 NO
 ETOPS AFFECTED
 NO
STRUCTURAL LIFE EXTN
 NO
 VENDOR SB INVOLVED
 NO
NOTE
 (1)
: Service Bulletin must be accomplished.
MATERIAL PRICE INFORMATION
No Material
DATE: Aug 03/15 SERVICE BULLETIN No.: A300-57-6114
REVISION No.: 01 - Jun 19/18 Page: 1
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 6

@A300-600
SERVICE BULLETIN
SUMMARY
EFFECTIVITY
This Service Bulletin is applicable to this (these) operator(s) :
14S
 AAW
 ABR AHK BCS EFX
 FDX IRA IRM KAC MNB MRJ MSR
QSM
 SOP
 SUD TAR THA TNO
 UPS URS UTP
CONCURRENT REQUIREMENTS
None
REFERENCES / REPERCUSSIONS
TFU
 None
OEB
 None
AOT
 None
SIL
 None
ISI
 None
LINE MAINTENANCE AFFECTED
 No
LIFE LIMIT
 None
OTHER
 None
NATURE OF THE WORK
AIRCRAFT
 YES
EQUIPMENT
 NO
HARD
 NO
SOFT
 NO
OBRM
 NO
MANPOWER
**CONF 001
Task 576114-839-895-001: Administrative
TOTAL MANHOURS
 1.00
ELAPSED TIME (HOURS)
 1.00
Task 576114-832-895-001: Inspection
TOTAL MANHOURS
 16.50
ELAPSED TIME (HOURS)
 16.50
**CONF 002
Task 576114-839-895-001: Administrative
TOTAL MANHOURS
 1.00
ELAPSED TIME (HOURS)
 1.00
Task 576114-832-895-001: Inspection
TOTAL MANHOURS
 18.50
DATE: Aug 03/15 SERVICE BULLETIN No.: A300-57-6114
REVISION No.: 01 - Jun 19/18 Page: 2
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 7

@A300-600
SERVICE BULLETIN
SUMMARY
Task 576114-832-895-001: Inspection
ELAPSED TIME (HOURS)
 18.50
**CONF 003
Task 576114-839-895-001
 : Administrative
TOTAL MANHOURS
 1.00
ELAPSED TIME (HOURS)
 1.00
Task 576114-832-895-001
 : Inspection
TOTAL MANHOURS
 18.50
ELAPSED TIME (HOURS)
 18.50
Task 576114-832-896-001
 : Inspection - Additional Work for Aircraft Inspected by Revision No.
00
TOTAL MANHOURS
 6.00
ELAPSED TIME (HOURS)
 6.00
APPENDICES
**CONF ALL
None
DATE: Aug 03/15 SERVICE BULLETIN No.: A300-57-6114
REVISION No.: 01 - Jun 19/18 Page: 3
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 8

@A300-600
SERVICE BULLETIN
SUMMARY
**CONF ALL
LH SHOWN
RH SYMMETRICAL
A
OUTER
FRONT SPAR
Z550 (Z650)
D_SB_576114_7_SAAA_01_00
A
A
NOTE:
AREA TO BE INSPECTED
RIB9
RIB29
Figure A-U SAAA - S heet 01
DATE: Aug 03/15 SERVICE BULLETIN No.: A300-57-6114
REVISION No.: 01 - Jun 19/18 Page: 4
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 9

@A300-600
SERVICE BULLETIN
SUMMARY
**CONF ALL
LH SHOWN
RH SYMMETRICAL
A
INNER
FRONT SPAR
RIB29
Z510 (Z610)
D_SB_576114_7_SBAA_01_00
A
A
NOTE:
AREA TO BE INSPECTED
RIB9
RIB1
Figure A-U SBAA - S heet 01
DATE: Aug 03/15 SERVICE BULLETIN No.: A300-57-6114
REVISION No.: 01 - Jun 19/18 Page: 5
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 10

@A300-600
SERVICE BULLETIN
SUMMARY
**CONF ALL
NOTE:
AREA TO BE INSPECTED
TYPICAL LOAD CARRYING
MANHOLE COVER
B
A A
A
A
STIFFENER
Z500
Z600
D
D − DAMAGE LIMITATION CHANGE
LH SHOWN
RH SYMMETRICAL
A
RIB22
RIB23
RIB24
RIB25
RIB26
RIB27
RIB28
B
B
Z550 (Z650)
FWD
A
A
D_SB_576114_7_SCAA_01_03
Figure A-USCAA - Sheet 01
DATE: Aug 03/15 SERVICE BULLETIN No.: A300-57-6114
REVISION No.: 01 - Jun 19/18 Page: 6
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 11

@A300-600
SERVICE BULLETIN
SUMMARY
**CONF 002 thru 003
NOTE:
AREA TO BE INSPECTED
LH SHOWN
RH SYMMETRICAL
A
RIB26
RIB27
FWD
Z550 (Z650)
OUTER
FRONT SPAR B
STGR13
STGR16
F
W
D
B
RIB26 RIB27
FRONT
SPAR
REAR
SPAR
A
A
D_SB_576114_7_SDAA_01_02
Figure A-USDAA - Sheet 01
DATE: Aug 03/15 SERVICE BULLETIN No.: A300-57-6114
REVISION No.: 01 - Jun 19/18 Page: 7
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 12

@A300-600
SERVICE BULLETIN
SUMMARY
This Page Intentionally Left Blank
DATE: Aug 03/15 SERVICE BULLETIN No.: A300-57-6114
REVISION No.: 01 - Jun 19/18 Page: 8
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 13

@A300-600
SERVICE BULLETIN
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
MANDATORY
 MANDATORY
 MANDATORY
ATA SYSTEM: 57
TITLE: WINGS - CHANGES TO ALLOWABLE DAMAGE LIMITATIONS IN SRM
FOR A300-600
MODIFICATION No.: None
This document contains AIRBUS PROPRIETARY INFORMATION and shall at all times remain the
property of AIRBUS; no intellectual property right or licence is granted by AIRBUS in connection with
any information contained in it. It is delivered on the express condition that said document and the
information contained in it shall be treated as confidential, shall not be used for any purpose other than
that for which it is hereby delivered. It shall not be disclosed in whole or in part to third parties and shall
not be duplicated in any manner (except for the purposes of performing the tasks described hereunder
and provided that any recipient of such document shall comply with the conditions herein), without
AIRBUS prior written consent.
1. PLANNING INFORMATION
**CONF ALL
A. EFFECTIVITY
(1) Models
B4-603 B4-605R B4-622 B4-622R C4-605R/F C4-620 F4-605R F4-622R
(2) Effectivity by MSN
0344 0358 0361 0365 0380 0388 0401 0405 0408 0411 0414 0417 0477 0479 0505
0521 0525 0530
 0532 0536 0543 0546 0553 0555 0557-0559 0561 0563 0572 0575
0579 0581 0584 0602-0603 0607-0608 0611 0613 0617-0618 0621 0623 0625-0626
0629-0630 0632-0633 0637 0641 0643 0657 0659 0664 0666 0668 0670 0677 0679
0683 0688 0694 0696 0699 0701 0703 0707 0709 0711 0713 0715 0717 0719
0721-0730 0732-0746
 0748-0750
 0752-0764 0766 0768-0775 0777-0794 0797
0799-0840 0845-0878
(3) Effectivity by Operator
The Operator/MSN relationship is provided for information only and is correct at the time
of issue in accordance with the information available to AIRBUS. Any future changes
resulting from transfer of an aircraft from one operator to another will not be reflected in
this list unless the Service Bulletin is revised for another reason.
DATE: Aug 03/15 SERVICE BULLETIN No.: A300-57-6114
REVISION No.: 01 - Jun 19/18 Page: 1
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 14

@A300-600
SERVICE BULLETIN
OPERATOR
 MSN
14S
 0694
 0699
 0719
 0721
 0782
 0786
 0787
AAW
 0788
ABR
 0557
 0677 0717
 0722
AHK
 0683 0770 0855 0856 0857 0858 0859 0860 0870 0871
BCS
 0602 0617 0621 0637 0641 0670 0679 0703 0711 0724 0729 0730
0737 0740 0743
 0753 0783 0797 0836 0837 0872
EFX
 0755
FDX
 0358 0361 0365 0388 0417 0477 0479 0530 0536 0543 0555 0559
0572 0575 0579 0581 0611 0613 0625 0630 0633 0657 0659 0664
0668 0688 0709 0713 0715 0726 0728 0735 0736 0738 0742 0745
0748 0752 0757 0759 0760 0761 0766 0768 0769 0771 0772 0774
0777 0778 0779 0780 0781 0789 0790 0791 0792 0793 0794 0799
0800 0801 0802 0803 0804 0873 0874 0875 0876 0877 0878
IRA
 0632 0696 0723 0727
IRM
 0380 0401 0405 0408 0411 0414 0546 0553 0608 0618 0623 0701
0773 0838
KAC
 0344
MNB
 0521 0525 0734 0739 0756 0758
MRJ
 0750 0762
MSR
 0561 0607
QSM
 0584
 0603
 0744
 0749
 0764
SOP
 0532
SUD
 0666 0775
TAR
 0505 0558 0563
THA
 0629 0784 0785
TNO
 0626
 0643
UPS
 0805 0806 0807 0808 0809 0810 0811 0812 0813 0814 0815 0816
0817 0818 0819 0820 0821 0822 0823 0824 0825 0826 0827 0828
0829 0830 0831 0832 0833 0834 0835 0839 0840 0845 0846 0847
0848 0849 0850 0851 0852 0853 0854 0861 0862 0863 0864 0865
0866 0867 0868 0869
URS
 0733
UTP
 0707 0725 0732 0741 0746 0754 0763
(4) Configuration by MSN
MSN
 CONFIGURATION
0344 0358 0361 0365 0380 0388 0401 0405 0408 0411 0414
0417 0477 0479 0505 0521 0525 0530 0532 0536 0543 0546
0553 0555 0557 0558 0559 0561 0563 0572 0575 0579 0581
0584 0602 0603 0607 0608 0611 0613 0617 0618 0621 0623
0625 0626 0629 0630 0632 0633 0637 0641 0643 0657 0659
0664 0666 0668 0670 0677 0679 0683 0688 0694 0696 0699
0701 0703 0707 0709 0711 0713 0715 0717 0719 0721 0722
0723 0724 0725 0727 0729 0730 0732 0733 0734 0737 0739
0740 0741 0743 0744 0746 0749 0750 0753 0754 0756 0762
0763
 0764
 0770
 0773
 0775
 0782
 0783
 0784
 0785
 0786
 0787
0788
 0797
 0836
 0837
 0838
001
DATE: Aug 03/15 SERVICE BULLETIN No.: A300-57-6114
REVISION No.: 01 - Jun 19/18 Page: 2
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 15

@A300-600
SERVICE BULLETIN
MSN
 CONFIGURATION
0726
 0728
 0735
 0736
 0738
 0742
 0745
 0748
 0752
 0757
 0759
0760
 0761
 0766
 0768
 0769
 0771
 0772
 0774
 0777
 0778
 0779
0780
 0781
 0789
 0790
 0791
 0792
 0793
 0794
 0799
 0800
 0801
0802
 0803
 0804
 0855
 0856
 0857
 0858
 0859
 0860
 0870
 0871
0873
 0874
 0875
 0876
 0877
 0878
003
0755 0758 0805 0806 0807 0808 0809 0810 0811 0812 0813
0814 0815 0816 0817 0818 0819 0820 0821 0822 0823 0824
0825 0826 0827 0828 0829 0830 0831 0832 0833 0834 0835
0839 0840 0845 0846 0847 0848 0849 0850 0851 0852 0853
0854 0861 0862 0863 0864 0865 0866 0867 0868 0869 0872
002
(5) Configuration definition
**CONF 001
Config. 001 is valid for A300-600 aircraft.
**CONF 002
Config. 002 is valid for A300-600F aircraft.
**CONF 003
Config. 003 is valid for A300-600F aircraft that were defined as config. 001 in Revision
No. 00 of this Service Bulletin.
(6) Material Effectivity
None
B. CONCURRENT REQUIREMENTS
None
C. REASON
(1) History
Recent static analysis has shown that some areas of the A300-600 wing structure
cannot sustain the damage previously published in the A300-600 Structural Repair
Manual (SRM). The SRM has been amended to reduce the amount of damage permitted
and indicate the areas of the wing structure where damage is no longer permitted.
(2) Objective/Action
Operators will be required to check the areas identified in this Service Bulletin and
compare against the current SRM issue (including temporary revisions) to determine if
the new requirements are met.
(3) Advantages
The accomplishment of this Service Bulletin will make sure that areas of the wing
structure identified in this Service Bulletin that have been damaged beyond the limits
that are specified in the SRM are identified and addressed.
DATE: Aug 03/15 SERVICE BULLETIN No.: A300-57-6114
REVISION No.: 01 - Jun 19/18 Page: 3
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 16

@A300-600
SERVICE BULLETIN
(4) Operational/Maintenance Consequences
None
D. DESCRIPTION
NOTE
: Do an inspection of the aircraft records. If the aircraft records are not
complete or if SRM repairs have not been recorded, do an inspection of the
aircraft structure.
To accomplish this Service Bulletin it is necessary to :
**CONF 001
Task 576114-839-895-001: Administrative
(1) Do a Check of the Aircraft Records
Task 576114-832-895-001: Inspection
(1) Do a Detailed Inspection of the LH Outer Front Spar
(2) Do a Detailed Inspection of the RH Outer Front Spar
(3) Do a Detailed Inspection of the LH Inner Front Spar
(4) Do a Detailed Inspection of the RH Inner Front Spar
(5) Do a Detailed Inspection of the Access Covers (Machined Alloy Load Carrying Type
4, 4A and 5) Outboard of Rib 22 on the LH Wing
(6) Do a Detailed Inspection of the Access Covers (Machined Alloy Load Carrying Type
4, 4A and 5) Outboard of Rib 22 on the RH Wing
**CONF 002
Task 576114-839-895-001: Administrative
(1) Do a Check of the Aircraft Records
Task 576114-832-895-001: Inspection
(1) Do a Detailed Inspection of the LH Outer Front Spar
(2) Do a Detailed Inspection of the RH Outer Front Spar
(3) Do a Detailed Inspection of the LH Inner Front Spar
(4) Do a Detailed Inspection of the RH Inner Front Spar
(5) Do a Detailed Inspection of the Lower Skin Area (Rib 26 to Rib 27) on the LH Wing
(6) Do a Detailed Inspection of the Lower Skin Area (Rib 26 to Rib 27)on the RH Wing
DATE: Aug 03/15 SERVICE BULLETIN No.: A300-57-6114
REVISION No.: 01 - Jun 19/18 Page: 4
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 17

@A300-600
SERVICE BULLETIN
(7) Do a Detailed Inspection of the Access Covers (Machined Alloy Load Carrying Type
4, 4A and 5) Outboard of Rib 22 on the LH Wing
(8) Do a Detailed Inspection of the Access Covers (Machined Alloy Load Carrying Type
4, 4A and 5) Outboard of Rib 22 on the RH Wing
**CONF 003
Task 576114-839-895-001
 : Administrative
(1) Do a Check of the Aircraft Records
Task 576114-832-895-001
 : Inspection
(1) Do a Detailed Inspection of the LH Outer Front Spar
(2) Do a Detailed Inspection of the RH Outer Front Spar
(3) Do a Detailed Inspection of the LH Inner Front Spar
(4) Do a Detailed Inspection of the RH Inner Front Spar
(5) Do a Detailed Inspection of the Lower Skin Area (Rib 26 to Rib 27) on the LH Wing
(6) Do a Detailed Inspection of the Lower Skin Area (Rib 26 to Rib 27)on the RH Wing
(7) Do a Detailed Inspection of the Access Covers (Machined Alloy Load Carrying Type
4, 4A and 5) Outboard of Rib 22 on the LH Wing
(8) Do a Detailed Inspection of the Access Covers (Machined Alloy Load Carrying Type
4, 4A and 5) Outboard of Rib 22 on the RH Wing
Task 576114-832-896-001
 : Inspection - Additional Work for Aircraft Inspected by Revision No.
00
(1) Do a Detailed Inspection of the Lower Skin Area (Rib 26 to Rib 27) on the LH Wing
(2) Do a Detailed Inspection of the Lower Skin Area (Rib 26 to Rib 27) on the RH Wing
**CONF ALL
E. COMPLIANCE
(1) Classification
MANDATORY: Service Bulletin must be accomplished.
(2) Accomplishment Timescale
This Service Bulletin has been classified Mandatory by the issue of an Airworthiness
Directive (AD) published by the European Av iation Safety Agenc y (EASA). The AD must
be used as the reference document for the mandated accomplishment timescale.
DATE: Aug 03/15 SERVICE BULLETIN No.: A300-57-6114
REVISION No.: 01 - Jun 19/18 Page: 5
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 18

@A300-600
SERVICE BULLETIN
F. APPROVAL
The technical content of this document is approved under the authority of Design
Organisation Approv al No. EASA. 21J.031.
If an aircraft listed in the effectivity has a modification or repair embodied that is not of
AIRBUS origin, and which affects the content of this Service Bulletin, the operator is
responsible for obtaining approval by its airworthiness authority for any adaptation necessary
before incorporation of the Service Bulletin.
G. MANPOWER
The manpower estimates given in this Service Bulletin are based on the direct labor cost to
do the work. These estimates assume that the work will be done by experienced personnel,
and may need to be revised upwards to suit operator’s circumstances. The estimates do not
include the time to prepare, plan or inspect the work. Manufacture and procurement of parts
and tools, drying times for paints, sealants, etc., and general administration work are also not
included.
**CONF 001
Task 576114-839-895-001: Administrative
On Aircraft
Do a Check of the Aircraft Records
 1.00
TOTAL MANHOURS
 1.00
ELAPSED TIME (HOURS)
 1.00
Task 576114-832-895-001: Inspection
Get Access
 2.00
On Aircraft
Do a Detailed Inspection of the LH Outer Front Spar
 2.00
Do a Detailed Inspection of the RH Outer Front Spar
 2.00
Do a Detailed Inspection of the LH Inner Front Spar
 2.00
Do a Detailed Inspection of the RH Inner Front Spar
 2.00
Do a Detailed Inspection of the Access Covers
(Machined Alloy Load Carrying Type 4, 4A and 5)
Outboard of Rib 22 on the LH Wing
2.00
Do a Detailed Inspection of the Access Covers
(Machined Alloy Load Carrying Type 4, 4A and 5)
Outboard of Rib 22 on the RH Wing
2.00
Tests
 0.50
Close-Up
 2.00
TOTAL MANHOURS
 16.50
ELAPSED TIME (HOURS)
 16.50
NOTE
: The minimum manhours necessary to accomplish this Service Bulletin are
those for the Inspection. Depending on the inspection result, additional
manhours can apply.
DATE: Aug 03/15 SERVICE BULLETIN No.: A300-57-6114
REVISION No.: 01 - Jun 19/18 Page: 6
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 19

@A300-600
SERVICE BULLETIN
**CONF 002
Task 576114-839-895-001: Administrative
On Aircraft
Do a Check of the Aircraft Records
 1.00
TOTAL MANHOURS
 1.00
ELAPSED TIME (HOURS)
 1.00
Task 576114-832-895-001: Inspection
Get Access
 2.00
On Aircraft
Do a Detailed Inspection of the LH Outer Front Spar
 2.00
Do a Detailed Inspection of the RH Outer Front Spar
 2.00
Do a Detailed Inspection of the LH Inner Front Spar
 2.00
Do a Detailed Inspection of the RH Inner Front Spar
 2.00
Do a Detailed Inspection of the Lower Skin Area (Rib
26 to Rib 27) on the LH Wing
1.00
Do a Detailed Inspection of the Lower Skin Area (Rib
26 to Rib 27)on the RH Wing
1.00
Do a Detailed Inspection of the Access Covers
(Machined Alloy Load Carrying Type 4, 4A and 5)
Outboard of Rib 22 on the LH Wing
2.00
Do a Detailed Inspection of the Access Covers
(Machined Alloy Load Carrying Type 4, 4A and 5)
Outboard of Rib 22 on the RH Wing
2.00
Tests
 0.50
Close-Up
 2.00
TOTAL MANHOURS
 18.50
ELAPSED TIME (HOURS)
 18.50
NOTE
: The minimum manhours necessary to accomplish this Service Bulletin are
those for the Inspection. Depending on the inspection result, additional
manhours can apply.
**CONF 003
Task 576114-839-895-001
 : Administrative
On Aircraft
Do a Check of the Aircraft Records
 1.00
TOTAL MANHOURS
 1.00
ELAPSED TIME (HOURS)
 1.00
Task 576114-832-895-001
 : Inspection
Get Access
 2.00
On Aircraft
Do a Detailed Inspection of the LH Outer Front Spar
 2.00
Do a Detailed Inspection of the RH Outer Front Spar
 2.00
DATE: Aug 03/15 SERVICE BULLETIN No.: A300-57-6114
REVISION No.: 01 - Jun 19/18 Page: 7
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 20

@A300-600
SERVICE BULLETIN
Task 576114-832-895-001
 : Inspection
Do a Detailed Inspection of the LH Inner Front Spar
 2.00
Do a Detailed Inspection of the RH Inner Front Spar
 2.00
Do a Detailed Inspection of the Lower Skin Area (Rib
26 to Rib 27) on the LH Wing
1.00
Do a Detailed Inspection of the Lower Skin Area (Rib
26 to Rib 27)on the RH Wing
1.00
Do a Detailed Inspection of the Access Covers
(Machined Alloy Load Carrying Type 4, 4A and 5)
Outboard of Rib 22 on the LH Wing
2.00
Do a Detailed Inspection of the Access Covers
(Machined Alloy Load Carrying Type 4, 4A and 5)
Outboard of Rib 22 on the RH Wing
2.00
Tests
 0.50
Close-Up
 2.00
TOTAL MANHOURS
 18.50
ELAPSED TIME (HOURS)
 18.50
NOTE
: The minimum manhours necessary to accomplish this Service Bulletin are
those for the Inspection. Depending on the inspection result, additional
manhours can apply.
Task 576114-832-896-001
 : Inspection - Additional Work for Aircraft Inspected by Revision No.
00
Get Access
 2.00
On Aircraft
Do a Detailed Inspection of the Lower Skin Area (Rib
26 to Rib 27) on the LH Wing
1.00
Do a Detailed Inspection of the Lower Skin Area (Rib
26 to Rib 27) on the RH Wing
1.00
Close-Up
 2.00
TOTAL MANHOURS
 6.00
ELAPSED TIME (HOURS)
 6.00
**CONF ALL
H. WEIGHT AND BALANCE
Not Changed
I. ELECTRICAL LOAD DATA
Not Changed
DATE: Aug 03/15 SERVICE BULLETIN No.: A300-57-6114
REVISION No.: 01 - Jun 19/18 Page: 8
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 21

@A300-600
SERVICE BULLETIN
J. REFERENCES
**CONF 001
Aircraft Maintenance Manual (AMM)
 06-21-00 06-41-57 20-16-00
24-00-00 28-11-22 28-11-33
Elec. Std. Practices Manual (ESPM)
 20-55-00
Structural Repair Manual (SRM)
 51-10-00
 57-20-16 57-20-21
**CONF 002
Aircraft Maintenance Manual (AMM)
 06-21-00 06-41-57 20-16-00
24-00-00 28-11-22 28-11-33
Elec. Std. Practices Manual (ESPM)
 20-55-00
Structural Repair Manual (SRM)
 51-10-00
 57-20-12 57-20-16
57-20-21
**CONF 003
Aircraft Maintenance Manual (AMM)
 06-21-00
 06-41-57
 20-16-00
24-00-00
 28-11-22
 28-11-33
Elec. Std. Practices Manual (ESPM)
 20-55-00
Structural Repair Manual (SRM)
 51-10-00
 57-20-12
 57-20-16
57-20-21
**CONF ALL
K. PUBLICATION AFFECTED
**CONF 001
Structural Repair Manual (SRM)
 57-20-16 57-20-21
**CONF 002 thru 003
Structural Repair Manual (SRM)
 57-20-12 57-20-16 57-20-21
**CONF ALL
L. INTERCHANGEABILITY/MIXABILITY
Not Applicable
M. SPARES
None
DATE: Aug 03/15 SERVICE BULLETIN No.: A300-57-6114
REVISION No.: 01 - Jun 19/18 Page: 9
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 22

@A300-600
SERVICE BULLETIN
This Page Intentionally Left Blank
DATE: Aug 03/15 SERVICE BULLETIN No.: A300-57-6114
REVISION No.: 01 - Jun 19/18 Page: 10
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 23

@A300-600
SERVICE BULLETIN
2. MATERIAL INFORMATION
**CONF ALL
A. MATERIAL - PRICE AND AVAILABILITY
No Material Set
B. INDUSTRY SUPPORT INFORMATION
AIRBUS will not credit the manhours indicated in this Service Bulletin. They remain at
operator’s charge.
C. LIST OF COMPONENTS
No Kit
D. LIST OF MATERIALS - OPERATOR SUPPLIED
None
E. PARTS TO BE RE-IDENTIFIED BY OPERATOR
None
F. TOOLING
None
DATE: Aug 03/15 SERVICE BULLETIN No.: A300-57-6114
REVISION No.: 01 - Jun 19/18 Page: 11
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 24

@A300-600
SERVICE BULLETIN
This Page Intentionally Left Blank
DATE: Aug 03/15 SERVICE BULLETIN No.: A300-57-6114
REVISION No.: 01 - Jun 19/18 Page: 12
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 25

@A300-600
SERVICE BULLETIN
3. ACCOMPLISHMENT INSTRUCTIONS
Task 576114-839-895-001 - Administrative
NOTE
: This Service Bulletin must be accomplished by a check of the aircraft records
and/or by inspection of the aircraft.
If the aircraft records are missing or are not complete, do the detailed inspection
procedure of the wing structure to make sure that no damage exists beyond that
allowed in the current revision of the SRM (including temporary revisions).
If aircraft records are complete, in accordance with the current revision of the SRM
(including temporary revisions), there is no need to visit the aircraft.
NOTE
: This Service Bulletin is classified mandatory or expected to be classified mandatory
by an Airworthiness Directive (AD). The paragraphs 3.C. and 3.D. in these
accomplishment instructions are Required for Compliance (RC) and must be done
to comply with the AD. Other paragraphs are recommended and may be deviated
from, done as part of other actions or done with accepted methods different from
those given in the Service Bulletin, as long as the RC paragraphs can be done and
the aircraft can be put back into a serviceable condition.
Task Associated Data
**CONF 001
Manpower
TOTAL MANHOURS
 1.00
ELAPSED TIME (HOURS)
 1.00
**CONF 002
Manpower
TOTAL MANHOURS
 1.00
ELAPSED TIME (HOURS)
 1.00
**CONF 003
Manpower
TOTAL MANHOURS
 1.00
ELAPSED TIME (HOURS)
 1.00
**CONF ALL
A. GENERAL
**CONF 001
None
DATE: Aug 03/15 SERVICE BULLETIN No.: A300-57-6114
REVISION No.: 01 - Jun 19/18 Page: 13
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 26

@A300-600
SERVICE BULLETIN
**CONF 002
None
**CONF 003
None
**CONF ALL
B. PREPARATION
**CONF 001
None
**CONF 002
None
**CONF 003
None
**CONF ALL
C. PROCEDURE
**CONF 001
(1) Subtask 576114-839-404-001 - Do a Check of the Aircraft Records
Manpower Resources
Manhours
 1.00
Minimum number of person
 1
Subtask elapsed time
 1.00
Skills
 NON SPECIFIC
References
Structural Repair Manual (SRM)
 57-20-16
57-20-21
Fig. A-UBAAA
Outer Front Spar Inspection Area
Sheet 01
Fig. A-UBBAA
Inner Front Spar Inspection Area
Sheet 01
Fig. A-UBCAA
Inspection of the Access Covers
(Machined Alloy Load Carrying Type 4,
4A and 5)
Sheet 01
DATE: Aug 03/15 SERVICE BULLETIN No.: A300-57-6114
REVISION No.: 01 - Jun 19/18 Page: 14
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 27

@A300-600
SERVICE BULLETIN
(a) Do a check of the aircraft records against the following SRM sections to make sure
that the existing repairs (if any) are within the new limits identified within the current
revision of the SRM (including temporary revisions):
Figure reference of Figures in this
Service Bulletin
SRM reference
(ATA chapter)
Area Affected
Fig. A-UBAAA Sheet 01
 SRM 57-20-21
 Outer Front Spar
Fig. A-UBBAA Sheet 01
 SRM 57-20-21
 Inner Front Spar
Fig. A-UBCAA Sheet 01
 SRM 57-20-16
 Access Covers (Load Carrying Type 4, 4A and
5)
1
 If the aircraft records are missing or not complete, in accordance with the
current revision of the SRM, go to TASK 576114-832-895 Inspection.
2
 If identified repairs are beyond the current SRM limits, contact AIRBUS within
3 months after you have completed this inspection.
3
 If identified repairs are within the current SRM limits, no further maintenance
steps are necessary.
**CONF 002
(1) Subtask 576114-839-404-002 - Do a Check of the Aircraft Records
Manpower Resources
Manhours
 1.00
Minimum number of person
 1
Subtask elapsed time
 1.00
Skills
 NON SPECIFIC
References
Structural Repair Manual (SRM)
 57-20-12
57-20-16
57-20-21
Fig. A-UBDAA
Lower Skin Inspection
Sheet 01
Fig. A-UBCAA
Inspection of the Access Covers
(Machined Alloy Load Carrying Type 4,
4A and 5)
Sheet 01
Fig. A-UBAAA
Outer Front Spar Inspection Area
Sheet 01
Fig. A-UBBAA
Inner Front Spar Inspection Area
Sheet 01
DATE: Aug 03/15 SERVICE BULLETIN No.: A300-57-6114
REVISION No.: 01 - Jun 19/18 Page: 15
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 28

@A300-600
SERVICE BULLETIN
(a) Do a check of the aircraft records against the following SRM sections to make sure
that the existing repairs (if any) are within the new limits identified within the current
revision of the SRM (including temporary revisions):
Figure reference of Figures in this
Service Bulletin
SRM reference
(ATA chapter)
Area Affected
Fig. A-UBAAA Sheet 01
 SRM 57-20-21
 Outer Front Spar
Fig. A-UBBAA Sheet 01
 SRM 57-20-21
 Inner Front Spar
Fig. A-UBDAA Sheet 01
 SRM 57-20-12
 Lower Panel Skin (Rib 26 to Rib 27 between
Front Spar and Stringer 13)
Fig. A-UBCAA Sheet 01
 SRM 57-20-16
 Access Covers (Load Carrying Type 4, 4A and
5)
1
 If the aircraft records are missing or not complete, in accordance with the
current revision of the SRM, go to TASK 576114-832-895 Inspection.
2
 If identified repairs are beyond the current SRM limits, contact AIRBUS within
3 months after you have completed this inspection.
3
 If identified repairs are within the current SRM limits, no further maintenance
steps are necessary.
**CONF 003
(1) Subtask 576114-839-404-002 - Do a Check of the Aircraft Records
Manpower Resources
Manhours
 1.00
Minimum number of person
 1
Subtask elapsed time
 1.00
Skills
 NON SPECIFIC
References
Structural Repair Manual (SRM)
 57-20-12
57-20-16
57-20-21
Fig. A-UBDAA
Lower Skin Inspection
Sheet
 01
Fig. A-UBCAA
Inspection of the Access Covers
(Machined Alloy Load Carrying Type 4,
4A and 5)
Sheet
 01
Fig. A-UBAAA
Outer Front Spar Inspection Area
Sheet
 01
Fig. A-UBBAA
Inner Front Spar Inspection Area
Sheet
 01
DATE: Aug 03/15 SERVICE BULLETIN No.: A300-57-6114
REVISION No.: 01 - Jun 19/18 Page: 16
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 29

@A300-600
SERVICE BULLETIN
(a) Do a check of the aircraft records against the following SRM sections to make sure
that the existing repairs (if any) are within the new limits identified within the current
revision of the SRM (including temporary revisions):
Figure reference of Figures in this
Service Bulletin
SRM reference
(ATA chapter)
Area Affected
Fig. A-UBAAA Sheet 01
 SRM 57-20-21
 Outer Front Spar
Fig. A-UBBAA Sheet 01
 SRM 57-20-21
 Inner Front Spar
Fig. A-UBDAA Sheet 01
 SRM 57-20-12
 Lower Panel Skin (Rib 26 to Rib 27 between
Front Spar and Stringer 13)
Fig. A-UBCAA Sheet 01
 SRM 57-20-16
 Access Covers (Load Carrying Type 4, 4A and
5)
1
 If the aircraft records are missing or not complete, in accordance with the
current revision of the SRM, go to TASK 576114-832-895 Inspection.
2
 If identified repairs are beyond the current SRM limits, contact AIRBUS within
3 months after you have completed this inspection.
3
 If identified repairs are within the current SRM limits, no further maintenance
steps are necessary.
**CONF ALL
D. TEST
**CONF 001
None
**CONF 002
None
**CONF 003
None
**CONF ALL
E. CLOSE-UP
**CONF 001
None
**CONF 002
None
**CONF 003
None
DATE: Aug 03/15 SERVICE BULLETIN No.: A300-57-6114
REVISION No.: 01 - Jun 19/18 Page: 17
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 30

@A300-600
SERVICE BULLETIN
This Page Intentionally Left Blank
DATE: Aug 03/15 SERVICE BULLETIN No.: A300-57-6114
REVISION No.: 01 - Jun 19/18 Page: 18
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 31

@A300-600
SERVICE BULLETIN
Task 576114-832-895-001 - Inspection
**CONF ALL
WARNING
: MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND ALL THE CAUTIONS
INCLUDED IN THE REFERENCED PROCEDURES.
WARNING
: THIS PROCEDURE USES A FUEL SYSTEM ITEM THAT IS IN A CATEGORY
KNOWN AS A CRITICAL DESIGN CONFIGURATION CONTROL LIMITATION
(CDCCL) CDCCL IDENTIFIES AN ITEM THAT CAN BE THE SOURCE OF A
POSSIBLE FUEL TANK IGNITION. YOU MUST KEEP ALL CDCCL ITEMS IN
THE APPROVED CONFIGURATION. DAMAGE, WEAR OR CHANGES TO A
CDCCL ITEM CAN CAUSE A POSSIBLE FUEL TANK EXPLOSION.
WARNING
: BEFORE YOU DO WORK IN A FUEL TANK, MAKE SURE THAT YOU OBEY
ALL THE SAFETY PROCEDURES. THIS WILL PREVENT INJURY TO PERSONS
AND/OR DAMAGE TO THE AIRCRAFT.
WARNING
: USE THE APPROVED PR OTECTIVE CLOTHING WHEN YOU GO IN A FUEL
TANK. THIS PREVENTS PERSONAL CONTAMINATION AND THE FORMATION
OF STATIC ELECTRICITY.
WARNING
: OBEY THE SAFETY PROCEDURES WHEN YOU DO WORK IN A FUEL TANK.
THIS WILL PREVENT INJURY OR DAMAGE.
WARNING
: DO NOT REMOVE YOUR RESPIRATOR WHILE YOU ARE IN A FUEL TANK
(UNLESS THE FUEL-GAS CONCENTRATION IS LESS THAN 5% OF LEL
(LOWER EXPLOSIVE LIMIT)). YOU WILL BECOME ILL OR DIE.
WARNING
: DO NOT GO INTO A FUEL TANK UNTIL THE FUEL-GAS CONCENTRATION
IS LESS THAN 10% OF LEL (LOWER EXPLOSIVE LIMIT) OR THE LOCAL
REGULATORY-AUTHORITY LIMIT.
WARNING
: YOU MUST ISOLATE THE AIRCRAFT BATTERIES AND THE ELECTRICAL
GROUND- POWER SUPPLY WHEN A FUEL TANK IS OPEN. THIS CAN
PREVENT AN EXPLOSION.
WARNING
: ALWAYS PUT ON AN APPROVED RESPIRATOR AND PROTECTIVE
CLOTHING BEFORE YOU GO INTO A FUEL TANK THAT HAS MICROBIAL
CONTAMINATION. IF YOU BREATHE IN OR TOUCH THE MICROBIAL
GROWTH, THERE CAN BE A HEALTH RISK.
DATE: Aug 03/15 SERVICE BULLETIN No.: A300-57-6114
REVISION No.: 01 - Jun 19/18 Page: 19
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 32

@A300-600
SERVICE BULLETIN
CAUTION
: ALWAYS OBEY THE PRECAUTIONS THAT FOLLOW TO KEEP
ELECTRICAL WIRING IN A SATISFACTORY CONDITION (ELECTRICALLY
AND MECHANICALLY SERVICEABLE) . WHEN YOU DO MAINTENANCE
WORK, REPAIRS OR MODIFICATIONS, ALWAYS KEEP ELECTRICAL WIRING,
COMPONENTS AND THE WORK AREA AS CLEAN AS POSSIBLE. TO DO
THIS:
- PUT PROTECTION, SUCH AS PLASTIC SHEETING, CLOTHS, ETC; AS
NECESSARY ON WIRING AND COMPONENTS.
- REGULARLY REMOVE ALL SHAVINGS, UNWANTED MATERIAL AND
OTHER CONTAMINATION.
THESE PRECAUTIONS WILL DECREASE THE RISK OF CONTAMINATION
AND DAMAGE TO THE ELECTRICAL WIRING INSTALLATION.
IF THERE IS CONTAMINATION, REFER TO ESPM 20-55-00.
NOTE
: This Service Bulletin must be accomplished by a check of the aircraft records
and/or by inspection of the aircraft.
If the aircraft records are missing or are not complete, do the detailed inspection
procedure of the wing structure to make sure that no damage exists beyond that
allowed in the current revision of the SRM (including temporary revisions).
If aircraft records are complete, in accordance with the current revision of the SRM
(including temporary revisions), there is no need to visit the aircraft.
NOTE
: The accomplishment instructions of this Service Bulletin include procedures given
in other documents or in other sections of the Service Bulletin. When the words
’refer to’ are used and the operator has a procedure accepted by the local authority
he belongs to, the accepted alternative procedure can be used. When the words ’in
accordance with’ are used then the given procedure must be followed.
NOTE
: The access and close-up instructions, not comprising return to service tests, in this
Service Bulletin do not constitute or affect the technical intent of the Service
Bulletin. Operators can therefore, as deemed necessary, omit or add access and/or
close-up steps to add flexibility to their maintenance operations as long as the
technical intent of the Service Bulletin is met within the set parameters.
NOTE
: Manual titles given in the accomplishment instructions are referred to by acronyms.
Refer to paragraph 1.J., References, for the definition of acronyms.
NOTE
: This Service Bulletin contains the instructions for the on-aircraft maintenance
necessary to ensure the continued airworthiness of the aircraft.
For any deviations to the instructions contained herein, contact AIRBUS for further
instructions and approval.
NOTE
: The purpose of flow charts is to supplement the information given in the Procedure
and Compliance paragraphs and not to serve as the primary source for tasks or
compliance times given in this Service Bulletin.
DATE: Aug 03/15 SERVICE BULLETIN No.: A300-57-6114
REVISION No.: 01 - Jun 19/18 Page: 20
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 33

@A300-600
SERVICE BULLETIN
NOTE
: This Service Bulletin is classified mandatory or expected to be classified mandatory
by an Airworthiness Directive (AD). The paragraphs 3.C. and 3.D. in these
accomplishment instructions are Required for Compliance (RC) and must be done
to comply with the AD. To allow more flexibility, the rule "refer to" and "in
accordance with" will apply to these paragraphs 3.C. and 3.D. Other paragraphs
are recommended and may be deviated from, done as part of other actions or
done with accepted methods different from those given in the Service Bulletin, as
long as the RC paragraphs can be done and the aircraft can be put back into a
serviceable condition.
Task Associated Data
**CONF 001
Zone
510 540 550 560 610 640 650 660
Access
Panel
 512DB 512FB 512KB 541AB 541BB 541CB 550BB 550DB
550EB 550FB 550GB 550HB 550JB 550KB 550LB 550MB
550NB 550PB 550QB 560BB 612DB 612FB 612KB 641AB
641BB 641CB 650BB 650DB 650EB 650FB 650GB 650HB
650JB 650KB 650LB 650MB 650NB 650PB 650QB 660BB
Manpower
TOTAL MANHOURS
 16.50
ELAPSED TIME (HOURS)
 16.50
**CONF 002
Zone
510 540 550 560 610 640 650 660
Access
Panel
 512DB 512FB 512KB 541AB 541BB 541CB 550BB 550DB
550EB 550FB 550GB 550HB 550JB 550KB 550LB 550MB
550NB 550PB 550QB 560BB 612DB 612FB 612KB 641AB
641BB 641CB 650BB 650DB 650EB 650FB 650GB 650HB
650JB 650KB 650LB 650MB 650NB 650PB 650QB 660BB
Manpower
TOTAL MANHOURS
 18.50
ELAPSED TIME (HOURS)
 18.50
**CONF 003
Zone
510
 540
 550
 560
 610
 640
 650
 660
Access
Panel
 512DB
 512FB
 512KB
 541AB
 541BB
 541CB
 550BB
 550DB
550EB
 550FB
 550GB
 550HB
 550JB
 550KB
 550LB
 550MB
550NB
 550PB
 550QB
 560BB
 612DB
 612FB
 612KB
 641AB
641BB
 641CB
 650BB
 650DB
 650EB
 650FB
 650GB
 650HB
650JB
 650KB
 650LB
 650MB
 650NB
 650PB
 650QB
 660BB
DATE: Aug 03/15 SERVICE BULLETIN No.: A300-57-6114
REVISION No.: 01 - Jun 19/18 Page: 21
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 34

@A300-600
SERVICE BULLETIN
Manpower
TOTAL MANHOURS
 18.50
ELAPSED TIME (HOURS)
 18.50
**CONF ALL
A. GENERAL
**CONF 001
(1) Subtask 576114-910-401-001 - Standard Practices
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 06-21-00, Page Block 001
06-41-57, Page Block 001
20-16-00, Page Block 201
(a) For the identification of zones, refer to AMM 06-21-00, Page Block 001.
(b) For the identification of access panels, refer to AMM 06-41-57, Page Block 001.
(c) For circuit breaker safety precautions, refer to AMM 20-16-00, Page Block 201.
(2) Subtask 576114-839-401-001 - Administrative
Manpower Resources
Skills
 NON SPECIFIC
Write in the applicable aircraft records that you have done all the work given in this
Service Bulletin.
**CONF 002
(1) Subtask 576114-910-401-001 - Standard Practices
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 06-21-00, Page Block 001
06-41-57, Page Block 001
20-16-00, Page Block 201
(a) For the identification of zones, refer to AMM 06-21-00, Page Block 001.
(b) For the identification of access panels, refer to AMM 06-41-57, Page Block 001.
(c) For circuit breaker safety precautions, refer to AMM 20-16-00, Page Block 201.
DATE: Aug 03/15 SERVICE BULLETIN No.: A300-57-6114
REVISION No.: 01 - Jun 19/18 Page: 22
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 35

@A300-600
SERVICE BULLETIN
(2) Subtask 576114-839-401-001 - Administrative
Manpower Resources
Skills
 NON SPECIFIC
Write in the applicable aircraft records that you have done all the work given in this
Service Bulletin.
**CONF 003
(1) Subtask 576114-910-401-001 - Standard Practices
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 06-21-00, Page Block 001
06-41-57, Page Block 001
20-16-00, Page Block 201
(a) For the identification of zones, refer to AMM 06-21-00, Page Block 001.
(b) For the identification of access panels, refer to AMM 06-41-57, Page Block 001.
(c) For circuit breaker safety precautions, refer to AMM 20-16-00, Page Block 201.
(2) Subtask 576114-839-401-001 - Administrative
Manpower Resources
Skills
 NON SPECIFIC
Write in the applicable aircraft records that you have done all the work given in this
Service Bulletin.
**CONF ALL
B. PREPARATION
**CONF 001
(1) Subtask 576114-941-401-001 - Job Set-up
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 24-00-00, Page Block 301
28-11-22, Page Block 401
NOTE
: The items given in this note shall be considered as the basic Aircraft
configuration before you start a maintenance task:
- Aircraft on the ground resting on landing gear (the ground safety
DATE: Aug 03/15 SERVICE BULLETIN No.: A300-57-6114
REVISION No.: 01 - Jun 19/18 Page: 23
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 36

@A300-600
SERVICE BULLETIN
locks and the wheel chocks are in position on the landing gear)
- Engine shut down, thrust reversers closed and locked
- Aircraft in clean configuration
- Parking brake applied
- Aircraft electrical network de-energized
- Hydraulic system s depressurized
- Access to the cockpit and cabin is available
- All circuit breakers are in closed position
- All controls in NORM, AUTO or OFF position.
(a) Put a warning notice in position in the cockpit to tell persons not to operate the
flight controls.
(b) Put access platform(s) in position to get access to the wing.
(c) Make sure the aircraft is electrically grounded, refer to AMM 24-00-00 Page Block
301.
(d) Do the job set-up procedures as specified in the ’Manhole Cover -
Removal/Installation’, refer to AMM 28-11-22, Page Block 401.
(2) Subtask 576114-010-401-001 - Remove T ank Access Covers for Inspection
Work Zones and Access Panels
Zone
 Access/Work location
510
 Access
 Panel 512DB, Panel 512FB, Panel 512KB
550
 Access
 Panel 550BB, Panel 550DB, Panel 550EB,
Panel 550FB, Panel 550GB, Panel 550HB,
Panel 550JB, Panel 550KB
610
 Access
 Panel 612DB, Panel 612FB, Panel 612KB
650
 Access
 Panel 650BB, Panel 650DB, Panel 650EB,
Panel 650FB, Panel 650GB, Panel 650HB,
Panel 650JB, Panel 650KB
540
 Access
 Panel 541AB, Panel 541BB, Panel 541CB
640
 Access
 Panel 641AB, Panel 641BB, Panel 641CB
Manpower Resources
Skills
 AIRFRAME
References
Aircraft Maintenance Manual (AMM)
 28-11-22, Page Block 401
DATE: Aug 03/15 SERVICE BULLETIN No.: A300-57-6114
REVISION No.: 01 - Jun 19/18 Page: 24
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 37

@A300-600
SERVICE BULLETIN
(a) Remove these access covers to get access to inboard front spar LH and RH, refer
to AMM 28-11-22, Page Block 401:
- 541AB, 541BB, 541CB, 512DB, 512FB, 512KB, 641AB, 641BB, 641CB,
612DB, 612FB and 612KB.
(b) Remove the type 4, 4A and 5 access covers that follow for access LH and RH,
refer to AMM 28-11-22, Page Block 401:
- 550BB, 550DB, 550EB, 550FB, 550GB, 550HB, 550JB, 550KB, 650BB,
650DB, 650EB, 650FB, 650GB, 650HB, 650JB and 650KB.
**CONF 002
(1) Subtask 576114-941-401-001 - Job Set-up
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 24-00-00, Page Block 301
28-11-22, Page Block 401
NOTE
: The items given in this note shall be considered as the basic Aircraft
configuration before you start a maintenance task:
- Aircraft on the ground resting on landing gear (the ground safety
locks and the wheel chocks are in position on the landing gear)
- Engine shut down, thrust reversers closed and locked
- Aircraft in clean configuration
- Parking brake applied
- Aircraft electrical network de-energized
- Hydraulic system s depressurized
- Access to the cockpit and cabin is available
- All circuit breakers are in closed position
- All controls in NORM, AUTO or OFF position.
(a) Put a warning notice in position in the cockpit to tell persons not to operate the
flight controls.
(b) Put access platform(s) in position to get access to the wing.
(c) Make sure the aircraft is electrically grounded, refer to AMM 24-00-00 Page Block
301.
DATE: Aug 03/15 SERVICE BULLETIN No.: A300-57-6114
REVISION No.: 01 - Jun 19/18 Page: 25
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 38

@A300-600
SERVICE BULLETIN
(d) Do the job set-up procedures as specified in the ’Manhole Cover -
Removal/Installation’, refer to AMM 28-11-22, Page Block 401.
(2) Subtask 576114-010-401-001 - Remove T ank Access Covers for Inspection
Work Zones and Access Panels
Zone
 Access/Work location
510
 Access
 Panel 512DB, Panel 512FB, Panel 512KB
550
 Access
 Panel 550BB, Panel 550DB, Panel 550EB,
Panel 550FB, Panel 550GB, Panel 550HB,
Panel 550JB, Panel 550KB
610
 Access
 Panel 612DB, Panel 612FB, Panel 612KB
650
 Access
 Panel 650BB, Panel 650DB, Panel 650EB,
Panel 650FB, Panel 650GB, Panel 650HB,
Panel 650JB, Panel 650KB
540
 Access
 Panel 541AB, Panel 541BB, Panel 541CB
640
 Access
 Panel 641AB, Panel 641BB, Panel 641CB
Manpower Resources
Skills
 AIRFRAME
References
Aircraft Maintenance Manual (AMM)
 28-11-22, Page Block 401
(a) Remove these access covers to get access to inboard front spar LH and RH, refer
to AMM 28-11-22, Page Block 401:
- 541AB, 541BB, 541CB, 512DB, 512FB, 512KB, 641AB, 641BB, 641CB,
612DB, 612FB and 612KB.
(b) Remove the type 4, 4A and 5 access covers that follow for access LH and RH,
refer to AMM 28-11-22, Page Block 401:
- 550BB, 550DB, 550EB, 550FB, 550GB, 550HB, 550JB, 550KB, 650BB,
650DB, 650EB, 650FB, 650GB, 650HB, 650JB and 650KB.
**CONF 003
(1) Subtask 576114-941-401-001 - Job Set-up
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 24-00-00, Page Block 301
28-11-22, Page Block 401
NOTE
: The items given in this note shall be considered as the basic Aircraft
configuration before you start a maintenance task:
- Aircraft on the ground resting on landing gear (the ground safety
DATE: Aug 03/15 SERVICE BULLETIN No.: A300-57-6114
REVISION No.: 01 - Jun 19/18 Page: 26
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 39

@A300-600
SERVICE BULLETIN
locks and the wheel chocks are in position on the landing gear)
- Engine shut down, thrust reversers closed and locked
- Aircraft in clean configuration
- Parking brake applied
- Aircraft electrical network de-energized
- Hydraulic system s depressurized
- Access to the cockpit and cabin is available
- All circuit breakers are in closed position
- All controls in NORM, AUTO or OFF position.
(a) Put a warning notice in position in the cockpit to tell persons not to operate the
flight controls.
(b) Put access platform(s) in position to get access to the wing.
(c) Make sure the aircraft is electrically grounded, refer to AMM 24-00-00 Page Block
301.
(d) Do the job set-up procedures as specified in the ’Manhole Cover -
Removal/Installation’, refer to AMM 28-11-22, Page Block 401.
(2) Subtask 576114-010-401-001 - Remove T ank Access Covers for Inspection
Work Zones and Access Panels
Zone
 Access/Work location
510
 Access
 Panel 512DB
 , Panel 512FB
 , Panel 512KB
550
 Access
 Panel 550BB
 , Panel 550DB
 , Panel 550EB
 ,
Panel 550FB
 , Panel 550GB
 , Panel 550HB
 ,
Panel 550JB
 , Panel 550KB
610
 Access
 Panel 612DB
 , Panel 612FB
 , Panel 612KB
650
 Access
 Panel 650BB
 , Panel 650DB
 , Panel 650EB
 ,
Panel 650FB
 , Panel 650GB
 , Panel 650HB
 ,
Panel 650JB
 , Panel 650KB
540
 Access
 Panel 541AB
 , Panel 541BB
 , Panel 541CB
640
 Access
 Panel 641AB
 , Panel 641BB
 , Panel 641CB
Manpower Resources
Skills
 AIRFRAME
References
Aircraft Maintenance Manual (AMM)
 28-11-22, Page Block 401
DATE: Aug 03/15 SERVICE BULLETIN No.: A300-57-6114
REVISION No.: 01 - Jun 19/18 Page: 27
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 40

@A300-600
SERVICE BULLETIN
(a) Remove these access covers to get access to inboard front spar LH and RH, refer
to AMM 28-11-22, Page Block 401:
- 541AB, 541BB, 541CB, 512DB, 512FB, 512KB, 641AB, 641BB, 641CB,
612DB, 612FB and 612KB.
(b) Remove the type 4, 4A and 5 access covers that follow for access LH and RH,
refer to AMM 28-11-22, Page Block 401:
- 550BB, 550DB, 550EB, 550FB, 550GB, 550HB, 550JB, 550KB, 650BB,
650DB, 650EB, 650FB, 650GB, 650HB, 650JB and 650KB.
**CONF ALL
C. PROCEDURE
**CONF 001
(1) Subtask 576114-220-401-001 - Do a Detailed Inspection of the LH Outer Front Spar
Work Zones and Access Panels
Zone
 Access/Work location
550
 Work location
 from Rib 9 to Rib 29
Manpower Resources
Manhours
 2.00
Minimum number of person
 1
Subtask elapsed time
 2.00
Skills
 AIRFRAME
References
Structural Repair Manual (SRM)
 51-10-00
57-20-21
Fig. A-UBAAA
Outer Front Spar Inspection Area
Sheet 01
Fig. A-UFAAA
Flowchart
Sheet 01
(a) On the outer front spar, between Rib 9 and Rib 29, do a detailed inspection on the
middle and upper sections of the spar web in accordance with SRM 57-20-21.
Refer to Fig. A-UBAAA Sheet 01
 , Fig. A-UFAAA Sheet 01
 and Table 1.
Wv
 -600
 -601
 -600R
Drawing No.
 A571-40875
 A571-40875
 A571-40875
 A571-41305
 A571-41305
Part No.
212/215
236/239
240/243
220/223
 216/219
 200/203
200/203
204/205
206/207
Material
 1103
 1213
 1103
 1213
 1213
Bay
9-10
 X
 X
 X
DATE: Aug 03/15 SERVICE BULLETIN No.: A300-57-6114
REVISION No.: 01 - Jun 19/18 Page: 28
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 41

@A300-600
SERVICE BULLETIN
Wv
 -600
 -601
 -600R
Drawing No.
 A571-40875
 A571-40875
 A571-40875
 A571-41305
 A571-41305
Part No.
212/215
236/239
240/243
220/223
 216/219
 200/203
200/203
204/205
206/207
Material
 1103
 1213
 1103
 1213
 1213
Bay
10-11
 X
 X
 X
 X
11-12
 X
 X
 X
 X
12-13
 X
 X
13-14
 X
 X
14-15
 X
 X
 X
15-16
 X
 X
 X
16-17
 X
 X
 X
 X
 X
17-18
 X
18-19
 X
 X
19-20
20-21
 X
21-22
 X
22-23
23-24
 X
24-25
 X
 X
25-26
26-27
27-28
28-29
Table 1 : Outer Front Spar Restricted Type B Allowable Damage
In Table 1, the "X" indicates no Type B damage is permissible.
- Identify the damage type in accordance with SRM 51-10-00.
- If there is damage OR a repair to the outer front spar between Rib 9 and Rib
29 that is within the limits given in the current revision of the SRM (including
temporary revisions), no further action is required in this area
- Record the damage or repair if it is not already recorded
- If there is damage OR a repair to the outer front spar between Rib 9 and
Rib 29 that is outside of the limits given in the current revision of the SRM
(including temporary revisions), that can be repaired/replaced, replace the
repair in accordance with an applicable current revision of the SRM (including
temporary revisions) repair, or another approved repair within 3 months (refer
to Repair Evaluation Guidelines) after the repair survey
DATE: Aug 03/15 SERVICE BULLETIN No.: A300-57-6114
REVISION No.: 01 - Jun 19/18 Page: 29
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 42

@A300-600
SERVICE BULLETIN
- If there is damage OR a repair to the outer front spar between Rib 9 and
Rib 29 that is outside of the limits given in the SRM, that can NOT be
repaired/replaced contact AIRBUS within 3 months after you have completed
this inspection.
(2) Subtask 576114-220-405-001 - Do a Detailed Inspection of the RH Outer Front Spar
Work Zones and Access Panels
Zone
 Access/Work location
650
 Work location
 from Rib 9 to Rib 29
Manpower Resources
Manhours
 2.00
Minimum number of person
 1
Subtask elapsed time
 2.00
Skills
 AIRFRAME
References
Structural Repair Manual (SRM)
 51-10-00
57-20-21
Fig. A-UBAAA
Outer Front Spar Inspection Area
Sheet 01
Fig. A-UFAAA
Flowchart
Sheet 01
(a) On the outer front spar, between Rib 9 and Rib 29, do a detailed inspection on the
middle and upper sections of the spar web in accordance with SRM 57-20-21.
Refer to Fig. A-UBAAA Sheet 01
 , Fig. A-UFAAA Sheet 01
 and Table 1.
Wv
 -600
 -601
 -600R
Drawing No.
 A571-40875
 A571-40875
 A571-40875
 A571-41305
 A571-41305
Part No.
212/215
236/239
240/243
220/223
 216/219
 200/203
200/203
204/205
206/207
Material
 1103
 1213
 1103
 1213
 1213
Bay
9-10
 X
 X
 X
10-11
 X
 X
 X
 X
11-12
 X
 X
 X
 X
12-13
 X
 X
13-14
 X
 X
14-15
 X
 X
 X
15-16
 X
 X
 X
16-17
 X
 X
 X
 X
 X
17-18
 X
18-19
 X
 X
19-20
20-21
 X
DATE: Aug 03/15 SERVICE BULLETIN No.: A300-57-6114
REVISION No.: 01 - Jun 19/18 Page: 30
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 43

@A300-600
SERVICE BULLETIN
Wv
 -600
 -601
 -600R
Drawing No.
 A571-40875
 A571-40875
 A571-40875
 A571-41305
 A571-41305
Part No.
212/215
236/239
240/243
220/223
 216/219
 200/203
200/203
204/205
206/207
Material
 1103
 1213
 1103
 1213
 1213
Bay
21-22
 X
22-23
23-24
 X
24-25
 X
 X
25-26
26-27
27-28
28-29
Table 1 : Outer Front Spar Restricted Type B Allowable Damage
In Table 1, the "X" indicates no Type B damage is permissible.
- Identify the damage type in accordance with SRM 51-10-00.
- If there is damage OR a repair to the outer front spar between Rib 9 and Rib
29 that is within the limits given in the current revision of the SRM (including
temporary revisions), no further action is required in this area
- Record the damage or repair if it is not already recorded
- If there is damage OR a repair to the outer front spar between Rib 9 and
Rib 29 that is outside of the limits given in the current revision of the SRM
(including temporary revisions), that can be repaired/replaced, replace the
repair in accordance with an applicable current revision of the SRM (including
temporary revisions) repair, or another approved repair within 3 months (refer
to Repair Evaluation Guidelines) after the repair survey
- If there is damage OR a repair to the outer front spar between Rib 9 and
Rib 29 that is outside of the limits given in the SRM, that can NOT be
repaired/replaced contact AIRBUS within 3 months after you have completed
this inspection.
(3) Subtask 576114-220-402-001 - Do a Detailed Inspection of the LH Inner Front Spar
Work Zones and Access Panels
Zone
 Access/Work location
510
 Work location
 from Rib 1 to Rib 9
DATE: Aug 03/15 SERVICE BULLETIN No.: A300-57-6114
REVISION No.: 01 - Jun 19/18 Page: 31
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 44

@A300-600
SERVICE BULLETIN
Manpower Resources
Manhours
 2.00
Minimum number of person
 1
Subtask elapsed time
 2.00
Skills
 AIRFRAME
References
Structural Repair Manual (SRM)
 51-10-00
57-20-21
Fig. A-UBBAA
Inner Front Spar Inspection Area
Sheet 01
Fig. A-UFAAA
Flowchart
Sheet 01
(a) On the inner front spar, between Rib 1 and Rib 9, do a detailed inspection on the
middle and upper sections of the spar web in accordance with SRM 57-20-21.
Refer to Fig. A-UBBAA Sheet 01
 , Fig. A-UFAAA Sheet 01
 and Table 2.
Wv
 -600
 -601
 -600R
Drawing No.
 A571-41298
 A571-41298
 A571-41298
Part No.
 000/001
 000/001
000/001/002/003
004/005/006/007
008/009/010/011
Material
 1218
 1218
 1218
Bay
1-2
2-3
3-4
4-5
 X
 X
 X
5-6
Table 2 : Inner Front Spar Capped Vertical Stiffner Restricted to Type C Allowable Damage
In Table 2, the "X" indicates no Type C damage is permissible to the vertical
stiffener cap.
- Identify the damage type in accordance with SRM 51-10-00.
- If there is damage OR a repair to the inner front spar between Rib 1 and Rib 9
that is within the limits given in the current revision of the SRM (including
temporary revisions), no further action is required in this area
- If there is damage OR a repair to the inner front spar between Rib 1 and Rib 9
that is outside of the limits given in the current revision of the SRM (including
temporary revisions), that can be repaired/replaced, replace the repair in
accordance with an applicable current revision of the SRM (including temporary
revisions) repair, or another approved repair within 3 months (refer to Repair
Evaluation Guidelines) after the repair survey
DATE: Aug 03/15 SERVICE BULLETIN No.: A300-57-6114
REVISION No.: 01 - Jun 19/18 Page: 32
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 45

@A300-600
SERVICE BULLETIN
- If there is damage OR a repair to the inner front spar between Rib 1 and
Rib 9 that is outside of the limits given in the current revision of the SRM
(including temporary revisions), that can NOT be repaired/replaced contact
AIRBUS within 3 months after you have completed this inspection
- Record the damage or repair if it is not already recorded.
(4) Subtask 576114-220-406-001 - Do a Detailed Inspection of the RH Inner Front Spar
Work Zones and Access Panels
Zone
 Access/Work location
610
 Work location
 from Rib 1 to Rib 9
Manpower Resources
Manhours
 2.00
Minimum number of person
 1
Subtask elapsed time
 2.00
Skills
 AIRFRAME
References
Structural Repair Manual (SRM)
 51-10-00
57-20-21
Fig. A-UBBAA
Inner Front Spar Inspection Area
Sheet 01
Fig. A-UFAAA
Flowchart
Sheet 01
(a) On the inner front spar, between Rib 1 and Rib 9, do a detailed inspection on the
middle and upper sections of the spar web in accordance with SRM 57-20-21.
Refer to Fig. A-UBBAA Sheet 01
 , Fig. A-UFAAA Sheet 01
 and Table 2.
Wv
 -600
 -601
 -600R
Drawing No.
 A571-41298
 A571-41298
 A571-41298
Part No.
 000/001
 000/001
000/001/002/003
004/005/006/007
008/009/010/011
Material
 1218
 1218
 1218
Bay
1-2
2-3
3-4
4-5
 X
 X
 X
5-6
Table 2 : Inner Front Spar Capped Vertical Stiffner Restricted to Type C Allowable Damage
In Table 2, the "X" indicates no Type C damage is permissible to the vertical
stiffener cap.
DATE: Aug 03/15 SERVICE BULLETIN No.: A300-57-6114
REVISION No.: 01 - Jun 19/18 Page: 33
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 46

@A300-600
SERVICE BULLETIN
- Identify the damage type in accordance with SRM 51-10-00.
- If there is damage OR a repair to the inner front spar between Rib 1 and Rib 9
that is within the limits given in the current revision of the SRM (including
temporary revisions), no further action is required in this area
- If there is damage OR a repair to the inner front spar between Rib 1 and Rib 9
that is outside of the limits given in the current revision of the SRM, that can be
repaired/replaced, replace the repair in accordance with an applicable current
revision of the SRM (including temporary revisions) repair, or another approved
repair within 3 months (refer to Repair Evaluation Guidelines) after the repair
survey
- If there is damage OR a repair to the inner front spar between Rib 1 and
Rib 9 that is outside of the limits given in the current revision of the SRM
(including temporary revisions), that can NOT be repaired/replaced contact
AIRBUS within 3 months after you have completed this inspection
- Record the damage or repair if it is not already recorded.
(5) Subtask 576114-220-404-001 - Do a Detailed Inspection of the Access Covers
(Machined Alloy Load Carrying Type 4, 4 A and 5) Outboard of Rib 22 on the LH
Wing
Work Zones and Access Panels
Zone
 Access/Work location
550
 Access
 Panel 550QB, Panel 550PB, Panel 550NB,
Panel 550MB, Panel 550LB
Work location
 from Rib 22 to Rib 29
560
 Access
 Panel 560BB
Work location
 from Rib 22 to Rib 29
Manpower Resources
Manhours
 2.00
Minimum number of person
 1
Subtask elapsed time
 2.00
Skills
 AIRFRAME
References
Aircraft Maintenance Manual (AMM)
 28-11-22, Page Block 401
Structural Repair Manual (SRM)
 57-20-16
Fig. A-UBCAA
Inspection of the Access Covers
(Machined Alloy Load Carrying Type 4,
4A and 5)
Sheet 01
Fig. A-UFAAA
Flowchart
Sheet 01
DATE: Aug 03/15 SERVICE BULLETIN No.: A300-57-6114
REVISION No.: 01 - Jun 19/18 Page: 34
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 47

@A300-600
SERVICE BULLETIN
(a) Do a detailed inspection of the access covers (machined alloy type 4, 4A and 5)
outboard of rib 22 in accordance with SRM 57-20-16
 .
Refer to Fig. A-UBCAA Sheet 01
 , Section A-A NOTES 01 to 05 and Fig. A-UFAAA
Sheet 01
 .
NOTE
: Dents in the covers to a maximum depth of 1.50 mm (0.059 in.) and
a minimum width (30 x depth) are permitted, provided they are not
in the area of a stiffener in accordance with SRM 57-20-16
 .
- If there is damage on any access cover in the areas shown outside of the area
of the stiffener, that is of a width greater than 30 x depth, no further action is
required in this area
- If there is ANY damage on an access cover that is:
. on the mating face with wing skin
. width less than 30 x depth
. in the area of the stiffener
. on the stiffener
replace the access cover, refer to AMM 28-11-22, Page Block 401.
(6) Subtask 576114-220-408-001 - Do a Detailed Inspection of the Access Covers
(Machined Alloy Load Carrying Type 4, 4 A and 5) Outboard of Rib 22 on the RH
Wing
Work Zones and Access Panels
Zone
 Access/Work location
650
 Access
 Panel 650QB, Panel 650PB, Panel 650NB,
Panel 650MB, Panel 650LB
Work location
 from Rib 22 to Rib 29
660
 Access
 Panel 660BB
Work location
 from Rib 22 to Rib 29
Manpower Resources
Manhours
 2.00
Minimum number of person
 1
Subtask elapsed time
 2.00
Skills
 AIRFRAME
References
Aircraft Maintenance Manual (AMM)
 28-11-22, Page Block 401
Structural Repair Manual (SRM)
 57-20-16
Fig. A-UBCAA
Inspection of the Access Covers
(Machined Alloy Load Carrying Type 4,
4A and 5)
Sheet 01
DATE: Aug 03/15 SERVICE BULLETIN No.: A300-57-6114
REVISION No.: 01 - Jun 19/18 Page: 35
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 48

@A300-600
SERVICE BULLETIN
References
Fig. A-UFAAA
Flowchart
Sheet 01
(a) Do a detailed inspection of the access covers (machined alloy type 4, 4A and 5)
outboard of rib 22 in accordance with SRM 57-20-16
 .
Refer to Fig. A-UBCAA Sheet 01
 , Section A-A NOTES 01 to 05 and Fig. A-UFAAA
Sheet 01
 .
NOTE
: Dents in the covers to a maximum depth of 1.50 mm (0.059 in.) and
a minimum width (30 x depth) are permitted, provided they are not
in the area of a stiffener in accordance with SRM 57-20-16
 .
- If there is damage on any access cover in the areas shown outside of the area
of the stiffener, that is of a width greater than 30 x depth, no further action is
required in this area
- If there is ANY damage on an access cover that is:
. on the mating face with wing skin
. width less than 30 x depth
. in the area of the stiffener
. on the stiffener
replace the access cover, refer to AMM 28-11-22, Page Block 401.
**CONF 002
(1) Subtask 576114-220-401-003 - Do a Detailed Inspection of the LH Outer Front Spar
Work Zones and Access Panels
Zone
 Access/Work location
550
 Work location
 from
 Rib 9 to
 Rib 29
Manpower Resources
Manhours
 2.00
Minimum number of person
 1
Subtask elapsed time
 2.00
Skills
 AIRFRAME
References
Structural Repair Manual (SRM)
 51-10-00
57-20-21
Fig. A-UBAAA
Outer Front Spar Inspection Area
Sheet
 01
Fig. A-UFAAA
Flowchart
Sheet
 01
DATE: Aug 03/15 SERVICE BULLETIN No.: A300-57-6114
REVISION No.: 01 - Jun 19/18 Page: 36
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 49

@A300-600
SERVICE BULLETIN
(a) On the outer front spar, between
 Rib 9 and
 Rib 29, do a detailed inspection on the
middle and upper sections of the spar web in accordance with SRM 57-20-21.
Refer to Fig. A-UBAAA Sheet 01
 , Fig. A-UFAAA Sheet 01
 and Table 1.
Wv
 A300F4-605R/ A300F4-622R
Drawing No.
 A571-41305
Part No.
 A571-41305
204/205/206/207
Material
 S07-1218
Bay
9-10
10-11
 X
11-12
 X
12-13
13-14
14-15
15-16
 X
16-17
 X
17-18
18-19
19-20
20-21
21-22
22-23
23-24
 X
24-25
 X
25-26
26-27
27-28
28-29
Table 1 : Outer Front Spar Restricted Type B Allowable Damage
In Table 1, the "X" indicates no Type B damage is permissible.
- Identify the damage type in accordance with SRM 51-10-00.
- If there is damage OR a repair to the outer front spar between
 Rib 9 and
 Rib
29 that is within the limits given in the current revision of the SRM (including
temporary revisions), no further action is required in this area
- Record the damage or repair if it is not already recorded
DATE: Aug 03/15 SERVICE BULLETIN No.: A300-57-6114
REVISION No.: 01 - Jun 19/18 Page: 37
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 50

@A300-600
SERVICE BULLETIN
- If there is damage OR a repair to the outer front spar between
 Rib 9 and
Rib 29 that is outside of the limits given in the current revision of the SRM
(including temporary revisions), that can be repaired/replaced, replace the
repair in accordance with an applicable current revision of the SRM (including
temporary revisions) repair, or another approved repair within 3 months (refer
to Repair Evaluation Guidelines) after the repair survey
- If there is damage OR a repair to the outer front spar between
 Rib 9 and
Rib 29 that is outside of the limits given in the SRM, that can NOT be
repaired/replaced contact AIRBUS within 3 months after you have completed
this inspection.
(2) Subtask 576114-220-405-003 - Do a Detailed Inspection of the RH Outer Front Spar
Work Zones and Access Panels
Zone
 Access/Work location
650
 Work location
 from
 Rib 9 to
 Rib 29
Manpower Resources
Manhours
 2.00
Minimum number of person
 1
Subtask elapsed time
 2.00
Skills
 AIRFRAME
References
Structural Repair Manual (SRM)
 51-10-00
57-20-21
Fig. A-UBAAA
Outer Front Spar Inspection Area
Sheet
 01
Fig. A-UFAAA
Flowchart
Sheet
 01
(a) On the outer front spar, between
 Rib 9 and
 Rib 29, do a detailed inspection on the
middle and upper sections of the spar web in accordance with SRM 57-20-21.
Refer to Fig. A-UBAAA Sheet 01
 , Fig. A-UFAAA Sheet 01
 and Table 1.
Wv
 A300F4-605R/ A300F4-622R
Drawing No.
 A571-41305
Part No.
 A571-41305
204/205/206/207
Material
 S07-1218
Bay
9-10
10-11
 X
11-12
 X
12-13
13-14
14-15
DATE: Aug 03/15 SERVICE BULLETIN No.: A300-57-6114
REVISION No.: 01 - Jun 19/18 Page: 38
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 51

@A300-600
SERVICE BULLETIN
Wv
 A300F4-605R/ A300F4-622R
Drawing No.
 A571-41305
Part No.
 A571-41305
204/205/206/207
Material
 S07-1218
Bay
15-16
 X
16-17
 X
17-18
18-19
19-20
20-21
21-22
22-23
23-24
 X
24-25
 X
25-26
26-27
27-28
28-29
Table 1 : Outer Front Spar Restricted Type B Allowable Damage
In Table 1, the "X" indicates no Type B damage is permissible.
- Identify the damage type in accordance with SRM 51-10-00.
- If there is damage OR a repair to the outer front spar between
 Rib 9 and
 Rib
29 that is within the limits given in the current revision of the SRM (including
temporary revisions), no further action is required in this area
- Record the damage or repair if it is not already recorded
- If there is damage OR a repair to the outer front spar between
 Rib 9 and
Rib 29 that is outside of the limits given in the current revision of the SRM
(including temporary revisions), that can be repaired/replaced, replace the
repair in accordance with an applicable current revision of the SRM (including
temporary revisions) repair, or another approved repair within 3 months (refer
to Repair Evaluation Guidelines) after the repair survey
- If there is damage OR a repair to the outer front spar between
 Rib 9 and
Rib 29 that is outside of the limits given in the SRM, that can NOT be
repaired/replaced contact AIRBUS within 3 months after you have completed
this inspection.
(3) Subtask 576114-220-402-003 - Do a Detailed Inspection of the LH Inner Front Spar
Work Zones and Access Panels
Zone
 Access/Work location
510
 Work location
 from
 Rib 1 to
 Rib 9
DATE: Aug 03/15 SERVICE BULLETIN No.: A300-57-6114
REVISION No.: 01 - Jun 19/18 Page: 39
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 52

@A300-600
SERVICE BULLETIN
Manpower Resources
Manhours
 2.00
Minimum number of person
 1
Subtask elapsed time
 2.00
Skills
 AIRFRAME
References
Structural Repair Manual (SRM)
 51-10-00
57-20-21
Fig. A-UBBAA
Inner Front Spar Inspection Area
Sheet
 01
Fig. A-UFAAA
Flowchart
Sheet
 01
(a) On the inner front spar, between
 Rib 1 and
 Rib 9, do a detailed inspection on the
middle and upper sections of the spar web in accordance with SRM 57-20-21.
Refer to Fig. A-UBBAA Sheet 01
 , Fig. A-UFAAA Sheet 01
 and Table 2.
Wv
 A300F4-605R/ A300F4-622R
Drawing No.
 A571-41298
Part No.
 A571-41298
002/003/004/005/006/007/008/009
Material
 S07-1218
Bay
1-2
2-3
3-4
4-5
 X
5-6
Table 2 : Inner Front Spar Capped Vertical Stiffner Restricted to Type C Allowable Damage
In Table 2, the "X" indicates no Type C damage is permissible to the vertical
stiffener cap.
- Identify the damage type in accordance with SRM 51-10-00.
- If there is damage OR a repair to the inner front spar between
 Rib 1 and
 Rib 9
that is within the limits given in the current revision of the SRM (including
temporary revisions), no further action is required in this area
- If there is damage OR a repair to the inner front spar between
 Rib 1 and
 Rib 9
that is outside of the limits given in the current revision of the SRM (including
temporary revisions), that can be repaired/replaced, replace the repair in
accordance with an applicable current revision of the SRM (including temporary
revisions) repair, or another approved repair within 3 months (refer to Repair
Evaluation Guidelines) after the repair survey
DATE: Aug 03/15 SERVICE BULLETIN No.: A300-57-6114
REVISION No.: 01 - Jun 19/18 Page: 40
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 53

@A300-600
SERVICE BULLETIN
- If there is damage OR a repair to the inner front spar between
 Rib 1 and
Rib 9 that is outside of the limits given in the current revision of the SRM
(including temporary revisions), that can NOT be repaired/replaced contact
AIRBUS within 3 months after you have completed this inspection
- Record the damage or repair if it is not already recorded.
(4) Subtask 576114-220-406-003 - Do a Detailed Inspection of the RH Inner Front Spar
Work Zones and Access Panels
Zone
 Access/Work location
610
 Work location
 from
 Rib 1 to
 Rib 9
Manpower Resources
Manhours
 2.00
Minimum number of person
 1
Subtask elapsed time
 2.00
Skills
 AIRFRAME
References
Structural Repair Manual (SRM)
 51-10-00
57-20-21
Fig. A-UBBAA
Inner Front Spar Inspection Area
Sheet
 01
Fig. A-UFAAA
Flowchart
Sheet
 01
(a) On the inner front spar, between
 Rib 1 and
 Rib 9, do a detailed inspection on the
middle and upper sections of the spar web in accordance with SRM 57-20-21.
Refer to Fig. A-UBBAA Sheet 01
 , Fig. A-UFAAA Sheet 01
 and Table 2.
Wv
 A300F4-605R/ A300F4-622R
Drawing No.
 A571-41298
Part No.
 A571-41298
002/003/004/005/006/007/008/009
Material
 S07-1218
Bay
1-2
2-3
3-4
4-5
 X
5-6
Table 2 : Inner Front Spar Capped Vertical Stiffner Restricted to Type C Allowable Damage
In Table 2, the "X" indicates no Type C damage is permissible to the vertical
stiffener cap.
- Identify the damage type in accordance with SRM 51-10-00.
DATE: Aug 03/15 SERVICE BULLETIN No.: A300-57-6114
REVISION No.: 01 - Jun 19/18 Page: 41
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 54

@A300-600
SERVICE BULLETIN
- If there is damage OR a repair to the inner front spar between
 Rib 1 and
 Rib 9
that is within the limits given in the current revision of the SRM (including
temporary revisions), no further action is required in this area
- If there is damage OR a repair to the inner front spar between
 Rib 1 and
 Rib 9
that is outside of the limits given in the current revision of the SRM, that can be
repaired/replaced, replace the repair in accordance with an applicable current
revision of the SRM (including temporary revisions) repair, or another approved
repair within 3 months (refer to Repair Evaluation Guidelines) after the repair
survey
- If there is damage OR a repair to the inner front spar between
 Rib 1 and
Rib 9 that is outside of the limits given in the current revision of the SRM
(including temporary revisions), that can NOT be repaired/replaced contact
AIRBUS within 3 months after you have completed this inspection
- Record the damage or repair if it is not already recorded.
(5) Subtask 576114-220-403-001 - Do a Detailed Inspection of the Lower Skin Area
(Rib 26 to Rib 27) on the LH Wing
Work Zones and Access Panels
Zone
 Access/Work location
550
 Work location
 from Rib 26 to Rib 27
from Front Spar to Rear Spar
Manpower Resources
Manhours
 1.00
Minimum number of person
 1
Subtask elapsed time
 1.00
Skills
 AIRFRAME
References
Structural Repair Manual (SRM)
 57-20-12
Fig. A-UBDAA
Lower Skin Inspection
Sheet 01
Fig. A-UFAAA
Flowchart
Sheet 01
(a) Do a detailed inspection of the lower skin area between ribs 26-27 from the front
spar to the rear spar, in accordance with
 SRM 57-20-12.
Refer to Fig. A-UBDAA Sheet 01
 and Fig. A-UFAAA Sheet 01
 .
- If there is no damage and no repairs that are outside the limits set in the
current revision of the SRM (including temporary revisions), no further action is
required in this area
DATE: Aug 03/15 SERVICE BULLETIN No.: A300-57-6114
REVISION No.: 01 - Jun 19/18 Page: 42
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 55

@A300-600
SERVICE BULLETIN
- If there is a repair that is outside of the limits set in the current revision of the
SRM (including temporary revisions) that can be replaced, after the repair
survey replace the repair in accordance with an applicable current SRM repair,
or another approved repair within 3 months after you have completed this
inspection (refer to the Repair Evaluation Guidelines)
- If a repair is found with no related records, contact AIRBUS
- If there is a repair that is outside of the limits set in the current revision of the
SRM (including temporary revisions), contact AIRBUS within 3 months after
you have completed this inspection.
(6) Subtask 576114-220-407-001 - Do a Detailed Inspection of the Lower Skin Area
(Rib 26 to Rib 27)on the RH Wing
Work Zones and Access Panels
Zone
 Access/Work location
650
 Work location
 from Rib 26 to Rib 27
from Front Spar to Rear Spar
Manpower Resources
Manhours
 1.00
Minimum number of person
 1
Subtask elapsed time
 1.00
Skills
 AIRFRAME
References
Structural Repair Manual (SRM)
 57-20-12
Fig. A-UBDAA
Lower Skin Inspection
Sheet 01
Fig. A-UFAAA
Flowchart
Sheet 01
(a) Do a detailed inspection of the lower skin area between ribs 26-27 from the front
spar to the rear spar, in accordance with
 SRM 57-20-12.
Refer to Fig. A-UBDAA Sheet 01
 and Fig. A-UFAAA Sheet 01
 .
- If there is no damage and no repairs that are outside the limits set in the
current revision of the SRM (including temporary revisions), no further action is
required in this area
- If there is a repair that is outside of the limits set in the current revision of the
SRM (including temporary revisions) that can be replaced, after the repair
survey replace the repair in accordance with an applicable current SRM repair,
or another approved repair within 3 months after you have completed this
inspection (refer to the Repair Evaluation Guidelines)
- If a repair is found with no related records, contact AIRBUS
DATE: Aug 03/15 SERVICE BULLETIN No.: A300-57-6114
REVISION No.: 01 - Jun 19/18 Page: 43
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 56

@A300-600
SERVICE BULLETIN
- If there is a repair that is outside of the limits set in the current revision of the
SRM (including temporary revisions), contact AIRBUS within 3 months after
you have completed this inspection.
(7) Subtask 576114-220-404-001 - Do a Detailed Inspection of the Access Covers
(Machined Alloy Load Carrying Type 4, 4 A and 5) Outboard of Rib 22 on the LH
Wing
Work Zones and Access Panels
Zone
 Access/Work location
550
 Access
 Panel 550QB, Panel 550PB, Panel 550NB,
Panel 550MB, Panel 550LB
Work location
 from Rib 22 to Rib 29
560
 Access
 Panel 560BB
Work location
 from Rib 22 to Rib 29
Manpower Resources
Manhours
 2.00
Minimum number of person
 1
Subtask elapsed time
 2.00
Skills
 AIRFRAME
References
Aircraft Maintenance Manual (AMM)
 28-11-22, Page Block 401
Structural Repair Manual (SRM)
 57-20-16
Fig. A-UBCAA
Inspection of the Access Covers
(Machined Alloy Load Carrying Type 4,
4A and 5)
Sheet 01
Fig. A-UFAAA
Flowchart
Sheet 01
(a) Do a detailed inspection of the access covers (machined alloy type 4, 4A and 5)
outboard of rib 22 in accordance with SRM 57-20-16
 .
Refer to Fig. A-UBCAA Sheet 01
 , Section A-A NOTES 01 to 05 and Fig. A-UFAAA
Sheet 01
 .
NOTE
: Dents in the covers to a maximum depth of 1.50 mm (0.059 in.) and
a minimum width (30 x depth) are permitted, provided they are not
in the area of a stiffener in accordance with SRM 57-20-16
 .
- If there is damage on any access cover in the areas shown outside of the area
of the stiffener, that is of a width greater than 30 x depth, no further action is
required in this area
- If there is ANY damage on an access cover that is:
. on the mating face with wing skin
. width less than 30 x depth
DATE: Aug 03/15 SERVICE BULLETIN No.: A300-57-6114
REVISION No.: 01 - Jun 19/18 Page: 44
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 57

@A300-600
SERVICE BULLETIN
. in the area of the stiffener
. on the stiffener
replace the access cover, refer to AMM 28-11-22, Page Block 401.
(8) Subtask 576114-220-408-001 - Do a Detailed Inspection of the Access Covers
(Machined Alloy Load Carrying Type 4, 4 A and 5) Outboard of Rib 22 on the RH
Wing
Work Zones and Access Panels
Zone
 Access/Work location
650
 Access
 Panel 650QB, Panel 650PB, Panel 650NB,
Panel 650MB, Panel 650LB
Work location
 from Rib 22 to Rib 29
660
 Access
 Panel 660BB
Work location
 from Rib 22 to Rib 29
Manpower Resources
Manhours
 2.00
Minimum number of person
 1
Subtask elapsed time
 2.00
Skills
 AIRFRAME
References
Aircraft Maintenance Manual (AMM)
 28-11-22, Page Block 401
Structural Repair Manual (SRM)
 57-20-16
Fig. A-UBCAA
Inspection of the Access Covers
(Machined Alloy Load Carrying Type 4,
4A and 5)
Sheet 01
Fig. A-UFAAA
Flowchart
Sheet 01
(a) Do a detailed inspection of the access covers (machined alloy type 4, 4A and 5)
outboard of rib 22 in accordance with SRM 57-20-16
 .
Refer to Fig. A-UBCAA Sheet 01
 , Section A-A NOTES 01 to 05 and Fig. A-UFAAA
Sheet 01
 .
NOTE
: Dents in the covers to a maximum depth of 1.50 mm (0.059 in.) and
a minimum width (30 x depth) are permitted, provided they are not
in the area of a stiffener in accordance with SRM 57-20-16
 .
- If there is damage on any access cover in the areas shown outside of the area
of the stiffener, that is of a width greater than 30 x depth, no further action is
required in this area
- If there is ANY damage on an access cover that is:
. on the mating face with wing skin
DATE: Aug 03/15 SERVICE BULLETIN No.: A300-57-6114
REVISION No.: 01 - Jun 19/18 Page: 45
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 58

@A300-600
SERVICE BULLETIN
. width less than 30 x depth
. in the area of the stiffener
. on the stiffener
replace the access cover, refer to AMM 28-11-22, Page Block 401.
**CONF 003
(1) Subtask 576114-220-401-003 - Do a Detailed Inspection of the LH Outer Front Spar
Work Zones and Access Panels
Zone
 Access/Work location
550
 Work location
 from
 Rib 9 to
 Rib 29
Manpower Resources
Manhours
 2.00
Minimum number of person
 1
Subtask elapsed time
 2.00
Skills
 AIRFRAME
References
Structural Repair Manual (SRM)
 51-10-00
57-20-21
Fig. A-UBAAA
Outer Front Spar Inspection Area
Sheet
 01
Fig. A-UFAAA
Flowchart
Sheet
 01
(a) On the outer front spar, between
 Rib 9 and
 Rib 29, do a detailed inspection on the
middle and upper sections of the spar web in accordance with SRM 57-20-21.
Refer to Fig. A-UBAAA Sheet 01
 , Fig. A-UFAAA Sheet 01
 and Table 1.
Wv
 A300F4-605R/ A300F4-622R
Drawing No.
 A571-41305
Part No.
 A571-41305
204/205/206/207
Material
 S07-1218
Bay
9-10
10-11
 X
11-12
 X
12-13
13-14
14-15
15-16
 X
16-17
 X
DATE: Aug 03/15 SERVICE BULLETIN No.: A300-57-6114
REVISION No.: 01 - Jun 19/18 Page: 46
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 59

@A300-600
SERVICE BULLETIN
Wv
 A300F4-605R/ A300F4-622R
Drawing No.
 A571-41305
Part No.
 A571-41305
204/205/206/207
Material
 S07-1218
Bay
17-18
18-19
19-20
20-21
21-22
22-23
23-24
 X
24-25
 X
25-26
26-27
27-28
28-29
Table 1 : Outer Front Spar Restricted Type B Allowable Damage
In Table 1, the "X" indicates no Type B damage is permissible.
- Identify the damage type in accordance with SRM 51-10-00.
- If there is damage OR a repair to the outer front spar between
 Rib 9 and
 Rib
29 that is within the limits given in the current revision of the SRM (including
temporary revisions), no further action is required in this area
- Record the damage or repair if it is not already recorded
- If there is damage OR a repair to the outer front spar between
 Rib 9 and
Rib 29 that is outside of the limits given in the current revision of the SRM
(including temporary revisions), that can be repaired/replaced, replace the
repair in accordance with an applicable current revision of the SRM (including
temporary revisions) repair, or another approved repair within 3 months (refer
to Repair Evaluation Guidelines) after the repair survey
- If there is damage OR a repair to the outer front spar between
 Rib 9 and
Rib 29 that is outside of the limits given in the SRM, that can NOT be
repaired/replaced contact AIRBUS within 3 months after you have completed
this inspection.
(2) Subtask 576114-220-405-003 - Do a Detailed Inspection of the RH Outer Front Spar
Work Zones and Access Panels
Zone
 Access/Work location
650
 Work location
 from
 Rib 9 to
 Rib 29
DATE: Aug 03/15 SERVICE BULLETIN No.: A300-57-6114
REVISION No.: 01 - Jun 19/18 Page: 47
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 60

@A300-600
SERVICE BULLETIN
Manpower Resources
Manhours
 2.00
Minimum number of person
 1
Subtask elapsed time
 2.00
Skills
 AIRFRAME
References
Structural Repair Manual (SRM)
 51-10-00
57-20-21
Fig. A-UBAAA
Outer Front Spar Inspection Area
Sheet
 01
Fig. A-UFAAA
Flowchart
Sheet
 01
(a) On the outer front spar, between
 Rib 9 and
 Rib 29, do a detailed inspection on the
middle and upper sections of the spar web in accordance with SRM 57-20-21.
Refer to Fig. A-UBAAA Sheet 01
 , Fig. A-UFAAA Sheet 01
 and Table 1.
Wv
 A300F4-605R/ A300F4-622R
Drawing No.
 A571-41305
Part No.
 A571-41305
204/205/206/207
Material
 S07-1218
Bay
9-10
10-11
 X
11-12
 X
12-13
13-14
14-15
15-16
 X
16-17
 X
17-18
18-19
19-20
20-21
21-22
22-23
23-24
 X
24-25
 X
25-26
26-27
27-28
28-29
Table 1 : Outer Front Spar Restricted Type B Allowable Damage
DATE: Aug 03/15 SERVICE BULLETIN No.: A300-57-6114
REVISION No.: 01 - Jun 19/18 Page: 48
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

The text continues at https://openairdocs.org/service-documents/airbus/a300-57-6114/file/1fd7f348bf99.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
