# Airbus Service Bulletin A300-57-6119

Copy: No revision named ("A300-57-6119R0"), 109 pages: PDF https://openairdocs.org/files/sha256/62/35/62352567456de143753086a53c8d45f0d8f55d2df655bec09a4d28d3b71240b5; text https://openairdocs.org/service-documents/airbus/a300-57-6119/file/62352567456d.md. Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2018-0497; AD 2018-19-18 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Airbus](https://openairdocs.org/service-documents/airbus.md)
- Type: Service bulletin (Service Bulletin)
- Number: A300-57-6119
- Page: https://openairdocs.org/service-documents/airbus/a300-57-6119

## ADs that cite it (2) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2019-12-04](https://openairdocs.org/ad/2019-12-04.md), effective Aug 7, 2019: No revision named
- [AD 2018-19-18](https://openairdocs.org/ad/2018-19-18.md), effective Nov 7, 2018: No revision named

Also cited in [2 proposed ADs](https://openairdocs.org/service-documents/airbus/a300-57-6119/proposed.md).

## Text (109 pages)

Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2018-0497; AD 2018-19-18 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

@A300-600
SERVICE BULLETIN
SUMMARY
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
This summary is for information only and is not approved for modification of the aircraft.
MANDATORY
 MANDATORY
 MANDATORY
ATA SYSTEM: 57
TITLE: FUSELAGE - CENTER SECTION - INSPECTION OF THE FR47/RIB1
JUNCTION AREA (FOR POST SB 57-6113 AIRCRAFT ONLY)
**CONF ALL
MODIFICATIONS
None
REASON/DESCRIPTION/OPERATIONAL CONSEQUENCES
A comprehensive in-service review has been initiated on A300 and A300-600 aircraft in order to
take into account early cracking, crack orientation and propagation, and therefore fine-tune existing
inspection requirements.
Inspection Service Bulletin A300-57-6049 and A300-57-6086 have reported numerous crack findings
mainly in the rear spar. Some have been found before the calculated threshold. Different root causes
are identified depending on the structural detail:
- The crack at Hole N˚4 (or C) is due to the stress concentration at the rear spar vertical flange run-
out.
- The cracks at Holes N˚6 (or G) and N˚40 (or F) (3/9 o’clock direction) are due to a local bending
moment coming from the tension loads carried by the fasteners N˚6 (or G) and N˚40 (or F).
- The cracks along 6/12 o’clock direction in the other holes are due to the wing load transfer.
NOTE
: Hole references above come from Service Bulletin A300-57-6050 when numbers are
used and from Service Bulletin A300-57-6049 or A300-57-6086 when letters are used.
Aircraft which have embodied the modification Service Bulletin A300-57-6113 have to be
covered by this inspection program.
This inspection Service Bulletin mandates an Ultrasonic (US) inspection of the Frame 47 (FR47) in
areas A, B, C, D and a radiographic one (X-Ray) for the area E. In case of crack finding, Airbus repair
support has to be contacted before next flight.
DATE: Apr 25/16 SERVICE BULLETIN No.: A300-57-6119
REVISION No.: 00 - Apr 25/16 Page: 1
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 2

@A300-600
SERVICE BULLETIN
SUMMARY
This inspection Service Bulletin aims at relaxing the former inspection program in avoiding repetitive
Rototest Inspection. No bolt removal is required for all areas.
Inspections as per Service Bulletin A300-57-6086 and Service Bulletin A300-57-6049 are cancelled and
replaced by this Service Bulletin for the aircraft in the effectivity.
GENERAL EVALUATION
EVALUATION TABLE
COMPLIANCE
 MANDATORY (1)
 CANCELS INSPECTION SB
 NO
POTENTIAL AD
 YES
 A/C OPERATION AFFECTED
 NO
RELIABILITY AFFECTED
 NO
 PAX COMFORT AFFECTED
 NO
COST SAVING
 NO
 ETOPS AFFECTED
 NO
STRUCTURAL LIFE EXTN
 NO
 VENDOR SB INVOLVED
 NO
DE-FUELLING/VENTILATION
 YES
NOTE
 (1)
: Service Bulletin must be accomplished.
MATERIAL PRICE INFORMATION
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET
 QTY PER
A/C
PRICE PER
A/C (USD)
MAIN PARTS
Kit 576119A01R01
 1
 50.00
 Nuts
Kit 576119A02R01
 1
 50.00
 Nuts
TOTAL
 100.00
EFFECTIVITY
This Service Bulletin is applicable to this (these) operator(s) :
67Q ABR AHK BCS FDX IRA IRM KAC MNB MRJ MSR SOP SUD
TAR THA UQA URS UTP
CONCURRENT REQUIREMENTS
None
REFERENCES / REPERCUSSIONS
TFU
 57.10.00.007
OEB
 None
AOT
 None
SIL
 None
ISI
 None
LINE MAINTENANCE AFFECTED
 No
LIFE LIMIT
 None
OTHER
 None
NATURE OF THE WORK
AIRCRAFT
 YES
DATE: Apr 25/16 SERVICE BULLETIN No.: A300-57-6119
REVISION No.: 00 - Apr 25/16 Page: 2
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 3

@A300-600
SERVICE BULLETIN
SUMMARY
EQUIPMENT
 NO
HARD
 NO
SOFT
 NO
OBRM
 NO
MANPOWER
Task 576119-832-801-001: Special Detailed Inspection of the Area A, Frame 47/Rib 1 Junction
Area, LH and RH Sides
TOTAL MANHOURS
 6.50
ELAPSED TIME (HOURS)
 3.50
Task 576119-832-802-001: Special Detailed Inspection of the Areas B and C, Frame 47/Rib 1
Junction Area, LH and RH Sides
TOTAL MANHOURS
 28.50
ELAPSED TIME (HOURS)
 13.50
Task 576119-832-803-001: Special Detailed Inspection of the Area D, Frame 47/Rib 1 Junction
Area, LH and RH Sides
TOTAL MANHOURS
 14.50
ELAPSED TIME (HOURS)
 7.50
Task 576119-832-804-001: Special Detailed Inspection of the Area E, Frame 47/Rib 1 Junction
Area, LH and RH Sides
TOTAL MANHOURS
 14.50
ELAPSED TIME (HOURS)
 7.50
APPENDICES
Appendix 01 - Elapsed Time Assumption
DATE: Apr 25/16 SERVICE BULLETIN No.: A300-57-6119
REVISION No.: 00 - Apr 25/16 Page: 3
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 4

@A300-600
SERVICE BULLETIN
SUMMARY
**CONF ALL
FR47
FR40
Z140
A
B
A
FR47
REAR SPAR DATUM
RIB1 DATUM
LH SHOWN
RH SYMMETRICAL
INTERNAL ANGLE
FITTING
B
A
A
B
B
B
D_SB_576119_5_SAAA_01_01
Figure A-FSAAA - Sheet 01
DATE: Apr 25/16 SERVICE BULLETIN No.: A300-57-6119
REVISION No.: 00 - Apr 25/16 Page: 4
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 5

@A300-600
SERVICE BULLETIN
SUMMARY
**CONF ALL
NOTE:
HOLES NOT AFFECTED
HOLES TO BE INSPECTED
F
W
D
FR47
REAR SPAR DATUM
RIB1
DATUM
189
165
187 190 191
162 161 160
VIEW LOOKING AFT
FR47
A A
B B
186
166 164 163
188
REAR SPAR DATUM
702
587
568
571
393
398 399
711710
100
712
41 42
154 155
701 700
703704
705
708
709
707
99
46
40
6
35 4
706
48
308
39
7
INTERNAL ANGLE
FITTING
INTERNAL ANGLE
FITTING
D_SB_576119_5_SAAA_02_01
Figure A-FSAAA - Sheet 02
DATE: Apr 25/16 SERVICE BULLETIN No.: A300-57-6119
REVISION No.: 00 - Apr 25/16 Page: 5
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 6

@A300-600
SERVICE BULLETIN
SUMMARY
This Page Intentionally Left Blank
DATE: Apr 25/16 SERVICE BULLETIN No.: A300-57-6119
REVISION No.: 00 - Apr 25/16 Page: 6
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 7

@A300-600
SERVICE BULLETIN
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
MANDATORY
 MANDATORY
 MANDATORY
ATA SYSTEM: 57
TITLE: FUSELAGE - CENTER SECTION - INSPECTION OF THE FR47/RIB1
JUNCTION AREA (FOR POST SB 57-6113 AIRCRAFT ONLY)
MODIFICATION No.: None
This document contains AIRBUS PROPRIETARY INFORMATION and shall at all times remain the
property of AIRBUS; no intellectual property right or licence is granted by AIRBUS in connection with
any information contained in it. It is delivered on the express condition that said document and the
information contained in it shall be treated as confidential, shall not be used for any purpose other than
that for which it is hereby delivered. It shall not be disclosed in whole or in part to third parties and shall
not be duplicated in any manner (except for the purposes of performing the tasks described hereunder
and provided that any recipient of such document shall comply with the conditions herein), without
AIRBUS prior written consent.
1. PLANNING INFORMATION
**CONF ALL
A. EFFECTIVITY
NOTE
: This Service Bulletin is only applicable to aircraft on which Mod. No.
13673S22887 (Service Bulletin A300-57-6113) is embodied.
(1) Models
B4-603 B4-605R B4-622 B4-622R C4-605R/FC4-620 F4-605R
(2) Effectivity by MSN
0344 0358 0361 0365 0380 0388 0401 0405 0408 0411 0414 0417 0477 0479 0505
0521 0525 0530 0532 0536 0543 0546 0553 0555 0557-0559 0561 0563 0572 0575
0579 0581 0584 0602-0603 0607-0608 0611 0613 0617-0618 0621 0623 0625-0626
0629-0630 0632-0633 0637 0641 0643 0657 0659 0664 0666 0668 0670 0673 0677
0679 0683 0688 0694 0696 0699 0701 0703 0707 0709 0711 0713 0715 0717 0719
0721-0730 0732-0746 0748-0750 0752-0764 0766 0768-0775 0777-0794 0797
0799-0804
DATE: Apr 25/16 SERVICE BULLETIN No.: A300-57-6119
REVISION No.: 00 - Apr 25/16 Page: 1
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 8

@A300-600
SERVICE BULLETIN
(3) Effectivity by Operator
The Operator/MSN relationship is provided for information only and is correct at the time
of issue in accordance with the information available to AIRBUS. Any future changes
resulting from transfer of an aircraft from one operator to another will not be reflected in
this list unless the Service Bulletin is revised for another reason.
OPERATOR
 MSN
67Q
 0584 0603 0744 0749 0764
ABR
 0557 0677 0717 0722
AHK
 0683 0770
BCS
 0602 0617 0621 0637 0641 0670 0679 0703 0711 0724 0729 0730
0737 0740 0743 0753 0783 0797
FDX
 0358 0361 0365 0388 0417 0477 0479 0530 0536 0543 0555 0559
0572 0575 0579 0581 0611 0613 0625 0630 0633 0657 0659 0664
0668 0688 0709 0713 0715 0726 0728 0735 0736 0738 0742 0745
0748 0752 0757 0759 0760 0761 0766 0768 0769 0771 0772 0774
0777 0778 0779 0780 0781 0789 0790 0791 0792 0793 0794 0799
0800 0801 0802 0803 0804
IRA
 0632 0696 0723 0727
IRM
 0380 0401 0405 0408 0411 0414 0546 0553 0608 0618 0623 0701
0773
KAC
 0344 0673 0694 0699 0719 0721
MNB
 0521 0525 0734 0739 0755 0756 0758
MRJ
 0750 0762
MSR
 0561 0607
SOP
 0532
SUD
 0666 0775
TAR
 0505 0558 0563
THA
 0629 0782 0784 0785 0786 0787
UQA
 0626 0643
URS
 0733 0788
UTP
 0707 0725 0732 0741 0746 0754 0763
(4) Configuration by MSN
MSN
 CONFIGURATION
0344 0358 0361 0365 0380 0388 0401 0405 0408 0411 0414
0417 0477 0479 0505 0521 0525 0530 0532 0536 0543 0546
0553 0555 0557 0558 0559 0561 0563 0572 0575 0579 0581
0584 0602 0603 0607 0608 0611 0613 0617 0618 0621 0623
0625 0626 0629 0630 0632 0633 0637 0641 0643 0657 0659
0664 0666 0668 0670 0673 0677 0679 0683 0688 0694 0696
0699 0701 0703 0707 0709 0711 0713 0715 0717 0719 0721
0722 0723 0724 0725 0726 0727 0728 0729 0730 0732 0733
0734 0735 0736 0737 0738 0739 0740 0741 0742 0743 0744
0745 0746 0748 0749 0750 0752 0753 0754 0755 0756 0757
0758 0759 0760 0761 0762 0763 0764 0766 0768 0769 0770
0771 0772 0773 0774 0775 0777 0778 0779 0780 0781 0782
0783 0784 0785 0786 0787 0788 0789 0790 0791 0792 0793
0794 0797 0799 0800 0801 0802 0803 0804
001
DATE: Apr 25/16 SERVICE BULLETIN No.: A300-57-6119
REVISION No.: 00 - Apr 25/16 Page: 2
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 9

@A300-600
SERVICE BULLETIN
(5) Configuration definition
**CONF 001
Config. 001 is valid for all the aircraft given in the effectivity of this Service Bulletin as a
standard configuration.
(6) Material Effectivity
MATERIAL
 QTY PER A/C
 SEE NOTES
Kit 576119A01R01
 1
Kit 576119A02R01
 1
B. CONCURRENT REQUIREMENTS
None
C. REASON
(1) History
A comprehensive in-service review has been initiated on A300 and A300-600 aircraft
in order to take into account early cracking, crack orientation and propagation, and
therefore fine-tune existing inspection requirements.
Inspection Service Bulletin A300-57-6049 and A300-57-6086 have reported numerous
crack findings mainly in the rear spar. Some have been found before the calculated
threshold. Different root causes are identified depending on the structural detail:
- The crack at Hole N˚4 (or C) is due to the stress concentration at the rear spar
vertical flange run-out.
- The cracks at Holes N˚6 (or G) and N˚40 (or F) (3/9 o’clock direction) are due to a
local bending moment coming from the tension loads carried by the fasteners N˚6
(or G) and N˚40 (or F).
- The cracks along 6/12 o’clock direction in the other holes are due to the wing load
transfer.
NOTE
: Hole references above come from Service Bulletin A300-57-6050
when numbers are used and from Service Bulletin A300-57-6049 or
A300-57-6086 when letters are used.
Aircraft which have embodied the modification Service Bulletin
A300-57-6113 have to be covered by this inspection program.
(2) Objective/Action
This inspection Service Bulletin mandates an Ultrasonic (US) inspection of the Frame 47
(FR47) in areas A, B, C, D and a radiographic one (X-Ray) for the area E. In case of
crack finding, Airbus repair support has to be contacted before next flight.
DATE: Apr 25/16 SERVICE BULLETIN No.: A300-57-6119
REVISION No.: 00 - Apr 25/16 Page: 3
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 10

@A300-600
SERVICE BULLETIN
(3) Advantages
This inspection Service Bulletin aims at relaxing the former inspection program in
avoiding repetitive Rototest Inspection. No bolt removal is required for all areas.
(4) Operational/Maintenance Consequences
Inspections as per Service Bulletin A300-57-6086 and Service Bulletin A300-57-6049 are
cancelled and replaced by this Service Bulletin for the aircraft in the effectivity.
D. DESCRIPTION
To accomplish this Service Bulletin it is necessary to :
Task 576119-832-801-001: Special Detailed Inspection of the Area A, Frame 47/Rib 1
Junction Area, LH and RH Sides
(1) Do a Special Detailed Inspection of the Area A, Frame 47/Rib 1 Junction Area, LH
Side
(2) Do a Special Detailed Inspection of the Area A, Frame 47/Rib 1 Junction Area, RH
Side
Task 576119-832-802-001: Special Detailed Inspection of the Areas B and C, Frame 47/Rib 1
Junction Area, LH and RH Sides
(1) Do a Special Detailed Inspection of the Area B, Frame 47/Rib 1 Junction Area, LH
Side
(2) Do a Special Detailed Inspection of the Area C, Frame 47/Rib 1 Junction Area, LH
Side
(3) Do a Special Detailed Inspection of the Area B, Frame 47/Rib 1 Junction Area, RH
Side
(4) Do a Special Detailed Inspection of the Area C, Frame 47/Rib 1 Junction Area, RH
Side
Task 576119-832-803-001: Special Detailed Inspection of the Area D, Frame 47/Rib 1
Junction Area, LH and RH Sides
(1) Do a Special Detailed Inspection of the Area D, Frame 47/Rib 1 Junction Area, LH
Side
(2) Do a Special Detailed Inspection of the Area D, Frame 47/Rib 1 Junction Area, RH
Side
Task 576119-832-804-001: Special Detailed Inspection of the Area E, Frame 47/Rib 1
Junction Area, LH and RH Sides
(1) Do a Special Detailed Inspection of the Area E, Frame 47/Rib 1 Junction Area, LH
Side
(2) Do a Special Detailed Inspection of the Area E, Frame 47/Rib 1 Junction Area, RH
DATE: Apr 25/16 SERVICE BULLETIN No.: A300-57-6119
REVISION No.: 00 - Apr 25/16 Page: 4
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 11

@A300-600
SERVICE BULLETIN
Side
E. COMPLIANCE
(1) Classification
MANDATORY: Service Bulletin must be accomplished.
(2) Accomplishment Timescale
This Service Bulletin has been classified Mandatory. It is expected that an Airworthiness
Directive (AD) published by the European Av iation Safety Agenc y (EASA) will be issued
to confirm this classification. It is anticipated that the AD will confirm the threshold and
interval given but reference should be made to the AD for confirmation of the mandated
accomplishment timescale.
Table 1, Config. 001 - Special Detailed Inspection of the Area A, Frame 47/Rib 1 Junction Area, LH
and RH Sides
Condition
 Action
 Compliance Time (FC or
FH whichever occurs
first)
Repetitive Interval (FC
or FH whichever occurs
first)
- Average Flight Time
(AFT) lower than 1.50 :
10200 FC / 15390 FH
See NOTE(*)
See NOTE(**)
All aircraft
 Do a special detailed
inspection of the area
A, Frame 47/Rib 1
junction area, LH and
RH sides in accordance
with TASK
576119-832-801 001
- AFT higher or equal to
1.50 : 9500 FC / 20520
FH
See NOTE(*)
See NOTE(**)
None
Contact AIRBUS
And
Before next flight
 None
Crack is found
Report to AIRBUS
 Within 10 days
 None
Report to AIRBUS
And
Within 1 month
 None
- AFT lower than 1.50 :
2100 FC / 3240 FH
See NOTE(**)
Crack is not found
Repeat the special
detailed inspection of
t h ea r e aA ,F r a m e
47/Rib 1 junction area in
accordance with TASK
596119-832-801 001
None
- AFT higher or equal to
1.50 : 2000 FC /4320
FH
See NOTE(**)
NOTE (*): From Service Bulletin A300-57-6113 embodiment
NOTE (**): Average Flight Time (AFT)=FH/FC. For AFT definition refer to Airworthiness Limitations
Section (ALS) Part 2
DATE: Apr 25/16 SERVICE BULLETIN No.: A300-57-6119
REVISION No.: 00 - Apr 25/16 Page: 5
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 12

@A300-600
SERVICE BULLETIN
Table 2, Config. 001 - Special Detailed Inspection of the Areas B and C, Frame 47/Rib 1 Junction
Area, LH and RH Sides
Condition
 Action
 Compliance Time (FC or
FH whichever occurs
first)
Repetitive Interval (FC
or FH whichever occurs
first)
- AFT lower than 1.50 :
8300 FC / 12520 FH
See NOTE (*)
See NOTE (**)
All aircraft
 Do a special detailed
inspection of the areas
B and C, Frame 47/Rib
1, junction area, LH and
RH sides in accordance
with TASK
596119-832-802 001
- AFT higher or equal to
1.50 : 7700 FC / 16690
FH
See NOTE (*)
See NOTE (**)
None
Contact AIRBUS
And
Before next flight
 None
Crack is found
Report to AIRBUS
 Within 10 days
 None
Report to AIRBUS
And
Within 1 month
 None
- AFT lower than 1.50 :
6500 FC / 9880 FH
See NOTE (**)
Crack is not found
Repeat the special
detailed inspection of
the areas B and C ,
Frame 47/Rib 1 junction
area, LH and RH sides
in accordance with
TASK 596119-832-802
001
None
- AFT higher or equal to
1.50 : 6100 FC / 13170
FH
See NOTE (**)
NOTE (*): From Service Bulletin A300-57-6113 embodiment
NOTE (**): Average Flight Time (AFT)=FH/FC. For AFT definition refer to Airworthiness Limitations
Section (ALS) Part 2
Table 3, Config. 001 - Special Detailed Inspection of the Area D, Frame 47/Rib 1 Junction Area , LH
and RH Sides
Condition
 Action
 Compliance Time (FC or
FH whichever occurs
first)
Repetitive Interval (FC
or FH whichever occurs
first)
- AFT lower than 1.50 :
2900 FC / 4490 FH
See NOTE (*)
See NOTE (**)
All aircraft
 Do a special detailed
inspection of the area D,
Frame 47/Rib 1, junction
area, LH and RH sides
in accordance with
TASK 596119-832-803
001
- AFT higher or equal to
1.50 : 2700 FC / 5990
FH
See NOTE (*)
See NOTE (**)
None
Contact AIRBUS
And
Before next flight
 None
Crack is found
Report to AIRBUS
 Within 10 days
 None
DATE: Apr 25/16 SERVICE BULLETIN No.: A300-57-6119
REVISION No.: 00 - Apr 25/16 Page: 6
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 13

@A300-600
SERVICE BULLETIN
Table 3, Config. 001 - Special Detailed Inspection of the Area D, Frame 47/Rib 1 Junction Area , LH
and RH Sides
Condition
 Action
 Compliance Time (FC or
FH whichever occurs
first)
Repetitive Interval (FC
or FH whichever occurs
first)
Report to AIRBUS
And
Within 1 month
 None
- AFT lower than 1.50 :
1900 FC / 2900 FH
See NOTE (**)
Crack is not found
Repeat the special
detailed inspection of
the area D, Frame
47/Rib 1 junction area,
LH and RH sides in
accordance with TASK
596119-832-803 001
None
- AFT higher or equal to
1.50 : 1800 FC / 3930
FH
See NOTE (**)
NOTE (*): From Service Bulletin A300-57-6113 embodiment
NOTE (**): Average Flight Time (AFT)=FH/FC. For AFT definition refer to Airworthiness Limitations
Section (ALS) Part 2
Table 4, Config. 001 - Special Detailed Inspection of the Area E, Frame 47/Rib 1 Junction Area, LH
and RH Sides
Condition
 Action
 Compliance Time (FC or
FH whichever occurs
first)
Repetitive Interval (FC
or FH whichever occurs
first)
- AFT lower than 1.50 :
12000 FC / 18080 FH
See NOTE (*)
See NOTE (**)
All aircraft
 Do a special detailed
inspection of the area E,
Frame 47/Rib 1junction
Area, LH and RH sides
in accordance with
TASK 596119-832-804
001
- AFT higher or equal to
1.50 : 11100 FC / 24110
FH
See NOTE (*)
See NOTE (**)
None
Contact AIRBUS
And
Before next flight
 None
Crack is found
Report to AIRBUS
 Within 10 days
 None
Report to AIRBUS
And
Within 1 month
 None
- AFT lower than 1.50 :
2400 FC / 3620 FH
See NOTE (**)
Crack is not found
Repeat the special
detailed inspection of
the area E, Frame
47/Rib 1 junction area,
LH and RH sides in
accordance with TASK
596119-832-804 001
None
- AFT higher or equal to
1.50 : 2200 FC / 4830
FH
See NOTE (**)
NOTE (*): From Service Bulletin A300-57-6113 embodiment
NOTE (**): Average Flight Time (AFT)=FH/FC. For AFT definition refer to Airworthiness Limitations
Section (ALS) Part 2
DATE: Apr 25/16 SERVICE BULLETIN No.: A300-57-6119
REVISION No.: 00 - Apr 25/16 Page: 7
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 14

@A300-600
SERVICE BULLETIN
F. APPROVAL
The technical content of this document is approved under the authority of Design
Organisation Approval No. EASA.21J.031.
If an aircraft listed in the effectivity has a modification or repair embodied that is not of
AIRBUS origin, and which affects the content of this Service Bulletin, the operator is
responsible for obtaining approval by its airworthiness authority for any adaptation necessary
before incorporation of the Service Bulletin.
G. MANPOWER
The manpower estimates given in this Service Bulletin are based on the direct labor cost to
do the work. These estimates assume that the work will be done by experienced personnel,
and may need to be revised upwards to suit operator’s circumstances. The estimates do not
include the time to prepare, plan or inspect the work. Manufacture and procurement of parts
and tools, drying times for paints, sealants, etc., and general administration work are also not
included.
Task 576119-832-801-001: Special Detailed Inspection of the Area A, Frame 47/Rib 1 Junction
Area, LH and RH Sides
Get Access
 2.00
On Aircraft
Do a Special Detailed Inspection of the Area A, Frame
47/Rib 1 Junction Area, LH Side
1.00
Do a Special Detailed Inspection of the Area A, Frame
47/Rib 1 Junction Area, RH Side
1.00
Close-Up
 2.50
TOTAL MANHOURS
 6.50
ELAPSED TIME (HOURS)
 3.50
NOTE
: For an explanation of the manhours and elapsed time, refer to the Gantt
Chart, Fig. A-FAAAA
 given in Appendix 01.
Task 576119-832-802-001: Special Detailed Inspection of the Areas B and C, Frame 47/Rib 1
Junction Area, LH and RH Sides
Get Access
 12.00
On Aircraft
Do a Special Detailed Inspection of the Area B, Frame
47/Rib 1 Junction Area, LH Side
1.00
Do a Special Detailed Inspection of the Area C, Frame
47/Rib 1 Junction Area, LH Side
1.00
Do a Special Detailed Inspection of the Area B, Frame
47/Rib 1 Junction Area, RH Side
1.00
Do a Special Detailed Inspection of the Area C, Frame
47/Rib 1 Junction Area, RH Side
1.00
Close-Up
 12.50
TOTAL MANHOURS
 28.50
ELAPSED TIME (HOURS)
 13.50
DATE: Apr 25/16 SERVICE BULLETIN No.: A300-57-6119
REVISION No.: 00 - Apr 25/16 Page: 8
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 15

@A300-600
SERVICE BULLETIN
NOTE
: For an explanation of the manhours and elapsed time, refer to the Gantt
Chart, Fig. A-FABAA
 given in Appendix 01.
Task 576119-832-803-001: Special Detailed Inspection of the Area D, Frame 47/Rib 1 Junction
Area, LH and RH Sides
Get Access
 6.00
On Aircraft
Do a Special Detailed Inspection of the Area D, Frame
47/Rib 1 Junction Area, LH Side
1.00
Do a Special Detailed Inspection of the Area D, Frame
47/Rib 1 Junction Area, RH Side
1.00
Close-Up
 6.50
TOTAL MANHOURS
 14.50
ELAPSED TIME (HOURS)
 7.50
NOTE
: For an explanation of the manhours and elapsed time, refer to the Gantt
Chart, Fig. A-FACAA
 given in Appendix 01.
Task 576119-832-804-001: Special Detailed Inspection of the Area E, Frame 47/Rib 1 Junction
Area, LH and RH Sides
Get Access
 6.00
On Aircraft
Do a Special Detailed Inspection of the Area E, Frame
47/Rib 1 Junction Area, LH Side
1.00
Do a Special Detailed Inspection of the Area E, Frame
47/Rib 1 Junction Area, RH Side
1.00
Close-Up
 6.50
TOTAL MANHOURS
 14.50
ELAPSED TIME (HOURS)
 7.50
NOTE
: For an explanation of the manhours and elapsed time, refer to the Gantt
Chart, Fig. A-FADAA
 given in Appendix 01.
H. WEIGHT AND BALANCE
Not Changed
I. ELECTRICAL LOAD DATA
Not Changed
J. REFERENCES
Aircraft Maintenance Manual (AMM)
 06-21-00 06-31-53 06-41-00
06-41-57 20-21-12 24-00-00
25-72-41 28-10-00 28-11-29
28-13-21 28-25-00 28-31-21
29-25-00
Elec. Std. Practices Manual (ESPM)
 20-55-00
Non Destructive Test Manual (NTM)
 57-10-34 57-10-45 57-10-50
Standards Manual (SM)
DATE: Apr 25/16 SERVICE BULLETIN No.: A300-57-6119
REVISION No.: 00 - Apr 25/16 Page: 9
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 16

@A300-600
SERVICE BULLETIN
Structural Repair Manual (SRM)
 51-40-20 51-40-30
K. PUBLICATION AFFECTED
Maintenance Planning Document (MPD)
 571011-01-1
571011-01-2
571016-01-1
571016-01-2
571016-01-3
571016-01-5
L. INTERCHANGEABILITY/MIXABILITY
Not Applicable
M. SPARES
None
DATE: Apr 25/16 SERVICE BULLETIN No.: A300-57-6119
REVISION No.: 00 - Apr 25/16 Page: 10
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 17

@A300-600
SERVICE BULLETIN
2. MATERIAL INFORMATION
**CONF ALL
A. MATERIAL - PRICE AND AVAILABILITY
(1) Procurement Addresses
Customers with aircraft shown in the effectivity of this Service Bulletin should send a
purchase order to AIRBUS. Quote the number of this Service Bulletin. The address is:
Kit 576119A01R01
Kit 576119A02R01
AIRBUS Material, Logistics and Suppliers
ATP II B,
Hein-Sass-Weg 24
21129 HAMBURG
GERMANY
For ordering by internet:
http://spares.airbus.com
For ordering by E-mail: airbus.kit@airbus.com
Telephone Hotlines:
A350/A380: +49 40 743 51775
A330/340, A300/310: +49 40 743 51616
A318/319/320/321: +49 40 743 51660
(2) Price and Availability
Kit 576119A01R01
Cost
 50.00 USD
Availability
 90 calendar days from receipt of order
The availability given above is the standard lead time from the date of your purchase
order. If items are required before this time, please include a retrofit planning schedule
with your order so that we can try to comply with your requirements.
The sales terms (costs and availability) are estimated in relation to economic conditions.
The latest valid price and lead time for ordering purposes shall be obtained through the
AirbusSpares portal or through a request for quotation to airbus.kit@airbus.com.
Kit 576119A02R01
Cost
 50.00 USD
Availability
 90 calendar days from receipt of order
The availability given above is the standard lead time from the date of your purchase
order. If items are required before this time, please include a retrofit planning schedule
with your order so that we can try to comply with your requirements.
The sales terms (costs and availability) are estimated in relation to economic conditions.
The latest valid price and lead time for ordering purposes shall be obtained through the
AirbusSpares portal or through a request for quotation to airbus.kit@airbus.com.
B. INDUSTRY SUPPORT INFORMATION
AIRBUS will not provide industry support for accomplishment of this Service Bulletin.
DATE: Apr 25/16 SERVICE BULLETIN No.: A300-57-6119
REVISION No.: 00 - Apr 25/16 Page: 11
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 18

@A300-600
SERVICE BULLETIN
C. LIST OF COMPONENTS
Kit 576119A01R01
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 ITEM
 OLD PART N˚
 INT
 SEE
NOTES
10
 NSA5059-4
 1
 NUT
16
 NSA5059-5
 1
 NUT
22
 MS24665-153
 3
 PIN
NOTE
: If you find part numbers of hardware components in the related kit(s) which
you cannot identify in the LIST OF COMPONENTS of this Service Bulletin,
refer to Standards Manual (SM). The SM will give you the correct part number
to part number relationship.
Kit 576119A02R01
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 ITEM
 OLD PART N˚
 INT
 SEE
NOTES
10
 NSA5059-4
 1
 NUT
16
 NSA5059-5
 1
 NUT
19
 NSA5060-4
 1
 NUT
22
 MS24665-153
 3
 PIN
NOTE
: If you find part numbers of hardware components in the related kit(s) which
you cannot identify in the LIST OF COMPONENTS of this Service Bulletin,
refer to Standards Manual (SM). The SM will give you the correct part number
to part number relationship.
D. LIST OF MATERIALS - OPERATOR SUPPLIED
None
E. PARTS TO BE RE-IDENTIFIED BY OPERATOR
None
F. TOOLING
(1) Tooling - Price and Availability
Not Changed
(2) Tools
NOTE
: To accomplish this Service Bulletin it is necessary to use the tools listed
in the subsequent referenced task:
- AMM 29-25-00, Page Block 501
(3) Special Tools
None
DATE: Apr 25/16 SERVICE BULLETIN No.: A300-57-6119
REVISION No.: 00 - Apr 25/16 Page: 12
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 19

@A300-600
SERVICE BULLETIN
3. ACCOMPLISHMENT INSTRUCTIONS
Task 576119-832-801-001 - Special Detailed Inspection of the Area A, Frame 47/Rib 1
Junction Area, LH and RH Sides
WARNING
: MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND ALL THE CAUTIONS
INCLUDED IN THE REFERENCED PROCEDURES.
CAUTION
: ALWAYS OBEY THE PRECAUTIONS THAT FOLLOW TO KEEP
ELECTRICAL WIRING IN A SATISFACTORY CONDITION (ELECTRICALLY
AND MECHANICALLY SERVICEABLE) . WHEN YOU DO MAINTENANCE
WORK, REPAIRS OR MODIFICATIONS, ALWAYS KEEP ELECTRICAL WIRING,
COMPONENTS AND THE WORK AREA AS CLEAN AS POSSIBLE. TO DO
THIS:
- PUT PROTECTION, SUCH AS PLASTIC SHEETING, CLOTHS, ETC. AS
NECESSARY ON WIRING AND COMPONENTS.
- REGULARLY REMOVE ALL SHAVINGS, UNWANTED MATERIAL AND
OTHER CONTAMINATION.
THESE PRECAUTIONS WILL DECREASE THE RISK OF CONTAMINATION
AND DAMAGE TO THE ELECTRICAL WIRING INSTALLATION.
IF THERE IS CONTAMINATION, REFER TO ESPM 20-55-00.
NOTE
: The accomplishment instructions of this Service Bulletin include procedures given
in other documents or in other sections of the Service Bulletin. When the words
"refer to" are used and the operator has a procedure accepted by the local
authority he belongs to, the accepted alternative procedure can be used. When the
words "in accordance with" are used then the given procedure must be followed.
NOTE
: The access and close-up instructions, not comprising return to service tests, in this
Service Bulletin do not constitute or affect the technical intent of the Service
Bulletin. Operators can therefore, as deemed necessary, omit or add access and/or
close-up steps to add flexibility to their maintenance operations as long as the
technical intent of the Service Bulletin is met within the set parameters.
NOTE
: Manual titles given in the accomplishment instructions are referred to by acronyms.
Refer to paragraph 1.J., References, for the definition of acronyms.
NOTE
: This Service Bulletin is classified mandatory or expected to be classified mandatory
by an Airworthiness Directive (AD). The paragraphs 3.C. and 3.D. in these
accomplishment instructions are Required for Compliance (RC) and must be done
to comply with the AD. Other paragraphs are recommended and may be deviated
from, done as part of other actions or done with accepted methods different from
those given in the Service Bulletin, as long as the RC paragraphs can be done and
the aircraft can be put back into a serviceable condition.
NOTE
: The purpose of flow charts is to supplement the information given in the Procedure
and Compliance paragraphs and not to serve as the primary source for tasks or
compliance times given in this Service Bulletin.
DATE: Apr 25/16 SERVICE BULLETIN No.: A300-57-6119
REVISION No.: 00 - Apr 25/16 Page: 13
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 20

@A300-600
SERVICE BULLETIN
Task Associated Data
Zone
143 144
Access
Panel
 147AZ 147BZ 147CZ 147DZ 148AZ 148CZ 148DZ
Manpower
TOTAL MANHOURS
 6.50
ELAPSED TIME (HOURS)
 3.50
A. GENERAL
(1) Subtask 576119-910-001-001 - Standard Practices
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 06-21-00, Page Block 001
06-31-53, Page Block 001
06-41-00, Page Block 001
20-21-12, Page Block 001
Structural Repair Manual (SRM)
 51-40-20
51-40-30
(a) For the Frame (FR) identification, refer to AMM 06-31-53, Page Block 001.
(b) For the identification of zones, refer to AMM 06-21-00, Page Block 001.
(c) For the identification of access panels, refer to AMM 06-41-00, Page Block 001.
(d) To torque tighten the standard threaded fasteners, refer to AMM 20-21-12, Page
Block 001.
(e) Remove and install fasteners in accordance with SRM 51-40-20.
(f) Obtain alternative and substitute fastener data in accordance with SRM 51-40-30.
(2) Subtask 576119-839-001-001 - Administrative
Manpower Resources
Skills
 NON SPECIFIC
Write in the applicable aircraft records that you have done all the work given in this
Service Bulletin.
B. PREPARATION
(1) Subtask 576119-941-001-001 - Job Set-up
Manpower Resources
Skills
 NON SPECIFIC
DATE: Apr 25/16 SERVICE BULLETIN No.: A300-57-6119
REVISION No.: 00 - Apr 25/16 Page: 14
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 21

@A300-600
SERVICE BULLETIN
References
Aircraft Maintenance Manual (AMM)
 24-00-00, Page Block 301
NOTE
: The items given in this note shall be considered as the basic Aircraft
configuration before you start a maintenance task:
- Aircraft on the ground resting on landing gear (the ground safety
locks and the wheel chocks are in position on the landing gear)
- Engine shut down, thrust reversers closed and locked
- Aircraft in clean configuration
- Parking brake applied
- Aircraft electrical network de-energized
- Hydraulic system s depressurized
- Access to the cockpit and cabin is available
- All circuit breakers are in closed position
- All controls in NORM, AUTO or OFF position.
(a) Make sure that the aircraft is electrically grounded, refer to AMM 24-00-00, Page
Block 301.
(b) Put an access platform in position at zone 140.
(2) Subtask 576119-941-016-001 - Job Set-up for LH Side
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 25-72-41, Page Block 401
(a) Remove the access panels 147DZ, 147CZ and 147BZ, refer to AMM 25-72-41,
Page Block 401.
(3) Subtask 576119-941-007-001 - Job Set-up for RH Side
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 25-72-41, Page Block 401
(a) Remove the access panels 148CZ and 148DZ, refer to AMM 25-72-41, Page Block
401.
DATE: Apr 25/16 SERVICE BULLETIN No.: A300-57-6119
REVISION No.: 00 - Apr 25/16 Page: 15
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 22

@A300-600
SERVICE BULLETIN
C. PROCEDURE
(1) Subtask 576119-280-001-001 - Do a Special Detailed Inspection of the Area A,
Frame 47/Rib 1 Junction Area, LH Side
Work Zones and Access Panels
Zone
 Access/Work location
143
 Access
 Panel 147DZ, Panel 147CZ, Panel 147BZ, Panel
147AZ
Work location
 Frame 47
Rib 1
Manpower Resources
Manhours
 1.00
Minimum number of person
 1
Subtask elapsed time
 1.00
Skills
 NON DESTRUCTIVE
TESTING
References
Non Destructive Test Manual (NTM)
 57-10-45 part 4
Fig. A-FBAAA
Special Detailed Inspection of the Area
A of the Frame 47/Rib 1 junction Area,
LH and RH Sides
Sheet 01
Sheet 02
Fig. A-FRAAA
Inspection Report for the Area A
Sheet 01
Sheet 02
Sheet 03
Fig. A-FFAAA
Flow Chart for the Area A
Sheet 01
(a) At the threshold given in the PLANNING INFORMATION Paragraph E.(2):
Do an ultrasonic inspection of the holes of the area A of the Frame 47/Rib 1
junction area :
Refer to Fig. A-FFAAA
Refer to Fig. A-FBAAA
Refer to NTM 57-10-45 part 4 procedures A, B and C
1
 If crack is not found:
a
 Report to AIRBUS within 1 month.
And
DATE: Apr 25/16 SERVICE BULLETIN No.: A300-57-6119
REVISION No.: 00 - Apr 25/16 Page: 16
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 23

@A300-600
SERVICE BULLETIN
Repeat the Special Detailed Inspection of the area A of the Frame 47/Rib
1 junction area in accordance with TASK 576119-832-801 001 Special
Detailed Inspection of the Area A, Frame 47/Rib 1 Junction Area, LH and
RH Sides at the interval given in the table 1 of the planning information
paragraph E.(2).
2
 If crack is found:
a
 Contact AIRBUS before next flight.
And
Report to AIRBUS within 10 days.
(b) Send the inspection report to AIRBUS, refer to Fig. A-FRAAA
.
(2) Subtask 576119-280-005-001 - Do a Special Detailed Inspection of the Area A,
Frame 47/Rib 1 Junction Area, RH Side
Work Zones and Access Panels
Zone
 Access/Work location
144
 Access
 Panel 148CZ, Panel 148DZ, Panel 148AZ
Work location
 Frame 47
Rib 1
Manpower Resources
Manhours
 1.00
Minimum number of person
 1
Subtask elapsed time
 1.00
Skills
 NON DESTRUCTIVE
TESTING
References
Non Destructive Test Manual (NTM)
 57-10-45 part 4
Fig. A-FBAAA
Special Detailed Inspection of the Area
A of the Frame 47/Rib 1 junction Area,
LH and RH Sides
Sheet 01
Sheet 02
Fig. A-FRAAA
Inspection Report for the Area A
Sheet 01
Sheet 02
Sheet 03
Fig. A-FFAAA
Flow Chart for the Area A
Sheet 01
(a) At the threshold given in the PLANNING INFORMATION Paragraph E.(2):
Do an ultrasonic inspection of the holes of the area A of the Frame 47/Rib 1
junction area :
Refer to Fig. A-FFAAA
DATE: Apr 25/16 SERVICE BULLETIN No.: A300-57-6119
REVISION No.: 00 - Apr 25/16 Page: 17
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 24

@A300-600
SERVICE BULLETIN
Refer to Fig. A-FBAAA
Refer to NTM 57-10-45 part 4 procedure A, B and C.
1
 If crack is not found:
a
 Report to AIRBUS within 1 month.
And
Repeat the Special Detailed Inspection of the area A of the Frame 47/Rib
1 junction area in accordance with TASK 576119-832-801 001 Special
Detailed Inspection of the Area A, Frame 47/Rib 1 Junction Area, LH and
RH Sides at the interval given in the table 1 of the planning information
paragraph E.(2).
2
 If crack is found:
a
 Contact AIRBUS before next flight.
And
Report to AIRBUS within 10 days.
(b) Send the inspection report to AIRBUS, refer to Fig. A-FRAAA
.
D. TEST
(1) Subtask 576119-700-001-001 - Testing
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 25-72-41, Page Block 401
NOTE
: This Service Bulletin requires the accomplishment of the following Tests
which are given in subtasks included in the topic Close-up. The
manhours for the tests are included in the referenced Service Bulletin
subtasks.
- Remove the safety clips and tags and close the circuit breakers as specified after
the installation of the access panels 147DZ, 147CZ, 147BZ, 148CZ and 148DZ,
refer to AMM 25-72-41, Page Block 401.
E. CLOSE-UP
(1) Subtask 576119-942-002-001 - Close-up for LH Side
Manpower Resources
Skills
 NON SPECIFIC
DATE: Apr 25/16 SERVICE BULLETIN No.: A300-57-6119
REVISION No.: 00 - Apr 25/16 Page: 18
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 25

@A300-600
SERVICE BULLETIN
References
Aircraft Maintenance Manual (AMM)
 25-72-41, Page Block 401
(a) Make sure that the work areas are clean and clear of tools and other items of
equipment.
(b) Install the access panels 147DZ, 147CZ and 147BZ, refer to AMM 25-72-41, Page
Block 401.
(2) Subtask 576119-942-003-001 - Close-up for RH Side
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 25-72-41, Page Block 401
(a) Make sure that the work areas are clean and clear of tools and other items of
equipment.
(b) Install the access panels 148DZ and 148CZ, refer to AMM 25-72-41, Page Block
401.
(3) Subtask 576119-942-001-001 - Close-up
Manpower Resources
Skills
 NON SPECIFIC
(a) Remove the access platform(s).
(b) Put the aircraft back to its initial configuration.
DATE: Apr 25/16 SERVICE BULLETIN No.: A300-57-6119
REVISION No.: 00 - Apr 25/16 Page: 19
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 26

@A300-600
SERVICE BULLETIN
This Page Intentionally Left Blank
DATE: Apr 25/16 SERVICE BULLETIN No.: A300-57-6119
REVISION No.: 00 - Apr 25/16 Page: 20
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 27

@A300-600
SERVICE BULLETIN
Task 576119-832-802-001 - Special Detailed Inspection of the Areas B and C, Frame 47/Rib 1
Junction Area, LH and RH Sides
WARNING
: MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND ALL THE CAUTIONS
INCLUDED IN THE REFERENCED PROCEDURES.
CAUTION
: ALWAYS OBEY THE PRECAUTIONS THAT FOLLOW TO KEEP
ELECTRICAL WIRING IN A SATISFACTORY CONDITION (ELECTRICALLY
AND MECHANICALLY SERVICEABLE) . WHEN YOU DO MAINTENANCE
WORK, REPAIRS OR MODIFICATIONS, ALWAYS KEEP ELECTRICAL WIRING,
COMPONENTS AND THE WORK AREA AS CLEAN AS POSSIBLE. TO DO
THIS:
- PUT PROTECTION, SUCH AS PLASTIC SHEETING, CLOTHS, ETC. AS
NECESSARY ON WIRING AND COMPONENTS.
- REGULARLY REMOVE ALL SHAVINGS, UNWANTED MATERIAL AND
OTHER CONTAMINATION.
THESE PRECAUTIONS WILL DECREASE THE RISK OF CONTAMINATION
AND DAMAGE TO THE ELECTRICAL WIRING INSTALLATION.
IF THERE IS CONTAMINATION, REFER TO ESPM 20-55-00.
NOTE
: The accomplishment instructions of this Service Bulletin include procedures given
in other documents or in other sections of the Service Bulletin. When the words
"refer to" are used and the operator has a procedure accepted by the local
authority he belongs to, the accepted alternative procedure can be used. When the
words "in accordance with" are used then the given procedure must be followed.
NOTE
: The access and close-up instructions, not comprising return to service tests, in this
Service Bulletin do not constitute or affect the technical intent of the Service
Bulletin. Operators can therefore, as deemed necessary, omit or add access and/or
close-up steps to add flexibility to their maintenance operations as long as the
technical intent of the Service Bulletin is met within the set parameters.
NOTE
: Manual titles given in the accomplishment instructions are referred to by acronyms.
Refer to paragraph 1.J., References, for the definition of acronyms.
NOTE
: This Service Bulletin is classified mandatory or expected to be classified mandatory
by an Airworthiness Directive (AD). The paragraphs 3.C. and 3.D. in these
accomplishment instructions are Required for Compliance (RC) and must be done
to comply with the AD. Other paragraphs are recommended and may be deviated
from, done as part of other actions or done with accepted methods different from
those given in the Service Bulletin, as long as the RC paragraphs can be done and
the aircraft can be put back into a serviceable condition.
NOTE
: The purpose of flow charts is to supplement the information given in the Procedure
and Compliance paragraphs and not to serve as the primary source for tasks or
compliance times given in this Service Bulletin.
DATE: Apr 25/16 SERVICE BULLETIN No.: A300-57-6119
REVISION No.: 00 - Apr 25/16 Page: 21
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 28

@A300-600
SERVICE BULLETIN
Task Associated Data
Zone
143 144
Access
Panel
 147AZ 147BZ 147CZ 147DZ 148AZ 148CZ 148DZ
Manpower
TOTAL MANHOURS
 28.50
ELAPSED TIME (HOURS)
 13.50
A. GENERAL
(1) Subtask 576119-910-002-001 - Standard Practices
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 06-21-00, Page Block 001
06-31-53, Page Block 001
06-41-00, Page Block 001
20-21-12, Page Block 001
Structural Repair Manual (SRM)
 51-40-20
51-40-30
(a) For the Frame (FR) identification, refer to AMM 06-31-53, Page Block 001.
(b) For the identification of zones, refer to AMM 06-21-00, Page Block 001.
(c) For the identification of access panels, refer to AMM 06-41-00, Page Block 001.
(d) To torque tighten the standard threaded fasteners, refer to AMM 20-21-12, Page
Block 001.
(e) Remove and install fasteners in accordance with SRM 51-40-20.
(f) Obtain alternative and substitute fastener data in accordance with SRM 51-40-30.
(2) Subtask 576119-839-002-001 - Administrative
Manpower Resources
Skills
 NON SPECIFIC
Write in the applicable aircraft records that you have done all the work given in this
Service Bulletin.
B. PREPARATION
(1) Subtask 576119-941-002-001 - Job Set-up
Manpower Resources
Skills
 NON SPECIFIC
DATE: Apr 25/16 SERVICE BULLETIN No.: A300-57-6119
REVISION No.: 00 - Apr 25/16 Page: 22
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 29

@A300-600
SERVICE BULLETIN
References
Aircraft Maintenance Manual (AMM)
 24-00-00, Page Block 301
28-10-00, Page Block 301
28-13-21, Page Block 401
28-25-00, Page Block 301
NOTE
: The items given in this note shall be considered as the basic Aircraft
configuration before you start a maintenance task:
- Aircraft on the ground resting on landing gear (the ground safety
locks and the wheel chocks are in position on the landing gear)
- Engine shut down, thrust reversers closed and locked
- Aircraft in clean configuration
- Parking brake applied
- Aircraft electrical network de-energized
- Hydraulic system s depressurized
- Access to the cockpit and cabin is available
- All circuit breakers are in closed position
- All controls in NORM, AUTO or OFF position.
(a) Make sure that the aircraft is electrically grounded, refer to AMM 24-00-00, Page
Block 301.
(b) Put an access platform in position at zone 140.
(c) Defuel the center tank, refer to AMM 28-25-00, Page Block 301.
(d) Degas and ventilate the center tank, refer to AMM 28-10-00, Page Block 301
(e) Remove the applicable vapor seal, refer to AMM 28-13-21, Page Block 401.
(2) Subtask 576119-941-010-001 - Job Set-up for LH Side
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 25-72-41, Page Block 401
28-11-29, Page Block 401
(a) Remove the access panels 147DZ, 147CZ and 147BZ, refer to AMM 25-72-41,
Page Block 401.
(b) Remove the center tank manhole cover 147AZ, refer to AMM 28-11-29, Page Block
401.
DATE: Apr 25/16 SERVICE BULLETIN No.: A300-57-6119
REVISION No.: 00 - Apr 25/16 Page: 23
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 30

@A300-600
SERVICE BULLETIN
(3) Subtask 576119-941-011-001 - Job Set-up for RH Side
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 25-72-41, Page Block 401
28-11-29, Page Block 401
(a) Remove the access panels 148CZ and 148DZ, refer to AMM 25-72-41, Page Block
401.
(b) Remove the center tank manhole cover 148AZ, refer to AMM 28-11-29, Page Block
401.
C. PROCEDURE
(1) Subtask 576119-280-002-001 - Do a Special Detailed Inspection of the Area B,
Frame 47/Rib 1 Junction Area, LH Side
Work Zones and Access Panels
Zone
 Access/Work location
143
 Access
 Panel 147DZ, Panel 147CZ, Panel 147BZ, Panel
147AZ
Work location
 Frame 47
Rib 1
Manpower Resources
Manhours
 1.00
Minimum number of person
 1
Subtask elapsed time
 1.00
Skills
 NON DESTRUCTIVE
TESTING
References
Non Destructive Test Manual (NTM)
 57-10-34 part 4
Fig. A-FBBAA
Special Detailed Inspection of the Area
B of the Frame 47/Rib 1 junction Area,
LH and RH Sides
Sheet 01
Sheet 02
Fig. A-FRBAA
Inspection Report for the Area B
Sheet 01
Sheet 02
Sheet 03
Fig. A-FFBAA
Flow Chart for the Area B
Sheet 01
(a) At the threshold given in the PLANNING INFORMATION Paragraph E.(2):
Do an ultrasonic inspection of the area B of the Frame 47/Rib 1 junction area :
Refer to Fig. A-FBBAA
DATE: Apr 25/16 SERVICE BULLETIN No.: A300-57-6119
REVISION No.: 00 - Apr 25/16 Page: 24
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 31

@A300-600
SERVICE BULLETIN
Refer to Fig. A-FFBAA
Refer to NTM 57-10-34 part 4 procedure E
1
 If crack is not found:
a
 Report to AIRBUS within 1 month.
And
Repeat the Special Detailed Inspection of the area A of the Frame 47/Rib
1 junction area in accordance with TASK 576119-832-802 001 Special
Detailed Inspection of the Areas B and C, Frame 47/Rib 1 Junction Area,
LH and RH Sides at the interval given in the table 1 of the planning
information paragraph E.(2).
2
 If crack is found:
a
 Contact AIRBUS before next flight.
And
Report to AIRBUS within 10 days.
(b) Send the inspection report to AIRBUS, refer to Fig. A-FRBAA
.
(2) Subtask 576119-280-009-001 - Do a Special Detailed Inspection of the Area C,
Frame 47/Rib 1 Junction Area, LH Side
Work Zones and Access Panels
Zone
 Access/Work location
143
 Access
 Panel 147DZ, Panel 147CZ, Panel 147BZ, Panel
147AZ
Work location
 Frame 47
Rib 1
Manpower Resources
Manhours
 1.00
Minimum number of person
 1
Subtask elapsed time
 1.00
Skills
 NON DESTRUCTIVE
TESTING
References
Non Destructive Test Manual (NTM)
 57-10-34 part 4
Fig. A-FBCAA
Special Detailed Inspection of the Area
C of the Frame 47/Rib 1 junction Area,
LH and RH Sides
Sheet 01
Sheet 02
DATE: Apr 25/16 SERVICE BULLETIN No.: A300-57-6119
REVISION No.: 00 - Apr 25/16 Page: 25
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 32

@A300-600
SERVICE BULLETIN
References
Fig. A-FRCAA
Inspection Report for the Area C
Sheet 01
Sheet 02
Sheet 03
Fig. A-FFCAA
Flow Chart for the Area C
Sheet 01
(a) At the threshold given in the PLANNING INFORMATION Paragraph E.(2):
Do an ultrasonic inspection of the area C of the Frame 47/Rib 1 junction area :
Refer to Fig. A-FBCAA
Refer to Fig. A-FFCAA
Refer to NTM 57-10-34 part 4 procedure A
1
 If crack is not found:
a
 Report to AIRBUS within 1 month.
And
Repeat the Special Detailed Inspection of the area A of the Frame 47/Rib
1 junction area in accordance with TASK 576119-832-802 001 Special
Detailed Inspection of the Areas B and C, Frame 47/Rib 1 Junction Area,
LH and RH Sides at the interval given in the table 1 of the planning
information paragraph E.(2).
2
 If crack is found:
a
 Contact AIRBUS before next flight.
And
Report to AIRBUS within 10 days.
(b) Send the inspection report to AIRBUS, refer to Fig. A-FRCAA
.
(3) Subtask 576119-280-006-001 - Do a Special Detailed Inspection of the Area B,
Frame 47/Rib 1 Junction Area, RH Side
Work Zones and Access Panels
Zone
 Access/Work location
144
 Access
 Panel 148AZ, Panel 148CZ, Panel 148DZ
Work location
 Frame 47
Rib 1
DATE: Apr 25/16 SERVICE BULLETIN No.: A300-57-6119
REVISION No.: 00 - Apr 25/16 Page: 26
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 33

@A300-600
SERVICE BULLETIN
Manpower Resources
Manhours
 1.00
Minimum number of person
 1
Subtask elapsed time
 1.00
Skills
 NON DESTRUCTIVE
TESTING
References
Non Destructive Test Manual (NTM)
 57-10-34 part 4
Fig. A-FBBAA
Special Detailed Inspection of the Area
B of the Frame 47/Rib 1 junction Area,
LH and RH Sides
Sheet 01
Sheet 02
Fig. A-FRBAA
Inspection Report for the Area B
Sheet 01
Sheet 02
Sheet 03
Fig. A-FFBAA
Flow Chart for the Area B
Sheet 01
(a) At the threshold given in the PLANNING INFORMATION Paragraph E.(2):
Do an ultrasonic inspection the area B of the Frame 47/Rib 1 junction area :
Refer to Fig. A-FBBAA
Refer to Fig. A-FFBAA
Refer to NTM 57-10-34 part 4 procedure E
1
 If crack is not found:
a
 Report to AIRBUS within 1 month.
And
Repeat the Special Detailed Inspection of the area A of the Frame 47/Rib
1junction area in accordance with TASK 576119-832-802 001 Special
Detailed Inspection of the Areas B and C, Frame 47/Rib 1 Junction Area,
LH and RH Sides at the interval given in the table 1 of the planning
information paragraph E.(2).
2
 If crack is found:
a
 Contact AIRBUS before next flight.
And
Report to AIRBUS within 10 days.
(b) Send the inspection report to AIRBUS, refer to Fig. A-FRBAA
.
DATE: Apr 25/16 SERVICE BULLETIN No.: A300-57-6119
REVISION No.: 00 - Apr 25/16 Page: 27
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 34

@A300-600
SERVICE BULLETIN
(4) Subtask 576119-280-010-001 - Do a Special Detailed Inspection of the Area C,
Frame 47/Rib 1 Junction Area, RH Side
Work Zones and Access Panels
Zone
 Access/Work location
144
 Access
 Panel 148CZ, Panel 148DZ, Panel 148AZ
Work location
 Frame 47
Rib 1
Manpower Resources
Manhours
 1.00
Minimum number of person
 1
Subtask elapsed time
 1.00
Skills
 NON DESTRUCTIVE
TESTING
References
Non Destructive Test Manual (NTM)
 57-10-34 part 4
Fig. A-FBCAA
Special Detailed Inspection of the Area
C of the Frame 47/Rib 1 junction Area,
LH and RH Sides
Sheet 01
Sheet 02
Fig. A-FRCAA
Inspection Report for the Area C
Sheet 01
Sheet 02
Sheet 03
Fig. A-FFCAA
Flow Chart for the Area C
Sheet 01
(a) At the threshold given in the PLANNING INFORMATION Paragraph E.(2):
Do an ultrasonic inspection of the area C of the Frame 47/Rib 1 junction area :
Refer to Fig. A-FBCAA
Refer to Fig. A-FFCAA
Refer to NTM 57-10-34 part 4 procedure A
1
 If crack is not found:
a
 Report to AIRBUS within 1 month.
And
Repeat the Special Detailed Inspection of the area A of the Frame 47/Rib
1 junction area in accordance with TASK 576119-832-802 001 Special
Detailed Inspection of the Areas B and C, Frame 47/Rib 1 Junction Area,
LH and RH Sides at the interval given in the table 1 of the planning
information paragraph E.(2).
DATE: Apr 25/16 SERVICE BULLETIN No.: A300-57-6119
REVISION No.: 00 - Apr 25/16 Page: 28
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 35

@A300-600
SERVICE BULLETIN
2
 If crack is found:
a
 Contact AIRBUS before next flight.
And
Report to AIRBUS within 10 days.
(b) Send the inspection report to AIRBUS, refer to Fig. A-FRCAA
.
D. TEST
(1) Subtask 576119-700-002-001 - Testing
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 25-72-41, Page Block 401
28-11-29, Page Block 401
28-13-21, Page Block 401
28-25-00, Page Block 301
NOTE
: This Service Bulletin requires the accomplishment of the following Tests
which are given in subtasks included in the topic Close-up. The
manhours for the tests are included in the referenced Service Bulletin
subtasks.
- Do the test after installation of the center tank manholes covers 147AZ and 148AZ,
refer to AMM 28-11-29, Page Block 401.
- Remove the safety clips and tags and close the circuit breakers as specified after
the installation of the center tank manhole covers 147AZ and 148AZ, AMM
28-11-29, Page Block 401.
- Remove the safety clips and tags and close the circuit breakers as specified after
the installation of the access panels 147DZ, 147CZ, 147BZ, 148CZ and 148DZ,
refer to AMM 25-72-41, Page Block 401.
- Remove the safety clips and tags and close the circuit breakers as specified after
the installation of the vapor seals, refer to AMM 28-13-21, Page Block 401.
E. CLOSE-UP
(1) Subtask 576119-942-004-001 - Close-up for LH Side
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 25-72-41, Page Block 401
28-11-29, Page Block 401
DATE: Apr 25/16 SERVICE BULLETIN No.: A300-57-6119
REVISION No.: 00 - Apr 25/16 Page: 29
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 36

@A300-600
SERVICE BULLETIN
(a) Make sure that the work areas are clean and clear of tools and other items of
equipment.
(b) Install the center manhole cover 147AZ, refer to AMM 28-11-29, Page Block 401.
(c) Install the access panels 147DZ, 147CZ and 147BZ, refer to AMM 25-72-41, Page
Block 401.
(2) Subtask 576119-942-005-001 - Close-up for RH Side
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 25-72-41, Page Block 401
28-11-29, Page Block 401
(a) Make sure that the work areas are clean and clear of tools and other items of
equipment.
(b) Install the center manhole cover 148AZ, refer to AMM 28-11-29, Page Block 401.
(c) Install the access panels 148DZ and 148CZ, refer to AMM 25-72-41, Page Block
401.
(3) Subtask 576119-942-006-001 - Close-up
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 28-25-00, Page Block 301
28-31-21, Page Block 401
(a) Install the removed vapor seal, refer to AMM 28-31-21, Page Block 401.
(b) Remove the access platform(s).
(c) Put the aircraft back to its initial configuration.
DATE: Apr 25/16 SERVICE BULLETIN No.: A300-57-6119
REVISION No.: 00 - Apr 25/16 Page: 30
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 37

@A300-600
SERVICE BULLETIN
Task 576119-832-803-001 - Special Detailed Inspection of the Area D, Frame 47/Rib 1
Junction Area, LH and RH Sides
WARNING
: MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND ALL THE CAUTIONS
INCLUDED IN THE REFERENCED PROCEDURES.
CAUTION
: ALWAYS OBEY THE PRECAUTIONS THAT FOLLOW TO KEEP
ELECTRICAL WIRING IN A SATISFACTORY CONDITION (ELECTRICALLY
AND MECHANICALLY SERVICEABLE) . WHEN YOU DO MAINTENANCE
WORK, REPAIRS OR MODIFICATIONS, ALWAYS KEEP ELECTRICAL WIRING,
COMPONENTS AND THE WORK AREA AS CLEAN AS POSSIBLE. TO DO
THIS:
- PUT PROTECTION, SUCH AS PLASTIC SHEETING, CLOTHS, ETC. AS
NECESSARY ON WIRING AND COMPONENTS.
- REGULARLY REMOVE ALL SHAVINGS, UNWANTED MATERIAL AND
OTHER CONTAMINATION.
THESE PRECAUTIONS WILL DECREASE THE RISK OF CONTAMINATION
AND DAMAGE TO THE ELECTRICAL WIRING INSTALLATION.
IF THERE IS CONTAMINATION, REFER TO ESPM 20-55-00.
NOTE
: The accomplishment instructions of this Service Bulletin include procedures given
in other documents or in other sections of the Service Bulletin. When the words
"refer to" are used and the operator has a procedure accepted by the local
authority he belongs to, the accepted alternative procedure can be used. When the
words "in accordance with" are used then the given procedure must be followed.
NOTE
: The access and close-up instructions, not comprising return to service tests, in this
Service Bulletin do not constitute or affect the technical intent of the Service
Bulletin. Operators can therefore, as deemed necessary, omit or add access and/or
close-up steps to add flexibility to their maintenance operations as long as the
technical intent of the Service Bulletin is met within the set parameters.
NOTE
: Manual titles given in the accomplishment instructions are referred to by acronyms.
Refer to paragraph 1.J., References, for the definition of acronyms.
NOTE
: This Service Bulletin is classified mandatory or expected to be classified mandatory
by an Airworthiness Directive (AD). The paragraphs 3.C. and 3.D. in these
accomplishment instructions are Required for Compliance (RC) and must be done
to comply with the AD. Other paragraphs are recommended and may be deviated
from, done as part of other actions or done with accepted methods different from
those given in the Service Bulletin, as long as the RC paragraphs can be done and
the aircraft can be put back into a serviceable condition.
NOTE
: The purpose of flow charts is to supplement the information given in the Procedure
and Compliance paragraphs and not to serve as the primary source for tasks or
compliance times given in this Service Bulletin.
DATE: Apr 25/16 SERVICE BULLETIN No.: A300-57-6119
REVISION No.: 00 - Apr 25/16 Page: 31
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 38

@A300-600
SERVICE BULLETIN
Task Associated Data
Zone
143 144 570 670
Access
Panel
 147AZ 147BZ 147CZ 147DZ 148AZ 148CZ 148DZ 571AB
671AB
Manpower
TOTAL MANHOURS
 14.50
ELAPSED TIME (HOURS)
 7.50
A. GENERAL
(1) Subtask 576119-910-003-001 - Standard Practices
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 06-21-00, Page Block 001
06-31-53, Page Block 001
06-41-00, Page Block 001
20-21-12, Page Block 001
Structural Repair Manual (SRM)
 51-40-20
51-40-30
(a) For the Frame (FR) identification, refer to AMM 06-31-53, Page Block 001.
(b) For the identification of zones, refer to AMM 06-21-00, Page Block 001.
(c) For the identification of access panels, refer to AMM 06-41-00, Page Block 001.
(d) To torque tighten the standard threaded fasteners, refer to AMM 20-21-12, Page
Block 001.
(e) Remove and install fasteners in accordance with SRM 51-40-20.
(f) Obtain alternative and substitute fastener data in accordance with SRM 51-40-30.
(2) Subtask 576119-839-003-001 - Administrative
Manpower Resources
Skills
 NON SPECIFIC
Write in the applicable aircraft records that you have done all the work given in this
Service Bulletin.
DATE: Apr 25/16 SERVICE BULLETIN No.: A300-57-6119
REVISION No.: 00 - Apr 25/16 Page: 32
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 39

@A300-600
SERVICE BULLETIN
B. PREPARATION
(1) Subtask 576119-941-003-001 - Job Set-up
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 24-00-00, Page Block 301
NOTE
: The items given in this note shall be considered as the basic Aircraft
configuration before you start a maintenance task:
- Aircraft on the ground resting on landing gear (the ground safety
locks and the wheel chocks are in position on the landing gear)
- Engine shut down, thrust reversers closed and locked
- Aircraft in clean configuration
- Parking brake applied
- Aircraft electrical network de-energized
- Hydraulic system s depressurized
- Access to the cockpit and cabin is available
- All circuit breakers are in closed position
- All controls in NORM, AUTO or OFF position.
(a) Make sure that the aircraft is electrically grounded, refer to AMM 24-00-00, Page
Block 301.
(b) Put an access platform in position at zone 140.
(2) Subtask 576119-941-014-001 - Job Set-up for LH Side
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 25-72-41, Page Block 401
(a) Remove the access panels 147DZ, 147CZ and 147BZ, refer to AMM 25-72-41,
Page Block 401.
(3) Subtask 576119-941-015-001 - Job Set-up for RH Side
Manpower Resources
Skills
 NON SPECIFIC
DATE: Apr 25/16 SERVICE BULLETIN No.: A300-57-6119
REVISION No.: 00 - Apr 25/16 Page: 33
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 40

@A300-600
SERVICE BULLETIN
References
Aircraft Maintenance Manual (AMM)
 25-72-41, Page Block 401
(a) Remove the access panels 148CZ and 148DZ, refer to AMM 25-72-41, Page Block
401.
(4) Subtask 576119-010-001-001 - Remove for Access for LH Side
Work Zones and Access Panels
Zone
 Access/Work location
570
 Access
 Panel 571AB
Manpower Resources
Skills
 AIRFRAME
References
Aircraft Maintenance Manual (AMM)
 06-41-57, Page Block 001
Fig. A-FBEAA
Removal/Installation of the Bracket for
access
Sheet 01
Sheet 02
Fig. A-FBFAA
Removal/Installation of the Hydraulic
Panel Assy for access
Sheet 01
Fig. A-FBIAA
Removal/Installation of the Fairing under
Wing Bottom Skin Panel for access
Sheet 01
Sheet 02
(a) Remove the hydraulic panel.
1
 Remove the access panel 571AB, refer to AMM 06-41-57, Page Block 001.
2
 Remove the fairing:
Refer to Fig. A-FBIAA
1 Fairing Item (29) Retain
attached with:
1 Insert Item (30) Retain
4 Bushe Item (26) Retain
1 Fairing Item (23) Retain
1 Bolt Item (28) Retain
3 Bolt Item (24) Retain
1 Bolt Item (27) Retain
DATE: Apr 25/16 SERVICE BULLETIN No.: A300-57-6119
REVISION No.: 00 - Apr 25/16 Page: 34
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 41

@A300-600
SERVICE BULLETIN
4 Nut Item (25) Retain
3
 Remove hydraulic panel:
Refer to Fig. A-FBFAA
1 Panel Item (31) Retain
attached with:
6 Guide Item (12) Retain
6 Bolt Item (13) Retain
1 Bolt Item (8) Retain
2 Bolt Item (14) Retain
2 Washer Item (15) Retain
1 Washer Item (9) Retain
1 Nut Item (10) Discard
2 Nut Item (16) Discard
3 Cotter Pin Item (11) Discard
(b) Remove the bracket:
Refer to Fig. A-FBEAA
1 Bracket Item (1) Retain
attached with:
1 Screw Item (2) Retain
1 Nut Item (3) Retain
1 Screw Item (4) Retain
1 Nut Item (5) Retain
1 Screw Item (6) Retain
1 Nut Item (7) Retain
DATE: Apr 25/16 SERVICE BULLETIN No.: A300-57-6119
REVISION No.: 00 - Apr 25/16 Page: 35
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 42

@A300-600
SERVICE BULLETIN
(5) Subtask 576119-010-002-001 - Remove for Access for RH Side
Work Zones and Access Panels
Zone
 Access/Work location
670
 Access
 Panel 671AB
Manpower Resources
Skills
 AIRFRAME
References
Aircraft Maintenance Manual (AMM)
 06-41-57, Page Block 001
Fig. A-FBEAA
Removal/Installation of the Bracket for
access
Sheet 01
Sheet 02
Fig. A-FBGAA
Removal/Installation of the RAT Panel
for access
Sheet 01
Fig. A-FBHAA
Removal/Installation of the Adjustable
Rod of the RAT for access
Sheet 01
Fig. A-FBIAA
Removal/Installation of the Fairing under
Wing Bottom Skin Panel for access
Sheet 01
Sheet 02
(a) Remove the Ram Air Turbine (RAT) panel.
1
 Remove the access panel 671AB, refer to AMM 06-41-57, Page Block 001.
2
 Remove the fairing:
Refer to Fig. A-FBIAA
1 Fairing Item (29) Retain
attached with:
1 Insert Item (30) Retain
4 Bushe Item (26) Retain
1 Fairing Item (23) Retain
1 Bolt Item (28) Retain
3 Bolt Item (24) Retain
1 Bolt Item (27) Retain
4 Nut Item (25) Retain
DATE: Apr 25/16 SERVICE BULLETIN No.: A300-57-6119
REVISION No.: 00 - Apr 25/16 Page: 36
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 43

@A300-600
SERVICE BULLETIN
3
 Remove hydraulic lines:
NOTE
: Plug/Cap ports and all open lines ends
- return filter line
- pressurization line
- overflow line
- return line
4
 Remove adjustable rod link to RAT:
Refer to Fig. A-FBHAA
NOTE
: Before proceeding with any work on RAT, make certain that
uplock unit actuating lever rigging pin is correctly inserted
1 Rod Item (33) Retain
attached with:
1 Bolt Item (18) Retain
1 Nut Item (19) Discard
1 Sleeve Item (20) Retain
1 Washer Item (21) Retain
1 Cotter Pin Item (22) Discard
5
 Remove RAT panel:
Refer to Fig. A-FBGAA
1 Panel Item (32) Retain
attached with:
3 Guide Item (12) Retain
3 Guide Item (17) Retain
6 Bolt Item (13) Retain
1 Bolt Item (8) Retain
2 Bolt Item (14) Retain
DATE: Apr 25/16 SERVICE BULLETIN No.: A300-57-6119
REVISION No.: 00 - Apr 25/16 Page: 37
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 44

@A300-600
SERVICE BULLETIN
2 Washer Item (15) Retain
1 Washer Item (9) Retain
1 Nut Item (10) Retain
2 Nut Item (16) Retain
3 Cotter Pin Item (11) Retain
(b) Remove the bracket:
Refer to Fig. A-FBEAA
1 Bracket Item (1) Retain
attached with:
1 Screw Item (2) Retain
1 Nut Item (3) Retain
1 Screw Item (4) Retain
1 Nut Item (5) Retain
1 Screw Item (6) Retain
1 Nut Item (7) Retain
C. PROCEDURE
(1) Subtask 576119-280-003-001 - Do a Special Detailed Inspection of the Area D,
Frame 47/Rib 1 Junction Area, LH Side
Work Zones and Access Panels
Zone
 Access/Work location
143
 Access
 Panel 147DZ, Panel 147CZ, Panel 147BZ, Panel
147AZ
Work location
 Frame 47
Rib 1
Manpower Resources
Manhours
 1.00
Minimum number of person
 1
Subtask elapsed time
 1.00
Skills
 NON DESTRUCTIVE
TESTING
DATE: Apr 25/16 SERVICE BULLETIN No.: A300-57-6119
REVISION No.: 00 - Apr 25/16 Page: 38
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 45

@A300-600
SERVICE BULLETIN
References
Non Destructive Test Manual (NTM)
 57-10-50 part 4
Fig. A-FBDAA
Special Detailed Inspection of the Areas
D and E of the Frame 47/Rib 1 junction
Area, LH and RH Sides
Sheet 01
Sheet 02
Fig. A-FFDAA
Flow Chart for the Areas D and E
Sheet 01
Fig. A-FRDAA
Inspection Report for the Area D and E
Sheet 01
Sheet 02
Sheet 03
(a) At the threshold given in the PLANNING INFORMATION Paragraph E.(2):
Do an ultrasonic inspection of the area D of the Frame 47/Rib 1 junction area :
Refer to Fig. A-FBDAA
Refer to Fig. A-FFDAA
Refer to NTM 57-10-50 part 4 procedure A
1
 If crack is not found:
a
 Report to AIRBUS within 1 month.
And
Repeat the Special Detailed Inspection of the area A of the Frame 47/Rib
1 junction area in accordance with TASK 576119-832-803 001 Special
Detailed Inspection of the Area D, Frame 47/Rib 1 Junction Area, LH and
RH Sides at the interval given in the table 1 of the planning information
paragraph E.(2).
2
 If crack is found:
a
 Contact AIRBUS before next flight.
And
Report to AIRBUS within 10 days.
(b) Send the inspection report to AIRBUS, refer to Fig. A-FRDAA
.
(2) Subtask 576119-280-007-001 - Do a Special Detailed Inspection of the Area D,
Frame 47/Rib 1 Junction Area, RH Side
Work Zones and Access Panels
Zone
 Access/Work location
144
 Access
 Panel 148AZ, Panel 148CZ, Panel 148DZ
Work location
 Frame 47
Rib 1
DATE: Apr 25/16 SERVICE BULLETIN No.: A300-57-6119
REVISION No.: 00 - Apr 25/16 Page: 39
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 46

@A300-600
SERVICE BULLETIN
Manpower Resources
Manhours
 1.00
Minimum number of person
 1
Subtask elapsed time
 1.00
Skills
 NON DESTRUCTIVE
TESTING
References
Non Destructive Test Manual (NTM)
 57-10-50 part 4
Fig. A-FBDAA
Special Detailed Inspection of the Areas
D and E of the Frame 47/Rib 1 junction
Area, LH and RH Sides
Sheet 01
Sheet 02
Fig. A-FFDAA
Flow Chart for the Areas D and E
Sheet 01
Fig. A-FRDAA
Inspection Report for the Area D and E
Sheet 01
Sheet 02
Sheet 03
(a) At the threshold given in the PLANNING INFORMATION Paragraph E.(2):
Do an ultrasonic inspection the holes of the area D of the Frame 47/Rib 1 junction
area :
Refer to Fig. A-FBDAA
Refer to Fig. A-FFDAA
Refer to NTM 57-10-50 part 4 procedure A
1
 If crack is not found:
a
 Report to AIRBUS within 1 month.
And
Repeat the Special Detailed Inspection of the area A of the Frame 47/Rib
1 junction area in accordance with TASK 576119-832-803 001 Special
Detailed Inspection of the Area D, Frame 47/Rib 1 Junction Area, LH and
RH Sides at the interval given in the table 1 of the planning information
paragraph E.(2).
2
 If crack is found:
a
 Contact AIRBUS before next flight.
And
Report to AIRBUS within 10 days.
(b) Send the inspection report to AIRBUS, refer to Fig. A-FRDAA
.
DATE: Apr 25/16 SERVICE BULLETIN No.: A300-57-6119
REVISION No.: 00 - Apr 25/16 Page: 40
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 47

@A300-600
SERVICE BULLETIN
D. TEST
(1) Subtask 576119-700-003-001 - Testing
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 25-72-41, Page Block 401
NOTE
: This Service Bulletin requires the accomplishment of the following Tests
which are given in subtasks included in the topic Close-up. The
manhours for the tests are included in the referenced Service Bulletin
subtasks.
- Remove the safety clips and tags and close the circuit breakers as specified after
the installation of the access panels 147DZ, 147CZ, 147BZ, 148CZ and 148DZ,
refer to AMM 25-72-41, Page Block 401.
E. CLOSE-UP
(1) Subtask 576119-410-001-001 - Install for access for LH Side
Work Zones and Access Panels
Zone
 Access/Work location
570
Manpower Resources
Skills
 AIRFRAME
Material necessary to do the job
Kit 576119A01R01
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 SEE
NOTES
10
 NSA5059-4
 1
 NUT
16
 NSA5059-5
 1
 NUT
22
 MS24665-153
 3
 PIN
References
Aircraft Maintenance Manual (AMM)
 06-41-57, Page Block 001
Fig. A-FBEAA
Removal/Installation of the Bracket for
access
Sheet 01
Sheet 02
Fig. A-FBFAA
Removal/Installation of the Hydraulic
Panel Assy for access
Sheet 01
Fig. A-FBGAA
Removal/Installation of the RAT Panel
for access
Sheet 01
DATE: Apr 25/16 SERVICE BULLETIN No.: A300-57-6119
REVISION No.: 00 - Apr 25/16 Page: 41
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 48

@A300-600
SERVICE BULLETIN
References
Fig. A-FBHAA
Removal/Installation of the Adjustable
Rod of the RAT for access
Sheet 01
Fig. A-FBIAA
Removal/Installation of the Fairing under
Wing Bottom Skin Panel for access
Sheet 01
Sheet 02
(a) Install the bracket:
Refer to Fig. A-FBEAA
1 Bracket Item (1) Retained at
removal
with:
1 Screw Item (2) Retained at
removal
1 Nut Item (3) Retained at
removal
1 Screw Item (4) Retained at
removal
1 Nut Item (5) Retained at
removal
1 Screw Item (6) Retained at
removal
1 Nut Item (7) Retained at
removal
(b) Install the hydraulic panel.
1
 Install hydraulic panel:
Refer to Fig. A-FBFAA
1 Panel Item (31) Retained at
removal
with:
6 Guide Item (12) Retained at
removal
6 Bolt Item (13) Retained at
removal
DATE: Apr 25/16 SERVICE BULLETIN No.: A300-57-6119
REVISION No.: 00 - Apr 25/16 Page: 42
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 49

@A300-600
SERVICE BULLETIN
1 Bolt Item (8) Retained at
removal
2 Bolt Item (14) Retained at
removal
2 Washer Item (15) Retained at
removal
1 Washer Item (9) Retained at
removal
1 Nut NSA5059-4 Item 10
1 Nut NSA5059-5 Item 16
3 Pin-Cotter MS24665-153 Item 22
2
 Install the fairing:
Refer to Fig. A-FBIAA
1 Fairing Item (29) Retained at
removal
with:
1 Insert Item (30) Retained at
removal
4 Bushe Item (26) Retained at
removal
1 Fairing Item (23) Retained at
removal
1 Bolt Item (28) Retained at
removal
3 Bolt Item (24) Retained at
removal
1 Bolt Item (27) Retained at
removal
4 Nut Item (25) Retained at
removal
3
 Install the access panel 571AB, refer to AMM 06-41-57, Page Block 001.
DATE: Apr 25/16 SERVICE BULLETIN No.: A300-57-6119
REVISION No.: 00 - Apr 25/16 Page: 43
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 50

@A300-600
SERVICE BULLETIN
(2) Subtask 576119-410-002-001 - Install for access for RH Side
Work Zones and Access Panels
Zone
 Access/Work location
670
Manpower Resources
Skills
 AIRFRAME
Material necessary to do the job
Kit 576119A02R01
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 SEE
NOTES
10
 NSA5059-4
 1
 NUT
16
 NSA5059-5
 1
 NUT
19
 NSA5060-4
 1
 NUT
22
 MS24665-153
 3
 PIN
References
Aircraft Maintenance Manual (AMM)
 06-41-57, Page Block 001
29-25-00, Page Block 501
Fig. A-FBEAA
Removal/Installation of the Bracket for
access
Sheet 01
Sheet 02
Fig. A-FBHAA
Removal/Installation of the Adjustable
Rod of the RAT for access
Sheet 01
Fig. A-FBIAA
Removal/Installation of the Fairing under
Wing Bottom Skin Panel for access
Sheet 01
Sheet 02
Fig. A-FBGAA
Removal/Installation of the RAT Panel
for access
Sheet 01
(a) Install the bracket:
Refer to Fig. A-FBEAA
1 Bracket Item (1) Retained at
removal
with:
1 Screw Item (2) Retained at
removal
1 Nut Item (1) Retained at
removal
DATE: Apr 25/16 SERVICE BULLETIN No.: A300-57-6119
REVISION No.: 00 - Apr 25/16 Page: 44
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 51

@A300-600
SERVICE BULLETIN
1 Screw Item (4) Retained at
removal
1 Nut Item (5) Retained at
removal
1 Screw Item (6) Retained at
removal
1 Nut Item (7) Retained at
removal
(b) Install the Ram Air Turbine (RAT) panel.
1
 Install RAT panel:
Refer to Fig. A-FBGAA
1 Panel Item (32) Retained at
removal
with:
3 Guide Item (12) Retained at
removal
3 Guide Item (17) Retained at
removal
6 Bolt Item (13) Retained at
removal
1 Bolt Item (8) Retained at
removal
2 Bolt Item (14) Retained at
removal
2 Washer Item (15) Retained at
removal
1 Washer Item (9) Retained at
removal
1 Nut NSA5059-4 Item 10
1 Nut NSA5059-5 Item 16
2 Pin-Cotter MS24665-153 Item 22
2
 Install adjustable rod link to RAT:
Refer to AMM 29-25-00, Page Block 501
DATE: Apr 25/16 SERVICE BULLETIN No.: A300-57-6119
REVISION No.: 00 - Apr 25/16 Page: 45
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 52

@A300-600
SERVICE BULLETIN
Refer to Fig. A-FBHAA
NOTE
: Before proceeding with any work on RAT, make certain that
uplock unit actuating lever rigging pin is correctly inserted.
1 Rod Item (33) Retained at
removal
with:
1 Bolt Item (18) Retained at
removal
1 Nut NSA5060-4 Item 19
1 Sleeve Item (20) Retained at
removal
1 Washer Item (21) Retained at
removal
1 Pin-Cotter MS24665-153 Item 22
3
 Install hydraulic lines:
- return filter line
- pressurization line
- overflow line
- return line
4
 Install the fairing:
Refer to Fig. A-FBIAA
1 Fairing Item (29) Retained at
removal
with:
1 Insert Item (30) Retained at
removal
4 Bushe Item (26) Retained at
removal
1 Fairing Item (23) Retained at
removal
1 Bolt Item (28) Retained at
removal
DATE: Apr 25/16 SERVICE BULLETIN No.: A300-57-6119
REVISION No.: 00 - Apr 25/16 Page: 46
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 53

@A300-600
SERVICE BULLETIN
3 Bolt Item (24) Retained at
removal
1 Bolt Item (27) Retained at
removal
4 Nut Item (25) Retained at
removal
5
 Install the access panel 671AB, refer to AMM 06-41-57, Page Block 001.
(3) Subtask 576119-942-007-001 - Close-up for LH Side
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 25-72-41, Page Block 401
28-11-29, Page Block 401
(a) Make sure that the work areas are clean and clear of tools and other items of
equipment.
(b) Install the center manhole cover 147AZ, refer to AMM 28-11-29, Page Block 401.
(c) Install the access panels 147DZ, 147CZ and 147BZ, refer to AMM 25-72-41, Page
Block 401.
(4) Subtask 576119-942-008-001 - Close-up for RH Side
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 25-72-41, Page Block 401
28-11-29, Page Block 401
(a) Make sure that the work areas are clean and clear of tools and other items of
equipment.
(b) Install the center manhole cover 148AZ, refer to AMM 28-11-29, Page Block 401.
(c) Install the access panels 148DZ and 148CZ, refer to AMM 25-72-41, Page Block
401.
(5) Subtask 576119-942-009-001 - Close-up
Manpower Resources
Skills
 NON SPECIFIC
DATE: Apr 25/16 SERVICE BULLETIN No.: A300-57-6119
REVISION No.: 00 - Apr 25/16 Page: 47
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 54

@A300-600
SERVICE BULLETIN
References
Aircraft Maintenance Manual (AMM)
 28-13-21, Page Block 401
28-25-00, Page Block 301
(a) Install the removed vapor seal, refer to AMM 28-13-21, Page Block 401.
(b) Remove the access platform(s).
(c) Put the aircraft back to its initial configuration.
DATE: Apr 25/16 SERVICE BULLETIN No.: A300-57-6119
REVISION No.: 00 - Apr 25/16 Page: 48
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 55

@A300-600
SERVICE BULLETIN
Task 576119-832-804-001 - Special Detailed Inspection of the Area E, Frame 47/Rib 1
Junction Area, LH and RH Sides
WARNING
: MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND ALL THE CAUTIONS
INCLUDED IN THE REFERENCED PROCEDURES.
CAUTION
: ALWAYS OBEY THE PRECAUTIONS THAT FOLLOW TO KEEP
ELECTRICAL WIRING IN A SATISFACTORY CONDITION (ELECTRICALLY
AND MECHANICALLY SERVICEABLE) . WHEN YOU DO MAINTENANCE
WORK, REPAIRS OR MODIFICATIONS, ALWAYS KEEP ELECTRICAL WIRING,
COMPONENTS AND THE WORK AREA AS CLEAN AS POSSIBLE. TO DO
THIS:
- PUT PROTECTION, SUCH AS PLASTIC SHEETING, CLOTHS, ETC. AS
NECESSARY ON WIRING AND COMPONENTS.
- REGULARLY REMOVE ALL SHAVINGS, UNWANTED MATERIAL AND
OTHER CONTAMINATION.
THESE PRECAUTIONS WILL DECREASE THE RISK OF CONTAMINATION
AND DAMAGE TO THE ELECTRICAL WIRING INSTALLATION.
IF THERE IS CONTAMINATION, REFER TO ESPM 20-55-00.
NOTE
: The accomplishment instructions of this Service Bulletin include procedures given
in other documents or in other sections of the Service Bulletin. When the words
"refer to" are used and the operator has a procedure accepted by the local
authority he belongs to, the accepted alternative procedure can be used. When the
words "in accordance with" are used then the given procedure must be followed.
NOTE
: The access and close-up instructions, not comprising return to service tests, in this
Service Bulletin do not constitute or affect the technical intent of the Service
Bulletin. Operators can therefore, as deemed necessary, omit or add access and/or
close-up steps to add flexibility to their maintenance operations as long as the
technical intent of the Service Bulletin is met within the set parameters.
NOTE
: Manual titles given in the accomplishment instructions are referred to by acronyms.
Refer to paragraph 1.J., References, for the definition of acronyms.
NOTE
: This Service Bulletin is classified mandatory or expected to be classified mandatory
by an Airworthiness Directive (AD). The paragraphs 3.C. and 3.D. in these
accomplishment instructions are Required for Compliance (RC) and must be done
to comply with the AD. Other paragraphs are recommended and may be deviated
from, done as part of other actions or done with accepted methods different from
those given in the Service Bulletin, as long as the RC paragraphs can be done and
the aircraft can be put back into a serviceable condition.
NOTE
: The purpose of flow charts is to supplement the information given in the Procedure
and Compliance paragraphs and not to serve as the primary source for tasks or
compliance times given in this Service Bulletin.
DATE: Apr 25/16 SERVICE BULLETIN No.: A300-57-6119
REVISION No.: 00 - Apr 25/16 Page: 49
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 56

@A300-600
SERVICE BULLETIN
Task Associated Data
Zone
143 144 570 670
Access
Panel
 147AZ 147BZ 147CZ 147DZ 148AZ 148CZ 148DZ
Manpower
TOTAL MANHOURS
 14.50
ELAPSED TIME (HOURS)
 7.50
A. GENERAL
(1) Subtask 576119-910-004-001 - Standard Practices
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 06-21-00, Page Block 001
06-31-53, Page Block 001
06-41-00, Page Block 001
20-21-12, Page Block 001
Structural Repair Manual (SRM)
 51-40-20
51-40-30
(a) For the Frame (FR) identification, refer to AMM 06-31-53, Page Block 001.
(b) For the identification of zones, refer to AMM 06-21-00, Page Block 001.
(c) For the identification of access panels, refer to AMM 06-41-00, Page Block 001.
(d) To torque tighten the standard threaded fasteners, refer to AMM 20-21-12, Page
Block 001.
(e) Remove and install fasteners in accordance with SRM 51-40-20.
(f) Obtain alternative and substitute fastener data in accordance with SRM 51-40-30.
(2) Subtask 576119-839-004-001 - Administrative
Manpower Resources
Skills
 NON SPECIFIC
Write in the applicable aircraft records that you have done all the work given in this
Service Bulletin.
B. PREPARATION
(1) Subtask 576119-941-004-001 - Job Set-up
Manpower Resources
Skills
 NON SPECIFIC
DATE: Apr 25/16 SERVICE BULLETIN No.: A300-57-6119
REVISION No.: 00 - Apr 25/16 Page: 50
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 57

@A300-600
SERVICE BULLETIN
References
Aircraft Maintenance Manual (AMM)
 24-00-00, Page Block 301
NOTE
: The items given in this note shall be considered as the basic Aircraft
configuration before you start a maintenance task:
- Aircraft on the ground resting on landing gear (the ground safety
locks and the wheel chocks are in position on the landing gear)
- Engine shut down, thrust reversers closed and locked
- Aircraft in clean configuration
- Parking brake applied
- Aircraft electrical network de-energized
- Hydraulic system s depressurized
- Access to the cockpit and cabin is available
- All circuit breakers are in closed position
- All controls in NORM, AUTO or OFF position.
(a) Make sure that the aircraft is electrically grounded, refer to AMM 24-00-00, Page
Block 301.
(b) Put an access platform in position at zone 140.
(2) Subtask 576119-941-012-001 - Job Set-up for LH Side
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 25-72-41, Page Block 401
28-11-29, Page Block 401
(a) Remove the access panels 147DZ, 147CZ and 147BZ, refer to AMM 25-72-41,
Page Block 401.
(b) Remove the center tank manhole cover 147AZ, refer to AMM 28-11-29, Page Block
401.
(3) Subtask 576119-941-013-001 - Job Set-up for RH Side
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 25-72-41, Page Block 401
DATE: Apr 25/16 SERVICE BULLETIN No.: A300-57-6119
REVISION No.: 00 - Apr 25/16 Page: 51
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 58

@A300-600
SERVICE BULLETIN
(a) Remove the access panels 148CZ and 148DZ, refer to AMM 25-72-41, Page Block
401.
(4) Subtask 576119-010-003-001 - Remove for Access for LH Side
Work Zones and Access Panels
Zone
 Access/Work location
570
Manpower Resources
Skills
 AIRFRAME
References
Aircraft Maintenance Manual (AMM)
 06-41-57, Page Block 001
Fig. A-FBEAA
Removal/Installation of the Bracket for
access
Sheet 01
Sheet 02
Fig. A-FBFAA
Removal/Installation of the Hydraulic
Panel Assy for access
Sheet 01
Fig. A-FBIAA
Removal/Installation of the Fairing under
Wing Bottom Skin Panel for access
Sheet 01
Sheet 02
(a) Remove the hydraulic panel.
1
 Remove the access panel 571AB, refer to AMM 06-41-57, Page Block 001.
2
 Remove the fairings
Refer to Fig. A-FBIAA
1 Fairing Item (29) Retain
attached with:
1 Inserts Item (30) Retain
4 Bushes Item (26) Retain
1 Fairing Item (23) Retain
1 Bolts Item (28) Retain
3 Bolts Item (24) Retain
1 Bolt Item (27) Retain
4 Nuts Item (25) Retain
DATE: Apr 25/16 SERVICE BULLETIN No.: A300-57-6119
REVISION No.: 00 - Apr 25/16 Page: 52
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 59

@A300-600
SERVICE BULLETIN
3
 Remove hydraulic panel:
Refer to Fig. A-FBFAA
1 Panel Item (31) Retain
attached with:
6 Guide Item (12) Retain
6 Bolt Item (13) Retain
1 Bolt Item (8) Retain
2 Bolt Item (14) Retain
2 Washer Item (15) Retain
1 Washer Item (9) Retain
1 Nut Item (10) Discard
2 Nut Item (16) Discard
3 Cotter Pin Item (11) Discard
(5) Subtask 576119-010-004-001 - Remove for Access for RH Side
Work Zones and Access Panels
Zone
 Access/Work location
670
Manpower Resources
Skills
 AIRFRAME
References
Aircraft Maintenance Manual (AMM)
 06-41-57, Page Block 001
Fig. A-FBEAA
Removal/Installation of the Bracket for
access
Sheet 01
Sheet 02
Fig. A-FBGAA
Removal/Installation of the RAT Panel
for access
Sheet 01
Fig. A-FBHAA
Removal/Installation of the Adjustable
Rod of the RAT for access
Sheet 01
Fig. A-FBIAA
Removal/Installation of the Fairing under
Wing Bottom Skin Panel for access
Sheet 01
Sheet 02
DATE: Apr 25/16 SERVICE BULLETIN No.: A300-57-6119
REVISION No.: 00 - Apr 25/16 Page: 53
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 60

@A300-600
SERVICE BULLETIN
(a) Remove the Ram Air Turbine (RAT) panel.
1
 Remove the access panel 671AB, refer to AMM 06-41-57, Page Block 001.
2
 Remove the fairing:
Refer to Fig. A-FBIAA
1 Fairing Item (29) Retain
attached with:
1 Insert Item (30) Retain
4 Bushe Item (26) Retain
1 Fairing Item (23) Retain
1 Bolt Item (28) Retain
3 Bolt Item (24) Retain
1 Bolt Item (27) Retain
4 Nut Item (25) Retain
3
 Remove hydraulic lines:
NOTE
: Plug/Cap ports and all open lines ends
- return filter line
- pressurization line
- overflow line
- return line
4
 Remove adjustable rod link to RAT:
Refer to Fig. A-FBHAA
NOTE
: Before proceeding with any work on RAT, make certain that
uplock unit actuating lever rigging pin is correctly inserted
1 Rod Item (33) Retain
attached with:
1 Bolt Item (18) Retain
1 Nut Item (19) Discard
DATE: Apr 25/16 SERVICE BULLETIN No.: A300-57-6119
REVISION No.: 00 - Apr 25/16 Page: 54
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

The text continues at https://openairdocs.org/service-documents/airbus/a300-57-6119/file/62352567456d.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
