# Airbus Service Bulletin A300-57-6125

Copy: No revision named ("A300-57-6125"), 118 pages: PDF https://openairdocs.org/files/sha256/5d/e6/5de6c83d6d06a2feee8515945665d454d40d271ec8e23e1a222616170de5c34d; text https://openairdocs.org/service-documents/airbus/a300-57-6125/file/5de6c83d6d06.md. Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2025-0342, the docket of AD 2025-16-05. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Airbus](https://openairdocs.org/service-documents/airbus.md)
- Type: Service bulletin (Service Bulletin)
- Number: A300-57-6125
- Page: https://openairdocs.org/service-documents/airbus/a300-57-6125

## Text (118 pages)

Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2025-0342, the docket of AD 2025-16-05. Not covered by OpenAirDocs’ CC0 dedication. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

A300-600
SERVICE BULLETIN
REV 00 Mar 27/24 A300-57-6125
Page 1
CONF ALL
AIRBUS
2, ROND POINT EMILE DEWOITINE
31700 BLAGNAC
FRANCE
 
The content of this document is the property of Airbus. All rights including copyrights are reserved.
It is supplied in confidence and commercial security on its contents must be maintained.
It must not be used for any purpose other than that for which it is supplied, nor may information
contained in it be disclosed to unauthorized persons.
It must not be reproduced in whole or in part without permission in writing from the owners of the
copyright. Requests for reproduction of any data in this document and the media authorized for it must
be addressed to Airbus.
MANDATORY MANDATORY MANDATORY
ATA SYSTEM: 57
TITLE: WINGS - MLG RIB 5 LOWER FLANGE SPOTFACES GEOMETRICAL
INSPECTION
MODIFICATION No.:
None

### Page 2

A300-600
SERVICE BULLETIN
SUMMARY
REV 00 Mar 27/24 A300-57-6125
Page 2
ATA SYSTEM: 57
TITLE: WINGS - MLG RIB 5 LOWER FLANGE SPOTFACES GEOMETRICAL
INSPECTION
SUMMARY
This summary is for information only and is not approved for modification of the aircraft.
A. MODIFICATIONS
CONF 001
MODIFICATION CLASSIFICATION
MAJOR None
MINOR None
NOTE: As per EASA IR 21, a minor change is one that has no appreciable effect on the
mass, balance, structural strength, reliability, operational characteristics affecting
the airworthiness of the product. All other changes are major changes.
CONF 002
MODIFICATION CLASSIFICATION
MAJOR None
MINOR None
NOTE: As per EASA IR 21, a minor change is one that has no appreciable effect on the
mass, balance, structural strength, reliability, operational characteristics affecting
the airworthiness of the product. All other changes are major changes.
CONF ALL
B. REASON
(1) History
As a result of in-service cracking in the Main Landing Gear attachment fitting at Rib 5,
gear Rib 5 lower flange area has been subject to two consecutive mandated retrofit
modifications to increase critical spotfaces corner radius, diameter and depth in order
to decrease stress level:
- Initial modification: Service Bulletin No. A300-57-6088
- T erminative modification: Service Bulletin No. A300-57-6110.
Following recent occurrences of lower flange cracking, AIRBUS issued the AOT
A57W017-21 to request a one-time inspection of all pre-mod 11912 A/C using the
Fluorescent Penetrant method allowing the detection of small cracks. Since AOT
publication, AIRBUS conducted an investigation that identified the root cause to be
various maintenance errors (misapplication of Service Bulletin instruction), leading to
incorrect geometry of the spotface (depth and radius).
(2) Objective/Action
This Service Bulletin consists in a Special Detailed Inspection (SDI) by performing a
one-time geometrical inspection of the seven identified spotfaces to assess geometric
compliance to terminative modification. This inspection consists in a spotface
geometry check using GO/NO-GO gauges, for the seven critical spotfaces on each rib

### Page 3

A300-600
SERVICE BULLETIN
SUMMARY
REV 00 Mar 27/24 A300-57-6125
Page 3
(Left Hand (LH) side and Right Hand (RH) side holes 43, 47, 48, 49, 50, 52 and 54):
any spotface non-conformance is to be reported to AIRBUS for further instructions.
Spotfaces previously repaired as per Repair Instruction (RI) R572-43667 all sheets do
not need to be inspected.
This Service Bulletin provides instructions to perform the inspection through two
different options. Option 1 describes the removal of the nuts using spanner CHS943
without removal of the MLG actuating cylinder (aircraft jacking not required), while
Option 2 covers the removal of the MLG actuating cylinder to allow access for the nut
removal (aircraft jacking required, but spanner CHS943 not required).
(3) Advantages
The embodiment of this Service Bulletin allows the operator to identify any potential
deviation from the geometrical compliance to the terminative modification, and to
contact AIRBUS for further instructions.
The appropriate embodiment of the terminative modification is essential to maintain
the structural integrity of the aircraft.
(4) Operational/Maintenance Consequences
None
C. GENERAL EVALUATION
EVALUATION TABLE
COMPLIANCE MANDATORY COST SAVING NO
A/C OPERATION
AFFECTED
NO VENDOR SB NO
CANCELS INSPECTION SB NO ETOPS AFFECTED NO
PAX COMFORT AFFECTED NO POTENTIAL AD YES
RELIABILITY AFFECTED NO STRUCTURAL LIFE EXTENSION NO
LIFE LIMIT NO LINE MAINTENANCE AFFECTED NO
NOTE: Service Bulletin must be accomplished.
D. MAINTENANCE CONFIGURATION
CONF 001
MAINTENANCE CONFIGURATION
A/C JACKING YES
CONF 002
MAINTENANCE CONFIGURATION
A/C JACKING YES
CONF ALL
E. MATERIAL PRICE INFORMATION
CONF 001
(1) Inspection of the MLG Rib 5 Lower Flange Holes on the LH/RH Wing

### Page 4

A300-600
SERVICE BULLETIN
SUMMARY
REV 00 Mar 27/24 A300-57-6125
Page 4
(a) T ask set A300-A-57-XX-6125-01000-93BA-A OPTION 1 - Inspection of the MLG Rib
5 Lower Flange Holes with MLG Actuating-Cylinder Assembly Installed, on the LH/
RH Wing
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET QTYPER A/C PRICE PER A/C MAIN PARTS
T ool kit 576125T01R00 1 See SB Spotface gauges, spanner and
sealing nut
Components See SB See Note Nut
NOTE: Price information to be obtained from the given supplier.
(b) T ask set A300-A-57-XX-6125-01000-93BB-A OPTION 2 - Inspection of the MLG Rib
5 Lower Flange Holes without MLG Actuating-Cylinder Assembly Installed, on the
LH/RH Wing
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET QTYPER A/C PRICE PER A/C MAIN PARTS
T ool kit 576125T01R00 1 See SB Spotface gauges, spanner and
sealing nut
Components See SB See Note Nut
NOTE: Price information to be obtained from the given supplier.
CONF 002
(1) Inspection of the MLG Rib 5 Lower Flange Holes on the LH/RH Wing
(a) T ask set A300-A-57-XX-6125-01000-93BA-A OPTION 1 - Inspection of the MLG Rib
5 Lower Flange Holes with MLG Actuating-Cylinder Assembly Installed, on the LH/
RH Wing
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET QTYPER A/C PRICE PER A/C MAIN PARTS
T ool kit 576125T01R00 1 See SB Spotface gauges, spanner and
sealing nut
Components See SB See Note Nut
NOTE: Price information to be obtained from the given supplier.
(b) T ask set A300-A-57-XX-6125-01000-93BB-A OPTION 2 - Inspection of the MLG Rib
5 Lower Flange Holes without MLG Actuating-Cylinder Assembly Installed, on the
LH/RH Wing
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET QTYPER A/C PRICE PER A/C MAIN PARTS
T ool kit 576125T01R00 1 See SB Spotface gauges, spanner and
sealing nut
Components See SB See Note Nut

### Page 5

A300-600
SERVICE BULLETIN
SUMMARY
REV 00 Mar 27/24 A300-57-6125
Page 5
NOTE: Price information to be obtained from the given supplier.
CONF ALL
F. APPLICABILITY
This Service Bulletin is applicable to this (these) operator(s):
26S 34P 34Z 98W ABR BCS F2I FDX IRA IRB IRM KAC KAL LOL MNB MON MRJ PVV QSM SMF
SOP SUD THA TNO UTP
G. CONCURRENT REQUIREMENTS
None
H. NATURE OF THE WORK
CONF 001
(1) Inspection of the MLG Rib 5 Lower Flange Holes on the LH/RH Wing
(a) T ask set A300-A-57-XX-6125-01000-93BA-A OPTION 1 - Inspection of the MLG Rib
5 Lower Flange Holes with MLG Actuating-Cylinder Assembly Installed, on the LH/
RH Wing
AIRCRAFT YES
EQUIPMENT NO
(b) T ask set A300-A-57-XX-6125-01000-93BB-A OPTION 2 - Inspection of the MLG Rib
5 Lower Flange Holes without MLG Actuating-Cylinder Assembly Installed, on the
LH/RH Wing
AIRCRAFT YES
EQUIPMENT NO
CONF 002
(1) Inspection of the MLG Rib 5 Lower Flange Holes on the LH/RH Wing
(a) T ask set A300-A-57-XX-6125-01000-93BA-A OPTION 1 - Inspection of the MLG Rib
5 Lower Flange Holes with MLG Actuating-Cylinder Assembly Installed, on the LH/
RH Wing
AIRCRAFT YES
EQUIPMENT NO
(b) T ask set A300-A-57-XX-6125-01000-93BB-A OPTION 2 - Inspection of the MLG Rib
5 Lower Flange Holes without MLG Actuating-Cylinder Assembly Installed, on the
LH/RH Wing
AIRCRAFT YES
EQUIPMENT NO
CONF ALL
I. MANPOWER
CONF 001
(1) Inspection of the MLG Rib 5 Lower Flange Holes on the LH/RH Wing

### Page 6

A300-600
SERVICE BULLETIN
SUMMARY
REV 00 Mar 27/24 A300-57-6125
Page 6
(a) T ask set A300-A-57-XX-6125-01000-93BA-A OPTION 1 - Inspection of the MLG Rib
5 Lower Flange Holes with MLG Actuating-Cylinder Assembly Installed, on the LH/
RH Wing
MANPOWER
TOTAL MAN-HOURS 38.75 h
ELAPSED TIME (HOURS) 19.75 h
(b) T ask set A300-A-57-XX-6125-01000-93BB-A OPTION 2 - Inspection of the MLG Rib
5 Lower Flange Holes without MLG Actuating-Cylinder Assembly Installed, on the
LH/RH Wing
MANPOWER
TOTAL MAN-HOURS 136.75
h
ELAPSED TIME (HOURS) 41.25 h
CONF 002
(1) Inspection of the MLG Rib 5 Lower Flange Holes on the LH/RH Wing
(a) T ask set A300-A-57-XX-6125-01000-93BA-A OPTION 1 - Inspection of the MLG Rib
5 Lower Flange Holes with MLG Actuating-Cylinder Assembly Installed, on the LH/
RH Wing
MANPOWER
TOTAL MAN-HOURS 38.75 h
ELAPSED TIME (HOURS) 19.75 h
(b) T ask set A300-A-57-XX-6125-01000-93BB-A OPTION 2 - Inspection of the MLG Rib
5 Lower Flange Holes without MLG Actuating-Cylinder Assembly Installed, on the
LH/RH Wing
MANPOWER
TOTAL MAN-HOURS 136.75
h
ELAPSED TIME (HOURS) 41.25 h

### Page 7

A300-600
SERVICE BULLETIN
SUMMARY
Figure ICN-A300-A-57XX6125-A-FAPE3-0085Y-A-003-01 Fig.SA Sol.AA SHEET 1/1
REV 00 Mar 27/24 A300-57-6125General Overview
Page 7
CONF ALL
J. GENERAL OVERVIEW
CONF ALL
A
F
W
D
INBD
B
A
A
LH SHOWN
RH SYMMETRICAL
Z572
Z672
RIB5
B
MLG RIB 5 LOWER FLANGE SPOTFACES 
TO BE INSPECTED
F
W
D
INBD
HOLE 50
HOLE 54
HOLE 52
HOLE 47
HOLE 48
HOLE 43
HOLE 49
ICN-A300-A-57XX6125-A-FAPE3-0085Y-A-003-01

### Page 8

A300-600
SERVICE BULLETIN
REV 00 Mar 27/24 A300-57-6125
Page 8
ATA SYSTEM: 57
TITLE: WINGS - MLG RIB 5 LOWER FLANGE SPOTFACES GEOMETRICAL
INSPECTION
1. PLANNING INFORMATION
A. APPLICABILITY
NOTE: This Service Bulletin is not applicable to spotfaces that have previously been
repaired in accordance with RI R572-43667 all sheets.
NOTE: This Service Bulletin is not applicable to the aircraft on which MOD No. 11912H5490
(WINGS - STRUCTURE - RIB 1 TO RIB 29 - FIT MODIFIED GEAR RIB 5 MACHINING
AND ASSEMBLY) is embodied or if the gear rib has been previously replaced with
the Part Number (PN) A57240810-006 or PN A57240810-007 or PN A57240810-008
or PN A57240810-009 or PN A57240810-010 or PN A57240810-011.
NOTE: This Service Bulletin is applicable to aircraft on which MOD No. 13534H5720
(Service Bulletin No. A300-57-6110) is embodied.
(1) Models
ON A/C 0380, 0401, 0405, 0408, 0411, 0414, 0546, 0553, 0618, 0623
B4-603
ON A/C 0464, 0505, 0518, 0521, 0532, 0556, 0558, 0563, 0584, 0603, 0608, 0626, 0632,
0643, 0696, 0701, 0707, 0709, 0713, 0715, 0723, 0725, 0727, 0732, 0741, 0744, 0746,
0749, 0754, 0763, 0764, 0773
B4-605R
ON A/C 0358, 0361, 0365, 0388, 0417
B4-622
ON A/C 0477, 0479, 0530, 0536, 0543, 0555, 0557, 0559, 0561, 0569, 0572, 0575, 0579,
0581, 0602, 0607, 0611, 0613, 0617, 0621, 0625, 0630, 0631, 0633, 0635, 0637, 0641,
0657, 0659, 0662, 0664, 0666, 0668, 0670, 0677, 0679, 0683, 0685, 0688, 0703, 0711,
0717, 0722, 0724, 0729, 0730, 0733, 0734, 0737, 0739, 0740, 0743, 0750, 0753, 0756,
0762, 0767, 0770, 0775, 0783, 0786
B4-622R
ON A/C 0344
C4-620
ON A/C 0726, 0728, 0735, 0736, 0738, 0742, 0745, 0748, 0752, 0757, 0759-0761, 0766,
0768, 0769, 0771, 0772, 0774, 0777-0781, 0789-0791
F4-605R
CONF ALL
(2) Applicability by MSN
0344 0358 0361 0365 0380 0388 0401 0405 0408 0411 0414 0417 0464 0477 0479
0505 0518 0521 0530 0532 0536 0543 0546 0553 0555-0559 0561 0563 0569 0572
0575 0579 0581 0584 0602 0603 0607 0608 0611 0613 0617 0618 0621 0623 0625
0626 0630-0633 0635 0637 0641 0643 0657 0659 0662 0664 0666 0668 0670 0677
0679 0683 0685 0688 0696 0701 0703 0707 0709 0711 0713 0715 0717 0722-0730
0732-0746 0748-0750 0752-0754 0756 0757 0759-0764 0766-0775 0777-0781 0783
0786 0789-0791
(3) MSN by configuration
CONF 001

### Page 9

A300-600
SERVICE BULLETIN
REV 00 Mar 27/24 A300-57-6125
Page 9
MSN CONFIGURATION
0344 0358 0361 0365 0380 0388 0401 0405 0408 0411 0414
0417 0464 0477 0479 0505 0518 0521 0530 0532 0536 0543
0546 0553 0555 0556 0557 0558 0559 0561 0563 0569 0572
0575 0579 0581 0584 0602 0603 0607 0608 0611 0613 0617
0618 0621 0623 0625 0626 0630 0631 0632 0633 0635 0637
0641 0643 0657 0659 0662 0664 0666 0668 0670 0677 0679
0683 0685 0688 0696 0701 0703 0707 0709 0711 0713 0715
0717 0722 0723 0724 0725 0726 0727 0728 0729 0730 0732
0733 0734 0735 0736 0737 0738 0739 0740 0741 0742 0743
0744 0745 0746 0748 0749 0750 0752 0753
001
CONF 002
MSN CONFIGURATION
0754 0756 0757 0759 0760 0761 0762 0763 0764 0766 0767
0768 0769 0770 0771 0772 0773 0774 0775 0777 0778 0779
0780 0781 0783 0786 0789 0790 0791
002
CONF ALL
(4) Configuration definition
CONF 001
Configuration 001
CONF 001 is applicable to the aircraft on which MOD No. 10768H5385 is not
embodied.
CONF 002
Configuration 002
CONF 002 is applicable to the aircraft on which MOD No. 10768H5385 is
embodied.
CONF ALL
B. CONCURRENT REQUIREMENTS
None
C. REASON
(1) History
As a result of in-service cracking in the Main Landing Gear attachment fitting at Rib 5,
gear Rib 5 lower flange area has been subject to two consecutive mandated retrofit
modifications to increase critical spotfaces corner radius, diameter and depth in order
to decrease stress level:
- Initial modification: Service Bulletin No. A300-57-6088
- T erminative modification: Service Bulletin No. A300-57-6110.
Following recent occurrences of lower flange cracking, AIRBUS issued the AOT
A57W017-21 to request a one-time inspection of all pre-mod 11912 A/C using the
Fluorescent Penetrant method allowing the detection of small cracks. Since AOT
publication, AIRBUS conducted an investigation that identified the root cause to be
various maintenance errors (misapplication of Service Bulletin instruction), leading to
incorrect geometry of the spotface (depth and radius).

### Page 10

A300-600
SERVICE BULLETIN
REV 00 Mar 27/24 A300-57-6125
Page 10
(2) Objective/Action
This Service Bulletin consists in a Special Detailed Inspection (SDI) by performing a
one-time geometrical inspection of the seven identified spotfaces to assess geometric
compliance to terminative modification. This inspection consists in a spotface
geometry check using GO/NO-GO gauges, for the seven critical spotfaces on each rib
(Left Hand (LH) side and Right Hand (RH) side holes 43, 47, 48, 49, 50, 52 and 54):
any spotface non-conformance is to be reported to AIRBUS for further instructions.
Spotfaces previously repaired as per Repair Instruction (RI) R572-43667 all sheets do
not need to be inspected.
This Service Bulletin provides instructions to perform the inspection through two
different options. Option 1 describes the removal of the nuts using spanner CHS943
without removal of the MLG actuating cylinder (aircraft jacking not required), while
Option 2 covers the removal of the MLG actuating cylinder to allow access for the nut
removal (aircraft jacking required, but spanner CHS943 not required).
(3) Advantages
The embodiment of this Service Bulletin allows the operator to identify any potential
deviation from the geometrical compliance to the terminative modification, and to
contact AIRBUS for further instructions.
The appropriate embodiment of the terminative modification is essential to maintain
the structural integrity of the aircraft.
(4) Operational/Maintenance Consequences
None
D. DESCRIPTION
NOTE: T o accomplish this Service Bulletin, you have two options.
T o accomplish this Service Bulletin it is necessary to:
(1) Inspection of the MLG Rib 5 Lower Flange Holes on the LH/RH Wing
(a) T ask set A300-A-57-XX-6125-01000-93BA-A OPTION 1 - Inspection of the MLG Rib
5 Lower Flange Holes with MLG Actuating-Cylinder Assembly Installed, on the LH/
RH Wing
1 Remove the Nut and Washer from the MLG Rib 5 Lower Flange on the LH
Wing
2 Remove the Nut and Washer from the MLG Rib 5 Lower Flange on the RH
Wing
3 Do a SDI of the MLG Rib 5 Lower Flange Holes on the LH Wing
4 Do a SDI of the MLG Rib 5 Lower Flange Holes on the RH Wing
CONF 001
5 Install the Nut and Washer in the MLG Rib 5 Lower Flange on the LH Wing
CONF 002
5 Install the Nut and Washer in the MLG Rib 5 Lower Flange on the LH Wing
CONF 001
6 Install the Nut and Washer in the MLG Rib 5 Lower Flange on the RH Wing
CONF 002
6 Install the Nut and Washer in the MLG Rib 5 Lower Flange on the RH Wing
CONF ALL

### Page 11

A300-600
SERVICE BULLETIN
REV 00 Mar 27/24 A300-57-6125
Page 11
7 Complete and Send the Inspection Report Sheet
(b) T ask set A300-A-57-XX-6125-01000-93BB-A OPTION 2 - Inspection of the MLG Rib
5 Lower Flange Holes without MLG Actuating-Cylinder Assembly Installed, on the
LH/RH Wing
1 Remove the Nut and Washer from the MLG Rib 5 Lower Flange on the LH
Wing
2 Remove the Nut and Washer from the MLG Rib 5 Lower Flange on the RH
Wing
3 Do a SDI of the MLG Rib 5 Lower Flange Holes on the LH Wing
4 Do a SDI of the MLG Rib 5 Lower Flange Holes on the RH Wing
CONF 001
5 Install the Nut and Washer in the MLG Rib 5 Lower Flange on the LH Wing
CONF 002
5 Install the Nut and Washer in the MLG Rib 5 Lower Flange on the LH Wing
CONF 001
6 Install the Nut and Washer in the MLG Rib 5 Lower Flange on the RH Wing
CONF 002
6 Install the Nut and Washer in the MLG Rib 5 Lower Flange on the RH Wing
CONF ALL
7 Complete and Send the Inspection Report Sheet
E. COMPLIANCE
(1) Classification
MANDATORY: Service Bulletin must be accomplished.
(2) Accomplishment Timescale
This Service Bulletin has been classified Mandatory. It is expected that an
Airworthiness Directive (AD) published by the European Union Aviation Safety Agency
(EASA) will be issued to confirm this classification. It is anticipated that the AD will
confirm the thresholds given below but reference should be made to the AD for
confirmation of the mandated accomplishment timescale.
One time inspection to be performed at the next heavy maintenance check without
exceeding 30 months from Service Bulletin issuance. In case of double radius
condition found or spotface not compliant, contact AIRBUS before next flight and
follow their instructions.
F. APPROVAL
The technical content of this document is approved under the authority of the Design
Organisation Approval ref. EASA.21J.031.
If an aircraft listed in the applicability has a modification or repair embodied that is not
of AIRBUS origin, and which affects the content of this Service Bulletin, the operator
is responsible for obtaining approval by its airworthiness authority for any adaptation
necessary before incorporation of the Service Bulletin.
G. MANPOWER
CONF 001
The manpower estimates given in this Service Bulletin are based on the direct labor cost to
do the work. These estimates assume that the work will be done by experienced personnel,
and may need to be revised upwards to suit operator’s circumstances. The estimates do not
include the time to prepare, plan or inspect the work. Manufacture and procurement of parts

### Page 12

A300-600
SERVICE BULLETIN
REV 00 Mar 27/24 A300-57-6125
Page 12
and tools, drying times for paints, sealants, etc., and general administration work are also
not included.
(1) Inspection of the MLG Rib 5 Lower Flange Holes on the LH/RH Wing
(a) T ask set A300-A-57-XX-6125-01000-93BA-A OPTION 1 - Inspection of the MLG Rib
5 Lower Flange Holes with MLG Actuating-Cylinder Assembly Installed, on the LH/
RH Wing
PREPARATION
Job Set-up 0.25 h
PROCEDURE
Remove the Nut and Washer from the MLG Rib 5 Lower
Flange on the LH Wing
6.00 h
Remove the Nut and Washer from the MLG Rib 5 Lower
Flange on the RH Wing
6.00 h
Do a SDI of the MLG Rib 5 Lower Flange Holes on the LH
Wing
7.00 h
Do a SDI of the MLG Rib 5 Lower Flange Holes on the RH
Wing
7.00 h
Install the Nut and Washer in the MLG Rib 5 Lower Flange
on the LH Wing
6.00 h
Install the Nut and Washer in the MLG Rib 5 Lower Flange
on the RH Wing
6.00 h
Complete and Send the Inspection Report Sheet 0.25 h
PREPARATION FOR TEST
None
TEST
None
CLOSE-UP
Close-Up 0.25 h
TOTAL MAN-HOURS 38.75 h
ELAPSED TIME (HOURS) 19.75 h
NOTE: For an explanation of the man-hours and elapsed time, refer to the
Gantt Chart given in Appendix A.
NOTE: The minimum man-hours necessary to accomplish this Service Bulletin
are those for the Inspection. Depending on the inspection result,
additional man-hours can apply.
(b) T ask set A300-A-57-XX-6125-01000-93BB-A OPTION 2 - Inspection of the MLG Rib
5 Lower Flange Holes without MLG Actuating-Cylinder Assembly Installed, on the
LH/RH Wing
PREPARATION
Job Set-up 0.25 h
Jack the Aircraft 13.50 h
Remove the MLG Actuating-Cylinder Assembly on the LH
Wing
17.00 h

### Page 13

A300-600
SERVICE BULLETIN
REV 00 Mar 27/24 A300-57-6125
Page 13
Remove the MLG Actuating-Cylinder Assembly on the RH
Wing
17.00 h
PROCEDURE
Remove the Nut and Washer from the MLG Rib 5 Lower
Flange on the LH Wing
6.00 h
Remove the Nut and Washer from the MLG Rib 5 Lower
Flange on the RH Wing
6.00 h
Do a SDI of the MLG Rib 5 Lower Flange Holes on the LH
Wing
7.00 h
Do a SDI of the MLG Rib 5 Lower Flange Holes on the RH
Wing
7.00 h
Install the Nut and Washer in the MLG Rib 5 Lower Flange
on the LH Wing
6.00 h
Install the Nut and Washer in the MLG Rib 5 Lower Flange
on the RH Wing
6.00 h
Complete and Send the Inspection Report Sheet 0.25 h
PREPARATION FOR TEST
Install the MLG Actuating-Cylinder Assembly on the LH
Wing
18.00 h
Install the MLG Actuating-Cylinder Assembly on the RH
Wing
18.00 h
TEST
T est 1.00 h
CLOSE-UP
Lower the Aircraft off Jack 13.50 h
Close-Up 0.25 h
TOTAL MAN-HOURS 136.75 h
ELAPSED TIME (HOURS) 41.25 h
NOTE: For an explanation of the man-hours and elapsed time, refer to the
Gantt Chart given in Appendix A.
NOTE: The minimum man-hours necessary to accomplish this Service Bulletin
are those for the Inspection. Depending on the inspection result,
additional man-hours can apply.
CONF 002
The manpower estimates given in this Service Bulletin are based on the direct labor cost to
do the work. These estimates assume that the work will be done by experienced personnel,
and may need to be revised upwards to suit operator’s circumstances. The estimates do not
include the time to prepare, plan or inspect the work. Manufacture and procurement of parts
and tools, drying times for paints, sealants, etc., and general administration work are also
not included.
(1) Inspection of the MLG Rib 5 Lower Flange Holes on the LH/RH Wing
(a) T ask set A300-A-57-XX-6125-01000-93BA-A OPTION 1 - Inspection of the MLG Rib
5 Lower Flange Holes with MLG Actuating-Cylinder Assembly Installed, on the LH/
RH Wing
PREPARATION
Job Set-up 0.25 h

### Page 14

A300-600
SERVICE BULLETIN
REV 00 Mar 27/24 A300-57-6125
Page 14
PROCEDURE
Remove the Nut and Washer from the MLG Rib 5 Lower
Flange on the LH Wing
6.00 h
Remove the Nut and Washer from the MLG Rib 5 Lower
Flange on the RH Wing
6.00 h
Do a SDI of the MLG Rib 5 Lower Flange Holes on the LH
Wing
7.00 h
Do a SDI of the MLG Rib 5 Lower Flange Holes on the RH
Wing
7.00 h
Install the Nut and Washer in the MLG Rib 5 Lower Flange
on the LH Wing
6.00 h
Install the Nut and Washer in the MLG Rib 5 Lower Flange
on the RH Wing
6.00 h
Complete and Send the Inspection Report Sheet 0.25 h
PREPARATION FOR TEST
None
TEST
None
CLOSE-UP
Close-Up 0.25 h
TOTAL MAN-HOURS 38.75 h
ELAPSED TIME (HOURS) 19.75 h
NOTE: For an explanation of the man-hours and elapsed time, refer to the
Gantt Chart given in Appendix A.
NOTE: The minimum man-hours necessary to accomplish this Service Bulletin
are those for the Inspection. Depending on the inspection result,
additional man-hours can apply.
(b) T ask set A300-A-57-XX-6125-01000-93BB-A OPTION 2 - Inspection of the MLG Rib
5 Lower Flange Holes without MLG Actuating-Cylinder Assembly Installed, on the
LH/RH Wing
PREPARATION
Job Set-up 0.25 h
Jack the Aircraft 13.50 h
Remove the MLG Actuating-Cylinder Assembly on the LH
Wing
17.00 h
Remove the MLG Actuating-Cylinder Assembly on the RH
Wing
17.00 h
PROCEDURE
Remove the Nut and Washer from the MLG Rib 5 Lower
Flange on the LH Wing
6.00 h
Remove the Nut and Washer from the MLG Rib 5 Lower
Flange on the RH Wing
6.00 h
Do a SDI of the MLG Rib 5 Lower Flange Holes on the LH
Wing
7.00 h

### Page 15

A300-600
SERVICE BULLETIN
REV 00 Mar 27/24 A300-57-6125
Page 15
Do a SDI of the MLG Rib 5 Lower Flange Holes on the RH
Wing
7.00 h
Install the Nut and Washer in the MLG Rib 5 Lower Flange
on the LH Wing
6.00 h
Install the Nut and Washer in the MLG Rib 5 Lower Flange
on the RH Wing
6.00 h
Complete and Send the Inspection Report Sheet 0.25 h
PREPARATION FOR TEST
Install the MLG Actuating-Cylinder Assembly on the LH
Wing
18.00 h
Install the MLG Actuating-Cylinder Assembly on the RH
Wing
18.00 h
TEST
T est 1.00 h
CLOSE-UP
Lower the Aircraft off Jack 13.50 h
Close-Up 0.25 h
TOTAL MAN-HOURS 136.75 h
ELAPSED TIME (HOURS) 41.25 h
NOTE: For an explanation of the man-hours and elapsed time, refer to the
Gantt Chart given in Appendix A.
NOTE: The minimum man-hours necessary to accomplish this Service Bulletin
are those for the Inspection. Depending on the inspection result,
additional man-hours can apply.
CONF ALL
H. WEIGHT AND BALANCE
Not changed
I. ELECTRICAL LOAD DATA
Not changed
J. REFERENCES
CONF 001
(1) Inspection of the MLG Rib 5 Lower Flange Holes on the LH/RH Wing
(a) T ask set A300-A-57-XX-6125-01000-93BA-A OPTION 1 - Inspection of the MLG Rib
5 Lower Flange Holes with MLG Actuating-Cylinder Assembly Installed, on the LH/
RH Wing
AIRCRAFT MAINTENANCE MANUAL (AMM)
06-21-00, Page Block 001 06-31-57, Page Block 001
20-21-12, Page Block 001 24-00-00, Page Block 301
32-31-46, Page Block 401
ALL OPERATORS TRANSMISSION (AOT)
A57W017-21-00

### Page 16

A300-600
SERVICE BULLETIN
REV 00 Mar 27/24 A300-57-6125
Page 16
CONSUMABLE MATERIAL LIST (CML)
See manual
ELECTRICAL STANDARD PRACTICES MANUAL (ESPM)
20-55-00
IN SERVICE INFORMATION (ISI)
00.00.00179
NON DESTRUCTIVE TEST MANUAL (NTM)
57-51-34
STANDARDS MANUAL (SM)
See manual
STRUCTURAL REPAIR MANUAL (SRM)
51-21-10 51-24-00
51-24-10 51-40-20
51-75-10 51-75-20
51-76-10
TECHNICAL FOLLOW UP (TFU)
57.50.00034
(b) T ask set A300-A-57-XX-6125-01000-93BB-A OPTION 2 - Inspection of the MLG Rib
5 Lower Flange Holes without MLG Actuating-Cylinder Assembly Installed, on the
LH/RH Wing
AIRCRAFT MAINTENANCE MANUAL (AMM)
06-21-00, Page Block 001 06-31-57, Page Block 001
07-11-00, Page Block 201 20-21-12, Page Block 001
24-00-00, Page Block 301 32-31-46, Page Block 401
ALL OPERATORS TRANSMISSION (AOT)
A57W017-21-00
CONSUMABLE MATERIAL LIST (CML)
See manual
ELECTRICAL STANDARD PRACTICES MANUAL (ESPM)
20-55-00
IN SERVICE INFORMATION (ISI)
00.00.00179
NON DESTRUCTIVE TEST MANUAL (NTM)
57-51-34

### Page 17

A300-600
SERVICE BULLETIN
REV 00 Mar 27/24 A300-57-6125
Page 17
STANDARDS MANUAL (SM)
See manual
STRUCTURAL REPAIR MANUAL (SRM)
51-21-10 51-24-00
51-24-10 51-40-20
51-51-00 51-75-10
51-75-20 51-76-10
TECHNICAL FOLLOW UP (TFU)
57.50.00034
CONF 002
(1) Inspection of the MLG Rib 5 Lower Flange Holes on the LH/RH Wing
(a) T ask set A300-A-57-XX-6125-01000-93BA-A OPTION 1 - Inspection of the MLG Rib
5 Lower Flange Holes with MLG Actuating-Cylinder Assembly Installed, on the LH/
RH Wing
AIRCRAFT MAINTENANCE MANUAL (AMM)
06-21-00, Page Block 001 06-31-57, Page Block 001
20-21-12, Page Block 001 24-00-00, Page Block 301
32-31-46, Page Block 401
ALL OPERATORS TRANSMISSION (AOT)
A57W017-21-00
CONSUMABLE MATERIAL LIST (CML)
See manual
ELECTRICAL STANDARD PRACTICES MANUAL (ESPM)
20-55-00
IN SERVICE INFORMATION (ISI)
00.00.00179
NON DESTRUCTIVE TEST MANUAL (NTM)
57-51-34
STANDARDS MANUAL (SM)
See manual
STRUCTURAL REPAIR MANUAL (SRM)
51-21-10 51-24-00
51-24-10 51-40-20
51-75-10 51-75-20
51-76-10

### Page 18

A300-600
SERVICE BULLETIN
REV 00 Mar 27/24 A300-57-6125
Page 18
TECHNICAL FOLLOW UP (TFU)
57.50.00034
(b) T ask set A300-A-57-XX-6125-01000-93BB-A OPTION 2 - Inspection of the MLG Rib
5 Lower Flange Holes without MLG Actuating-Cylinder Assembly Installed, on the
LH/RH Wing
AIRCRAFT MAINTENANCE MANUAL (AMM)
06-21-00, Page Block 001 06-31-57, Page Block 001
07-11-00, Page Block 201 20-21-12, Page Block 001
24-00-00, Page Block 301 32-31-46, Page Block 401
ALL OPERATORS TRANSMISSION (AOT)
A57W017-21-00
CONSUMABLE MATERIAL LIST (CML)
See manual
ELECTRICAL STANDARD PRACTICES MANUAL (ESPM)
20-55-00
IN SERVICE INFORMATION (ISI)
00.00.00179
NON DESTRUCTIVE TEST MANUAL (NTM)
57-51-34
STANDARDS MANUAL (SM)
See manual
STRUCTURAL REPAIR MANUAL (SRM)
51-21-10 51-24-00
51-24-10 51-40-20
51-51-00 51-75-10
51-75-20 51-76-10
TECHNICAL FOLLOW UP (TFU)
57.50.00034
CONF ALL
K. PUBLICATION AFFECTED
None
L. INDUSTRY SUPPORT INFORMATION
AIRBUS will not provide industry support for accomplishment of this Service Bulletin.

### Page 19

A300-600
SERVICE BULLETIN
REV 00 Mar 27/24 A300-57-6125
Page 19
2. MATERIAL INFORMATION
A. MATERIAL APPLICABILITY
CONF 001
Material for task set A300-A-57-XX-6125-01000-93BA-A OPTION 1 - Inspection
of the MLG Rib 5 Lower Flange Holes with MLG Actuating-Cylinder Assembly
Installed, on the LH/RH Wing
MATERIAL QTY SEE NOTES
T ool kit 576125T01R00 1
Referenced tools See SB
Consumables See SB
Referenced consumables See SB
Components See SB
Referenced parts See SB
Material for task set A300-A-57-XX-6125-01000-93BB-A OPTION 2 - Inspection
of the MLG Rib 5 Lower Flange Holes without MLG Actuating-Cylinder Assembly
Installed, on the LH/RH Wing
MATERIAL QTY SEE NOTES
T ool kit 576125T01R00 1
Referenced tools See SB
Consumables See SB
Referenced consumables See SB
Components See SB
Referenced parts See SB
CONF 002
Material for task set A300-A-57-XX-6125-01000-93BA-A OPTION 1 - Inspection
of the MLG Rib 5 Lower Flange Holes with MLG Actuating-Cylinder Assembly
Installed, on the LH/RH Wing
MATERIAL QTY SEE NOTES
T ool kit 576125T01R00 1
Referenced tools See SB
Consumables See SB
Referenced consumables See SB
Components See SB
Referenced parts See SB
Material for task set A300-A-57-XX-6125-01000-93BB-A OPTION 2 - Inspection
of the MLG Rib 5 Lower Flange Holes without MLG Actuating-Cylinder Assembly
Installed, on the LH/RH Wing
MATERIAL QTY SEE NOTES
T ool kit 576125T01R00 1
Referenced tools See SB
Consumables See SB
Referenced consumables See SB
Components See SB

### Page 20

A300-600
SERVICE BULLETIN
REV 00 Mar 27/24 A300-57-6125
Page 20
MATERIAL QTY SEE NOTES
Referenced parts See SB
CONF ALL
B. TOOLING
Tool kit 576125T01R00
Availability 180 d (calendar days from receipt of order)
NOTE(S)
Procurement to be negotiated directly with AIRBUS.
Procurement address
D4296
AIRBUS Material, Logistics and Suppliers
Customer Order Fulfilment
Weg beim Jaeger 150
22335 HAMBURG
GERMANY
Phone: +49 (0) 40 50 76 40 02
E-mail: Please contact your Single Point Of Contact
(SPOC)
Internet: http://spares.airbus.com
D4296
AIRBUS
Material, Logistics and Suppliers
Weg beim Jaeger 150
22335 HAMBURG
GERMANY
Fax: +49 40 50 76 3225
E-mail: T ool.LEASE@airbus.com
Internet: http://spares.airbus.com
NOTE(S)
Customers with aircraft shown in the applicability of this Service Bulletin should send
a purchase order to AIRBUS at the address given above and quote the number of this
Service Bulletin.
Operators interested in the lease of standard tools should contact AIRBUS at the
address given above.
ITEM PART No. QTY (UM) KEYWORD DRAWING SEE NOTES
98A57104901000 1 GAUGES (1)
99A57204445000 1 NUT (1)
CHS943 1 SPANNER (1) (2)
NOTE(S)
(1): AIRBUS tool kits cannot be ordered as a complete set. For the necessary tools, send
an order for each single item through the given channel.
(2): Spanner, PN CHS943 is only applicable for option one.
CONF 001
Referenced tools for task set A300-A-57-XX-6125-01000-93BA-A OPTION 1 -
Inspection of the MLG Rib 5 Lower Flange Holes with MLG Actuating-Cylinder
Assembly Installed, on the LH/RH Wing
T o accomplish this Service Bulletin it is necessary to use the expandable parts listed in:
Ref. AMM 32-31-46, Page Block 401

### Page 21

A300-600
SERVICE BULLETIN
REV 00 Mar 27/24 A300-57-6125
Page 21
Referenced tools for task set A300-A-57-XX-6125-01000-93BB-A OPTION 2 -
Inspection of the MLG Rib 5 Lower Flange Holes without MLG Actuating-Cylinder
Assembly Installed, on the LH/RH Wing
T o accomplish this Service Bulletin it is necessary to use the expandable parts listed in:
Ref. AMM 32-31-46, Page Block 401
CONF 002
Referenced tools for task set A300-A-57-XX-6125-01000-93BA-A OPTION 1 -
Inspection of the MLG Rib 5 Lower Flange Holes with MLG Actuating-Cylinder
Assembly Installed, on the LH/RH Wing
T o accomplish this Service Bulletin it is necessary to use the expandable parts listed in:
Ref. AMM 32-31-46, Page Block 401
Referenced tools for task set A300-A-57-XX-6125-01000-93BB-A OPTION 2 -
Inspection of the MLG Rib 5 Lower Flange Holes without MLG Actuating-Cylinder
Assembly Installed, on the LH/RH Wing
T o accomplish this Service Bulletin it is necessary to use the expandable parts listed in:
Ref. AMM 32-31-46, Page Block 401
CONF ALL
C. CONSUMABLES
CONF 001
Consumables for task set A300-A-57-XX-6125-01000-93BA-A OPTION 1 -
Inspection of the MLG Rib 5 Lower Flange Holes with MLG Actuating-Cylinder
Assembly Installed, on the LH/RH Wing
ITEM REFERENCE CML DESCRIPTION DRAWING SEE NOTES
04DAB2
Primer Epoxy Paint -
- Corrosion Inhibiting
Structure
06ABA1 Polysulfide Sealant - FuelT ank Brushable
08BAA9 Non Aqueous Cleaner -General
10ABC1
Surface Pretreatment
- Light Alloys Chemical
Conversion Yellow
14SBA1 T extile - Lint free Cotton
Consumables for task set A300-A-57-XX-6125-01000-93BB-A OPTION 2 -
Inspection of the MLG Rib 5 Lower Flange Holes without MLG Actuating-Cylinder
Assembly Installed, on the LH/RH Wing
ITEM REFERENCE CML DESCRIPTION DRAWING SEE NOTES
04DAB2
Primer Epoxy Paint -
- Corrosion Inhibiting
Structure
06ABA1 Polysulfide Sealant - FuelT ank Brushable
08BAA9 Non Aqueous Cleaner -General

### Page 22

A300-600
SERVICE BULLETIN
REV 00 Mar 27/24 A300-57-6125
Page 22
ITEM REFERENCE CML DESCRIPTION DRAWING SEE NOTES
10ABC1
Surface Pretreatment
- Light Alloys Chemical
Conversion Yellow
14SBA1 T extile - Lint free Cotton
CONF 002
Consumables for task set A300-A-57-XX-6125-01000-93BA-A OPTION 1 -
Inspection of the MLG Rib 5 Lower Flange Holes with MLG Actuating-Cylinder
Assembly Installed, on the LH/RH Wing
ITEM REFERENCE CML DESCRIPTION DRAWING SEE NOTES
04DAB2
Primer Epoxy Paint -
- Corrosion Inhibiting
Structure
06ABA1 Polysulfide Sealant - FuelT ank Brushable
08BAA9 Non Aqueous Cleaner -General
10ABC1
Surface Pretreatment
- Light Alloys Chemical
Conversion Yellow
14SBA1 T extile - Lint free Cotton
Consumables for task set A300-A-57-XX-6125-01000-93BB-A OPTION 2 -
Inspection of the MLG Rib 5 Lower Flange Holes without MLG Actuating-Cylinder
Assembly Installed, on the LH/RH Wing
ITEM REFERENCE CML DESCRIPTION DRAWING SEE NOTES
04DAB2
Primer Epoxy Paint -
- Corrosion Inhibiting
Structure
06ABA1 Polysulfide Sealant - FuelT ank Brushable
08BAA9 Non Aqueous Cleaner -General
10ABC1
Surface Pretreatment
- Light Alloys Chemical
Conversion Yellow
14SBA1 T extile - Lint free Cotton
CONF 001
Referenced consumables for task set A300-A-57-XX-6125-01000-93BA-A OPTION
1 - Inspection of the MLG Rib 5 Lower Flange Holes with MLG Actuating-Cylinder
Assembly Installed, on the LH/RH Wing
T o accomplish this Service Bulletin it is necessary to use the consumable materials listed in:
Ref. AMM 32-31-46, Page Block 401
Ref. SRM 51-75-20
Ref. SRM 51-21-10
Ref. SRM 51-24-10

### Page 23

A300-600
SERVICE BULLETIN
REV 00 Mar 27/24 A300-57-6125
Page 23
Ref. SRM 51-75-10
Referenced consumables for task set A300-A-57-XX-6125-01000-93BB-A OPTION 2
- Inspection of the MLG Rib 5 Lower Flange Holes without MLG Actuating-Cylinder
Assembly Installed, on the LH/RH Wing
T o accomplish this Service Bulletin it is necessary to use the consumable materials listed in:
Ref. AMM 32-31-46, Page Block 401
Ref. SRM 51-75-20
Ref. SRM 51-21-10
Ref. SRM 51-24-10
Ref. SRM 51-75-10
CONF 002
Referenced consumables for task set A300-A-57-XX-6125-01000-93BA-A OPTION
1 - Inspection of the MLG Rib 5 Lower Flange Holes with MLG Actuating-Cylinder
Assembly Installed, on the LH/RH Wing
T o accomplish this Service Bulletin it is necessary to use the consumable materials listed in:
Ref. AMM 32-31-46, Page Block 401
Ref. SRM 51-75-20
Ref. SRM 51-21-10
Ref. SRM 51-24-10
Ref. SRM 51-75-10
Referenced consumables for task set A300-A-57-XX-6125-01000-93BB-A OPTION 2
- Inspection of the MLG Rib 5 Lower Flange Holes without MLG Actuating-Cylinder
Assembly Installed, on the LH/RH Wing
T o accomplish this Service Bulletin it is necessary to use the consumable materials listed in:
Ref. AMM 32-31-46, Page Block 401
Ref. SRM 51-75-20
Ref. SRM 51-21-10
Ref. SRM 51-24-10
Ref. SRM 51-75-10
CONF ALL
D. LIST OF NEW PARTS
CONF 001
Components for task set A300-A-57-XX-6125-01000-93BA-A OPTION 1 - Inspection
of the MLG Rib 5 Lower Flange Holes with MLG Actuating-Cylinder Assembly
Installed, on the LH/RH Wing
Procurement address D4296
AIRBUS Material, Logistics and Suppliers Standard
Parts
Customer Order Fulfilment
Phone: +49 (0) 40 50 76 40 02
E-mail: Please contact your Single Point Of Contact
(SPOC)
Internet: http://spares.airbus.com or via SPEC2000
NOTE(S)

### Page 24

A300-600
SERVICE BULLETIN
REV 00 Mar 27/24 A300-57-6125
Page 24
For standard hardware the purchase order must be addressed to AIRBUS at the
address given above. Quote the number of this Service Bulletin, the MSN and, if
applicable the Retrofit Information Letter (RIL) reference.
ITEM PART No. QTY (UM) KEYWORD DRAWING SEE NOTES
1 NSA5472-12K7(D4296) 14 NUT (1) (2)
NOTE(S)
Refer to the AIRBUS Ref. SM if you find part numbers of hardware components which
you cannot identify. The SM will give you the correct part number to part number
relationship.
(1): Operator supplied standard hardware parts, required to accomplish this Service
Bulletin, are to be supplied from the operator's stock.
(2): The components listed above are not an AIRBUS Kit, the required parts must be
ordered as necessary through the given channel.
Components for task set A300-A-57-XX-6125-01000-93BB-A OPTION 2 - Inspection
of the MLG Rib 5 Lower Flange Holes without MLG Actuating-Cylinder Assembly
Installed, on the LH/RH Wing
Procurement address D4296
AIRBUS Material, Logistics and Suppliers Standard
Parts
Customer Order Fulfilment
Phone: +49 (0) 40 50 76 40 02
E-mail: Please contact your Single Point Of Contact
(SPOC)
Internet: http://spares.airbus.com or via SPEC2000
NOTE(S)
For standard hardware the purchase order must be addressed to AIRBUS at the
address given above. Quote the number of this Service Bulletin, the MSN and, if
applicable the Retrofit Information Letter (RIL) reference.
ITEM PART No. QTY (UM) KEYWORD DRAWING SEE NOTES
1 NSA5472-12K7(D4296) 14 NUT (1) (2)
NOTE(S)
Refer to the AIRBUS Ref. SM if you find part numbers of hardware components which
you cannot identify. The SM will give you the correct part number to part number
relationship.
(1): Operator supplied standard hardware parts, required to accomplish this Service
Bulletin, are to be supplied from the operator's stock.
(2): The components listed above are not an AIRBUS Kit, the required parts must be
ordered as necessary through the given channel.
CONF 002
Components for task set A300-A-57-XX-6125-01000-93BA-A OPTION 1 - Inspection
of the MLG Rib 5 Lower Flange Holes with MLG Actuating-Cylinder Assembly
Installed, on the LH/RH Wing
Procurement address D4296
AIRBUS Material, Logistics and Suppliers Standard
Parts
Customer Order Fulfilment
Phone: +49 (0) 40 50 76 40 02

### Page 25

A300-600
SERVICE BULLETIN
REV 00 Mar 27/24 A300-57-6125
Page 25
E-mail: Please contact your Single Point Of Contact
(SPOC)
Internet: http://spares.airbus.com or via SPEC2000
NOTE(S)
For standard hardware the purchase order must be addressed to AIRBUS at the
address given above. Quote the number of this Service Bulletin, the MSN and, if
applicable the Retrofit Information Letter (RIL) reference.
ITEM PART No. QTY (UM) KEYWORD DRAWING SEE NOTES
1 NSA5472-12K7(D4296) 14 NUT (1) (2)
NOTE(S)
Refer to the AIRBUS Ref. SM if you find part numbers of hardware components which
you cannot identify. The SM will give you the correct part number to part number
relationship.
(1): Operator supplied standard hardware parts, required to accomplish this Service
Bulletin, are to be supplied from the operator's stock.
(2): The components listed above are not an AIRBUS Kit, the required parts must be
ordered as necessary through the given channel.
Components for task set A300-A-57-XX-6125-01000-93BB-A OPTION 2 - Inspection
of the MLG Rib 5 Lower Flange Holes without MLG Actuating-Cylinder Assembly
Installed, on the LH/RH Wing
Procurement address D4296
AIRBUS Material, Logistics and Suppliers Standard
Parts
Customer Order Fulfilment
Phone: +49 (0) 40 50 76 40 02
E-mail: Please contact your Single Point Of Contact
(SPOC)
Internet: http://spares.airbus.com or via SPEC2000
NOTE(S)
For standard hardware the purchase order must be addressed to AIRBUS at the
address given above. Quote the number of this Service Bulletin, the MSN and, if
applicable the Retrofit Information Letter (RIL) reference.
ITEM PART No. QTY (UM) KEYWORD DRAWING SEE NOTES
1 NSA5472-12K7(D4296) 14 NUT (1) (2)
NOTE(S)
Refer to the AIRBUS Ref. SM if you find part numbers of hardware components which
you cannot identify. The SM will give you the correct part number to part number
relationship.
(1): Operator supplied standard hardware parts, required to accomplish this Service
Bulletin, are to be supplied from the operator's stock.
(2): The components listed above are not an AIRBUS Kit, the required parts must be
ordered as necessary through the given channel.
CONF 001
Referenced parts for task set A300-A-57-XX-6125-01000-93BA-A OPTION 1 -
Inspection of the MLG Rib 5 Lower Flange Holes with MLG Actuating-Cylinder
Assembly Installed, on the LH/RH Wing
T o accomplish this Service Bulletin it is necessary to use the expandable parts listed in:

### Page 26

A300-600
SERVICE BULLETIN
REV 00 Mar 27/24 A300-57-6125
Page 26
Ref. AMM 32-31-46, Page Block 401
Referenced parts for task set A300-A-57-XX-6125-01000-93BB-A OPTION 2 -
Inspection of the MLG Rib 5 Lower Flange Holes without MLG Actuating-Cylinder
Assembly Installed, on the LH/RH Wing
T o accomplish this Service Bulletin it is necessary to use the expandable parts listed in:
Ref. AMM 32-31-46, Page Block 401
CONF 002
Referenced parts for task set A300-A-57-XX-6125-01000-93BA-A OPTION 1 -
Inspection of the MLG Rib 5 Lower Flange Holes with MLG Actuating-Cylinder
Assembly Installed, on the LH/RH Wing
T o accomplish this Service Bulletin it is necessary to use the expandable parts listed in:
Ref. AMM 32-31-46, Page Block 401
Referenced parts for task set A300-A-57-XX-6125-01000-93BB-A OPTION 2 -
Inspection of the MLG Rib 5 Lower Flange Holes without MLG Actuating-Cylinder
Assembly Installed, on the LH/RH Wing
T o accomplish this Service Bulletin it is necessary to use the expandable parts listed in:
Ref. AMM 32-31-46, Page Block 401
CONF ALL
E. LIST OF EXISTING PARTS
No parts

### Page 27

A300-600
SERVICE BULLETIN
REV 00 Mar 27/24 A300-57-6125
Page 27
3. ACCOMPLISHMENT INSTRUCTIONS
Task set A300-A-57-XX-6125-01000-93BA-A (A300-A-57-XX-6125-01ZZZ-93BZ-A)
OPTION 1 - Inspection of the MLG Rib 5 Lower Flange Holes with MLG Actuating-Cylinder Assembly
Installed, on the LH/RH Wing
WARNING: MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND ALL THE CAUTIONS
INCLUDED IN THE REFERENCED PROCEDURES.
CAUTION: ALWAYS OBEY THE PRECAUTIONS THAT FOLLOW TO KEEP ELECTRICAL
WIRING IN A SATISFACTORY CONDITION (ELECTRICALLY AND MECHANICALLY
SERVICEABLE). WHEN YOU DO A MAINTENANCE WORK, REPAIRS OR
MODIFICATIONS, ALWAYS KEEP ELECTRICAL WIRING, COMPONENTS AND
THE WORK AREA AS CLEAN AS POSSIBLE. TO DO THIS:
- PUT PROTECTION, SUCH AS PLASTIC SHEETING, CLOTHS, ETC., AS
NECESSARY ON WIRING AND COMPONENTS.
- REGULARLY REMOVE ALL SHAVINGS, UNWANTED MATERIAL AND
OTHER CONTAMINATION.
THESE PRECAUTIONS WILL DECREASE THE RISK OF CONTAMINATION AND
DAMAGE TO THE ELECTRICAL WIRING INSTALLATION.
IF THERE IS CONTAMINATION, REFER TO Ref. ESPM 20-55-00.
NOTE: The accomplishment instructions of this Service Bulletin include procedures given in
other documents or in other sections of the Service Bulletin. When the words “refer to”
are used and the operator has a procedure accepted by the local authority he belongs to,
the accepted alternative procedure can be used. When the words “in accordance with”
are used then the given procedure must be followed.
NOTE: The access and close-up instructions, not comprising return to service tests, in this
Service Bulletin do not constitute or affect the technical intent of the Service Bulletin.
Operators can therefore, as deemed necessary, omit or add access and/or close-up steps
to add flexibility to their maintenance operations as long as the technical intent of the
Service Bulletin is met within the set parameters.
NOTE: Manual titles given in the accomplishment instructions are referred to by acronyms. Refer
to paragraph 1.J., References, for the definition of acronyms.
NOTE: The purpose of flowcharts is to supplement the information given in the Procedure and
Compliance paragraphs and not to serve as the primary source for tasks or compliance
times given in this Service Bulletin.
NOTE: This Service Bulletin is classified mandatory or expected to be classified mandatory by
an Airworthiness Directive (AD). The paragraphs 3.C. and 3.E. in these accomplishment
instructions are Required for Compliance (RC) and must be done to comply with the AD.
T o allow more flexibility, the rule "refer to" and "in accordance with" will apply to these
paragraphs 3.C. and 3.E. Other paragraphs are recommended and may be deviated from,
done as part of other actions or done with accepted methods different from those given
in the Service Bulletin, as long as the RC paragraphs can be done and the aircraft can be
put back into a serviceable condition.
NOTE: This Service Bulletin contains the instructions for the on-aircraft maintenance necessary
to ensure the continued airworthiness of the aircraft.
For any deviations to the instructions, contact AIRBUS for further instructions and
approval.
NOTE: Discarded parts must be managed at the operator's discretion.

### Page 28

A300-600
SERVICE BULLETIN
REV 00 Mar 27/24 A300-57-6125
Page 28
A. TASK SET ASSOCIATED INFORMATION
Task Manpower
CONF 001
TOTAL MAN-HOURS 38.75 h
CONF 002
TOTAL MAN-HOURS 38.75 h
CONF 001
ELAPSED TIME (HOURS) 19.75 h
CONF 002
ELAPSED TIME (HOURS) 19.75 h
CONF ALL
B. PREPARATION
(1) Task A300-A-57-XX-6125-01001-540A-A (A300-A-57-XX-6125-01ZZZ-540Z-A)
Job Set-up
Job Set-Up Information
Manpower/Resources/Skills
Man-hours 0.25 h
Minimum Number of person 1
Elapsed Time 0.25 h
Referenced Information
Manuals/Drawings References/Sheets
AMM 24-00-00, Page Block 301
Procedure
NOTE: For the basic Aircraft configuration, refer to AMM Chapter “Introduction -
Aircraft status for maintenance" in Manual Front Matter section.
(a) Make sure that the aircraft is electrically grounded, refer to Ref. AMM 24-00-00,
Page Block 301.
(b) Put the warning notices in the flight compartment to tell persons not to operate
the flight controls.
(c) Make sure the MLG safety pins are in position.
(d) Put an access platform in position below the area of MLG Rib 5.
C. PROCEDURE
(1) Task A300-A-57-XX-6125-03001-520A-A (A300-A-57-XX-6125-03ZZZ-520Z-A)
Remove the Nut and Washer from the MLG Rib 5 Lower Flange on the LH
Wing
Job Set-Up Information
Working Area
Impacted Zone Access / Work Location
572 Work location Rib 5
Manpower/Resources/Skills
Man-hours 6.00 h
Minimum Number of person 1

### Page 29

A300-600
SERVICE BULLETIN
REV 00 Mar 27/24 A300-57-6125
Page 29
Elapsed Time 6.00 h
Skills Airframe
Material necessary to do the job
Tool kit 576125T01R00
ITEM PART No. QTY (UM) KEYWORD DRAWING SEE NOTES
CHS943 1 SPANNER (1) (2)
NOTE(S)
(1): AIRBUS tool kits cannot be ordered as a complete set. For the necessary tools, send
an order for each single item through the given channel.
(2): Spanner, PN CHS943 is only applicable for option one.
Consumables
ITEM REFERENCE CML DESCRIPTION DRAWING SEE NOTES
08BAA9 Non Aqueous Cleaner -General
14SBA1 T extile - Lint free Cotton
Referenced Information
Manuals/Drawings References/Sheets
AMM 06-21-00, Page Block 00106-31-57, Page Block 001
CML CONSUMABLE MATERIAL LIST (CML)
SRM 51-40-2051-76-10
Procedure
Ref. Fig.BA Removal of the Nut and Washer from the MLG Gear Rib 5 Lower Flange on
the LH Wing.
(a) Standard Practices given in this procedure:
1 For the identification of zones, refer to Ref. AMM 06-21-00, Page Block 001.
2 For the identification of wing ribs, refer to Ref. AMM 06-31-57, Page Block
001.
3 Remove the fasteners in accordance with Ref. SRM 51-40-20.
4 Remove sealant in accordance with Ref. SRM 51-76-10.
5 For the specification of Material application codes given in this Service
Bulletin, refer to Ref. CML.
6 T ag all the parts you must remove and retain to make the subsequent
installation easier.
7 Put all the retained hardware in identified plastic bags and attach the bags
to the related unit.
CAUTION: WHEN YOU REMOVE THE FASTENERS, BE CAREFUL NOT TO CAUSE
DAMAGE TO THE FASTENER HOLES.
(b) Remove the nut and washer from the installed bolts at the fastener holes 43, 47,
48, 49, 50, 52 and 54 on the LH wing:
7 NUT   Item (1) Discard

### Page 30

A300-600
SERVICE BULLETIN
REV 00 Mar 27/24 A300-57-6125
Page 30
and
7 WASHER   Item (2) Retain
use
1 SPANNER-SPECIAL CHS943  
NOTE: Use a spanner CHS943 or an equivalent standard or a locally
manufactured tool to support the removal of the nuts at hole 47 and 54.
In case of absence of Spanner CHS943 or equivalent tooling, removal
of MLG actuating-cylinder assembly can be performed to ease access,
refer to Option 2.
NOTE: Bolts do not have to be removed to perform the inspection.
(c) Carefully remove the sealant from the spotface surface using a non metallic
scraper.
(d) Clean the inspection area, with:
  Non Aqueous Cleaner -
General
08BAA9  
and
  T extile - Lint free Cotton14SBA1

### Page 31

A300-600
SERVICE BULLETIN
Figure ICN-A300-A-57XX6125-A-FAPE3-0085S-A-002-01 Fig.BA Sol.AA SHEET 1/1
REV 00 Mar 27/24 A300-57-6125Removal of the Nut and Washer from the
MLG Gear Rib 5 Lower Flange on the LH Wing Page 31
CONF ALL
A
A
F
W
D
INBD
B
Z572
RIB5
ITEM P/N
NSA5472-12K7
-
DESCRIPTION
NUT
REMARKS 
REMOVE AND DISCARD
REMOVE AND RETAIN
(1)
(2) WASHER
HOLE
SYMBOL
B
F
W
D
INBD
HOLE 47
HOLE 48
HOLE 50
HOLE 54
HOLE 43
HOLE 49
HOLE 52
ICN-A300-A-57XX6125-A-FAPE3-0085S-A-002-01

### Page 32

A300-600
SERVICE BULLETIN
REV 00 Mar 27/24 A300-57-6125
Page 32
(2) Task A300-A-57-XX-6125-04001-520A-A (A300-A-57-XX-6125-04ZZZ-520Z-A)
Remove the Nut and Washer from the MLG Rib 5 Lower Flange on the RH
Wing
Job Set-Up Information
Working Area
Impacted Zone Access / Work Location
672 Work location Rib 5
Manpower/Resources/Skills
Man-hours 6.00 h
Minimum Number of person 1
Elapsed Time 6.00 h
Skills Airframe
Material necessary to do the job
Tool kit 576125T01R00
ITEM PART No. QTY (UM) KEYWORD DRAWING SEE NOTES
CHS943 1 SPANNER (1) (2)
NOTE(S)
(1): AIRBUS tool kits cannot be ordered as a complete set. For the necessary tools, send
an order for each single item through the given channel.
(2): Spanner, PN CHS943 is only applicable for option one.
Consumables
ITEM REFERENCE CML DESCRIPTION DRAWING SEE NOTES
08BAA9 Non Aqueous Cleaner -General
14SBA1 T extile - Lint free Cotton
Referenced Information
Manuals/Drawings References/Sheets
AMM 06-21-00, Page Block 00106-31-57, Page Block 001
CML CONSUMABLE MATERIAL LIST (CML)
SRM 51-40-2051-76-10
Procedure
Ref. Fig.BB Removal of the Nut and Washer from the MLG Gear Rib 5 Lower Flange on
the RH Wing.
(a) Standard Practices given in this procedure:
1 For the identification of zones, refer to Ref. AMM 06-21-00, Page Block 001.
2 For the identification of wing ribs, refer to Ref. AMM 06-31-57, Page Block
001.
3 Remove the fasteners in accordance with Ref. SRM 51-40-20.
4 Remove sealant in accordance with Ref. SRM 51-76-10.

### Page 33

A300-600
SERVICE BULLETIN
REV 00 Mar 27/24 A300-57-6125
Page 33
5 For the specification of Material application codes given in this Service
Bulletin, refer to Ref. CML.
6 T ag all the parts you must remove and retain to make the subsequent
installation easier.
7 Put all the retained hardware in identified plastic bags and attach the bags
to the related unit.
CAUTION: WHEN YOU REMOVE THE FASTENERS, BE CAREFUL NOT TO CAUSE
DAMAGE TO THE FASTENER HOLES.
(b) Remove the nut and washer from the installed bolts at the fastener holes 43, 47,
48, 49, 50, 52 and 54 on the RH wing:
7 NUT   Item (1) Discard
and
7 WASHER   Item (2) Retain
use
1 SPANNER-SPECIAL CHS943  
NOTE: Use a spanner CHS943 or an equivalent standard or a locally
manufactured tool to support the removal of the nuts at hole 47 and 54.
In case of absence of Spanner CHS943 or equivalent tooling, removal
of MLG actuating-cylinder assembly can be performed to ease access,
refer to Option 2.
NOTE: Bolts do not have to be removed to perform the inspection.
(c) Carefully remove the sealant from the spotface surface using a non metallic
scraper.
(d) Clean the inspection area, with:
  Non Aqueous Cleaner -
General
08BAA9  
and
  T extile - Lint free Cotton14SBA1

### Page 34

A300-600
SERVICE BULLETIN
Figure ICN-A300-A-57XX6125-A-FAPE3-0085R-A-002-01 Fig.BB Sol.AA SHEET 1/1
REV 00 Mar 27/24 A300-57-6125Removal of the Nut and Washer from the
MLG Gear Rib 5 Lower Flange on the RH Wing Page 34
CONF ALL
A
F
W
D A
INBD
BZ672
RIB5
B
INBD
F
W
D
HOLE 47
HOLE 48
HOLE 50
HOLE 54
HOLE 43
HOLE 49
HOLE 52
ITEM P/N
NSA5472-12K7
-
DESCRIPTION
NUT
REMARKS 
REMOVE AND DISCARD
REMOVE AND RETAIN
(1)
(2) WASHER
HOLE
SYMBOL
ICN-A300-A-57XX6125-A-FAPE3-0085R-A-002-01

### Page 35

A300-600
SERVICE BULLETIN
REV 00 Mar 27/24 A300-57-6125
Page 35
(3) Task A300-A-57-XX-6125-01001-311A-A (A300-A-57-XX-6125-01ZZZ-311Z-A)
Do a SDI of the MLG Rib 5 Lower Flange Holes on the LH Wing
Job Set-Up Information
Working Area
Impacted Zone Access / Work Location
572 Work location Rib 5
Manpower/Resources/Skills
Man-hours 7.00 h
Minimum Number of person 1
Elapsed Time 7.00 h
Skills Airframe
Material necessary to do the job
Tool kit 576125T01R00
ITEM PART No. QTY (UM) KEYWORD DRAWING SEE NOTES
98A57104901000 1 GAUGES (1)
99A57204445000 1 NUT (1)
NOTE(S)
(1): AIRBUS tool kits cannot be ordered as a complete set. For the necessary tools, send
an order for each single item through the given channel.
Consumables
ITEM REFERENCE CML DESCRIPTION DRAWING SEE NOTES
04DAB2
Primer Epoxy Paint -
- Corrosion Inhibiting
Structure
08BAA9 Non Aqueous Cleaner -General
10ABC1
Surface Pretreatment
- Light Alloys Chemical
Conversion Yellow
14SBA1 T extile - Lint free Cotton
Referenced Information
Manuals/Drawings References/Sheets
AMM 06-21-00, Page Block 00106-31-57, Page Block 001
CML CONSUMABLE MATERIAL LIST (CML)
NTM 57-51-34
SRM
51-21-10
51-24-00
51-75-10
51-75-20
Procedure
(a) Standard Practices given in this procedure:

### Page 36

A300-600
SERVICE BULLETIN
REV 00 Mar 27/24 A300-57-6125
Page 36
1 For the identification of zones, refer to Ref. AMM 06-21-00, Page Block 001.
2 For the identification of wing ribs, refer to Ref. AMM 06-31-57, Page Block
001.
3 Apply sealant in accordance with Ref. SRM 51-24-00.
4 Repair the paint coating in accordance with Ref. SRM 51-75-10.
5 Repair the protective treatment of metal parts in accordance with Ref. SRM
51-21-10.
6 For the specification of Material application codes given in this Service
Bulletin, refer to Ref. CML.
(b) Do a detailed visual inspection to check for the double radius condition on the
areas around the fastener holes 43, 47, 48, 49, 50, 52 and 54 on the LH wing,
at the threshold given in the PLANNING INFORMATION paragraph 1.E.(2) and
refer to Ref. Fig.BC Inspection of the MLG Gear Rib 5 Lower Flange Holes on the
LH Wing, Ref. Fig.BH Example of the Double Radius Condition and Ref. Fig.FA
Flowchart.
1 If double radius condition found:
a After completion of all inspections, complete and send the Inspection
Report sheet in accordance with Ref. T ask A300-A-57-XX-6125-01ZZZ-
90AZ-A.
b Contact AIRBUS and follow their instructions.
2 If double radius condition not found:
a For each spotface do a check with paint intact, using the GO/NO-GO
gauge, refer to Ref. Fig.BI Inspection for the Spotface Check with Paint
Applied and Ref. Fig.FA Flowchart:
<1> Install the GO/NO-GO gauge, PN 98A57104901200 over
fastener thread, supplied in:
1 SPOTFACE GAUGES 98A57104901000  
clamp in place, using:
1 SEALING NUT 99A57204445000  
NOTE: Sealing nut to be hand tightened only.
<2> If the spotface is compliant in accordance with Ref. Fig.BG
Spotface Compliance Criteria:
<a> Remove the GO/NO-GO gauge.
<b> After completion of all inspections, complete and send
the Inspection Report sheet in accordance with Ref. T ask
A300-A-57-XX-6125-04ZZZ-720Z-A.
<c> No further action on compliant spotfaces.
<3> If the spotface is not compliant in accordance with Ref. Fig.BG
Spotface Compliance Criteria:
<a> Remove the GO/NO-GO gauge.
<b> Remove the paint layer from the spotface back to bare
metal and make sure that an additional paint layer of 15
mm (0.0591 in.) is removed around the circumference of
the spotface, refer to Ref. NTM 57-51-34 and Ref. SRM 51-

### Page 37

A300-600
SERVICE BULLETIN
REV 00 Mar 27/24 A300-57-6125
Page 37
75-20 and Ref. Fig.BJ Inspection for Spotface Check with
Paint Removed.
<c> Clean the inspection area, with:
  Non Aqueous Cleaner -
General
08BAA9  
and
  T extile - Lint free Cotton14SBA1  
<d> Do a spotface check with paint removed, using the GO/
NO-GO gauge, refer to Ref. Fig.BJ Inspection for Spotface
Check with Paint Removed and Ref. Fig.FA Flowchart:
[1] Install the GO/NO-GO gauge, PN 98A57104901210
over fastener thread, supplied in:
1 SPOTFACE GAUGES 98A57104901000  
clamp in place, using:
1 SEALING NUT 99A57204445000  
NOTE: Sealing nut to be hand tightened only.
[2] If the spotface is compliant in accordance with Ref.
Fig.BG Spotface Compliance Criteria:
[a] Remove the GO/NO-GO gauge.
[b] Apply surface protection and restore the
removed paint in accordance with Ref. SRM 51-
75-10, use:
  Surface Pretreatment
- Light Alloys Chemical
Conversion Yellow
10ABC1  
and
  Primer Epoxy Paint -
- Corrosion Inhibiting
Structure
04DAB2  
[c] After completion of all inspections, complete
and send the Inspection Report sheet in
accordance with Ref. T ask A300-A-57-XX-6125-
01ZZZ-90AZ-A.
[d] No further action on compliant spotfaces.
[3] If the spotface is not compliant in accordance with
Ref. Fig.BG Spotface Compliance Criteria:
[a] After completion of all inspections, complete
and send the Inspection Report sheet in
accordance with Ref. T ask A300-A-57-XX-6125-
01ZZZ-90AZ-A.
[b] Contact AIRBUS and follow their instructions.
(c) Install the nut and washer in the MLG Rib 5 lower flange in accordance with Ref.
T ask A300-A-57-XX-6125-04ZZZ-720Z-A.

### Page 38

A300-600
SERVICE BULLETIN
Figure ICN-A300-A-57XX6125-A-FAPE3-0085T-A-003-01 Fig.BC Sol.AA SHEET 1/1
REV 00 Mar 27/24 A300-57-6125Inspection of the MLG Gear Rib 5
Lower Flange Holes on the LH Wing Page 38
CONF ALL
A
A
F
W
D
INBD
NOTE:
B
INSPECTION AREA
RIB5
Z572
BFW
D
INBD
HOLE 50
HOLE 54
HOLE 52
HOLE 47
HOLE 48
HOLE 43
HOLE 49
ICN-A300-A-57XX6125-A-FAPE3-0085T-A-003-01

### Page 39

A300-600
SERVICE BULLETIN
Figure ICN-A300-A-57XX6125-A-FAPE3-0085O-A-001-01 Fig.BH Sol.AA SHEET 1/1
REV 00 Mar 27/24 A300-57-6125Example of the Double Radius Condition
Page 39
CONF ALL
EXAMPLE OF DOUBLE RADIUS CONDITION
ICN-A300-A-57XX6125-A-FAPE3-0085O-A-001-01

### Page 40

A300-600
SERVICE BULLETIN
Figure ICN-A300-A-57XX6125-A-FAPE3-00862-A-002-01 Fig.FA Sol.AA SHEET 1/1
REV 00 Mar 27/24 A300-57-6125Flowchart
Page 40
CONF ALL
NOTE:
FOR THE COMPLIANCE TIMES, REFER TO THE ACCOMPLISHMENT TIMESCALE PARA 1.E.(2).
NO YES
YES
REMOVE THE PAINT ON THE
NON-COMPLIANT SPOTFACES
IS THE
SPOTFACE COMPLIANT AS PER
THE SPOTFACE COMPLIANCE
CRITERIA?
NO
NO
YES
CONTACT AIRBUS AND FOLLOW
THEIR INSTRUCTION
THE PURPOSE OF FLOWCHARTS IS TO SUPPLEMENT THE INFORMATION GIVEN IN THE PROCEDURE AND
COMPLIANCE PARAGRAPHS AND NOT TO SERVE AS THE PRIMARY SOURCE FOR TASKS OR COMPLIANCE
TIMES GIVEN IN THIS SERVICE BULLETIN.
IS THERE A
DOUBLE RADIUS CONDITION
FOUND?
IS THE SPOTFACE
COMPLIANT AS PER
THE SPOTFACE COMPLIANCE
CRITERIA?
01
DO A DETAILED VISUAL INSPECTION TO CHECK
FOR THE DOUBLE RADIUS CONDITION ON EACH
REQUESTED SPOTFACE 01
DO AN INSPECTION OF THE SPOTFACE
WITHOUT PAINT, USING GO/NO-GO GAUGES
DO AN INSPECTION OF THE SPOTFACE
WITH PAINT, USING GO/NO-GO GAUGES CONTACT AIRBUS AND FOLLOW
THEIR INSTRUCTION
NO FURTHER ACTION
ON COMPLIANT
SPOTFACE
COMPLETE AND SEND THE
INSPECTION REPORT
ICN-A300-A-57XX6125-A-FAPE3-00862-A-002-01

### Page 41

A300-600
SERVICE BULLETIN
Figure ICN-A300-A-57XX6125-A-FAPE3-0085N-A-001-01 Fig.BI Sol.AA SHEET 1/1
REV 00 Mar 27/24 A300-57-6125Inspection for the Spotface Check with Paint Applied
Page 41
CONF ALL
ICN-A300-A-57XX6125-A-FAPE3-0085N-A-001-01

### Page 42

A300-600
SERVICE BULLETIN
Figure ICN-A300-A-57XX6125-A-FAPE3-0085P-A-001-01 Fig.BG Sol.AA SHEET 1/1
REV 00 Mar 27/24 A300-57-6125Spotface Compliance Criteria
Page 42
CONF ALL
NON-COMPLIANT
NON-COMPLIANT
GAUGE SITS ABOVE FLANGE UPPER SURFACE
INDICATING NON-CONFORMANT SPOTFACE
DEPTH.
COMPLIANT
SPOTFACE COMPLIANCE CRITERIA
GAUGE DOES NOT SIT CLOSELY WITHIN THE
GAP PRESENT BETWEEN GAUGE AND
SPOTFACE INDICATING NON-CONFORMANT
SPOTFACE CIRCUMFERENCE.
SPOTFACE DIAMETER AND/OR RADIUS.
GAUGE SITS CLOSELY WITHIN SPOTFACE,
AND
GAUGE AT OR BELOW FLANGE UPPER
WITH NO GAPS AROUND CIRCUMFERENCE
SURFACE.
ICN-A300-A-57XX6125-A-FAPE3-0085P-A-001-01

### Page 43

A300-600
SERVICE BULLETIN
Figure ICN-A300-A-57XX6125-A-FAPE3-0085Q-A-001-01 Fig.BJ Sol.AA SHEET 1/1
REV 00 Mar 27/24 A300-57-6125Inspection for Spotface Check with Paint Removed
Page 43
CONF ALL
MAKE SURE THAT THE ADDITIONAL PAINT 15 mm (0.591 in), SHOULD BE REMOVE AROUND THE
OUTER CIRCUMFERENCE OF THE SPOTFACE.
NOTE:
01
ICN-A300-A-57XX6125-A-FAPE3-0085Q-A-001-01

### Page 44

A300-600
SERVICE BULLETIN
REV 00 Mar 27/24 A300-57-6125
Page 44
(4) Task A300-A-57-XX-6125-02001-311A-A (A300-A-57-XX-6125-02ZZZ-311Z-A)
Do a SDI of the MLG Rib 5 Lower Flange Holes on the RH Wing
Job Set-Up Information
Working Area
Impacted Zone Access / Work Location
672 Work location Rib 5
Manpower/Resources/Skills
Man-hours 7.00 h
Minimum Number of person 1
Elapsed Time 7.00 h
Skills Airframe
Material necessary to do the job
Tool kit 576125T01R00
ITEM PART No. QTY (UM) KEYWORD DRAWING SEE NOTES
98A57104901000 1 GAUGES (1)
99A57204445000 1 NUT (1)
NOTE(S)
(1): AIRBUS tool kits cannot be ordered as a complete set. For the necessary tools, send
an order for each single item through the given channel.
Consumables
ITEM REFERENCE CML DESCRIPTION DRAWING SEE NOTES
04DAB2
Primer Epoxy Paint -
- Corrosion Inhibiting
Structure
08BAA9 Non Aqueous Cleaner -General
10ABC1
Surface Pretreatment
- Light Alloys Chemical
Conversion Yellow
14SBA1 T extile - Lint free Cotton
Referenced Information
Manuals/Drawings References/Sheets
AMM 06-21-00, Page Block 00106-31-57, Page Block 001
CML CONSUMABLE MATERIAL LIST (CML)
NTM 57-51-34
SRM
51-21-10
51-24-00
51-75-10
51-75-20
Procedure
(a) Standard Practices given in this procedure:

### Page 45

A300-600
SERVICE BULLETIN
REV 00 Mar 27/24 A300-57-6125
Page 45
1 For the identification of zones, refer to Ref. AMM 06-21-00, Page Block 001.
2 For the identification of wing ribs, refer to Ref. AMM 06-31-57, Page Block
001.
3 Apply sealant in accordance with Ref. SRM 51-24-00.
4 Repair the paint coating in accordance with Ref. SRM 51-75-10.
5 Repair the protective treatment of metal parts in accordance with Ref. SRM
51-21-10.
6 For the specification of Material application codes given in this Service
Bulletin, refer to Ref. CML.
(b) Do a detailed visual inspection to check for the double radius condition on the
areas around the fastener holes 43, 47, 48, 49, 50, 52 and 54 on the RH wing,
at the threshold given in the PLANNING INFORMATION paragraph 1.E.(2) and
refer to Ref. Fig.BD Inspection of the MLG Gear Rib 5 Lower Flange Holes on the
RH Wing, Ref. Fig.BH Example of the Double Radius Condition and Ref. Fig.FA
Flowchart.
1 If double radius condition found:
a After completion of all inspections, complete and send the Inspection
Report sheet in accordance with Ref. T ask A300-A-57-XX-6125-01ZZZ-
90AZ-A.
b Contact AIRBUS and follow their instructions.
2 If double radius condition not found:
a For each spotface do a check with paint applied, using the GO/NO-GO
gauge, refer to Ref. Fig.BI Inspection for the Spotface Check with Paint
Applied and Ref. Fig.FA Flowchart:
<1> Install the GO/NO-GO gauge, PN 98A57104901200 over
fastener thread, supplied in:
1 SPOTFACE GAUGES 98A57104901000  
clamp in place, using:
1 SEALING NUT 99A57204445000  
NOTE: Sealing nut to be hand tightened only.
<2> If the spotface is compliant in accordance with Ref. Fig.BG
Spotface Compliance Criteria:
<a> Remove the GO/NO-GO gauge.
<b> After completion of all inspections, complete and send
the Inspection Report sheet in accordance with Ref. T ask
A300-A-57-XX-6125-01ZZZ-90AZ-A.
<c> No further action on compliant spotfaces.
<3> If the spotface is not compliant in accordance with Ref. Fig.BG
Spotface Compliance Criteria:
<a> Remove the GO/NO-GO gauge.
<b> Remove the paint layer from the spotface back to bare
metal and make sure that an additional paint layer of 15
mm (0.0591 in.) is removed around the circumference of
the spotface, refer to Ref. NTM 57-51-34 and Ref. SRM 51-

### Page 46

A300-600
SERVICE BULLETIN
REV 00 Mar 27/24 A300-57-6125
Page 46
75-20 and Ref. Fig.BJ Inspection for Spotface Check with
Paint Removed.
<c> Clean the inspection area, with:
  Non Aqueous Cleaner -
General
08BAA9  
and
  T extile - Lint free Cotton14SBA1  
<d> Do a spotface check with paint removed, using the GO/
NO-GO gauge, refer to Ref. Fig.BJ Inspection for Spotface
Check with Paint Removed and Ref. Fig.FA Flowchart:
[1] Install the GO/NO-GO gauge, PN 98A57104901210
over fastener thread, supplied in:
1 SPOTFACE GAUGES 98A57104901000  
clamp in place, using:
1 SEALING NUT 99A57204445000  
NOTE: Sealing nut to be hand tightened only.
[2] If the spotface is compliant in accordance with Ref.
Fig.BG Spotface Compliance Criteria:
[a] Remove the GO/NO-GO gauge.
[b] Apply surface protection and restore the
removed paint in accordance with Ref. SRM 51-
75-10, use:
  Surface Pretreatment
- Light Alloys Chemical
Conversion Yellow
10ABC1  
and
  Primer Epoxy Paint -
- Corrosion Inhibiting
Structure
04DAB2  
[c] After completion of all inspections, complete
and send the Inspection Report sheet in
accordance with Ref. T ask A300-A-57-XX-6125-
01ZZZ-90AZ-A.
[d] No further action on compliant spotfaces.
[3] If the spotface is not compliant in accordance with
Ref. Fig.BG Spotface Compliance Criteria:
[a] After completion of all inspections, complete
and send the Inspection Report sheet in
accordance with Ref. T ask A300-A-57-XX-6125-
01ZZZ-90AZ-A.
[b] Contact AIRBUS and follow their instructions.
(c) Install the nut and washer in the MLG Rib 5 lower flange in accordance with Ref.
T ask A300-A-57-XX-6125-05ZZZ-720Z-A.

### Page 47

A300-600
SERVICE BULLETIN
Figure ICN-A300-A-57XX6125-A-FAPE3-00861-A-003-01 Fig.BD Sol.AA SHEET 1/1
REV 00 Mar 27/24 A300-57-6125Inspection of the MLG Gear Rib 5
Lower Flange Holes on the RH Wing Page 47
CONF ALL
A
F
W
D A
INBD
B
NOTE:
INSPECTION AREA
RIB5
Z672
B
INBD
F
W
D
HOLE 50
HOLE 54
HOLE 52
HOLE 47
HOLE 48
HOLE 43
HOLE 49
ICN-A300-A-57XX6125-A-FAPE3-00861-A-003-01

### Page 48

A300-600
SERVICE BULLETIN
Figure ICN-A300-A-57XX6125-A-FAPE3-0085O-A-001-01 Fig.BH Sol.AA SHEET 1/1
REV 00 Mar 27/24 A300-57-6125Example of the Double Radius Condition
Page 48
CONF ALL
EXAMPLE OF DOUBLE RADIUS CONDITION
ICN-A300-A-57XX6125-A-FAPE3-0085O-A-001-01

### Page 49

A300-600
SERVICE BULLETIN
Figure ICN-A300-A-57XX6125-A-FAPE3-00862-A-002-01 Fig.FA Sol.AA SHEET 1/1
REV 00 Mar 27/24 A300-57-6125Flowchart
Page 49
CONF ALL
NOTE:
FOR THE COMPLIANCE TIMES, REFER TO THE ACCOMPLISHMENT TIMESCALE PARA 1.E.(2).
NO YES
YES
REMOVE THE PAINT ON THE
NON-COMPLIANT SPOTFACES
IS THE
SPOTFACE COMPLIANT AS PER
THE SPOTFACE COMPLIANCE
CRITERIA?
NO
NO
YES
CONTACT AIRBUS AND FOLLOW
THEIR INSTRUCTION
THE PURPOSE OF FLOWCHARTS IS TO SUPPLEMENT THE INFORMATION GIVEN IN THE PROCEDURE AND
COMPLIANCE PARAGRAPHS AND NOT TO SERVE AS THE PRIMARY SOURCE FOR TASKS OR COMPLIANCE
TIMES GIVEN IN THIS SERVICE BULLETIN.
IS THERE A
DOUBLE RADIUS CONDITION
FOUND?
IS THE SPOTFACE
COMPLIANT AS PER
THE SPOTFACE COMPLIANCE
CRITERIA?
01
DO A DETAILED VISUAL INSPECTION TO CHECK
FOR THE DOUBLE RADIUS CONDITION ON EACH
REQUESTED SPOTFACE 01
DO AN INSPECTION OF THE SPOTFACE
WITHOUT PAINT, USING GO/NO-GO GAUGES
DO AN INSPECTION OF THE SPOTFACE
WITH PAINT, USING GO/NO-GO GAUGES CONTACT AIRBUS AND FOLLOW
THEIR INSTRUCTION
NO FURTHER ACTION
ON COMPLIANT
SPOTFACE
COMPLETE AND SEND THE
INSPECTION REPORT
ICN-A300-A-57XX6125-A-FAPE3-00862-A-002-01

### Page 50

A300-600
SERVICE BULLETIN
Figure ICN-A300-A-57XX6125-A-FAPE3-0085N-A-001-01 Fig.BI Sol.AA SHEET 1/1
REV 00 Mar 27/24 A300-57-6125Inspection for the Spotface Check with Paint Applied
Page 50
CONF ALL
ICN-A300-A-57XX6125-A-FAPE3-0085N-A-001-01

### Page 51

A300-600
SERVICE BULLETIN
Figure ICN-A300-A-57XX6125-A-FAPE3-0085P-A-001-01 Fig.BG Sol.AA SHEET 1/1
REV 00 Mar 27/24 A300-57-6125Spotface Compliance Criteria
Page 51
CONF ALL
NON-COMPLIANT
NON-COMPLIANT
GAUGE SITS ABOVE FLANGE UPPER SURFACE
INDICATING NON-CONFORMANT SPOTFACE
DEPTH.
COMPLIANT
SPOTFACE COMPLIANCE CRITERIA
GAUGE DOES NOT SIT CLOSELY WITHIN THE
GAP PRESENT BETWEEN GAUGE AND
SPOTFACE INDICATING NON-CONFORMANT
SPOTFACE CIRCUMFERENCE.
SPOTFACE DIAMETER AND/OR RADIUS.
GAUGE SITS CLOSELY WITHIN SPOTFACE,
AND
GAUGE AT OR BELOW FLANGE UPPER
WITH NO GAPS AROUND CIRCUMFERENCE
SURFACE.
ICN-A300-A-57XX6125-A-FAPE3-0085P-A-001-01

### Page 52

A300-600
SERVICE BULLETIN
Figure ICN-A300-A-57XX6125-A-FAPE3-0085Q-A-001-01 Fig.BJ Sol.AA SHEET 1/1
REV 00 Mar 27/24 A300-57-6125Inspection for Spotface Check with Paint Removed
Page 52
CONF ALL
MAKE SURE THAT THE ADDITIONAL PAINT 15 mm (0.591 in), SHOULD BE REMOVE AROUND THE
OUTER CIRCUMFERENCE OF THE SPOTFACE.
NOTE:
01
ICN-A300-A-57XX6125-A-FAPE3-0085Q-A-001-01

### Page 53

A300-600
SERVICE BULLETIN
REV 00 Mar 27/24 A300-57-6125
Page 53
CONF 001
(5) Task A300-A-57-XX-6125-04001-720A-A (A300-A-57-XX-6125-04ZZZ-720Z-A)
Install the Nut and Washer in the MLG Rib 5 Lower Flange on the LH Wing
Job Set-Up Information
Working Area
Impacted Zone Access / Work Location
572 Work location Rib 5
Manpower/Resources/Skills
Man-hours 6.00 h
Minimum Number of person 1
Elapsed Time 6.00 h
Skills Airframe
Material necessary to do the job
Consumables
ITEM REFERENCE CML DESCRIPTION DRAWING SEE NOTES
06ABA1 Polysulfide Sealant - FuelT ank Brushable
Components
ITEM PART No. QTY (UM) KEYWORD DRAWING SEE NOTES
1 NSA5472-12K7 7 NUT (1) (2)
NOTE(S)
(1): Operator supplied standard hardware parts, required to accomplish this Service
Bulletin, are to be supplied from the operator's stock.
(2): The components listed above are not an AIRBUS Kit, the required parts must be
ordered as necessary through the given channel.
Referenced Information
Manuals/Drawings References/Sheets
AMM
06-21-00, Page Block 001
06-31-57, Page Block 001
20-21-12, Page Block 001
CML CONSUMABLE MATERIAL LIST (CML)
SRM
51-24-00
51-40-20
51-75-10
Procedure
Ref. Fig.BE Installation of the Nut and Washer in the MLG Gear Rib 5 Lower Flange on
the LH Wing.
(a) Standard Practices given in this procedure:
1 For the identification of zones, refer to Ref. AMM 06-21-00, Page Block 001.
2 For the identification of wing ribs, refer to Ref. AMM 06-31-57, Page Block
001.
3 Install the fasteners in accordance with Ref. SRM 51-40-20.

### Page 54

A300-600
SERVICE BULLETIN
REV 00 Mar 27/24 A300-57-6125
Page 54
4 T o torque tighten the standard threaded fasteners, refer to Ref. AMM 20-21-
12, Page Block 001.
5 For the specification of Material application codes given in this Service
Bulletin, refer to Ref. CML.
6 Apply sealant in accordance with Ref. SRM 51-24-00.
(b) Apply sealant in the spotface surface, use:
  Polysulfide Sealant -
Fuel T ank Brushable
06ABA1  
(c) Install the nut and washer on the installed taper-lok bolts at the fastener holes
43, 47, 48, 49, 50, 52 and 54 on the LH wing:
7 WASHER   Item (2) Retained
and
7 NUT NSA5472-12K7 Item 1
NOTE: Washer, item (2) can be reused if it is not damaged.
NOTE: If installing new washer(s), the maximum washer stack allowed is 1x
NSA5368-1216AX + 1x NSA5368-1216BX. Not 2x NSA5368-1216BX.
(d) T orque tighten the nut, item 1, for taper-lok bolts between 25.43 m.daN (2250
lbf.in.) and 31.07 m.daN (2750 lbf.in.).
(e) Protect fastener heads with paint coatings in accordance with Ref. SRM 51-75-10.

### Page 55

A300-600
SERVICE BULLETIN
Figure ICN-A300-A-57XX6125-A-FAPE3-0085X-A-003-01 Fig.BE Sol.AA SHEET 1/1
REV 00 Mar 27/24 A300-57-6125Installation of the Nut and Washer in the
MLG Gear Rib 5 Lower Flange on the LH Wing Page 55
CONF 001
A
A
F
W
D
INBD
B
Z572
RIB5
B
F
W
D
INBD
ITEM P/N
NSA5472-12K7
-
DESCRIPTION
NUT
REMARKS 
(2) WASHER
HOLE
SYMBOL
1
-
01
HOLE 47
HOLE 48
HOLE 50
HOLE 54
HOLE 43
HOLE 49
HOLE 52
NOTE:
TORQUE TIGHTEN THE NUT, ITEM 1, (FOR TAPER-LOK BOLTS) BETWEEN 25.43 m.daN (2250 lbf.in)01
AND 31.07 m.daN (2750 lbf.in).
APPLY SEALANT, MATERIAL No 06ABA1, ON THE SPOTFACE SURFACE.02
02
ICN-A300-A-57XX6125-A-FAPE3-0085X-A-003-01

### Page 56

A300-600
SERVICE BULLETIN
REV 00 Mar 27/24 A300-57-6125
Page 56
CONF 002
(5) Task A300-A-57-XX-6125-04002-720A-A (A300-A-57-XX-6125-04ZZZ-720Z-A)
Install the Nut and Washer in the MLG Rib 5 Lower Flange on the LH Wing
Job Set-Up Information
Working Area
Impacted Zone Access / Work Location
572 Work location Rib 5
Manpower/Resources/Skills
Man-hours 6.00 h
Minimum Number of person 1
Elapsed Time 6.00 h
Skills Airframe
Material necessary to do the job
Consumables
ITEM REFERENCE CML DESCRIPTION DRAWING SEE NOTES
06ABA1 Polysulfide Sealant - FuelT ank Brushable
Components
ITEM PART No. QTY (UM) KEYWORD DRAWING SEE NOTES
1 NSA5472-12K7 7 NUT (1) (2)
NOTE(S)
(1): Operator supplied standard hardware parts, required to accomplish this Service
Bulletin, are to be supplied from the operator's stock.
(2): The components listed above are not an AIRBUS Kit, the required parts must be
ordered as necessary through the given channel.
Referenced Information
Manuals/Drawings References/Sheets
AMM
06-21-00, Page Block 001
06-31-57, Page Block 001
20-21-12, Page Block 001
CML CONSUMABLE MATERIAL LIST (CML)
SRM
51-24-00
51-40-20
51-75-10
Procedure
Ref. Fig.BE Installation of the Nut and Washer in the MLG Gear Rib 5 Lower Flange on
the LH Wing.
(a) Standard Practices given in this procedure:
1 For the identification of zones, refer to Ref. AMM 06-21-00, Page Block 001.
2 For the identification of wing ribs, refer to Ref. AMM 06-31-57, Page Block
001.
3 Install the fasteners in accordance with Ref. SRM 51-40-20.

### Page 57

A300-600
SERVICE BULLETIN
REV 00 Mar 27/24 A300-57-6125
Page 57
4 T o torque tighten the standard threaded fasteners, refer to Ref. AMM 20-21-
12, Page Block 001.
5 For the specification of Material application codes given in this Service
Bulletin, refer to Ref. CML.
6 Apply sealant in accordance with Ref. SRM 51-24-00.
(b) Apply sealant in the spotface surface, use:
  Polysulfide Sealant -
Fuel T ank Brushable
06ABA1  
(c) Install the nut and washer on the installed parallel bolts at the fastener holes 43,
47, 48, 49, 50, 52 and 54 on the LH wing:
7 WASHER   Item (2) Retained
and
7 NUT NSA5472-12K7 Item 1
NOTE: Washer, item (2) can be reused if it is not damaged.
NOTE: If installing new washer(s), the maximum washer stack allowed is 1x
NSA5368-1216AX + 1x NSA5368-1216BX. Not 2x NSA5368-1216BX.
(d) T orque tighten the nut, item 1, for parallel bolts between 14.0 m.daN (1240
lbf.in.) and 16.0 m.daN (1420 lbf.in.).
(e) Protect fastener heads with paint coatings in accordance with Ref. SRM 51-75-10.

### Page 58

A300-600
SERVICE BULLETIN
Figure ICN-A300-A-57XX6125-A-FAPE3-0085V-A-003-01 Fig.BE Sol.AB SHEET 1/1
REV 00 Mar 27/24 A300-57-6125Installation of the Nut and Washer in the
MLG Gear Rib 5 Lower Flange on the LH Wing Page 58
CONF 002
A
A
F
W
D
INBD
B
NOTE:
TORQUETIGHTEN THE NUT, ITEM 1, (FOR PARALLEL BOLTS) BETWEEN 14.0 m.daN (1240 lbf.in) AND01
16.0 m.daN (1420 lbf.in). 
Z572
RIB5
ITEM P/N
NSA5472-12K7
-
DESCRIPTION
NUT
REMARKS 
(2) WASHER
HOLE
SYMBOL
1
B
F
W
D
INBD
-
01
HOLE 47
HOLE 48
HOLE 50
HOLE 54
HOLE 43
HOLE 49
HOLE 52
APPLY SEALANT, MATERIAL No 06ABA1, ON THE SPOTFACE SURFACE.
02
02
ICN-A300-A-57XX6125-A-FAPE3-0085V-A-003-01

### Page 59

A300-600
SERVICE BULLETIN
REV 00 Mar 27/24 A300-57-6125
Page 59
CONF 001
(6) Task A300-A-57-XX-6125-05001-720A-A (A300-A-57-XX-6125-05ZZZ-720Z-A)
Install the Nut and Washer in the MLG Rib 5 Lower Flange on the RH Wing
Job Set-Up Information
Working Area
Impacted Zone Access / Work Location
672 Work location Rib 5
Manpower/Resources/Skills
Man-hours 6.00 h
Minimum Number of person 1
Elapsed Time 6.00 h
Skills Airframe
Material necessary to do the job
Consumables
ITEM REFERENCE CML DESCRIPTION DRAWING SEE NOTES
06ABA1 Polysulfide Sealant - FuelT ank Brushable
Components
ITEM PART No. QTY (UM) KEYWORD DRAWING SEE NOTES
1 NSA5472-12K7 7 NUT (1) (2)
NOTE(S)
(1): Operator supplied standard hardware parts, required to accomplish this Service
Bulletin, are to be supplied from the operator's stock.
(2): The components listed above are not an AIRBUS Kit, the required parts must be
ordered as necessary through the given channel.
Referenced Information
Manuals/Drawings References/Sheets
AMM
06-21-00, Page Block 001
06-31-57, Page Block 001
20-21-12, Page Block 001
CML CONSUMABLE MATERIAL LIST (CML)
SRM
51-24-00
51-40-20
51-75-10
Procedure
Ref. Fig.BF Installation of the Nut and Washer in the MLG Gear Rib 5 Lower Flange on
the RH Wing.
(a) Standard Practices given in this procedure:
1 For the identification of zones, refer to Ref. AMM 06-21-00, Page Block 001.
2 For the identification of wing ribs, refer to Ref. AMM 06-31-57, Page Block
001.
3 Install the fasteners in accordance with Ref. SRM 51-40-20.

### Page 60

A300-600
SERVICE BULLETIN
REV 00 Mar 27/24 A300-57-6125
Page 60
4 T o torque tighten the standard threaded fasteners, refer to Ref. AMM 20-21-
12, Page Block 001.
5 For the specification of Material application codes given in this Service
Bulletin, refer to Ref. CML.
6 Apply sealant in accordance with Ref. SRM 51-24-00.
(b) Apply sealant in the spotface surface, use:
  Polysulfide Sealant -
Fuel T ank Brushable
06ABA1  
(c) Install the nut and washer on the installed taper-lok bolts at the fastener holes
43, 47, 48, 49, 50, 52 and 54 on the RH wing:
7 WASHER   Item (2) Retained
and
7 NUT NSA5472-12K7 Item 1
NOTE: Washer, item (2) can be reused if it is not damaged.
NOTE: If installing new washer(s), the maximum washer stack allowed is 1x
NSA5368-1216AX + 1x NSA5368-1216BX. Not 2x NSA5368-1216BX.
(d) T orque tighten the nut, item 1, for taper-lok bolts between 25.43 m.daN (2250
lbf.in.) and 31.07 m.daN (2750 lbf.in.).
(e) Protect fastener heads with paint coatings in accordance with Ref. SRM 51-75-10.

The text continues at https://openairdocs.org/service-documents/airbus/a300-57-6125/file/5de6c83d6d06.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.