# Airbus Service Bulletin A310-57-2105

Copy: No revision named ("SB A310-57-2105"), 108 pages: PDF https://openairdocs.org/files/sha256/0c/3f/0c3f35f15786b5cc3b3ed024accb67dee54bec1bc4bd1a923e47b9a4122b6a47; text https://openairdocs.org/service-documents/airbus/a310-57-2105/file/0c3f35f15786.md. Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2018-0025; AD 2018-11-06 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Airbus](https://openairdocs.org/service-documents/airbus.md)
- Type: Service bulletin (Service Bulletin)
- Number: A310-57-2105
- Page: https://openairdocs.org/service-documents/airbus/a310-57-2105

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2018-11-06](https://openairdocs.org/ad/2018-11-06.md), effective Jul 3, 2018: No revision named

Also cited in [1 proposed AD](https://openairdocs.org/service-documents/airbus/a310-57-2105/proposed.md).

## Text (108 pages)

Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2018-0025; AD 2018-11-06 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

@A310
SERVICE BULLETIN
SUMMARY
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
This summary is for information only and is not approved for modification of the aircraft.
MANDATORY
 MANDATORY
 MANDATORY
ATA SYSTEM: 57
TITLE: WINGS - CENTER SECTION - RIB 1 - LOWER TEE FITTING BETWEEN
FR40/47 PERFORM COLD WORKING OF HOLES
**CONF ALL
MODIFICATIONS
MODIFICATION CLASSIFICATION
MAJOR
 13777S22915
MINOR
 None
NOTE
: As per EASA IR 21, a minor change is one that has no appreciable effect on the
mass, balance, structural strength, reliability, operational characteristics affecting the
airworthiness of the product. All other changes are major changes.
REASON/DESCRIPTION/OPERATIONAL CONSEQUENCES
Following Widespread Fatigue Damage (WFD) analysis, it has been found that the area of lower wing
junction requires some modifications in order to reach the Limit Of Validity (L.O.V. definition from
FAR26.21).
This Service Bulletin details the work necessary to renew and cold work the holes of the first fasteners
row close to RIB1. The fasteners are located stiffener 1 to 14, outer wing between FR40 and FR47 on
LH and RH sides.
The procedure as described in this Service Bulletin is to be performed if no Airbus repair and/or repair
improvement has been previously performed in the same area. In case of repairs performed previously,
please contact AIRBUS Repair Support department for further instructions.
Accomplishment of this Service Bulletin will reach the L.O.V. for aircraft models A310-200 and
A310-300.
This Modification Service Bulletin affects the airworthiness limitations of Airworthiness Limitation Section
(ALS) Part 2 which shall be introduced within the A/C maintenance program under the operator
responsibility. Please download the relevant ALS Variation on Airbus World.
DATE: Nov 23/16 SERVICE BULLETIN No.: A310-57-2105
REVISION No.: 00 - Nov 23/16 Page: 1
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 2

@A310
SERVICE BULLETIN
SUMMARY
GENERAL EVALUATION
EVALUATION TABLE
COMPLIANCE
 MANDATORY (1)
 CANCELS INSPECTION SB
 NO
POTENTIAL AD
 YES
 A/C OPERATION AFFECTED
 NO
RELIABILITY AFFECTED
 NO
 PAX COMFORT AFFECTED
 NO
COST SAVING
 NO
 ETOPS AFFECTED
 NO
STRUCTURAL LIFE EXTN
 YES
 VENDOR SB INVOLVED
 NO
DE-FUELLING/VENTILATION
 YES
NOTE
 (1)
: Service Bulletin must be accomplished.
MATERIAL PRICE INFORMATION
**CONF 001
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET
 QTY PER
A/C
PRICE PER
A/C (USD)
MAIN PARTS
Kit 572105A01R00
 2
 24,200.00
 Bolt, nut
Standard tool TOOLA01
 1
 See SB
 Capital tool, Durable tool, Expendable
tool
Standard tool TOOLA02
 1
 See SB
 Capital tool, Durable tool, Expendable
tool
**CONF 002
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET
 QTY PER
A/C
PRICE PER
A/C (USD)
MAIN PARTS
Kit 572105A02R00
 2
 22,600.00
 Bolt, nut
Standard tool TOOLA01
 1
 See SB
 Capital tool, Durable tool, Expendable
tool
Standard tool TOOLA02
 1
 See SB
 Capital tool, Durable tool, Expendable
tool
**CONF 003
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET
 QTY PER
A/C
PRICE PER
A/C (USD)
MAIN PARTS
Kit 572105A03R00
 2
 24,000.00
 Bolt, nut
Standard tool TOOLA01
 1
 See SB
 Capital tool, Durable tool, Expendable
tool
Standard tool TOOLA02
 1
 See SB
 Capital tool, Durable tool, Expendable
tool
DATE: Nov 23/16 SERVICE BULLETIN No.: A310-57-2105
REVISION No.: 00 - Nov 23/16 Page: 2
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 3

@A310
SERVICE BULLETIN
SUMMARY
**CONF 004
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET
 QTY PER
A/C
PRICE PER
A/C (USD)
MAIN PARTS
Kit 572105A02R00
 2
 22,600.00
 Bolt, nut
Standard tool TOOLA01
 1
 See SB
 Capital tool, Durable tool, Expendable
tool
Standard tool TOOLA02
 1
 See SB
 Capital tool, Durable tool, Expendable
tool
EFFECTIVITY
**CONF ALL
This Service Bulletin is applicable to this (these) operator(s) :
18T 19U 40T 50W 58X 82Z 98W 99Y AFG BBC CFC DGA F2I
FDX GAF I2L IRA IRM IYE K1P KAC KZU PCA PIA QQE R1T
RJA ROT RZO SGX SUD TBN THY TSC UBD UZB WHT
CONCURRENT REQUIREMENTS
None
REFERENCES / REPERCUSSIONS
TFU
 None
OEB
 None
AOT
 None
SIL
 None
ISI
 00.00.00198
51.48.00001
LINE MAINTENANCE AFFECTED
 No
LIFE LIMIT
 None
OTHER
 None
NATURE OF THE WORK
AIRCRAFT
 YES
EQUIPMENT
 NO
HARD
 NO
SOFT
 NO
OBRM
 NO
MANPOWER
**CONF 001
Task 572105-831-801-001: Cold Work the Lower Tee Fitting Fastener Holes, on the Wing Side
TOTAL MANHOURS
 66.00
DATE: Nov 23/16 SERVICE BULLETIN No.: A310-57-2105
REVISION No.: 00 - Nov 23/16 Page: 3
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 4

@A310
SERVICE BULLETIN
SUMMARY
Task 572105-831-801-001: Cold Work the Lower Tee Fitting Fastener Holes, on the Wing Side
ELAPSED TIME (HOURS)
 18.00
**CONF 002, 004
Task 572105-831-801-001: Cold Work the Lower Tee Fitting Fastener Holes, on the Wing Side
TOTAL MANHOURS
 66.00
ELAPSED TIME (HOURS)
 18.00
**CONF 003
Task 572105-831-801-001: Cold Work the Lower Tee Fitting Fastener Holes, on the Wing Side
TOTAL MANHOURS
 66.00
ELAPSED TIME (HOURS)
 18.00
APPENDICES
**CONF ALL
Appendix 01 - Elapsed Time Assumption
DATE: Nov 23/16 SERVICE BULLETIN No.: A310-57-2105
REVISION No.: 00 - Nov 23/16 Page: 4
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 5

@A310
SERVICE BULLETIN
SUMMARY
**CONF ALL
RIB1LH
RIB1RH
FR40
FR47
B
B
A
B
LH SHOWN
RH SYMMETRICAL
COLD WORKING OF THE
FASTENER HOLES
RIB1LH
FR47
FR40
Z500
Z600 Z140
A
B_SB_572105_5_SAAA_01_02
Figure A-FSAAA - Sheet 01
DATE: Nov 23/16 SERVICE BULLETIN No.: A310-57-2105
REVISION No.: 00 - Nov 23/16 Page: 5
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 6

@A310
SERVICE BULLETIN
SUMMARY
This Page Intentionally Left Blank
DATE: Nov 23/16 SERVICE BULLETIN No.: A310-57-2105
REVISION No.: 00 - Nov 23/16 Page: 6
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 7

@A310
SERVICE BULLETIN
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
MANDATORY
 MANDATORY
 MANDATORY
ATA SYSTEM: 57
TITLE: WINGS - CENTER SECTION - RIB 1 - LOWER TEE FITTING BETWEEN
FR40/47 PERFORM COLD WORKING OF HOLES
MODIFICATION No.: 13777S22915
This document contains AIRBUS PROPRIETARY INFORMATION and shall at all times remain the
property of AIRBUS; no intellectual property right or licence is granted by AIRBUS in connection with
any information contained in it. It is delivered on the express condition that said document and the
information contained in it shall be treated as confidential, shall not be used for any purpose other than
that for which it is hereby delivered. It shall not be disclosed in whole or in part to third parties and shall
not be duplicated in any manner (except for the purposes of performing the tasks described hereunder
and provided that any recipient of such document shall comply with the conditions herein), without
AIRBUS prior written consent.
1. PLANNING INFORMATION
**CONF ALL
A. EFFECTIVITY
NOTE
: This modification is applicable by Service Bulletin only.
(1) Models
310-203 310-221 310-222 310-304 310-308 310-322 310-324 310-325
(2) Effectivity by MSN
0162 0230 0245 0248 0267 0278 0281 0283 0331 0356 0362 0364 0369 0378 0394
0399 0413 0418-0419 0421-0422 0425 0431 0434 0436-0437 0439 0441 0444-0447
0449 0452 0456-0458 0467 0472-0473 0478 0480 0482-0484 0488-0492 0494-0500
0503 0519-0520 0522-0524 0526 0537 0539 0545 0547 0549-0552 0562 0564-0565
0567-0568 0571 0574 0576 0585-0588 0590-0595 0597 0599-0600 0620 0622 0624
0636 0644 0646-0649 0651 0653 0656 0658 0660-0661 0663 0667 0671-0672 0674
0676 0678 0682 0687 0689 0691 0700 0702 0704 0706
DATE: Nov 23/16 SERVICE BULLETIN No.: A310-57-2105
REVISION No.: 00 - Nov 23/16 Page: 1
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 8

@A310
SERVICE BULLETIN
(3) Effectivity by Operator
The Operator/MSN relationship is provided for information only and is correct at the time
of issue in accordance with the information available to AIRBUS. Any future changes
resulting from transfer of an aircraft from one operator to another will not be reflected in
this list unless the Service Bulletin is revised for another reason.
OPERATOR
 MSN
18T
 0473
19U
 0399
40T
 0413
50W
 0498
58X
 0431
82Z
 0550 0551
98W
 0495
99Y
 0489
AFG
 0496 0497
BBC
 0594 0700
CFC
 0425 0441 0444 0446 0482
DGA
 0418 0421 0422
F2I
 0491 0520
FDX
 0162 0230 0245 0248 0267 0278 0281 0283 0331 0356 0362 0364
0369 0378 0394 0439 0449 0452 0456 0457 0458 0467 0492 0500
0539 0549 0552 0593
GAF
 0434 0484 0503 0522 0523
I2L
 0661
IRA
 0436 0671
IRM
 0488 0499 0524 0526 0537 0547 0564 0567 0586 0595 0620
IYE
 0568 0702 0704
K1P
 0648
KAC
 0647 0649 0663
KZU
 0592 0622 0646
PCA
 0419
PIA
 0585 0587 0590 0653 0656 0660 0676 0678 0682 0687 0689 0691
QQE
 0667
R1T
 0591
RJA
 0445 0490
ROT
 0636 0644
RZO
 0571 0624 0651
SGX
 0519 0562
SUD
 0437
TBN
 0565
THY
 0478 0480
TSC
 0447 0472 0483 0545 0588 0597 0599 0600 0658
UBD
 0672 0674
UZB
 0574 0576 0706
WHT
 0494
DATE: Nov 23/16 SERVICE BULLETIN No.: A310-57-2105
REVISION No.: 00 - Nov 23/16 Page: 2
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 9

@A310
SERVICE BULLETIN
(4) Configuration by MSN
MSN
 CONFIGURATION
0162 0230 0245 0248 0267 0278 0281 0283 0331 0356 0362
0364 0369
003
0378 0399 0413 0418 0421 0422 0425 0431 0434 0436 0437
0439 0441 0444 0445 0446 0447 0449 0452 0456 0457 0458
0467 0472 0473 0478 0480 0482 0483 0484 0488 0489 0490
0491 0492 0494 0495 0496 0497 0498 0499 0500 0503 0519
0520 0522 0523 0524 0526 0537 0539 0545 0547 0549 0550
0551 0552 0562 0564 0565 0567 0568 0571 0574 0576 0585
0586 0587 0588 0590 0591 0592 0593 0594 0595 0597 0599
0600 0620 0622 0624 0636 0644 0646 0647 0648 0649 0651
0653 0656 0658 0660 0661 0663 0667 0671 0672 0674 0676
0678 0682 0687 0689 0691 0700 0702 0704 0706
002
0394
 001
0419
 004
(5) Configuration definition
**CONF 001
Config. 001 is valid for A310-200 aircraft, except MSN 0419, on which modification No.
04977 is embodied.
**CONF 002
Config. 002 is valid for A310-300 aircraft.
**CONF 003
Config. 003 is valid for A310-200 aircraft on which modification No. 04977 is not
embodied.
**CONF 004
Config. 004 is valid for A310-200 aircraft MSN 0419.
(6) Material Effectivity
**CONF 001
MATERIAL
 QTY PER A/C
 SEE NOTES
Kit 572105A01R00
 2
Consumable CMLA01
 1
Standard tool TOOLA01
 1
Standard tool TOOLA02
 1
**CONF 002, 004
MATERIAL
 QTY PER A/C
 SEE NOTES
Kit 572105A02R00
 2
Consumable CMLA01
 1
Standard tool TOOLA01
 1
Standard tool TOOLA02
 1
DATE: Nov 23/16 SERVICE BULLETIN No.: A310-57-2105
REVISION No.: 00 - Nov 23/16 Page: 3
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 10

@A310
SERVICE BULLETIN
**CONF 003
MATERIAL
 QTY PER A/C
 SEE NOTES
Kit 572105A03R00
 2
Consumable CMLA01
 1
Standard tool TOOLA01
 1
Standard tool TOOLA02
 1
**CONF ALL
B. CONCURRENT REQUIREMENTS
None
C. REASON
(1) History
Following Widespread Fatigue Damage (WFD) analysis, it has been found that the area
of lower wing junction requires some modifications in order to reach the Limit Of Validity
(L.O.V. definition from FAR26.21).
(2) Objective/Action
This Service Bulletin details the work necessary to renew and cold work the holes of the
first fasteners row close to RIB1. The fasteners are located stiffener 1 to 14, outer wing
between FR40 and FR47 on LH and RH sides.
The procedure as described in this Service Bulletin is to be performed if no Airbus repair
and/or repair improvement has been previously performed in the same area. In case of
repairs performed previously, please contact AIRBUS Repair Support department for
further instructions.
(3) Advantages
Accomplishment of this Service Bulletin will reach the L.O.V. for aircraft models
A310-200 and A310-300.
(4) Operational/Maintenance Consequences
This Modification Service Bulletin affects the airworthiness limitations of Airworthiness
Limitation Section (ALS) Part 2 which shall be introduced within the A/C maintenance
program under the operator responsibility. Please download the relevant ALS Variation
on Airbus World.
D. DESCRIPTION
To accomplish this Service Bulletin it is necessary to :
**CONF 001
Task 572105-831-801-001: Cold Work the Lower Tee Fitting Fastener Holes, on the Wing
DATE: Nov 23/16 SERVICE BULLETIN No.: A310-57-2105
REVISION No.: 00 - Nov 23/16 Page: 4
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 11

@A310
SERVICE BULLETIN
Side
(1) Cold Work the Lower Tee Fitting Fastener Holes between FR40 and FR47, on the
LH Side
(2) Cold Work the Lower Tee Fitting Fastener Holes between FR40 and FR47, on the
RH Side
**CONF 002
Task 572105-831-801-001: Cold Work the Lower Tee Fitting Fastener Holes, on the Wing
Side
(1) Cold Work the Lower Tee Fitting Fastener Holes between FR40 and FR47, on the
LH Side
(2) Cold Work the Lower Tee Fitting Fastener Holes between FR40 and FR47, on the
RH Side
**CONF 003
Task 572105-831-801-001: Cold Work the Lower Tee Fitting Fastener Holes, on the Wing
Side
(1) Cold Work the Lower Tee Fitting Fastener Holes between FR40 and FR47, on the
LH Side
(2) Cold Work the Lower Tee Fitting Fastener Holes between FR40 and FR47, on the
RH Side
**CONF 004
Task 572105-831-801-001: Cold Work the Lower Tee Fitting Fastener Holes, on the Wing
Side
(1) Cold Work the Lower Tee Fitting Fastener Holes between FR40 and FR47, on the
LH Side
(2) Cold Work the Lower Tee Fitting Fastener Holes between FR40 and FR47, on the
RH Side
**CONF ALL
E. COMPLIANCE
(1) Classification
MANDATORY: Service Bulletin must be accomplished.
DATE: Nov 23/16 SERVICE BULLETIN No.: A310-57-2105
REVISION No.: 00 - Nov 23/16 Page: 5
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 12

@A310
SERVICE BULLETIN
(2) Accomplishment Timescale
**CONF 001, 003 thru 004
Accomplishment of this Service Bulletin must be done within 47000 Flight Cycles (FC) or
103900 Flight Hours (FH), whichever occurs first.
This Service Bulletin has been classified Mandatory. It is expected that an Airworthiness
Directive (AD) published by the European Av iation Safety Agenc y (EASA) will be issued
to confirm this classification. It is anticipated that the AD will confirm the thresholds
given but reference should be made to the AD for confirmation of the mandated
accomplishment timescale.
**CONF 002
Accomplishment of this Service Bulletin must be done within 42100 FC or 118100 FH,
whichever occurs first.
This Service Bulletin has been classified Mandatory. It is expected that an Airworthiness
Directive (AD) published by the European Av iation Safety Agenc y (EASA) will be issued
to confirm this classification. It is anticipated that the AD will confirm the thresholds
given but reference should be made to the AD for confirmation of the mandated
accomplishment timescale.
**CONF ALL
F. APPROVAL
The technical content of this document is approved under the authority of Design
Organisation Approval No. EASA.21J.031.
If an aircraft listed in the effectivity has a modification or repair embodied that is not of
AIRBUS origin, and which affects the content of this Service Bulletin, the operator is
responsible for obtaining approval by its airworthiness authority for any adaptation necessary
before incorporation of the Service Bulletin.
G. MANPOWER
The manpower estimates given in this Service Bulletin are based on the direct labor cost to
do the work. These estimates assume that the work will be done by experienced personnel,
and may need to be revised upwards to suit operator’s circumstances. The estimates do not
include the time to prepare, plan or inspect the work. Manufacture and procurement of parts
and tools, drying times for paints, sealants, etc., and general administration work are also not
included.
**CONF 001
Task 572105-831-801-001: Cold Work the Lower Tee Fitting Fastener Holes, on the Wing Side
Get Access
 2.00
On Aircraft
Cold Work the Lower Tee Fitting Fastener Holes
between FR40 and FR47, on the LH Side
30.00
DATE: Nov 23/16 SERVICE BULLETIN No.: A310-57-2105
REVISION No.: 00 - Nov 23/16 Page: 6
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 13

@A310
SERVICE BULLETIN
Task 572105-831-801-001: Cold Work the Lower Tee Fitting Fastener Holes, on the Wing Side
Cold Work the Lower Tee Fitting Fastener Holes
between FR40 and FR47, on the RH Side
30.00
Tests
 2.00
Close-Up
 2.00
TOTAL MANHOURS
 66.00
ELAPSED TIME (HOURS)
 18.00
NOTE
: For an explanation of the manhours and elapsed time, refer to the Gantt
Chart, Fig. A-FAAAA
, given in the Appendix 01 - Elapsed Time Assumption .
**CONF 002, 004
Task 572105-831-801-001: Cold Work the Lower Tee Fitting Fastener Holes, on the Wing Side
Get Access
 2.00
On Aircraft
Cold Work the Lower Tee Fitting Fastener Holes
between FR40 and FR47, on the LH Side
30.00
Cold Work the Lower Tee Fitting Fastener Holes
between FR40 and FR47, on the RH Side
30.00
Tests
 2.00
Close-Up
 2.00
TOTAL MANHOURS
 66.00
ELAPSED TIME (HOURS)
 18.00
NOTE
: For an explanation of the manhours and elapsed time, refer to the Gantt
Chart, Fig. A-FAAAA
, given in the Appendix 01 - Elapsed Time Assumption .
**CONF 003
Task 572105-831-801-001: Cold Work the Lower Tee Fitting Fastener Holes, on the Wing Side
Get Access
 2.00
On Aircraft
Cold Work the Lower Tee Fitting Fastener Holes
between FR40 and FR47, on the LH Side
30.00
Cold Work the Lower Tee Fitting Fastener Holes
between FR40 and FR47, on the RH Side
30.00
Tests
 2.00
Close-Up
 2.00
TOTAL MANHOURS
 66.00
ELAPSED TIME (HOURS)
 18.00
NOTE
: For an explanation of the manhours and elapsed time, refer to the Gantt
Chart, Fig. A-FAAAA
, given in the Appendix 01 - Elapsed Time Assumption .
DATE: Nov 23/16 SERVICE BULLETIN No.: A310-57-2105
REVISION No.: 00 - Nov 23/16 Page: 7
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 14

@A310
SERVICE BULLETIN
**CONF ALL
H. WEIGHT AND BALANCE
Not Changed
I. ELECTRICAL LOAD DATA
Not Changed
J. REFERENCES
**CONF 001
Airworthiness Limitation Section (ALS)
 Airworthiness Limitation Section
(ALS) Part 2
Aircraft Maintenance Manual (AMM)
 06-21-00 06-31-53 06-41-00
20-16-00 20-21-12 24-00-00
28-00-00 28-10-00 28-11-22
28-25-00
Elec. Std. Practices Manual (ESPM)
 20-55-00
Non Destructive Test Manual (NTM)
 51-10-01
Standards Manual (SM)
Structural Repair Manual (SRM)
 51-23-00 51-24-00 51-40-00
51-40-20 51-40-30 51-40-40
51-40-41 51-40-44 51-40-46
**CONF 002, 004
Airworthiness Limitation Section (ALS)
 Airworthiness Limitation Section
(ALS) Part 2
Aircraft Maintenance Manual (AMM)
 06-21-00 06-31-53 06-41-00
20-16-00 20-21-12 24-00-00
28-00-00 28-10-00 28-11-22
28-25-00
Elec. Std. Practices Manual (ESPM)
 20-55-00
Non Destructive Test Manual (NTM)
 51-10-01
Standards Manual (SM)
Structural Repair Manual (SRM)
 51-23-00 51-24-00 51-40-00
51-40-20 51-40-30 51-40-40
51-40-41 51-40-44 51-40-46
Airworthiness Limitation Section (ALS)
 Airworthiness Limitation Section
(ALS) Part 2
Aircraft Maintenance Manual (AMM)
 06-21-00 06-31-53 06-41-00
20-16-00 20-21-12 24-00-00
28-00-00 28-10-00 28-11-22
28-25-00
Elec. Std. Practices Manual (ESPM)
 20-55-00
Non Destructive Test Manual (NTM)
 51-10-01
Standards Manual (SM)
DATE: Nov 23/16 SERVICE BULLETIN No.: A310-57-2105
REVISION No.: 00 - Nov 23/16 Page: 8
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 15

@A310
SERVICE BULLETIN
Structural Repair Manual (SRM)
 51-23-00 51-24-00 51-40-00
51-40-20 51-40-30 51-40-40
51-40-41 51-40-44 51-40-46
**CONF 003
Airworthiness Limitation Section (ALS)
 Airworthiness Limitation Section
(ALS) Part 2
Aircraft Maintenance Manual (AMM)
 06-21-00 06-31-53 06-41-00
20-16-00 20-21-12 24-00-00
28-00-00 28-10-00 28-11-22
28-25-00
Elec. Std. Practices Manual (ESPM)
 20-55-00
Non Destructive Test Manual (NTM)
 51-10-01
Standards Manual (SM)
Structural Repair Manual (SRM)
 51-23-00 51-24-00 51-40-00
51-40-20 51-40-30 51-40-40
51-40-41 51-40-44 51-40-46
**CONF ALL
K. PUBLICATION AFFECTED
Airworthiness Limitation Section (ALS)
 Airworthiness Limitation Section
(ALS) Part 2
L. INTERCHANGEABILITY/MIXABILITY
Not Applicable
M. SPARES
None
DATE: Nov 23/16 SERVICE BULLETIN No.: A310-57-2105
REVISION No.: 00 - Nov 23/16 Page: 9
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 16

@A310
SERVICE BULLETIN
This Page Intentionally Left Blank
DATE: Nov 23/16 SERVICE BULLETIN No.: A310-57-2105
REVISION No.: 00 - Nov 23/16 Page: 10
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 17

@A310
SERVICE BULLETIN
2. MATERIAL INFORMATION
**CONF ALL
A. MATERIAL - PRICE AND AVAILABILITY
(1) Procurement Addresses
Customers with aircraft shown in the effectivity of this Service Bulletin should send a
purchase order to AIRBUS. Quote the number of this Service Bulletin. The address is:
Kit 572105A01R00
Kit 572105A02R00
Kit 572105A03R00
AIRBUS Material, Logistics and Suppliers
ATP II B
Hein-Sass-Weg 24
21129 HAMBURG
GERMANY
For ordering by internet:
http://spares.airbus.com
For ordering by E-mail: airbus.kit@airbus.com
Telephone Hotlines:
A330/340, A300/310: +49 40 743 51616
(2) Price and Availability
Kit 572105A01R00
Cost
 12,100.00 USD
Availability
 320 calendar days from receipt of order
The availability given above is the standard lead time from the date of your purchase
order. If items are required before this time, please include a retrofit planning schedule
with your order so that we can try to comply with your requirements.
The sales terms (costs and availability) are estimated in relation to economic conditions.
The latest valid price and lead time for ordering purposes shall be obtained through the
AirbusSpares portal or through a request for quotation to airbus.kit@airbus.com.
Kit 572105A02R00
Cost
 11,300.00 USD
Availability
 320 calendar days from receipt of order
The availability given above is the standard lead time from the date of your purchase
order. If items are required before this time, please include a retrofit planning schedule
with your order so that we can try to comply with your requirements.
The sales terms (costs and availability) are estimated in relation to economic conditions.
The latest valid price and lead time for ordering purposes shall be obtained through the
AirbusSpares portal or through a request for quotation to airbus.kit@airbus.com.
Kit 572105A03R00
Cost
 12,000.00 USD
Availability
 320 calendar days from receipt of order
DATE: Nov 23/16 SERVICE BULLETIN No.: A310-57-2105
REVISION No.: 00 - Nov 23/16 Page: 11
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 18

@A310
SERVICE BULLETIN
The availability given above is the standard lead time from the date of your purchase
order. If items are required before this time, please include a retrofit planning schedule
with your order so that we can try to comply with your requirements.
The sales terms (costs and availability) are estimated in relation to economic conditions.
The latest valid price and lead time for ordering purposes shall be obtained through the
AirbusSpares portal or through a request for quotation to airbus.kit@airbus.com.
B. INDUSTRY SUPPORT INFORMATION
AIRBUS will not provide industry support for accomplishment of this Service Bulletin.
C. LIST OF COMPONENTS
Kit 572105A01R00
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 ITEM
 OLD PART N˚
 INT
 SEE
NOTES
10
 EN6114V8Y18
 9
 BOLT
11
 EN6114V8Y19
 11
 BOLT
12
 EN6114V8Y20
 2
 BOLT
14
 EN6114V8Y22
 1
 BOLT
15
 EN6114V8Y23
 1
 BOLT
16
 EN6114V8Y24
 1
 BOLT
17
 EN6114V8Y25
 3
 BOLT
18
 EN6114V8Y26
 1
 BOLT
19
 EN6114V8Y27
 2
 BOLT
20
 EN6114V8Y28
 2
 BOLT
21
 EN6114V8Y29
 2
 BOLT
22
 EN6114V8Y30
 2
 BOLT
23
 EN6114V8Y31
 1
 BOLT
24
 EN6114V8Y32
 2
 BOLT
26
 EN6114V8Y34
 2
 BOLT
31
 ASNA2531-8
 6
 NUT
32
 ASNA2532-8
 36
 NUT
33
 NAS1149D0863K
 2
 WASHER
NOTE
: If you find part numbers of hardware components in the related kit(s) which
you cannot identify in the LIST OF COMPONENTS of this Service Bulletin,
refer to Standards Manual (SM). The SM will give you the correct part number
to part number relationship.
Kit 572105A02R00
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 ITEM
 OLD PART N˚
 INT
 SEE
NOTES
11
 EN6114V8Y19
 18
 BOLT
12
 EN6114V8Y20
 3
 BOLT
14
 EN6114V8Y22
 1
 BOLT
15
 EN6114V8Y23
 2
 BOLT
17
 EN6114V8Y25
 3
 BOLT
DATE: Nov 23/16 SERVICE BULLETIN No.: A310-57-2105
REVISION No.: 00 - Nov 23/16 Page: 12
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 19

@A310
SERVICE BULLETIN
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 ITEM
 OLD PART N˚
 INT
 SEE
NOTES
18
 EN6114V8Y26
 1
 BOLT
19
 EN6114V8Y27
 1
 BOLT
20
 EN6114V8Y28
 3
 BOLT
21
 EN6114V8Y29
 1
 BOLT
22
 EN6114V8Y30
 2
 BOLT
23
 EN6114V8Y31
 2
 BOLT
24
 EN6114V8Y32
 1
 BOLT
26
 EN6114V8Y34
 4
 BOLT
31
 ASNA2531-8
 6
 NUT
32
 ASNA2532-8
 36
 NUT
NOTE
: If you find part numbers of hardware components in the related kit(s) which
you cannot identify in the LIST OF COMPONENTS of this Service Bulletin,
refer to Standards Manual (SM). The SM will give you the correct part number
to part number relationship.
Kit 572105A03R00
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 ITEM
 OLD PART N˚
 INT
 SEE
NOTES
10
 EN6114V8Y18
 12
 BOLT
11
 EN6114V8Y19
 9
 BOLT
13
 EN6114V8Y21
 1
 BOLT
14
 EN6114V8Y22
 2
 BOLT
16
 EN6114V8Y24
 3
 BOLT
17
 EN6114V8Y25
 1
 BOLT
18
 EN6114V8Y26
 1
 BOLT
19
 EN6114V8Y27
 2
 BOLT
20
 EN6114V8Y28
 2
 BOLT
21
 EN6114V8Y29
 2
 BOLT
22
 EN6114V8Y30
 2
 BOLT
23
 EN6114V8Y31
 1
 BOLT
24
 EN6114V8Y32
 2
 BOLT
26
 EN6114V8Y34
 2
 BOLT
31
 ASNA2531-8
 6
 NUT
32
 ASNA2532-8
 36
 NUT
33
 NAS1149D0863K
 2
 WASHER
NOTE
: If you find part numbers of hardware components in the related kit(s) which
you cannot identify in the LIST OF COMPONENTS of this Service Bulletin,
refer to Standards Manual (SM). The SM will give you the correct part number
to part number relationship.
DATE: Nov 23/16 SERVICE BULLETIN No.: A310-57-2105
REVISION No.: 00 - Nov 23/16 Page: 13
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 20

@A310
SERVICE BULLETIN
D. LIST OF MATERIALS - OPERATOR SUPPLIED
(1) Consumable Materials
Consumable CMLA01
ITEM
 DESCRIPTION
 REFERENCE TO CML
MAT. No.
QTY PER A/C
 SEE
NOTES
Primer Polyurethane Paint--
Corrosion Inhibiting
04EAC2
 As required
Top Coat Polyurethane-- External
Structure
04JAA3
 As required
Polysulfide Sealant-Fuel Tank
Brushable
06ABA1
 As required
Polysulfide Sealant-Fuel Tank Fillet
 06ABB1
 As required
Non Aqueous Cleaner-General
 08BAA9
 As required
Textile-Lint Free Cotton
 14SBA1
 As required
(2) Components
None
(3) Equipment
None
E. PARTS TO BE RE-IDENTIFIED BY OPERATOR
None
F. TOOLING
(1) Tooling - Price and Availability
(a) Procurement Addresses
Operators interested in obtaining the Fatigue Technology Inc. (FTI) tool kit should
contact:
Standard tool TOOLA01
 Fatigue Technology Inc.
401 Andover Park East
SEATTLE,
WA 98188-7605
USA
Internet: http://www.fatiguetech.com
Phone: (206) 2462010
Fax: (206) 2449886
Operators interested in obtaining the West Coast Industries Inc. (WCI) tool kit
should contact:
DATE: Nov 23/16 SERVICE BULLETIN No.: A310-57-2105
REVISION No.: 00 - Nov 23/16 Page: 14
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 21

@A310
SERVICE BULLETIN
Standard tool TOOLA02
 West Coast Industries Inc.
14900 Whitman Ave. N
Seattle, Washington 98133
USA
Phone: (206) 365-7513
Fax: (206) 365-7483
Email: info@coldwork.com
Europe, Middle-east, Africa, India and Russia:
customer@capaero.com / +33 5 61 92 04 91
(France)
(b) Price and Availability
Standard tool TOOLA01
Procurement to be negotiated directly with Fatigue Technology Inc. (FTI).
Standard tool TOOLA02
Procurement to be negotiated directly with West Coast Industries Inc. (WCI).
(2) Tools
NOTE
: To accomplish this Service Bulletin it is necessary to use the tools listed
in the subsequent referenced task:
- NTM 51-10-01, Page Block 601
- AMM 28-10-00, Page Block 301
- AMM 28-11-22, Page Block 401
Standard tool TOOLA01
ITEM
 TOOL N˚
 TOOL NAME
 QTY
 SEE
NOTES
DKA310572105-1
 Durable Tooling
 1
 (1)
EKA310572105-1
 Expendable Tooling
 1
 (2)
FTIA310572105-1
 Capital Tooling
 1
 (3)
NOTE
: The above list of components is not an AIRBUS Kit, the required parts
shall be ordered as necessary through the given channel.
NOTE
: FTI has allocated the following tool kit numbers for cold expansion:
For the definition of capital, durable and expendable tools refer to ISI
51.48.00001.
NOTE
 (1)
: Durable tooling: DK-A310-57-2105-1
DATE: Nov 23/16 SERVICE BULLETIN No.: A310-57-2105
REVISION No.: 00 - Nov 23/16 Page: 15
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 22

@A310
SERVICE BULLETIN
The durable tool kit contains the minimum quantity of durable tools
necessary to accomplish the Service Bulletin on one aircraft. If the
Service Bulletin is to be accomplished on more than one aircraft, the
number of durable kits required can be established by reference to ISI
51.48.00001.
NOTE
 (2)
: Expendable tooling. Ref: EK-A310-57-2105-1
The expendable tool kit contains the quantity for expendable tools
required to accomplish the Service Bulletin on one aircraft. Order one
expendable tool kit for every aircraft on which this Service Bulletin is to
be accomplished.
NOTE
 (3)
: Capital tooling: FTI-A310-57-2105-1
The capital tools provided in this kit are not specific to this Service
Bulletin and are normally already available in operator’s stock as long-
term investment or can be loaned from FTI.
Standard tool TOOLA02
ITEM
 TOOL N˚
 TOOL NAME
 QTY
 SEE
NOTES
DKA310572105-1
 Durable Tooling
 1
 (1)
EKA310572105-1
 Expendable Tooling
 1
 (2)
WCIA310572105-1
 Capital Tooling
 1
 (3)
NOTE
: The above list of components is not an AIRBUS Kit, the required parts
shall be ordered as necessary through the given channel.
NOTE
: WCI has allocated the following tool kit numbers for cold expansion:
For the definition of capital, durable and expendable tools refer to ISI
51.48.00001.
NOTE
 (1)
: Durable tooling: DK-A310-57-2105-1
The durable tool kit contains the minimum quantity of durable tools
necessary to accomplish the Service Bulletin on one aircraft. If the
Service Bulletin is to be accomplished on more than one aircraft, the
number of durable kits required can be established by reference to ISI
51.48.00001.
NOTE
 (2)
: Expendable tooling. Ref: EK-A310-57-2105-1
The expendable tool kit contains the quantity for expendable tools
required to accomplish the Service Bulletin on one aircraft. Order one
expendable tool kit for every aircraft on which this Service Bulletin is to
be accomplished.
NOTE
 (3)
: Capital tooling: WCI-A310-57-2105-1
DATE: Nov 23/16 SERVICE BULLETIN No.: A310-57-2105
REVISION No.: 00 - Nov 23/16 Page: 16
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 23

@A310
SERVICE BULLETIN
The capital tools provided in this kit are not specific to this Service
Bulletin and are normally already available in operator’s stock as long-
term investment or can be loaned from WCI.
(3) Special Tools
None
DATE: Nov 23/16 SERVICE BULLETIN No.: A310-57-2105
REVISION No.: 00 - Nov 23/16 Page: 17
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 24

@A310
SERVICE BULLETIN
This Page Intentionally Left Blank
DATE: Nov 23/16 SERVICE BULLETIN No.: A310-57-2105
REVISION No.: 00 - Nov 23/16 Page: 18
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 25

@A310
SERVICE BULLETIN
3. ACCOMPLISHMENT INSTRUCTIONS
Task 572105-831-801-001 - Cold Work the Lower Tee Fitting Fastener Holes, on the Wing
Side
WARNING
: MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND ALL THE CAUTIONS
INCLUDED IN THE REFERENCED PROCEDURES.
CAUTION
: ALWAYS OBEY THE PRECAUTIONS THAT FOLLOW TO KEEP
ELECTRICAL WIRING IN A SATISFACTORY CONDITION (ELECTRICALLY
AND MECHANICALLY SERVICEABLE) . WHEN YOU DO MAINTENANCE
WORK, REPAIRS OR MODIFICATIONS, ALWAYS KEEP ELECTRICAL WIRING,
COMPONENTS AND THE WORK AREA AS CLEAN AS POSSIBLE. TO DO
THIS:
- PUT PROTECTION, SUCH AS PLASTIC SHEETING, CLOTHS, ETC; AS
NECESSARY ON WIRING AND COMPONENTS.
- REGULARLY REMOVE ALL SHAVINGS, UNWANTED MATERIAL AND
OTHER CONTAMINATION.
THESE PRECAUTIONS WILL DECREASE THE RISK OF CONTAMINATION
AND DAMAGE TO THE ELECTRICAL WIRING INSTALLATION.
IF THERE IS CONTAMINATION REFER TO ESPM 20-55-00.
NOTE
: The accomplishment instructions of this Service Bulletin include procedures given
in other documents or in other sections of the Service Bulletin. When the words
’refer to’ are used and the operator has a procedure accepted by the local authority
he belongs to, the accepted alternative procedure can be used. When the words ’in
accordance with’ are used then the given procedure must be followed.
NOTE
: The access and close-up instructions, not comprising return to service tests, in this
Service Bulletin do not constitute or affect the technical intent of the Service
Bulletin. Operators can therefore, as deemed necessary, omit or add access and/or
close-up steps to add flexibility to their maintenance operations as long as the
technical intent of the Service Bulletin is met within the set parameters.
NOTE
: Manual titles given in the accomplishment instructions are referred to by acronyms.
Refer to paragraph 1.J., References, for the definition of acronyms.
NOTE
: This Service Bulletin is classified mandatory or expected to be classified mandatory
by an Airworthiness Directive (AD). The paragraphs 3.C. and 3.D. in these
accomplishment instructions are Required for Compliance (RC) and must be done
to comply with the AD. Other paragraphs are recommended and may be deviated
from, done as part of other actions or done with accepted methods different from
those given in the Service Bulletin, as long as the RC paragraphs can be done and
the aircraft can be put back into a serviceable condition.
NOTE
: This Service Bulletin contains the instructions for the on-aircraft maintenance
necessary to ensure the continued airworthiness of the aircraft.
For any deviations to the instructions contained herein, contact Airbus for repair
DATE: Nov 23/16 SERVICE BULLETIN No.: A310-57-2105
REVISION No.: 00 - Nov 23/16 Page: 19
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 26

@A310
SERVICE BULLETIN
instructions and approval.
NOTE
: Discarded parts must be managed at the operator’s discretion.
Task Associated Data
**CONF 001
Zone
540 640
Access
Panel
 540AB 640AB
Manpower
TOTAL MANHOURS
 66.00
ELAPSED TIME (HOURS)
 18.00
**CONF 002
Zone
540 640
Access
Panel
 540AB 640AB
Manpower
TOTAL MANHOURS
 66.00
ELAPSED TIME (HOURS)
 18.00
**CONF 003
Zone
540 640
Access
Panel
 540AB 640AB
Manpower
TOTAL MANHOURS
 66.00
ELAPSED TIME (HOURS)
 18.00
**CONF 004
Zone
540 640
Access
Panel
 540AB 640AB
Manpower
TOTAL MANHOURS
 66.00
ELAPSED TIME (HOURS)
 18.00
DATE: Nov 23/16 SERVICE BULLETIN No.: A310-57-2105
REVISION No.: 00 - Nov 23/16 Page: 20
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 27

@A310
SERVICE BULLETIN
**CONF ALL
A. GENERAL
**CONF 001
(1) Subtask 572105-910-001-001 - Standard Practices
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 06-21-00, Page Block 001
06-31-53, Page Block 001
06-41-00, Page Block 001
20-16-00, Page Block 201
20-21-12, Page Block 001
Structural Repair Manual (SRM)
 51-23-00
51-24-00
51-24-00
51-40-00
51-40-20
51-40-30
51-40-40
51-40-41
51-40-46
(a) For the identification of zones, refer to AMM 06-21-00, Page Block 001.
(b) For the Frame (FR) identification, refer to AMM 06-31-53, Page Block 001.
(c) For the identification of access panels, refer to AMM 06-41-00, Page Block 001.
(d) For circuit breaker safety practices, refer to AMM 20-16-00, Page Block 201.
(e) For the specification of the materials (Mat. No.) given in this Service Bulletin, refer
to the Consumable Materials List (CML).
(f) Put all the retained hardware in identified plastic bags and attach the bags to the
related unit.
(g) Remove and install fasteners in accordance with SRM 51-40-20.
(h) To torque and tighten the standard threaded fasteners, refer to AMM 20-21-12,
Page Block 001.
(i) Obtain fastener hole diameters and drill data in accordance with SRM 51-40-40.
(j) Obtain alternative and substitute fastener data in accordance with SRM 51-40-30.
(k) If alternative and substitute fasteners have to be used, you must make sure that the
associated nut/collar are compatible in accordance with SRM 51-40-00 ’Mating Part’
column.
DATE: Nov 23/16 SERVICE BULLETIN No.: A310-57-2105
REVISION No.: 00 - Nov 23/16 Page: 21
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 28

@A310
SERVICE BULLETIN
(l) If the length of any fastener specified in this Service Bulletin does not meet
installation standards given in SRM, Chapter 51, then a fastener of the same
specification, or an approved substitute, with a length which meets the installation
standards given in SRM, Chapter 51 may be used. In addition, washers may be
installed for fasteners grip length in accordance with SRM, Chapter 51.
(m) Obtain the countersinking data in accordance with SRM 51-40-46.
(n) Do the cold expansion of fastener holes in accordance with SRM 51-40-41.
(o) Apply sealant in accordance with SRM 51-24-00.
(p) Renew the protective finish in accordance with SRM 51-23-00.
(2) Subtask 572105-839-001-001 - Administrative
Manpower Resources
Skills
 NON SPECIFIC
Write in the applicable aircraft records that you have done all the work given in this
Service Bulletin.
**CONF 002
(1) Subtask 572105-910-001-001 - Standard Practices
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 06-21-00, Page Block 001
06-31-53, Page Block 001
06-41-00, Page Block 001
20-16-00, Page Block 201
20-21-12, Page Block 001
Structural Repair Manual (SRM)
 51-23-00
51-24-00
51-24-00
51-40-00
51-40-20
51-40-30
51-40-40
51-40-41
51-40-46
(a) For the identification of zones, refer to AMM 06-21-00, Page Block 001.
(b) For the Frame (FR) identification, refer to AMM 06-31-53, Page Block 001.
(c) For the identification of access panels, refer to AMM 06-41-00, Page Block 001.
(d) For circuit breaker safety practices, refer to AMM 20-16-00, Page Block 201.
DATE: Nov 23/16 SERVICE BULLETIN No.: A310-57-2105
REVISION No.: 00 - Nov 23/16 Page: 22
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 29

@A310
SERVICE BULLETIN
(e) For the specification of the materials (Mat. No.) given in this Service Bulletin, refer
to the Consumable Materials List (CML).
(f) Put all the retained hardware in identified plastic bags and attach the bags to the
related unit.
(g) Remove and install fasteners in accordance with SRM 51-40-20.
(h) To torque and tighten the standard threaded fasteners, refer to AMM 20-21-12,
Page Block 001.
(i) Obtain fastener hole diameters and drill data in accordance with SRM 51-40-40.
(j) Obtain alternative and substitute fastener data in accordance with SRM 51-40-30.
(k) If alternative and substitute fasteners have to be used, you must make sure that the
associated nut/collar are compatible in accordance with SRM 51-40-00 ’Mating Part’
column.
(l) If the length of any fastener specified in this Service Bulletin does not meet
installation standards given in SRM, Chapter 51, then a fastener of the same
specification, or an approved substitute, with a length which meets the installation
standards given in SRM, Chapter 51 may be used. In addition, washers may be
installed for fasteners grip length in accordance with SRM, Chapter 51.
(m) Obtain the countersinking data in accordance with SRM 51-40-46.
(n) Do the cold expansion of fastener holes in accordance with SRM 51-40-41.
(o) Apply sealant in accordance with SRM 51-24-00.
(p) Renew the protective finish in accordance with SRM 51-23-00.
(2) Subtask 572105-839-001-001 - Administrative
Manpower Resources
Skills
 NON SPECIFIC
Write in the applicable aircraft records that you have done all the work given in this
Service Bulletin.
**CONF 003
(1) Subtask 572105-910-001-001 - Standard Practices
Manpower Resources
Skills
 NON SPECIFIC
DATE: Nov 23/16 SERVICE BULLETIN No.: A310-57-2105
REVISION No.: 00 - Nov 23/16 Page: 23
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 30

@A310
SERVICE BULLETIN
References
Aircraft Maintenance Manual (AMM)
 06-21-00, Page Block 001
06-31-53, Page Block 001
06-41-00, Page Block 001
20-16-00, Page Block 201
20-21-12, Page Block 001
Structural Repair Manual (SRM)
 51-23-00
51-24-00
51-24-00
51-40-00
51-40-20
51-40-30
51-40-40
51-40-41
51-40-46
(a) For the identification of zones, refer to AMM 06-21-00, Page Block 001.
(b) For the Frame (FR) identification, refer to AMM 06-31-53, Page Block 001.
(c) For the identification of access panels, refer to AMM 06-41-00, Page Block 001.
(d) For circuit breaker safety practices, refer to AMM 20-16-00, Page Block 201.
(e) For the specification of the materials (Mat. No.) given in this Service Bulletin, refer
to the Consumable Materials List (CML).
(f) Put all the retained hardware in identified plastic bags and attach the bags to the
related unit.
(g) Remove and install fasteners in accordance with SRM 51-40-20.
(h) To torque and tighten the standard threaded fasteners, refer to AMM 20-21-12,
Page Block 001.
(i) Obtain fastener hole diameters and drill data in accordance with SRM 51-40-40.
(j) Obtain alternative and substitute fastener data in accordance with SRM 51-40-30.
(k) If alternative and substitute fasteners have to be used, you must make sure that the
associated nut/collar are compatible in accordance with SRM 51-40-00 ’Mating Part’
column.
(l) If the length of any fastener specified in this Service Bulletin does not meet
installation standards given in SRM, Chapter 51, then a fastener of the same
specification, or an approved substitute, with a length which meets the installation
standards given in SRM, Chapter 51 may be used. In addition, washers may be
installed for fasteners grip length in accordance with SRM, Chapter 51.
(m) Obtain the countersinking data in accordance with SRM 51-40-46.
(n) Do the cold expansion of fastener holes in accordance with SRM 51-40-41.
DATE: Nov 23/16 SERVICE BULLETIN No.: A310-57-2105
REVISION No.: 00 - Nov 23/16 Page: 24
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 31

@A310
SERVICE BULLETIN
(o) Apply sealant in accordance with SRM 51-24-00.
(p) Renew the protective finish in accordance with SRM 51-23-00.
(2) Subtask 572105-839-001-001 - Administrative
Manpower Resources
Skills
 NON SPECIFIC
Write in the applicable aircraft records that you have done all the work given in this
Service Bulletin.
**CONF 004
(1) Subtask 572105-910-001-001 - Standard Practices
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 06-21-00, Page Block 001
06-31-53, Page Block 001
06-41-00, Page Block 001
20-16-00, Page Block 201
20-21-12, Page Block 001
Structural Repair Manual (SRM)
 51-23-00
51-24-00
51-24-00
51-40-00
51-40-20
51-40-30
51-40-40
51-40-41
51-40-46
(a) For the identification of zones, refer to AMM 06-21-00, Page Block 001.
(b) For the Frame (FR) identification, refer to AMM 06-31-53, Page Block 001.
(c) For the identification of access panels, refer to AMM 06-41-00, Page Block 001.
(d) For circuit breaker safety practices, refer to AMM 20-16-00, Page Block 201.
(e) For the specification of the materials (Mat. No.) given in this Service Bulletin, refer
to the Consumable Materials List (CML).
(f) Put all the retained hardware in identified plastic bags and attach the bags to the
related unit.
(g) Remove and install fasteners in accordance with SRM 51-40-20.
(h) To torque and tighten the standard threaded fasteners, refer to AMM 20-21-12,
Page Block 001.
DATE: Nov 23/16 SERVICE BULLETIN No.: A310-57-2105
REVISION No.: 00 - Nov 23/16 Page: 25
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 32

@A310
SERVICE BULLETIN
(i) Obtain fastener hole diameters and drill data in accordance with SRM 51-40-40.
(j) Obtain alternative and substitute fastener data in accordance with SRM 51-40-30.
(k) If alternative and substitute fasteners have to be used, you must make sure that the
associated nut/collar are compatible in accordance with SRM 51-40-00 ’Mating Part’
column.
(l) If the length of any fastener specified in this Service Bulletin does not meet
installation standards given in SRM, Chapter 51, then a fastener of the same
specification, or an approved substitute, with a length which meets the installation
standards given in SRM, Chapter 51 may be used. In addition, washers may be
installed for fasteners grip length in accordance with SRM, Chapter 51.
(m) Obtain the countersinking data in accordance with SRM 51-40-46.
(n) Do the cold expansion of fastener holes in accordance with SRM 51-40-41.
(o) Apply sealant in accordance with SRM 51-24-00.
(p) Renew the protective finish in accordance with SRM 51-23-00.
(2) Subtask 572105-839-001-001 - Administrative
Manpower Resources
Skills
 NON SPECIFIC
Write in the applicable aircraft records that you have done all the work given in this
Service Bulletin.
**CONF ALL
B. PREPARATION
**CONF 001
(1) Subtask 572105-941-001-001 - Job Set-up
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 24-00-00, Page Block 301
28-00-00, Page Block 301
28-10-00, Page Block 301
28-11-22, Page Block 401
28-25-00, Page Block 301
NOTE
: The items given in this note shall be considered as the basic Aircraft
configuration before you start a maintenance task:
- Aircraft on the ground resting on landing gear (the ground safety
locks and the wheel chocks are in position on the landing gear)
DATE: Nov 23/16 SERVICE BULLETIN No.: A310-57-2105
REVISION No.: 00 - Nov 23/16 Page: 26
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 33

@A310
SERVICE BULLETIN
- Engine shut down, thrust reversers closed and locked
- Aircraft in clean configuration
- Parking brake applied
- Aircraft electrical network de-energized
- Hydraulic system s depressurized
- Access to the cockpit and cabin is available
- All circuit breakers are in closed position
- All controls in NORM, AUTO or OFF position.
(a) Make sure that the aircraft is electrically grounded, refer to AMM 24-00-00, Page
Block 301.
(b) Defuel the necessary fuel tanks, refer to AMM 28-25-00, Page Block 301.
(c) Degas and ventilate the tank, refer to AMM 28-00-00, Page Block 301 and AMM
28-10-00, Page Block 301.
(d) Put an access platform in position at zones 510 and 610.
(e) Remove the wing tank manholes 540AB and 640AB, refer to AMM 28-11-22, Page
Block 401.
**CONF 002
(1) Subtask 572105-941-001-001 - Job Set-up
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 24-00-00, Page Block 301
28-00-00, Page Block 301
28-10-00, Page Block 301
28-11-22, Page Block 401
28-25-00, Page Block 301
NOTE
: The items given in this note shall be considered as the basic Aircraft
configuration before you start a maintenance task:
- Aircraft on the ground resting on landing gear (the ground safety
locks and the wheel chocks are in position on the landing gear)
- Engine shut down, thrust reversers closed and locked
- Aircraft in clean configuration
DATE: Nov 23/16 SERVICE BULLETIN No.: A310-57-2105
REVISION No.: 00 - Nov 23/16 Page: 27
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 34

@A310
SERVICE BULLETIN
- Parking brake applied
- Aircraft electrical network de-energized
- Hydraulic system s depressurized
- Access to the cockpit and cabin is available
- All circuit breakers are in closed position
- All controls in NORM, AUTO or OFF position.
(a) Make sure that the aircraft is electrically grounded, refer to AMM 24-00-00, Page
Block 301.
(b) Defuel the necessary fuel tanks, refer to AMM 28-25-00, Page Block 301.
(c) Degas and ventilate the tank, refer to AMM 28-00-00, Page Block 301 and AMM
28-10-00, Page Block 301.
(d) Put an access platform in position at zones 510 and 610.
(e) Remove the wing tank manholes 540AB and 640AB, refer to AMM 28-11-22, Page
Block 401.
**CONF 003
(1) Subtask 572105-941-001-001 - Job Set-up
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 24-00-00, Page Block 301
28-00-00, Page Block 301
28-10-00, Page Block 301
28-11-22, Page Block 401
28-25-00, Page Block 301
NOTE
: The items given in this note shall be considered as the basic Aircraft
configuration before you start a maintenance task:
- Aircraft on the ground resting on landing gear (the ground safety
locks and the wheel chocks are in position on the landing gear)
- Engine shut down, thrust reversers closed and locked
- Aircraft in clean configuration
- Parking brake applied
- Aircraft electrical network de-energized
DATE: Nov 23/16 SERVICE BULLETIN No.: A310-57-2105
REVISION No.: 00 - Nov 23/16 Page: 28
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 35

@A310
SERVICE BULLETIN
- Hydraulic system s depressurized
- Access to the cockpit and cabin is available
- All circuit breakers are in closed position
- All controls in NORM, AUTO or OFF position.
(a) Make sure that the aircraft is electrically grounded, refer to AMM 24-00-00, Page
Block 301.
(b) Defuel the necessary fuel tanks, refer to AMM 28-25-00, Page Block 301.
(c) Degas and ventilate the tank, refer to AMM 28-00-00, Page Block 301 and AMM
28-10-00, Page Block 301.
(d) Put an access platform in position at zones 510 and 610.
(e) Remove the wing tank manholes 540AB and 640AB, refer to AMM 28-11-22, Page
Block 401.
**CONF 004
(1) Subtask 572105-941-001-001 - Job Set-up
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 24-00-00, Page Block 301
28-00-00, Page Block 301
28-10-00, Page Block 301
28-11-22, Page Block 401
28-25-00, Page Block 301
NOTE
: The items given in this note shall be considered as the basic Aircraft
configuration before you start a maintenance task:
- Aircraft on the ground resting on landing gear (the ground safety
locks and the wheel chocks are in position on the landing gear)
- Engine shut down, thrust reversers closed and locked
- Aircraft in clean configuration
- Parking brake applied
- Aircraft electrical network de-energized
- Hydraulic system s depressurized
- Access to the cockpit and cabin is available
DATE: Nov 23/16 SERVICE BULLETIN No.: A310-57-2105
REVISION No.: 00 - Nov 23/16 Page: 29
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 36

@A310
SERVICE BULLETIN
- All circuit breakers are in closed position
- All controls in NORM, AUTO or OFF position.
(a) Make sure that the aircraft is electrically grounded, refer to AMM 24-00-00, Page
Block 301.
(b) Defuel the necessary fuel tanks, refer to AMM 28-25-00, Page Block 301.
(c) Degas and ventilate the tank, refer to AMM 28-00-00, Page Block 301 and AMM
28-10-00, Page Block 301.
(d) Put an access platform in position at zones 510 and 610.
(e) Remove the wing tank manholes 540AB and 640AB, refer to AMM 28-11-22, Page
Block 401.
**CONF ALL
C. PROCEDURE
NOTE
: It is allowed to perform the modification on the LH and RH side at the same
time.
**CONF 001
(1) Subtask 572105-831-001-001 - Cold Work the Lower Tee Fitting Fastener Holes
between FR40 and FR47, on the LH Side
Work Zones and Access Panels
Zone
 Access/Work location
540
 Access
 Panel 540AB
Work location
 from Frame 40 to Frame 47
Manpower Resources
Manhours
 30.00
Minimum number of person
 2
Subtask elapsed time
 15.00
Skills
 AIRFRAME
Material necessary to do the job
Kit 572105A01R00
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 SEE
NOTES
10
 EN6114V8Y18
 9
 BOLT
11
 EN6114V8Y19
 11
 BOLT
12
 EN6114V8Y20
 2
 BOLT
14
 EN6114V8Y22
 1
 BOLT
15
 EN6114V8Y23
 1
 BOLT
16
 EN6114V8Y24
 1
 BOLT
DATE: Nov 23/16 SERVICE BULLETIN No.: A310-57-2105
REVISION No.: 00 - Nov 23/16 Page: 30
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 37

@A310
SERVICE BULLETIN
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 SEE
NOTES
17
 EN6114V8Y25
 3
 BOLT
18
 EN6114V8Y26
 1
 BOLT
19
 EN6114V8Y27
 2
 BOLT
20
 EN6114V8Y28
 2
 BOLT
21
 EN6114V8Y29
 2
 BOLT
22
 EN6114V8Y30
 2
 BOLT
23
 EN6114V8Y31
 1
 BOLT
24
 EN6114V8Y32
 2
 BOLT
26
 EN6114V8Y34
 2
 BOLT
31
 ASNA2531-8
 6
 NUT
32
 ASNA2532-8
 36
 NUT
33
 NAS1149D0863K
 2
 WASHER
Consumable CMLA01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Primer Polyurethane Paint--
Corrosion Inhibiting
04EAC2
 As required
Top Coat Polyurethane--
External Structure
04JAA3
 As required
Polysulfide Sealant-Fuel
Tank Brushable
06ABA1
 As required
Polysulfide Sealant-Fuel
Tank Fillet
06ABB1
 As required
Non Aqueous Cleaner-
General
08BAA9
 As required
Textile-Lint Free Cotton
 14SBA1
 As required
Standard tool TOOLA01
ITEM
 TOOL N˚
 TOOL NAME
 QTY
 SEE
NOTES
DKA310572105-1
 Durable Tooling
 1
 (1)
EKA310572105-1
 Expendable Tooling
 1
 (2)
FTIA310572105-1
 Capital Tooling
 1
 (3)
NOTE
: The above list of components is not an AIRBUS Kit, the required parts
shall be ordered as necessary through the given channel.
NOTE
: FTI has allocated the following tool kit numbers for cold expansion:
For the definition of capital, durable and expendable tools refer to ISI
51.48.00001.
NOTE
 (1)
: Durable tooling: DK-A310-57-2105-1
DATE: Nov 23/16 SERVICE BULLETIN No.: A310-57-2105
REVISION No.: 00 - Nov 23/16 Page: 31
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 38

@A310
SERVICE BULLETIN
The durable tool kit contains the minimum quantity of durable tools
necessary to accomplish the Service Bulletin on one aircraft. If the
Service Bulletin is to be accomplished on more than one aircraft, the
number of durable kits required can be established by reference to ISI
51.48.00001.
NOTE
 (2)
: Expendable tooling. Ref: EK-A310-57-2105-1
The expendable tool kit contains the quantity for expendable tools
required to accomplish the Service Bulletin on one aircraft. Order one
expendable tool kit for every aircraft on which this Service Bulletin is to
be accomplished.
NOTE
 (3)
: Capital tooling: FTI-A310-57-2105-1
The capital tools provided in this kit are not specific to this Service
Bulletin and are normally already available in operator’s stock as long-
term investment or can be loaned from FTI.
Standard tool TOOLA02
ITEM
 TOOL N˚
 TOOL NAME
 QTY
 SEE
NOTES
DKA310572105-1
 Durable Tooling
 1
 (1)
EKA310572105-1
 Expendable Tooling
 1
 (2)
WCIA310572105-1
 Capital Tooling
 1
 (3)
NOTE
: The above list of components is not an AIRBUS Kit, the required parts
shall be ordered as necessary through the given channel.
NOTE
: WCI has allocated the following tool kit numbers for cold expansion:
For the definition of capital, durable and expendable tools refer to ISI
51.48.00001.
NOTE
 (1)
: Durable tooling: DK-A310-57-2105-1
The durable tool kit contains the minimum quantity of durable tools
necessary to accomplish the Service Bulletin on one aircraft. If the
Service Bulletin is to be accomplished on more than one aircraft, the
number of durable kits required can be established by reference to ISI
51.48.00001.
NOTE
 (2)
: Expendable tooling. Ref: EK-A310-57-2105-1
The expendable tool kit contains the quantity for expendable tools
required to accomplish the Service Bulletin on one aircraft. Order one
expendable tool kit for every aircraft on which this Service Bulletin is to
be accomplished.
NOTE
 (3)
: Capital tooling: WCI-A310-57-2105-1
The capital tools provided in this kit are not specific to this Service
Bulletin and are normally already available in operator’s stock as long-
term investment or can be loaned from WCI.
DATE: Nov 23/16 SERVICE BULLETIN No.: A310-57-2105
REVISION No.: 00 - Nov 23/16 Page: 32
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 39

@A310
SERVICE BULLETIN
References
Aircraft Maintenance Manual (AMM)
 20-21-12, Page Block 001
Non Destructive Test Manual (NTM)
 51-10-01, Page Block 601
Structural Repair Manual (SRM)
 51-23-00
51-24-00
51-40-20
51-40-41
51-40-44
51-40-46
Fig. A-FBAAA
Cold Working of the Lower Tee Fitting
Fastener Holes, on the Wing Side
Sheet 01
Sheet 02
Sheet 03
Sheet 04
Sheet 05
CAUTION
: ALL THE COLD WORKING STEPS ARE TO BE DONE ON ONE HOLE
OUT OF TWO PER SIDE AT THE SAME TIME. THIS IS TO PREVENT
DAMAGE TO THE AIRCRAFT.
(a) Cold work the lower Tee fitting fastener holes on the LH wing, between Frame 40
and Frame 47:
Refer to Fig. A-FBAAA
.
1
 Remove the fasteners, as shown on Fig. A-FBAAA Sheet 01
 , Views A and B
and Fig. A-FBAAA Sheet 02
 , View C, in accordance with SRM 51-40-20:
42 Bolt Item (1) Discard
42 Nut Item (2) Discard
2
 Remove the old sealant with a non metallic spatula.
3
 Clean the work area with:
Non Aqueous
Cleaner-General
08BAA9 As required
Textile-Lint Free
Cotton
14SBA1 As required
and if necessary, use a non metallic scraper.
4
 Do a rotating probe test of the fastener holes in accordance with NTM
51-10-01, Page Block 601, as shown on Fig. A-FBAAA Sheet 02
 ,V i e wC :
a
 In case of crack findings in the fastener holes, contact AIRBUS before
next flight and follow their instructions.
b
 In case of no crack findings, continue with the next workstep.
DATE: Nov 23/16 SERVICE BULLETIN No.: A310-57-2105
REVISION No.: 00 - Nov 23/16 Page: 33
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 40

@A310
SERVICE BULLETIN
5
 Do a check of the existing hole diameters and compare with the values given
on Fig. A-FBAAA Sheet 04
 and Fig. A-FBAAA Sheet 05
 :
a
 In case the existing hole diameter is more than or equal to the minimum
starting hole diameter, please contact AIRBUS for further instructions
before next flight.
b
 In case the hole diameter is less than the minimum starting hole
diameter, do the next step.
6
 Drill and ream the fastener holes to the correct starting hole diameter, as
shown on Fig. A-FBAAA Sheet 04
 and Fig. A-FBAAA Sheet 05
 and in
accordance with SRM 51-40-44 and SRM 51-40-41.
Refer to FTI Tool list No.:
DKA310572105-1 Durable Tooling 1
or
Refer to WCI Tool list No.:
DKA310572105-1 Durable Tooling 1
7
 Deburr and clean the drilled areas.
8
 Do the cold working of the 42 holes, in accordance with SRM 51-40-41, as
shown on Fig. A-FBAAA Sheet 03
 , Fig. A-FBAAA Sheet 04
 and Fig. A-FBAAA
Sheet 05
:
a
 Install the split sleeves as shown on Fig. A-FBAAA Sheet 03
 .
Refer to FTI Tool list No.:
EKA310572105-1 Expendable Tooling 1
or
Refer to WCI Tool list No.:
EKA310572105-1 Expendable Tooling 1
b
 Do a cold working of the 42 fastener holes in accordance with SRM
51-40-41.
Refer to FTI Tool list No.:
FTIA310572105-1 Capital Tooling 1
or
Refer to WCI Tool list No.:
WCIA310572105-1 Capital Tooling 1
DATE: Nov 23/16 SERVICE BULLETIN No.: A310-57-2105
REVISION No.: 00 - Nov 23/16 Page: 34
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 41

@A310
SERVICE BULLETIN
c
 Remove the split sleeves.
9
 Ream the cold worked holes to the final hole diameter, as shown on Fig. A-
FBAAA Sheet 03
 , Fig. A-FBAAA Sheet 04
 and Fig. A-FBAAA Sheet 05
 and in
accordance with SRM 51-40-41.
Refer to FTI Tool list No.:
DKA310572105-1 Durable Tooling 1
or
Refer to WCI Tool list No.:
DKA310572105-1 Durable Tooling 1
10
 Deburr and clean the drilled areas.
11
 Countersink the holes in accordance with SRM 51-40-46.
12
 Deburr and clean the countersunk holes.
13
 Wet install, as shown on Fig. A-FBAAA Sheet 01
 , Views A and B, Fig. A-
FBAAA Sheet 03
 ,V i e wD , Fig. A-FBAAA Sheet 04
 and Fig. A-FBAAA Sheet
05
, in accordance with SRM 51-40-20:
9 Bolt EN6114V8Y18 Item 10
11 Bolt EN6114V8Y19 Item 11
2 Bolt EN6114V8Y20 Item 12
1 Bolt EN6114V8Y22 Item 14
1 Bolt EN6114V8Y23 Item 15
1 Bolt EN6114V8Y24 Item 16
3 Bolt EN6114V8Y25 Item 17
1 Bolt EN6114V8Y26 Item 18
2 Bolt EN6114V8Y27 Item 19
2 Bolt EN6114V8Y28 Item 20
2 Bolt EN6114V8Y29 Item 21
2 Bolt EN6114V8Y30 Item 22
1 Bolt EN6114V8Y31 Item 23
2 Bolt EN6114V8Y32 Item 24
DATE: Nov 23/16 SERVICE BULLETIN No.: A310-57-2105
REVISION No.: 00 - Nov 23/16 Page: 35
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 42

@A310
SERVICE BULLETIN
2 Bolt EN6114V8Y34 Item 26
6 Nut ASNA2531-8 Item 31
36 Nut ASNA2532-8 Item 32
2 Washer NAS1149D0863K Item 33
with:
Polysulfide Sealant-
Fuel Tank
Brushable
06ABA1 As required
14
 Torque standard threaded fasteners, refer to AMM 20-21-12, Page Block 001.
15
 Protect the fasteners inside the wing, in accordance with SRM 51-23-00 and
SRM 51-24-00, with:
Primer
Polyurethane Paint-
- Corrosion
Inhibiting
04EAC2 As required
and
Polysulfide Sealant-
Fuel Tank Fillet
06ABB1 As required
16
 Protect the head of the fasteners, in accordance with SRM 51-23-00, with:
Primer
Polyurethane Paint-
- Corrosion
Inhibiting
04EAC2 As required
and
Top Coat
Polyurethane--
External Structure
04JAA3 As required
(2) Subtask 572105-831-002-001 - Cold Work the Lower Tee Fitting Fastener Holes
between FR40 and FR47, on the RH Side
Work Zones and Access Panels
Zone
 Access/Work location
640
 Access
 Panel 640AB
Work location
 from Frame 40 to Frame 47
DATE: Nov 23/16 SERVICE BULLETIN No.: A310-57-2105
REVISION No.: 00 - Nov 23/16 Page: 36
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 43

@A310
SERVICE BULLETIN
Manpower Resources
Manhours
 30.00
Minimum number of person
 2
Subtask elapsed time
 15.00
Skills
 AIRFRAME
Material necessary to do the job
Kit 572105A01R00
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 SEE
NOTES
10
 EN6114V8Y18
 9
 BOLT
11
 EN6114V8Y19
 11
 BOLT
12
 EN6114V8Y20
 2
 BOLT
14
 EN6114V8Y22
 1
 BOLT
15
 EN6114V8Y23
 1
 BOLT
16
 EN6114V8Y24
 1
 BOLT
17
 EN6114V8Y25
 3
 BOLT
18
 EN6114V8Y26
 1
 BOLT
19
 EN6114V8Y27
 2
 BOLT
20
 EN6114V8Y28
 2
 BOLT
21
 EN6114V8Y29
 2
 BOLT
22
 EN6114V8Y30
 2
 BOLT
23
 EN6114V8Y31
 1
 BOLT
24
 EN6114V8Y32
 2
 BOLT
26
 EN6114V8Y34
 2
 BOLT
31
 ASNA2531-8
 6
 NUT
32
 ASNA2532-8
 36
 NUT
33
 NAS1149D0863K
 2
 WASHER
Consumable CMLA01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Primer Polyurethane Paint--
Corrosion Inhibiting
04EAC2
 As required
Top Coat Polyurethane--
External Structure
04JAA3
 As required
Polysulfide Sealant-Fuel
Tank Brushable
06ABA1
 As required
Polysulfide Sealant-Fuel
Tank Fillet
06ABB1
 As required
Non Aqueous Cleaner-
General
08BAA9
 As required
Textile-Lint Free Cotton
 14SBA1
 As required
DATE: Nov 23/16 SERVICE BULLETIN No.: A310-57-2105
REVISION No.: 00 - Nov 23/16 Page: 37
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 44

@A310
SERVICE BULLETIN
Standard tool TOOLA01
ITEM
 TOOL N˚
 TOOL NAME
 QTY
 SEE
NOTES
DKA310572105-1
 Durable Tooling
 1
 (1)
EKA310572105-1
 Expendable Tooling
 1
 (2)
FTIA310572105-1
 Capital Tooling
 1
 (3)
NOTE
: The above list of components is not an AIRBUS Kit, the required parts
shall be ordered as necessary through the given channel.
NOTE
: FTI has allocated the following tool kit numbers for cold expansion:
For the definition of capital, durable and expendable tools refer to ISI
51.48.00001.
NOTE
 (1)
: Durable tooling: DK-A310-57-2105-1
The durable tool kit contains the minimum quantity of durable tools
necessary to accomplish the Service Bulletin on one aircraft. If the
Service Bulletin is to be accomplished on more than one aircraft, the
number of durable kits required can be established by reference to ISI
51.48.00001.
NOTE
 (2)
: Expendable tooling. Ref: EK-A310-57-2105-1
The expendable tool kit contains the quantity for expendable tools
required to accomplish the Service Bulletin on one aircraft. Order one
expendable tool kit for every aircraft on which this Service Bulletin is to
be accomplished.
NOTE
 (3)
: Capital tooling: FTI-A310-57-2105-1
The capital tools provided in this kit are not specific to this Service
Bulletin and are normally already available in operator’s stock as long-
term investment or can be loaned from FTI.
Standard tool TOOLA02
ITEM
 TOOL N˚
 TOOL NAME
 QTY
 SEE
NOTES
DKA310572105-1
 Durable Tooling
 1
 (1)
EKA310572105-1
 Expendable Tooling
 1
 (2)
WCIA310572105-1
 Capital Tooling
 1
 (3)
NOTE
: The above list of components is not an AIRBUS Kit, the required parts
shall be ordered as necessary through the given channel.
NOTE
: WCI has allocated the following tool kit numbers for cold expansion:
For the definition of capital, durable and expendable tools refer to ISI
51.48.00001.
NOTE
 (1)
: Durable tooling: DK-A310-57-2105-1
DATE: Nov 23/16 SERVICE BULLETIN No.: A310-57-2105
REVISION No.: 00 - Nov 23/16 Page: 38
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 45

@A310
SERVICE BULLETIN
The durable tool kit contains the minimum quantity of durable tools
necessary to accomplish the Service Bulletin on one aircraft. If the
Service Bulletin is to be accomplished on more than one aircraft, the
number of durable kits required can be established by reference to ISI
51.48.00001.
NOTE
 (2)
: Expendable tooling. Ref: EK-A310-57-2105-1
The expendable tool kit contains the quantity for expendable tools
required to accomplish the Service Bulletin on one aircraft. Order one
expendable tool kit for every aircraft on which this Service Bulletin is to
be accomplished.
NOTE
 (3)
: Capital tooling: WCI-A310-57-2105-1
The capital tools provided in this kit are not specific to this Service
Bulletin and are normally already available in operator’s stock as long-
term investment or can be loaned from WCI.
References
Aircraft Maintenance Manual (AMM)
 20-21-12, Page Block 001
Non Destructive Test Manual (NTM)
 51-10-01, Page Block 601
Structural Repair Manual (SRM)
 51-23-00
51-24-00
51-40-20
51-40-41
51-40-44
51-40-46
Fig. A-FBAAA
Cold Working of the Lower Tee Fitting
Fastener Holes, on the Wing Side
Sheet 01
Sheet 02
Sheet 03
Sheet 04
Sheet 05
CAUTION
: ALL THE COLD WORKING STEPS ARE TO BE DONE ON ONE HOLE
OUT OF TWO PER SIDE AT THE SAME TIME. THIS IS TO PREVENT
DAMAGE TO THE AIRCRAFT.
(a) Cold work the lower Tee fitting fastener holes on the RH wing, between Frame 40
and Frame 47:
Refer to Fig. A-FBAAA
.
1
 Remove the fasteners, as shown on Fig. A-FBAAA Sheet 01
 , Views A and B
and Fig. A-FBAAA Sheet 02
 , View C, in accordance with SRM 51-40-20:
42 Bolt Item (1) Discard
42 Nut Item (2) Discard
2
 Remove the old sealant with a non metallic spatula.
DATE: Nov 23/16 SERVICE BULLETIN No.: A310-57-2105
REVISION No.: 00 - Nov 23/16 Page: 39
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 46

@A310
SERVICE BULLETIN
3
 Clean the work area with:
Non Aqueous
Cleaner-General
08BAA9 As required
Textile-Lint Free
Cotton
14SBA1 As required
and if necessary, use a non metallic scraper.
4
 Do a rotating probe test of the fastener holes in accordance with NTM
51-10-01, Page Block 601, as shown on Fig. A-FBAAA Sheet 02
 ,V i e wC :
a
 In case of crack findings in the fastener holes, contact AIRBUS before
next flight and follow their instructions.
b
 In case of no crack findings, continue with the next workstep.
5
 Do a check of the existing hole diameters and compare with the values given
on Fig. A-FBAAA Sheet 04
 and Fig. A-FBAAA Sheet 05
 :
a
 In case the existing hole diameter is more than or equal to the minimum
starting hole diameter, please contact AIRBUS for further instructions
before next flight.
b
 In case the hole diameter is less than the minimum starting hole
diameter, do the next step.
6
 Drill and ream the fastener holes to the correct starting hole diameter, as
shown on Fig. A-FBAAA Sheet 04
 and Fig. A-FBAAA Sheet 05
 and in
accordance with SRM 51-40-44 and SRM 51-40-41.
Refer to FTI Tool list No.:
DKA310572105-1 Durable Tooling 1
or
Refer to WCI Tool list No.:
DKA310572105-1 Durable Tooling 1
7
 Deburr and clean the drilled areas.
8
 Do the cold working of the 42 holes, in accordance with SRM 51-40-41, as
shown on Fig. A-FBAAA Sheet 03
 , Fig. A-FBAAA Sheet 04
 and Fig. A-FBAAA
Sheet 05
:
a
 Install the split sleeves as shown on Fig. A-FBAAA Sheet 03
 .
Refer to FTI Tool list No.:
EKA310572105-1 Expendable Tooling 1
or
DATE: Nov 23/16 SERVICE BULLETIN No.: A310-57-2105
REVISION No.: 00 - Nov 23/16 Page: 40
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 47

@A310
SERVICE BULLETIN
Refer to WCI Tool list No.:
EKA310572105-1 Expendable Tooling 1
b
 Do a cold working of the 42 fastener holes in accordance with SRM
51-40-41.
Refer to FTI Tool list No.:
FTIA310572105-1 Capital Tooling 1
or
Refer to WCI Tool list No.:
WCIA310572105-1 Capital Tooling 1
c
 Remove the split sleeves.
9
 Ream the cold worked holes to the final hole diameter, as shown on Fig. A-
FBAAA Sheet 03
 , Fig. A-FBAAA Sheet 04
 and Fig. A-FBAAA Sheet 05
 and in
accordance with SRM 51-40-41.
Refer to FTI Tool list No.:
DKA310572105-1 Durable Tooling 1
or
Refer to WCI Tool list No.:
DKA310572105-1 Durable Tooling 1
10
 Deburr and clean the drilled areas.
11
 Countersink the holes in accordance with SRM 51-40-46.
12
 Deburr and clean the countersunk holes.
13
 Wet install, as shown on Fig. A-FBAAA Sheet 01
 , Views A and B, Fig. A-
FBAAA Sheet 03
 ,V i e wD , Fig. A-FBAAA Sheet 04
 and Fig. A-FBAAA Sheet
05
, in accordance with SRM 51-40-20:
9 Bolt EN6114V8Y18 Item 10
11 Bolt EN6114V8Y19 Item 11
2 Bolt EN6114V8Y20 Item 12
1 Bolt EN6114V8Y22 Item 14
1 Bolt EN6114V8Y23 Item 15
1 Bolt EN6114V8Y24 Item 16
DATE: Nov 23/16 SERVICE BULLETIN No.: A310-57-2105
REVISION No.: 00 - Nov 23/16 Page: 41
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 48

@A310
SERVICE BULLETIN
3 Bolt EN6114V8Y25 Item 17
1 Bolt EN6114V8Y26 Item 18
2 Bolt EN6114V8Y27 Item 19
2 Bolt EN6114V8Y28 Item 20
2 Bolt EN6114V8Y29 Item 21
2 Bolt EN6114V8Y30 Item 22
1 Bolt EN6114V8Y31 Item 23
2 Bolt EN6114V8Y32 Item 24
2 Bolt EN6114V8Y34 Item 26
6 Nut ASNA2531-8 Item 31
36 Nut ASNA2532-8 Item 32
2 Washer NAS1149D0863K Item 33
with:
Polysulfide Sealant-
Fuel Tank
Brushable
06ABA1 As required
14
 Torque standard threaded fasteners, refer to AMM 20-21-12, Page Block 001.
15
 Protect the fasteners inside the wing, in accordance with SRM 51-23-00 and
SRM 51-24-00, with:
Primer
Polyurethane Paint-
- Corrosion
Inhibiting
04EAC2 As required
and
Polysulfide Sealant-
Fuel Tank Fillet
06ABB1 As required
16
 Protect the head of the fasteners, in accordance with SRM 51-23-00, with:
Primer
Polyurethane Paint-
- Corrosion
Inhibiting
04EAC2 As required
and
DATE: Nov 23/16 SERVICE BULLETIN No.: A310-57-2105
REVISION No.: 00 - Nov 23/16 Page: 42
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 49

@A310
SERVICE BULLETIN
Top Coat
Polyurethane--
External Structure
04JAA3 As required
**CONF 002
(1) Subtask 572105-831-001-002 - Cold Work the Lower Tee Fitting Fastener Holes
between FR40 and FR47, on the LH Side
Work Zones and Access Panels
Zone
 Access/Work location
540
 Access
 Panel 540AB
Work location
 from Frame 40 to Frame 47
Manpower Resources
Manhours
 30.00
Minimum number of person
 2
Subtask elapsed time
 15.00
Skills
 AIRFRAME
Material necessary to do the job
Kit 572105A02R00
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 SEE
NOTES
11
 EN6114V8Y19
 18
 BOLT
12
 EN6114V8Y20
 3
 BOLT
14
 EN6114V8Y22
 1
 BOLT
15
 EN6114V8Y23
 2
 BOLT
17
 EN6114V8Y25
 3
 BOLT
18
 EN6114V8Y26
 1
 BOLT
19
 EN6114V8Y27
 1
 BOLT
20
 EN6114V8Y28
 3
 BOLT
21
 EN6114V8Y29
 1
 BOLT
22
 EN6114V8Y30
 2
 BOLT
23
 EN6114V8Y31
 2
 BOLT
24
 EN6114V8Y32
 1
 BOLT
26
 EN6114V8Y34
 4
 BOLT
31
 ASNA2531-8
 6
 NUT
32
 ASNA2532-8
 36
 NUT
Consumable CMLA01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Primer Polyurethane Paint--
Corrosion Inhibiting
04EAC2
 As required
Top Coat Polyurethane--
External Structure
04JAA3
 As required
DATE: Nov 23/16 SERVICE BULLETIN No.: A310-57-2105
REVISION No.: 00 - Nov 23/16 Page: 43
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 50

@A310
SERVICE BULLETIN
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Polysulfide Sealant-Fuel
Tank Brushable
06ABA1
 As required
Polysulfide Sealant-Fuel
Tank Fillet
06ABB1
 As required
Non Aqueous Cleaner-
General
08BAA9
 As required
Textile-Lint Free Cotton
 14SBA1
 As required
Standard tool TOOLA01
ITEM
 TOOL N˚
 TOOL NAME
 QTY
 SEE
NOTES
DKA310572105-1
 Durable Tooling
 1
 (1)
EKA310572105-1
 Expendable Tooling
 1
 (2)
FTIA310572105-1
 Capital Tooling
 1
 (3)
NOTE
: The above list of components is not an AIRBUS Kit, the required parts
shall be ordered as necessary through the given channel.
NOTE
: FTI has allocated the following tool kit numbers for cold expansion:
For the definition of capital, durable and expendable tools refer to ISI
51.48.00001.
NOTE
 (1)
: Durable tooling: DK-A310-57-2105-1
The durable tool kit contains the minimum quantity of durable tools
necessary to accomplish the Service Bulletin on one aircraft. If the
Service Bulletin is to be accomplished on more than one aircraft, the
number of durable kits required can be established by reference to ISI
51.48.00001.
NOTE
 (2)
: Expendable tooling. Ref: EK-A310-57-2105-1
The expendable tool kit contains the quantity for expendable tools
required to accomplish the Service Bulletin on one aircraft. Order one
expendable tool kit for every aircraft on which this Service Bulletin is to
be accomplished.
NOTE
 (3)
: Capital tooling: FTI-A310-57-2105-1
The capital tools provided in this kit are not specific to this Service
Bulletin and are normally already available in operator’s stock as long-
term investment or can be loaned from FTI.
Standard tool TOOLA02
ITEM
 TOOL N˚
 TOOL NAME
 QTY
 SEE
NOTES
DKA310572105-1
 Durable Tooling
 1
 (1)
EKA310572105-1
 Expendable Tooling
 1
 (2)
WCIA310572105-1
 Capital Tooling
 1
 (3)
DATE: Nov 23/16 SERVICE BULLETIN No.: A310-57-2105
REVISION No.: 00 - Nov 23/16 Page: 44
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 51

@A310
SERVICE BULLETIN
NOTE
: The above list of components is not an AIRBUS Kit, the required parts
shall be ordered as necessary through the given channel.
NOTE
: WCI has allocated the following tool kit numbers for cold expansion:
For the definition of capital, durable and expendable tools refer to ISI
51.48.00001.
NOTE
 (1)
: Durable tooling: DK-A310-57-2105-1
The durable tool kit contains the minimum quantity of durable tools
necessary to accomplish the Service Bulletin on one aircraft. If the
Service Bulletin is to be accomplished on more than one aircraft, the
number of durable kits required can be established by reference to ISI
51.48.00001.
NOTE
 (2)
: Expendable tooling. Ref: EK-A310-57-2105-1
The expendable tool kit contains the quantity for expendable tools
required to accomplish the Service Bulletin on one aircraft. Order one
expendable tool kit for every aircraft on which this Service Bulletin is to
be accomplished.
NOTE
 (3)
: Capital tooling: WCI-A310-57-2105-1
The capital tools provided in this kit are not specific to this Service
Bulletin and are normally already available in operator’s stock as long-
term investment or can be loaned from WCI.
References
Aircraft Maintenance Manual (AMM)
 20-21-12, Page Block 001
Non Destructive Test Manual (NTM)
 51-10-01, Page Block 601
Structural Repair Manual (SRM)
 51-23-00
51-24-00
51-40-20
51-40-41
51-40-44
51-40-46
Fig. A-FBAAB
Cold Working of the Lower Tee Fitting
Fastener Holes, on the Wing Side
Sheet 01
Sheet 02
Sheet 03
Sheet 04
CAUTION
: ALL THE COLD WORKING STEPS ARE TO BE DONE ON ONE HOLE
OUT OF TWO PER SIDE AT THE SAME TIME. THIS IS TO PREVENT
DAMAGE TO THE AIRCRAFT.
(a) Cold work the lower Tee fitting fastener holes on the LH wing, between Frame 40
and Frame 47:
Refer to Fig. A-FBAAB
.
DATE: Nov 23/16 SERVICE BULLETIN No.: A310-57-2105
REVISION No.: 00 - Nov 23/16 Page: 45
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 52

@A310
SERVICE BULLETIN
1
 Remove the fasteners, as shown on Fig. A-FBAAB Sheet 01
 , Views A and B
and Fig. A-FBAAB Sheet 02
 , View C, in accordance with SRM 51-40-20:
42 Bolt Item (1) Discard
42 Nut Item (2) Discard
2
 Remove the old sealant with a non metallic spatula.
3
 Clean the work area with:
Non Aqueous
Cleaner-General
08BAA9 As required
Textile-Lint Free
Cotton
14SBA1 As required
and if necessary, use a non metallic scraper.
4
 Do a rotating probe test of the fastener holes in accordance with NTM
51-10-01, Page Block 601, as shown on Fig. A-FBAAB Sheet 02
 ,V i e wC :
a
 In case of crack findings in the fastener holes, contact AIRBUS before
next flight and follow their instructions.
b
 In case of no crack findings, continue with the next workstep.
5
 Do a check of the existing hole diameters and compare with the values given
on Fig. A-FBAAB Sheet 04
 :
a
 In case the existing hole diameter is more than or equal to the minimum
starting hole diameter, please contact AIRBUS for further instructions
before next flight.
b
 In case the hole diameter is less than the minimum starting hole
diameter, do the next step.
6
 Drill and ream the fastener holes to the correct starting hole diameter, as
shown on Fig. A-FBAAB Sheet 04
 and in accordance with SRM 51-40-44 and
SRM 51-40-41.
Refer to FTI Tool list No.:
DKA310572105-1 Durable Tooling 1
or
Refer to WCI Tool list No.:
DKA310572105-1 Durable Tooling 1
7
 Deburr and clean the drilled areas.
DATE: Nov 23/16 SERVICE BULLETIN No.: A310-57-2105
REVISION No.: 00 - Nov 23/16 Page: 46
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 53

@A310
SERVICE BULLETIN
8
 Do the cold working of the 42 holes, in accordance with SRM 51-40-41, as
shown on Fig. A-FBAAB Sheet 03
 and Fig. A-FBAAB Sheet 04
 :
a
 Install the split sleeves as shown on Fig. A-FBAAB Sheet 03
 .
Refer to FTI Tool list No.:
EKA310572105-1 Expendable Tooling 1
or
Refer to WCI Tool list No.:
EKA310572105-1 Expendable Tooling 1
b
 Do a cold working of the 42 fastener holes in accordance with SRM
51-40-41.
Refer to FTI Tool list No.:
FTIA310572105-1 Capital Tooling 1
or
Refer to WCI Tool list No.:
WCIA310572105-1 Capital Tooling 1
c
 Remove the split sleeves.
9
 Ream the cold worked holes to the final hole diameter, as shown on Fig. A-
FBAAB Sheet 03
 and Fig. A-FBAAB Sheet 04
 and in accordance with SRM
51-40-41.
Refer to FTI Tool list No.:
DKA310572105-1 Durable Tooling 1
or
Refer to WCI Tool list No.:
DKA310572105-1 Durable Tooling 1
10
 Deburr and clean the drilled areas.
11
 Countersink the holes in accordance with SRM 51-40-46.
12
 Deburr and clean the countersunk holes.
13
 Wet install, as shown on Fig. A-FBAAB Sheet 01
 , Views A and B, Fig. A-
FBAAB Sheet 03
 , View D and Fig. A-FBAAB Sheet 04
 , in accordance with
SRM 51-40-20:
18 Bolt EN6114V8Y19 Item 11
DATE: Nov 23/16 SERVICE BULLETIN No.: A310-57-2105
REVISION No.: 00 - Nov 23/16 Page: 47
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 54

@A310
SERVICE BULLETIN
3 Bolt EN6114V8Y20 Item 12
1 Bolt EN6114V8Y22 Item 14
2 Bolt EN6114V8Y23 Item 15
3 Bolt EN6114V8Y25 Item 17
1 Bolt EN6114V8Y26 Item 18
1 Bolt EN6114V8Y27 Item 19
3 Bolt EN6114V8Y28 Item 20
1 Bolt EN6114V8Y29 Item 21
2 Bolt EN6114V8Y30 Item 22
2 Bolt EN6114V8Y31 Item 23
1 Bolt EN6114V8Y32 Item 24
4 Bolt EN6114V8Y34 Item 26
6 Nut ASNA2531-8 Item 31
36 Nut ASNA2532-8 Item 32
with:
Polysulfide Sealant-
Fuel Tank
Brushable
06ABA1 As required
14
 Torque standard threaded fasteners, refer to AMM 20-21-12, Page Block 001.
15
 Protect the fasteners inside the wing, in accordance with SRM 51-23-00 and
SRM 51-24-00, with:
Primer
Polyurethane Paint-
- Corrosion
Inhibiting
04EAC2 As required
and
Polysulfide Sealant-
Fuel Tank Fillet
06ABB1 As required
DATE: Nov 23/16 SERVICE BULLETIN No.: A310-57-2105
REVISION No.: 00 - Nov 23/16 Page: 48
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 55

@A310
SERVICE BULLETIN
16
 Protect the head of the fasteners, in accordance with SRM 51-23-00, with:
Primer
Polyurethane Paint-
- Corrosion
Inhibiting
04EAC2 As required
and
Top Coat
Polyurethane--
External Structure
04JAA3 As required
(2) Subtask 572105-831-002-002 - Cold Work the Lower Tee Fitting Fastener Holes
between FR40 and FR47, on the RH Side
Work Zones and Access Panels
Zone
 Access/Work location
640
 Access
 Panel 640AB
Work location
 from Frame 40 to Frame 47
Manpower Resources
Manhours
 30.00
Minimum number of person
 2
Subtask elapsed time
 15.00
Skills
 AIRFRAME
Material necessary to do the job
Kit 572105A02R00
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 SEE
NOTES
11
 EN6114V8Y19
 18
 BOLT
12
 EN6114V8Y20
 3
 BOLT
14
 EN6114V8Y22
 1
 BOLT
15
 EN6114V8Y23
 2
 BOLT
17
 EN6114V8Y25
 3
 BOLT
18
 EN6114V8Y26
 1
 BOLT
19
 EN6114V8Y27
 1
 BOLT
20
 EN6114V8Y28
 3
 BOLT
21
 EN6114V8Y29
 1
 BOLT
22
 EN6114V8Y30
 2
 BOLT
23
 EN6114V8Y31
 2
 BOLT
24
 EN6114V8Y32
 1
 BOLT
26
 EN6114V8Y34
 4
 BOLT
31
 ASNA2531-8
 6
 NUT
32
 ASNA2532-8
 36
 NUT
DATE: Nov 23/16 SERVICE BULLETIN No.: A310-57-2105
REVISION No.: 00 - Nov 23/16 Page: 49
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 56

@A310
SERVICE BULLETIN
Consumable CMLA01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Primer Polyurethane Paint--
Corrosion Inhibiting
04EAC2
 As required
Top Coat Polyurethane--
External Structure
04JAA3
 As required
Polysulfide Sealant-Fuel
Tank Brushable
06ABA1
 As required
Polysulfide Sealant-Fuel
Tank Fillet
06ABB1
 As required
Non Aqueous Cleaner-
General
08BAA9
 As required
Textile-Lint Free Cotton
 14SBA1
 As required
Standard tool TOOLA01
ITEM
 TOOL N˚
 TOOL NAME
 QTY
 SEE
NOTES
DKA310572105-1
 Durable Tooling
 1
 (1)
EKA310572105-1
 Expendable Tooling
 1
 (2)
FTIA310572105-1
 Capital Tooling
 1
 (3)
NOTE
: The above list of components is not an AIRBUS Kit, the required parts
shall be ordered as necessary through the given channel.
NOTE
: FTI has allocated the following tool kit numbers for cold expansion:
For the definition of capital, durable and expendable tools refer to ISI
51.48.00001.
NOTE
 (1)
: Durable tooling: DK-A310-57-2105-1
The durable tool kit contains the minimum quantity of durable tools
necessary to accomplish the Service Bulletin on one aircraft. If the
Service Bulletin is to be accomplished on more than one aircraft, the
number of durable kits required can be established by reference to ISI
51.48.00001.
NOTE
 (2)
: Expendable tooling. Ref: EK-A310-57-2105-1
The expendable tool kit contains the quantity for expendable tools
required to accomplish the Service Bulletin on one aircraft. Order one
expendable tool kit for every aircraft on which this Service Bulletin is to
be accomplished.
NOTE
 (3)
: Capital tooling: FTI-A310-57-2105-1
The capital tools provided in this kit are not specific to this Service
Bulletin and are normally already available in operator’s stock as long-
term investment or can be loaned from FTI.
DATE: Nov 23/16 SERVICE BULLETIN No.: A310-57-2105
REVISION No.: 00 - Nov 23/16 Page: 50
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 57

@A310
SERVICE BULLETIN
Standard tool TOOLA02
ITEM
 TOOL N˚
 TOOL NAME
 QTY
 SEE
NOTES
DKA310572105-1
 Durable Tooling
 1
 (1)
EKA310572105-1
 Expendable Tooling
 1
 (2)
WCIA310572105-1
 Capital Tooling
 1
 (3)
NOTE
: The above list of components is not an AIRBUS Kit, the required parts
shall be ordered as necessary through the given channel.
NOTE
: WCI has allocated the following tool kit numbers for cold expansion:
For the definition of capital, durable and expendable tools refer to ISI
51.48.00001.
NOTE
 (1)
: Durable tooling: DK-A310-57-2105-1
The durable tool kit contains the minimum quantity of durable tools
necessary to accomplish the Service Bulletin on one aircraft. If the
Service Bulletin is to be accomplished on more than one aircraft, the
number of durable kits required can be established by reference to ISI
51.48.00001.
NOTE
 (2)
: Expendable tooling. Ref: EK-A310-57-2105-1
The expendable tool kit contains the quantity for expendable tools
required to accomplish the Service Bulletin on one aircraft. Order one
expendable tool kit for every aircraft on which this Service Bulletin is to
be accomplished.
NOTE
 (3)
: Capital tooling: WCI-A310-57-2105-1
The capital tools provided in this kit are not specific to this Service
Bulletin and are normally already available in operator’s stock as long-
term investment or can be loaned from WCI.
References
Aircraft Maintenance Manual (AMM)
 20-21-12, Page Block 001
Non Destructive Test Manual (NTM)
 51-10-01, Page Block 601
Structural Repair Manual (SRM)
 51-23-00
51-24-00
51-40-20
51-40-41
51-40-44
51-40-46
Fig. A-FBAAB
Cold Working of the Lower Tee Fitting
Fastener Holes, on the Wing Side
Sheet 01
Sheet 02
Sheet 03
Sheet 04
CAUTION
: ALL THE COLD WORKING STEPS ARE TO BE DONE ON ONE HOLE
OUT OF TWO PER SIDE AT THE SAME TIME. THIS IS TO PREVENT
DAMAGE TO THE AIRCRAFT.
DATE: Nov 23/16 SERVICE BULLETIN No.: A310-57-2105
REVISION No.: 00 - Nov 23/16 Page: 51
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 58

@A310
SERVICE BULLETIN
(a) Cold work the lower Tee fitting fastener holes on the RH wing, between Frame 40
and Frame 47:
Refer to Fig. A-FBAAB
.
1
 Remove the fasteners, as shown on Fig. A-FBAAB Sheet 01
 , Views A and B
and Fig. A-FBAAB Sheet 02
 , View C, in accordance with SRM 51-40-20:
42 Bolt Item (1) Discard
42 Nut Item (2) Discard
2
 Remove the old sealant with a non metallic spatula.
3
 Clean the work area with:
Non Aqueous
Cleaner-General
08BAA9 As required
Textile-Lint Free
Cotton
14SBA1 As required
and if necessary, use a non metallic scraper.
4
 Do a rotating probe test of the fastener holes in accordance with NTM
51-10-01, Page Block 601, as shown on Fig. A-FBAAB Sheet 02
 ,V i e wC :
a
 In case of crack findings in the fastener holes, contact AIRBUS before
next flight and follow their instructions.
b
 In case of no crack findings, continue with the next workstep.
5
 Do a check of the existing hole diameters and compare with the values given
on Fig. A-FBAAB Sheet 04
 :
a
 In case the existing hole diameter is more than or equal to the minimum
starting hole diameter, please contact AIRBUS for further instructions
before next flight.
b
 In case the hole diameter is less than the minimum starting hole
diameter, do the next step.
6
 Drill and ream the fastener holes to the correct starting hole diameter, as
shown on Fig. A-FBAAB Sheet 04
 and in accordance with SRM 51-40-44 and
SRM 51-40-41.
Refer to FTI Tool list No.:
DKA310572105-1 Durable Tooling 1
or
Refer to WCI Tool list No.:
DATE: Nov 23/16 SERVICE BULLETIN No.: A310-57-2105
REVISION No.: 00 - Nov 23/16 Page: 52
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 59

@A310
SERVICE BULLETIN
DKA310572105-1 Durable Tooling 1
7
 Deburr and clean the drilled areas.
8
 Do the cold working of the 42 holes, in accordance with SRM 51-40-41, as
shown on Fig. A-FBAAB Sheet 03
 and Fig. A-FBAAB Sheet 04
 :
a
 Install the split sleeves as shown on Fig. A-FBAAB Sheet 03
 .
Refer to FTI Tool list No.:
EKA310572105-1 Expendable Tooling 1
or
Refer to WCI Tool list No.:
EKA310572105-1 Expendable Tooling 1
b
 Do a cold working of the 42 fastener holes in accordance with SRM
51-40-41.
Refer to FTI Tool list No.:
FTIA310572105-1 Capital Tooling 1
or
Refer to WCI Tool list No.:
WCIA310572105-1 Capital Tooling 1
c
 Remove the split sleeves.
9
 Ream the cold worked holes to the final hole diameter, as shown on Fig. A-
FBAAB Sheet 03
 and Fig. A-FBAAB Sheet 04
 and in accordance with SRM
51-40-41.
Refer to FTI Tool list No.:
DKA310572105-1 Durable Tooling 1
or
Refer to WCI Tool list No.:
DKA310572105-1 Durable Tooling 1
10
 Deburr and clean the drilled areas.
11
 Countersink the holes in accordance with SRM 51-40-46.
12
 Deburr and clean the countersunk holes.
DATE: Nov 23/16 SERVICE BULLETIN No.: A310-57-2105
REVISION No.: 00 - Nov 23/16 Page: 53
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 60

@A310
SERVICE BULLETIN
13
 Wet install, as shown on Fig. A-FBAAB Sheet 01
 , Views A and B, Fig. A-
FBAAB Sheet 03
 , View D and Fig. A-FBAAB Sheet 04
 , in accordance with
SRM 51-40-20:
18 Bolt EN6114V8Y19 Item 11
3 Bolt EN6114V8Y20 Item 12
1 Bolt EN6114V8Y22 Item 14
2 Bolt EN6114V8Y23 Item 15
3 Bolt EN6114V8Y25 Item 17
1 Bolt EN6114V8Y26 Item 18
1 Bolt EN6114V8Y27 Item 19
3 Bolt EN6114V8Y28 Item 20
1 Bolt EN6114V8Y29 Item 21
2 Bolt EN6114V8Y30 Item 22
2 Bolt EN6114V8Y31 Item 23
1 Bolt EN6114V8Y32 Item 24
4 Bolt EN6114V8Y34 Item 26
6 Nut ASNA2531-8 Item 31
36 Nut ASNA2532-8 Item 32
with:
Polysulfide Sealant-
Fuel Tank
Brushable
06ABA1 As required
14
 Torque standard threaded fasteners, refer to AMM 20-21-12, Page Block 001.
15
 Protect the fasteners inside the wing, in accordance with SRM 51-23-00 and
SRM 51-24-00, with:
Primer
Polyurethane Paint-
- Corrosion
Inhibiting
04EAC2 As required
and
DATE: Nov 23/16 SERVICE BULLETIN No.: A310-57-2105
REVISION No.: 00 - Nov 23/16 Page: 54
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

The text continues at https://openairdocs.org/service-documents/airbus/a310-57-2105/file/0c3f35f15786.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
