# Airbus Service Bulletin A300-57-6121

Copy: No revision named ("A300-57-6121"), 132 pages: PDF https://openairdocs.org/files/sha256/c6/36/c636584ba451b8ba0c77f7877a69fd46b40fdb259fc22646d2bb2856051f7c1c; text https://openairdocs.org/service-documents/airbus/a300-57-6121/file/c636584ba451.md. Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2019-0020, the docket of AD 2019-12-04. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Airbus](https://openairdocs.org/service-documents/airbus.md)
- Type: Service bulletin (Service Bulletin)
- Number: A300-57-6121
- Page: https://openairdocs.org/service-documents/airbus/a300-57-6121

## Text (132 pages)

Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2019-0020, the docket of AD 2019-12-04. Not covered by OpenAirDocs’ CC0 dedication. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

@A300-600
SERVICE BULLETIN
SUMMARY
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
This summary is for information only and is not approved for modification of the aircraft.
MANDATORY
 MANDATORY
 MANDATORY
ATA SYSTEM: 57
TITLE: WINGS - CENTER WING BOX - INSPECTION OF FR47 LOWER
CORNER JUNCTION (POST-MOD 12171 OR POST-MOD 12249)
**CONF ALL
MODIFICATIONS
None
REASON/DESCRIPTION/OPERATIONAL CONSEQUENCES
From Manufacturer Serial Number (MSN) 0805, structural reinforcement of the Frame 47 lower corner
junction has been introduced by the installation of a reinforced internal fitting and an extended external
angle fitting. These Modifications (MOD)s, MOD No. 12171S21827 and MOD No. 12249S21912, aimed
at improving the Fatigue and Damage Tolerance (F&DT) potential of the area compared to the initial
design.
F&DT reassessment of this configuration has been performed following the same methodology that led
to the update of the maintenance figures for the initial design configuration (Inspection Service Bulletin
(ISB) No. A300-57-6049 and ISB No. A300-57-6086).
Conclusions of this study allow confirming the positive impact of the reinforcement on the vertical side
of the junction but not on the horizontal one. This is confirmed by in service findings with cracks
detected earlier than expected.
Therefore, a decrease of the inspections thresholds and intervals for this horizontal face is required
and, as for the initial design, an additional inspection of the lower panel (ultrasonic means) is added.
This Service Bulletin calls for a rotating probe inspection of the holes in the horizontal and vertical
flanges of the Frame 47 internal corner angle fitting and for an ultrasonic inspection of the holes of the
Center Wing Box (CWB) lower panel.
The procedure as described in this Service Bulletin is to be performed if no AIRBUS repair and/or repair
improvement has been previously performed in the same area. In case of repairs performed previously,
please contact AIRBUS Repair Support department for further instructions.
The accomplishment of this Service Bulletin allows detection of crack at an early stage, thus avoiding
an extensive repair.
DATE: Aug 31/18 SERVICE BULLETIN No.: A300-57-6121
REVISION No.: 00 - Aug 31/18 Page: 1
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 2

@A300-600
SERVICE BULLETIN
SUMMARY
This Service Bulletin supersedes Airworthiness Limitation Item (ALI) tasks reference 571012 and
571014.
The Operational/Maintenance Consequences of this Service Bulletin are covered by the update of the
affected publications detailed in ’PLANNING INFORMATION’.
GENERAL EVALUATION
EVALUATION TABLE
COMPLIANCE
 MANDATORY (1)
 CANCELS INSPECTION SB
 NO
POTENTIAL AD
 YES
 A/C OPERATION AFFECTED
 NO
RELIABILITY AFFECTED
 NO
 PAX COMFORT AFFECTED
 NO
COST SAVING
 NO
 ETOPS AFFECTED
 NO
STRUCTURAL LIFE EXTN
 NO
 VENDOR SB INVOLVED
 NO
DEFUELING/VENTING
 YES
NOTE
 (1)
: Service Bulletin must be accomplished.
MATERIAL PRICE INFORMATION
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET
 QTY PER
A/C
PRICE PER
A/C (USD)
MAIN PARTS
Kit 576121A01R00
 1
 50.00
 Nuts, pin-cotter
Kit 576121A02R00
 1
 50.00
 Nuts, pin-cotter
TOTAL
 100.00
Component COMPA01
 2
 See SB
 Bolts, nuts, washers
Component COMPA02
 2
 See SB
 Bolts, nuts
EFFECTIVITY
This Service Bulletin is applicable to this (these) operator(s) :
AHK BCS FDX IRM UPS
CONCURRENT REQUIREMENTS
None
REFERENCES / REPERCUSSIONS
TFU
 57.10.00.007
OEB
 None
AOT
 None
SIL
 None
ISI
 None
LINE MAINTENANCE AFFECTED
 No
LIFE LIMIT
 None
OTHER
 None
DATE: Aug 31/18 SERVICE BULLETIN No.: A300-57-6121
REVISION No.: 00 - Aug 31/18 Page: 2
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 3

@A300-600
SERVICE BULLETIN
SUMMARY
NATURE OF THE WORK
AIRCRAFT
 YES
EQUIPMENT
 NO
MANPOWER
Task 576121-832-801-001: Special Detailed Inspection of the Horizontal Junction Area of the
CWB Lower Angle Fitting at Frame 47
TOTAL MANHOURS
 106.50
ELAPSED TIME (HOURS)
 28.50
Task 576121-832-802-001: Special Detailed Inspection of the Vertical Junction Area of the CWB
Lower Angle Fitting at Frame 47
TOTAL MANHOURS
 129.50
ELAPSED TIME (HOURS)
 34.50
Task 576121-832-803-001: Special Detailed Inspection of the CWB Lower Panel Area at Frame
47
TOTAL MANHOURS
 6.00
ELAPSED TIME (HOURS)
 3.00
APPENDICES
Appendix 01 - Inspection Report
Appendix 02 - Manpower Gantt Chart
DATE: Aug 31/18 SERVICE BULLETIN No.: A300-57-6121
REVISION No.: 00 - Aug 31/18 Page: 3
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 4

@A300-600
SERVICE BULLETIN
SUMMARY
**CONF ALL
Z140
A
FR47
REAR SPAR DATUM
DATUM
LH SHOWN
RH SYMMETRICAL
FASTENER HOLES
OF INTERNAL ANGLE
B
FR47
FR40
B
A
B
RIB1
FITTING TO BE INSPECTED
D_SB_576121_5_SAAA_01_00
Figure A-FSAAA - Sheet 01
DATE: Aug 31/18 SERVICE BULLETIN No.: A300-57-6121
REVISION No.: 00 - Aug 31/18 Page: 4
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 5

@A300-600
SERVICE BULLETIN
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
MANDATORY
 MANDATORY
 MANDATORY
ATA SYSTEM: 57
TITLE: WINGS - CENTER WING BOX - INSPECTION OF FR47 LOWER
CORNER JUNCTION (POST-MOD 12171 OR POST-MOD 12249)
MODIFICATION No.: None
This document contains AIRBUS PROPRIETARY INFORMATION and shall at all times remain the
property of AIRBUS; no intellectual property right or licence is granted by AIRBUS in connection with
any information contained in it. It is delivered on the express condition that said document and the
information contained in it shall be treated as confidential, shall not be used for any purpose other than
that for which it is hereby delivered. It shall not be disclosed in whole or in part to third parties and shall
not be duplicated in any manner (except for the purposes of performing the tasks described hereunder
and provided that any recipient of such document shall comply with the conditions herein), without
AIRBUS prior written consent.
1. PLANNING INFORMATION
**CONF ALL
A. EFFECTIVITY
NOTE
: This Service Bulletin is only applicable to aircraft on which MOD
No. 12171S21827 (REINFORCE FR47) and/or MOD No. 12249S21912
(REINFORCE FR47) are embodied.
(1) Models
B4-622R F4-605R F4-622R
(2) Effectivity by MSN
0805-0840 0845-0878
(3) Effectivity by Operator
The Operator/MSN relationship is provided for information only and is correct at the time
of issue in accordance with the information available to AIRBUS. Any future changes
resulting from transfer of an aircraft from one operator to another will not be reflected in
this list unless the Service Bulletin is revised for another reason.
DATE: Aug 31/18 SERVICE BULLETIN No.: A300-57-6121
REVISION No.: 00 - Aug 31/18 Page: 1
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 6

@A300-600
SERVICE BULLETIN
OPERATOR
 MSN
AHK
 0855 0856 0857 0858 0859 0860 0870 0871
BCS
 0836 0837 0872
FDX
 0873 0874 0875 0876 0877 0878
IRM
 0838
UPS
 0805 0806 0807 0808 0809 0810 0811 0812 0813 0814 0815 0816
0817 0818 0819 0820 0821 0822 0823 0824 0825 0826 0827 0828
0829 0830 0831 0832 0833 0834 0835 0839 0840 0845 0846 0847
0848 0849 0850 0851 0852 0853 0854 0861 0862 0863 0864 0865
0866 0867 0868 0869
(4) Configuration by MSN
MSN
 CONFIGURATION
0805 0806 0807 0808 0809 0810 0811 0812 0813 0814 0815
0816 0817 0818 0819 0820 0821 0822 0823 0824 0825 0826
0827 0828 0829 0830 0831 0832 0833 0834 0835 0836 0837
0838 0839 0840 0845 0846 0847 0848 0849 0850 0851 0852
0853 0854 0855 0856 0857 0858 0859 0860 0861 0862 0863
0864 0865 0866 0867 0868 0869 0870 0871 0872 0873 0874
0875 0876 0877 0878
001
(5) Configuration definition
**CONF 001
Config. 001 is valid for all the aircraft given in the effectivity of this Service Bulletin as a
standard configuration.
(6) Material Effectivity
MATERIAL
 QTY PER A/C
 SEE NOTES
Kit 576121A01R00
 1
 (1)
Kit 576121A02R00
 1
 (2)
Component COMPA01
 2
Component COMPA02
 2
Consumable CMLA01
 1
NOTE
 (1)
: Kit 576121A01R00 is applicable for TASK 576121-832-802 001 Special
Detailed Inspection of the Vertical Junction Area of the CWB Lower
Angle Fitting at Frame 47 on the LH side.
NOTE
 (2)
: Kit 576121A02R00 is applicable for TASK 576121-832-802 001 Special
Detailed Inspection of the Vertical Junction Area of the CWB Lower
Angle Fitting at Frame 47 on the RH side.
B. CONCURRENT REQUIREMENTS
None
DATE: Aug 31/18 SERVICE BULLETIN No.: A300-57-6121
REVISION No.: 00 - Aug 31/18 Page: 2
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 7

@A300-600
SERVICE BULLETIN
C. REASON
(1) History
From Manufacturer Serial Number (MSN) 0805, structural reinforcement of the Frame 47
lower corner junction has been introduced by the installation of a reinforced internal
fitting and an extended external angle fitting. These Modifications (MOD)s, MOD No.
12171S21827 and MOD No. 12249S21912, aimed at improving the Fatigue and
Damage Tolerance (F&DT) potential of the area compared to the initial design.
F&DT reassessment of this configuration has been performed following the same
methodology that led to the update of the maintenance figures for the initial design
configuration (Inspection Service Bulletin (ISB) No. A300-57-6049 and ISB No.
A300-57-6086).
Conclusions of this study allow confirming the positive impact of the reinforcement on
the vertical side of the junction but not on the horizontal one. This is confirmed by in
service findings with cracks detected earlier than expected.
Therefore, a decrease of the inspections thresholds and intervals for this horizontal face
is required and, as for the initial design, an additional inspection of the lower panel
(ultrasonic means) is added.
(2) Objective/Action
This Service Bulletin calls for a rotating probe inspection of the holes in the horizontal
and vertical flanges of the Frame 47 internal corner angle fitting and for an ultrasonic
inspection of the holes of the Center Wing Box (CWB) lower panel.
The procedure as described in this Service Bulletin is to be performed if no AIRBUS
repair and/or repair improvement has been previously performed in the same area.
In case of repairs performed previously, please contact AIRBUS Repair Support
department for further instructions.
(3) Advantages
The accomplishment of this Service Bulletin allows detection of crack at an early stage,
thus avoiding an extensive repair.
This Service Bulletin supersedes Airworthiness Limitation Item (ALI) tasks reference
571012 and 571014.
(4) Operational/Maintenance Consequences
The Operational/Maintenance Consequences of this Service Bulletin are covered by the
update of the affected publications detailed in ’PLANNING INFORMATION’.
D. DESCRIPTION
NOTE
: In case of concurrent embodiment of bot h inspection Tasks, inspection TASK
576121-832-801-001 and inspection TASK 576121-832-802-001, AIRBUS
recommends to ensure that a maximum of 50% of the fasteners concerned by
each task (which means a maximum of 50% of the fasteners of inspection
TASK 576121-832-801-001 and a maximum of 50% of the fasteners of
DATE: Aug 31/18 SERVICE BULLETIN No.: A300-57-6121
REVISION No.: 00 - Aug 31/18 Page: 3
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 8

@A300-600
SERVICE BULLETIN
inspection TASK 576121-832-802-001) are removed at any time.
To accomplish this Service Bulletin it is necessary to :
Task 576121-832-801-001: Special Detailed Inspection of the Horizontal Junction Area of the
CWB Lower Angle Fitting at Frame 47
(1) Do a Special Detailed Inspection of the Holes A, B, C, D, E, F, G, P, Q and S on the
LH Side
(2) Do a Special Detailed Inspection of the Holes A, B, C, D, E, F, G, P, Q and S on the
RH Side
(3) Depending on the Inspection Results, Do a Special Detailed Inspection of the Hole T
on the LH Side
(4) Depending on the Inspection Results, Do a Special Detailed Inspection of the Hole T
on the RH Side
(5) Depending on the Inspection Results, Oversize the Affected Hole(s) and Do a
Special Detailed Inspection on the LH Side
(6) Depending on the Inspection Results, Oversize the Affected Hole(s) and Do a
Special Detailed Inspection on the RH Side
(7) Depending on the Inspection Results, Install New Nominal or First Oversize
Fasteners on the LH Side
(8) Depending on the Inspection Results, Install New Nominal or First Oversize
Fasteners on the RH Side
Task 576121-832-802-001: Special Detailed Inspection of the Vertical Junction Area of the
CWB Lower Angle Fitting at Frame 47
(1) Do a Special Detailed Inspection of the Holes H, I, J, K, L, M, N, U, V, W, X, Y and Z
on the LH Side
(2) Do a Special Detailed Inspection of the Holes H, I, J, K, L, M, N, U, V, W, X, Y and Z
on the RH Side
(3) Depending on the Inspection Results, Oversize the Affected Hole(s) and Do a
Special Detailed Inspection on the LH Side
(4) Depending on the Inspection Results, Oversize the Affected Hole(s) and Do a
Special Detailed Inspection on the RH Side
(5) Depending on the Inspection Results, Install New Nominal or First Oversize
Fasteners on the LH Side
(6) Depending on the Inspection Results, Install New Nominal or First Oversize
Fasteners on the RH Side
Task 576121-832-803-001: Special Detailed Inspection of the CWB Lower Panel Area at
DATE: Aug 31/18 SERVICE BULLETIN No.: A300-57-6121
REVISION No.: 00 - Aug 31/18 Page: 4
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 9

@A300-600
SERVICE BULLETIN
Frame 47
(1) Do a Special Detailed Inspection on the CWB Lower Panel Area at Frame 47 on the
LH Side
(2) Do a Special Detailed Inspection on the CWB lower Panel Area at Frame 47 on the
RH Side
E. COMPLIANCE
(1) Classification
MANDATORY: Service Bulletin must be accomplished.
(2) Accomplishment Timescale
This Service Bulletin has been classified Mandatory. It is expected that an Airworthiness
Directive (AD) published by the European Av iation Safety Agenc y (EASA) will be issued
to confirm this classification. It is anticipated that the AD will confirm the thresholds and
intervals given but reference should be made to the AD for confirmation of the mandated
accomplishment timescale.
Table 1, Config 001 - Special Detailed Inspection of the Horizontal Junction Area of the CWB Lower
Angle Fitting at Frame 47
Compliance time
Condition
 Action
Threshold
(whichever occurs
first)
Grace Period
Repetitive
interval
(whichever
occurs first)
Aircraft with
average flight
time higher or
equal to 1.5
See NOTE(*)
Do a special detailed
inspection of the
horizontal junction area of
the CWB lower angle
fitting at Frame 47 in
accordance with TASK
576121-832-801-001
Before 12600
Flight Cycles (FC)
or 27200 Flight
Hours (FH) since
first flight
Within 12 months
from issuance
date of this
Service Bulletin
None
DATE: Aug 31/18 SERVICE BULLETIN No.: A300-57-6121
REVISION No.: 00 - Aug 31/18 Page: 5
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 10

@A300-600
SERVICE BULLETIN
Table 1, Config 001 - Special Detailed Inspection of the Horizontal Junction Area of the CWB Lower
Angle Fitting at Frame 47
Compliance time
Condition
 Action
Threshold
(whichever occurs
first)
Grace Period
Repetitive
interval
(whichever
occurs first)
Install the new nominal or
first oversize fasteners in
accordance with
SUBTASK
576121-400-001-001 on
the LH side and/or
SUBTASK
576121-400-002-001 on
the RH side
And
Before next flight
 None
 None
Upload the inspection
report in AirbusWorld
And
Within one month
from inspection
date
None
 None
If crack is not
found
Repeat the special
detailed inspection in
accordance TASK
576121-832-801-001
None
 None
 6050 FC or
13050 FH since
the last
inspection date
If crack is
found and bore
diameter is not
equal to
nominal
diameter
Contact AIRBUS
 Before next flight
 None
 None
If crack is
found and bore
diameter is
equal to
nominal
diameter
Oversize the hole
diameter to first oversize
diameter and do a special
detailed inspection of the
holes in accordance with
SUBTASK
576121-250-009-001 on
the LH side and/or
SUBTASK
576121-250-010-001 on
the RH side
Before next flight
 None
 None
If crack is
found after
doing the
oversize
Contact AIRBUS
 Before next flight
 None
 None
DATE: Aug 31/18 SERVICE BULLETIN No.: A300-57-6121
REVISION No.: 00 - Aug 31/18 Page: 6
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 11

@A300-600
SERVICE BULLETIN
Table 1, Config 001 - Special Detailed Inspection of the Horizontal Junction Area of the CWB Lower
Angle Fitting at Frame 47
Compliance time
Condition
 Action
Threshold
(whichever occurs
first)
Grace Period
Repetitive
interval
(whichever
occurs first)
Install the new first
oversize fasteners in
accordance with
SUBTASK
576121-400-001-001 on
the LH side and/or
SUBTASK
576121-400-002-001 on
the RH side
And
Before next flight
 None
 None
Upload the inspection
report in AirbusWorld
And
Within one month
from inspection
date
None
 None
If crack is not
found after
doing the
oversize
Repeat the special
detailed inspection in
accordance TASK
576121-832-801-001
None
 None
 6050 FC or
13050 FH since
the last
inspection date
Aircraft with
average flight
time lower than
1.5
See NOTE (*)
Do a special detailed
inspection of the
horizontal junction area of
the CWB lower angle
fitting at Frame 47 in
accordance with TASK
576121-832-801-001
Before 13600 FC
or 20400 FH since
first flight
Within 12 months
from issuance
date of this
Service Bulletin
None
Install the new nominal or
first oversize fasteners in
accordance with
SUBTASK
576121-400-001-001 on
the LH side and/or
SUBTASK
576121-400-002-001 on
the RH side
And
Before next flight
 None
 None
Upload the inspection
report in AirbusWorld
And
Within one month
from inspection
date
None
 None
If crack is not
found
Repeat the special
detailed inspection in
accordance TASK
576121-832-801-001
None
 None
 6500 FC or 9800
FH since the last
inspection date
DATE: Aug 31/18 SERVICE BULLETIN No.: A300-57-6121
REVISION No.: 00 - Aug 31/18 Page: 7
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 12

@A300-600
SERVICE BULLETIN
Table 1, Config 001 - Special Detailed Inspection of the Horizontal Junction Area of the CWB Lower
Angle Fitting at Frame 47
Compliance time
Condition
 Action
Threshold
(whichever occurs
first)
Grace Period
Repetitive
interval
(whichever
occurs first)
If crack is
found and bore
diameter is not
equal to
nominal
diameter
Contact AIRBUS
 Before next flight
 None
 None
If crack is
found and bore
diameter is
equal to
nominal
diameter
Oversize the hole
diameter to first oversize
diameter and do a special
detailed inspection of the
holes in accordance with
SUBTASK
576121-250-009-001 on
the LH side and/or
SUBTASK
576121-250-010-001 on
the RH side
Before next flight
 None
 None
If crack is
found after
doing the
oversize
Contact AIRBUS
 Before next flight
 None
 None
Install the new first
oversize fasteners in
accordance with
SUBTASK
576121-400-001-001 on
the LH side and/or
SUBTASK
576121-400-002-001 on
the RH side
And
Before next flight
 None
 None
Upload the inspection
report in AirbusWorld
And
Within one month
from inspection
date
None
 None
If crack is not
found after
doing the
oversize
Repeat the special
detailed inspection in
accordance TASK
576121-832-801-001
None
 None
 6500 FC or 9800
FH since the last
inspection date
NOTE (*): The average flight time can be established by dividing the FH by the FC counted:
- from first flight, for selecting the inspection threshold
- from the last inspection, for selecting the inspection interval.
DATE: Aug 31/18 SERVICE BULLETIN No.: A300-57-6121
REVISION No.: 00 - Aug 31/18 Page: 8
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 13

@A300-600
SERVICE BULLETIN
Table 2, Config 001 - Special Detailed Inspection of the Vertical Junction Area of the CWB Lower
Angle Fitting at Frame 47
Compliance time
Condition
 Action
Threshold
(whichever occurs
first)
Grace Period
Repetitive
interval
(whichever
occurs first)
Aircraft with
average flight
time higher or
equal to 1.5
See NOTE(*)
Do a special detailed
inspection of the vertical
junction area of the CWB
lower angle fitting at
Frame 47 in accordance
with TASK
576121-832-802-001
Before 22400 FC
or 48300 FH since
first flight
Within 12 months
from issuance
date of this
Service Bulletin
None
Install the new nominal or
first oversize fasteners in
accordance with
SUBTASK
576121-400-003-001 on
the LH side and/or
SUBTASK
576121-400-004-001 on
the RH side
And
Before next flight
 None
 None
Upload the inspection
report in AirbusWorld
And
Within one month
from inspection
date
None
 None
If crack is not
found
Repeat the special
detailed inspection in
accordance TASK
576121-832-802-001
None
 None
 12050 FC or
26050 FH since
the last
inspection date
If crack is
found and bore
diameter is not
equal to
nominal
diameter
Contact AIRBUS
 Before next flight
 None
 None
If crack is
found and bore
diameter is
equal to
nominal
diameter
Oversize the hole
diameter to first oversize
diameter and do a special
detailed inspection of the
holes in accordance with
SUBTASK
576121-250-011-001 on
the LH side and/or
SUBTASK
576121-250-012-001 on
the RH side
Before next flight
 None
 None
DATE: Aug 31/18 SERVICE BULLETIN No.: A300-57-6121
REVISION No.: 00 - Aug 31/18 Page: 9
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 14

@A300-600
SERVICE BULLETIN
Table 2, Config 001 - Special Detailed Inspection of the Vertical Junction Area of the CWB Lower
Angle Fitting at Frame 47
Compliance time
Condition
 Action
Threshold
(whichever occurs
first)
Grace Period
Repetitive
interval
(whichever
occurs first)
If crack is
found after
doing the
oversize
Contact AIRBUS
 Before next flight
 None
 None
Install the new first
oversize fasteners in
accordance with
SUBTASK
576121-400-003-001 on
the LH side and/or
SUBTASK
576121-400-004-001 on
the RH side
And
Before next flight
 None
 None
Upload the inspection
report in AirbusWorld
And
Within one month
from inspection
date
None
 None
If crack is not
found after
doing the
oversize
Repeat the special
detailed inspection in
accordance TASK
576121-832-802-001
None
 None
 12050 FC or
26050 FH since
the last
inspection date
Aircraft with
average flight
time lower than
1.5
See NOTE (*)
Do a special detailed
inspection of the vertical
junction area of the CWB
lower angle fitting at
Frame 47 in accordance
with TASK
576121-832-802-001
Before 24100 FC
or 36200 FH since
first flight
Within 12 months
from issuance
date of this
Service Bulletin
None
DATE: Aug 31/18 SERVICE BULLETIN No.: A300-57-6121
REVISION No.: 00 - Aug 31/18 Page: 10
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 15

@A300-600
SERVICE BULLETIN
Table 2, Config 001 - Special Detailed Inspection of the Vertical Junction Area of the CWB Lower
Angle Fitting at Frame 47
Compliance time
Condition
 Action
Threshold
(whichever occurs
first)
Grace Period
Repetitive
interval
(whichever
occurs first)
Install the new nominal or
first oversize fasteners in
accordance with
SUBTASK
576121-400-003-001 on
the LH side and/or
SUBTASK
576121-400-004-001 on
the RH side
And
Before next flight
 None
 None
Upload the inspection
report in AirbusWorld
And
Within one month
from inspection
date
None
 None
If crack is not
found
Repeat the special
detailed inspection in
accordance TASK
576121-832-802-001
None
 None
 13000 FC or
19500 FH since
the last
inspection date
If crack is
found and bore
diameter is not
equal to
nominal
diameter
Contact AIRBUS
 Before next flight
 None
 None
If crack is
found and bore
diameter is
equal to
nominal
diameter
Oversize the hole
diameter to first oversize
diameter and do a special
detailed inspection of the
holes in accordance with
SUBTASK
576121-250-011-001 on
the LH side and/or
SUBTASK
576121-250-012-001 on
the RH side
Before next flight
 None
 None
If crack is
found after
doing the
oversize
Contact AIRBUS
 Before next flight
 None
 None
DATE: Aug 31/18 SERVICE BULLETIN No.: A300-57-6121
REVISION No.: 00 - Aug 31/18 Page: 11
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 16

@A300-600
SERVICE BULLETIN
Table 2, Config 001 - Special Detailed Inspection of the Vertical Junction Area of the CWB Lower
Angle Fitting at Frame 47
Compliance time
Condition
 Action
Threshold
(whichever occurs
first)
Grace Period
Repetitive
interval
(whichever
occurs first)
Install the new first
oversize fasteners in
accordance with
SUBTASK
576121-400-003-001 on
the LH side and/or
SUBTASK
576121-400-004-001 on
the RH side
And
Before next flight
 None
 None
Upload the inspection
report in AirbusWorld
And
Within one month
from inspection
date
None
 None
If crack is not
found after
doing the
oversize
Repeat the special
detailed inspection in
accordance TASK
576121-832-802-001
None
 None
 13000 FC or
19500 FH since
the last
inspection date
NOTE (*): The average flight time can be established by dividing the FH by the FC counted:
- from first flight, for selecting the inspection threshold
- from the last inspection, for selecting the inspection interval.
Table 3, Config 001 - Special Detailed Inspection of the CWB Lower Panel Area at Frame 47
Compliance time
Condition
 Action
Threshold
(whichever occurs
first)
Grace Period
Repetitive
interval
(whichever
occurs first)
Aircraft with
average flight
time higher or
equal to 1.5
See NOTE(*)
Do a special detailed
inspection of the CWB
lower panel area at Frame
47 in accordance with
TASK
576121-832-803-001
Before 12600 FC
or 27200 FH since
first flight
Within 12 months
from issuance
date of this
Service Bulletin
None
If crack is
found
Contact AIRBUS
 Before next flight
 None
 None
Upload the inspection
report in AirbusWorld
And
Within one month
from inspection
date
None
 None
If crack is not
found
Repeat the special
detailed inspection in
accordance TASK
576121-832-803-001
None
 None
 1800 FC or 3950
FH since the last
inspection date
DATE: Aug 31/18 SERVICE BULLETIN No.: A300-57-6121
REVISION No.: 00 - Aug 31/18 Page: 12
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 17

@A300-600
SERVICE BULLETIN
Table 3, Config 001 - Special Detailed Inspection of the CWB Lower Panel Area at Frame 47
Compliance time
Condition
 Action
Threshold
(whichever occurs
first)
Grace Period
Repetitive
interval
(whichever
occurs first)
Aircraft with
average flight
time lower than
1.5
See NOTE (*)
Do a special detailed
inspection of the CWB
lower panel area at Frame
47 in accordance with
TASK
576121-832-803-001
Before 13600 FC
or 20400 FH since
first flight
Within 12 months
from issuance
date of this
Service Bulletin
None
If crack is
found
Contact AIRBUS
 Before next flight
 None
 None
Upload the inspection
report in AirbusWorld
And
Within one month
from inspection
date
None
 None
If crack is not
found
Repeat the special
detailed inspection in
accordance TASK
576121-832-803-001
None
 None
 1950 FC or 2950
FH since the last
inspection date
NOTE (*): The average flight time can be established by dividing the FH by the FC counted:
- from first flight, for selecting the inspection threshold
- from the last inspection, for selecting the inspection interval.
F. APPROVAL
The technical content of this document is approved under the authority of Design
Organisation Approval No. EASA.21J.031.
If an aircraft listed in the effectivity has a modification or repair embodied that is not of
AIRBUS origin, and which affects the content of this Service Bulletin, the operator is
responsible for obtaining approval by its airworthiness authority for any adaptation necessary
before incorporation of the Service Bulletin.
G. MANPOWER
The manpower estimates given in this Service Bulletin are based on the direct labor cost to
do the work. These estimates assume that the work will be done by experienced personnel,
and may need to be revised upwards to suit operator’s circumstances. The estimates do not
include the time to prepare, plan or inspect the work. Manufacture and procurement of parts
and tools, drying times for paints, sealants, etc., and general administration work are also not
included.
NOTE
: The minimum man-hours necessary to accomplish this Service Bulletin are
those for the Inspection. Depending on the inspection result, additional man-
DATE: Aug 31/18 SERVICE BULLETIN No.: A300-57-6121
REVISION No.: 00 - Aug 31/18 Page: 13
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 18

@A300-600
SERVICE BULLETIN
hours can apply.
Task 576121-832-801-001: Special Detailed Inspection of the Horizontal Junction Area of the
CWB Lower Angle Fitting at Frame 47
Get Access
 16.00
On Aircraft
Do a Special Detailed Inspection of the Holes A, B, C,
D, E, F, G, P, Q and S on the LH Side
12.00
Do a Special Detailed Inspection of the Holes A, B, C,
D, E, F, G, P, Q and S on the RH Side
12.00
Depending on the Inspection Results, Do a Special
Detailed Inspection of the Hole T on the LH Side
1.00
Depending on the Inspection Results, Do a Special
Detailed Inspection of the Hole T on the RH Side
1.00
Depending on the Inspection Results, Oversize the
Affected Hole(s) and Do a Special Detailed Inspection
on the LH Side
12.00
Depending on the Inspection Results, Oversize the
Affected Hole(s) and Do a Special Detailed Inspection
on the RH Side
12.00
Depending on the Inspection Results, Install New
Nominal or First Oversize Fasteners on the LH Side
12.00
Depending on the Inspection Results, Install New
Nominal or First Oversize Fasteners on the RH Side
12.00
Close-Up
 16.50
TOTAL MANHOURS
 106.50
ELAPSED TIME (HOURS)
 28.50
NOTE
: For an explanation of the man-hours and elapsed time, refer to the Gantt
Chart, Fig. A-FADAA
 given in Appendix 02.
Task 576121-832-802-001: Special Detailed Inspection of the Vertical Junction Area of the CWB
Lower Angle Fitting at Frame 47
Get Access
 28.50
On Aircraft
Do a Special Detailed Inspection of the Holes H, I, J,
K, L, M, N, U, V, W, X, Y and Z on the LH Side
12.00
Do a Special Detailed Inspection of the Holes H, I, J,
K, L, M, N, U, V, W, X, Y and Z on the RH Side
12.00
Depending on the Inspection Results, Oversize the
Affected Hole(s) and Do a Special Detailed Inspection
on the LH Side
12.00
Depending on the Inspection Results, Oversize the
Affected Hole(s) and Do a Special Detailed Inspection
on the RH Side
12.00
Depending on the Inspection Results, Install New
Nominal or First Oversize Fasteners on the LH Side
12.00
Depending on the Inspection Results, Install New
Nominal or First Oversize Fasteners on the RH Side
12.00
DATE: Aug 31/18 SERVICE BULLETIN No.: A300-57-6121
REVISION No.: 00 - Aug 31/18 Page: 14
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 19

@A300-600
SERVICE BULLETIN
Task 576121-832-802-001: Special Detailed Inspection of the Vertical Junction Area of the CWB
Lower Angle Fitting at Frame 47
Close-Up
 29.00
TOTAL MANHOURS
 129.50
ELAPSED TIME (HOURS)
 34.50
NOTE
: For an explanation of the man-hours and elapsed time, refer to the Gantt
Chart, Fig. A-FAEAA
 given in Appendix 02.
Task 576121-832-803-001: Special Detailed Inspection of the CWB Lower Panel Area at Frame
47
Get Access
 2.00
On Aircraft
Do a Special Detailed Inspection on the CWB Lower
Panel Area at Frame 47 on the LH Side
1.00
Do a Special Detailed Inspection on the CWB lower
Panel Area at Frame 47 on the RH Side
1.00
Close-Up
 2.00
TOTAL MANHOURS
 6.00
ELAPSED TIME (HOURS)
 3.00
NOTE
: For an explanation of the man-hours and elapsed time, refer to the Gantt
Chart, Fig. A-FAFAA
 given in Appendix 02.
H. WEIGHT AND BALANCE
Not Changed
I. ELECTRICAL LOAD DATA
Not Changed
J. REFERENCES
Aircraft Maintenance Manual (AMM)
 06-21-00 06-31-53 06-41-00
06-41-57 20-21-12 24-00-00
25-72-41 28-00-00 28-10-00
28-11-29 28-13-21 28-25-00
29-00-00
Consumable Material List (CML)
Elec. Std. Practices Manual (ESPM)
 20-55-00
Non Destructive Test Manual (NTM)
 57-10-12 57-10-45 57-10-50
Standards Manual (SM)
Structural Repair Manual (SRM)
 51-22-00 51-24-00 51-40-00
51-40-20 51-40-30 51-40-40
51-75-10
K. PUBLICATION AFFECTED
Airworthiness Limitation Section (ALS)
Impact on scheduled maintenance: Refer to MPD
DATE: Aug 31/18 SERVICE BULLETIN No.: A300-57-6121
REVISION No.: 00 - Aug 31/18 Page: 15
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 20

@A300-600
SERVICE BULLETIN
L. INTERCHANGEABILITY/MIXABILITY
Not Applicable
M. SPARES
None
DATE: Aug 31/18 SERVICE BULLETIN No.: A300-57-6121
REVISION No.: 00 - Aug 31/18 Page: 16
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 21

@A300-600
SERVICE BULLETIN
2. MATERIAL INFORMATION
**CONF ALL
A. MATERIAL - PRICE AND AVAILABILITY
(1) Procurement Addresses
Customers with aircraft shown in the effectivity of this Service Bulletin should send a
purchase order to AIRBUS. Quote the number of this Service Bulletin. The address is:
Kit 576121A01R00
Kit 576121A02R00
AIRBUS Material, Logistics and Suppliers
ATP II B,
Hein-Sass-Weg 24
21129 HAMBURG
GERMANY
For ordering by internet:
http://spares.airbus.com
For ordering by E-mail: airbus.kit@airbus.com
Telephone Hotline: +49 40 743 51616
For standard hardware the purchase order shall be addressed to AIRBUS. Quote the
number of this Service Bulletin, the MSN and, if applicable the Retrofit Information Letter
(RIL) reference. Please send your request to:
Component COMPA01
Component COMPA02
AIRBUS Material, Logistics and Suppliers
Standard Parts
For ordering by internet:
http://spares.airbus.com or vi a SPEC2000
For ordering by E-mail:
ifd.spares@airbus.com
Phone: +49 (0) 40 50 76 40 03
(2) Price and Availability
Kit 576121A01R00
Cost
 50.00 USD
Availability
 240 calendar days from receipt of order
The availability given above is the standard lead time from the date of your purchase
order. If items are required before this time, please include a retrofit planning schedule
with your order so that we can try to comply with your requirements.
The sales terms (costs and availability) are estimated in relation to economic conditions.
The latest valid price and lead time for ordering purposes shall be obtained through the
AIRBUS Spares portal or through a request for quotation to airbus.kit@airbus.com.
Kit 576121A02R00
Cost
 50.00 USD
Availability
 240 calendar days from receipt of order
DATE: Aug 31/18 SERVICE BULLETIN No.: A300-57-6121
REVISION No.: 00 - Aug 31/18 Page: 17
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 22

@A300-600
SERVICE BULLETIN
The availability given above is the standard lead time from the date of your purchase
order. If items are required before this time, please include a retrofit planning schedule
with your order so that we can try to comply with your requirements.
The sales terms (costs and availability) are estimated in relation to economic conditions.
The latest valid price and lead time for ordering purposes shall be obtained through the
AIRBUS Spares portal or through a request for quotation to airbus.kit@airbus.com.
Component COMPA01
Operator supplied standard hardware parts, required to accomplish this Service Bulletin,
are to be supplied from the operator’s stock.
Component COMPA02
Operator supplied standard hardware parts, required to accomplish this Service Bulletin,
are to be supplied from the operator’s stock.
B. INDUSTRY SUPPORT INFORMATION
AIRBUS will not provide industry support for accomplishment of this Service Bulletin.
This Service Bulletin is the subject of an AIRBUS monitored retrofit campaign.
For the organization of this retrofit, you are kindly requested to contact AIRBUS retrofit
management department: monitored.retrofit@airbus.com.
C. LIST OF COMPONENTS
Kit 576121A01R00
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 ITEM
 OLD PART N˚
 INT
 SEE
NOTES
10
 NSA5059-4
 1
 NUT
11
 MS24665-152
 2
 PIN
16
 NSA5059-5
 1
 NUT
NOTE
: If you find part numbers of hardware components in the related kit(s) which
you cannot identify in the LIST OF COMPONENTS of this Service Bulletin,
refer to Standards Manual (SM). The SM will give you the correct part number
to part number relationship.
Kit 576121A02R00
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 ITEM
 OLD PART N˚
 INT
 SEE
NOTES
10
 NSA5059-4
 1
 NUT
11
 MS24665-152
 2
 PIN
16
 NSA5059-5
 1
 NUT
19
 NSA5060-4
 1
 NUT
22
 MS24665-153
 1
 PIN
DATE: Aug 31/18 SERVICE BULLETIN No.: A300-57-6121
REVISION No.: 00 - Aug 31/18 Page: 18
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 23

@A300-600
SERVICE BULLETIN
NOTE
: If you find part numbers of hardware components in the related kit(s) which
you cannot identify in the LIST OF COMPONENTS of this Service Bulletin,
refer to Standards Manual (SM). The SM will give you the correct part number
to part number relationship.
D. LIST OF MATERIALS - OPERATOR SUPPLIED
(1) Consumable Materials
Consumable CMLA01
ITEM
 DESCRIPTION
 REFERENCE TO CML
MAT. No.
QTY PER A/C
 SEE
NOTES
Primer Polyurethane Paint -
Corrosion Inhibiting
04EAC2
 As required
Top Coat Polyurethane - Grey
Internal Structure
04JME4
 As required
Polyurethane Coating - Fuel Vapour
Barrier Struct
04PAG2
 As required
Polysulfide Sealant - General
Purpose Brushable
06AAA1
 As required
Polysulfide Sealant - Fuel Tank
Brushable
06ABA1
 As required
Non Aqueous Cleaner-General
 08BAA9
 As required
Corrosion Preventive Compound -
Water Displacing
12ADB1
 As required
Textile-Lint Free Cotton
 14SBA1
 As required
(2) Components
Component COMPA01
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 ITEM
 OLD PART N˚
 INT
 SEE
NOTES
1
 EN6114V10-48
 1
 BOLT
2
 EN6114V10-44
 1
 BOLT
3
 EN6114V9-42
 1
 BOLT
4
 EN6114V9-40
 1
 BOLT
5
 EN6114V9-32
 1
 BOLT
6
 EN6114V8-32
 1
 BOLT
7
 EN6114V9-30
 1
 BOLT
34
 EN6114V8-38
 1
 BOLT
35
 EN6114V8-36
 1
 BOLT
36
 EN6114V8-24
 1
 BOLT
37
 EN6114V8-27
 1
 BOLT
38
 ASNA2531-10
 1
 NUT
39
 ASNA2532-10
 1
 NUT
40
 ASNA2532-9
 4
 NUT
41
 EN6114V10X49
 1
 BOLT
42
 ASNA2532-8
 3
 NUT
DATE: Aug 31/18 SERVICE BULLETIN No.: A300-57-6121
REVISION No.: 00 - Aug 31/18 Page: 19
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 24

@A300-600
SERVICE BULLETIN
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 ITEM
 OLD PART N˚
 INT
 SEE
NOTES
43
 EN6114V10X45
 1
 BOLT
44
 ASNA2531-8
 2
 NUT
45
 EN6114V9X43
 1
 BOLT
46
 EN6114V9X41
 1
 BOLT
55
 EN6114V9X33
 1
 BOLT
56
 EN6114V8X33
 1
 BOLT
57
 EN6114V9X31
 1
 BOLT
58
 EN6114V8X28
 1
 BOLT
59
 EN6114V8X39
 1
 BOLT
60
 EN6114V8X37
 1
 BOLT
61
 EN6114V8X25
 1
 BOLT
68
 NSA5369PD816B
 2
 WASHER
69
 NSA5369PD816D
 1
 WASHER
NOTE
: If you find part numbers of hardware components in the related kit(s)
which you cannot identify in the LIST OF COMPONENTS of this Service
Bulletin, refer to Standards Manual (SM). The SM will give you the
correct part number to part number relationship.
NOTE
: The above list of components is not an AIRBUS Kit, the required parts
shall be ordered as necessary through the given channel.
NOTE
: The components listed above are only necessary if no crack is found
during any inspection of the horizontal junction of the angle fitting. The
quantity of these items are to be ordered as required.
Component COMPA02
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 ITEM
 OLD PART N˚
 INT
 SEE
NOTES
44
 ASNA2531-8
 6
 NUT
47
 EN6115V9-31
 4
 BOLT
48
 EN6115V8-31
 3
 BOLT
49
 EN6115V8-34
 1
 BOLT
50
 EN6115V8-36
 1
 BOLT
51
 EN6115V8-40
 1
 BOLT
52
 EN6115V7-42
 3
 BOLT
53
 ASNA2531-9
 4
 NUT
54
 ASNA2531-7
 3
 NUT
62
 EN6115V9X32
 4
 BOLT
63
 EN6115V8X32
 3
 BOLT
64
 EN6115V8X35
 1
 BOLT
65
 EN6115V8X37
 1
 BOLT
66
 EN6115V8X41
 1
 BOLT
67
 EN6115V7X43
 3
 BOLT
DATE: Aug 31/18 SERVICE BULLETIN No.: A300-57-6121
REVISION No.: 00 - Aug 31/18 Page: 20
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 25

@A300-600
SERVICE BULLETIN
NOTE
: If you find part numbers of hardware components in the related kit(s)
which you cannot identify in the LIST OF COMPONENTS of this Service
Bulletin, refer to Standards Manual (SM). The SM will give you the
correct part number to part number relationship.
NOTE
: The above list of components is not an AIRBUS Kit, the required parts
shall be ordered as necessary through the given channel.
NOTE
: The components listed above are only necessary if no crack is found
during any inspection of the vertical junction of the angle fitting. The
quantity of these items are to be ordered as required.
(3) Equipment
None
E. PARTS TO BE RE-IDENTIFIED BY OPERATOR
None
F. TOOLING
(1) Tooling - Price and Availability
None
(2) Tools
NOTE
: To accomplish this Service Bulletin it is necessary to use the tools listed
in the subsequent re ferenced tasks:
- AMM 28-10-00, Page Block 301
- NTM 57-10-12 part 6
- NTM 57-10-45 part 4
- NTM 57-10-50 part 6.
(3) Special Tools
None
DATE: Aug 31/18 SERVICE BULLETIN No.: A300-57-6121
REVISION No.: 00 - Aug 31/18 Page: 21
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 26

@A300-600
SERVICE BULLETIN
This Page Intentionally Left Blank
DATE: Aug 31/18 SERVICE BULLETIN No.: A300-57-6121
REVISION No.: 00 - Aug 31/18 Page: 22
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 27

@A300-600
SERVICE BULLETIN
3. ACCOMPLISHMENT INSTRUCTIONS
Task 576121-832-801-001 - Special Detailed Inspection of the Horizontal Junction Area of
the CWB Lower Angle Fitting at Frame 47
WARNING
: MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND ALL THE CAUTIONS
INCLUDED IN THE REFERENCED PROCEDURES
CAUTION
: ALWAYS OBEY THE PRECAUTIONS THAT FOLLOW TO KEEP
ELECTRICAL WIRING IN A SATISFACTORY CONDITION (ELECTRICALLY
AND MECHANICALLY SERVICEABLE) . WHEN YOU DO MAINTENANCE
WORK, REPAIRS OR MODIFICATIONS, ALWAYS KEEP ELECTRICAL WIRING,
COMPONENTS AND THE WORK AREA AS CLEAN AS POSSIBLE. TO DO
THIS:
- PUT PROTECTION, SUCH AS PLASTIC SHEETING, CLOTHS, ETC., AS
NECESSARY ON WIRING AND COMPONENTS.
- REGULARLY REMOVE ALL SHAVINGS, UNWANTED MATERIAL AND
OTHER CONTAMINATION.
THESE PRECAUTIONS WILL DECREASE THE RISK OF CONTAMINATION
AND DAMAGE TO THE ELECTRICAL WIRING INSTALLATION.
IF THERE IS CONTAMINATION, REFER TO ESPM 20-55-00.
NOTE
: The accomplishment instructions of this Service Bulletin include procedures given
in other documents or in other sections of the Service Bulletin. When the words
’refer to’ are used and the operator has a procedure accepted by the local authority
he belongs to, the accepted alternative procedure can be used. When the words ’in
accordance with’ are used then the given procedure must be followed.
NOTE
: The access and close-up instructions, not comprising return to service tests, in this
Service Bulletin do not constitute or affect the technical intent of the Service
Bulletin. Operators can therefore, as deemed necessary, omit or add access and/or
close-up steps to add flexibility to their maintenance operations as long as the
technical intent of the Service Bulletin is met within the set parameters.
NOTE
: Manual titles given in the accomplishment instructions are referred to by acronyms.
Refer to paragraph 1.J., References, for the definition of acronyms.
NOTE
: This Service Bulletin contains the instructions for the on-aircraft maintenance
necessary to ensure the continued airworthiness of the aircraft.
For any deviations to the instructions, including RC paragraph contained herein,
contact AIRBUS for further instructions and approval.
NOTE
: This Service Bulletin is classified mandatory or expected to be classified mandatory
by an Airworthiness Directive (AD). The paragraphs 3.C. and 3.D. in these
accomplishment instructions are Required for Compliance (RC) and must be done
to comply with the AD. To allow more flexibility, the rule "refer to" and "in
accordance with" will apply to these paragraphs 3.C. and 3.D. Other paragraphs
are recommended and may be deviated from, done as part of other actions or
DATE: Aug 31/18 SERVICE BULLETIN No.: A300-57-6121
REVISION No.: 00 - Aug 31/18 Page: 23
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 28

@A300-600
SERVICE BULLETIN
done with accepted methods different from those given in the Service Bulletin, as
long as the RC paragraphs can be done and the aircraft can be put back into a
serviceable condition.
NOTE
: The purpose of flowcharts is to supplement the information given in the Procedure
and Compliance paragraphs and not to serve as the primary source for tasks or
compliance times given in this Service Bulletin.
NOTE
: Discarded parts must be managed at the operator’s discretion.
Task Associated Data
Zone
140
Manpower
TOTAL MANHOURS
 106.50
ELAPSED TIME (HOURS)
 28.50
A. GENERAL
(1) Subtask 576121-910-001-001 - Standard Practices
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 06-21-00, Page Block 001
06-31-53, Page Block 001
06-41-00, Page Block 001
20-21-12, Page Block 001
Consumable Material List (CML)
Structural Repair Manual (SRM)
 51-22-00
51-24-00
51-40-00
51-40-20
51-40-30
51-40-40
51-75-10
(a) For the Frame (FR) identification, refer to AMM 06-31-53, Page Block 001.
(b) For the identification of zones, refer to AMM 06-21-00, Page Block 001.
(c) For the identification of access panels, refer to AMM 06-41-00, Page Block 001.
(d) To torque tighten the standard threaded fasteners, refer to AMM 20-21-12, Page
Block 001.
(e) Remove and install fasteners in accordance with SRM 51-40-20.
(f) Get alternative and substitute fastener data in accordance with SRM 51-40-30.
DATE: Aug 31/18 SERVICE BULLETIN No.: A300-57-6121
REVISION No.: 00 - Aug 31/18 Page: 24
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 29

@A300-600
SERVICE BULLETIN
(g) Apply sealant in accordance with SRM 51-24-00.
(h) Get fastener hole diameters and drill data in accordance with SRM 51-40-40.
(i) Renew the protective finish in accordance with SRM 51-75-10.
(j) For the specification of Material Numbers (Mat. No.) given in this Service Bulletin,
refer to the Consumable Material List (CML).
(k) If the length of any fastener specified in this Service Bulletin does not meet
installation standards given in SRM Chapter 51, then a fastener of the same
specification, or an approved substitute, with a length which meets the installation
standards given in SRM Chapter 51 may be used. In addition, washers may be
installed for fastener grip length in accordance with SRM Chapter 51.
(l) If alternative and substitute fasteners have to be used, you must make sure that the
associated nut/collar are compatible in accordance with SRM 51-40-00 ’Mating Part’
column.
(m) Apply corrosion protection in accordance with SRM 51-22-00.
(2) Subtask 576121-839-001-001 - Administrative
Manpower Resources
Skills
 NON SPECIFIC
Write in the applicable aircraft records that you have done all the work given in this
Service Bulletin.
B. PREPARATION
(1) Subtask 576121-941-001-001 - Job Set-up
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 24-00-00, Page Block 301
28-10-00, Page Block 301
28-25-00, Page Block 301
NOTE
: For the basic Aircraft configuration, refer to AMM Chapter "Introduction -
Aircraft status for maintenance" in Manual Front Matter section.
(a) Make sure that the aircraft is electrically grounded, refer to AMM 24-00-00, Page
Block 301.
(b) Put an access platform in position at zone 140.
(c) Defuel the center tank, refer to AMM 28-25-00, Page Block 301.
(d) Degas and vent the center tank, refer to AMM 28-10-00, Page Block 301.
DATE: Aug 31/18 SERVICE BULLETIN No.: A300-57-6121
REVISION No.: 00 - Aug 31/18 Page: 25
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 30

@A300-600
SERVICE BULLETIN
(2) Subtask 576121-010-003-001 - Remove/Open for the Access of the LH Side
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 25-72-41, Page Block 401
28-00-00, Page Block 401
28-11-29, Page Block 401
28-13-21, Page Block 401
(a) Remove the access panels 147DZ, 147CZ and 147BZ, refer to AMM 25-72-41,
Page Block 401.
(b) Remove the center tank manhole cover 147AZ, refer to AMM 28-11-29, Page Block
401.
(c) If necessary, for a better access remove the applicable vapor seals, refer to AMM
28-13-21, Page Block 401.
(d) In the center wing box, remove fuel lines and equipment around the working areas,
refer to AMM 28-00-00, Page Block 401.
(3) Subtask 576121-010-004-001 - Remove/Open for the Access of the RH Side
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 25-72-41, Page Block 401
28-00-00, Page Block 401
28-11-29, Page Block 401
28-13-21, Page Block 401
(a) Remove the access panels 148CZ and 148DZ, refer to AMM 25-72-41, Page Block
401.
(b) Remove the center tank manhole cover 148AZ, refer to AMM 28-11-29, Page Block
401.
(c) If necessary, for a better access remove the applicable vapor seals, refer to AMM
28-13-21, Page Block 401.
(d) In the center wing box, remove fuel lines and equipment around the working areas,
refer to AMM 28-00-00, Page Block 401.
DATE: Aug 31/18 SERVICE BULLETIN No.: A300-57-6121
REVISION No.: 00 - Aug 31/18 Page: 26
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 31

@A300-600
SERVICE BULLETIN
C. PROCEDURE
(1) Subtask 576121-250-001-001 - Do a Special Detailed Inspection of the Holes A, B,
C, D, E, F, G, P, Q and S on the LH Side
Work Zones and Access Panels
Zone
 Access/Work location
140
 Work location
 Frame 47
Manpower Resources
Manhours
 12.00
Minimum number of person
 2
Subtask elapsed time
 6.00
Skills
 NON DESTRUCTIVE
TESTING
Material necessary to do the job
Consumable CMLA01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Non Aqueous Cleaner-
General
08BAA9
 As required
Textile-Lint Free Cotton
 14SBA1
 As required
References
Non Destructive Test Manual (NTM)
 57-10-12 part 6
Structural Repair Manual (SRM)
 51-40-20
Fig. A-FBAAA
Inspection of the Holes A, B, C, D, E, F,
G, P, Q, S and T
Sheet 01
Sheet 02
Fig. A-FBCAA
Removal of the Fasteners A, B, C, D, E,
F, G, P, Q, S and T
Sheet 01
Sheet 02
Fig. A-FFAAA
Flowchart for the Inspection of the
Horizontal Junction Area of the CWB
Lower Angle Fitting at FR47
Sheet 01
(a) At the threshold given in Tabl e 1 of the PLANNING INFORMATION paragraph
E.(2):
Refer to Fig. A-FFAAA
Do a special detailed inspection of the holes A, B, C, D, E, F, G, P, Q and S on the
LH side.
Refer to Fig. A-FBAAA
DATE: Aug 31/18 SERVICE BULLETIN No.: A300-57-6121
REVISION No.: 00 - Aug 31/18 Page: 27
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 32

@A300-600
SERVICE BULLETIN
1
 Remove the sealant around the fasteners. Use a non-metallic spatula in the
event of scratches, polish surface and perform protection.
2
 Remove and discard the fasteners in accordance with SRM 51-40-20.
Refer to Fig. A-FBCAA
3
 Clean the surfaces of the holes with:
Textile-Lint Free
Cotton
14SBA1 As required
Made moist with:
Non Aqueous
Cleaner-General
08BAA9 As required
4
 Do a rotating probe inspection of the holes and do a check of the bore
diameter, refer to NTM 57-10-12 part 6.
Refer to Fig. A-FBAAA
a
 If crack is found:
<1> If crack is found in hole G, do SUBTASK 576121-250-007 001
Depending on the Inspection Results, Do a Special Detailed
Inspection of the Hole T on the LH Side .
<2> If bore diameter is equal to nominal diameter:
<a> Do SUBTASK 576121-250-009 001 Depending on the
Inspection Results, Oversize the Affected Hole(s) and Do a
Special Detailed Inspection on the LH Side .
<3> If bore diameter is not equal to nominal diameter:
<a> Contact AIRBUS before next flight.
b
 If no crack is found:
<1> Do SUBTASK 576121-400-001 001 Depending on the Inspection
Results, Install New Nominal or First Oversize Fasteners on the LH
Side .
And
Upload the completed Inspection Report sheet given in Appendix 01
in accordance with ISI 00.00.00179.
And
DATE: Aug 31/18 SERVICE BULLETIN No.: A300-57-6121
REVISION No.: 00 - Aug 31/18 Page: 28
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 33

@A300-600
SERVICE BULLETIN
Repeat the special detailed inspection at the interval given in Table
1 of the PLANNING INFORMATION paragraph E.(2) in accordance
with TASK 576121-832-801 001 Special Detailed Inspection of the
Horizontal Junction Area of the CWB Lower Angle Fitting at Frame
47 .
(2) Subtask 576121-250-002-001 - Do a Special Detailed Inspection of the Holes A, B,
C, D, E, F, G, P, Q and S on the RH Side
Work Zones and Access Panels
Zone
 Access/Work location
140
 Work location
 Frame 47
Manpower Resources
Manhours
 12.00
Minimum number of person
 2
Subtask elapsed time
 6.00
Skills
 NON DESTRUCTIVE
TESTING
Material necessary to do the job
Consumable CMLA01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Non Aqueous Cleaner-
General
08BAA9
 As required
Textile-Lint Free Cotton
 14SBA1
 As required
References
Non Destructive Test Manual (NTM)
 57-10-12 part 6
Structural Repair Manual (SRM)
 51-40-20
Fig. A-FBAAA
Inspection of the Holes A, B, C, D, E, F,
G, P, Q, S and T
Sheet 01
Sheet 02
Fig. A-FBCAA
Removal of the Fasteners A, B, C, D, E,
F, G, P, Q, S and T
Sheet 01
Sheet 02
Fig. A-FFAAA
Flowchart for the Inspection of the
Horizontal Junction Area of the CWB
Lower Angle Fitting at FR47
Sheet 01
(a) At the threshold given in Tabl e 1 of the PLANNING INFORMATION paragraph
E.(2):
Refer to Fig. A-FFAAA
Do a special detailed inspection of the holes A, B, C, D, E, F, G, P, Q and S on the
RH side.
DATE: Aug 31/18 SERVICE BULLETIN No.: A300-57-6121
REVISION No.: 00 - Aug 31/18 Page: 29
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 34

@A300-600
SERVICE BULLETIN
Refer to Fig. A-FBAAA
1
 Remove the sealant around the fasteners. Use a non-metallic spatula in the
event of scratches, polish surface and perform protection.
2
 Remove and discard the fasteners in accordance with SRM 51-40-20.
Refer to Fig. A-FBCAA
3
 Clean the surfaces of the holes with:
Textile-Lint Free
Cotton
14SBA1 As required
Made moist with:
Non Aqueous
Cleaner-General
08BAA9 As required
4
 Do a rotating probe inspection of the holes and do a check of the bore
diameter, refer to NTM 57-10-12 part 6.
Refer to Fig. A-FBAAA
a
 If crack is found:
<1> If crack is found in hole G, do SUBTASK 576121-250-008 001
Depending on the Inspection Results, Do a Special Detailed
Inspection of the Hole T on the RH Side .
<2> If bore diameter is equal to nominal diameter:
<a> Do SUBTASK 576121-250-010 001 Depending on the
Inspection Results, Oversize the Affected Hole(s) and Do a
Special Detailed Inspection on the RH Side .
<3> If bore diameter is not equal to nominal diameter:
<a> Contact AIRBUS before next flight.
b
 If no crack is found:
<1> Do SUBTASK 576121-400-002 001 Depending on the Inspection
Results, Install New Nominal or First Oversize Fasteners on the RH
Side .
And
Upload the completed Inspection Report sheet given in Appendix 01
in accordance with ISI 00.00.00179.
And
DATE: Aug 31/18 SERVICE BULLETIN No.: A300-57-6121
REVISION No.: 00 - Aug 31/18 Page: 30
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 35

@A300-600
SERVICE BULLETIN
Repeat the special detailed inspection at the interval given in Table
1 of the PLANNING INFORMATION paragraph E.(2) in accordance
with TASK 576121-832-801 001 Special Detailed Inspection of the
Horizontal Junction Area of the CWB Lower Angle Fitting at Frame
47 .
(3) Subtask 576121-250-007-001 - Depending on the Inspection Results, Do a Special
Detailed Inspection of the Hole T on the LH Side
Work Zones and Access Panels
Zone
 Access/Work location
140
 Work location
 Frame 47
Manpower Resources
Manhours
 1.00
Minimum number of person
 2
Subtask elapsed time
 0.50
Skills
 NON DESTRUCTIVE
TESTING
Material necessary to do the job
Consumable CMLA01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Non Aqueous Cleaner-
General
08BAA9
 As required
Textile-Lint Free Cotton
 14SBA1
 As required
References
Non Destructive Test Manual (NTM)
 57-10-12 part 6
Structural Repair Manual (SRM)
 51-40-20
Fig. A-FBAAA
Inspection of the Holes A, B, C, D, E, F,
G, P, Q, S and T
Sheet 01
Sheet 02
Fig. A-FBCAA
Removal of the Fasteners A, B, C, D, E,
F, G, P, Q, S and T
Sheet 01
Sheet 02
Fig. A-FFAAA
Flowchart for the Inspection of the
Horizontal Junction Area of the CWB
Lower Angle Fitting at FR47
Sheet 01
(a) Do a special detailed inspection of hole T on the LH side.
Refer to Fig. A-FFAAA
 and Fig. A-FBAAA
1
 Remove the sealant around the fastener. Use a non-metallic spatula in the
event of scratches, polish surface and perform protection.
DATE: Aug 31/18 SERVICE BULLETIN No.: A300-57-6121
REVISION No.: 00 - Aug 31/18 Page: 31
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 36

@A300-600
SERVICE BULLETIN
2
 Remove and discard the fastener in accordance with SRM 51-40-20.
Refer to Fig. A-FBCAA
3
 Clean the surface of the hole with:
Textile-Lint Free
Cotton
14SBA1 As required
Made moist with:
Non Aqueous
Cleaner-General
08BAA9 As required
4
 Do a rotating probe inspection of the hole and do a check of the bore
diameter, refer to NTM 57-10-12 part 6.
Refer to Fig. A-FBAAA
a
 If crack is found:
<1> If bore diameter is equal to nominal diameter:
<a> Do SUBTASK 576121-250-009 001 Depending on the
Inspection Results, Oversize the Affected Hole(s) and Do a
Special Detailed Inspection on the LH Side .
<2> If bore diameter is not equal to nominal diameter:
<a> Contact AIRBUS before next flight.
b
 If no crack is found:
<1> Do SUBTASK 576121-400-001 001 Depending on the Inspection
Results, Install New Nominal or First Oversize Fasteners on the LH
Side .
And
Upload the completed Inspection Report sheet given in Appendix 01
in accordance with ISI 00.00.00179.
And
Repeat the special detailed inspection at the interval given in Table
1 of the PLANNING INFORMATION paragraph E.(2) in accordance
with TASK 576121-832-801 001 Special Detailed Inspection of the
Horizontal Junction Area of the CWB Lower Angle Fitting at Frame
47 .
DATE: Aug 31/18 SERVICE BULLETIN No.: A300-57-6121
REVISION No.: 00 - Aug 31/18 Page: 32
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 37

@A300-600
SERVICE BULLETIN
(4) Subtask 576121-250-008-001 - Depending on the Inspection Results, Do a Special
Detailed Inspection of the Hole T on the RH Side
Work Zones and Access Panels
Zone
 Access/Work location
140
 Work location
 Frame 47
Manpower Resources
Manhours
 1.00
Minimum number of person
 2
Subtask elapsed time
 0.50
Skills
 NON DESTRUCTIVE
TESTING
Material necessary to do the job
Consumable CMLA01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Non Aqueous Cleaner-
General
08BAA9
 As required
Textile-Lint Free Cotton
 14SBA1
 As required
References
Non Destructive Test Manual (NTM)
 57-10-12 part 6
Structural Repair Manual (SRM)
 51-40-20
Fig. A-FBAAA
Inspection of the Holes A, B, C, D, E, F,
G, P, Q, S and T
Sheet 01
Sheet 02
Fig. A-FBCAA
Removal of the Fasteners A, B, C, D, E,
F, G, P, Q, S and T
Sheet 01
Sheet 02
Fig. A-FFAAA
Flowchart for the Inspection of the
Horizontal Junction Area of the CWB
Lower Angle Fitting at FR47
Sheet 01
(a) Do a special detailed inspection of hole T on the RH side.
Refer to Fig. A-FFAAA
 and Fig. A-FBAAA
1
 Remove the sealant around the fastener. Use a non-metallic spatula in the
event of scratches, polish surface and perform protection.
2
 Remove and discard the fastener in accordance with SRM 51-40-20.
Refer to Fig. A-FBCAA
DATE: Aug 31/18 SERVICE BULLETIN No.: A300-57-6121
REVISION No.: 00 - Aug 31/18 Page: 33
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 38

@A300-600
SERVICE BULLETIN
3
 Clean the surface of the hole with:
Textile-Lint Free
Cotton
14SBA1 As required
Made moist with:
Non Aqueous
Cleaner-General
08BAA9 As required
4
 Do a rotating probe inspection of the hole and do a check of the bore
diameter, refer to NTM 57-10-12 part 6.
Refer to Fig. A-FBAAA
a
 If crack is found:
<1> If bore diameter is equal to nominal diameter:
<a> Do SUBTASK 576121-250-010 001 Depending on the
Inspection Results, Oversize the Affected Hole(s) and Do a
Special Detailed Inspection on the RH Side .
<2> If bore diameter is not equal to nominal diameter:
<a> Contact AIRBUS before next flight.
b
 If no crack is found:
<1> Do SUBTASK 576121-400-002 001 Depending on the Inspection
Results, Install New Nominal or First Oversize Fasteners on the RH
Side .
And
Upload the completed Inspection Report sheet given in Appendix 01
in accordance with ISI 00.00.00179.
And
Repeat the special detailed inspection at the interval given in Table
1 of the PLANNING INFORMATION paragraph E.(2) in accordance
with TASK 576121-832-801 001 Special Detailed Inspection of the
Horizontal Junction Area of the CWB Lower Angle Fitting at Frame
47 .
(5) Subtask 576121-250-009-001 - Depending on the Inspection Results, Oversize the
Affected Hole(s) and Do a Special Detailed Inspection on the LH Side
Work Zones and Access Panels
Zone
 Access/Work location
140
 Work location
 Frame 47
DATE: Aug 31/18 SERVICE BULLETIN No.: A300-57-6121
REVISION No.: 00 - Aug 31/18 Page: 34
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 39

@A300-600
SERVICE BULLETIN
Manpower Resources
Manhours
 12.00
Minimum number of person
 2
Subtask elapsed time
 6.00
Skills
 NON DESTRUCTIVE
TESTING
Material necessary to do the job
Consumable CMLA01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Non Aqueous Cleaner-
General
08BAA9
 As required
Textile-Lint Free Cotton
 14SBA1
 As required
References
Non Destructive Test Manual (NTM)
 57-10-12 part 6
Structural Repair Manual (SRM)
 51-40-40
Fig. A-FBAAA
Inspection of the Holes A, B, C, D, E, F,
G, P, Q, S and T
Sheet 01
Sheet 02
Fig. A-FBMAA
Installation of New Nominal or First
Oversize Fasteners in the Horizontal
Junction Area of the CWB Lower Angle
Fitting at FR47
Sheet 01
Sheet 02
Sheet 03
Sheet 04
(a) Drill and ream the affected hole(s) to first oversize diameter in accordance with
SRM 51-40-40.
Refer to Fig. A-FBMAA
(b) Deburr and clean the surfaces of the holes with:
Textile-Lint Free
Cotton
14SBA1 As required
Made moist with:
Non Aqueous
Cleaner-General
08BAA9 As required
(c) Do a rotating probe inspection of the oversized hole(s), refer to NTM 57-10-12 part
6.
Refer to Fig. A-FBAAA
1
 If crack is found:
a
 Contact AIRBUS before next flight.
DATE: Aug 31/18 SERVICE BULLETIN No.: A300-57-6121
REVISION No.: 00 - Aug 31/18 Page: 35
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 40

@A300-600
SERVICE BULLETIN
2
 If no crack is found:
a
 Do SUBTASK 576121-400-001 001 Depending on the Inspection Results,
Install New Nominal or First Oversize Fasteners on the LH Side .
And
Upload the completed Inspection Report sheet given in Appendix 01 in
accordance with ISI 00.00.00179.
And
Repeat the special detailed inspection at the interval given in Table 1
of the PLANNING INFORMATION paragraph E.(2) in accordance with
TASK 576121-832-801 001 Special Detailed Inspection of the Horizontal
Junction Area of the CWB Lower Angle Fitting at Frame 47 .
(6) Subtask 576121-250-010-001 - Depending on the Inspection Results, Oversize the
Affected Hole(s) and Do a Special Detailed Inspection on the RH Side
Work Zones and Access Panels
Zone
 Access/Work location
140
 Work location
 Frame 47
Manpower Resources
Manhours
 12.00
Minimum number of person
 2
Subtask elapsed time
 6.00
Skills
 NON DESTRUCTIVE
TESTING
Material necessary to do the job
Consumable CMLA01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Non Aqueous Cleaner-
General
08BAA9
 As required
Textile-Lint Free Cotton
 14SBA1
 As required
References
Non Destructive Test Manual (NTM)
 57-10-12 part 6
Structural Repair Manual (SRM)
 51-40-40
Fig. A-FBAAA
Inspection of the Holes A, B, C, D, E, F,
G, P, Q, S and T
Sheet 01
Sheet 02
DATE: Aug 31/18 SERVICE BULLETIN No.: A300-57-6121
REVISION No.: 00 - Aug 31/18 Page: 36
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 41

@A300-600
SERVICE BULLETIN
References
Fig. A-FBMAA
Installation of New Nominal or First
Oversize Fasteners in the Horizontal
Junction Area of the CWB Lower Angle
Fitting at FR47
Sheet 01
Sheet 02
Sheet 03
Sheet 04
(a) Drill and ream the affected hole(s) to first oversize diameter in accordance with
SRM 51-40-40.
Refer to Fig. A-FBMAA
(b) Deburr and clean the surfaces of the holes with:
Textile-Lint Free
Cotton
14SBA1 As required
Made moist with:
Non Aqueous
Cleaner-General
08BAA9 As required
(c) Do a rotating probe inspection of the oversized hole(s), refer to NTM 57-10-12 part
6.
Refer to Fig. A-FBAAA
1
 If crack is found:
a
 Contact AIRBUS before next flight.
2
 If no crack is found:
a
 Do SUBTASK 576121-400-002 001 Depending on the Inspection Results,
Install New Nominal or First Oversize Fasteners on the RH Side .
And
Upload the completed Inspection Report sheet given in Appendix 01 in
accordance with ISI 00.00.00179.
And
Repeat the special detailed inspection at the interval given in Table 1
of the PLANNING INFORMATION paragraph E.(2) in accordance with
TASK 576121-832-801 001 Special Detailed Inspection of the Horizontal
Junction Area of the CWB Lower Angle Fitting at Frame 47 .
(7) Subtask 576121-400-001-001 - Depending on the Inspection Results, Install New
Nominal or First Oversize Fasteners on the LH Side
Work Zones and Access Panels
Zone
 Access/Work location
140
 Work location
 Frame 47
DATE: Aug 31/18 SERVICE BULLETIN No.: A300-57-6121
REVISION No.: 00 - Aug 31/18 Page: 37
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 42

@A300-600
SERVICE BULLETIN
Manpower Resources
Manhours
 12.00
Minimum number of person
 2
Subtask elapsed time
 6.00
Skills
 AIRFRAME
Material necessary to do the job
Component COMPA01
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 SEE
NOTES
1
 EN6114V10-48
 1
 BOLT
2
 EN6114V10-44
 1
 BOLT
3
 EN6114V9-42
 1
 BOLT
4
 EN6114V9-40
 1
 BOLT
5
 EN6114V9-32
 1
 BOLT
6
 EN6114V8-32
 1
 BOLT
7
 EN6114V9-30
 1
 BOLT
34
 EN6114V8-38
 1
 BOLT
35
 EN6114V8-36
 1
 BOLT
36
 EN6114V8-24
 1
 BOLT
37
 EN6114V8-27
 1
 BOLT
38
 ASNA2531-10
 1
 NUT
39
 ASNA2532-10
 1
 NUT
40
 ASNA2532-9
 4
 NUT
41
 EN6114V10X49
 1
 BOLT
42
 ASNA2532-8
 3
 NUT
43
 EN6114V10X45
 1
 BOLT
44
 ASNA2531-8
 2
 NUT
45
 EN6114V9X43
 1
 BOLT
46
 EN6114V9X41
 1
 BOLT
55
 EN6114V9X33
 1
 BOLT
56
 EN6114V8X33
 1
 BOLT
57
 EN6114V9X31
 1
 BOLT
58
 EN6114V8X28
 1
 BOLT
59
 EN6114V8X39
 1
 BOLT
60
 EN6114V8X37
 1
 BOLT
61
 EN6114V8X25
 1
 BOLT
68
 NSA5369PD816B
 2
 WASHER
69
 NSA5369PD816D
 1
 WASHER
NOTE
: The above list of components is not an AIRBUS Kit, the required parts
shall be ordered as necessary through the given channel.
NOTE
: The components listed above are only necessary if no crack is found
during any inspection of the horizontal junction of the angle fitting. The
quantity of these items are to be ordered as required.
DATE: Aug 31/18 SERVICE BULLETIN No.: A300-57-6121
REVISION No.: 00 - Aug 31/18 Page: 38
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 43

@A300-600
SERVICE BULLETIN
Consumable CMLA01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Primer Polyurethane Paint -
Corrosion Inhibiting
04EAC2
 As required
Top Coat Polyurethane -
Grey Internal Structure
04JME4
 As required
Polyurethane Coating - Fuel
Vapour Barrier Struct
04PAG2
 As required
Polysulfide Sealant -
General Purpose Brushable
06AAA1
 As required
Polysulfide Sealant - Fuel
Tank Brushable
06ABA1
 As required
Corrosion Preventive
Compound - Water
Displacing
12ADB1
 As required
References
Aircraft Maintenance Manual (AMM)
 20-21-12, Page Block 001
Structural Repair Manual (SRM)
 51-22-00
51-24-00
51-40-00
51-40-20
51-40-30
51-75-10
Fig. A-FBMAA
Installation of New Nominal or First
Oversize Fasteners in the Horizontal
Junction Area of the CWB Lower Angle
Fitting at FR47
Sheet 01
Sheet 02
Sheet 03
Sheet 04
(a) Wet install the new nominal or first oversize fasteners:
Refer to AMM 20-21-12, Page Block 001
In accordance with SRM 51-40-20, SRM 51-40-30 and SRM 51-40-00
Refer to Fig. A-FBMAA
Hole A:
1 Nut ASNA2532-9 Item 40
1 Bolt EN6114V9-40 Item 4
Or
1 Bolt EN6114V9X41 Item 46
Hole B:
DATE: Aug 31/18 SERVICE BULLETIN No.: A300-57-6121
REVISION No.: 00 - Aug 31/18 Page: 39
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 44

@A300-600
SERVICE BULLETIN
1 Nut ASNA2532-9 Item 40
1 Bolt EN6114V9-32 Item 5
Or
1 Bolt EN6114V9X33 Item 55
Hole C:
1 Nut ASNA2532-8 Item 42
1 Bolt EN6114V8-32 Item 6
Or
1 Bolt EN6114V8X33 Item 56
Hole D:
1 Nut ASNA2532-9 Item 40
1 Bolt EN6114V9-30 Item 7
Or
1 Bolt EN6114V9X31 Item 57
Hole E:
1 Nut ASNA2532-8 Item 42
1 Bolt EN6114V8-27 Item 37
Or
1 Bolt EN6114V8X28 Item 58
Hole F:
1 Nut ASNA2531-8 Item 44
1 Washer NSA5369PD816B Item 68
1 Washer NSA5369PD816D Item 69
1 Bolt EN6114V8-38 Item 34
Or
1 Bolt EN6114V8X39 Item 59
Hole G:
1 Nut ASNA2532-8 Item 42
DATE: Aug 31/18 SERVICE BULLETIN No.: A300-57-6121
REVISION No.: 00 - Aug 31/18 Page: 40
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 45

@A300-600
SERVICE BULLETIN
1 Washer NSA5369PD816B Item 68
1 Bolt EN6114V8-36 Item 35
Or
1 Bolt EN6114V8X37 Item 60
Hole P:
1 Nut ASNA2532-9 Item 40
1 Bolt EN6114V9-42 Item 3
Or
1 Bolt EN6114V9X43 Item 45
Hole Q:
1 Nut ASNA2532-10 Item 39
1 Bolt EN6114V10-44 Item 2
Or
1 Bolt EN6114V10X45 Item 43
Hole S:
1 Nut ASNA2531-10 Item 38
1 Bolt EN6114V10-48 Item 1
Or
1 Bolt EN6114V10X49 Item 41
Hole T:
1 Nut ASNA2531-8 Item 44
1 Bolt EN6114V8-24 Item 36
Or
1 Bolt EN6114V8X25 Item 61
Make the fasteners wet with:
In accordance with SRM 51-24-00
Polysulfide Sealant
- General Purpose
Brushable
06AAA1 As required
DATE: Aug 31/18 SERVICE BULLETIN No.: A300-57-6121
REVISION No.: 00 - Aug 31/18 Page: 41
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 46

@A300-600
SERVICE BULLETIN
1
 Seal the fasteners with:
In accordance with SRM 51-24-00
Polysulfide Sealant
- Fuel Tank
Brushable
06ABA1 As required
2
 Protect the fasteners with:
In accordance with SRM 51-75-10
Primer
Polyurethane Paint
- Corrosion
Inhibiting
04EAC2 As required
And
Top Coat
Polyurethane - Grey
Internal Structure
04JME4 As required
NOTE
: Let the first layer cure before you apply the second layer.
(b) Do the sealing and protection of the work area:
In accordance with SRM 51-22-00 and SRM 51-75-10
Apply on the outside of the center fuel tank:
Polyurethane
Coating - Fuel
Vapour Barrier
Struct
04PAG2 As required
And
Corrosion
Preventive
Compound - Water
Displacing
12ADB1 As required
(8) Subtask 576121-400-002-001 - Depending on the Inspection Results, Install New
Nominal or First Oversize Fasteners on the RH Side
Work Zones and Access Panels
Zone
 Access/Work location
140
 Work location
 Frame 47
DATE: Aug 31/18 SERVICE BULLETIN No.: A300-57-6121
REVISION No.: 00 - Aug 31/18 Page: 42
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 47

@A300-600
SERVICE BULLETIN
Manpower Resources
Manhours
 12.00
Minimum number of person
 2
Subtask elapsed time
 6.00
Skills
 AIRFRAME
Material necessary to do the job
Component COMPA01
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 SEE
NOTES
1
 EN6114V10-48
 1
 BOLT
2
 EN6114V10-44
 1
 BOLT
3
 EN6114V9-42
 1
 BOLT
4
 EN6114V9-40
 1
 BOLT
5
 EN6114V9-32
 1
 BOLT
6
 EN6114V8-32
 1
 BOLT
7
 EN6114V9-30
 1
 BOLT
34
 EN6114V8-38
 1
 BOLT
35
 EN6114V8-36
 1
 BOLT
36
 EN6114V8-24
 1
 BOLT
37
 EN6114V8-27
 1
 BOLT
38
 ASNA2531-10
 1
 NUT
39
 ASNA2532-10
 1
 NUT
40
 ASNA2532-9
 4
 NUT
41
 EN6114V10X49
 1
 BOLT
42
 ASNA2532-8
 3
 NUT
43
 EN6114V10X45
 1
 BOLT
44
 ASNA2531-8
 2
 NUT
45
 EN6114V9X43
 1
 BOLT
46
 EN6114V9X41
 1
 BOLT
55
 EN6114V9X33
 1
 BOLT
56
 EN6114V8X33
 1
 BOLT
57
 EN6114V9X31
 1
 BOLT
58
 EN6114V8X28
 1
 BOLT
59
 EN6114V8X39
 1
 BOLT
60
 EN6114V8X37
 1
 BOLT
61
 EN6114V8X25
 1
 BOLT
68
 NSA5369PD816B
 2
 WASHER
69
 NSA5369PD816D
 1
 WASHER
NOTE
: The above list of components is not an AIRBUS Kit, the required parts
shall be ordered as necessary through the given channel.
NOTE
: The components listed above are only necessary if no crack is found
during any inspection of the horizontal junction of the angle fitting. The
quantity of these items are to be ordered as required.
DATE: Aug 31/18 SERVICE BULLETIN No.: A300-57-6121
REVISION No.: 00 - Aug 31/18 Page: 43
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 48

@A300-600
SERVICE BULLETIN
Consumable CMLA01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Primer Polyurethane Paint -
Corrosion Inhibiting
04EAC2
 As required
Top Coat Polyurethane -
Grey Internal Structure
04JME4
 As required
Polyurethane Coating - Fuel
Vapour Barrier Struct
04PAG2
 As required
Polysulfide Sealant -
General Purpose Brushable
06AAA1
 As required
Polysulfide Sealant - Fuel
Tank Brushable
06ABA1
 As required
Corrosion Preventive
Compound - Water
Displacing
12ADB1
 As required
References
Aircraft Maintenance Manual (AMM)
 20-21-12, Page Block 001
Structural Repair Manual (SRM)
 51-22-00
51-24-00
51-40-00
51-40-20
51-40-30
51-75-10
Fig. A-FBMAA
Installation of New Nominal or First
Oversize Fasteners in the Horizontal
Junction Area of the CWB Lower Angle
Fitting at FR47
Sheet 01
Sheet 02
Sheet 03
Sheet 04
(a) Wet install the new nominal or first oversize fasteners:
Refer to AMM 20-21-12, Page Block 001
In accordance with SRM 51-40-20, SRM 51-40-30 and SRM 51-40-00
Refer to Fig. A-FBMAA
Hole A:
1 Nut ASNA2532-9 Item 40
1 Bolt EN6114V9-40 Item 4
Or
1 Bolt EN6114V9X41 Item 46
Hole B:
DATE: Aug 31/18 SERVICE BULLETIN No.: A300-57-6121
REVISION No.: 00 - Aug 31/18 Page: 44
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 49

@A300-600
SERVICE BULLETIN
1 Nut ASNA2532-9 Item 40
1 Bolt EN6114V9-32 Item 5
Or
1 Bolt EN6114V9X33 Item 55
Hole C:
1 Nut ASNA2532-8 Item 42
1 Bolt EN6114V8-32 Item 6
Or
1 Bolt EN6114V8X33 Item 56
Hole D:
1 Nut ASNA2532-9 Item 40
1 Bolt EN6114V9-30 Item 7
Or
1 Bolt EN6114V9X31 Item 57
Hole E:
1 Nut ASNA2532-8 Item 42
1 Bolt EN6114V8-27 Item 37
Or
1 Bolt EN6114V8X28 Item 58
Hole F:
1 Nut ASNA2531-8 Item 44
1 Washer NSA5369PD816B Item 68
1 Washer NSA5369PD816D Item 69
1 Bolt EN6114V8-38 Item 34
Or
1 Bolt EN6114V8X39 Item 59
Hole G:
1 Nut ASNA2532-8 Item 42
DATE: Aug 31/18 SERVICE BULLETIN No.: A300-57-6121
REVISION No.: 00 - Aug 31/18 Page: 45
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 50

@A300-600
SERVICE BULLETIN
1 Washer NSA5369PD816B Item 68
1 Bolt EN6114V8-36 Item 35
Or
1 Bolt EN6114V8X37 Item 60
Hole P:
1 Nut ASNA2532-9 Item 40
1 Bolt EN6114V9-42 Item 3
Or
1 Bolt EN6114V9X43 Item 45
Hole Q:
1 Nut ASNA2532-10 Item 39
1 Bolt EN6114V10-44 Item 2
Or
1 Bolt EN6114V10X45 Item 43
Hole S:
1 Nut ASNA2531-10 Item 38
1 Bolt EN6114V10-48 Item 1
Or
1 Bolt EN6114V10X49 Item 41
Hole T:
1 Nut ASNA2531-8 Item 44
1 Bolt EN6114V8-24 Item 36
Or
1 Bolt EN6114V8X25 Item 61
Make the fasteners wet with:
In accordance with SRM 51-24-00
Polysulfide Sealant
- General Purpose
Brushable
06AAA1 As required
DATE: Aug 31/18 SERVICE BULLETIN No.: A300-57-6121
REVISION No.: 00 - Aug 31/18 Page: 46
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 51

@A300-600
SERVICE BULLETIN
1
 Seal the fasteners with:
In accordance with SRM 51-24-00
Polysulfide Sealant
- Fuel Tank
Brushable
06ABA1 As required
2
 Protect the fasteners with:
In accordance with SRM 51-75-10
Primer
Polyurethane Paint
- Corrosion
Inhibiting
04EAC2 As required
And
Top Coat
Polyurethane - Grey
Internal Structure
04JME4 As required
NOTE
: Let the first layer cure before you apply the second layer.
(b) Do the sealing and protection of the work area:
In accordance with SRM 51-22-00 and SRM 51-75-10
Apply on the outside of the center fuel tank:
Polyurethane
Coating - Fuel
Vapour Barrier
Struct
04PAG2 As required
And
Corrosion
Preventive
Compound - Water
Displacing
12ADB1 As required
D. TEST
(1) Subtask 576121-700-001-001 - Testing
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 25-72-41, Page Block 401
28-11-29, Page Block 401
28-13-21, Page Block 401
DATE: Aug 31/18 SERVICE BULLETIN No.: A300-57-6121
REVISION No.: 00 - Aug 31/18 Page: 47
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 52

@A300-600
SERVICE BULLETIN
NOTE
: This Service Bulletin requires the accomplishment of Tests which are
given in:
- SUBTASK 576121-410-003 001 Install/Close Items
Removed/Opened for the Access of the LH Side
- SUBTASK 576121-410-004 001 Install/Close Items
Removed/Opened for the Access of the RH Side
- SUBTASK 576121-942-001 001 Close-up .
The man-hours for the tests are included in the referenced Service
Bulletin subtasks.
(a) Job set-up
1
 Do the test before the installation of the center tank manhole covers 147AZ
and 148AZ, refer to AMM 28-11-29, Page Block 401.
2
 Remove the safety clip(s) and/or tag(s) and close/unlock this (these) circuit
breaker(s) as specified in the center tank manhole covers 147AZ and 148AZ,
removal/installation, refer to AMM 28-11-29, Page Block 401.
3
 Remove the safety clip(s) and/or tag(s) and close/unlock this (these) circuit
breaker(s) as specified after the installation of the access panels 147BZ,
147CZ, 148CZ, 147DZ and 148DZ, refer to AMM 25-72-41, Page Block 401.
(b) Procedure
1
 Do the test as specified after the installation of the center tank manhole covers
147AZ and 148AZ, refer to AMM 28-11-29, Page Block 401.
2
 If removed, do the test as specified after the installation of the vapor seals,
refer to AMM 28-13-21, Page Block 401.
(c) Close-up
1
 If the vapor seals have been removed, remove the safety clip(s) and/or
tag(s) and close/unlock this (these) circuit breaker(s) as specified after the
installation of the vapor seals, refer to AMM 28-13-21, Page Block 401.
E. CLOSE-UP
(1) Subtask 576121-410-003-001 - Install/Close Items Removed/Opened for the Access
of the LH Side
Manpower Resources
Skills
 NON SPECIFIC
DATE: Aug 31/18 SERVICE BULLETIN No.: A300-57-6121
REVISION No.: 00 - Aug 31/18 Page: 48
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 53

@A300-600
SERVICE BULLETIN
References
Aircraft Maintenance Manual (AMM)
 25-72-41, Page Block 401
28-00-00, Page Block 401
28-11-29, Page Block 401
28-13-21, Page Block 401
(a) Make sure that the work areas are clean and clear of tools and other items of
equipment.
(b) In the center wing box, install fuel lines and equipment around the working areas,
refer to AMM 28-00-00, Page Block 401.
(c) If removed, install the removed vapor seals, refer to AMM 28-13-21, Page Block
401.
(d) Install the center manhole cover 147AZ, refer to AMM 28-11-29, Page Block 401.
(e) Install the access panels 147BZ, 147CZ and 147DZ, refer to AMM 25-72-41, Page
Block 401.
(2) Subtask 576121-410-004-001 - Install/Close Items Removed/Opened for the Access
of the RH Side
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 25-72-41, Page Block 401
28-00-00, Page Block 401
28-11-29, Page Block 401
28-13-21, Page Block 401
(a) Make sure that the work areas are clean and clear of tools and other items of
equipment.
(b) In the center wing box, install fuel lines and equipment around the working areas,
refer to AMM 28-00-00, Page Block 401.
(c) If removed, install the removed vapor seals, refer to AMM 28-13-21, Page Block
401.
(d) Install the center manhole cover 148AZ, refer to AMM 28-11-29, Page Block 401.
(e) Install the access panels 148CZ and 148DZ, refer to AMM 25-72-41, Page Block
401.
(3) Subtask 576121-942-001-001 - Close-up
Manpower Resources
Skills
 NON SPECIFIC
(a) Remove the access platform(s).
DATE: Aug 31/18 SERVICE BULLETIN No.: A300-57-6121
REVISION No.: 00 - Aug 31/18 Page: 49
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 54

@A300-600
SERVICE BULLETIN
(b) Put the aircraft back to its initial configuration.
DATE: Aug 31/18 SERVICE BULLETIN No.: A300-57-6121
REVISION No.: 00 - Aug 31/18 Page: 50
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 55

@A300-600
SERVICE BULLETIN
Task 576121-832-802-001 - Special Detailed Inspection of the Vertical Junction Area of the
CWB Lower Angle Fitting at Frame 47
WARNING
: MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND ALL THE CAUTIONS
INCLUDED IN THE REFERENCED PROCEDURES
CAUTION
: ALWAYS OBEY THE PRECAUTIONS THAT FOLLOW TO KEEP
ELECTRICAL WIRING IN A SATISFACTORY CONDITION (ELECTRICALLY
AND MECHANICALLY SERVICEABLE) . WHEN YOU DO MAINTENANCE
WORK, REPAIRS OR MODIFICATIONS, ALWAYS KEEP ELECTRICAL WIRING,
COMPONENTS AND THE WORK AREA AS CLEAN AS POSSIBLE. TO DO
THIS:
- PUT PROTECTION, SUCH AS PLASTIC SHEETING, CLOTHS, ETC., AS
NECESSARY ON WIRING AND COMPONENTS.
- REGULARLY REMOVE ALL SHAVINGS, UNWANTED MATERIAL AND
OTHER CONTAMINATION.
THESE PRECAUTIONS WILL DECREASE THE RISK OF CONTAMINATION
AND DAMAGE TO THE ELECTRICAL WIRING INSTALLATION.
IF THERE IS CONTAMINATION, REFER TO ESPM 20-55-00.
NOTE
: The accomplishment instructions of this Service Bulletin include procedures given
in other documents or in other sections of the Service Bulletin. When the words
’refer to’ are used and the operator has a procedure accepted by the local authority
he belongs to, the accepted alternative procedure can be used. When the words ’in
accordance with’ are used then the given procedure must be followed.
NOTE
: The access and close-up instructions, not comprising return to service tests, in this
Service Bulletin do not constitute or affect the technical intent of the Service
Bulletin. Operators can therefore, as deemed necessary, omit or add access and/or
close-up steps to add flexibility to their maintenance operations as long as the
technical intent of the Service Bulletin is met within the set parameters.
NOTE
: Manual titles given in the accomplishment instructions are referred to by acronyms.
Refer to paragraph 1.J., References, for the definition of acronyms.
NOTE
: This Service Bulletin contains the instructions for the on-aircraft maintenance
necessary to ensure the continued airworthiness of the aircraft.
For any deviations to the instructions, including RC paragraph contained herein,
contact AIRBUS for further instructions and approval.
NOTE
: This Service Bulletin is classified mandatory or expected to be classified mandatory
by an Airworthiness Directive (AD). The paragraphs 3.C. and 3.D. in these
accomplishment instructions are Required for Compliance (RC) and must be done
to comply with the AD. To allow more flexibility, the rule "refer to" and "in
accordance with" will apply to these paragraphs 3.C. and 3.D. Other paragraphs
are recommended and may be deviated from, done as part of other actions or
done with accepted methods different from those given in the Service Bulletin, as
long as the RC paragraphs can be done and the aircraft can be put back into a
DATE: Aug 31/18 SERVICE BULLETIN No.: A300-57-6121
REVISION No.: 00 - Aug 31/18 Page: 51
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 56

@A300-600
SERVICE BULLETIN
serviceable condition.
NOTE
: The purpose of flowcharts is to supplement the information given in the Procedure
and Compliance paragraphs and not to serve as the primary source for tasks or
compliance times given in this Service Bulletin.
NOTE
: Discarded parts must be managed at the operator’s discretion.
Task Associated Data
Zone
140
Manpower
TOTAL MANHOURS
 129.50
ELAPSED TIME (HOURS)
 34.50
A. GENERAL
(1) Subtask 576121-910-002-001 - Standard Practices
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 06-21-00, Page Block 001
06-31-53, Page Block 001
06-41-00, Page Block 001
20-21-12, Page Block 001
Consumable Material List (CML)
Structural Repair Manual (SRM)
 51-22-00
51-24-00
51-40-00
51-40-20
51-40-30
51-40-40
51-75-10
(a) For the Frame (FR) identification, refer to AMM 06-31-53, Page Block 001.
(b) For the identification of zones, refer to AMM 06-21-00, Page Block 001.
(c) For the identification of access panels, refer to AMM 06-41-00, Page Block 001.
(d) To torque tighten the standard threaded fasteners, refer to AMM 20-21-12, Page
Block 001.
(e) Remove and install fasteners in accordance with SRM 51-40-20.
(f) Get alternative and substitute fastener data in accordance with SRM 51-40-30.
(g) Get fastener hole diameters and drill data in accordance with SRM 51-40-40.
DATE: Aug 31/18 SERVICE BULLETIN No.: A300-57-6121
REVISION No.: 00 - Aug 31/18 Page: 52
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 57

@A300-600
SERVICE BULLETIN
(h) Apply sealant in accordance with SRM 51-24-00.
(i) Renew the protective finish in accordance with SRM 51-75-10.
(j) For the specification of Material Numbers (Mat. No.) given in this Service Bulletin,
refer to the Consumable Material List (CML).
(k) Tag all the parts you must remove and retain to make the subsequent installation
easier.
(l) Put all the retained hardware in identified plastic bags and attach the bags to the
related unit.
(m) If the length of any fastener specified in this Service Bulletin does not meet
installation standards given in SRM Chapter 51, then a fastener of the same
specification, or an approved substitute, with a length which meets the installation
standards given in SRM Chapter 51 may be used. In addition, washers may be
installed for fastener grip length in accordance with SRM Chapter 51.
(n) If alternative and substitute fasteners have to be used, you must make sure that the
associated nut/collar are compatible in accordance with SRM 51-40-00 ’Mating Part’
column.
(o) Apply corrosion protection in accordance with SRM 51-22-00.
(2) Subtask 576121-839-003-001 - Administrative
Manpower Resources
Skills
 NON SPECIFIC
Write in the applicable aircraft records that you have done all the work given in this
Service Bulletin.
B. PREPARATION
(1) Subtask 576121-941-002-001 - Job Set-up
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 24-00-00, Page Block 301
28-10-00, Page Block 301
28-25-00, Page Block 301
NOTE
: For the basic Aircraft configuration, refer to AMM Chapter "Introduction -
Aircraft status for maintenance" in Manual Front Matter section.
(a) Make sure that the aircraft is electrically grounded, refer to AMM 24-00-00, Page
Block 301.
(b) Put an access platform in position at zone 140.
DATE: Aug 31/18 SERVICE BULLETIN No.: A300-57-6121
REVISION No.: 00 - Aug 31/18 Page: 53
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 58

@A300-600
SERVICE BULLETIN
(c) Defuel the center tank, refer to AMM 28-25-00, Page Block 301.
(d) Degas and vent the center tank, refer to AMM 28-10-00, Page Block 301.
(2) Subtask 576121-010-001-001 - Remove/Open for the Access of the LH Side
Manpower Resources
Skills
 AIRFRAME
References
Aircraft Maintenance Manual (AMM)
 06-41-57, Page Block 001
25-72-41, Page Block 401
28-00-00, Page Block 401
28-11-29, Page Block 401
28-13-21, Page Block 401
29-00-00, Page Block 001
Structural Repair Manual (SRM)
 51-40-20
Fig. A-FBIAA
Removal/Installation of the Fairing under
Wing Bottom Skin Panel for Access
Sheet 01
Sheet 02
Fig. A-FBFAA
Removal/Installation of the Hydraulic
Panel Assy for Access
Sheet 01
Fig. A-FBKAA
Localization of the Hydraulic Pipes to be
Removed
Sheet 01
Sheet 02
(a) Remove the access panels 147DZ, 147CZ and 147BZ, refer to AMM 25-72-41,
Page Block 401.
(b) Remove the center tank manhole cover 147AZ, refer to AMM 28-11-29, Page Block
401.
(c) If necessary, for a better access remove the applicable vapor seals, refer to AMM
28-13-21, Page Block 401.
(d) In the center wing box, remove fuel lines and equipment around the working areas,
refer to AMM 28-00-00, Page Block 401.
(e) Remove the hydraulic panel.
1
 Remove the access panel 571AB, refer to AMM 06-41-57, Page Block 001.
2
 Remove the fairings:
Refer to Fig. A-FBIAA
In accordance with SRM 51-40-20
2 Fairing Item (29) Retain
attached with:
DATE: Aug 31/18 SERVICE BULLETIN No.: A300-57-6121
REVISION No.: 00 - Aug 31/18 Page: 54
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 59

@A300-600
SERVICE BULLETIN
2 Insert Item (30) Retain
8 Bushes Item (26) Retain
2 Fairing Item (23) Retain
2 Bolt Item (28) Retain
6 Bolt Item (24) Retain
2 Bolt Item (27) Retain
8 Nut Item (25) Retain
3
 In zone 542, disconnect the connectors 43QAA and 49QAA.
4
 In zone 571, disconnect the connectors 3GHA, 11QBA, 11QQA, 24GQA,
33GRA, 51QAA, 57QAA, 1935VCA and 1937VCA and ground connections
536VN and 538VN.
5
 Remove hydraulic panel:
Refer to Fig. A-FBFAA
In accordance with SRM 51-40-20
1 Panel Item (31) Retain
attached with:
6 Guide Item (12) Retain
6 Bolt Item (13) Retain
1 Bolt Item (8) Retain
1 Bolt Item (14) Retain
1 Washer Item (15) Retain
1 Washer Item (9) Retain
1 Nut Item (10) Discard
1 Nut Item (16) Discard
2 Cotter Pin Item (11) Discard
DATE: Aug 31/18 SERVICE BULLETIN No.: A300-57-6121
REVISION No.: 00 - Aug 31/18 Page: 55
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 60

@A300-600
SERVICE BULLETIN
(f) Remove the hydraulic lines:
WARNING
: OBEY THE HYDRAULIC SAFETY PROCEDURES. WORK ON
THE HYDRAULIC SYSTEMS CAN BE DANGEROUS.
WARNING
: DO NOT GET HYDRAULIC FLUID ON YOUR SKIN, IN YOUR
EYES OR IN YOUR MOUTH. HYDRAULIC FLUID IS POISONOUS
AND CAN GO THROUGH YOUR SKIN AND INTO YOUR
BODY. FLUSH HYDRAULIC FLUID FROM YOUR EYES, MOUTH
OR SKIN WITH WATER. GET MEDICAL AID IF YOU GET
HYDRAULIC FLUID IN YOUR EYES OR MOUTH.
CAUTION
: PLUG/CAP PORTS AND ALL OPEN LINE ENDS.
Refer to AMM 29-00-00, Page Block 001
Refer to Fig. A-FBKAA
1
 Return filter line.
2
 Pressurization line.
3
 Overflow line.
4
 Return line.
(3) Subtask 576121-010-002-001 - Remove/Open for the Access of the RH Side
Manpower Resources
Skills
 AIRFRAME
References
Aircraft Maintenance Manual (AMM)
 06-41-57, Page Block 001
25-72-41, Page Block 401
28-00-00, Page Block 401
28-11-29, Page Block 401
28-13-21, Page Block 401
Structural Repair Manual (SRM)
 51-40-20
Fig. A-FBGAA
Removal/Installation of the RAT Panel
for Access
Sheet 01
Fig. A-FBHAA
Removal/Installation of the Adjustable
Rod of the RAT for Access
Sheet 01
Fig. A-FBIAA
Removal/Installation of the Fairing under
Wing Bottom Skin Panel for Access
Sheet 01
Sheet 02
(a) Remove the access panels 148CZ and 148DZ, refer to AMM 25-72-41, Page Block
401.
DATE: Aug 31/18 SERVICE BULLETIN No.: A300-57-6121
REVISION No.: 00 - Aug 31/18 Page: 56
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

The text continues at https://openairdocs.org/service-documents/airbus/a300-57-6121/file/c636584ba451.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.