# Airbus Service Bulletin A310-32-2151

Copy: No revision named ("SB_A310-32-2151_r00"), 19 pages: PDF https://openairdocs.org/files/sha256/fb/3d/fb3df7fc3e5d55018c08761b13cb568ef394c85838b5e4b81de7347061ad16da; text https://openairdocs.org/service-documents/airbus/a310-32-2151/file/fb3df7fc3e5d.md. Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2018-0301; AD 2018-19-07 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Airbus](https://openairdocs.org/service-documents/airbus.md)
- Type: Service bulletin (Service Bulletin)
- Number: A310-32-2151
- Page: https://openairdocs.org/service-documents/airbus/a310-32-2151

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2018-19-07](https://openairdocs.org/ad/2018-19-07.md), effective Nov 13, 2018: No revision named

Also cited in [1 proposed AD](https://openairdocs.org/service-documents/airbus/a310-32-2151/proposed.md).

## Text (19 pages)

Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2018-0301; AD 2018-19-07 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

@A310
SERVICE BULLETIN
SUMMARY
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
This summary is for information only and is not approved for modification of the aircraft.
MANDATORY
 MANDATORY
 MANDATORY
ATA SYSTEM: 32
TITLE: LANDING GEAR - ALTERNATE BRAKI NG WITH ANTI-SKID - INSTALL
NEW PARKING BRAKE OPERATED VALVE IN THE YELLOW
HYDRAULIC BAY
**CONF ALL
MODIFICATIONS
MODIFICATION CLASSIFICATION
MAJOR
 None
MINOR
 13201S22637
NOTE
: As per EASA IR 21, a minor change is one that has no appreciable effect on the
mass, balance, structural strength, reliability, operational characteristics affecting the
airworthiness of the product. All other changes are major changes.
REASON/DESCRIPTION/OPERATIONAL CONSEQUENCES
In-service aircraft have experienced in the Yellow Hydraulic Bay some cracking of the Parking Brake
Operated Valve (PBOV) at Port C Nut PN A80993.
- This may lead to loss of the yellow hydraulic system and the alternate braking: parking brake may
be inoperative due to yellow accumulators low pressure.
This modification replaces the PBOV PN A25315-1 currently fitted on the aircraft by the PBOV PN
A25315020-2.
Main improvements are:
- Replacement of the Nut material Aluminum AU2GN with Steel 17-4PH which will increase the
fatigue resistance of the nut.
- Increase of the tightening torque of the Nut
- Improvement of the fatigue resistance of the Body by its shot peened area at port A
- Due to the painting removal from the PBOV, some electrical bonding areas have been created.
DATE: Jul 04/17 SERVICE BULLETIN No.: A310-32-2151
REVISION No.: 00 - Jul 04/17 Page: 1
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 2

@A310
SERVICE BULLETIN
SUMMARY
Accomplishment of this Service Bulletin will improve the fatigue resistance of the PBOV and reduce the
risk of Nut rupture.
GENERAL EVALUATION
EVALUATION TABLE
COMPLIANCE
 MANDATORY (1)
 CANCELS INSPECTION SB
 NO
POTENTIAL AD
 YES
 A/C OPERATION AFFECTED
 NO
RELIABILITY AFFECTED
 NO
 PAX COMFORT AFFECTED
 NO
COST SAVING
 NO
 ETOPS AFFECTED
 NO
STRUCTURAL LIFE EXTN
 NO
 VENDOR SB INVOLVED
 NO
NOTE
 (1)
: Service Bulletin must be accomplished.
MATERIAL PRICE INFORMATION
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET
 QTY PER
A/C
PRICE PER
A/C (USD)
MAIN PARTS
Equipment BFEB01
 1
 See SB
 Parking Brake Operated Valve
EFFECTIVITY
This Service Bulletin is applicable to this (these) operator(s) :
14S 18T 19U 38M 40T 50W 58X 82Z 98W 99Y AFG BBC CFC
DGA F2I FDX GAF I2L IRA IRM IYE KAC KZU PCA PIA QQE
R1T RJA ROT RZO SGX SUD TBN THY TSC UBD UZB WHT
CONCURRENT REQUIREMENTS
None
REFERENCES / REPERCUSSIONS
TFU
 None
OEB
 None
AOT
 None
SIL
 None
ISI
 None
LINE MAINTENANCE AFFECTED
 No
LIFE LIMIT
 None
OTHER
 None
NATURE OF THE WORK
AIRCRAFT
 NO
EQUIPMENT
 YES
HARD
 NO
SOFT
 NO
OBRM
 NO
DATE: Jul 04/17 SERVICE BULLETIN No.: A310-32-2151
REVISION No.: 00 - Jul 04/17 Page: 2
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 3

@A310
SERVICE BULLETIN
SUMMARY
MANPOWER
Task 322151-831-895-001: Modification
TOTAL MANHOURS
 6.00
ELAPSED TIME (HOURS)
 6.00
APPENDICES
None
DATE: Jul 04/17 SERVICE BULLETIN No.: A310-32-2151
REVISION No.: 00 - Jul 04/17 Page: 3
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 4

@A310
SERVICE BULLETIN
SUMMARY
**CONF ALL
FR47
FR54
A
REPLACEMENT OF THE
PARKING BRAKE
Z148A
744
OPERATED VALVE (PBOV)
B_SB_322151_7_SAAA_01_01
Figure A-USAAA - Sheet 01
DATE: Jul 04/17 SERVICE BULLETIN No.: A310-32-2151
REVISION No.: 00 - Jul 04/17 Page: 4
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 5

@A310
SERVICE BULLETIN
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
MANDATORY
 MANDATORY
 MANDATORY
ATA SYSTEM: 32
TITLE: LANDING GEAR - ALTERNATE BRAKI NG WITH ANTI-SKID - INSTALL
NEW PARKING BRAKE OPERATED VALVE IN THE YELLOW
HYDRAULIC BAY
MODIFICATION No.: 13201S22637
This document contains AIRBUS PROPRIETARY INFORMATION and shall at all times remain the
property of AIRBUS; no intellectual property right or licence is granted by AIRBUS in connection with
any information contained in it. It is delivered on the express condition that said document and the
information contained in it shall be treated as confidential, shall not be used for any purpose other than
that for which it is hereby delivered. It shall not be disclosed in whole or in part to third parties and shall
not be duplicated in any manner (except for the purposes of performing the tasks described hereunder
and provided that any recipient of such document shall comply with the conditions herein), without
AIRBUS prior written consent.
1. PLANNING INFORMATION
**CONF ALL
A. EFFECTIVITY
NOTE
: This modification is applicable by Service Bulletin only.
(1) Models
310-203 310-221 310-222 310-304 310-308 310-322 310-324 310-325
(2) Effectivity by MSN
0162 0230 0245 0248 0267 0278 0281 0283 0331 0356 0362 0364 0369 0378 0394
0399 0413 0418-0419 0421-0422 0425 0431 0434 0436-0437 0439 0441 0444-0447
0449 0452 0456-0458 0467 0472-0473 0478 0480 0482-0484 0488-0492 0494-0500
0503 0519-0520 0522-0524 0526 0537 0539 0545 0547 0549-0552 0562 0564-0565
0567-0568 0571 0574 0576 0585-0588 0590-0595 0597 0599-0600 0620 0622 0624
0636 0644 0646-0649 0651 0653 0656 0658 0660-0661 0663 0667 0671-0672 0674
0676 0678 0682 0687 0689 0691 0700 0702 0704 0706
DATE: Jul 04/17 SERVICE BULLETIN No.: A310-32-2151
REVISION No.: 00 - Jul 04/17 Page: 1
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 6

@A310
SERVICE BULLETIN
(3) Effectivity by Operator
The Operator/MSN relationship is provided for information only and is correct at the time
of issue in accordance with the information available to AIRBUS. Any future changes
resulting from transfer of an aircraft from one operator to another will not be reflected in
this list unless the Service Bulletin is revised for another reason.
OPERATOR
 MSN
14S
 0647 0663
18T
 0473
19U
 0399
38M
 0648
40T
 0413
50W
 0498
58X
 0431
82Z
 0550 0551
98W
 0495
99Y
 0489
AFG
 0496 0497
BBC
 0594 0700
CFC
 0425 0441 0444 0446 0482
DGA
 0418 0421 0422
F2I
 0491 0520
FDX
 0162 0230 0245 0248 0267 0278 0281 0283 0331 0356 0362 0364
0369 0378 0394 0439 0449 0452 0456 0457 0458 0467 0492 0500
0539 0549 0552 0593
GAF
 0434 0484 0503 0522 0523
I2L
 0661
IRA
 0436 0671
IRM
 0488 0499 0524 0526 0537 0547 0564 0567 0586 0595 0620
IYE
 0568 0702 0704
KAC
 0649
KZU
 0592 0622 0646
PCA
 0419
PIA
 0585 0587 0590 0653 0656 0660 0676 0678 0682 0687 0689 0691
QQE
 0667
R1T
 0591
RJA
 0445 0490
ROT
 0636 0644
RZO
 0571 0624 0651
SGX
 0519 0562
SUD
 0437
TBN
 0565
THY
 0478 0480
TSC
 0447 0472 0483 0545 0588 0597 0599 0600 0658
UBD
 0672 0674
UZB
 0574 0576 0706
WHT
 0494
DATE: Jul 04/17 SERVICE BULLETIN No.: A310-32-2151
REVISION No.: 00 - Jul 04/17 Page: 2
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 7

@A310
SERVICE BULLETIN
(4) Configuration by MSN
MSN
 CONFIGURATION
0162 0230 0245 0248 0267 0278 0281 0283 0331 0356 0362
0364 0369 0378 0394 0399 0413 0418 0419 0421 0422 0425
0431 0434 0436 0437 0439 0441 0444 0445 0446 0447 0449
0452 0456 0457 0458 0467 0472 0473 0478 0480 0482 0483
0484 0488 0489 0490 0491 0492 0494 0495 0496 0497 0498
0499 0500 0503 0519 0520 0522 0523 0524 0526 0537 0539
0545 0547 0549 0550 0551 0552 0562 0564 0565 0567 0568
0571 0574 0576 0585 0586 0587 0588 0590 0591 0592 0593
0594 0595 0597 0599 0600 0620 0622 0624 0636 0644 0646
0647 0648 0649 0651 0653 0656 0658 0660 0661 0663 0667
0671 0672 0674 0676 0678 0682 0687 0689 0691 0700 0702
0704 0706
001
(5) Configuration definition
**CONF 001
Config. 001 is valid for all the aircraft given in the effectivity of this Service Bulletin as a
standard configuration.
(6) Material Effectivity
MATERIAL
 QTY PER A/C
 SEE NOTES
Equipment BFEB01
 1
B. CONCURRENT REQUIREMENTS
None
C. REASON
(1) History
In-service aircraft have experienced in the Yellow Hydraulic Bay some cracking of the
Parking Brake Operated Valve (PBOV) at Port C Nut PN A80993.
- This may lead to loss of the yellow hydraulic system and the alternate braking:
parking brake may be inoperative due to yellow accumulators low pressure.
(2) Objective/Action
This modification replaces the PBOV PN A25315-1 currently fitted on the aircraft by the
PBOV PN A25315020-2.
Main improvements are:
- Replacement of the Nut material Aluminum AU2GN with Steel 17-4PH which will
increase the fatigue resistance of the nut.
- Increase of the tightening torque of the Nut
DATE: Jul 04/17 SERVICE BULLETIN No.: A310-32-2151
REVISION No.: 00 - Jul 04/17 Page: 3
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 8

@A310
SERVICE BULLETIN
- Improvement of the fatigue resistance of the Body by its shot peened area at port A
- Due to the painting removal from the PBOV, some electrical bonding areas have
been created.
(3) Advantages
Accomplishment of this Service Bulletin will improve the fatigue resistance of the PBOV
and reduce the risk of Nut rupture.
(4) Operational/Maintenance Consequences
None
D. DESCRIPTION
To accomplish this Service Bulletin it is necessary to :
Task 322151-831-895-001: Modification
(1) Replace the PBOV
E. COMPLIANCE
(1) Classification
MANDATORY: Service Bulletin must be accomplished.
(2) Accomplishment Timescale
Accomplishment of this Service Bulletin must be done within 5 years from the issuance
of this Service Bulletin.
This Service Bulletin has been classified Mandatory. It is expected that an Airworthiness
Directive (AD) published by the European Av iation Safety Agenc y (EASA) will be issued
to confirm this classification. It is anticipated that the AD will confirm the compliance
time given but reference should be made to the AD for confirmation of the mandated
accomplishment timescale.
F. APPROVAL
The technical content of this document is approved under the authority of Design
Organization Approval No. EASA.21J.031.
If an aircraft listed in the effectivity has a modification or repair embodied that is not of
AIRBUS origin, and which affects the content of this Service Bulletin, the operator is
responsible for obtaining approval by its airworthiness authority for any adaptation necessary
before incorporation of the Service Bulletin.
DATE: Jul 04/17 SERVICE BULLETIN No.: A310-32-2151
REVISION No.: 00 - Jul 04/17 Page: 4
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 9

@A310
SERVICE BULLETIN
G. MANPOWER
The manpower estimates given in this Service Bulletin are based on the direct labor cost to
do the work. These estimates assume that the work will be done by experienced personnel,
and may need to be revised upwards to suit operator’s circumstances. The estimates do not
include the time to prepare, plan or inspect the work. Manufacture and procurement of parts
and tools, drying times for paints, sealants, etc., and general administration work are also not
included.
Task 322151-831-895-001: Modification
Get Access
 1.50
On Aircraft
Replace the PBOV
 2.50
Tests
 0.50
Close-Up
 1.50
TOTAL MANHOURS
 6.00
ELAPSED TIME (HOURS)
 6.00
H. WEIGHT AND BALANCE
None
I. ELECTRICAL LOAD DATA
None
J. REFERENCES
Aircraft Maintenance Manual (AMM)
 06-21-00 20-23-12 24-00-00
32-45-00 32-45-14
ATA Common Support Data Dictionary (CSDD),
Chapter 2
Elec. Std. Practices Manual (ESPM)
 20-55-00
K. PUBLICATION AFFECTED
Illustrated Parts Catalog (IPC)
 32-45-03 32-45-14
L. INTERCHANGEABILITY/MIXABILITY
DESCRIPTION
 OLD PART N˚
 NEW PART N˚
 INT
 MIXABILITY
 SEE
NOTES
Valve-Parking Brake
 A25315-1
 A25315020-2
 01
 Not
Applicable
NOTE
: For definitions of interchangeability codes in column INT., refer to ATA
Common Support Data Dictionary (CSDD), Chapter 2.
M. SPARES
Valve-Parking Brake A25315-1
DATE: Jul 04/17 SERVICE BULLETIN No.: A310-32-2151
REVISION No.: 00 - Jul 04/17 Page: 5
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 10

@A310
SERVICE BULLETIN
The parts listed here must not be installed anymore on aircraft which have accomplished this
Service Bulletin or which have the equivalent production modification embodied.
DATE: Jul 04/17 SERVICE BULLETIN No.: A310-32-2151
REVISION No.: 00 - Jul 04/17 Page: 6
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 11

@A310
SERVICE BULLETIN
2. MATERIAL INFORMATION
**CONF ALL
A. MATERIAL - PRICE AND AVAILABILITY
(1) Procurement Addresses
Vendor parts are to be procured from:
Equipment BFEB01
 SAFRAN LANDING SYSTEMS
78146 Velizy-Villacoublay
France
+33 1 46 29 87 70
(2) Price and Availability
No AIRBUS kit will be provided.
Procurement terms for the equipment must be negotiated with the equipment supplier.
B. INDUSTRY SUPPORT INFORMATION
Industry support terms for the equipment must be negotiated with the equipment supplier.
This Service Bulletin is the subject of an AIRBUS monitored retrofit campaign.
For the organization of this retrofit, you are kindly requested to contact AIRBUS retrofit
management department.
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
France
E-mail: monitored.retrofit@airbus.com
C. LIST OF COMPONENTS
No Kit
D. LIST OF MATERIALS - OPERATOR SUPPLIED
(1) Consumable Materials
None
(2) Components
NOTE
: To accomplish this Service Bulletin it is necessary to use the expendable
parts listed in the AMM 32-45-14, Page Block 401.
DATE: Jul 04/17 SERVICE BULLETIN No.: A310-32-2151
REVISION No.: 00 - Jul 04/17 Page: 7
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 12

@A310
SERVICE BULLETIN
(3) Equipment
Equipment BFEB01
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 ITEM
 OLD PART N˚
 INT
 SEE
NOTES
1
 A25315020-2
 1
 VALVE
 (1)
 A25315-1
 01
NOTE
: For definitions of interchangeability codes in column INT., refer to ATA
Common Support Data Dictionary (CSDD), Chapter 2.
E. PARTS TO BE RE-IDENTIFIED BY OPERATOR
None
F. TOOLING
None
DATE: Jul 04/17 SERVICE BULLETIN No.: A310-32-2151
REVISION No.: 00 - Jul 04/17 Page: 8
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 13

@A310
SERVICE BULLETIN
3. ACCOMPLISHMENT INSTRUCTIONS
Task 322151-831-895-001 - Modification
WARNING
: MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND ALL THE CAUTIONS
INCLUDED IN THE REFERENCED PROCEDURES.
CAUTION
: ALWAYS OBEY THE PRECAUTIONS THAT FOLLOW TO KEEP
ELECTRICAL WIRING IN A SATISFACTORY CONDITION (ELECTRICALLY
AND MECHANICALLY SERVICEABLE) . WHEN YOU DO MAINTENANCE
WORK, REPAIRS OR MODIFICATIONS, ALWAYS KEEP ELECTRICAL WIRING,
COMPONENTS AND THE WORK AREA AS CLEAN AS POSSIBLE. TO DO
THIS:
- PUT PROTECTION, SUCH AS PLASTIC SHEETING, CLOTHS, ETC; AS
NECESSARY ON WIRING AND COMPONENTS.
- REGULARLY REMOVE ALL SHAVINGS, UNWANTED MATERIAL AND
OTHER CONTAMINATION.
THESE PRECAUTIONS WILL DECREASE THE RISK OF CONTAMINATION
AND DAMAGE TO THE ELECTRICAL WIRING INSTALLATION.
IF THERE IS CONTAMINATION, REFER TO ESPM 20-55-00.
NOTE
: The accomplishment instructions of this Service Bulletin include procedures given
in other documents or in other sections of the Service Bulletin. When the words
’refer to’ are used and the operator has a procedure accepted by the local authority
he belongs to, the accepted alternative procedure can be used. When the words ’in
accordance with’ are used then the given procedure must be followed.
NOTE
: The access and close-up instructions, not comprising return to service tests, in this
Service Bulletin do not constitute or affect the technical intent of the Service
Bulletin. Operators can therefore, as deemed necessary, omit or add access and/or
close-up steps to add flexibility to their maintenance operations as long as the
technical intent of the Service Bulletin is met within the set parameters.
NOTE
: Manual titles given in the accomplishment instructions are referred to by acronyms.
Refer to paragraph 1.J., References, for the definition of acronyms.
NOTE
: This Service Bulletin is classified mandatory or expected to be classified mandatory
by an Airworthiness Directive (AD). The paragraphs 3.C and 3.D in these
accomplishment instructions are Required for Compliance (RC) and must be done
to comply with the AD. Other paragraphs are recommended and may be deviated
from, done as part of other actions or done with accepted methods different from
those given in the Service Bulletin, as long as the RC paragraphs can be done and
the aircraft can be put back into a serviceable condition.
NOTE
: This Service Bulletin contains the instructions for the on-aircraft maintenance
necessary to ensure the continued airworthiness of the aircraft.
For any deviations to the instructions contained herein, contact Airbus for further
instructions and approval.
DATE: Jul 04/17 SERVICE BULLETIN No.: A310-32-2151
REVISION No.: 00 - Jul 04/17 Page: 9
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 14

@A310
SERVICE BULLETIN
NOTE
: Discarded parts must be managed at the operator’s discretion.
Task Associated Data
Zone
148
Access
Door
 744
Manpower
TOTAL MANHOURS
 6.00
ELAPSED TIME (HOURS)
 6.00
A. GENERAL
(1) Subtask 322151-910-401-001 - Standard Practices
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 06-21-00, Page Block 001
20-23-12, Page Block 001
(a) For identification of zones, refer to AMM 06-21-00, Page Block 001.
(b) To torque tighten pipe unions, refer to AMM 20-23-12, Page Block 001.
(c) Tag all the parts you must remove and retain to make the subsequent installation
easier.
(2) Subtask 322151-839-401-001 - Administrative
Manpower Resources
Skills
 NON SPECIFIC
Write in the applicable aircraft records that you have done all the work given in this
Service Bulletin.
B. PREPARATION
(1) Subtask 322151-941-401-001 - Job Set-up
Work Zones and Access Panels
Zone
 Access/Work location
148
 Access
 Door 744
Manpower Resources
Skills
 NON SPECIFIC
DATE: Jul 04/17 SERVICE BULLETIN No.: A310-32-2151
REVISION No.: 00 - Jul 04/17 Page: 10
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 15

@A310
SERVICE BULLETIN
References
Aircraft Maintenance Manual (AMM)
 24-00-00, Page Block 301
32-45-14, Page Block 401
NOTE
: The items given in this note shall be considered as the basic Aircraft
configuration before you start a maintenance task:
- Aircraft on the ground resting on landing gear (the ground safety
locks and the wheel chocks are in position on the landing gear)
- Engine shut down, thrust reversers closed and locked
- Aircraft in clean configuration
- Parking brake applied
- Aircraft electrical network de-energized
- Hydraulic system depressurized
- Access to the cockpit and cabin is available
- All circuit breakers are in closed position
- All controls in NORM, AUTO or OFF position.
(a) Make sure that the aircraft is electrically grounded, refer to AMM 24-00-00, Page
Block 301.
(b) Do the Job Setup procedure as specified in the removal/installation of the PBOV,
refer to AMM 32-45-14, Page Block 401.
C. PROCEDURE
(1) Subtask 322151-960-401-001 - Replace the PBOV
Work Zones and Access Panels
Zone
 Access/Work location
148
 Access
 Door 744
Manpower Resources
Manhours
 2.50
Minimum number of person
 1
Subtask elapsed time
 2.50
Skills
 NON SPECIFIC
DATE: Jul 04/17 SERVICE BULLETIN No.: A310-32-2151
REVISION No.: 00 - Jul 04/17 Page: 11
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 16

@A310
SERVICE BULLETIN
Material necessary to do the job
Equipment BFEB01
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 SEE
NOTES
1
 A25315020-2
 1
 VALVE
References
Aircraft Maintenance Manual (AMM)
 32-45-14, Page Block 401
Fig. A-UBAAA
Replacement of PBOV
Sheet 01
(a) Remove the PBOV, refer to AMM 32-45-14, Page Block 401 and Fig. A-UBAAA
.
1 Valve-Parking Brake A25315-1 Item (1) Discard
(b) Install the PBOV, refer to AMM 32-45-14, Page Block 401 and Fig. A-UBAAA
.
1 Valve-Parking Brake A25315020-2 Item 1
D. TEST
(1) Subtask 322151-710-401-001 - Operational
Work Zones and Access Panels
Zone
 Access/Work location
148
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 32-45-00, Page Block 501
(a) Do the test after the removal/installation of the PBOV, refer to AMM 32-45-00, Page
Block 501.
E. CLOSE-UP
(1) Subtask 322151-942-401-001 - Close-up
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 32-45-14, Page Block 401
(a) Do the Close-up procedure as specified in the removal/installation of the PBOV,
refer to AMM 32-45-14, Page Block 401.
(b) Put the aircraft back to its initial configuration.
DATE: Jul 04/17 SERVICE BULLETIN No.: A310-32-2151
REVISION No.: 00 - Jul 04/17 Page: 12
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 17

@A310
SERVICE BULLETIN
**CONF ALL
FR47
FR54
A
Z148A
744
(1)
1
B_SB_322151_7_BAAA_01_00
Figure A-UBAAA - Sheet 01
Replacement of PBOV
DATE: Jul 04/17 SERVICE BULLETIN No.: A310-32-2151
REVISION No.: 00 - Jul 04/17 Page: 13
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 18

@A310
SERVICE BULLETIN
Service Bulletin REPORTING
TITLE: LANDING GEAR - ALTERNATE BRAKI NG WITH ANTI-SKID - INSTALL
NEW PARKING BRAKE OPERATED VALVE IN THE YELLOW
HYDRAULIC BAY
MODIFICATION No.: 13201S22637
SB Reporting status
This Service Bulletin will only be incorporated into affected customized Maintenance and Flight
Operations Products if it is duly reported to Airbus.
General information
The SB Reporting policy is published in ISI 00.00.00135. This document provides information regarding:
the SB Reporting means and benefits, the update of customized Maintenance Products and customized
Flight Operations Products.
If this Service Bulletin has an operational impact, refer to paragraph "Flight Operations Products" for
further information on the update of affected Flight Operations Products.
SB Reporting procedure
Standard practice to report SB is to use the online reporting application on AirbusWorld.
Refer to ISI 00.00.00179:
- For complete information on reporting means to Airbus. Question 2 "What are the standard
practices for SB reporting?"
- If this SB requires previous or simultaneous accomplishment of other SBs, Question 3 "What about
the reporting of prerequisite Service Bulletin?"
NOTE:
 ISI 00.00.00179 covers all the frequently asked questions about SB Reporting. It is revised on a
regular basis.
DATE: Jul 04/17 SERVICE BULLETIN No.: A310-32-2151
REVISION No.: 00 - Jul 04/17 Page: 1
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 19

@A310
SERVICE BULLETIN
QUALITY PERCEPTION FORM
Use this form to tell us what is your perception of the quality of this Service Bulletin. The reported data
that you provide us will be used to analyse areas of difficulties and to take corrective action to further
improve the quality of our Service Bulletins.
We thank you for the time you have taken in completing this form.
(Please rate on a scale of 1 to 4, with 4 being the highest score)
- Quality rating of this SB 4321
- Quality rating of the Accomplishment Instructions 4321
- Quality rating of the Illustrations 4321
- Is this SB easy to understand ? Y/N
If you have had difficulties in the accomplishment of this SB please quote below the area(s) and give a
short description of the issue.
Planning Material Instructions
X Effectivity X Kit content X Preparation
X Reason X List of Materials Operator Supplied X Mod/Inspection
X Manpower X Industry support X Test
X References X Re-identification X Close-Up
X Publication X Tooling X Illustrations
Comments:
Operator: Date:
Name/Title:
Please return this form to:
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX FRANCE
Attn : SEM4 Service Bulletins Management
F A X:( 3 3 )56 19 34 25 1
Or via your Resident Customer Support Office.
DATE: Jul 04/17 SERVICE BULLETIN No.: A310-32-2151
REVISION No.: 00 - Jul 04/17 Page: 1
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
