# Airbus Service Bulletin A310-24-2105

Copy: Revision 02 ("FAA-2014-0775_SB A310-24-2105_Rev02_Removed Appendices"), 346 pages: PDF https://openairdocs.org/files/sha256/fc/0e/fc0e7ae37a456e901e770b58db9c23ee82830d79623243f4f690efd80ac9e9bb; text https://openairdocs.org/service-documents/airbus/a310-24-2105/file/fc0e7ae37a45.md. Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2014-0775; AD 2016-07-22 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Airbus](https://openairdocs.org/service-documents/airbus.md)
- Type: Service bulletin (Service Bulletin)
- Number: A310-24-2105
- Latest revision known: A310-24-2105, Revision 02, dated January 5, 2015 (OpenAirDocs)
- Page: https://openairdocs.org/service-documents/airbus/a310-24-2105

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2016-07-22](https://openairdocs.org/ad/2016-07-22.md), effective May 16, 2016: Revisions 01 and 02

Also cited in [1 proposed AD](https://openairdocs.org/service-documents/airbus/a310-24-2105/proposed.md).

## Text (346 pages)

Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2014-0775; AD 2016-07-22 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

@A310
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
MANDATORY
 MANDATORY
 MANDATORY
ATA SYSTEM: 24
TITLE: ELECTRIC COMMON INSTALLA TION - WINGS - IMPROVE WIRING
INSTALLATION
MODIFICATION No.: 13492S22794 13497D23225
This page transmits Revision No.02 of Service Bulletin No.A310-24-2105
ADDITIONAL WORK
**CONF ALL
No additional work is required by this revision for aircraft modified by any previous issue.
REASON
Revision No.02 issued to:
- Update the quantity of placards in KIT D01 and D02.
CHANGES
- The main changes are:
. Quantity update of placards in KIT D01 and D02
. Validity of KIT D01 and D03 in the Material Information paragraph
SUMMARY
MATERIAL PRICE INFORMATION
 MATERIAL PRICE INFORMATION TABLE
UPDATED
R
MATERIAL PRICE INFORMATION TABLE
UPDATED
R
EFFECTIVITY
 OPERATOR LIST UPDATED
 R
PLANNING INFORMATION
EFFECTIVITY
 EFFECTIVITY RELATED INFORMATION
UPDATED
R
Configuration definition
CONF 002
 CONFIGURATION DEFINITION UPDATED
 R
DATE: Mar 20/13 SERVICE BULLETIN No.: A310-24-2105
REVISION No.: 02 - Jan 05/15 Page: 1
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 2

@A310
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
CONF 003
 CONFIGURATION DEFINITION UPDATED
 R
CONF 004
 CONFIGURATION DEFINITION UPDATED
 R
Material Effectivity
 MATERIAL EFFECTIVITY UPDATED
MATERIAL SET QUANTITY UPDATED
MATERIAL SET UPDATED
R
MATERIAL EFFECTIVITY UPDATED
MATERIAL SET QUANTITY UPDATED
MATERIAL SET UPDATED
R
MATERIAL INFORMATION
LIST OF COMPONENTS
Kit 242105D01R08
 PART MATERIAL SET UPDATED
QUANTITY UPDATED
R
Kit 242105D02R08
 PART MATERIAL SET UPDATED
QUANTITY UPDATED
R
ACCOMPLISHMENT INSTRUCTIONS
TASK 242105- 831-848-001-
MODIFICATION
Subtask 242105-831-213-002
 SUBTASK SOLUTION UPDATED
QUANTITY UPDATED
MATERIAL LIST UPDATED
R
Subtask 242105-831-214-002
 SUBTASK SOLUTION UPDATED
QUANTITY UPDATED
MATERIAL LIST UPDATED
R
Subtask 242105-831-220-002
 SUBTASK SOLUTION UPDATED
QUANTITY UPDATED
MATERIAL LIST UPDATED
R
Subtask 242105-831-211-003
 SUBTASK SOLUTION UPDATED
QUANTITY UPDATED
MATERIAL LIST UPDATED
R
Subtask 242105-831-212-003
 SUBTASK SOLUTION UPDATED
QUANTITY UPDATED
MATERIAL LIST UPDATED
R
Subtask 242105-831-213-001
 SUBTASK SOLUTION UPDATED
QUANTITY UPDATED
MATERIAL LIST UPDATED
R
Subtask 242105-831-214-001
 SUBTASK SOLUTION UPDATED
QUANTITY UPDATED
MATERIAL LIST UPDATED
R
Subtask 242105-831-220-001
 SUBTASK SOLUTION UPDATED
QUANTITY UPDATED
MATERIAL LIST UPDATED
R
Subtask 242105-831-211-002
 SUBTASK SOLUTION UPDATED
QUANTITY UPDATED
MATERIAL LIST UPDATED
R
Subtask 242105-831-213-002
 SUBTASK SOLUTION UPDATED
QUANTITY UPDATED
MATERIAL LIST UPDATED
R
DATE: Mar 20/13 SERVICE BULLETIN No.: A310-24-2105
REVISION No.: 02 - Jan 05/15 Page: 2
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 3

@A310
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
Subtask 242105-831-214-002
 SUBTASK SOLUTION UPDATED
QUANTITY UPDATED
MATERIAL LIST UPDATED
R
Subtask 242105-831-220-002
 SUBTASK SOLUTION UPDATED
QUANTITY UPDATED
MATERIAL LIST UPDATED
R
Subtask 242105-831-211-002
 SUBTASK SOLUTION UPDATED
QUANTITY UPDATED
MATERIAL LIST UPDATED
R
Subtask 242105-831-213-002
 SUBTASK SOLUTION UPDATED
QUANTITY UPDATED
MATERIAL LIST UPDATED
R
Subtask 242105-831-214-002
 SUBTASK SOLUTION UPDATED
QUANTITY UPDATED
MATERIAL LIST UPDATED
R
Subtask 242105-831-220-002
 SUBTASK SOLUTION UPDATED
QUANTITY UPDATED
MATERIAL LIST UPDATED
R
FILING INSTRUCTIONS
This Service Bulletin has been generated electronically and is reissued as a complete document.
Replace the complete document.
Put this Revision Transmittal Sheet in front of the Service Bulletin.
HISTORY OF PREVIOUS REVISIONS
Revision No.01 issued to:
Update the effectivity.
REVISION SEQUENCE
ORIGINAL: Mar 20/13
REVISION No. : 01 - Dec 11/13
REVISION No. : 02 - Jan 05/15
DATE: Mar 20/13 SERVICE BULLETIN No.: A310-24-2105
REVISION No.: 02 - Jan 05/15 Page: 3
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 4

@A310
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
This Page Intentionally Left Blank
DATE: Mar 20/13 SERVICE BULLETIN No.: A310-24-2105
REVISION No.: 02 - Jan 05/15 Page: 4
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 5

@A310
SERVICE BULLETIN
SUMMARY
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
This summary is for information only and is not approved for modification of the aircraft.
MANDATORY
 MANDATORY
 MANDATORY
ATA SYSTEM: 24
TITLE: ELECTRIC COMMON INSTALLA TION - WINGS - IMPROVE WIRING
INSTALLATION
**CONF ALL
MODIFICATIONS
MODIFICATION CLASSIFICATION
MAJOR
 13492S22794
 13497D23225
MINOR
 None
NOTE
: As per EASA IR 21, a minor change is one that has no appreciable effect on the
mass, balance, structural strength, reliability, operational characteristics affecting the
airworthiness of the product. All other changes are major changes.
REASON/DESCRIPTION/OPERATIONAL CONSEQUENCES
The A310 aircraft operator’s feedback further to the accomplishment of the mandatory Inspection
Service Bulletin A310-24-2095 and a review of the wing electrical installation at the AIRBUS final
assembly line have shown that the wing electrical installation doesn’t comply with the minimum distance
inspection criteria to the surrounding structure in a few wing locations.
This Service Bulletin requires:
- the installation of new bracket assemblies to improve the electrical harnesses installation and
secure the clearance to the structure in identified locations
- the installation of protective split sleeve as mechanical protection to the electrical harnesses in
areas where the minimum distance to the structure cannot be achieved.
Accomplishment of this modification Service Bulletin will improve the wing electrical installation in the
identified areas and prevent possible chafing and subsequent damage to the electrical harnesses and
surrounding structure.
GENERAL EVALUATION
EVALUATION TABLE
COMPLIANCE
 MANDATORY (1)
 CANCELS INSPECTION SB
 NO
DATE: Mar 20/13 SERVICE BULLETIN No.: A310-24-2105
REVISION No.: 02 - Jan 05/15 Page: 1
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 6

@A310
SERVICE BULLETIN
SUMMARY
EVALUATION TABLE
POTENTIAL AD
 YES
 A/C OPERATION AFFECTED
 NO
RELIABILITY AFFECTED
 NO
 PAX COMFORT AFFECTED
 NO
COST SAVING
 NO
 ETOPS AFFECTED
 NO
STRUCTURAL LIFE EXTN
 NO
 VENDOR SB INVOLVED
 NO
Kit Price (USD)
 See SB
NOTE
 (1)
: Service Bulletin must be accomplished.
MATERIAL PRICE INFORMATION
**CONF 001
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET
 QTY PER
A/C
PRICE PER
A/C (USD)
MAIN PARTS
Kit 242105A01R03
 1
 10,480.00
 Protective sleeve, spacer, hardware
Kit 242105B01R02
 1
 36.00
 Brackets, nutplate, rivets
Kit 242105D02R08
 1
 8,090.00
 Ramp, clamp, spacer, protection sleeve
and attachment parts
TOTAL
 18,606.00
**CONF 002
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET
 QTY PER
A/C
PRICE PER
A/C (USD)
MAIN PARTS
Kit 242105A01R03
 1
 10,480.00
 Protective sleeve, spacer, hardware
Kit 242105B01R02
 1
 36.00
 Brackets, nutplate, rivets
Kit 242105D01R08
 1
 3,590.00
 Ramp, clamp, spacer, protection sleeve
and attachment parts
Kit 242105D04R00
 1
 97.00
 Clamp and attachment parts
TOTAL
 14,203.00
**CONF 003
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET
 QTY PER
A/C
PRICE PER
A/C (USD)
MAIN PARTS
Kit 242105A01R03
 1
 10,480.00
 Protective sleeve, spacer, hardware
Kit 242105B01R02
 1
 36.00
 Brackets, nutplate, rivets
Kit 242105D02R08
 1
 8,090.00
 Ramp, clamp, spacer, protection sleeve
and attachment parts
Kit 242105D04R00
 1
 97.00
 Clamp and attachment parts
TOTAL
 18,703.00
DATE: Mar 20/13 SERVICE BULLETIN No.: A310-24-2105
REVISION No.: 02 - Jan 05/15 Page: 2
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 7

@A310
SERVICE BULLETIN
SUMMARY
**CONF 004
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET
 QTY PER
A/C
PRICE PER
A/C (USD)
MAIN PARTS
Kit 242105A01R03
 1
 10,480.00
 Protective sleeve, spacer, hardware
Kit 242105B01R02
 1
 36.00
 Brackets, nutplate, rivets
Kit 242105D02R08
 1
 8,090.00
 Ramp, clamp, spacer, protection sleeve
and attachment parts
Kit 242105D03R01
 1
 96.00
 Clamp and attachment parts
Kit 242105D04R00
 1
 97.00
 Clamp and attachment parts
TOTAL
 18,799.00
EFFECTIVITY
**CONF ALL
This Service Bulletin is applicable to this (these) operator(s) :
18T 19U 40T 50W
 58X 82Z 85Z 98W 99Y AFG AIC BBC CFC
DGA F2I
 FDX GAF HFY IRA IRM IYE K1P KAC KZU MGL PCA
PIA QAF R1T RJA ROT RZO SGX SUD THY TSC UBD UZB WHT
CONCURRENT REQUIREMENTS
None
REFERENCES / REPERCUSSIONS
TFU
 None
OEB
 None
AOT
 None
SIL
 None
LINE MAINTENANCE AFFECTED
 No
LIFE LIMIT
 None
OTHER
 None
NATURE OF THE WORK
AIRCRAFT
 YES
EQUIPMENT
 NO
HARD
 NO
SOFT
 NO
OBRM
 NO
DATE: Mar 20/13 SERVICE BULLETIN No.: A310-24-2105
REVISION No.: 02 - Jan 05/15 Page: 3
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 8

@A310
SERVICE BULLETIN
SUMMARY
MANPOWER
**CONF 001
Task 242105-831-848-001: MODIFICATION
TOTAL MANHOURS
 54.25
ELAPSED TIME (HOURS)
 30.75
**CONF 002
Task 242105-831-848-001: MODIFICATION
TOTAL MANHOURS
 49.50
ELAPSED TIME (HOURS)
 29.50
**CONF 003
Task 242105-831-848-001: MODIFICATION
TOTAL MANHOURS
 54.25
ELAPSED TIME (HOURS)
 34.00
**CONF 004
Task 242105-831-848-001: MODIFICATION
TOTAL MANHOURS
 55.50
ELAPSED TIME (HOURS)
 31.25
APPENDICES
**CONF ALL
Appendix 01 - Elapsed Time Assumption
DATE: Mar 20/13 SERVICE BULLETIN No.: A310-24-2105
REVISION No.: 02 - Jan 05/15 Page: 4
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 9

@A310
SERVICE BULLETIN
SUMMARY
**CONF 001 thru 003
B_SB_242105_6_SAAB_01_03
ZONES WITH ROUTING TO MODIFY
Z573
Z513
Z613
 − Z137 Z138
Z673
Z512
Z612
Z524
Z624
Z675
Figure A-GSAAB - Sheet 01
DATE: Mar 20/13 SERVICE BULLETIN No.: A310-24-2105
REVISION No.: 02 - Jan 05/15 Page: 5
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 10

@A310
SERVICE BULLETIN
SUMMARY
**CONF 004
Z573
Z513
Z613
 − Z137 Z138
Z673
ZONES WITH ROUTING TO MODIFY
Z512
Z612
Z524
Z624
Z575
B_SB_242105_6_SAAE_01_01
Figure A-GSAAE - Sheet 01
DATE: Mar 20/13 SERVICE BULLETIN No.: A310-24-2105
REVISION No.: 02 - Jan 05/15 Page: 6
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 11

@A310
SERVICE BULLETIN
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
MANDATORY
 MANDATORY
 MANDATORY
ATA SYSTEM: 24
TITLE: ELECTRIC COMMON INSTALLA TION - WINGS - IMPROVE WIRING
INSTALLATION
MODIFICATION No.: 13492S22794 13497D23225
This document contains AIRBUS PROPRIETARY INFORMATION and shall at all times remain the
property of AIRBUS; no intellectual property right or licence is granted by AIRBUS in connection with
any information contained in it. It is delivered on the express condition that said document and the
information contained in it shall be treated as confidential, shall not be used for any purpose other than
that for which it is hereby delivered. It shall not be disclosed in whole or in part to third parties and shall
not be duplicated in any manner (except for the purposes of performing the tasks described hereunder
and provided that any recipient of such document shall comply with the conditions herein), without
AIRBUS prior written consent.
1. PLANNING INFORMATION
**CONF ALL
A. EFFECTIVITY
This modification is applicable by Service Bulletin only.
(1) Models
310-203 310-221 310-222 310-304 310-308 310-322 310-324 310-325
(2) Effectivity by MSN
0162 0230 0237 0245 0248 0267 0278 0281 0283 0331 0356
 0362 0364 0369 0378
0394 0399 0407 0413 0418-0419 0421-0422 0425 0431 0434 0436-0437 0439 0441
0444-0447 0449 0452 0456-0458 0467 0472-0473 0478 0480
 0482-0484
 0488-0492
0494-0500 0503
 0519-0520 0522-0524 0526-0527 0537 0539 0545 0547 0549-0552
0562 0564-0565 0567-0568 0571 0574 0576 0585-0588 0590-0595 0597 0599-0600
0620 0622 0624 0636 0644 0646-0649 0651
 0653
 0656 0658 0660-0661 0663 0667
0671-0672 0674 0676 0678 0682 0687 0689 0691 0700 0702 0704 0706
DATE: Mar 20/13 SERVICE BULLETIN No.: A310-24-2105
REVISION No.: 02 - Jan 05/15 Page: 1
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 12

@A310
SERVICE BULLETIN
(3) Effectivity by Operator
The Operator/MSN relationship is provided for information only and is correct at the time
of issue in accordance with the information available to AIRBUS. Any future changes
resulting from transfer of an aircraft from one operator to another will not be reflected in
this list unless the Service Bulletin is revised for another reason.
OPERATOR
 MSN
18T
 0473
19U
 0399
40T
 0413
50W
 0498
58X
 0431
82Z
 0550 0551
85Z
 0527
98W
 0495
99Y
 0489
AFG
 0496 0497
AIC
 0407
BBC
 0594 0700
CFC
 0425 0441 0444 0446 0482
DGA
 0418 0421 0422
F2I
 0491
 0520
FDX
 0162 0230 0237 0245 0248 0267 0278 0281 0283 0331 0356 0362
0364 0369 0378 0394 0439 0449 0452 0456 0457 0458 0467 0492
0500 0539 0549 0552 0593
GAF
 0434 0484 0503 0522 0523
HFY
 0565
IRA
 0436 0671
IRM
 0488 0499 0524 0537 0547 0564 0567 0586 0595 0620
IYE
 0568 0702 0704
K1P
 0648
KAC
 0647 0649 0663
KZU
 0592 0622 0646
MGL
 0526
PCA
 0419
PIA
 0585 0587 0590 0653 0656 0660 0676 0678 0682 0687 0689 0691
QAF
 0667
R1T
 0591
RJA
 0445 0490
ROT
 0636 0644
RZO
 0571 0624 0651 0661
SGX
 0519 0562
SUD
 0437
THY
 0478 0480
TSC
 0447 0472 0483 0545 0588 0597 0599 0600 0658
UBD
 0672 0674
UZB
 0574 0576 0706
DATE: Mar 20/13 SERVICE BULLETIN No.: A310-24-2105
REVISION No.: 02 - Jan 05/15 Page: 2
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 13

@A310
SERVICE BULLETIN
OPERATOR
 MSN
WHT
 0494
(4) Configuration by MSN
MSN
 CONFIGURATION
0162 0230 0237 0245 0248 0267 0278 0281 0283 0331 0356
0362 0364 0369 0394
002
0378 0439 0449 0452 0456 0457 0458 0467 0489 0492 0500
0539 0549 0568 0574 0576 0591 0594 0624 0636 0644 0660
0672 0674 0676 0678 0682 0687 0689 0700 0702 0704 0706
001
0399 0407 0413 0419 0421 0422 0431 0434 0436 0437 0620
 003
0418 0425 0441 0444 0445 0446 0447 0472 0473 0478 0480
0482 0483 0484 0488 0490 0491 0494 0495 0496 0497 0498
0499 0503 0519 0520 0522 0523 0524 0526 0527 0537 0545
0547 0550 0551 0552 0562 0564 0565 0567 0571 0585 0586
0587 0588 0590 0592 0593 0595 0597 0599 0600 0622 0646
0647 0648 0649 0651 0653 0656 0658 0661 0663 0667 0671
0691
004
(5) Configuration definition
**CONF 001
Config. 001 is valid for the 310-324 and 310-325 type of aircraft in the effectivity of this
Service Bulletin for aircraft without installation of 5082VN and 5084VN on RIB 8 and
without installation of wires 2612-5017 and 2612-5016 on 2147VC.
**CONF 002
Config. 002 is valid for the 310-203, 310-221, 310-222, 310-324 and 310-325 type of
aircraft in the effectivity of this Service Bulletin for aircraft with 5082VN and 5084VN on
RIB 8 installed and without installation of wires 2612-5017 and 2612-5016 on 2147VC.
**CONF 003
Config. 003 is valid for the 310-304 and 310-322 type of aircraft in the effectivity of this
Service Bulletin with 5082VN and 5084VN on RIB 8 installed and without installation of
wires 2612-5017 and 2612-5016 on 2147VC.
**CONF 004
Config. 004 is valid for the 310-308 and 310-304 type of aircraft in the effectivity of this
Service Bulletin with 5082VN and 5084VN on RIB 8 installed and with wires 2612-5017
and 2612-5016 on 2147VC installed.
(6) Material Effectivity
**CONF 001
MATERIAL
 QTY PER A/C
 SEE NOTES
Kit 242105A01R03
 1
Consumable CMLA01
 As required
Kit 242105B01R02
 1
Consumable CMLB01
 As required
DATE: Mar 20/13 SERVICE BULLETIN No.: A310-24-2105
REVISION No.: 02 - Jan 05/15 Page: 3
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 14

@A310
SERVICE BULLETIN
MATERIAL
 QTY PER A/C
 SEE NOTES
Kit 242105D02R08
 1
Consumable CMLD01
 As required
**CONF 002
MATERIAL
 QTY PER A/C
 SEE NOTES
Kit 242105A01R03
 1
Consumable CMLA01
 As required
Kit 242105B01R02
 1
Consumable CMLB01
 As required
Kit 242105D01R08
 1
Kit 242105D04R00
 1
Consumable CMLD01
 As required
**CONF 003
MATERIAL
 QTY PER A/C
 SEE NOTES
Kit 242105A01R03
 1
Consumable CMLA01
 As required
Kit 242105B01R02
 1
Consumable CMLB01
 As required
Kit 242105D02R08
 1
Kit 242105D04R00
 1
Consumable CMLD01
 As required
**CONF 004
MATERIAL
 QTY PER A/C
 SEE NOTES
Kit 242105A01R03
 1
Consumable CMLA01
 As required
Kit 242105B01R02
 1
Consumable CMLB01
 As required
Kit 242105D02R08
 1
Kit 242105D03R01
 1
Kit 242105D04R00
 1
Consumable CMLD01
 As required
**CONF ALL
B. CONCURRENT REQUIREMENTS
None
DATE: Mar 20/13 SERVICE BULLETIN No.: A310-24-2105
REVISION No.: 02 - Jan 05/15 Page: 4
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 15

@A310
SERVICE BULLETIN
C. REASON
(1) History
The A310 aircraft operator’s feedback further to the accomplishment of the mandatory
Inspection Service Bulletin A310-24-2095 and a review of the wing electrical installation
at the AIRBUS final assembly line have shown that the wing electrical installation doesn’t
comply with the minimum distance inspection criteria to the surrounding structure in a
few wing locations.
(2) Objective/Action
This Service Bulletin requires:
- the installation of new bracket assemblies to improve the electrical harnesses
installation and secure the clearance to the structure in identified locations
- the installation of protective split sleeve as mechanical protection to the electrical
harnesses in areas where the minimum distance to the structure cannot be
achieved.
(3) Advantages
Accomplishment of this modification Service Bulletin will improve the wing electrical
installation in the identified areas and prevent possible chafing and subsequent damage
to the electrical harnesses and surrounding structure.
(4) Operational/Maintenance Consequences
None
D. DESCRIPTION
To accomplish this Service Bulletin it is necessary to :
**CONF 001
Task 242105-831-848-001: MODIFICATION
(1) Install Adhesive Clipping Bracket on the LH and RH Wing Leading Edge in the Area
of Rib 7
(2) Attach the routes 1E and 1G with the lacing tape in the LH shroud box leading edge.
(3) Attach the routes 2E and 2G with the lacing tape in the RH shroud box leading edge.
(4) Modify the routing in the LH forward wing to fuselage fairing.
(5) Modify the routing in the RH forward wing to fuselage fairing.
(6) Modify the routing on the LH shroud box leading edge.
(7) Modify the routing on the RH shroud box leading edge.
DATE: Mar 20/13 SERVICE BULLETIN No.: A310-24-2105
REVISION No.: 02 - Jan 05/15 Page: 5
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 16

@A310
SERVICE BULLETIN
(8) Install new nutplate on the RH wing Leading edge
(9) Modify the electrical routing installation at the LH front spar in the area of RIB 2
(10) Modify the electrical routing installation at the RH front spar in the area of RIB 2
(11) Modify the electrical routing installation at the LH front spar in the area of RIB 3.
(12) Modify the electrical routing installation at the RH front spar in the area of RIB 3.
(13) Modify the electrical routing installation at the LH and RH front spars in the area of
RIB 5 and RIB 6.
(14) Modify the electrical routing installation at the LH and RH front spars in the area of
RIB 7 and RIB 8.
(15) Modify the electrical routing installation at the LH front spar in the area of RIB 20
and RIB 21.
(16) Modify the electrical routing installation at the RH front spar in the area of RIB 20
and RIB 21.
(17) Modify the electrical routing installation at the RH front spar in the area of RIB 28
and RIB 28A.
**CONF 002
Task 242105-831-848-001: MODIFICATION
(1) Install Adhesive Clipping Bracket on the LH and RH Wing Leading Edge in the Area
of Rib 7
(2) Attach the routes 1E and 1G with the lacing tape in the LH shroud box leading edge.
(3) Attach the routes 2E and 2G with the lacing tape in the RH shroud box leading edge.
(4) Modify the routing in the LH forward wing to fuselage fairing.
(5) Modify the routing in the RH forward wing to fuselage fairing.
(6) Modify the routing on the LH shroud box leading edge.
(7) Modify the routing on the RH shroud box leading edge.
(8) Install new nutplate on the RH wing Leading edge
(9) Modify the electrical routing installation at the LH front spar in the area of RIB 2.
(10) Modify the electrical routing installation at the RH front spar in the area of RIB 2.
(11) Modify the electrical routing installation at the LH front spar in the area of RIB 3.
(12) Modify the electrical routing installation at the RH front spar in the area of RIB 3.
DATE: Mar 20/13 SERVICE BULLETIN No.: A310-24-2105
REVISION No.: 02 - Jan 05/15 Page: 6
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 17

@A310
SERVICE BULLETIN
(13) Modify the electrical routing installation at the LH and RH front spars in the area of
RIB 5 and RIB 6.
(14) Modify the electrical routing installation at the LH and RH front spars in the area of
RIB 7 and RIB 8.
(15) Modify the electrical routing installation at the RH front spar in the area of RIB 28
and RIB 28A.
**CONF 003
Task 242105-831-848-001: MODIFICATION
(1) Install Adhesive Clipping Bracket on the LH and RH Wing Leading Edge in the Area
of Rib 7
(2) Attach the routes 1E and 1G with the lacing tape in the LH shroud box leading edge.
(3) Attach the routes 2E and 2G with the lacing tape in the RH shroud box leading edge.
(4) Modify the routing in the LH forward wing to fuselage fairing.
(5) Modify the routing in the RH forward wing to fuselage fairing.
(6) Modify the routing on the LH shroud box leading edge.
(7) Modify the routing on the RH shroud box leading edge.
(8) Install new nutplate on the RH wing Leading edge
(9) Modify the electrical routing installation at the LH front spar in the area of RIB 2.
(10) Modify the electrical routing installation at the RH front spar in the area of RIB 2.
(11) Modify the electrical routing installation at the LH front spar in the area of RIB 3.
(12) Modify the electrical routing installation at the RH front spar in the area of RIB 3.
(13) Modify the electrical routing installation at the LH and RH front spars in the area of
RIB 5 and RIB 6.
(14) Modify the electrical routing installation at the LH and RH front spars in the area of
RIB 7 and RIB 8.
(15) Modify the electrical routing installation at the LH front spar in the area of RIB 20
and RIB 21.
(16) Modify the electrical routing installation at the RH front spar in the area of RIB 20
and RIB 21.
(17) Modify the electrical routing installation at the RH front spar in the area of RIB 28
and RIB 28A.
DATE: Mar 20/13 SERVICE BULLETIN No.: A310-24-2105
REVISION No.: 02 - Jan 05/15 Page: 7
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 18

@A310
SERVICE BULLETIN
**CONF 004
Task 242105-831-848-001: MODIFICATION
(1) Install Adhesive Clipping Bracket on the LH and RH Wing Leading Edge in the Area
of Rib 7
(2) Attach the routes 1E and 1G with the lacing tape in the LH shroud box leading edge.
(3) Attach the routes 2E and 2G with the lacing tape in the RH shroud box leading edge.
(4) Modify the routing in the LH forward wing to fuselage fairing.
(5) Modify the routing in the RH forward wing to fuselage fairing.
(6) Modify the routing on the LH shroud box leading edge.
(7) Modify the routing on the RH shroud box leading edge.
(8) Install new nutplate on the RH wing Leading edge
(9) Modify the electrical routing installation at the LH front spar in the area of RIB 2.
(10) Modify the electrical routing installation at the RH front spar in the area of RIB 2.
(11) Modify the electrical routing installation at the LH front spar in the area of RIB 3.
(12) Modify the electrical routing installation at the RH front spar in the area of RIB 3.
(13) Modify the electrical routing installation at the LH and RH front spars in the area of
RIB 5 and RIB 6.
(14) Modify the electrical routing installation at the LH and RH front spars in the area of
RIB 7 and RIB 8.
(15) Modify the electrical routing installation at the RH front spar in the area of RIB 8.
(16) Modify the electrical routing installation at the LH front spar in the area of RIB 20
and RIB 21.
(17) Modify the electrical routing installation at the RH front spar in the area of RIB 20
and RIB 21.
(18) Modify the electrical routing installation at the RH front spar in the area of RIB 28
and RIB 28A.
(19) Modify the electrical routing installation at the LH rear spar in the area of RIB 9.
DATE: Mar 20/13 SERVICE BULLETIN No.: A310-24-2105
REVISION No.: 02 - Jan 05/15 Page: 8
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 19

@A310
SERVICE BULLETIN
**CONF ALL
E. COMPLIANCE
(1) Classification
MANDATORY: Service Bulletin must be accomplished.
(2) Accomplishment Timescale
This Service Bulletin has been classified Mandatory by the issue of an Airworthiness
Directive (AD) published by the European Av iation Safety Agenc y (EASA). The AD must
be used as the reference document for the mandated accomplishment timescale.
F. APPROVAL
The technical content of this document is approved under the authority of the Design
Organisation Approval No. EASA.21J.031.
If an aircraft listed in the effectivity has a modification or repair embodied that is not of
AIRBUS origin, and which affects the content of this Service Bulletin, the operator is
responsible for obtaining approval by its airworthiness authority for any adaptation necessary
before incorporation of the Service Bulletin.
G. MANPOWER
The manpower estimates given in this Service Bulletin are based on the direct labor cost to
do the work. These estimates assume that the work will be done by experienced personnel,
and may need to be revised upwards to suit operator’s circumstances. The estimates do not
include the time to prepare, plan or inspect the work. Manufacture and procurement of parts
and tools, drying times for paints, sealants, etc., and general administration work are also not
included.
For an explanation of the manhours and elapsed time, refer to Appendix 01 - Elapsed Time
Assumption .
**CONF 001
Task 242105-831-848-001: MODIFICATION
Get Access
 8.00
On Aircraft
Install Adhesive Clipping Bracket on the LH and RH
Wing Leading Edge in the Area of Rib 7
1.00
Attach the routes 1E and 1G with the lacing tape in the
LH shroud box leading edge.
0.50
Attach the routes 2E and 2G with the lacing tape in the
RH shroud box leading edge.
0.50
Modify the routing in the LH forward wing to fuselage
fairing.
2.00
Modify the routing in the RH forward wing to fuselage
fairing.
2.00
DATE: Mar 20/13 SERVICE BULLETIN No.: A310-24-2105
REVISION No.: 02 - Jan 05/15 Page: 9
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 20

@A310
SERVICE BULLETIN
Task 242105-831-848-001: MODIFICATION
Modify the routing on the LH shroud box leading edge.
 6.00
Modify the routing on the RH shroud box leading edge.
 6.00
Install new nutplate on the RH wing Leading edge
 1.00
Modify the electrical routing installation at the LH front
spar in the area of RIB 2
1.5
Modify the electrical routing installation at the RH front
spar in the area of RIB 2
2.00
Modify the electrical routing installation at the LH front
spar in the area of RIB 3.
1.00
Modify the electrical routing installation at the RH front
spar in the area of RIB 3.
1.00
Modify the electrical routing installation at the LH and
RH front spars in the area of RIB 5 and RIB 6.
2.50
Modify the electrical routing installation at the LH and
RH front spars in the area of RIB 7 and RIB 8.
1.00
Modify the electrical routing installation at the LH front
spar in the area of RIB 20 and RIB 21.
3.25
Modify the electrical routing installation at the RH front
spar in the area of RIB 20 and RIB 21.
2.50
Modify the electrical routing installation at the RH front
spar in the area of RIB 28 and RIB 28A.
1.50
Tests
 1.00
Close-Up
 10.00
TOTAL MANHOURS
 54.25
ELAPSED TIME (HOURS)
 30.75
**CONF 002
Task 242105-831-848-001: MODIFICATION
Get Access
 8.00
On Aircraft
Install Adhesive Clipping Bracket on the LH and RH
Wing Leading Edge in the Area of Rib 7
1.00
Attach the routes 1E and 1G with the lacing tape in the
LH shroud box leading edge.
0.50
Attach the routes 2E and 2G with the lacing tape in the
RH shroud box leading edge.
0.50
Modify the routing in the LH forward wing to fuselage
fairing.
2.00
Modify the routing in the RH forward wing to fuselage
fairing.
2.00
Modify the routing on the LH shroud box leading edge.
 6.00
Modify the routing on the RH shroud box leading edge.
 6.00
Install new nutplate on the RH wing Leading edge
 1.00
DATE: Mar 20/13 SERVICE BULLETIN No.: A310-24-2105
REVISION No.: 02 - Jan 05/15 Page: 10
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 21

@A310
SERVICE BULLETIN
Task 242105-831-848-001: MODIFICATION
Modify the electrical routing installation at the LH front
spar in the area of RIB 2.
1.75
Modify the electrical routing installation at the RH front
spar in the area of RIB 2.
1.75
Modify the electrical routing installation at the LH front
spar in the area of RIB 3.
1.75
Modify the electrical routing installation at the RH front
spar in the area of RIB 3.
1.75
Modify the electrical routing installation at the LH and
RH front spars in the area of RIB 5 and RIB 6.
2.50
Modify the electrical routing installation at the LH and
RH front spars in the area of RIB 7 and RIB 8.
0.50
Modify the electrical routing installation at the RH front
spar in the area of RIB 28 and RIB 28A.
1.50
Tests
 1.00
Close-Up
 10.00
TOTAL MANHOURS
 49.50
ELAPSED TIME (HOURS)
 29.50
**CONF 003
Task 242105-831-848-001: MODIFICATION
Get Access
 8.00
On Aircraft
Install Adhesive Clipping Bracket on the LH and RH
Wing Leading Edge in the Area of Rib 7
1.00
Attach the routes 1E and 1G with the lacing tape in the
LH shroud box leading edge.
0.50
Attach the routes 2E and 2G with the lacing tape in the
RH shroud box leading edge.
0.50
Modify the routing in the LH forward wing to fuselage
fairing.
2.00
Modify the routing in the RH forward wing to fuselage
fairing.
2.00
Modify the routing on the LH shroud box leading edge.
 6.00
Modify the routing on the RH shroud box leading edge.
 6.00
Install new nutplate on the RH wing Leading edge
 1.00
Modify the electrical routing installation at the LH front
spar in the area of RIB 2.
1.5
Modify the electrical routing installation at the RH front
spar in the area of RIB 2.
2.00
Modify the electrical routing installation at the LH front
spar in the area of RIB 3.
1.00
Modify the electrical routing installation at the RH front
spar in the area of RIB 3.
1.00
DATE: Mar 20/13 SERVICE BULLETIN No.: A310-24-2105
REVISION No.: 02 - Jan 05/15 Page: 11
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 22

@A310
SERVICE BULLETIN
Task 242105-831-848-001: MODIFICATION
Modify the electrical routing installation at the LH and
RH front spars in the area of RIB 5 and RIB 6.
2.50
Modify the electrical routing installation at the LH and
RH front spars in the area of RIB 7 and RIB 8.
1.00
Modify the electrical routing installation at the LH front
spar in the area of RIB 20 and RIB 21.
3.25
Modify the electrical routing installation at the RH front
spar in the area of RIB 20 and RIB 21.
2.50
Modify the electrical routing installation at the RH front
spar in the area of RIB 28 and RIB 28A.
1.50
Tests
 1.00
Close-Up
 10.00
TOTAL MANHOURS
 54.25
ELAPSED TIME (HOURS)
 34.00
**CONF 004
Task 242105-831-848-001: MODIFICATION
Get Access
 8.00
On Aircraft
Install Adhesive Clipping Bracket on the LH and RH
Wing Leading Edge in the Area of Rib 7
1.00
Attach the routes 1E and 1G with the lacing tape in the
LH shroud box leading edge.
0.50
Attach the routes 2E and 2G with the lacing tape in the
RH shroud box leading edge.
0.50
Modify the routing in the LH forward wing to fuselage
fairing.
2.00
Modify the routing in the RH forward wing to fuselage
fairing.
2.00
Modify the routing on the LH shroud box leading edge.
 6.00
Modify the routing on the RH shroud box leading edge.
 6.00
Install new nutplate on the RH wing Leading edge
 1.00
Modify the electrical routing installation at the LH front
spar in the area of RIB 2.
1.5
Modify the electrical routing installation at the RH front
spar in the area of RIB 2.
2.00
Modify the electrical routing installation at the LH front
spar in the area of RIB 3.
1.00
Modify the electrical routing installation at the RH front
spar in the area of RIB 3.
1.00
Modify the electrical routing installation at the LH and
RH front spars in the area of RIB 5 and RIB 6.
2.50
Modify the electrical routing installation at the LH and
RH front spars in the area of RIB 7 and RIB 8.
1.00
DATE: Mar 20/13 SERVICE BULLETIN No.: A310-24-2105
REVISION No.: 02 - Jan 05/15 Page: 12
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 23

@A310
SERVICE BULLETIN
Task 242105-831-848-001: MODIFICATION
Modify the electrical routing installation at the RH front
spar in the area of RIB 8.
0.50
Modify the electrical routing installation at the LH front
spar in the area of RIB 20 and RIB 21.
3.25
Modify the electrical routing installation at the RH front
spar in the area of RIB 20 and RIB 21.
2.50
Modify the electrical routing installation at the RH front
spar in the area of RIB 28 and RIB 28A.
1.50
Modify the electrical routing installation at the LH rear
spar in the area of RIB 9.
0.75
Tests
 1.00
Close-Up
 10.00
TOTAL MANHOURS
 55.50
ELAPSED TIME (HOURS)
 31.25
**CONF ALL
H. WEIGHT AND BALANCE
The weight and balance estimates given in this Service Bulletin are based on the
Manufacturer’s Empty Weight (MEW) and do not include operator item’s. For the definition of
MEW and operator’s items refer to Weight and Balance Manual (WBM) Chapter 1-00-07.
**CONF 001
Manufacturers Empty Weight +0.668 KG (+1.4726 LB)
Effect on Balance +21.454 KGM (+155.176 LB.FT )
**CONF 002
Manufacturers Empty Weight +0.319 KG (+0.7032 LB)
Effect on Balance +10.741 KGM (+77.689 LB.FT )
**CONF 003
Manufacturers Empty Weight +0.668 KG (+1.4726 LB)
Effect on Balance +21.454 KGM (+155.176 LB.FT )
**CONF 004
Manufacturers Empty Weight +0.018 KG (+0.0396 LB)
Effect on Balance +0.621 KGM (+4.491 LB.FT )
**CONF ALL
I. ELECTRICAL LOAD DATA
Not Changed
DATE: Mar 20/13 SERVICE BULLETIN No.: A310-24-2105
REVISION No.: 02 - Jan 05/15 Page: 13
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 24

@A310
SERVICE BULLETIN
J. REFERENCES
**CONF 001
Aircraft Maintenance Manual (AMM)
 06-21-00 06-31-53 06-41-00
06-41-53 06-41-57 20-21-12
20-23-12 20-27-00 24-00-00
27-50-00 27-61-00 27-80-00
29-00-00 29-10-00 29-14-00
29-25-00 32-12-11 36-11-00
53-15-63 71-00-00
Consumable Material List (CML)
Elec. Std. Practices Manual (ESPM)
 20-25-51 20-33-33 20-33-41
20-33-44 20-55-00
Standards Manual (SM)
Structural Repair Manual (SRM)
 51-23-00 51-24-00 51-40-20
51-40-21 51-40-30 51-40-40
51-40-50 51-43-00 51-75-10
51-77-10
Weight and Balance Manual (WBM)
 Weight and Balance Manual
(WBM) Chapter 1-00-07
**CONF 002
Aircraft Maintenance Manual (AMM)
 06-21-00 06-31-53 06-41-00
06-41-53 06-41-57 20-21-12
20-23-12 20-27-00 24-00-00
27-50-00 27-61-00 27-80-00
29-00-00 29-10-00 29-14-00
29-25-00 32-12-11 36-11-00
53-15-63 71-00-00
Consumable Material List (CML)
Elec. Std. Practices Manual (ESPM)
 20-25-51 20-33-33 20-33-41
20-33-44 20-55-00
Standards Manual (SM)
Structural Repair Manual (SRM)
 51-23-00 51-24-00 51-40-20
51-40-21 51-40-30 51-40-40
51-40-50 51-43-00 51-75-10
51-77-10
Weight and Balance Manual (WBM)
 Weight and Balance Manual
(WBM) Chapter 1-00-07
**CONF 003
Aircraft Maintenance Manual (AMM)
 06-21-00 06-31-53 06-41-00
06-41-53 06-41-57 20-21-12
20-23-12 20-27-00 24-00-00
27-50-00 27-61-00 27-80-00
29-00-00 29-10-00 29-14-00
29-25-00 32-12-11 36-11-00
53-15-63 71-00-00
Consumable Material List (CML)
DATE: Mar 20/13 SERVICE BULLETIN No.: A310-24-2105
REVISION No.: 02 - Jan 05/15 Page: 14
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 25

@A310
SERVICE BULLETIN
Elec. Std. Practices Manual (ESPM)
 20-25-51 20-33-33 20-33-41
20-33-44 20-55-00
Standards Manual (SM)
Structural Repair Manual (SRM)
 51-23-00 51-24-00 51-40-20
51-40-21 51-40-30 51-40-40
51-40-50 51-43-00 51-75-10
51-77-10
Weight and Balance Manual (WBM)
 Weight and Balance Manual
(WBM) Chapter 1-00-07
**CONF 004
Aircraft Maintenance Manual (AMM)
 06-21-00 06-31-53 06-41-00
06-41-53 06-41-57 20-21-12
20-23-12 20-27-00 24-00-00
27-50-00 27-61-00 27-80-00
29-00-00 29-10-00 29-14-00
29-25-00 32-12-11 36-11-00
53-15-63 71-00-00
Consumable Material List (CML)
Elec. Std. Practices Manual (ESPM)
 20-25-51 20-33-33 20-33-41
20-33-44 20-55-00
Standards Manual (SM)
Structural Repair Manual (SRM)
 51-23-00 51-24-00 51-40-20
51-40-21 51-40-30 51-40-40
51-40-50 51-43-00 51-75-10
51-77-10
Weight and Balance Manual (WBM)
 Weight and Balance Manual
(WBM) Chapter 1-00-07
**CONF ALL
K. PUBLICATION AFFECTED
Illustrated Parts Catalog (IPC)
 24-92-02 24-92-03
L. INTERCHANGEABILITY/MIXABILITY
Not Applicable
M. SPARES
None
DATE: Mar 20/13 SERVICE BULLETIN No.: A310-24-2105
REVISION No.: 02 - Jan 05/15 Page: 15
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 26

@A310
SERVICE BULLETIN
This Page Intentionally Left Blank
DATE: Mar 20/13 SERVICE BULLETIN No.: A310-24-2105
REVISION No.: 02 - Jan 05/15 Page: 16
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 27

@A310
SERVICE BULLETIN
2. MATERIAL INFORMATION
**CONF ALL
A. MATERIAL - PRICE AND AVAILABILITY
(1) Procurement Addresses
Customers with aircraft shown in the effectivity of this Service Bulletin should send a
purchase order to AIRBUS. Quote the number of this Service Bulletin. The address is:
Kit 242105A01R03
Kit 242105B01R02
Kit 242105D01R08
Kit 242105D02R08
Kit 242105D03R01
Kit 242105D04R00
AIRBUS
Material, Logistics and Suppliers
Weg beim Jaeger 150
D-22335 HAMBURG
GERMANY
For ordering by internet:
http://spares.airbus.com
For ordering by fax: +49 40 50 76 4012
For ordering by E-mail:
ifd.spares@airbus.com
(2) Price and Availability
Kit 242105A01R03
Cost
 10,480.00 USD
Availability
 90 calendar days from receipt of order
The availability given above is the standard lead time from the date of your purchase
order. If items are required before this time, please include a retrofit planning schedule
with your order so that we can try to comply with your requirements.
The sales terms (costs and availability) are estimated in relation to economic conditions.
The latest valid price and lead time for ordering purposes shall be obtained through the
AirbusSpares portal or through a request for quotation to airbus.kit@airbus.com.
Kit 242105B01R02
Cost
 36.00 USD
Availability
 90 calendar days from receipt of order
The availability given above is the standard lead time from the date of your purchase
order. If items are required before this time, please include a retrofit planning schedule
with your order so that we can try to comply with your requirements.
The sales terms (costs and availability) are estimated in relation to economic conditions.
The latest valid price and lead time for ordering purposes shall be obtained through the
AirbusSpares portal or through a request for quotation to airbus.kit@airbus.com.
Kit 242105D01R08
Cost
 3,590.00 USD
Availability
 90 calendar days from receipt of order
DATE: Mar 20/13 SERVICE BULLETIN No.: A310-24-2105
REVISION No.: 02 - Jan 05/15 Page: 17
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 28

@A310
SERVICE BULLETIN
The availability given above is the standard lead time from the date of your purchase
order. If items are required before this time, please include a retrofit planning schedule
with your order so that we can try to comply with your requirements.
The sales terms (costs and availability) are estimated in relation to economic conditions.
The latest valid price and lead time for ordering purposes shall be obtained through the
AirbusSpares portal or through a request for quotation to airbus.kit@airbus.com.
Kit 242105D02R08
Cost
 8,090.00 USD
Availability
 90 calendar days from receipt of order
The availability given above is the standard lead time from the date of your purchase
order. If items are required before this time, please include a retrofit planning schedule
with your order so that we can try to comply with your requirements.
The sales terms (costs and availability) are estimated in relation to economic conditions.
The latest valid price and lead time for ordering purposes shall be obtained through the
AirbusSpares portal or through a request for quotation to airbus.kit@airbus.com.
Kit 242105D03R01
Cost
 96.00 USD
Availability
 90 calendar days from receipt of order
The availability given above is the standard lead time from the date of your purchase
order. If items are required before this time, please include a retrofit planning schedule
with your order so that we can try to comply with your requirements.
The sales terms (costs and availability) are estimated in relation to economic conditions.
The latest valid price and lead time for ordering purposes shall be obtained through the
AirbusSpares portal or through a request for quotation to airbus.kit@airbus.com.
Kit 242105D04R00
Cost
 97.00 USD
Availability
 90 calendar days from receipt of order
The availability given above is the standard lead time from the date of your purchase
order. If items are required before this time, please include a retrofit planning schedule
with your order so that we can try to comply with your requirements.
The sales terms (costs and availability) are estimated in relation to economic conditions.
The latest valid price and lead time for ordering purposes shall be obtained through the
AirbusSpares portal or through a request for quotation to airbus.kit@airbus.com.
B. INDUSTRY SUPPORT INFORMATION
AIRBUS will provide a 10% reduction to the applicable kits sales prices given in the
paragraph ’Price and Availability’ for orders placed before Dec 31/2015.
DATE: Mar 20/13 SERVICE BULLETIN No.: A310-24-2105
REVISION No.: 02 - Jan 05/15 Page: 18
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 29

@A310
SERVICE BULLETIN
C. LIST OF COMPONENTS
Kit 242105A01R03
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 ITEM
 OLD PART N˚
 INT
 SEE
NOTES
51
 NSA8420-5
 2( M )
 CORD
52
 EN6049-007-08-5
 56 (M)
 SLEEVE
53
 NSA935401-05
 344
 TIE
55
 A9201346420000
 2
 GROMMET
56
 NAS1801-3-17
 12
 SCREW
57
 NAS1149D0316H
 34
 WASHER
60
 NAS1801-3-13
 8
 SCREW
61
 NSA5527-03-03
 8
 SPACER
62
 NSA935401-13
 15
 TIE
63
 NSA5527-03-01
 16
 SPACER
64
 NSA5527-03-02
 10
 SPACER
65
 A9222505750000
 2
 SPACER
66
 EN6049-007-13-5
 56 (M)
 SLEEVE
67
 EN6049-007-19-5
 56 (ME)
 SLEEVE
69
 NSA939510BN
 4( M )
 STRIP
85
 NSA5516-08ND
 32
 CLAMP
86
 NSA5516-18ND
 32
 CLAMP
91
 A0041113620000
 3
 BRACKET
92
 A0041113620100
 3
 BRACKET
93
 A0041113720000
 3
 BRACKET
94
 A0041113720100
 3
 BRACKET
96
 NSA5516-10ND
 16
 CLAMP
97
 NAS1801-3-14
 6
 SCREW
98
 NAS1801-3-8
 6
 SCREW
99
 NAS1801-3-16
 2
 SCREW
NOTE
: If you find part numbers of hardware components in the related kit(s) which
you cannot identify in the LIST OF COMPONENTS of this Service Bulletin,
refer to Standards Manual (SM). The SM will give you the correct part number
to part number relationship.
Kit 242105D01R08
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 ITEM
 OLD PART N˚
 INT
 SEE
NOTES
2
 MS21919WCH10
 2
 CLAMP
3
 NAS1149D0332K
 5
 WASHER
4
 NSA5527-03-03D
 2
 SPACER
6
 NAS1801-3-10
 2
 SCREW
7
 NSA5527-03-05D
 2
 SPACER
9
 MS21919WCH3
 3
 CLAMP
10
 MS21919WCH2
 2
 CLAMP
18
 MS21919WCH12
 3
 CLAMP
DATE: Mar 20/13 SERVICE BULLETIN No.: A310-24-2105
REVISION No.: 02 - Jan 05/15 Page: 19
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 30

@A310
SERVICE BULLETIN
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 ITEM
 OLD PART N˚
 INT
 SEE
NOTES
19
 MS21919WCH4
 8
 CLAMP
20
 EN6049-007-05-5
 2( M E )
 SLEEVE
21
 EN6049-007-19-5
 2( M E )
 SLEEVE
23
 NAS1801-3-16
 4
 SCREW
24
 MS21042-3
 2
 NUT
27
 NSA5527-03-15D
 2
 SPACER
28
 NAS1801-3-30
 1
 SCREW
29
 MS21919WCH11
 6
 CLAMP
30
 MS21919WCH5
 1
 CLAMP
31
 NAS1801-3-13
 2
 SCREW
32
 NSA5527-03-07D
 4
 SPACER
42
 A9249252400400
 2
 RAMP
43
 NSA935401-03
 32
 TIE
100
 B9239030000200
 15
 PLACARD
NOTE
: If you find part numbers of hardware components in the related kit(s) which
you cannot identify in the LIST OF COMPONENTS of this Service Bulletin,
refer to Standards Manual (SM). The SM will give you the correct part number
to part number relationship.
Kit 242105D02R08
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 ITEM
 OLD PART N˚
 INT
 SEE
NOTES
2
 MS21919WCH10
 2
 CLAMP
3
 NAS1149D0332K
 9
 WASHER
4
 NSA5527-03-03D
 2
 SPACER
6
 NAS1801-3-10
 2
 SCREW
7
 NSA5527-03-05D
 2
 SPACER
8
 NSA5527-03-01D
 4
 SPACER
9
 MS21919WCH3
 15
 CLAMP
10
 MS21919WCH2
 6
 CLAMP
11
 NAS1801-3-18
 4
 SCREW
18
 MS21919WCH12
 5
 CLAMP
19
 MS21919WCH4
 11
 CLAMP
20
 EN6049-007-05-5
 2( M E )
 SLEEVE
21
 EN6049-007-19-5
 2( M E )
 SLEEVE
23
 NAS1801-3-16
 4
 SCREW
24
 MS21042-3
 6
 NUT
25
 NAS1096-3-24
 4
 SCREW
26
 NAS1096-3-22
 4
 SCREW
27
 NSA5527-03-15D
 2
 SPACER
28
 NAS1801-3-30
 1
 SCREW
29
 MS21919WCH11
 5
 CLAMP
30
 MS21919WCH5
 2
 CLAMP
31
 NAS1801-3-13
 2
 SCREW
DATE: Mar 20/13 SERVICE BULLETIN No.: A310-24-2105
REVISION No.: 02 - Jan 05/15 Page: 20
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 31

@A310
SERVICE BULLETIN
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 ITEM
 OLD PART N˚
 INT
 SEE
NOTES
32
 NSA5527-03-07D
 10
 SPACER
40
 A9249252400000
 2
 RAMP
41
 A9249252400200
 2
 RAMP
42
 A9249252400400
 2
 RAMP
43
 NSA935401-03
 56
 TIE
100
 B9239030000200
 19
 PLACARD
NOTE
: If you find part numbers of hardware components in the related kit(s) which
you cannot identify in the LIST OF COMPONENTS of this Service Bulletin,
refer to Standards Manual (SM). The SM will give you the correct part number
to part number relationship.
Kit 242105D03R01
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 ITEM
 OLD PART N˚
 INT
 SEE
NOTES
10
 MS21919WCH2
 2
 CLAMP
15
 NAS1801-3-35
 1
 SCREW
16
 NSA5527-03-11D
 1
 SPACER
100
 B9239030000200
 1
 PLACARD
NOTE
: If you find part numbers of hardware components in the related kit(s) which
you cannot identify in the LIST OF COMPONENTS of this Service Bulletin,
refer to Standards Manual (SM). The SM will give you the correct part number
to part number relationship.
Kit 242105D04R00
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 ITEM
 OLD PART N˚
 INT
 SEE
NOTES
3
 NAS1149D0332K
 1
 WASHER
6
 NAS1801-3-10
 1
 SCREW
9
 MS21919WCH3
 1
 CLAMP
24
 MS21042-3
 1
 NUT
100
 B9239030000200
 1
 PLACARD
NOTE
: If you find part numbers of hardware components in the related kit(s) which
you cannot identify in the LIST OF COMPONENTS of this Service Bulletin,
refer to Standards Manual (SM). The SM will give you the correct part number
to part number relationship.
Kit 242105B01R02
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 ITEM
 OLD PART N˚
 INT
 SEE
NOTES
102
 ABS1546B3C12
 2
 BRACKET
106
 NSA5456-3-8
 1
 NUTPLATE
111
 ANSA2050DCJ3210
 2
 RIVET
DATE: Mar 20/13 SERVICE BULLETIN No.: A310-24-2105
REVISION No.: 02 - Jan 05/15 Page: 21
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 32

@A310
SERVICE BULLETIN
NOTE
: If you find part numbers of hardware components in the related kit(s) which
you cannot identify in the LIST OF COMPONENTS of this Service Bulletin,
refer to Standards Manual (SM). The SM will give you the correct part number
to part number relationship.
D. LIST OF MATERIALS - OPERATOR SUPPLIED
(1) Consumable Materials
Consumable CMLA01
ITEM
 DESCRIPTION
 REFERENCE TO CML
MAT. No.
QTY PER A/C
 SEE
NOTES
Polyvinylacetat Pvac
 05-034
 As required
Aluminium Foil
 05-169
 As required
Stainless Steel Lockwire
 05-289
 As required
68
 Epoxy Resin
 08-051
 As required
Consumable CMLD01
ITEM
 DESCRIPTION
 REFERENCE TO CML
MAT. No.
QTY PER A/C
 SEE
NOTES
Solvent General Purpose
 11-026
 As required
Lint-Free Cotton Cloth
 19-003
 As required
Consumable CMLB01
ITEM
 DESCRIPTION
 REFERENCE TO CML
MAT. No.
QTY PER A/C
 SEE
NOTES
Two Part Paste Adhesive
 08-078
 As required
Multi Purpose Thixotropic Paste
 09-016J
 As required
Solvent General Purpose
 11-026
 As required
Lint-Free Cotton Cloth
 19-003
 As required
(2) Components
None
(3) Equipment
None
E. PARTS TO BE RE-IDENTIFIED BY OPERATOR
None
F. TOOLING
None
DATE: Mar 20/13 SERVICE BULLETIN No.: A310-24-2105
REVISION No.: 02 - Jan 05/15 Page: 22
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 33

@A310
SERVICE BULLETIN
3. ACCOMPLISHMENT INSTRUCTIONS
Task 242105-831-848-001 - MODIFICATION
WARNING
: MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND ALL THE CAUTIONS
INCLUDED IN THE REFERENCED PROCEDURES
WARNING
: MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS
ARE CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO
PERSONS AND/OR DAMAGE.
CAUTION
: ALWAYS OBEY THE PRECAUTIONS THAT FOLLOW TO KEEP ELECTRICAL
WIRING IN A SATISFACTORY CONDITION (ELECTRICALLY AND
MECHANICALLY SERVICEABLE).
WHEN YOU DO MAINTENANCE WORK, REPAIRS OR MODIFICATIONS,
ALWAYS KEEP ELECTRICAL WIRING, COMPONENTS AND THE WORK AREA
AS CLEAN AS POSSIBLE. TO DO THIS:
- PUT PROTECTION, SUCH AS PLASTIC SHEETING, CLOTHS, ETC. AS
NECESSARY ON ELECTRICAL W IRING AND COMPONENTS
- REGULARLY REMOVE ALL SHAVINGS, UNWANTED MATERIAL AND
OTHER CONTAMINATION.
THESE PRECAUTIONS WILL DECREASE THE RISK OF CONTAMINATION
AND DAMAGE TO THE ELECTRICAL WIRING INSTALLATION.
IF THERE IS CONTAMINATION REFER TO ESPM 20-55-00.
NOTE
: The accomplishment instructions of this Service Bulletin refer to procedures
included in other AIRBUS documents. When the words ’refer to’ are used and the
operator has an accepted alternative procedure, the accepted alternative procedure
can be used. When the words ’in accordance with’ are included in the instruction,
the procedure in the AIRBUS document must be used.
NOTE
: The access and close-up instructions, not comprising return to service tests, in this
Service Bulletin do not constitute or affect the technical intent of the Service
Bulletin. Operators can therefore, as deemed necessary, omit or add access and/or
close-up steps to add flexibility to their maintenance operations as long as the
technical intent of the Service Bulletin is met within the set parameters.
NOTE
: Manual titles given in the accomplishment instructions are referred to by acronyms.
Refer to paragraph 1.J., References, for the definition of acronyms.
NOTE
: This Service Bulletin is classified mandatory or expected to be classified mandatory
by an Airworthiness Directive (AD). The paragraphs 3.C. and 3.D. in these
accomplishment instructions are Required for Compliance (RC) and must be done
to comply with the AD. Other paragraphs are recommended and may be deviated
from, done as part of other actions or done with accepted methods different from
those given in the Service Bulletin, as long as the RC paragraphs can be done and
the aircraft can be put back into a serviceable condition.
DATE: Mar 20/13 SERVICE BULLETIN No.: A310-24-2105
REVISION No.: 02 - Jan 05/15 Page: 23
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 34

@A310
SERVICE BULLETIN
Task Associated Data
**CONF 001
Zone
120 137 138 500 512 520 524 573 600 612 620 624 673
Access
Panel
 512HB 513QL 513RR 612HB 613QL 613RR 624KB 672AZ
672BZ
Manpower
TOTAL MANHOURS
 54.25
ELAPSED TIME (HOURS)
 30.75
**CONF 002
Zone
120 137 138 500 512 520 573 600 612 620 624 673
Access
Panel
 512HB 513QL 513RR 612HB 613QL 613RR 624KB 672AZ
672BZ
Manpower
TOTAL MANHOURS
 49.50
ELAPSED TIME (HOURS)
 29.50
**CONF 003
Zone
120 137 138 500 512 520 524 573 600 612 620 624 673
Access
Panel
 512HB 513QL 513RR 612HB 613QL 613RR 624KB 672AZ
672BZ
Manpower
TOTAL MANHOURS
 54.25
ELAPSED TIME (HOURS)
 34.00
**CONF 004
Zone
120 137 138 500 512 520 524 573 575 600 612 620 624 673
Access
Panel
 512HB 513QL 513RR 612HB 613QL 613RR 624KB 672AZ
672BZ
Manpower
TOTAL MANHOURS
 55.50
ELAPSED TIME (HOURS)
 31.25
DATE: Mar 20/13 SERVICE BULLETIN No.: A310-24-2105
REVISION No.: 02 - Jan 05/15 Page: 24
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 35

@A310
SERVICE BULLETIN
**CONF ALL
A. GENERAL
**CONF 001
(1) Subtask 242105-910-001-001 - Standard Practices
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 06-21-00, Page Block 001
06-31-53, Page Block 001
06-41-53, Page Block 001
06-41-57, Page Block 001
20-23-12, Page Block 001
Consumable Material List (CML)
Elec. Std. Practices Manual (ESPM)
 20-25-51
20-33-41
20-33-44
Standards Manual (SM)
Structural Repair Manual (SRM)
 51-40-21
51-40-30
51-40-50
51-43-00
(a) For the specification of materials (Mat. No.) that you must use in this Service
Bulletin refer to Consumable Materials List (CML).
(b) For the frames (FR) identification (Refer to AMM 06-31-53, Page Block 001).
(c) For the identification of zones (Refer to AMM 06-21-00, Page Block 001).
(d) For the identification of the access panels (Refer to AMM 06-41-53, Page Block
001 and AMM 06-41-57, Page Block 001).
(e) Tag all the parts you must remove and retain to make the subsequent installation
easier.
(f) Put all the retained hardware in identified plastic bags and attach the bags to the
related unit.
(g) If you find part numbers of hardware components in the related kit(s) which you
cannot identify in the LIST OF COMPONENTS of this Service Bulletin, refer to the
Standards Manual (SM). The SM will give you the correct part number to part
number relationship.
(h) To torque tighten the hydraulic line unions (Refer to AMM 20-23-12, Page Block
001).
(i) Use a non-metallic spatula to remove the sealant.
DATE: Mar 20/13 SERVICE BULLETIN No.: A310-24-2105
REVISION No.: 02 - Jan 05/15 Page: 25
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 36

@A310
SERVICE BULLETIN
(j) Remove/install the fasteners (Refer to SRM 51-40-21).
(k) For standard torque value (Refer to SRM 51-43-00).
(l) For fasteners spacing and margin (Refer to SRM 51-40-50).
(m) For alternative and substitute fasteners (Refer to SRM 51-40-30).
(n) For the cable tie application and tooling (Refer to ESPM 20-33-44 and ESPM
20-25-51).
(o) For the cable support and too ling (Refer to ESPM 20-33-41).
(p) When you install protective electrical conduit :
- Deburr the ends after you have cut it to the correct size.
- At the lowest part of a cable loop make two cut-outs in the conduit to give
drainage.
- Cut the conduit before installation to make sure you do not damage the
electrical cables.
- Where necessary, install cable ties from between 13 mm and 15 mm (0.51 and
0.59 in.) from the cut ends of the conduit, to give support.
- Where necessary, attach the conduit to the aircraft structure or to existing
cable harnesses, with the cable ties supplied.
(q) Install Service Bulletin identification placards at each end of new or modified
electrical wires in a position where they can be easily seen and at approximately
every 1.50 m (59.0 in.).
(2) Subtask 242105-910-401-001 - Standard Practices
Manpower Resources
Skills
 AIRFRAME
References
Aircraft Maintenance Manual (AMM)
 06-21-00, Page Block 001
06-31-53, Page Block 001
06-41-00, Page Block 001
20-21-12, Page Block 001
Consumable Material List (CML)
Structural Repair Manual (SRM)
 51-23-00
51-24-00
51-40-20
51-40-21
51-40-30
51-40-40
(a) For the Frame (FR) identification, refer to AMM 06-31-53, Page Block 001.
DATE: Mar 20/13 SERVICE BULLETIN No.: A310-24-2105
REVISION No.: 02 - Jan 05/15 Page: 26
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 37

@A310
SERVICE BULLETIN
(b) For the identification of zones, refer to AMM 06-21-00, Page Block 001.
(c) For the identification of access panels, refer to AMM 06-41-00, Page Block 001.
(d) For the specification of materials (Mat. No.) given in this Service Bulletin, refer to
Consumable Material List (CML).
(e) To torque tighten the standard threaded fasteners, refer to AMM Task 20-21-12,
Page Block 001.
(f) Remove and install fasteners in accordance with SRM 51-40-20.
(g) Obtain fastener hole diameters and drill data in accordance with SRM 51-40-40.
(h) Obtain alternative and substitute fastener data, in accordance with SRM 51-40-30.
(i) Remove and install fasteners in accordance with SRM 51-40-20.
(j) For the drilling of rivet holes:
- Use a soft lead pencil and make marks to show the position of the rivet holes.
- Make sure that you have the correct edge clearance before you drill the
fastener holes.
- If not shown otherwise the tolerance for rivet holes is +0.1 mm (+0.004 in).
- Transfer-drill the existing holes with a pilot drill and a drill bush.
- Deburr the holes after you have drilled them.
- Cut the rivets to the correct length, as necessary.
- When you remove fasteners you must be careful that you do not damage the
holes in the structure.
- Drill new fastener holes with a pilot drill of 2.5 mm (0.098 in) diameter.
Increase the hole diameter to the correct size for the fastener which you must
install.
(k) Apply sealant in accordance with SRM 51-24-00.
(l) Apply interfay sealant in accordance with SRM 51-24-00.
(m) Renew the protective in accordance with SRM 51-23-00.
(3) Subtask 242105-910-201-001 - Standard Practices
Work Zones and Access Panels
Zone
 Access/Work location
120
DATE: Mar 20/13 SERVICE BULLETIN No.: A310-24-2105
REVISION No.: 02 - Jan 05/15 Page: 27
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 38

@A310
SERVICE BULLETIN
Manpower Resources
Skills
 NON SPECIFIC
Material necessary to do the job
Consumable CMLD01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Solvent General Purpose
 11-026
 As required
Lint-Free Cotton Cloth
 19-003
 As required
References
Consumable Material List (CML)
Structural Repair Manual (SRM)
 51-77-10
(a) If necessary, clean the work area with:
Solvent General
Purpose
11-026 As required
Lint-Free Cotton
Cloth
19-003 As required
(b) Use the curing cycle of the Two Par t Paste Adhesive, Mat. No. 08-078, in
accordance with SRM 51-77-10.
(4) Subtask 242105-839-201-001 - Administrative
Manpower Resources
Skills
 NON SPECIFIC
Write in the applicable aircraft records that you have done all the work given in this
Service Bulletin.
**CONF 002
(1) Subtask 242105-910-001-001 - Standard Practices
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 06-21-00, Page Block 001
06-31-53, Page Block 001
06-41-53, Page Block 001
06-41-57, Page Block 001
20-23-12, Page Block 001
Consumable Material List (CML)
DATE: Mar 20/13 SERVICE BULLETIN No.: A310-24-2105
REVISION No.: 02 - Jan 05/15 Page: 28
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 39

@A310
SERVICE BULLETIN
References
Elec. Std. Practices Manual (ESPM)
 20-25-51
20-33-41
20-33-44
Standards Manual (SM)
Structural Repair Manual (SRM)
 51-40-21
51-40-30
51-40-50
51-43-00
(a) For the specification of materials (Mat. No.) that you must use in this Service
Bulletin refer to Consumable Materials List (CML).
(b) For the frames (FR) identification (Refer to AMM 06-31-53, Page Block 001).
(c) For the identification of zones (Refer to AMM 06-21-00, Page Block 001).
(d) For the identification of the access panels (Refer to AMM 06-41-53, Page Block
001 and AMM 06-41-57, Page Block 001).
(e) Tag all the parts you must remove and retain to make the subsequent installation
easier.
(f) Put all the retained hardware in identified plastic bags and attach the bags to the
related unit.
(g) If you find part numbers of hardware components in the related kit(s) which you
cannot identify in the LIST OF COMPONENTS of this Service Bulletin, refer to the
Standards Manual (SM). The SM will give you the correct part number to part
number relationship.
(h) To torque tighten the hydraulic line unions (Refer to AMM 20-23-12, Page Block
001).
(i) Use a non-metallic spatula to remove the sealant.
(j) Remove/install the fasteners (Refer to SRM 51-40-21).
(k) For standard torque value (Refer to SRM 51-43-00).
(l) For fasteners spacing and margin (Refer to SRM 51-40-50).
(m) For alternative and substitute fasteners (Refer to SRM 51-40-30).
(n) For the cable tie application and tooling (Refer to ESPM 20-33-44 and ESPM
20-25-51).
(o) For the cable support and too ling (Refer to ESPM 20-33-41).
(p) When you install protective electrical conduit :
- Deburr the ends after you have cut it to the correct size.
DATE: Mar 20/13 SERVICE BULLETIN No.: A310-24-2105
REVISION No.: 02 - Jan 05/15 Page: 29
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 40

@A310
SERVICE BULLETIN
- At the lowest part of a cable loop make two cut-outs in the conduit to give
drainage.
- Cut the conduit before installation to make sure you do not damage the
electrical cables.
- Where necessary, install cable ties from between 13 mm and 15 mm (0.51 and
0.59 in.) from the cut ends of the conduit, to give support.
- Where necessary, attach the conduit to the aircraft structure or to existing
cable harnesses, with the cable ties supplied.
(q) Install Service Bulletin identification placards at each end of new or modified
electrical wires in a position where they can be easily seen and at approximately
every 1.50 m (59.0 in.).
(2) Subtask 242105-910-401-001 - Standard Practices
Manpower Resources
Skills
 AIRFRAME
References
Aircraft Maintenance Manual (AMM)
 06-21-00, Page Block 001
06-31-53, Page Block 001
06-41-00, Page Block 001
20-21-12, Page Block 001
Consumable Material List (CML)
Structural Repair Manual (SRM)
 51-23-00
51-24-00
51-40-20
51-40-21
51-40-30
51-40-40
(a) For the Frame (FR) identification, refer to AMM 06-31-53, Page Block 001.
(b) For the identification of zones, refer to AMM 06-21-00, Page Block 001.
(c) For the identification of access panels, refer to AMM 06-41-00, Page Block 001.
(d) For the specification of materials (Mat. No.) given in this Service Bulletin, refer to
Consumable Material List (CML).
(e) To torque tighten the standard threaded fasteners, refer to AMM Task 20-21-12,
Page Block 001.
(f) Remove and install fasteners in accordance with SRM 51-40-20.
(g) Obtain fastener hole diameters and drill data in accordance with SRM 51-40-40.
(h) Obtain alternative and substitute fastener data, in accordance with SRM 51-40-30.
(i) Remove and install fasteners in accordance with SRM 51-40-20.
DATE: Mar 20/13 SERVICE BULLETIN No.: A310-24-2105
REVISION No.: 02 - Jan 05/15 Page: 30
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 41

@A310
SERVICE BULLETIN
(j) For the drilling of rivet holes:
- Use a soft lead pencil and make marks to show the position of the rivet holes.
- Make sure that you have the correct edge clearance before you drill the
fastener holes.
- If not shown otherwise the tolerance for rivet holes is +0.1 mm (+0.004 in).
- Transfer-drill the existing holes with a pilot drill and a drill bush.
- Deburr the holes after you have drilled them.
- Cut the rivets to the correct length, as necessary.
- When you remove fasteners you must be careful that you do not damage the
holes in the structure.
- Drill new fastener holes with a pilot drill of 2.5 mm (0.098 in) diameter.
Increase the hole diameter to the correct size for the fastener which you must
install.
(k) Apply sealant in accordance with SRM 51-24-00.
(l) Apply interfay sealant in accordance with SRM 51-24-00.
(m) Renew the protective in accordance with SRM 51-23-00.
(3) Subtask 242105-910-201-001 - Standard Practices
Work Zones and Access Panels
Zone
 Access/Work location
120
Manpower Resources
Skills
 NON SPECIFIC
Material necessary to do the job
Consumable CMLD01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Solvent General Purpose
 11-026
 As required
Lint-Free Cotton Cloth
 19-003
 As required
References
Consumable Material List (CML)
Structural Repair Manual (SRM)
 51-77-10
DATE: Mar 20/13 SERVICE BULLETIN No.: A310-24-2105
REVISION No.: 02 - Jan 05/15 Page: 31
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 42

@A310
SERVICE BULLETIN
(a) If necessary, clean the work area with:
Solvent General
Purpose
11-026 As required
Lint-Free Cotton
Cloth
19-003 As required
(b) Use the curing cycle of the Two Par t Paste Adhesive, Mat. No. 08-078, in
accordance with SRM 51-77-10.
(4) Subtask 242105-839-201-001 - Administrative
Manpower Resources
Skills
 NON SPECIFIC
Write in the applicable aircraft records that you have done all the work given in this
Service Bulletin.
**CONF 003
(1) Subtask 242105-910-001-001 - Standard Practices
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 06-21-00, Page Block 001
06-31-53, Page Block 001
06-41-53, Page Block 001
06-41-57, Page Block 001
20-23-12, Page Block 001
Consumable Material List (CML)
Elec. Std. Practices Manual (ESPM)
 20-25-51
20-33-41
20-33-44
Standards Manual (SM)
Structural Repair Manual (SRM)
 51-40-21
51-40-30
51-40-50
51-43-00
(a) For the specification of materials (Mat. No.) that you must use in this Service
Bulletin refer to Consumable Materials List (CML).
(b) For the frames (FR) identification (Refer to AMM 06-31-53, Page Block 001).
(c) For the identification of zones (Refer to AMM 06-21-00, Page Block 001).
(d) For the identification of the access panels (Refer to AMM 06-41-53, Page Block
001 and AMM 06-41-57, Page Block 001).
DATE: Mar 20/13 SERVICE BULLETIN No.: A310-24-2105
REVISION No.: 02 - Jan 05/15 Page: 32
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 43

@A310
SERVICE BULLETIN
(e) Tag all the parts you must remove and retain to make the subsequent installation
easier.
(f) Put all the retained hardware in identified plastic bags and attach the bags to the
related unit.
(g) If you find part numbers of hardware components in the related kit(s) which you
cannot identify in the LIST OF COMPONENTS of this Service Bulletin, refer to the
Standards Manual (SM). The SM will give you the correct part number to part
number relationship.
(h) To torque tighten the hydraulic line unions (Refer to AMM 20-23-12, Page Block
001).
(i) Use a non-metallic spatula to remove the sealant.
(j) Remove/install the fasteners (Refer to SRM 51-40-21).
(k) For standard torque value (Refer to SRM 51-43-00).
(l) For fasteners spacing and margin (Refer to SRM 51-40-50).
(m) For alternative and substitute fasteners (Refer to SRM 51-40-30).
(n) For the cable tie application and tooling (Refer to ESPM 20-33-44 and ESPM
20-25-51).
(o) For the cable support and too ling (Refer to ESPM 20-33-41).
(p) When you install protective electrical conduit :
- Deburr the ends after you have cut it to the correct size.
- At the lowest part of a cable loop make two cut-outs in the conduit to give
drainage.
- Cut the conduit before installation to make sure you do not damage the
electrical cables.
- Where necessary, install cable ties from between 13 mm and 15 mm (0.51 and
0.59 in.) from the cut ends of the conduit, to give support.
- Where necessary, attach the conduit to the aircraft structure or to existing
cable harnesses, with the cable ties supplied.
(q) Install Service Bulletin identification placards at each end of new or modified
electrical wires in a position where they can be easily seen and at approximately
every 1.50 m (59.0 in.).
(2) Subtask 242105-910-401-001 - Standard Practices
Manpower Resources
Skills
 AIRFRAME
DATE: Mar 20/13 SERVICE BULLETIN No.: A310-24-2105
REVISION No.: 02 - Jan 05/15 Page: 33
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 44

@A310
SERVICE BULLETIN
References
Aircraft Maintenance Manual (AMM)
 06-21-00, Page Block 001
06-31-53, Page Block 001
06-41-00, Page Block 001
20-21-12, Page Block 001
Consumable Material List (CML)
Structural Repair Manual (SRM)
 51-23-00
51-24-00
51-40-20
51-40-21
51-40-30
51-40-40
(a) For the Frame (FR) identification, refer to AMM 06-31-53, Page Block 001.
(b) For the identification of zones, refer to AMM 06-21-00, Page Block 001.
(c) For the identification of access panels, refer to AMM 06-41-00, Page Block 001.
(d) For the specification of materials (Mat. No.) given in this Service Bulletin, refer to
Consumable Material List (CML).
(e) To torque tighten the standard threaded fasteners, refer to AMM Task 20-21-12,
Page Block 001.
(f) Remove and install fasteners in accordance with SRM 51-40-20.
(g) Obtain fastener hole diameters and drill data in accordance with SRM 51-40-40.
(h) Obtain alternative and substitute fastener data, in accordance with SRM 51-40-30.
(i) Remove and install fasteners in accordance with SRM 51-40-20.
(j) For the drilling of rivet holes:
- Use a soft lead pencil and make marks to show the position of the rivet holes.
- Make sure that you have the correct edge clearance before you drill the
fastener holes.
- If not shown otherwise the tolerance for rivet holes is +0.1 mm (+0.004 in).
- Transfer-drill the existing holes with a pilot drill and a drill bush.
- Deburr the holes after you have drilled them.
- Cut the rivets to the correct length, as necessary.
- When you remove fasteners you must be careful that you do not damage the
holes in the structure.
DATE: Mar 20/13 SERVICE BULLETIN No.: A310-24-2105
REVISION No.: 02 - Jan 05/15 Page: 34
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 45

@A310
SERVICE BULLETIN
- Drill new fastener holes with a pilot drill of 2.5 mm (0.098 in) diameter.
Increase the hole diameter to the correct size for the fastener which you must
install.
(k) Apply sealant in accordance with SRM 51-24-00.
(l) Apply interfay sealant in accordance with SRM 51-24-00.
(m) Renew the protective in accordance with SRM 51-23-00.
(3) Subtask 242105-910-201-001 - Standard Practices
Work Zones and Access Panels
Zone
 Access/Work location
120
Manpower Resources
Skills
 NON SPECIFIC
Material necessary to do the job
Consumable CMLD01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Solvent General Purpose
 11-026
 As required
Lint-Free Cotton Cloth
 19-003
 As required
References
Consumable Material List (CML)
Structural Repair Manual (SRM)
 51-77-10
(a) If necessary, clean the work area with:
Solvent General
Purpose
11-026 As required
Lint-Free Cotton
Cloth
19-003 As required
(b) Use the curing cycle of the Two Par t Paste Adhesive, Mat. No. 08-078, in
accordance with SRM 51-77-10.
(4) Subtask 242105-839-201-001 - Administrative
Manpower Resources
Skills
 NON SPECIFIC
Write in the applicable aircraft records that you have done all the work given in this
Service Bulletin.
DATE: Mar 20/13 SERVICE BULLETIN No.: A310-24-2105
REVISION No.: 02 - Jan 05/15 Page: 35
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 46

@A310
SERVICE BULLETIN
**CONF 004
(1) Subtask 242105-910-001-001 - Standard Practices
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 06-21-00, Page Block 001
06-31-53, Page Block 001
06-41-53, Page Block 001
06-41-57, Page Block 001
20-23-12, Page Block 001
Consumable Material List (CML)
Elec. Std. Practices Manual (ESPM)
 20-25-51
20-33-41
20-33-44
Standards Manual (SM)
Structural Repair Manual (SRM)
 51-40-21
51-40-30
51-40-50
51-43-00
(a) For the specification of materials (Mat. No.) that you must use in this Service
Bulletin refer to Consumable Materials List (CML).
(b) For the frames (FR) identification (Refer to AMM 06-31-53, Page Block 001).
(c) For the identification of zones (Refer to AMM 06-21-00, Page Block 001).
(d) For the identification of the access panels (Refer to AMM 06-41-53, Page Block
001 and AMM 06-41-57, Page Block 001).
(e) Tag all the parts you must remove and retain to make the subsequent installation
easier.
(f) Put all the retained hardware in identified plastic bags and attach the bags to the
related unit.
(g) If you find part numbers of hardware components in the related kit(s) which you
cannot identify in the LIST OF COMPONENTS of this Service Bulletin, refer to the
Standards Manual (SM). The SM will give you the correct part number to part
number relationship.
(h) To torque tighten the hydraulic line unions (Refer to AMM 20-23-12, Page Block
001).
(i) Use a non-metallic spatula to remove the sealant.
(j) Remove/install the fasteners (Refer to SRM 51-40-21).
(k) For standard torque value (Refer to SRM 51-43-00).
DATE: Mar 20/13 SERVICE BULLETIN No.: A310-24-2105
REVISION No.: 02 - Jan 05/15 Page: 36
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 47

@A310
SERVICE BULLETIN
(l) For fasteners spacing and margin (Refer to SRM 51-40-50).
(m) For alternative and substitute fasteners (Refer to SRM 51-40-30).
(n) For the cable tie application and tooling (Refer to ESPM 20-33-44 and ESPM
20-25-51).
(o) For the cable support and too ling (Refer to ESPM 20-33-41).
(p) When you install protective electrical conduit :
- Deburr the ends after you have cut it to the correct size.
- At the lowest part of a cable loop make two cut-outs in the conduit to give
drainage.
- Cut the conduit before installation to make sure you do not damage the
electrical cables.
- Where necessary, install cable ties from between 13 mm and 15 mm (0.51 and
0.59 in.) from the cut ends of the conduit, to give support.
- Where necessary, attach the conduit to the aircraft structure or to existing
cable harnesses, with the cable ties supplied.
(q) Install Service Bulletin identification placards at each end of new or modified
electrical wires in a position where they can be easily seen and at approximately
every 1.50 m (59.0 in.).
(2) Subtask 242105-910-401-001 - Standard Practices
Manpower Resources
Skills
 AIRFRAME
References
Aircraft Maintenance Manual (AMM)
 06-21-00, Page Block 001
06-31-53, Page Block 001
06-41-00, Page Block 001
20-21-12, Page Block 001
Consumable Material List (CML)
Structural Repair Manual (SRM)
 51-23-00
51-24-00
51-40-20
51-40-21
51-40-30
51-40-40
(a) For the Frame (FR) identification, refer to AMM 06-31-53, Page Block 001.
(b) For the identification of zones, refer to AMM 06-21-00, Page Block 001.
(c) For the identification of access panels, refer to AMM 06-41-00, Page Block 001.
DATE: Mar 20/13 SERVICE BULLETIN No.: A310-24-2105
REVISION No.: 02 - Jan 05/15 Page: 37
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 48

@A310
SERVICE BULLETIN
(d) For the specification of materials (Mat. No.) given in this Service Bulletin, refer to
Consumable Material List (CML).
(e) To torque tighten the standard threaded fasteners, refer to AMM Task 20-21-12,
Page Block 001.
(f) Remove and install fasteners in accordance with SRM 51-40-20.
(g) Obtain fastener hole diameters and drill data in accordance with SRM 51-40-40.
(h) Obtain alternative and substitute fastener data, in accordance with SRM 51-40-30.
(i) Remove and install fasteners in accordance with SRM 51-40-20.
(j) For the drilling of rivet holes:
- Use a soft lead pencil and make marks to show the position of the rivet holes.
- Make sure that you have the correct edge clearance before you drill the
fastener holes.
- If not shown otherwise the tolerance for rivet holes is +0.1 mm (+0.004 in).
- Transfer-drill the existing holes with a pilot drill and a drill bush.
- Deburr the holes after you have drilled them.
- Cut the rivets to the correct length, as necessary.
- When you remove fasteners you must be careful that you do not damage the
holes in the structure.
- Drill new fastener holes with a pilot drill of 2.5 mm (0.098 in) diameter.
Increase the hole diameter to the correct size for the fastener which you must
install.
(k) Apply sealant in accordance with SRM 51-24-00.
(l) Apply interfay sealant in accordance with SRM 51-24-00.
(m) Renew the protective in accordance with SRM 51-23-00.
(3) Subtask 242105-910-201-001 - Standard Practices
Work Zones and Access Panels
Zone
 Access/Work location
120
Manpower Resources
Skills
 NON SPECIFIC
DATE: Mar 20/13 SERVICE BULLETIN No.: A310-24-2105
REVISION No.: 02 - Jan 05/15 Page: 38
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 49

@A310
SERVICE BULLETIN
Material necessary to do the job
Consumable CMLD01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Solvent General Purpose
 11-026
 As required
Lint-Free Cotton Cloth
 19-003
 As required
References
Consumable Material List (CML)
Structural Repair Manual (SRM)
 51-77-10
(a) If necessary, clean the work area with:
Solvent General
Purpose
11-026 As required
Lint-Free Cotton
Cloth
19-003 As required
(b) Use the curing cycle of the Two Par t Paste Adhesive, Mat. No. 08-078, in
accordance with SRM 51-77-10.
(4) Subtask 242105-839-201-001 - Administrative
Manpower Resources
Skills
 NON SPECIFIC
Write in the applicable aircraft records that you have done all the work given in this
Service Bulletin.
**CONF ALL
B. PREPARATION
**CONF 001
(1) Subtask 242105-941-001-001 - Job Set-up
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 24-00-00, Page Block 301
27-50-00, Page Block 301
29-10-00, Page Block 301
29-14-00, Page Block 301
DATE: Mar 20/13 SERVICE BULLETIN No.: A310-24-2105
REVISION No.: 02 - Jan 05/15 Page: 39
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 50

@A310
SERVICE BULLETIN
(a) The following items shall be considered as the basic Aircraft configuration before
you start a maintenance task:
- Aircraft on the ground resting on landing gear (the ground safety locks and the
wheel chocks are in position on the landing gear).
- Engine shut down, thrust reversers closed and locked.
- Aircraft in clean configuration.
- Parking brake applied.
- Aircraft electrical network de-energized.
- Hydraulic systems depressurized.
- Access to the cockpit and cabin is available.
- All circuit breakers are in closed position.
- All controls in NORM, AUTO or OFF position.
(b) Make sure that the aircraft is electrically grounded (Refer to AMM 24-00-00, Page
Block 301).
(c) Put access platform(s) in position.
(d) Depressurize the Yellow Hydraulic System (Refer to AMM 29-10-00, Page Block
301 and AMM 29-14-00, Page Block 301).
(e) Do the Job Set-up procedure as specified in the Extension and Retraction of Flaps
with Aircraft System (Refer to AMM 27-50-00, Page Block 301).
(2) Subtask 242105-010-001-001 - Remove/Open for Access
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 06-41-57, Page Block 001
27-50-00, Page Block 301
32-12-11, Page Block 301
53-15-63, Page Block 401
(a) Open the Main Landing Gear (MLG) door (Refer to AMM 32-12-11, Page Block
301).
(b) Fully extend the flaps (Refer to AMM 27-50-00, Page Block 301).
(c) Remove the access panels 572AB, 672AB, 572AZ, 572BZ, 572CZ, 572DZ, 572EZ,
572FZ, 572GZ, 672AZ, 672BZ, 672CZ, 672DZ, 672EZ, 672FZ and 672GZ (Refer to
AMM 06-41-57, Page Block 001).
DATE: Mar 20/13 SERVICE BULLETIN No.: A310-24-2105
REVISION No.: 02 - Jan 05/15 Page: 40
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 51

@A310
SERVICE BULLETIN
(d) Remove the access panels 512FB, 612FB, 512BB, 612BB, 612DB, 513RR and
613RR (Refer to AMM 06-41-57, Page Block 001).
(e) Remove all the necessary fairing panels (Refer to AMM 53-15-63, Page Block 401).
(f) If necessary, remove the access panels 571BB, 571CB, 671BB and 671CB (Refer
to AMM 06-41-57, Page Block 001).
(g) If necessary, remove the access panels 513BL, 513DL, 513CL, 513EL, 513FL,
513ML, 613BR, 613DR, 613CR, 613ER, 613FR and 613HR (Refer to AMM
06-41-57, Page Block 001).
(3) Subtask 242105-010-003-001 - Remove the Air Ducts and the Deflector in the LH
Wings for access.
Work Zones and Access Panels
Zone
 Access/Work location
512
 Access
 Panel 513RR, Panel 513QL
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 06-41-57, Page Block 001
36-11-00, Page Block 401
Fig. A-FCAAA
Removal of Air Ducts and Reflector in
the Wings for access
Sheet 01
Sheet 02
Sheet 03
NOTE
: This workstep is necessary to be done to access the raceway box to
accomplish SUBTASK 242105-831-003 001 Modify the routing in the LH
forward wing to fuselage fairing. .
NOTE
: Two persons are necessary for this access.
(a) Remove the Air Ducts :
Refer to Fig. A-FCAAA Sheet 01
 and Fig. A-FCAAA Sheet 02
Refer to AMM 36-11-00, Page Block 401
1 Duct Assy Item (70) Retain
1 Insulation Item (71) Retain
1 Tube Assy Item (72) Retain
1 Insulation Item (71) Retain
1 Tube Assy Item (73) Retain
DATE: Mar 20/13 SERVICE BULLETIN No.: A310-24-2105
REVISION No.: 02 - Jan 05/15 Page: 41
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 52

@A310
SERVICE BULLETIN
NOTE
: Retain the hardware.
(b) Remove the Deflector :
Refer to Fig. A-FCAAA Sheet 01
 and Fig. A-FCAAA Sheet 02
1 Shield Item (75) Retain
1 Bracket Item (74) Retain
1 Shield Assy Item (76) Retain
NOTE
: Retain the hardware.
NOTE
: Two persons necessary (one on the above and one on the lower
side of the panel).
(c) Remove the access panel 513QL (Refer to AMM 06-41-57, Page Block 001).
(d) Remove the cover of the Raceway Box :
Refer to Fig. A-FCAAA Sheet 01
 and Fig. A-FCAAA Sheet 03
1 Cover Item (77) Retain
NOTE
: Retain the hardware.
(4) Subtask 242105-010-002-001 - Remove the Air Ducts and the Deflector in the RH
Wings for access.
Work Zones and Access Panels
Zone
 Access/Work location
612
 Access
 Panel 613RR, Panel 613QL
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 06-41-57, Page Block 001
36-11-00, Page Block 401
Fig. A-FCAAA
Removal of Air Ducts and Reflector in
the Wings for access
Sheet 01
Sheet 02
Sheet 03
NOTE
: Two persons are necessary for this access.
(a) Remove the Air Ducts :
Refer to Fig. A-FCAAA Sheet 01
 and Fig. A-FCAAA Sheet 02
Refer to AMM 36-11-00, Page Block 401
DATE: Mar 20/13 SERVICE BULLETIN No.: A310-24-2105
REVISION No.: 02 - Jan 05/15 Page: 42
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 53

@A310
SERVICE BULLETIN
1 Duct Assy Item (70) Retain
1 Insulation Item (71) Retain
1 Tube Assy Item (72) Retain
1 Insulation Item (71) Retain
1 Tube Assy Item (73) Retain
NOTE
: Retain the hardware.
(b) Remove the Deflector :
Refer to Fig. A-FCAAA Sheet 01
 and Fig. A-FCAAA Sheet 02
1 Shield Item (75) Retain
1 Bracket Item (74) Retain
1 Shield Assy Item (76) Retain
NOTE
: Retain the hardware.
(c) Remove the access panel 613QL (Refer to AMM 06-41-57, Page Block 001).
(d) Remove the cover of the Raceway Box :
Refer to Fig. A-FCAAA Sheet 01
 and Fig. A-FCAAA Sheet 03
1 Cover Item (77) Retain
NOTE
: Retain the hardware.
(5) Subtask 242105-010-004-001 - Remove two Hydraulic Pipes in the RH Wings for
access.
Work Zones and Access Panels
Zone
 Access/Work location
673
 Access
 Panel 672AZ, Panel 672BZ
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 29-00-00, Page Block 401
Fig. A-FCBAA
Removal of Hydraulic Pipes for access
Sheet 01
Sheet 02
Sheet 03
Sheet 04
DATE: Mar 20/13 SERVICE BULLETIN No.: A310-24-2105
REVISION No.: 02 - Jan 05/15 Page: 43
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 54

@A310
SERVICE BULLETIN
NOTE
: This workstep is necessary before accomplishment of SUBTASK
242105-831-006 001 Modify the routing on the RH shroud box leading
edge. .
(a) Remove the hardware :
Refer to Fig. A-FCBAA Sheet 01
 , Fig. A-FCBAA Sheet 02
 , Fig. A-FCBAA Sheet 03
and Fig. A-FCBAA Sheet 04
1 Tie-Cable Item (62) Discard
1 Block Isolator Item (83) Retain
2 Bolt Item (80) Retain
2 Washer Item (81) Retain
2 Block Clamp Item (82) Retain
(b) Remove the two Hydraulic Pipes :
Refer to Fig. A-FCBAA Sheet 01
 , Fig. A-FCBAA Sheet 02
 and Fig. A-FCBAA Sheet
03
Refer to AMM 29-00-00, Page Block 401
1 Hydraulic Pipes Item (78) Retain
1 Hydraulic Pipes Item (79) Retain
(6) Subtask 242105-941-401-001 - Job Set-up
Work Zones and Access Panels
Zone
 Access/Work location
612
 Access
 Panel 612HB
512
 Access
 Panel 512HB
624
 Access
 Panel 624KB
Manpower Resources
Skills
 AIRFRAME
References
Aircraft Maintenance Manual (AMM)
 24-00-00, Page Block 301
27-80-00, Page Block 301
29-10-00, Page Block 301
Structural Repair Manual (SRM)
 51-40-21
51-40-40
51-75-10
(a) Fully extend slats, refer to AMM 27-80-00, Page Block 301.
DATE: Mar 20/13 SERVICE BULLETIN No.: A310-24-2105
REVISION No.: 02 - Jan 05/15 Page: 44
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 55

@A310
SERVICE BULLETIN
(b) Depressurize the hyd raulic system, refer to AM M 29-10-00, Page Block 301.
(c) Make sure the aircraft is electrically grounded, refer to AMM 24-00-00, Page Block
301.
(d) In the cockpit, place warning notices in position not to operate the slats.
(e) Put access platforms in position at zone(s) 512, 612 and 624.
(f) Remove panels 612HB, 512HB and 624KB.
(7) Subtask 242105-941-201-002 - JOB SET-UP
Work Zones and Access Panels
Zone
 Access/Work location
600
500
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 06-41-57, Page Block 001
WARNING
: PUT WARNING NOTICES IN THE COCKPIT TO TELL PERSONS
NOT TO OPERATE THE FLIGHT CONTROLS. THE MOVEMENT CAN
CAUSE INJURY TO PERSONS.
(a) The following items shall be considered as the basic Aircraft configuration before
you start a maintenance task:
- Aircraft on the ground resting on landing gear (the ground safety locks and the
wheel chocks are in position on the landing gear).
- Engine shut down, thrust reversers closed and locked.
- Aircraft in clean configuration.
- Parking brake applied.
- Aircraft electrical network de-energized.
- Hydraulic systems depressurized.
- Access to the cockpit and cabin is available.
- All circuit breakers are in closed position.
- All controls in NORM, AUTO or OFF position.
(b) Install the safety guard (PN 98A27503003000) on the flap and slat control lever.
DATE: Mar 20/13 SERVICE BULLETIN No.: A310-24-2105
REVISION No.: 02 - Jan 05/15 Page: 45
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 56

@A310
SERVICE BULLETIN
(c) Put access platforms in position below the leading-edges of:
- the LH wing at Zone 512
- the LH wing at Zone 524
- the RH wing at Zone 612
- the RH wing at Zone 624
(d) On the lower surface of the LH wing, remove the leading-edge access panels
512BB, 512CB, 512DB, 512GB and 512JB, refer to AMM 06-41-57, Page Block
001 as necessary.
(e) On the lower surface of the LH wing, remove the leading-edge access panels
524BB, 524CB and 524KB, refer to AMM 06-41-57, Page Block 001 as necessary.
(f) On the lower surface of the RH wing, remove the leading-edge access panels
612BB, 612CB, 612DB, 612GB, 612JB, refer to AMM 06-41-57, Page Block 001 as
necessary.
(g) On the lower surface of the RH wing, remove the leading-edge access panels
624BB and 624CB, refer to AMM 06-41-57, Page Block 001 as necessary.
**CONF 002
(1) Subtask 242105-941-001-001 - Job Set-up
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 24-00-00, Page Block 301
27-50-00, Page Block 301
29-10-00, Page Block 301
29-14-00, Page Block 301
(a) The following items shall be considered as the basic Aircraft configuration before
you start a maintenance task:
- Aircraft on the ground resting on landing gear (the ground safety locks and the
wheel chocks are in position on the landing gear).
- Engine shut down, thrust reversers closed and locked.
- Aircraft in clean configuration.
- Parking brake applied.
- Aircraft electrical network de-energized.
- Hydraulic systems depressurized.
DATE: Mar 20/13 SERVICE BULLETIN No.: A310-24-2105
REVISION No.: 02 - Jan 05/15 Page: 46
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 57

@A310
SERVICE BULLETIN
- Access to the cockpit and cabin is available.
- All circuit breakers are in closed position.
- All controls in NORM, AUTO or OFF position.
(b) Make sure that the aircraft is electrically grounded (Refer to AMM 24-00-00, Page
Block 301).
(c) Put access platform(s) in position.
(d) Depressurize the Yellow Hydraulic System (Refer to AMM 29-10-00, Page Block
301 and AMM 29-14-00, Page Block 301).
(e) Do the Job Set-up procedure as specified in the Extension and Retraction of Flaps
with Aircraft System (Refer to AMM 27-50-00, Page Block 301).
(2) Subtask 242105-010-001-001 - Remove/Open for Access
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 06-41-57, Page Block 001
27-50-00, Page Block 301
32-12-11, Page Block 301
53-15-63, Page Block 401
(a) Open the Main Landing Gear (MLG) door (Refer to AMM 32-12-11, Page Block
301).
(b) Fully extend the flaps (Refer to AMM 27-50-00, Page Block 301).
(c) Remove the access panels 572AB, 672AB, 572AZ, 572BZ, 572CZ, 572DZ, 572EZ,
572FZ, 572GZ, 672AZ, 672BZ, 672CZ, 672DZ, 672EZ, 672FZ and 672GZ (Refer to
AMM 06-41-57, Page Block 001).
(d) Remove the access panels 512FB, 612FB, 512BB, 612BB, 612DB, 513RR and
613RR (Refer to AMM 06-41-57, Page Block 001).
(e) Remove all the necessary fairing panels (Refer to AMM 53-15-63, Page Block 401).
(f) If necessary, remove the access panels 571BB, 571CB, 671BB and 671CB (Refer
to AMM 06-41-57, Page Block 001).
(g) If necessary, remove the access panels 513BL, 513DL, 513CL, 513EL, 513FL,
513ML, 613BR, 613DR, 613CR, 613ER, 613FR and 613HR (Refer to AMM
06-41-57, Page Block 001).
DATE: Mar 20/13 SERVICE BULLETIN No.: A310-24-2105
REVISION No.: 02 - Jan 05/15 Page: 47
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 58

@A310
SERVICE BULLETIN
(3) Subtask 242105-010-003-001 - Remove the Air Ducts and the Deflector in the LH
Wings for access.
Work Zones and Access Panels
Zone
 Access/Work location
512
 Access
 Panel 513RR, Panel 513QL
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 06-41-57, Page Block 001
36-11-00, Page Block 401
Fig. A-FCAAA
Removal of Air Ducts and Reflector in
the Wings for access
Sheet 01
Sheet 02
Sheet 03
NOTE
: This workstep is necessary to be done to access the raceway box to
accomplish SUBTASK 242105-831-003 001 Modify the routing in the LH
forward wing to fuselage fairing. .
NOTE
: Two persons are necessary for this access.
(a) Remove the Air Ducts :
Refer to Fig. A-FCAAA Sheet 01
 and Fig. A-FCAAA Sheet 02
Refer to AMM 36-11-00, Page Block 401
1 Duct Assy Item (70) Retain
1 Insulation Item (71) Retain
1 Tube Assy Item (72) Retain
1 Insulation Item (71) Retain
1 Tube Assy Item (73) Retain
NOTE
: Retain the hardware.
(b) Remove the Deflector :
Refer to Fig. A-FCAAA Sheet 01
 and Fig. A-FCAAA Sheet 02
1 Shield Item (75) Retain
1 Bracket Item (74) Retain
1 Shield Assy Item (76) Retain
DATE: Mar 20/13 SERVICE BULLETIN No.: A310-24-2105
REVISION No.: 02 - Jan 05/15 Page: 48
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 59

@A310
SERVICE BULLETIN
NOTE
: Retain the hardware.
NOTE
: Two persons necessary (one on the above and one on the lower
side of the panel).
(c) Remove the access panel 513QL (Refer to AMM 06-41-57, Page Block 001).
(d) Remove the cover of the Raceway Box :
Refer to Fig. A-FCAAA Sheet 01
 and Fig. A-FCAAA Sheet 03
1 Cover Item (77) Retain
NOTE
: Retain the hardware.
(4) Subtask 242105-010-002-001 - Remove the Air Ducts and the Deflector in the RH
Wings for access.
Work Zones and Access Panels
Zone
 Access/Work location
612
 Access
 Panel 613RR, Panel 613QL
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 06-41-57, Page Block 001
36-11-00, Page Block 401
Fig. A-FCAAA
Removal of Air Ducts and Reflector in
the Wings for access
Sheet 01
Sheet 02
Sheet 03
NOTE
: Two persons are necessary for this access.
(a) Remove the Air Ducts :
Refer to Fig. A-FCAAA Sheet 01
 and Fig. A-FCAAA Sheet 02
Refer to AMM 36-11-00, Page Block 401
1 Duct Assy Item (70) Retain
1 Insulation Item (71) Retain
1 Tube Assy Item (72) Retain
1 Insulation Item (71) Retain
1 Tube Assy Item (73) Retain
NOTE
: Retain the hardware.
DATE: Mar 20/13 SERVICE BULLETIN No.: A310-24-2105
REVISION No.: 02 - Jan 05/15 Page: 49
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 60

@A310
SERVICE BULLETIN
(b) Remove the Deflector :
Refer to Fig. A-FCAAA Sheet 01
 and Fig. A-FCAAA Sheet 02
1 Shield Item (75) Retain
1 Bracket Item (74) Retain
1 Shield Assy Item (76) Retain
NOTE
: Retain the hardware.
(c) Remove the access panel 613QL (Refer to AMM 06-41-57, Page Block 001).
(d) Remove the cover of the Raceway Box :
Refer to Fig. A-FCAAA Sheet 01
 and Fig. A-FCAAA Sheet 03
1 Cover Item (77) Retain
NOTE
: Retain the hardware.
(5) Subtask 242105-010-004-001 - Remove two Hydraulic Pipes in the RH Wings for
access.
Work Zones and Access Panels
Zone
 Access/Work location
673
 Access
 Panel 672AZ, Panel 672BZ
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 29-00-00, Page Block 401
Fig. A-FCBAA
Removal of Hydraulic Pipes for access
Sheet 01
Sheet 02
Sheet 03
Sheet 04
NOTE
: This workstep is necessary before accomplishment of SUBTASK
242105-831-006 001 Modify the routing on the RH shroud box leading
edge. .
(a) Remove the hardware :
Refer to Fig. A-FCBAA Sheet 01
 , Fig. A-FCBAA Sheet 02
 , Fig. A-FCBAA Sheet 03
and Fig. A-FCBAA Sheet 04
1 Tie-Cable Item (62) Discard
1 Block Isolator Item (83) Retain
DATE: Mar 20/13 SERVICE BULLETIN No.: A310-24-2105
REVISION No.: 02 - Jan 05/15 Page: 50
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

The text continues at https://openairdocs.org/service-documents/airbus/a310-24-2105/file/fc0e7ae37a45.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
