# Airbus Service Bulletin A330-54-3042

Copy: No revision named ("A330-54-3042 R00"), 36 pages: PDF https://openairdocs.org/files/sha256/56/19/56193e488c35bfff0933ac4e3c737d116df74de1c4aac8a202b2713e1dd57ac2; text https://openairdocs.org/service-documents/airbus/a330-54-3042/file/56193e488c35.md. Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2018-1003; AD 2019-03-15 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Airbus](https://openairdocs.org/service-documents/airbus.md)
- Type: Service bulletin (Service Bulletin)
- Number: A330-54-3042
- Page: https://openairdocs.org/service-documents/airbus/a330-54-3042

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2019-03-15](https://openairdocs.org/ad/2019-03-15.md), effective Apr 3, 2019: No revision named

Also cited in [1 proposed AD](https://openairdocs.org/service-documents/airbus/a330-54-3042/proposed.md).

## Text (36 pages)

Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2018-1003; AD 2019-03-15 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

@A330
SERVICE BULLETIN
SUMMARY
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
This summary is for information only and is not approved for modification of the aircraft.
MANDATORY
 MANDATORY
 MANDATORY
ATA SYSTEM: 54
TITLE: NACELLES/PYLONS - GENERAL - A330 CF6-80 ENGINES DRAIN PIPE
AND LOWER APF U-SHAPED RIBS INSPECTION
**CONF ALL
MODIFICATIONS
None
REASON/DESCRIPTION/OPERATIONAL CONSEQUENCES
Damaged drain pipes Part Number (PN) F7173000700000 located above lower Aft Pylon Fairing (APF)
of A330-200/300 equipped with General Electric (GE) engines have been reported on 19 aircraft.
An interference condition can be present during the installation of the lower aft fairing assembly to the
pylon. The trailing edge assembly of the fairing has an internal frame bracket and shear clip that can
interfere and cause chafing with the aircraft hydraulic drain line.
This Service Bulletin requires a boroscope inspection of the drain pipes to detect possible contact with
U-shaped ribs of the lower APF.
Accomplishment of this Service Bulletin will contribute to maintain the structural integrity of the drain
pipes.
GENERAL EVALUATION
EVALUATION TABLE
COMPLIANCE
 MANDATORY (1)
 CANCELS INSPECTION SB
 NO
POTENTIAL AD
 YES
 A/C OPERATION AFFECTED
 NO
RELIABILITY AFFECTED
 NO
 PAX COMFORT AFFECTED
 NO
COST SAVING
 NO
 ETOPS AFFECTED
 NO
STRUCTURAL LIFE EXTN
 NO
 VENDOR SB INVOLVED
 NO
NOTE
 (1)
: Service Bulletin must be accomplished.
DATE: May 17/18 SERVICE BULLETIN No.: A330-54-3042
REVISION No.: 00 - May 17/18 Page: 1
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 2

@A330
SERVICE BULLETIN
SUMMARY
MATERIAL PRICE INFORMATION
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET
 QTY PER
A/C
PRICE PER
A/C (USD)
MAIN PARTS
Component COMPA01
 1
 See SB
 Drain Pipe
EFFECTIVITY
This Service Bulletin is applicable to this (these) operator(s) :
18P 46O 87Z 98W AAW ACI AEA AFR AIB ARG ASL ASY AZA
BEL CAL DAH DAL EIN EVA F2I FIN G8E HFY IAW IBE ISS
JAI KLM LAA LMU MAU QAF QFA QTR RSF RSY SAI SXD TAM
TAP THY XLF
CONCURRENT REQUIREMENTS
None
REFERENCES / REPERCUSSIONS
TFU
 71.00.00.112
OEB
 None
AOT
 None
SIL
 None
ISI
 None
LINE MAINTENANCE AFFECTED
 No
LIFE LIMIT
 None
OTHER
 None
NATURE OF THE WORK
AIRCRAFT
 YES
EQUIPMENT
 NO
MANPOWER
Task 543042-832-801-001: Inspection
TOTAL MANHOURS
 2.00
ELAPSED TIME (HOURS)
 1.50
Task 543042-833-801-001: Repair
TOTAL MANHOURS
 15.00
ELAPSED TIME (HOURS)
 5.25
APPENDICES
Appendix 01 - Inspection Report
Appendix 02 - Manpower Gantt Chart
DATE: May 17/18 SERVICE BULLETIN No.: A330-54-3042
REVISION No.: 00 - May 17/18 Page: 2
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 3

@A330
SERVICE BULLETIN
SUMMARY
**CONF ALL
A
Z460
Z450
A
A
LH SHOWN
RH IDENTICAL
PART TO BE
INSPECTED
G_SB_543042_5_SAAA_01_00
Figure A-FSAAA - Sheet 01
Summary
DATE: May 17/18 SERVICE BULLETIN No.: A330-54-3042
REVISION No.: 00 - May 17/18 Page: 3
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 4

@A330
SERVICE BULLETIN
SUMMARY
This Page Intentionally Left Blank
DATE: May 17/18 SERVICE BULLETIN No.: A330-54-3042
REVISION No.: 00 - May 17/18 Page: 4
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 5

@A330
SERVICE BULLETIN
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
MANDATORY
 MANDATORY
 MANDATORY
ATA SYSTEM: 54
TITLE: NACELLES/PYLONS - GENERAL - A330 CF6-80 ENGINES DRAIN PIPE
AND LOWER APF U-SHAPED RIBS INSPECTION
MODIFICATION No.: None
This document contains AIRBUS PROPRIETARY INFORMATION and shall at all times remain the
property of AIRBUS; no intellectual property right or licence is granted by AIRBUS in connection with
any information contained in it. It is delivered on the express condition that said document and the
information contained in it shall be treated as confidential, shall not be used for any purpose other than
that for which it is hereby delivered. It shall not be disclosed in whole or in part to third parties and shall
not be duplicated in any manner (except for the purposes of performing the tasks described hereunder
and provided that any recipient of such document shall comply with the conditions herein), without
AIRBUS prior written consent.
1. PLANNING INFORMATION
**CONF ALL
A. EFFECTIVITY
NOTE
: This Service Bulletin is applicable only to aircraft equipped with GE CF6-80E1
engines.
NOTE
: This Service Bulletin is only applicable to aircraft on which MOD No.
207430S34580 (Service Bulletin No. A330-54-3041) is not embodied.
(1) Models
330-202 330-203 330-301 330-302 330-303
(2) Effectivity by MSN
0030 0037 0045 0054-0055 0070 0086 0200 0211 0269 0272 0330 0339 0397 0422
0441 0443 0448 0458 0463 0465-0466 0472-0473 0477 0481 0486-0487 0489 0498
0500 0502-0504 0506-0508 0510-0511 0513 0516 0519 0521-0522 0530 0535 0553
0555 0558 0564 0567 0571 0573-0574 0584 0587 0593 0595 0602-0603 0605 0607
0612 0616 0623 0634 0637-0638 0641 0644 0647 0650 0653 0655 0657 0659 0661
0667 0671 0675 0678 0680 0682 0684 0686 0691 0693 0695 0697 0699-0700
0703-0705 0707 0711-0712 0714 0721 0725 0733-0734 0738 0742-0743 0745-0747
0749 0752 0754-0755 0760 0769-0770 0774 0789 0792 0801 0805 0811 0813-0814
0819-0820 0823 0825-0826 0831 0834 0838 0841-0842 0847 0849 0853 0861 0871
DATE: May 17/18 SERVICE BULLETIN No.: A330-54-3042
REVISION No.: 00 - May 17/18 Page: 1
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 6

@A330
SERVICE BULLETIN
0877 0882-0883 0885 0887-0888 0892-0893 0898-0901 0904 0907 0914 0918 0920
0923 0925 0931-0932 0934 0940 0945 0947 0950-0951 0956 0969 0976 0980 0985
0994 0996 1007 1013 1023 1025 1036 1043 1057 1061 1067 1078 1088 1094 1106
1123 1135 1161 1169 1173-1174 1177 1183 1198 1218 1225 1235 1251-1252 1254
1258 1268 1272 1274 1278 1283 1287 1294 1300 1308 1313 1321 1327 1339 1346
1351 1354 1360-1361 1365 1367 1370 1377 1379 1381 1385 1391 1405 1412 1426
1437 1450 1458 1472 1476 1478 1487 1490 1499 1501 1505 1507 1514-1516 1529
1535 1539 1543 1571 1580 1605 1613 1616 1620 1622-1623 1627-1630 1637 1640
1642 1644 1649 1679 1684 1690 1694 1696 1700-1701 1704 1706 1710 1713 1716
1718-1721 1728 1736-1737 1740 1742 1744 1747-1748 1755 1761 1767 1769
1777-1778 1783-1784 1791 1794 1806 1817 1835 1854
(3) Effectivity by Operator
The Operator/MSN relationship is provided for information only and is correct at the time
of issue in accordance with the information available to AIRBUS. Any future changes
resulting from transfer of an aircraft from one operator to another will not be reflected in
this list unless the Service Bulletin is revised for another reason.
OPERATOR
 MSN
18P
 1321
46O
 0655
87Z
 0535
98W
 0054
AAW
 1043 1472 1535
ACI
 0507 0510
AEA
 0733 0745 0749 0814 0931 0950
AFR
 0422 0443 0448 0458 0465 0481 0498 0500 0502 0503 0516 0519
0567 0584 0657
AIB
 0871
ARG
 0587 0634 1605 1623 1737 1748
ASL
 0885
ASY
 0747 0892 0898 0951 0969 1036 1183
AZA
 0272 0339 0825 0831 1123 1135 1218 1225 1252 1283 1308 1313
1327 1354
BEL
 0030 0037 0045
CAL
 0602 0607 0641 0671 0675 0691 0699 0707 0714 0725 0752 0769
0805 0823 0838 0861 0920 1177 1272 1278 1346 1367 1450 1539
DAH
 0644 0647 0650 0653 0667 1613 1630 1649
DAL
 1627 1628 1637 1679 1701 1716 1720 1721 1769 1783
EIN
 0269 0330 0397 0441 0841 0847 0985 1025 1106 1742 1744 1791
1817
EVA
 0678 0693 0755 1254 1268 1274 1684 1690 1767 1778 1794 1806
F2I
 0055 0070 0086 0200
FIN
 0994 1007 1013 1023 1067 1078 1088 1173
G8E
 0463
HFY
 0211
IAW
 1339
IBE
 1377 1385 1405 1426 1437 1490 1507 1515 1694 1700 1710 1719
1728 1736 1740 1747 1755 1761 1777 1784 1835 1854
DATE: May 17/18 SERVICE BULLETIN No.: A330-54-3042
REVISION No.: 00 - May 17/18 Page: 2
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 7

@A330
SERVICE BULLETIN
OPERATOR
 MSN
ISS
 0571
JAI
 0888 0923 0947 0956 1351 1361 1370 1391
KLM
 0682 0686 0703 0738 0770 0801 0925 1161 1287 1294 1300 1381
1580
LAA
 1412 1505 1543
LMU
 0661
MAU
 0883 1057
QAF
 0487 0605
QFA
 0506 0508 0513 0522 0553 0558 0564 0574 0593 0595 0603 0695
0705 0712 0842 0853 0887 0940 0945 0976 1061 1094 1169 1174
1198 1251 1258 1365
QTR
 0473 0489 0511 0521 0623 0637 0638 0659 0680 0711 0721 0734
0743 0746 0760 0789 0792 0813 0820 0826 0849 0893 0907 0918
RSF
 0980 0996 1235 1379 1478 1516
RSY
 0472 0700
SAI
 0811 0819 0834 0900
SXD
 0504 0530 0555 0573 0612 0616 0684
TAM
 0466
TAP
 0477 0486 0877 0899 0904 0914 0934
THY
 0697 0704 0742 0754 0774 0882 0901 0932 1458 1476 1487 1499
1501 1514 1529 1571 1616 1620 1622 1629 1640 1642 1644 1696
1704 1706 1713 1718
XLF
 1360
DATE: May 17/18 SERVICE BULLETIN No.: A330-54-3042
REVISION No.: 00 - May 17/18 Page: 3
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 8

@A330
SERVICE BULLETIN
(4) Configuration by MSN
MSN
 CONFIGURATION
0030 0037 0045 0054 0055 0070 0086 0200 0211 0269 0272
0330 0339 0397 0422 0441 0443 0448 0458 0463 0465 0466
0472 0473 0477 0481 0486 0487 0489 0498 0500 0502 0503
0504 0506 0507 0508 0510 0511 0513 0516 0519 0521 0522
0530 0535 0553 0555 0558 0564 0567 0571 0573 0574 0584
0587 0593 0595 0602 0603 0605 0607 0612 0616 0623 0634
0637 0638 0641 0644 0647 0650 0653 0655 0657 0659 0661
0667 0671 0675 0678 0680 0682 0684 0686 0691 0693 0695
0697 0699 0700 0703 0704 0705 0707 0711 0712 0714 0721
0725 0733 0734 0738 0742 0743 0745 0746 0747 0749 0752
0754 0755 0760 0769 0770 0774 0789 0792 0801 0805 0811
0813 0814 0819 0820 0823 0825 0826 0831 0834 0838 0841
0842 0847 0849 0853 0861 0871 0877 0882 0883 0885 0887
0888 0892 0893 0898 0899 0900 0901 0904 0907 0914 0918
0920 0923 0925 0931 0932 0934 0940 0945 0947 0950 0951
0956 0969 0976 0980 0985 0994 0996 1007 1013 1023 1025
1036 1043 1057 1061 1067 1078 1088 1094 1106 1123 1135
1161 1169 1173 1174 1177 1183 1198 1218 1225 1235 1251
1252 1254 1258 1268 1272 1274 1278 1283 1287 1294 1300
1308 1313 1321 1327 1339 1346 1351 1354 1360 1361 1365
1367 1370 1377 1379 1381 1385 1391 1405 1412 1426 1437
1450 1458 1472 1476 1478 1487 1490 1499 1501 1505 1507
1514 1515 1516 1529 1535 1539 1543 1571 1580 1605 1613
1616 1620 1622 1623 1627 1628 1629 1630 1637 1640 1642
1644 1649 1679 1684 1690 1694 1696 1700 1701 1704 1706
1710 1713 1716 1718 1719 1720 1721 1728 1736 1737 1740
1742 1744 1747 1748 1755 1761 1767 1769 1777 1778 1783
1784 1791 1794 1806 1817 1835 1854
001
(5) Configuration definition
**CONF 001
Config. 001 is valid for all the aircraft given in the effectivity of this Service Bulletin as a
standard configuration.
(6) Material Effectivity
MATERIAL
 QTY PER A/C
 SEE NOTES
Component COMPA01
 1
B. CONCURRENT REQUIREMENTS
None
DATE: May 17/18 SERVICE BULLETIN No.: A330-54-3042
REVISION No.: 00 - May 17/18 Page: 4
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 9

@A330
SERVICE BULLETIN
C. REASON
(1) History
Damaged drain pipes Part Number (PN) F7173000700000 located above lower Aft Pylon
Fairing (APF) of A330-200/300 equipped with General Electric (GE) engines have been
reported on 19 aircraft.
An interference condition can be present during the installation of the lower aft fairing
assembly to the pylon. The trailing edge assembly of the fairing has an internal frame
bracket and shear clip that can interfere and cause chafing with the aircraft hydraulic
drain line.
(2) Objective/Action
This Service Bulletin requires a boroscope inspection of the drain pipes to detect
possible contact with U-shaped ribs of the lower APF.
(3) Advantages
Accomplishment of this Service Bulletin will contribute to maintain the structural integrity
of the drain pipes.
(4) Operational/Maintenance Consequences
None
D. DESCRIPTION
To accomplish this Service Bulletin it is necessary to :
Task 543042-832-801-001: Inspection
(1) Do a Special Detailed Inspection of the Drain Pipe and the U-Shaped Ribs of the
Lower APF at Left Hand (LH) Pylon
(2) Do a Special Detailed Inspection of the Drain Pipe and the U-Shaped Ribs of the
Lower APF at Right Hand (RH) Pylon
Task 543042-833-801-001: Repair
(1) Replace the Drain Pipe at LH Pylon
(2) Replace the Drain Pipe at RH Pylon
E. COMPLIANCE
(1) Classification
MANDATORY: Service Bulletin must be accomplished.
DATE: May 17/18 SERVICE BULLETIN No.: A330-54-3042
REVISION No.: 00 - May 17/18 Page: 5
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 10

@A330
SERVICE BULLETIN
(2) Accomplishment Timescale
This Service Bulletin has been classified Mandatory. It is expected that an Airworthiness
Directive (AD) published by the European Av iation Safety Agenc y (EASA) will be issued
to confirm this classification. It is anticipated that the AD will confirm the thresholds
given but reference should be made to the AD for confirmation of the mandated
accomplishment timescale.
Table 1, Config. 001 - Special Detailed Inspection of the Drain Pipe and the U-shaped ribs of the
Lower Aft Pylon Fairing
Condition
 Action
 Compliance time
 Repetitive interval
All aircraft
 Do a special detailed inspection
of the drain pipe located above
the lower APF and the U-
shaped ribs of the lower APF in
accordance with TASK
543042-832-801 001
Within 26 months
after the original
issue date of this
Service Bulletin
None
Replace the drain pipe in
accordance with TASK
543042-833-801 001
and
Accomplish modification
Service Bulletin No.
A330-54-3041
Before next flight
 None
AND
Upload the inspection report
 None
 None
AND
Damage found with
through crack or
damage detected inside
drain pipe with leakage
from pylon area A
No further action
 None
 None
Replace the drain pipe in
accordance with TASK
543042-833-801 001
and
Accomplish modification
Service Bulletin No.
A330-54-3041
Within 10 Flight
Cycles (FC)
None
AND
Upload the inspection report
 None
 None
AND
Damage detected inside
the drain pipe without
leakage from pylon area
A
No further action
 None
 None
Replace the drain pipe in
accordance with TASK
543042-833-801 001
and
Accomplish modification
Service Bulletin No.
A330-54-3041
Within 50 FC
 None
AND
Upload the inspection report
 None
 None
AND
Damage detected
outside the drain pipe
and/or contact detected
between drain pipe and
U-shaped ribs
No further action
 None
 None
DATE: May 17/18 SERVICE BULLETIN No.: A330-54-3042
REVISION No.: 00 - May 17/18 Page: 6
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 11

@A330
SERVICE BULLETIN
Table 1, Config. 001 - Special Detailed Inspection of the Drain Pipe and the U-shaped ribs of the
Lower Aft Pylon Fairing
Condition
 Action
 Compliance time
 Repetitive interval
No findings found
 No further action
 None
 None
F. APPROVAL
The technical content of this document is approved under the authority of Design
Organisation Approval No. EASA.21J.031.
If an aircraft listed in the effectivity has a modification or repair embodied that is not of
AIRBUS origin, and which affects the content of this Service Bulletin, the operator is
responsible for obtaining approval by its airworthiness authority for any adaptation necessary
before incorporation of the Service Bulletin.
G. MANPOWER
The manpower estimates given in this Service Bulletin are based on the direct labor cost to
do the work. These estimates assume that the work will be done by experienced personnel,
and may need to be revised upwards to suit operator’s circumstances. The estimates do not
include the time to prepare, plan or inspect the work. Manufacture and procurement of parts
and tools, drying times for paints, sealants, etc., and general administration work are also not
included.
NOTE
: The minimum man-hours necessary to accomplish this Service Bulletin are
those for the Inspection. Depending on the inspection result, additional man-
hours can apply.
Task 543042-832-801-001: Inspection
Get Access
 0.50
On Aircraft
Do a Special Detailed Inspection of the Drain Pipe and
the U-Shaped Ribs of the Lower APF at Left Hand
(LH) Pylon
0.50
Do a Special Detailed Inspection of the Drain Pipe and
the U-Shaped Ribs of the Lower APF at Right Hand
(RH) Pylon
0.50
Close-Up
 0.50
TOTAL MANHOURS
 2.00
ELAPSED TIME (HOURS)
 1.50
NOTE
: For an explanation of the man-hours and elapsed time, refer to the Gantt
Chart, Fig. A-FABAA
 given in Appendix 02.
Task 543042-833-801-001: Repair
Get Access
 6.00
On Aircraft
Replace the Drain Pipe at LH Pylon
 1.00
Replace the Drain Pipe at RH Pylon
 1.00
DATE: May 17/18 SERVICE BULLETIN No.: A330-54-3042
REVISION No.: 00 - May 17/18 Page: 7
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 12

@A330
SERVICE BULLETIN
Task 543042-833-801-001: Repair
Close-Up
 7.00
TOTAL MANHOURS
 15.00
ELAPSED TIME (HOURS)
 5.25
H. WEIGHT AND BALANCE
Not Changed
I. ELECTRICAL LOAD DATA
Not Changed
J. REFERENCES
Aircraft Maintenance Manual (AMM)
 06-20-00 06-31-53 12-34-24
54-51-29 54-56-11
Elec. Std. Practices Manual (ESPM)
 20-55-00
In Service Information (ISI)
 00.00.00179
Non Destructive Test Manual (NTM)
 51-90-00
Service Bulletin (SB)
 A330-54-3041
K. PUBLICATION AFFECTED
None
L. INTERCHANGEABILITY/MIXABILITY
Not Applicable
M. SPARES
None
DATE: May 17/18 SERVICE BULLETIN No.: A330-54-3042
REVISION No.: 00 - May 17/18 Page: 8
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 13

@A330
SERVICE BULLETIN
2. MATERIAL INFORMATION
**CONF ALL
A. MATERIAL - PRICE AND AVAILABILITY
(1) Procurement Addresses
Customers with aircraft shown in the effectivity of this Service Bulletin should send a
purchase order to AIRBUS. Quote the number of this Service Bulletin. The address is:
Component COMPA01
 AIRBUS Material, Logistics and Suppliers
IFD - In Flight Desk
Weg beim Jaeger 150
D-22335 HAMBURG
For ordering by internet:
http://spares.airbus.com
For ordering by fax: +49 40 50 76 4012
For ordering by E-mail:
ifd.spares@airbus.com
(2) Price and Availability
Operator supplied AIRBUS parts required to accomplish this Service Bulletin are to be
purchased by a spares purchase order.
B. INDUSTRY SUPPORT INFORMATION
AIRBUS will credit the man hours indicated in this Service Bulletin for inspections that are
performed on aircraft in warranty at the time of such inspection. Credit will be at the agreed
in-house warranty labor rate. Claims for labor allowance should be received no later than 90
days after completion of the last affected warranted aircraft.
For those aircraft in warranty at the time of such inspection with findings further to
inspection as per this Service Bulletin, AIRBUS will credit the man hours indicated in this
Service Bulletin for corrections that are performed on aircraft in warranty at the time of
such correction. Credit will be at the agreed in-house warranty labor rate. Claims for labor
allowance should be received no later than 90 days after completion of the last affected
warranted aircraft.
As a special policy and only in case of findings further to inspection as per this Service
Bulletin, AIRBUS will share the costs of accomplishment of this Service Bulletin by providing
the AIRBUS parts at no charge for orders placed within 26 months after original issue date of
this Service Bulletin.
This Service Bulletin is the subject of an AIRBUS monitored retrofit campaign.
For the organization of this retrofit, you are kindly requested to contact AIRBUS retrofit
management department: monitored.retrofit@airbus.com.
C. LIST OF COMPONENTS
No Kit
DATE: May 17/18 SERVICE BULLETIN No.: A330-54-3042
REVISION No.: 00 - May 17/18 Page: 9
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 14

@A330
SERVICE BULLETIN
D. LIST OF MATERIALS - OPERATOR SUPPLIED
(1) Consumable Materials
None
(2) Components
NOTE
: To accomplish this Service Bulletin it is necessary to use the expendable
parts listed in the subsequent referenced task:
- AMM Task 54-51-29-400-813.
Component COMPA01
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 ITEM
 OLD PART N˚
 INT
 SEE
NOTES
1
 F7173000700000
 2
 PIPE
 (1)
NOTE
: The components listed above are only necessary if findings are found.
The quantity of these items are to be ordered as required.
NOTE
 (1)
: The above list of components is not an AIRBUS Kit, the required parts
shall be ordered as necessary through the given channel.
(3) Equipment
None
E. PARTS TO BE RE-IDENTIFIED BY OPERATOR
None
F. TOOLING
(1) Tooling - Price and Availability
None
(2) Tools
NOTE
: To accomplish this Service Bulletin it is necessary to use the tools listed
in the subsequent re ferenced tasks:
- AMM Task 54-51-29-000-813
- AMM Task 54-51-29-400-813.
(3) Special Tools
None
DATE: May 17/18 SERVICE BULLETIN No.: A330-54-3042
REVISION No.: 00 - May 17/18 Page: 10
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 15

@A330
SERVICE BULLETIN
3. ACCOMPLISHMENT INSTRUCTIONS
Task 543042-832-801-001 - Inspection
WARNING
: MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND ALL THE CAUTIONS
INCLUDED IN THE REFERENCED PROCEDURES.
CAUTION
: ALWAYS OBEY THE PRECAUTIONS THAT FOLLOW TO KEEP
ELECTRICAL WIRING IN A SATISFACTORY CONDITION (ELECTRICALLY
AND MECHANICALLY SERVICEABLE) . WHEN YOU DO MAINTENANCE
WORK, REPAIRS OR MODIFICATIONS, ALWAYS KEEP ELECTRICAL WIRING,
COMPONENTS AND THE WORK AREA AS CLEAN AS POSSIBLE. TO DO
THIS:
- PUT PROTECTION, SUCH AS PLASTIC SHEETING, CLOTHS, ETC., AS
NECESSARY ON WIRING AND COMPONENTS.
- REGULARLY REMOVE ALL SHAVINGS, UNWANTED MATERIAL AND
OTHER CONTAMINATION.
THESE PRECAUTIONS WILL DECREASE THE RISK OF CONTAMINATION
AND DAMAGE TO THE ELECTRICAL WIRING INSTALLATION.
IF THERE IS CONTAMINATION, REFER TO ESPM 20-55-00.
NOTE
: The accomplishment instructions of this Service Bulletin include procedures given
in other documents or in other sections of the Service Bulletin. When the words
’refer to’ are used and the operator has a procedure accepted by the local authority
he belongs to, the accepted alternative procedure can be used. When the words ’in
accordance with’ are used then the given procedure must be followed.
NOTE
: The access and close-up instructions, not comprising return to service tests, in this
Service Bulletin do not constitute or affect the technical intent of the Service
Bulletin. Operators can therefore, as deemed necessary, omit or add access and/or
close-up steps to add flexibility to their maintenance operations as long as the
technical intent of the Service Bulletin is met within the set parameters.
NOTE
: Manual titles given in the accomplishment instructions are referred to by acronyms.
Refer to paragraph 1.J., References, for the definition of acronyms.
NOTE
: This Service Bulletin contains the instructions for the on-aircraft maintenance
necessary to ensure the continued airworthiness of the aircraft.
For any deviations to the instructions, including RC paragraph contained herein,
contact AIRBUS for further instructions and approval.
NOTE
: This Service Bulletin is classified mandatory or expected to be classified mandatory
by an Airworthiness Directive (AD). The paragraphs 3.C. and 3.D. in these
accomplishment instructions are Required for Compliance (RC) and must be done
to comply with the AD. To allow more flexibility, the rule "refer to" and "in
accordance with" will apply to these paragraphs 3.C. and 3.D. Other paragraphs
are recommended and may be deviated from, done as part of other actions or
done with accepted methods different from those given in the Service Bulletin, as
DATE: May 17/18 SERVICE BULLETIN No.: A330-54-3042
REVISION No.: 00 - May 17/18 Page: 11
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 16

@A330
SERVICE BULLETIN
long as the RC paragraphs can be done and the aircraft can be put back into a
serviceable condition.
NOTE
: The purpose of flowcharts is to supplement the information given in the Procedure
and Compliance paragraphs and not to serve as the primary source for tasks or
compliance times given in this Service Bulletin.
Task Associated Data
Zone
450 460
Manpower
TOTAL MANHOURS
 2.00
ELAPSED TIME (HOURS)
 1.50
A. GENERAL
(1) Subtask 543042-910-001-001 - Standard Practices
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 06-20-00, Page Block 001
06-31-53, Page Block 001
(a) For the Frame (FR) identification, refer to AMM 06-31-53, Page Block 001.
(b) For the identification of zones, refer to AMM 06-20-00, Page Block 001.
(2) Subtask 543042-839-001-001 - Administrative
Manpower Resources
Skills
 NON SPECIFIC
Write in the applicable aircraft records that you have done all the work given in this
Service Bulletin.
B. PREPARATION
(1) Subtask 543042-941-001-001 - Job Set-up
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 Task 12-34-24-860-802
Task 54-56-11-000-802
NOTE
: For the basic Aircraft configuration, refer to AMM Chapter "Introduction -
Aircraft status for maintenance" in Manual Front Matter section.
DATE: May 17/18 SERVICE BULLETIN No.: A330-54-3042
REVISION No.: 00 - May 17/18 Page: 12
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 17

@A330
SERVICE BULLETIN
(a) Make sure that the aircraft is electrically grounded, refer to AMM Task
12-34-24-860-802.
(b) Do the job set-up procedure as specified in the removal of the lower fairing, refer to
AMM Task 54-56-11-000-802.
C. PROCEDURE
(1) Subtask 543042-290-001-001 - Do a Special Detailed Inspection of the Drain Pipe
and the U-Shaped Ribs of the Lower APF at Left Hand (LH) Pylon
Work Zones and Access Panels
Zone
 Access/Work location
450
Manpower Resources
Manhours
 0.50
Minimum number of person
 1
Subtask elapsed time
 0.50
Skills
 NON DESTRUCTIVE
TESTING
References
In Service Information (ISI)
 00.00.00179
Non Destructive Test Manual (NTM)
 51-90-00
Service Bulletin (SB)
 A330-54-3041
Fig. A-FBAAA
Boroscope Inspection of the Drain Pipe
Sheet 01
Sheet 02
Fig. A-FFAAA
Flowchart
Sheet 01
(a) At the threshold given in the PLANNING INFORMATION paragraph E.(2):
1
 Do a boroscope inspection inside and outside the drain pipe located above the
lower APF at LH pylon and the U-shaped ribs of the lower APF, refer to NTM
51-90-00.
Refer to Fig. A-FBAAA
Refer to Fig. A-FFAAA
a
 If damage is found with through crack or damage is detected inside drain
pipe with leakage from pylon area A:
<1> Replace the drain pipe before next flight in accordance with TASK
543042-833-801 001 Repair .
<2> Accomplish modification Service Bulletin No. A330-54-3041.
DATE: May 17/18 SERVICE BULLETIN No.: A330-54-3042
REVISION No.: 00 - May 17/18 Page: 13
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 18

@A330
SERVICE BULLETIN
<3> Upload the completed Inspection Report sheet given in Appendix 01
in accordance with ISI 00.00.00179.
NOTE
: Uploading the Inspection Report sheet is not
Required for Compliance.
<4> No further action.
b
 If drain pipe is damaged inside with no leakage from pylon area A:
<1> Replace the drain pipe at the threshold given in the PLANNING
INFORMATION paragraph E.(2) in accordance with TASK
543042-833-801 001 Repair .
<2> Accomplish modification Service Bulletin No. A330-54-3041.
<3> Upload the completed Inspection Report sheet given in Appendix 01
in accordance with ISI 00.00.00179.
NOTE
: Uploading the Inspection Report sheet is not
Required for Compliance.
<4> No further action.
c
 If damage is detected outside the drain pipe and/or contact is detected
between the drain pipe and the U-shaped ribs:
<1> Replace the drain pipe at the threshold given in the PLANNING
INFORMATION paragraph E.(2) in accordance with TASK
543042-833-801 001 Repair .
<2> Accomplish modification Service Bulletin No. A330-54-3041.
<3> Upload the completed Inspection Report sheet given in Appendix 01
in accordance with ISI 00.00.00179.
NOTE
: Uploading the Inspection Report sheet is not
Required for Compliance.
<4> No further action.
d
 If no findings are found:
<1> No further action.
(2) Subtask 543042-290-002-001 - Do a Special Detailed Inspection of the Drain Pipe
and the U-Shaped Ribs of the Lower APF at Right Hand (RH) Pylon
Work Zones and Access Panels
Zone
 Access/Work location
460
DATE: May 17/18 SERVICE BULLETIN No.: A330-54-3042
REVISION No.: 00 - May 17/18 Page: 14
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 19

@A330
SERVICE BULLETIN
Manpower Resources
Manhours
 0.50
Minimum number of person
 1
Subtask elapsed time
 0.50
Skills
 NON DESTRUCTIVE
TESTING
References
In Service Information (ISI)
 00.00.00179
Non Destructive Test Manual (NTM)
 51-90-00
Service Bulletin (SB)
 A330-54-3041
Fig. A-FBAAA
Boroscope Inspection of the Drain Pipe
Sheet 01
Sheet 02
Fig. A-FFAAA
Flowchart
Sheet 01
(a) At the threshold given in the PLANNING INFORMATION paragraph E.(2):
1
 Do a boroscope inspection inside and outside the drain pipe located above the
lower APF at RH pylon and the U-shaped ribs of the lower APF, refer to NTM
51-90-00.
Refer to Fig. A-FBAAA
Refer to Fig. A-FFAAA
a
 If damage is found with through crack or damage is detected inside drain
pipe with leakage from pylon area A:
<1> Replace the drain pipe before next flight in accordance with TASK
543042-833-801 001 Repair .
<2> Accomplish modification Service Bulletin No. A330-54-3041.
<3> Upload the completed Inspection Report sheet given in Appendix 01
in accordance with ISI 00.00.00179.
NOTE
: Uploading the Inspection Report sheet is not
Required for Compliance.
<4> No further action.
b
 If drain pipe is damaged inside with no leakage from pylon area A:
<1> Replace the drain pipe at the threshold given in the PLANNING
INFORMATION paragraph E.(2) in accordance with TASK
543042-833-801 001 Repair .
<2> Accomplish modification Service Bulletin No. A330-54-3041.
DATE: May 17/18 SERVICE BULLETIN No.: A330-54-3042
REVISION No.: 00 - May 17/18 Page: 15
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 20

@A330
SERVICE BULLETIN
<3> Upload the completed Inspection Report sheet given in Appendix 01
in accordance with ISI 00.00.00179.
NOTE
: Uploading the Inspection Report sheet is not
Required for Compliance.
<4> No further action.
c
 If damage is detected outside the drain pipe and/or contact is detected
between the drain pipe and the U-shaped ribs:
<1> Replace the drain pipe at the threshold given in the PLANNING
INFORMATION paragraph E.(2) in accordance with TASK
543042-833-801 001 Repair .
<2> Accomplish modification Service Bulletin No. A330-54-3041.
<3> Upload the completed Inspection Report sheet given in Appendix 01
in accordance with ISI 00.00.00179.
NOTE
: Uploading the Inspection Report sheet is not
Required for Compliance.
<4> No further action.
d
 If no findings are found:
<1> No further action.
D. TEST
None
E. CLOSE-UP
NOTE
: If you intend to accomplish an associated Repair Task during the same
layover period, the subsequent Close-up procedure is not necessary.
(1) Subtask 543042-942-001-001 - Close-up
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 Task 54-56-11-400-802
(a) Make sure that the work areas are clean and clear of tools and other items of
equipment.
(b) Do the close-up procedure as specified after the installation of the lower fairing,
refer to AMM Task 54-56-11-400-802.
(c) Put the aircraft back to its initial configuration.
DATE: May 17/18 SERVICE BULLETIN No.: A330-54-3042
REVISION No.: 00 - May 17/18 Page: 16
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 21

@A330
SERVICE BULLETIN
Task 543042-833-801-001 - Repair
WARNING
: MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND ALL THE CAUTIONS
INCLUDED IN THE REFERENCED PROCEDURES.
CAUTION
: ALWAYS OBEY THE PRECAUTIONS THAT FOLLOW TO KEEP
ELECTRICAL WIRING IN A SATISFACTORY CONDITION (ELECTRICALLY
AND MECHANICALLY SERVICEABLE) . WHEN YOU DO MAINTENANCE
WORK, REPAIRS OR MODIFICATIONS, ALWAYS KEEP ELECTRICAL WIRING,
COMPONENTS AND THE WORK AREA AS CLEAN AS POSSIBLE. TO DO
THIS:
- PUT PROTECTION, SUCH AS PLASTIC SHEETING, CLOTHS, ETC., AS
NECESSARY ON WIRING AND COMPONENTS.
- REGULARLY REMOVE ALL SHAVINGS, UNWANTED MATERIAL AND
OTHER CONTAMINATION.
THESE PRECAUTIONS WILL DECREASE THE RISK OF CONTAMINATION
AND DAMAGE TO THE ELECTRICAL WIRING INSTALLATION.
IF THERE IS CONTAMINATION, REFER TO ESPM 20-55-00.
NOTE
: The accomplishment instructions of this Service Bulletin include procedures given
in other documents or in other sections of the Service Bulletin. When the words
’refer to’ are used and the operator has a procedure accepted by the local authority
he belongs to, the accepted alternative procedure can be used. When the words ’in
accordance with’ are used then the given procedure must be followed.
NOTE
: The access and close-up instructions, not comprising return to service tests, in this
Service Bulletin do not constitute or affect the technical intent of the Service
Bulletin. Operators can therefore, as deemed necessary, omit or add access and/or
close-up steps to add flexibility to their maintenance operations as long as the
technical intent of the Service Bulletin is met within the set parameters.
NOTE
: Manual titles given in the accomplishment instructions are referred to by acronyms.
Refer to paragraph 1.J., References, for the definition of acronyms.
NOTE
: This Service Bulletin contains the instructions for the on-aircraft maintenance
necessary to ensure the continued airworthiness of the aircraft.
For any deviations to the instructions, including RC paragraph contained herein,
contact AIRBUS for further instructions and approval.
NOTE
: This Service Bulletin is classified mandatory or expected to be classified mandatory
by an Airworthiness Directive (AD). The paragraphs 3.C. and 3.D. in these
accomplishment instructions are Required for Compliance (RC) and must be done
to comply with the AD. To allow more flexibility, the rule "refer to" and "in
accordance with" will apply to these paragraphs 3.C. and 3.D. Other paragraphs
are recommended and may be deviated from, done as part of other actions or
done with accepted methods different from those given in the Service Bulletin, as
long as the RC paragraphs can be done and the aircraft can be put back into a
serviceable condition.
DATE: May 17/18 SERVICE BULLETIN No.: A330-54-3042
REVISION No.: 00 - May 17/18 Page: 17
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 22

@A330
SERVICE BULLETIN
NOTE
: Discarded parts must be managed at the operator’s discretion.
Task Associated Data
Zone
453 463
Manpower
TOTAL MANHOURS
 15.00
ELAPSED TIME (HOURS)
 5.25
A. GENERAL
(1) Subtask 543042-910-002-001 - Standard Practices
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 06-20-00, Page Block 001
06-31-53, Page Block 001
(a) For the Frame (FR) identification, refer to AMM 06-31-53, Page Block 001.
(b) For the identification of zones, refer to AMM 06-20-00, Page Block 001.
(2) Subtask 543042-839-002-001 - Administrative
Manpower Resources
Skills
 NON SPECIFIC
Write in the applicable aircraft records that you have done all the work given in this
Service Bulletin.
B. PREPARATION
(1) Subtask 543042-941-002-001 - Job Set-up
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 Task 12-34-24-860-802
Task 54-56-11-000-802
NOTE
: For the basic Aircraft configuration, refer to AMM Chapter "Introduction -
Aircraft status for maintenance" in Manual Front Matter section.
(a) Make sure that the aircraft is electrically grounded, refer to AMM Task
12-34-24-860-802.
(b) Remove the lower fairing from LH and RH pylons, refer to AMM Task
54-56-11-000-802.
DATE: May 17/18 SERVICE BULLETIN No.: A330-54-3042
REVISION No.: 00 - May 17/18 Page: 18
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 23

@A330
SERVICE BULLETIN
C. PROCEDURE
(1) Subtask 543042-900-001-001 - Replace the Drain Pipe at LH Pylon
Work Zones and Access Panels
Zone
 Access/Work location
453
Manpower Resources
Manhours
 1.00
Minimum number of person
 1
Subtask elapsed time
 1.00
Skills
 AIRFRAME
Material necessary to do the job
Component COMPA01
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 SEE
NOTES
1
 F7173000700000
 1
 PIPE
 (1)
NOTE
: The components listed above are only necessary if findings are found.
The quantity of these items are to be ordered as required.
NOTE
 (1)
: The above list of components is not an AIRBUS Kit, the required parts
shall be ordered as necessary through the given channel.
References
Aircraft Maintenance Manual (AMM)
 Task 54-51-29-000-813
Task 54-51-29-400-813
Fig. A-FBBAA
Replacement of the Drain Pipe
Sheet 01
(a) Replace the drain pipe at LH pylon:
Refer to Fig. A-FBBAA
1
 Remove the drain pipe item (1), refer to AMM Task 54-51-29-000-813.
1 Drain Pipe F7173000700000 Item (1) Discard
2
 Install the drain pipe item 1, refer to AMM Task 54-51-29-400-813.
1 Drain Pipe F7173000700000 Item 1
(2) Subtask 543042-900-002-001 - Replace the Drain Pipe at RH Pylon
Work Zones and Access Panels
Zone
 Access/Work location
463
DATE: May 17/18 SERVICE BULLETIN No.: A330-54-3042
REVISION No.: 00 - May 17/18 Page: 19
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 24

@A330
SERVICE BULLETIN
Manpower Resources
Manhours
 1.00
Minimum number of person
 1
Subtask elapsed time
 1.00
Skills
 AIRFRAME
Material necessary to do the job
Component COMPA01
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 SEE
NOTES
1
 F7173000700000
 1
 PIPE
 (1)
NOTE
: The components listed above are only necessary if findings are found.
The quantity of these items are to be ordered as required.
NOTE
 (1)
: The above list of components is not an AIRBUS Kit, the required parts
shall be ordered as necessary through the given channel.
References
Aircraft Maintenance Manual (AMM)
 Task 54-51-29-000-813
Task 54-51-29-400-813
Fig. A-FBBAA
Replacement of the Drain Pipe
Sheet 01
(a) Replace the drain pipe at RH pylon:
Refer to Fig. A-FBBAA
1
 Remove the drain pipe item (1), refer to AMM Task 54-51-29-000-813.
1 Drain Pipe F7173000700000 Item (1) Discard
2
 Install the drain pipe item 1, refer to AMM Task 54-51-29-400-813.
1 Drain Pipe F7173000700000 Item 1
D. TEST
None
E. CLOSE-UP
NOTE
: If you intend to accomplish the modification Service Bulletin No.
A330-54-3041 during the same layover period, the subsequent Close-up
procedure is not necessary.
(1) Subtask 543042-942-002-001 - Close-up
Manpower Resources
Skills
 NON SPECIFIC
DATE: May 17/18 SERVICE BULLETIN No.: A330-54-3042
REVISION No.: 00 - May 17/18 Page: 20
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 25

@A330
SERVICE BULLETIN
References
Aircraft Maintenance Manual (AMM)
 Task 54-56-11-400-802
(a) Make sure that the work areas are clean and clear of tools and other items of
equipment.
(b) Install the lower fairing of the LH and RH pylons, refer to AMM Task
54-56-11-400-802.
(c) Put the aircraft back to its initial configuration.
DATE: May 17/18 SERVICE BULLETIN No.: A330-54-3042
REVISION No.: 00 - May 17/18 Page: 21
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 26

@A330
SERVICE BULLETIN
**CONF ALL
B
C
B
RIB1
RIB12
RIB18A
A
A
Z460
Z450
A
LH SHOWN
RH IDENTICAL
LH SHOWN
RH IDENTICAL
DRAIN PIPE
TO BE INSPECTED
G_SB_543042_5_BAAA_01_00
Figure A-FBAAA - Sheet 01
Boroscope Inspection of the Drain Pipe
DATE: May 17/18 SERVICE BULLETIN No.: A330-54-3042
REVISION No.: 00 - May 17/18 Page: 22
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 27

@A330
SERVICE BULLETIN
**CONF ALL
C
D
BOROSCOPE
ENTRY POINT
NOTE:
CONTACT ZONE BETWEEN DRAIN PIPE AND U−SHAPED RIB.
LENGTH BETWEEN BOROSCOPE ENTRY POINT AND RIB18 IS01
2250 mm (88.582 in) AND LENGTH BETWEEN BOROSCOPE
VIEW LOOKING AFT
DRAIN PIPE OMITTED FOR CLARITY
ENTRY POINT AND RIB19 IS 2400 mm (94.488 in).
RIB18
01
D
LH SHOWN
RH IDENTICAL
LOWER APF
LOWER APF
RIB19
G_SB_543042_5_BAAA_02_01
Figure A-FBAAA - Sheet 02
Boroscope Inspection of the Drain Pipe
DATE: May 17/18 SERVICE BULLETIN No.: A330-54-3042
REVISION No.: 00 - May 17/18 Page: 23
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 28

@A330
SERVICE BULLETIN
**CONF ALL
B
B
RIB1
RIB12
RIB18A
A
A
Z463
Z453
A
LH SHOWN
RH IDENTICAL
LH SHOWN
RH IDENTICAL
(1)
1
G_SB_543042_5_BBAA_01_00
Figure A-FBBAA - Sheet 01
Replacement of the Drain Pipe
DATE: May 17/18 SERVICE BULLETIN No.: A330-54-3042
REVISION No.: 00 - May 17/18 Page: 24
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 29

@A330
SERVICE BULLETIN
**CONF ALL
DAMAGE FOUND WITH
THROUGH CRACK?
DO A SPECIAL DETAILED INSPECTION INSIDE AND OUTSIDE THE DRAIN PIPE
AND THE U−SHAPED RIBS OF THE LOWER APF, AT THE THRESHOLD GIVEN
IN THE PLANNING INFORMATION PARAGRAPH E.(2), IN ACCORDANCE WITH
TASK 543042−832−801−001
YES
NOYES
DAMAGE DETECTED OUTSIDE
THE DRAIN PIPE AND/OR CONTACT DETECTED
BETWEEN THE DRAIN PIPE AND
THE U−SHAPED RIBS?
NOYES
INSIDE THE DRAIN PIPE?
DAMAGE DETECTED
NO
NO
NO FURTHER ACTION
YES
REPLACE THE DRAIN PIPE
BEFORE NEXT FLIGHT
IN ACCORDANCE WITH
TASK 543042−833−801−001
ACCOMPLISH MODIFICATION
SERVICE BULLETIN No A330−54−3041
UPLOAD THE COMPLETED
INSPECTION REPORT
NO FURTHER ACTION
ACCOMPLISH MODIFICATION
SERVICE BULLETIN No A330−54−3041
REPLACE THE DRAIN PIPE AT THE
THRESHOLD GIVEN IN THE PLANNING
TASK 543042−833−801−001
INFORMATION PARAGRAPH E.(2)
IN ACCORDANCE WITH
NOTE:
THE PURPOSE OF FLOWCHARTS IS TO SUPPLEMENT THE INFORMATION GIVEN IN THE PROCEDURE
AND COMPLIANCE PARAGRAPHS AND NOT TO SERVE AS THE PRIMARY SOURCE FOR TASKS OR
COMPLIANCE TIMES GIVEN IN THIS SERVICE BULLETIN.
LEAKAGE DETECTED
FROM PYLON AREA A?
G_SB_543042_5_FAAA_01_02
Figure A-FFAAA - Sheet 01
Flowchart
DATE: May 17/18 SERVICE BULLETIN No.: A330-54-3042
REVISION No.: 00 - May 17/18 Page: 25
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 30

@A330
SERVICE BULLETIN
This Page Intentionally Left Blank
DATE: May 17/18 SERVICE BULLETIN No.: A330-54-3042
REVISION No.: 00 - May 17/18 Page: 26
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 31

@A330
SERVICE BULLETIN
Appendix 01 - Inspection Report
**CONF ALL
The results of the inspection, including no findings, replacement or actions to be done, must be
uploaded in accordance with ISI 00.00.00179.
DATE: May 17/18 SERVICE BULLETIN No.: A330-54-3042
REVISION No.: 00 - May 17/18 Page: 1
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 32

@A330
SERVICE BULLETIN
Appendix 01 - Inspection Report
**CONF ALL
INSPECTION REPORT
SERVICE BULLETIN No :
A/C MSN :
FLIGHT CYCLES :
FLIGHT HOURS :
A330−54−3042
DATE OF INSPECTION :
INSPECTION METHOD : SPECIAL DETAILED
INSPECTION
UPLOAD THE COMPLETED INSPECTION REPORT
SHEET IN ACCORDANCE WITH ISI 00.00.00179
INSPECT INSIDE AND OUTSIDE THE
DRAIN PIPE LOCATED ABOVE THE
LOWER APF AND U−SHAPED RIBS
OF THE LOWER APF AT THE LH PYLON
INSPECTION RESULTS
DAMAGE FOUND WITH
THROUGH CRACK OR
DAMAGE DETECTED INSIDE
THE DRAIN PIPE WITH
LEAKAGE FROM PYLON
AREA A?
FOLLOW−UP ACTIONS
DRAIN PIPE REPLACED
INSPECT INSIDE AND OUTSIDE THE
DRAIN PIPE LOCATED ABOVE THE
LOWER APF AND U−SHAPED RIBS
OF THE LOWER APF AT THE RH PYLON
SB A330−54−3041 APPLIED
DRAIN PIPE REPLACED
SB A330−54−3041 APPLIED
DRAIN PIPE REPLACED
SB A330−54−3041 APPLIED
DRAIN PIPE REPLACED
SB A330−54−3041 APPLIED
DRAIN PIPE REPLACED
SB A330−54−3041 APPLIED
DRAIN PIPE REPLACED
SB A330−54−3041 APPLIED
DAMAGE DETECTED OUTSIDE
THE DRAIN PIPE
AND/OR CONTACT BETWEEN
THE DRAIN PIPE AND THE
U−SHAPED RIBS?
DAMAGE DETECTED INSIDE
THE DRAIN PIPE WITHOUT
LEAKAGE FROM PYLON
AREA A?
DAMAGE DETECTED OUTSIDE
THE DRAIN PIPE
AND/OR CONTACT BETWEEN
THE DRAIN PIPE AND THE
U−SHAPED RIBS?
CF6−80 ENGINE DRAIN PIPE AND U−SHAPED RIBS INSPECTION
DAMAGE DETECTED INSIDE
THE DRAIN PIPE WITHOUT
LEAKAGE FROM PYLON
AREA A?
DAMAGE FOUND WITH
THROUGH CRACK OR
DAMAGE DETECTED INSIDE
THE DRAIN PIPE WITH
LEAKAGE FROM PYLON
AREA A?
G_SB_543042_5_AAAA_01_02
Figure A-FAAAA - Sheet 01
Inspection Report
DATE: May 17/18 SERVICE BULLETIN No.: A330-54-3042
REVISION No.: 00 - May 17/18 Page: 2
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 33

@A330
SERVICE BULLETIN
Appendix 02 - Manpower Gantt Chart
**CONF ALL
For an explanation of the man-hours and elapsed time, refer to the next page(s).
DATE: May 17/18 SERVICE BULLETIN No.: A330-54-3042
REVISION No.: 00 - May 17/18 Page: 1
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 34

@A330
SERVICE BULLETIN
Appendix 02 - Manpower Gantt Chart
**CONF ALL
ELAPSED TIME ASSUMPTION SERVICE BULLETIN No A330−54−3042
GET ACCESS
MH ET/S
TOTAL MANHOURS
SB ELAPSED TIME
2.00
1.50
STEPS
0.50 0.50
0
DO A SPECIAL DETAILED 0.50 0.50
0.50 0.50 1DO A SPECIAL DETAILED
INSPECTION OF THE DRAIN
PIPE AND THE U−SHAPED RIBS
CLOSE−UP 0.50 0.50
1
1
INSPECTION OF THE DRAIN
PIPE AND THE U−SHAPED RIBS
MH
ET/S:
PER
MANHOURS
ELAPSED TIME PER STEP
NUMBER OF PERSONS
01
02
THIS CHART IS ONLY A PROPOSAL.
OPERATORS MAY DETERMINE THAT ANOTHER WAY
TO DO THE WORK IS MORE SUITABLE FOR THEM.
01
02
NOTE:
PER
1
:
:
SB ELAPSED TIME
(HOURS)
IF A VSB IS INVOLVED, THE ASSOCIATED MANHOURS
ARE NOT REFLECTED IN THIS GANTT CHART.
1
OF THE LOWER APF AT LH PYLON
OF THE LOWER APF AT RH PYLON
0.5 1.5
G_SB_543042_5_ABAA_01_01
Figure A-FABAA - Sheet 01
Gantt Chart
DATE: May 17/18 SERVICE BULLETIN No.: A330-54-3042
REVISION No.: 00 - May 17/18 Page: 2
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 35

@A330
SERVICE BULLETIN
Service Bulletin REPORTING
TITLE: NACELLES/PYLONS - GENERAL - A330 CF6-80 ENGINES DRAIN PIPE
AND LOWER APF U-SHAPED RIBS INSPECTION
MODIFICATION No.: None
SB Reporting status
This Service Bulletin will only be incorporated into affected customized Maintenance and Flight
Operations Products if it is duly reported to Airbus.
General information
The SB Reporting policy is published in ISI 00.00.00135. This document provides information regarding:
the SB Reporting means and benefits, the update of customized Maintenance Products and customized
Flight Operations Products.
If this Service Bulletin has an operational impact, refer to paragraph "Flight Operations Products" for
further information on the update of affected Flight Operations Products.
SB Reporting procedure
Standard practice to report SB is to use the online reporting application on AirbusWorld.
Refer to ISI 00.00.00179:
- For complete information on reporting means to Airbus. Question 2 "What are the standard
practices for SB reporting?"
- If this SB requires previous or simultaneous accomplishment of other SBs, Question 3 "What about
the reporting of prerequisite Service Bulletin?"
NOTE:
 ISI 00.00.00179 covers all the frequently asked questions about SB Reporting. It is revised on a
regular basis.
DATE: May 17/18 SERVICE BULLETIN No.: A330-54-3042
REVISION No.: 00 - May 17/18 Page: 1
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 36

@A330
SERVICE BULLETIN
QUALITY PERCEPTION FORM
Use this form to tell us what is your perception of the quality of this Service Bulletin. The reported data
that you provide us will be used to analyse areas of difficulties and to take corrective action to further
improve the quality of our Service Bulletins.
We thank you for the time you have taken in completing this form.
(Please rate on a scale of 1 to 4, with 4 being the highest score)
- Quality rating of this SB 4321
- Quality rating of the Accomplishment Instructions 4321
- Quality rating of the Illustrations 4321
- Is this SB easy to understand ? Y/N
If you have had difficulties in the accomplishment of this SB please quote below the area(s) and give a
short description of the issue.
Planning Material Instructions
X Effectivity X Kit content X Preparation
X Reason X List of Materials Operator Supplied X Mod/Inspection
X Manpower X Industry support X Test
X References X Re-identification X Close-Up
X Publication X Tooling X Illustrations
Comments:
Operator: Date:
Name/Title:
Please return this form to:
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX FRANCE
Attn : SEM4 Service Bulletins Management
F A X:( 3 3 )56 19 34 25 1
Or via your Resident Customer Support Office.
DATE: May 17/18 SERVICE BULLETIN No.: A330-54-3042
REVISION No.: 00 - May 17/18 Page: 1
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
