# Airbus Service Bulletin A330-57-3130

Copy: No revision named ("A330-57-3130 R01"), 134 pages: PDF https://openairdocs.org/files/sha256/d6/f4/d6f4d994024d460f2712d2e76bbfa34efb0c3750eb9e60a7d3aca96195f22b77; text https://openairdocs.org/service-documents/airbus/a330-57-3130/file/d6f4d994024d.md. Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2018-0113, the docket of AD 2019-16-07. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Airbus](https://openairdocs.org/service-documents/airbus.md)
- Type: Service bulletin (Service Bulletin)
- Number: A330-57-3130
- Page: https://openairdocs.org/service-documents/airbus/a330-57-3130

Also cited in [1 proposed AD](https://openairdocs.org/service-documents/airbus/a330-57-3130/proposed.md).

## Text (134 pages)

Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2018-0113, the docket of AD 2019-16-07. Not covered by OpenAirDocs’ CC0 dedication. Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

@A330
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
ATA SYSTEM: 57
TITLE: FUSELAGE - CENTER FUSELAGE - MODIFICATION OF FASTENER
HOLE NO. 260 AT FRAME 40
MODIFICATION No.: 206050S33790
This page transmits Revision No.01 of Service Bulletin No.A330-57-3130
ADDITIONAL WORK
**CONF ALL
No additional work is required by this revision for aircraft modified by any previous issue.
REASON
Revision No. 01 issued to:
- Update the EFFECTIVITY paragraph
- Remove the MPD from the PUBLICATION AFFECTED paragraph
- Modify the Service Bulletin structure further to validation on Manufacturer Serial Number (MSN)
0422.
CHANGES
The main changes of this revision are:
- GENERAL EVALUATION table has been updated
- EFFECTIVITY paragraph has been updated
- REASON paragr aph has been updated
- COMPLIANCE paragraph has been updated
- MANPOWER table has been updated
- REFERENCES paragraph has been updated
- MATERIAL INFORMATION paragraph has been updated:
. Procurement address for Kit 573130A01R00 and Kit 573130A02R00 has been updated
DATE: Nov 23/16 SERVICE BULLETIN No.: A330-57-3130
REVISION No.: 01 - Feb 13/18 Page: 1
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 2

@A330
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
. Price and Availability note has been updated
. INDUSTRY SUPPORT INFORMATION paragraph has been updated
. Consumable Materials List (CML) has been updated.
- ACCOMPLISHMENT INSTRUCTIONS paragraph has been updated and modified:
. Warning has been added
. Note has been added
. STANDARD PRACTICES paragraph has been updated
. PREPARATION par agraph has been updated
. PROCEDURE paragraph has been updated
. TEST paragraph has been updated
. CLOSE-UP paragraph has been updated.
- Figure A-FBEAA has been created
- Figure A-FBDAA and A-FBDAB has been updated
- Manpower Gantt Chart has been updated.
SUMMARY
REASON/DESCRIPTION/OPERATIONAL
CONSEQUENCES
REASON UPDATED
 R
GENERAL EVALUATION
 GENERAL EVALUATION TABLE UPDATED
 R
EFFECTIVITY
 OPERATOR LIST UPDATED
 R
NATURE OF THE WORK
 NATURE OF WORK TABLE UPDATED
 R
MANPOWER
 MANPOWER UPDATED
 R
MANPOWER UPDATED
 R
MANPOWER UPDATED
 R
MANPOWER UPDATED
 R
PLANNING INFORMATION
EFFECTIVITY
 EFFECTIVITY RELATED INFORMATION
UPDATED
R
Configuration definition
CONF 001
 CONFIGURATION DEFINITION UPDATED
 R
CONF 002
 CONFIGURATION DEFINITION UPDATED
 R
CONF 004
 CONFIGURATION DEFINITION UPDATED
 R
REASON
Operational/Maintenance
Consequences
OPERATIONAL/MAINTENANCE CONSEQUENCES
UPDATED
R
COMPLIANCE
Accomplishment Timescale
 ACCOMPLISHMENT TIMESCALE UPDATED
 R
DATE: Nov 23/16 SERVICE BULLETIN No.: A330-57-3130
REVISION No.: 01 - Feb 13/18 Page: 2
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 3

@A330
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
MANPOWER
 MANPOWER UPDATED
 R
MANPOWER UPDATED
 R
MANPOWER UPDATED
 R
MANPOWER UPDATED
 R
REFERENCES
 REFERENCED DOCUMENTATION UPDATED
 R
REFERENCED DOCUMENTATION UPDATED
 R
REFERENCED DOCUMENTATION UPDATED
 R
REFERENCED DOCUMENTATION UPDATED
 R
PUBLICATION AFFECTED
 PUBLICATIONS AFFECTED UPDATED
 R
MATERIAL INFORMATION
MATERIAL - PRICE AND AVAILABILITY
Procurement Addresses
 PROCUREMENT ADDRESSES UPDATED
 R
Price and Availability
 PRICE AND AVAILABILITY UPDATED
 R
INDUSTRY SUPPORT INFORMATION
 INDUSTRY SUPPORT INFORMATION UPDATED
 R
LIST OF MATERIALS - OPERATOR
SUPPLIED
Consumable Materials
Consumable CMLA01
 CONSUMABLE MATERIAL SET UPDATED
CONSUMABLE UPDATED
QUANTITY UPDATED
R
TOOLING
Tooling - Price and Availability
Procurement Addresses
 PROCUREMENT ADDRESSES UPDATED
 R
Price and Availability
 PRICE AND AVAILABILITY UPDATED
MATERIAL SET UPDATED
R
ACCOMPLISHMENT INSTRUCTIONS
TASK 573130- 831-801-001-Modification
 TASK SOLUTION UPDATED
WARNING UPDATED
NOTE UPDATED
CAUTION UPDATED
R
Task associated data - 001
 MAN HOURS UPDATED
ELAPSED TIME UPDATED
R
Task associated data - 002
 MAN HOURS UPDATED
ELAPSED TIME UPDATED
R
Task associated data - 003
 MAN HOURS UPDATED
ELAPSED TIME UPDATED
R
Task associated data - 004
 MAN HOURS UPDATED
ELAPSED TIME UPDATED
R
Subtask 573130-910-001-001
 SUBTASK SOLUTION UPDATED
REFERENCED DOCUMENTATION UPDATED
REFERENCES UPDATED
R
Subtask 573130-910-001-001
 SUBTASK SOLUTION UPDATED
REFERENCED DOCUMENTATION UPDATED
REFERENCES UPDATED
R
Subtask 573130-910-001-001
 SUBTASK SOLUTION UPDATED
REFERENCED DOCUMENTATION UPDATED
REFERENCES UPDATED
R
DATE: Nov 23/16 SERVICE BULLETIN No.: A330-57-3130
REVISION No.: 01 - Feb 13/18 Page: 3
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 4

@A330
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
Subtask 573130-910-001-001
 SUBTASK SOLUTION UPDATED
REFERENCED DOCUMENTATION UPDATED
REFERENCES UPDATED
R
Subtask 573130-941-001-001
 SUBTASK SOLUTION UPDATED
REFERENCED DOCUMENTATION UPDATED
NOTE UPDATED
R
Subtask 573130-865-001-001
 SUBTASK SOLUTION DELETED FOR
APPLICABLE MSN
D
Subtask 573130-941-002-001
 SUBTASK SOLUTION DELETED FOR
APPLICABLE MSN
D
Subtask 573130-010-002-001
 SUBTASK SOLUTION UPDATED
CONFIGURATION UPDATED
FIGURE REFERENCE UPDATED
PANEL UPDATED
REFERENCED DOCUMENTATION UPDATED
ITEM NUMBER UPDATED
PART NUMBER DESCRIPTION UPDATED
QUANTITY UPDATED
REFERENCES UPDATED
R
Subtask 573130-941-001-002
 SUBTASK SOLUTION UPDATED
REFERENCED DOCUMENTATION UPDATED
NOTE UPDATED
R
Subtask 573130-865-001-001
 SUBTASK SOLUTION DELETED FOR
APPLICABLE MSN
D
Subtask 573130-941-002-001
 SUBTASK SOLUTION DELETED FOR
APPLICABLE MSN
D
Subtask 573130-010-002-001
 SUBTASK SOLUTION UPDATED
CONFIGURATION UPDATED
FIGURE REFERENCE UPDATED
PANEL UPDATED
REFERENCED DOCUMENTATION UPDATED
ITEM NUMBER UPDATED
PART NUMBER DESCRIPTION UPDATED
QUANTITY UPDATED
REFERENCES UPDATED
R
Subtask 573130-941-001-002
 SUBTASK SOLUTION UPDATED
REFERENCED DOCUMENTATION UPDATED
NOTE UPDATED
R
Subtask 573130-865-001-001
 SUBTASK SOLUTION DELETED FOR
APPLICABLE MSN
D
Subtask 573130-941-002-001
 SUBTASK SOLUTION DELETED FOR
APPLICABLE MSN
D
DATE: Nov 23/16 SERVICE BULLETIN No.: A330-57-3130
REVISION No.: 01 - Feb 13/18 Page: 4
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 5

@A330
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
Subtask 573130-010-002-001
 SUBTASK SOLUTION UPDATED
CONFIGURATION UPDATED
FIGURE REFERENCE UPDATED
PANEL UPDATED
REFERENCED DOCUMENTATION UPDATED
ITEM NUMBER UPDATED
PART NUMBER DESCRIPTION UPDATED
QUANTITY UPDATED
REFERENCES UPDATED
R
Subtask 573130-941-001-001
 SUBTASK SOLUTION UPDATED
REFERENCED DOCUMENTATION UPDATED
NOTE UPDATED
R
Subtask 573130-865-001-001
 SUBTASK SOLUTION DELETED FOR
APPLICABLE MSN
D
Subtask 573130-941-002-001
 SUBTASK SOLUTION DELETED FOR
APPLICABLE MSN
D
Subtask 573130-010-002-001
 SUBTASK SOLUTION UPDATED
CONFIGURATION UPDATED
FIGURE REFERENCE UPDATED
PANEL UPDATED
REFERENCED DOCUMENTATION UPDATED
ITEM NUMBER UPDATED
PART NUMBER DESCRIPTION UPDATED
QUANTITY UPDATED
REFERENCES UPDATED
R
Subtask 573130-020-001-001
 SUBTASK SOLUTION UPDATED
MANPOWER RESSOURCE UPDATED
R
Subtask 573130-250-001-001
 SUBTASK SOLUTION UPDATED
MANPOWER RESSOURCE UPDATED
R
Subtask 573130-831-001-001
 SUBTASK SOLUTION UPDATED
CONSUMABLE UPDATED
QUANTITY UPDATED
REFERENCED DOCUMENTATION UPDATED
MANPOWER RESSOURCE UPDATED
MATERIAL LIST UPDATED
REFERENCES UPDATED
R
Subtask 573130-420-001-001
 SUBTASK SOLUTION UPDATED
CONSUMABLE UPDATED
QUANTITY UPDATED
REFERENCED DOCUMENTATION UPDATED
CONFIGURATION UPDATED
MANPOWER RESSOURCE UPDATED
MATERIAL LIST UPDATED
REFERENCES UPDATED
FIGURE REFERENCE UPDATED
R
Subtask 573130-020-002-001
 SUBTASK SOLUTION UPDATED
MANPOWER RESSOURCE UPDATED
R
Subtask 573130-250-002-001
 SUBTASK SOLUTION UPDATED
MANPOWER RESSOURCE UPDATED
R
DATE: Nov 23/16 SERVICE BULLETIN No.: A330-57-3130
REVISION No.: 01 - Feb 13/18 Page: 5
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 6

@A330
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
Subtask 573130-831-002-001
 SUBTASK SOLUTION UPDATED
CONSUMABLE UPDATED
QUANTITY UPDATED
REFERENCED DOCUMENTATION UPDATED
MANPOWER RESSOURCE UPDATED
MATERIAL LIST UPDATED
REFERENCES UPDATED
R
Subtask 573130-420-002-001
 SUBTASK SOLUTION UPDATED
CONSUMABLE UPDATED
QUANTITY UPDATED
REFERENCED DOCUMENTATION UPDATED
CONFIGURATION UPDATED
MANPOWER RESSOURCE UPDATED
MATERIAL LIST UPDATED
REFERENCES UPDATED
FIGURE REFERENCE UPDATED
R
Subtask 573130-020-001-001
 SUBTASK SOLUTION UPDATED
MANPOWER RESSOURCE UPDATED
R
Subtask 573130-250-001-001
 SUBTASK SOLUTION UPDATED
MANPOWER RESSOURCE UPDATED
R
Subtask 573130-831-001-001
 SUBTASK SOLUTION UPDATED
CONSUMABLE UPDATED
QUANTITY UPDATED
REFERENCED DOCUMENTATION UPDATED
MANPOWER RESSOURCE UPDATED
MATERIAL LIST UPDATED
REFERENCES UPDATED
R
Subtask 573130-420-001-003
 SUBTASK SOLUTION ADDED
 N
Subtask 573130-420-001-001
 SUBTASK SOLUTION DELETED FOR
APPLICABLE MSN
D
Subtask 573130-020-002-001
 SUBTASK SOLUTION UPDATED
MANPOWER RESSOURCE UPDATED
R
Subtask 573130-250-002-001
 SUBTASK SOLUTION UPDATED
MANPOWER RESSOURCE UPDATED
R
Subtask 573130-831-002-001
 SUBTASK SOLUTION UPDATED
CONSUMABLE UPDATED
QUANTITY UPDATED
REFERENCED DOCUMENTATION UPDATED
MANPOWER RESSOURCE UPDATED
MATERIAL LIST UPDATED
REFERENCES UPDATED
R
Subtask 573130-420-002-004
 SUBTASK SOLUTION ADDED
 N
Subtask 573130-420-002-001
 SUBTASK SOLUTION DELETED FOR
APPLICABLE MSN
D
Subtask 573130-020-001-002
 SUBTASK SOLUTION UPDATED
MANPOWER RESSOURCE UPDATED
R
Subtask 573130-250-001-002
 SUBTASK SOLUTION UPDATED
MANPOWER RESSOURCE UPDATED
R
DATE: Nov 23/16 SERVICE BULLETIN No.: A330-57-3130
REVISION No.: 01 - Feb 13/18 Page: 6
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 7

@A330
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
Subtask 573130-831-001-002
 SUBTASK SOLUTION UPDATED
CONSUMABLE UPDATED
QUANTITY UPDATED
REFERENCED DOCUMENTATION UPDATED
MANPOWER RESSOURCE UPDATED
MATERIAL LIST UPDATED
REFERENCES UPDATED
R
Subtask 573130-420-001-004
 SUBTASK SOLUTION ADDED
 N
Subtask 573130-420-001-002
 SUBTASK SOLUTION DELETED FOR
APPLICABLE MSN
D
Subtask 573130-020-002-002
 SUBTASK SOLUTION UPDATED
MANPOWER RESSOURCE UPDATED
R
Subtask 573130-250-002-002
 SUBTASK SOLUTION UPDATED
MANPOWER RESSOURCE UPDATED
R
Subtask 573130-831-002-002
 SUBTASK SOLUTION UPDATED
CONSUMABLE UPDATED
QUANTITY UPDATED
REFERENCED DOCUMENTATION UPDATED
MANPOWER RESSOURCE UPDATED
MATERIAL LIST UPDATED
REFERENCES UPDATED
R
Subtask 573130-420-002-003
 SUBTASK SOLUTION ADDED
 N
Subtask 573130-420-002-002
 SUBTASK SOLUTION DELETED FOR
APPLICABLE MSN
D
Subtask 573130-020-001-002
 SUBTASK SOLUTION UPDATED
MANPOWER RESSOURCE UPDATED
R
Subtask 573130-250-001-002
 SUBTASK SOLUTION UPDATED
MANPOWER RESSOURCE UPDATED
R
Subtask 573130-831-001-002
 SUBTASK SOLUTION UPDATED
CONSUMABLE UPDATED
QUANTITY UPDATED
REFERENCED DOCUMENTATION UPDATED
MANPOWER RESSOURCE UPDATED
MATERIAL LIST UPDATED
REFERENCES UPDATED
R
Subtask 573130-420-001-002
 SUBTASK SOLUTION UPDATED
CONSUMABLE UPDATED
QUANTITY UPDATED
REFERENCED DOCUMENTATION UPDATED
CONFIGURATION UPDATED
MANPOWER RESSOURCE UPDATED
MATERIAL LIST UPDATED
REFERENCES UPDATED
FIGURE REFERENCE UPDATED
R
Subtask 573130-020-002-002
 SUBTASK SOLUTION UPDATED
MANPOWER RESSOURCE UPDATED
R
Subtask 573130-250-002-002
 SUBTASK SOLUTION UPDATED
MANPOWER RESSOURCE UPDATED
R
DATE: Nov 23/16 SERVICE BULLETIN No.: A330-57-3130
REVISION No.: 01 - Feb 13/18 Page: 7
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 8

@A330
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
Subtask 573130-831-002-002
 SUBTASK SOLUTION UPDATED
CONSUMABLE UPDATED
QUANTITY UPDATED
REFERENCED DOCUMENTATION UPDATED
MANPOWER RESSOURCE UPDATED
MATERIAL LIST UPDATED
REFERENCES UPDATED
R
Subtask 573130-420-002-002
 SUBTASK SOLUTION UPDATED
CONSUMABLE UPDATED
QUANTITY UPDATED
REFERENCED DOCUMENTATION UPDATED
CONFIGURATION UPDATED
MANPOWER RESSOURCE UPDATED
MATERIAL LIST UPDATED
REFERENCES UPDATED
FIGURE REFERENCE UPDATED
R
Subtask 573130-700-001-001
 SUBTASK SOLUTION UPDATED
REFERENCED DOCUMENTATION UPDATED
CONFIGURATION UPDATED
FIN UPDATED
PANEL UPDATED
REFERENCES UPDATED
NOTE UPDATED
R
Subtask 573130-790-001-001
 SUBTASK SOLUTION ADDED
 N
Subtask 573130-700-001-001
 SUBTASK SOLUTION UPDATED
REFERENCED DOCUMENTATION UPDATED
CONFIGURATION UPDATED
FIN UPDATED
PANEL UPDATED
REFERENCES UPDATED
NOTE UPDATED
R
Subtask 573130-790-001-002
 SUBTASK SOLUTION ADDED
 N
Subtask 573130-700-001-001
 SUBTASK SOLUTION UPDATED
REFERENCED DOCUMENTATION UPDATED
CONFIGURATION UPDATED
FIN UPDATED
PANEL UPDATED
REFERENCES UPDATED
NOTE UPDATED
R
Subtask 573130-790-001-002
 SUBTASK SOLUTION ADDED
 N
Subtask 573130-700-001-001
 SUBTASK SOLUTION UPDATED
REFERENCED DOCUMENTATION UPDATED
CONFIGURATION UPDATED
FIN UPDATED
PANEL UPDATED
REFERENCES UPDATED
NOTE UPDATED
R
Subtask 573130-790-001-001
 SUBTASK SOLUTION ADDED
 N
DATE: Nov 23/16 SERVICE BULLETIN No.: A330-57-3130
REVISION No.: 01 - Feb 13/18 Page: 8
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 9

@A330
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
Subtask 573130-410-001-001
 SUBTASK SOLUTION UPDATED
REFERENCED DOCUMENTATION UPDATED
CONFIGURATION UPDATED
FIGURE REFERENCE UPDATED
ITEM NUMBER UPDATED
PART NUMBER DESCRIPTION UPDATED
QUANTITY UPDATED
PANEL UPDATED
REFERENCES UPDATED
R
Subtask 573130-942-003-001
 SUBTASK SOLUTION UPDATED
REFERENCED DOCUMENTATION UPDATED
REFERENCES UPDATED
R
Subtask 573130-410-001-001
 SUBTASK SOLUTION UPDATED
REFERENCED DOCUMENTATION UPDATED
CONFIGURATION UPDATED
FIGURE REFERENCE UPDATED
ITEM NUMBER UPDATED
PART NUMBER DESCRIPTION UPDATED
QUANTITY UPDATED
PANEL UPDATED
REFERENCES UPDATED
R
Subtask 573130-942-003-002
 SUBTASK SOLUTION UPDATED
REFERENCED DOCUMENTATION UPDATED
REFERENCES UPDATED
R
Subtask 573130-410-001-001
 SUBTASK SOLUTION UPDATED
REFERENCED DOCUMENTATION UPDATED
CONFIGURATION UPDATED
FIGURE REFERENCE UPDATED
ITEM NUMBER UPDATED
PART NUMBER DESCRIPTION UPDATED
QUANTITY UPDATED
PANEL UPDATED
REFERENCES UPDATED
R
Subtask 573130-942-003-002
 SUBTASK SOLUTION UPDATED
REFERENCED DOCUMENTATION UPDATED
REFERENCES UPDATED
R
Subtask 573130-410-001-001
 SUBTASK SOLUTION UPDATED
REFERENCED DOCUMENTATION UPDATED
CONFIGURATION UPDATED
FIGURE REFERENCE UPDATED
ITEM NUMBER UPDATED
PART NUMBER DESCRIPTION UPDATED
QUANTITY UPDATED
PANEL UPDATED
REFERENCES UPDATED
R
Subtask 573130-942-003-001
 SUBTASK SOLUTION UPDATED
REFERENCED DOCUMENTATION UPDATED
REFERENCES UPDATED
R
Fig. A-FBDAA
Fig. A-FBDAA Sheet 01
 SHEET UPDATED
 R
DATE: Nov 23/16 SERVICE BULLETIN No.: A330-57-3130
REVISION No.: 01 - Feb 13/18 Page: 9
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 10

@A330
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
Fig. A-FBDAA Sheet 02
 SHEET UPDATED
 R
Fig. A-FBDAB
Fig. A-FBDAB Sheet 01
 SHEET UPDATED
 R
Fig. A-FBDAB Sheet 02
 SHEET UPDATED
 R
Fig. A-FBEAA
 FIGURE SOLUTION ADDED
 N
Fig. A-FBEAA Sheet 01
 SHEET ADDED
 N
Appendix 01 - Manpower Gantt Chart
Fig. A-FAAAA
Fig. A-FAAAA Sheet 01
 SHEET UPDATED
 R
Fig. A-FAAAB
Fig. A-FAAAB Sheet 01
 SHEET UPDATED
 R
FILING INSTRUCTIONS
This Service Bulletin has been generated electronically and is reissued as a complete document.
Replace the complete document.
Put this Revision Transmittal Sheet in front of the Service Bulletin.
HISTORY OF PREVIOUS REVISIONS
No previous revision
REVISION SEQUENCE
ORIGINAL: Nov 23/16
REVISION No. : 01 - Feb 13/18
DATE: Nov 23/16 SERVICE BULLETIN No.: A330-57-3130
REVISION No.: 01 - Feb 13/18 Page: 10
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 11

@A330
SERVICE BULLETIN
SUMMARY
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
This summary is for information only and is not approved for modification of the aircraft.
ATA SYSTEM: 57
TITLE: FUSELAGE - CENTER FUSELAGE - MODIFICATION OF FASTENER
HOLE NO. 260 AT FRAME 40
**CONF ALL
MODIFICATIONS
MODIFICATION CLASSIFICATION
MAJOR
 206050S33790
MINOR
 None
NOTE
: As per EASA IR 21, a minor change is one that has no appreciable effect on the
mass, balance, structural strength, reliability, operational characteristics affecting the
airworthiness of the product. All other changes are major changes.
REASON/DESCRIPTION/OPERATIONAL CONSEQUENCES
The area at Frame (FR) 40 is subjected to a specific maintenance program. A new campaign of
modifications has been launched to improve the maintenance program, decrease the number of
maintenance actions and to improve the structural potential of the aircraft to meet the future Extended
Service Goal (ESG) / Design Service Goal (DSG).
This Service Bulletin recommends the cold expansion of hole 260 at FR40 to improve the fatigue
behaviour.
Depending on the configuration, this reinforcement consists in doing a second or third cold expansion of
fastener hole 260 and installing oversized fastener with high interference.
Accomplishment of this Service Bulletin will prevent cracks and will increase the fatigue life on the area
of FR40.
Accomplishment of this Service Bulletin cancels the requirements of Inspection Service Bulletin No.
A330-57-3115 for hole item 260, if accomplished after the lower bound described in the PLANNING
INFORMATION paragraph 1.E.
GENERAL EVALUATION
EVALUATION TABLE
COMPLIANCE
 RECOMMENDED (1)
 CANCELS INSPECTION SB
 NO
POTENTIAL AD
 NO
 A/C OPERATION AFFECTED
 NO
DATE: Nov 23/16 SERVICE BULLETIN No.: A330-57-3130
REVISION No.: 01 - Feb 13/18 Page: 1
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 12

@A330
SERVICE BULLETIN
SUMMARY
EVALUATION TABLE
RELIABILITY AFFECTED
 NO
 PAX COMFORT AFFECTED
 NO
COST SAVING
 NO
 ETOPS AFFECTED
 NO
STRUCTURAL LIFE EXTN
 NO
 VENDOR SB INVOLVED
 NO
DE-FUELLING/VENTILATION
 YES
 VALIDATION ON AIRCRAFT
 YES
NOTE
 (1)
: Service Bulletin recommended to be accomplished to prevent significant operational
disruptions.
NOTE
: Depending on aircraft configuration, defuelling of the center fuel tank may be required
before performing the cold working procedure.
NOTE
: This Service Bulletin has been validated at original issue on A330 aircraft with
Manufacturer Serial Number (MSN) 0422.
MATERIAL PRICE INFORMATION
**CONF 001
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET
 QTY PER
A/C
PRICE PER
A/C (USD)
MAIN PARTS
Kit 573130A01R00
 1
 50.00
 Bolts, nuts
Standard tool TOOLA01
 1
 See SB
 FTI cold working tools
Standard tool TOOLA02
 1
 See SB
 WCI cold working tools
**CONF 002
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET
 QTY PER
A/C
PRICE PER
A/C (USD)
MAIN PARTS
Kit 573130A01R00
 1
 50.00
 Bolts, nuts
Standard tool TOOLA01
 1
 See SB
 FTI cold working tools
Standard tool TOOLA02
 1
 See SB
 WCI cold working tools
**CONF 003
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET
 QTY PER
A/C
PRICE PER
A/C (USD)
MAIN PARTS
Kit 573130A02R00
 1
 50.00
 Bolts, nuts
Standard tool TOOLA01
 1
 See SB
 FTI cold working tools
Standard tool TOOLA02
 1
 See SB
 WCI cold working tools
DATE: Nov 23/16 SERVICE BULLETIN No.: A330-57-3130
REVISION No.: 01 - Feb 13/18 Page: 2
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 13

@A330
SERVICE BULLETIN
SUMMARY
**CONF 004
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET
 QTY PER
A/C
PRICE PER
A/C (USD)
MAIN PARTS
Kit 573130A02R00
 1
 50.00
 Bolts, nuts
Standard tool TOOLA01
 1
 See SB
 FTI cold working tools
Standard tool TOOLA02
 1
 See SB
 WCI cold working tools
EFFECTIVITY
**CONF ALL
This Service Bulletin is applicable to this (these) operator(s) :
38W 96U AAL ACA ACI AEA AFR ALD
 ALK ARG AZA AZU BEL
BER BGH CPA CRL CSA DGA EIN F2I FWI GFA GRL HDA HFY
HVN JAV KAL MLM OHY PLM QAF QFA QTR RSY
 SAS TAE TAM
TAP TCX THA THY TSC U6A
 UAE VKG WRC XLF
CONCURRENT REQUIREMENTS
None
REFERENCES / REPERCUSSIONS
TFU
 57.11.00.007
OEB
 None
AOT
 None
SIL
 None
ISI
 None
LINE MAINTENANCE AFFECTED
 No
LIFE LIMIT
 None
OTHER
 None
NATURE OF THE WORK
AIRCRAFT
 YES
EQUIPMENT
 NO
MANPOWER
**CONF 001
Task 573130-831-801-001: Modification
TOTAL MANHOURS
 49.00
ELAPSED TIME (HOURS)
 23.00
DATE: Nov 23/16 SERVICE BULLETIN No.: A330-57-3130
REVISION No.: 01 - Feb 13/18 Page: 3
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 14

@A330
SERVICE BULLETIN
SUMMARY
**CONF 002
Task 573130-831-801-001: Modification
TOTAL MANHOURS
 45.00
ELAPSED TIME (HOURS)
 21.00
**CONF 003
Task 573130-831-801-001: Modification
TOTAL MANHOURS
 45.00
ELAPSED TIME (HOURS)
 21.00
**CONF 004
Task 573130-831-801-001: Modification
TOTAL MANHOURS
 49.00
ELAPSED TIME (HOURS)
 23.00
APPENDICES
**CONF ALL
Appendix 01 - Manpower Gantt Chart
DATE: Nov 23/16 SERVICE BULLETIN No.: A330-57-3130
REVISION No.: 01 - Feb 13/18 Page: 4
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 15

@A330
SERVICE BULLETIN
SUMMARY
**CONF ALL
A
FR40
FR47
VIEW LOOKING AFT
RH SHOWN
LH SYMMETRICAL
BU
P
INBD
CENTER WING BOX
LOWER PANEL REFERENCE
COLD WORKING OF
THE FASTENER HOLE
STGR38RH
STGR39RH
FR40
B
C
Z141
Z142
A
LH
RH
H260
G_SB_573130_5_SAAA_01_02
Figure A-FSAAA - Sheet 01
Cold Working of the Fastener Hole 260 at FR40 on the Left Hand (LH) and the Right Hand (RH) Side
DATE: Nov 23/16 SERVICE BULLETIN No.: A330-57-3130
REVISION No.: 01 - Feb 13/18 Page: 5
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 16

@A330
SERVICE BULLETIN
SUMMARY
**CONF ALL
DATUMFR40
STGR1
LH SHOWN
RH SYMMETRICAL
Y1959
C
COLD WORKING OF
THE FASTENER HOLE
H260
G_SB_573130_5_SAAA_02_00
Figure A-FSAAA - Sheet 02
Cold Working of the Fastener Hole 260 at FR40 on the Left Hand (LH) and the Right Hand (RH) Side
DATE: Nov 23/16 SERVICE BULLETIN No.: A330-57-3130
REVISION No.: 01 - Feb 13/18 Page: 6
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 17

@A330
SERVICE BULLETIN
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
ATA SYSTEM: 57
TITLE: FUSELAGE - CENTER FUSELAGE - MODIFICATION OF FASTENER
HOLE NO. 260 AT FRAME 40
MODIFICATION No.: 206050S33790
This document contains AIRBUS PROPRIETARY INFORMATION and shall at all times remain the
property of AIRBUS; no intellectual property right or licence is granted by AIRBUS in connection with
any information contained in it. It is delivered on the express condition that said document and the
information contained in it shall be treated as confidential, shall not be used for any purpose other than
that for which it is hereby delivered. It shall not be disclosed in whole or in part to third parties and shall
not be duplicated in any manner (except for the purposes of performing the tasks described hereunder
and provided that any recipient of such document shall comply with the conditions herein), without
AIRBUS prior written consent.
1. PLANNING INFORMATION
**CONF ALL
A. EFFECTIVITY
NOTE
: This Service Bulletin is only applicable to aircraft on which modification
No. 44360S13013, modification No. 44360S13482 are embodied, Service
Bulletin No. A330-57-3131 is accomplished and on which modification No.
49202S16307 is not embodied.
(1) Models
330-202 330-203 330-223 330-243 330-301 330-322 330-323 330-342
330-343
(2) Effectivity by MSN
0177 0181 0195 0200 0206 0209 0211 0219 0222-0224 0226 0229-0232 0234 0238
0240-0241 0244 0247-0251 0253-0256 0258-0259 0261-0262 0265-0267 0269
0271-0272 0275-0277 0279 0281 0283-0288 0290-0291 0293
 0295-0296
 0300-0301
0303 0305-0306 0308-0309 0311-0317 0320 0322-0324 0326 0328 0330 0333-0334
0337-0340 0342-0346 0348-0351 0353 0356-0358 0361-0362 0364-0366 0368-0370
0372 0375 0380 0382 0384 0386 0388-0389 0392-0393 0396-0398 0400-0401
0403-0405 0407-0409 0412 0418-0423 0425 0427-0428 0432 0437 0439 0441
0443-0444 0448 0451-0452 0454-0456 0458 0461-0463 0465-0466 0469 0472-0473
0476-0477 0479-0481 0484 0486-0487 0489-0491 0493-0494 0496-0498 0500-0510
0512 0522
DATE: Nov 23/16 SERVICE BULLETIN No.: A330-57-3130
REVISION No.: 01 - Feb 13/18 Page: 1
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 18

@A330
SERVICE BULLETIN
(3) Effectivity by Operator
The Operator/MSN relationship is provided for information only and is correct at the time
of issue in accordance with the information available to AIRBUS. Any future changes
resulting from transfer of an aircraft from one operator to another will not be reflected in
this list unless the Service Bulletin is revised for another reason.
OPERATOR
 MSN
38W
 0401
96U
 0396
AAL
 0315 0323 0333 0337 0342 0370 0375 0380 0388
ACA
 0277 0279 0284 0344 0400 0408 0412 0419
ACI
 0507 0510
AEA
 0461 0505
AFR
 0422 0443 0448 0458 0465 0481 0498 0500 0502 0503
ALD
 0326
 0328
 0392
ALK
 0303 0306 0311 0313 0456
ARG
 0290 0300 0358 0364
AZA
 0272 0339 0463
AZU
 0365
 0372
 0462 0494
BEL
 0229 0249 0291
 0324
BER
 0288 0322 0403 0432 0444 0454 0469 0476 0493
BGH
 0255
CPA
 0386 0389 0393 0418 0420 0421 0423 0439
CRL
 0285 0320
CSA
 0425
DGA
 0240
EIN
 0269 0330 0397
F2I
 0200
FWI
 0253 0343
GFA
 0276 0281 0286 0287 0334 0340
GRL
 0230
HDA
 0234 0244 0405 0479 0512
HFY
 0211 0262
HVN
 0275 0366
JAV
 0409
KAL
 0206 0219 0222 0226 0241 0256 0258 0267 0338 0350 0351 0368
0428 0484 0490
MLM
 0451
OHY
 0316 0345 0353 0362 0404 0437
PLM
 0261
 0265
QAF
 0487
QFA
 0506 0508 0522
QTR
 0441 0473 0489
RSY
 0283
 0293
 0295
SAS
 0496 0497
TAE
 0348
TAM
 0232 0238 0247 0259 0361 0466 0472
DATE: Nov 23/16 SERVICE BULLETIN No.: A330-57-3130
REVISION No.: 01 - Feb 13/18 Page: 2
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 19

@A330
SERVICE BULLETIN
OPERATOR
 MSN
TAP
 0181 0195 0223 0305 0308 0312 0317 0477 0486
TCX
 0254 0266 0301 0398
THA
 0209 0231 0346
THY
 0504
TSC
 0177 0248 0250 0251 0271 0314
 0369 0407 0427 0455
 0480
U6A
 0224
UAE
 0382 0384 0452 0491 0509
VKG
 0309 0349 0356 0357
WRC
 0296
XLF
 0501
(4) Configuration by MSN
MSN
 CONFIGURATION
0177 0200 0209
 0224 0231 0234 0244 0346 0386 0389 0393
0405 0418 0420 0421 0423 0425
 0439 0479 0512
003
0181 0195 0211 0222 0223 0226 0229 0230 0232 0238 0247
0249 0250 0253 0254 0255 0258 0259 0262 0266 0269 0271
0272 0275 0276 0281 0286 0287 0290 0291 0296 0300 0303
0305 0308 0309 0311 0312 0317 0322 0324 0330 0334 0339
0340 0343 0353 0358 0361 0362 0364 0366 0397 0398 0401
0404 0427 0456 0461 0462 0463 0466 0480 0487 0494 0501
0502 0504 0505
001 004
0206 0219 0241 0256 0267 0277 0279 0284 0315 0323 0333
0337 0338 0342 0344 0349 0350 0351 0356 0357 0368 0370
0375 0380 0388 0400 0407 0408 0412 0419 0428 0484 0490
0496 0497
002 003
0240 0248 0251 0261 0265 0283 0285 0288
 0293 0295 0301
0306 0313 0314 0316 0320 0326 0328 0345 0348 0365 0369
0372 0382 0384 0392 0396 0403
 0409 0422 0432 0437 0441
0443 0444
 0448 0451 0452 0454 0455 0458 0465 0469
 0472
0473 0476 0477
 0481 0486
 0489 0491 0493
 0498 0500 0503
0506
 0507 0508 0509 0510 0522
004
(5) Configuration definition
**CONF 001
Config. 001 is valid for standard (STD) 7 aircraft on which modification No.
44360S13013, modification No. 44360S13482 are embodied, Service Bulletin No.
A330-57-3131 is accomplished and on which modification No. 49202S16307 is not
embodied and on which Service Bulletin No. A330-57-3083 is not accomplished.
**CONF 002
Config. 002 is valid for STD 6 and STD 8 aircraft on which modification No.
44360S13013, modification No. 44360S13482 are embodied, Service Bulletin No.
A330-57-3131 is accomplished and on which modification No. 49202S16307 is not
embodied and on which Service Bulletin No. A330-57-3083 is not accomplished.
DATE: Nov 23/16 SERVICE BULLETIN No.: A330-57-3130
REVISION No.: 01 - Feb 13/18 Page: 3
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 20

@A330
SERVICE BULLETIN
**CONF 003
Config. 003 is valid for STD 6 and STD 8 aircraft on which modification No.
44360S13013, modification No. 44360S13482 are embodied, Service Bulletin No.
A330-57-3131 is accomplished and on which modification No. 49202S16307 is not
embodied and on which Service Bulletin No. A330-57-3083 is accomplished.
**CONF 004
Config. 004 is valid for STD 7 aircraft on which modification No. 44360S13013,
modification No. 44360S13482 are embodied, Service Bulletin No. A330-57-3131 is
accomplished and on which modification No. 49202S16307 is not embodied and on
which Service Bulletin No. A330-57-3083 is accomplished.
(6) Material Effectivity
NOTE
: Only 1 TOOL Kit is necessary to perform the Cold Working, either
TOOLA01 or TOOLA02 depending on the supplier chosen.
**CONF 001 thru 002
MATERIAL
 QTY PER A/C
 SEE NOTES
Kit 573130A01R00
 1
Consumable CMLA01
 1
Standard tool TOOLA01
 1
Standard tool TOOLA02
 1
**CONF 003 thru 004
MATERIAL
 QTY PER A/C
 SEE NOTES
Kit 573130A02R00
 1
Consumable CMLA01
 1
Standard tool TOOLA01
 1
Standard tool TOOLA02
 1
**CONF ALL
B. CONCURRENT REQUIREMENTS
None
C. REASON
(1) History
The area at Frame (FR) 40 is subjected to a specific maintenance program. A new
campaign of modifications has been launched to improve the maintenance program,
decrease the number of maintenance actions and to improve the structural potential of
the aircraft to meet the future Extended Service Goal (ESG) / Design Service Goal
(DSG).
DATE: Nov 23/16 SERVICE BULLETIN No.: A330-57-3130
REVISION No.: 01 - Feb 13/18 Page: 4
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 21

@A330
SERVICE BULLETIN
(2) Objective/Action
This Service Bulletin recommends the cold expansion of hole 260 at FR40 to improve
the fatigue behaviour.
Depending on the configuration, this reinforcement consists in doing a second or
third cold expansion of fastener hole 260 and installing oversized fastener with high
interference.
(3) Advantages
Accomplishment of this Service Bulletin will prevent cracks and will increase the fatigue
life on the area of FR40.
(4) Operational/Maintenance Consequences
Accomplishment of this Service Bulletin cancels the requirements of Inspection Service
Bulletin No. A330-57-3115 for hole item 260, if accomplished after the lower bound
described in the PLANNING INFORMATION paragraph 1.E.
D. DESCRIPTION
To accomplish this Service Bulletin it is necessary to :
**CONF 001
Task 573130-831-801-001: Modification
(1) Remove the Fastener from the Hole 260 between STGR37 and STGR38 at FR40, on
the LH Side
(2) Do an Inspection of the Fastener Hole 260 between STGR37 and STGR38 at FR40,
on the LH Side
(3) Do a Cold Working of the Fastener Hole 260 between STGR37 and STGR38 at
FR40, on the LH Side
(4) Install the Fastener in the Hole 260 between STGR37 and STGR38 at FR40, on the
LH Side
(5) Remove the Fastener from the Hole 260 between STGR37 and STGR38 at FR40, on
the RH Side
(6) Do an Inspection of the Fastener Hole 260 between STGR37 and STGR38 at FR40,
on the RH side
(7) Do a Cold Working of the Fastener Hole 260 between STGR37 and STGR38 at
FR40, on the RH Side
(8) Install the Fastener in the Hole 260 between STGR37 and STGR38 at FR40, on the
RH Side
DATE: Nov 23/16 SERVICE BULLETIN No.: A330-57-3130
REVISION No.: 01 - Feb 13/18 Page: 5
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 22

@A330
SERVICE BULLETIN
**CONF 002
Task 573130-831-801-001: Modification
(1) Remove the Fastener from the Hole 260 between STGR37 and STGR38 at FR40, on
the LH Side
(2) Do an Inspection of the Fastener Hole 260 between STGR37 and STGR38 at FR40,
on the LH Side
(3) Do a Cold Working of the Fastener Hole 260 between STGR37 and STGR38 at
FR40, on the LH Side
(4) Install the Fastener in the Hole 260 between STGR37 and STGR38 at FR40, on the
LH Side
(5) Remove the Fastener from the Hole 260 between STGR37 and STGR38 at FR40, on
the RH Side
(6) Do an Inspection of the Fastener Hole 260 between STGR37 and STGR38 at FR40,
on the RH side
(7) Do a Cold Working of the Fastener Hole 260 between STGR37 and STGR38 at
FR40, on the RH Side
(8) Install the Fastener in the Hole 260 between STGR37 and STGR38 at FR40, on the
RH Side
**CONF 003
Task 573130-831-801-001: Modification
(1) Remove the Fastener from the Hole 260 between STGR37 and STGR38 at FR40, on
the LH Side
(2) Do an Inspection of the Fastener Hole 260 between STGR37 and STGR38 at FR40,
on the LH Side
(3) Do a Cold Working of the Fastener Hole 260 between STGR37 and STGR38 at
FR40, on the LH Side
(4) Install the Fastener in the Hole 260 between STGR37 and STGR38 at FR40, on the
LH Side
(5) Remove the Fastener from the Hole 260 between STGR37 and STGR38 at FR40, on
the RH Side
(6) Do an Inspection of the Fastener Hole 260 between STGR37 and STGR38 at FR40,
on the RH side
(7) Do a Cold Working of the Fastener Hole 260 between STGR37 and STGR38 at
FR40, on the RH Side
(8) Install the Fastener in the Hole 260 between STGR37 and STGR38 at FR40, on the
DATE: Nov 23/16 SERVICE BULLETIN No.: A330-57-3130
REVISION No.: 01 - Feb 13/18 Page: 6
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 23

@A330
SERVICE BULLETIN
RH Side
**CONF 004
Task 573130-831-801-001: Modification
(1) Remove the Fastener from the Hole 260 between STGR37 and STGR38 at FR40, on
the LH Side
(2) Do an Inspection of the Fastener Hole 260 between STGR37 and STGR38 at FR40,
on the LH Side
(3) Do a Cold Working of the Fastener Hole 260 between STGR37 and STGR38 at
FR40, on the LH Side
(4) Install the Fastener in the Hole 260 between STGR37 and STGR38 at FR40, on the
LH Side
(5) Remove the Fastener from the Hole 260 between STGR37 and STGR38 at FR40, on
the RH Side
(6) Do an Inspection of the Fastener Hole 260 between STGR37 and STGR38 at FR40,
on the RH side
(7) Do a Cold Working of the Fastener Hole 260 between STGR37 and STGR38 at
FR40, on the RH Side
(8) Install the Fastener in the Hole 260 between STGR37 and STGR38 at FR40, on the
RH Side
**CONF ALL
E. COMPLIANCE
(1) Classification
RECOMMENDED: Service Bulletin recommended to be accomplished to prevent
significant operational disruptions.
(2) Accomplishment Timescale
AIRBUS recommends not to perform modification before the Flight Cycles (FC)/Flight
Hours (FH) values given in the table below. In case of early embodiment, additional
inspection of the Center Wing Box (CWB) lower panel might be required before ESG.
Lower bound counted
from first flight
Aircraft Series
 Aircraft
Standard
Weight
Variant
(WV)
WV Groups
 Configuration
FC
 FH
DATE: Nov 23/16 SERVICE BULLETIN No.: A330-57-3130
REVISION No.: 01 - Feb 13/18 Page: 7
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 24

@A330
SERVICE BULLETIN
A330-300
 ST6
 010 series
 Group 33B
 POST MOD
No. 44360 PRE
MOD No.
49202 PRE
Service Bulletin
No.
A330-57-3083
and POST
Service Bulletin
No.
A330-57-3131
26770
 69714
A330-300
 ST6
 010 series
 Group 33B
 POST MOD
No. 44360 PRE
MOD No.
49202 POST
Service Bulletin
No.
A330-57-3083
and POST
Service Bulletin
No.
A330-57-3131
25966
 67090
A330-300
 ST8
 020 series
except WV
022
Group 33C
 POST MOD
No. 44360 PRE
MOD No.
49202 PRE
Service Bulletin
No.
A330-57-3083
and POST
Service Bulletin
No.
A330-57-3131
25647
 66046
A330-300
 ST8
 020 series
except WV
022
Group 33C
 POST MOD
No. 44360 PRE
MOD No.
49202 POST
Service Bulletin
No.
A330-57-3083
and POST
Service Bulletin
No.
A330-57-3131
24791
 63250
DATE: Nov 23/16 SERVICE BULLETIN No.: A330-57-3130
REVISION No.: 01 - Feb 13/18 Page: 8
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 25

@A330
SERVICE BULLETIN
A330-300
 ST8
 022
 Group 33D
 POST MOD
No. 44360 PRE
MOD No.
49202 PRE
Service Bulletin
No.
A330-57-3083
and POST
Service Bulletin
No.
A330-57-3131
26108
 67554
A330-300
 ST8
 022
 Group 33D
 POST MOD
No. 44360 PRE
MOD No.
49202 POST
Service Bulletin
No.
A330-57-3083
and POST
Service Bulletin
No.
A330-57-3131
24274
 64828
A330-200
 ST7
 020 series
 Group 32A
 POST MOD
No. 44360 PRE
MOD No.
49202 PRE
Service Bulletin
No.
A330-57-3083
and POST
Service Bulletin
No.
A330-57-3131
22972
 70402
A330-200
 ST7
 020 series
 Group 32A
 POST MOD
No. 44360 PRE
MOD No.
49202 POST
Service Bulletin
No.
A330-57-3083
and POST
Service Bulletin
No.
A330-57-3131
22178
 67623
Lower bound table
F. APPROVAL
The technical content of this document is approved under the authority of Design
Organisation Approval No. EASA.21J.031.
DATE: Nov 23/16 SERVICE BULLETIN No.: A330-57-3130
REVISION No.: 01 - Feb 13/18 Page: 9
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 26

@A330
SERVICE BULLETIN
If an aircraft listed in the effectivity has a modification or repair embodied that is not of
AIRBUS origin, and which affects the content of this Service Bulletin, the operator is
responsible for obtaining approval by its airworthiness authority for any adaptation necessary
before incorporation of the Service Bulletin.
G. MANPOWER
The manpower estimates given in this Service Bulletin are based on the direct labor cost to
do the work. These estimates assume that the work will be done by experienced personnel,
and may need to be revised upwards to suit operator’s circumstances. The estimates do not
include the time to prepare, plan or inspect the work. Manufacture and procurement of parts
and tools, drying times for paints, sealants, etc., and general administration work are also not
included.
**CONF 001
Task 573130-831-801-001: Modification
Get Access
 18.50
On Aircraft
Remove the Fastener from the Hole 260 between
STGR37 and STGR38 at FR40, on the LH Side
0.50
Do an Inspection of the Fastener Hole 260 between
STGR37 and STGR38 at FR40, on the LH Side
0.50
Do a Cold Working of the Fastener Hole 260 between
STGR37 and STGR38 at FR40, on the LH Side
3.00
Install the Fastener in the Hole 260 between STGR37
and STGR38 at FR40, on the LH Side
1.00
Remove the Fastener from the Hole 260 between
STGR37 and STGR38 at FR40, on the RH Side
0.50
Do an Inspection of the Fastener Hole 260 between
STGR37 and STGR38 at FR40, on the RH side
0.50
Do a Cold Working of the Fastener Hole 260 between
STGR37 and STGR38 at FR40, on the RH Side
3.00
Install the Fastener in the Hole 260 between STGR37
and STGR38 at FR40, on the RH Side
1.00
Tests
 2.00
Close-Up
 18.50
TOTAL MANHOURS
 49.00
ELAPSED TIME (HOURS)
 23.00
NOTE
: For an explanation of the man-hours and elapsed time, refer to the Gantt
Chart,
 Fig. A-FAAAA
 given in Appendix 01 - Manpower Gantt Chart .
**CONF 002
Task 573130-831-801-001: Modification
Get Access
 16.50
On Aircraft
Remove the Fastener from the Hole 260 between
STGR37 and STGR38 at FR40, on the LH Side
0.50
DATE: Nov 23/16 SERVICE BULLETIN No.: A330-57-3130
REVISION No.: 01 - Feb 13/18 Page: 10
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 27

@A330
SERVICE BULLETIN
Task 573130-831-801-001: Modification
Do an Inspection of the Fastener Hole 260 between
STGR37 and STGR38 at FR40, on the LH Side
0.50
Do a Cold Working of the Fastener Hole 260 between
STGR37 and STGR38 at FR40, on the LH Side
3.00
Install the Fastener in the Hole 260 between STGR37
and STGR38 at FR40, on the LH Side
1.00
Remove the Fastener from the Hole 260 between
STGR37 and STGR38 at FR40, on the RH Side
0.50
Do an Inspection of the Fastener Hole 260 between
STGR37 and STGR38 at FR40, on the RH side
0.50
Do a Cold Working of the Fastener Hole 260 between
STGR37 and STGR38 at FR40, on the RH Side
3.00
Install the Fastener in the Hole 260 between STGR37
and STGR38 at FR40, on the RH Side
1.00
Tests
 2.00
Close-Up
 16.50
TOTAL MANHOURS
 45.00
ELAPSED TIME (HOURS)
 21.00
NOTE
: For an explanation of the man-hours and elapsed time, refer to the Gantt
Chart,
 Fig. A-FAAAB
 given in Appendix 01 - Manpower Gantt Chart .
**CONF 003
Task 573130-831-801-001: Modification
Get Access
 16.50
On Aircraft
Remove the Fastener from the Hole 260 between
STGR37 and STGR38 at FR40, on the LH Side
0.50
Do an Inspection of the Fastener Hole 260 between
STGR37 and STGR38 at FR40, on the LH Side
0.50
Do a Cold Working of the Fastener Hole 260 between
STGR37 and STGR38 at FR40, on the LH Side
3.00
Install the Fastener in the Hole 260 between STGR37
and STGR38 at FR40, on the LH Side
1.00
Remove the Fastener from the Hole 260 between
STGR37 and STGR38 at FR40, on the RH Side
0.50
Do an Inspection of the Fastener Hole 260 between
STGR37 and STGR38 at FR40, on the RH side
0.50
Do a Cold Working of the Fastener Hole 260 between
STGR37 and STGR38 at FR40, on the RH Side
3.00
Install the Fastener in the Hole 260 between STGR37
and STGR38 at FR40, on the RH Side
1.00
Tests
 2.00
Close-Up
 16.50
TOTAL MANHOURS
 45.00
ELAPSED TIME (HOURS)
 21.00
DATE: Nov 23/16 SERVICE BULLETIN No.: A330-57-3130
REVISION No.: 01 - Feb 13/18 Page: 11
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 28

@A330
SERVICE BULLETIN
NOTE
: For an explanation of the man-hours and elapsed time, refer to the Gantt
Chart,
 Fig. A-FAAAB
 given in Appendix 01 - Manpower Gantt Chart .
**CONF 004
Task 573130-831-801-001: Modification
Get Access
 18.50
On Aircraft
Remove the Fastener from the Hole 260 between
STGR37 and STGR38 at FR40, on the LH Side
0.50
Do an Inspection of the Fastener Hole 260 between
STGR37 and STGR38 at FR40, on the LH Side
0.50
Do a Cold Working of the Fastener Hole 260 between
STGR37 and STGR38 at FR40, on the LH Side
3.00
Install the Fastener in the Hole 260 between STGR37
and STGR38 at FR40, on the LH Side
1.00
Remove the Fastener from the Hole 260 between
STGR37 and STGR38 at FR40, on the RH Side
0.50
Do an Inspection of the Fastener Hole 260 between
STGR37 and STGR38 at FR40, on the RH side
0.50
Do a Cold Working of the Fastener Hole 260 between
STGR37 and STGR38 at FR40, on the RH Side
3.00
Install the Fastener in the Hole 260 between STGR37
and STGR38 at FR40, on the RH Side
1.00
Tests
 2.00
Close-Up
 18.50
TOTAL MANHOURS
 49.00
ELAPSED TIME (HOURS)
 23.00
NOTE
: For an explanation of the man-hours and elapsed time, refer to the Gantt
Chart,
 Fig. A-FAAAA
 given in Appendix 01 - Manpower Gantt Chart .
**CONF ALL
H. WEIGHT AND BALANCE
Not Changed
I. ELECTRICAL LOAD DATA
Not Changed
DATE: Nov 23/16 SERVICE BULLETIN No.: A330-57-3130
REVISION No.: 01 - Feb 13/18 Page: 12
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 29

@A330
SERVICE BULLETIN
J. REFERENCES
**CONF 001
Aircraft Maintenance Manual (AMM)
 06-20-00 06-31-53 06-41-53
12-34-24 20-21-11 21-20-00
21-21-41 21-21-51 25-52-00
25-80-00 28-00-00 28-10-00
28-11-00
 28-25-00 32-12-00
38-41-00
 52-30-00 52-32-11
57-17-11
Elec. Std. Practices Manual (ESPM)
 20-55-00
In Service Information (ISI)
 51.48.00001
Non Destructive Test Manual (NTM)
 51-10-01 51-10-08
Service Bulletin (SB)
 A330-57-3083
A330-57-3131
Standards Manual (SM)
Structural Repair Manual (SRM)
 51-24-00 51-42-00 51-43-00
51-44-00 51-48-00 51-70-20
51-75-12 51-76-12
**CONF 002
Aircraft Maintenance Manual (AMM)
 06-20-00 06-31-53 06-41-53
12-34-24 20-21-11 21-20-00
21-21-41 21-21-51 25-52-00
25-80-00 32-12-00 38-41-00
52-30-00 52-32-11 57-17-11
Elec. Std. Practices Manual (ESPM)
 20-55-00
In Service Information (ISI)
 51.48.00001
Non Destructive Test Manual (NTM)
 51-10-01 51-10-08
Service Bulletin (SB)
 A330-57-3083
A330-57-3131
Standards Manual (SM)
Structural Repair Manual (SRM)
 51-24-00 51-42-00 51-43-00
51-44-00 51-48-00 51-70-20
51-75-12
**CONF 003
Aircraft Maintenance Manual (AMM)
 06-20-00 06-31-53 06-41-53
12-34-24 20-21-11 21-20-00
21-21-41 21-21-51 25-52-00
25-80-00 32-12-00 38-41-00
52-30-00 52-32-11 57-17-11
Elec. Std. Practices Manual (ESPM)
 20-55-00
In Service Information (ISI)
 51.48.00001
Non Destructive Test Manual (NTM)
 51-10-01 51-10-08
Service Bulletin (SB)
 A330-57-3083
A330-57-3131
Standards Manual (SM)
DATE: Nov 23/16 SERVICE BULLETIN No.: A330-57-3130
REVISION No.: 01 - Feb 13/18 Page: 13
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 30

@A330
SERVICE BULLETIN
Structural Repair Manual (SRM)
 51-24-00 51-42-00 51-43-00
51-44-00 51-46-00 51-48-00
51-70-20
 51-75-12
**CONF 004
Aircraft Maintenance Manual (AMM)
 06-20-00 06-31-53 06-41-53
12-34-24 20-21-11 21-20-00
21-21-41 21-21-51 25-52-00
25-80-00 28-00-00 28-10-00
28-11-00
 28-25-00 32-12-00
38-41-00
 52-30-00 52-32-11
57-17-11
Elec. Std. Practices Manual (ESPM)
 20-55-00
In Service Information (ISI)
 51.48.00001
Non Destructive Test Manual (NTM)
 51-10-01 51-10-08
Service Bulletin (SB)
 A330-57-3083
A330-57-3131
Standards Manual (SM)
Structural Repair Manual (SRM)
 51-24-00 51-42-00 51-43-00
51-44-00 51-46-00 51-48-00
51-70-20
 51-75-12 51-76-12
**CONF ALL
K. PUBLICATION AFFECTED
None
L. INTERCHANGEABILITY/MIXABILITY
Not Applicable
M. SPARES
None
DATE: Nov 23/16 SERVICE BULLETIN No.: A330-57-3130
REVISION No.: 01 - Feb 13/18 Page: 14
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 31

@A330
SERVICE BULLETIN
2. MATERIAL INFORMATION
**CONF ALL
A. MATERIAL - PRICE AND AVAILABILITY
(1) Procurement Addresses
Customers with aircraft shown in the effectivity of this Service Bulletin should send a
purchase order to AIRBUS. Quote the number of this Service Bulletin. The address is:
Kit 573130A01R00
Kit 573130A02R00
AIRBUS Material, Logistics and Suppliers
ATP II B,
Hein-Sass-Weg 24
21129 HAMBURG
GERMANY
For ordering by internet:
http://spares.airbus.com
For ordering by E-mail: airbus.kit@airbus.com
Telephone Hotline: +49 40 743 51616
(2) Price and Availability
Kit 573130A01R00
Cost
 50.00 USD
Availability
 180 calendar days from receipt of order
The availability given above is the standard lead time from the date of your purchase
order. If items are required before this time, please include a retrofit planning schedule
with your order so that we can try to comply with your requirements.
The sales terms (costs and availability) are estimated in relation to economic conditions.
The latest valid price and lead time for ordering purposes shall be obtained through the
Airbus Spares portal or through a request for quotation to airbus.kit@airbus.com.
Kit 573130A02R00
Cost
 50.00 USD
Availability
 180 calendar days from receipt of order
The availability given above is the standard lead time from the date of your purchase
order. If items are required before this time, please include a retrofit planning schedule
with your order so that we can try to comply with your requirements.
The sales terms (costs and availability) are estimated in relation to economic conditions.
The latest valid price and lead time for ordering purposes shall be obtained through the
Airbus Spares portal or through a request for quotation to airbus.kit@airbus.com.
B. INDUSTRY SUPPORT INFORMATION
AIRBUS will not provide industry support for accomplishment of this Service Bulletin.
This Service Bulletin is the subject of an AIRBUS monitored retrofit campaign.
DATE: Nov 23/16 SERVICE BULLETIN No.: A330-57-3130
REVISION No.: 01 - Feb 13/18 Page: 15
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 32

@A330
SERVICE BULLETIN
For the organization of this retrofit, you are kindly requested to contact AIRBUS retrofit
management department.
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
France
E-mail: monitored.retrofit@airbus.com
C. LIST OF COMPONENTS
Kit 573130A01R00
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 ITEM
 OLD PART N˚
 INT
 SEE
NOTES
7
 EN6115K8-16
 2
 BOLT
8
 ASNA2531-8
 2
 NUT
NOTE
: If you find part numbers of hardware components in the related kit(s) which
you cannot identify in the LIST OF COMPONENTS of this Service Bulletin,
refer to Standards Manual (SM). The SM will give you the correct part number
to part number relationship.
Kit 573130A02R00
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 ITEM
 OLD PART N˚
 INT
 SEE
NOTES
9
 EN6115K9-16
 2
 BOLT
10
 ASNA2531-9
 2
 NUT
NOTE
: If you find part numbers of hardware components in the related kit(s) which
you cannot identify in the LIST OF COMPONENTS of this Service Bulletin,
refer to Standards Manual (SM). The SM will give you the correct part number
to part number relationship.
D. LIST OF MATERIALS - OPERATOR SUPPLIED
(1) Consumable Materials
Consumable CMLA01
ITEM
 DESCRIPTION
 REFERENCE TO CML
MAT. No.
QTY PER A/C
 SEE
NOTES
Wash Primer - Structure
 04CMA2
 As required
Primer Polyurethane Paint -
Corrosion Inhibiting
04EAC2
 As required
Top Coat Polyurethane - Grey
Internal Structure
04JME4
 As required
Polyurethane Coating - Fuel Vapour
Barrier Struct
04PAG2
 As required
Polysulfide Sealant - Fuel Tank
Brushable
06ABA1
 As required
DATE: Nov 23/16 SERVICE BULLETIN No.: A330-57-3130
REVISION No.: 01 - Feb 13/18 Page: 16
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 33

@A330
SERVICE BULLETIN
ITEM
 DESCRIPTION
 REFERENCE TO CML
MAT. No.
QTY PER A/C
 SEE
NOTES
Coating Sealant - Fuel Tank
Brushable
06HAA1
 As required
Adhesion Promoter - For Sealant
 06PAG1
 As required
Non Aqueous Cleaner - General
 08BAA9
 As required
Corrosion Preventive Compound -
Water Displacing
12ADB1
 As required
Textile - Lint Free Cotton
 14SBA1
 As required
(2) Components
None
(3) Equipment
None
E. PARTS TO BE RE-IDENTIFIED BY OPERATOR
None
F. TOOLING
(1) Tooling - Price and Availability
(a) Procurement Addresses
NOTE
: Only 1 TOOL Kit is necessary to perform the Cold Working, either
TOOLA01 or TOOLA02 depending on the supplier chosen.
Operators interested in obtaining the Fatigue Technology Inc. (FTI) tool kit should
contact:
Standard tool TOOLA01
 Fatigue Technology Inc.
401 Andover Park East
SEATTLE, WA 98188-7605
USA
Internet: http://www.fatiguetech.com
Phone: (206) 2462010
Fax: (206) 2449886
Operators interested in obtaining the West Coast Industries (WCI) tool kit should
contact:
DATE: Nov 23/16 SERVICE BULLETIN No.: A330-57-3130
REVISION No.: 01 - Feb 13/18 Page: 17
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 34

@A330
SERVICE BULLETIN
Standard tool TOOLA02
 West Coast Industries Inc.
14900 Whitman Ave. N
Seattle, Washington 98133
Tel: (206) 365-7513
Fax: (206) 365-7483
Email: info@coldwork.com
Europe, Middle-East, Africa, India and
Russia:
T e l . :+ 3 356 19 20 49 1( F r a n c e )
Email: customer@capaero.com
(b) Price and Availability
Standard tool
 TOOLA01
Procurement to be negotiated directly with FTI.
Standard tool
 TOOLA02
Procurement to be negotiated directly with WCI.
(2) Tools
NOTE
: Only 1 TOOL Kit is necessary to perform the Cold Working, either
TOOLA01 or TOOLA02 depending on the supplier chosen.
To accomplish this Service Bulletin it is necessary to use the tools and equipment listed
in:
- AMM Task 52-32-11-820-803
- NTM Task 51-10-01-250-801
- NTM Task 51-10-08.
Standard tool TOOLA01
ITEM
 TOOL N˚
 TOOL NAME
 QTY
 SEE
NOTES
DKA330573130-1
 Durable Tooling
 1
 (1)
EKA330573130-1
 Expendable Tooling
 1
 (2)
FTIA330573130-1
 Capital Tooling
 1
 (3)
NOTE
: FTI has allocated the following tool kit numbers for cold expansion:
For the definition of capital, durable and expendable tools, refer to ISI
51.48.00001
NOTE
 (1)
: Durable tooling: Ref. DK-A330-57-3130-1
DATE: Nov 23/16 SERVICE BULLETIN No.: A330-57-3130
REVISION No.: 01 - Feb 13/18 Page: 18
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 35

@A330
SERVICE BULLETIN
The durable tool kit contains the minimum quantity of durable tools
necessary to accomplish the Service Bulletin on one aircraft. If the
Service Bulletin is to be accomplished on more than one aircraft, the
number of durable kits required can be established by reference to ISI
51.48.00001.
NOTE
 (2)
: Expendable tooling: Ref. EK-A330-57-3130-1
The expendable tool kit contains the quantity of expendable tools
required to accomplish the Service Bulletin on one aircraft. Order one
expendable tool kit for every aircraft on which this Service Bulletin is to
be accomplished.
NOTE
 (3)
: Capital tooling: Ref. FTI-A330-57-3130-1
The capital tools provided in this kit are not specific to this Service
Bulletin and are normally already available in operators’ stock as a long-
term investment or can be loaned from FTI.
Standard tool TOOLA02
ITEM
 TOOL N˚
 TOOL NAME
 QTY
 SEE
NOTES
DKA330573130-1
 Durable Tooling
 1
 (1)
EKA330573130-1
 Expendable Tooling
 1
 (2)
WCIA330573130-1
 Capital Tooling
 1
 (3)
NOTE
: WCI has allocated the following tool kit numbers for cold expansion:
For the definition of capital, durable and expendable tools, refer to ISI
51.48.00001
NOTE
 (1)
: Durable tooling: Ref. DK-A330-57-3130-1
The durable tool kit contains the minimum quantity of durable tools
necessary to accomplish the Service Bulletin on one aircraft. If the
Service Bulletin is to be accomplished on more than one aircraft, the
number of durable kits required can be established by reference to ISI
51.48.00001.
NOTE
 (2)
: Expendable tooling: Ref. EK-A330-57-3130-1
The expendable tool kit contains the quantity of expendable tools
required to accomplish the Service Bulletin on one aircraft. Order one
expendable tool kit for every aircraft on which this Service Bulletin is to
be accomplished.
NOTE
 (3)
: Capital tooling: Ref. WCI-A330-57-3130-1
The capital tools provided in this kit are not specific to this Service
Bulletin and are normally already available in operators’ stock as a long-
term investment or can be loaned from WCI.
DATE: Nov 23/16 SERVICE BULLETIN No.: A330-57-3130
REVISION No.: 01 - Feb 13/18 Page: 19
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 36

@A330
SERVICE BULLETIN
(3) Special Tools
None
DATE: Nov 23/16 SERVICE BULLETIN No.: A330-57-3130
REVISION No.: 01 - Feb 13/18 Page: 20
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 37

@A330
SERVICE BULLETIN
3. ACCOMPLISHMENT INSTRUCTIONS
Task 573130-831-801-001 - Modification
WARNING
: MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND ALL THE CAUTIONS
INCLUDED IN THE REFERENCED PROCEDURES.
WARNING
: THIS PROCEDURE USES A FUEL SYSTEM ITEM THAT IS IN A CATEGORY
KNOWN AS A CRITICAL DESIGN CONFIGURATION CONTROL LIMITATION
(CDCCL). CDCCL IDENTIFIES AN ITEM THAT CAN BE THE SOURCE OF A
POSSIBLE FUEL TANK IGNITION. YOU MUST KEEP ALL CDCCL ITEMS IN
THE APPROVED CONFIGURATION. DAMAGE, WEAR OR CHANGES TO A
CDCCL ITEM CAN CAUSE A POSSIBLE TANK EXPLOSION.
CAUTION
: ALWAYS OBEY THE PRECAUTIONS THAT FOLLOW TO KEEP
ELECTRICAL WIRING IN A SATISFACTORY CONDITION (ELECTRICALLY
AND MECHANICALLY SERVICEABLE) . WHEN YOU DO MAINTENANCE
WORK, REPAIRS OR MODIFICATIONS, ALWAYS KEEP ELECTRICAL WIRING,
COMPONENTS AND THE WORK AREA AS CLEAN AS POSSIBLE. TO DO
THIS:
- PUT PROTECTION, SUCH AS PLASTIC SHEETING, CLOTHS, ETC., AS
NECESSARY ON WIRING AND COMPONENTS.
- REGULARLY REMOVE ALL SHAVINGS, UNWANTED MATERIAL AND
OTHER CONTAMINATION.
THESE PRECAUTIONS WILL DECREASE THE RISK OF CONTAMINATION
AND DAMAGE TO THE ELECTRICAL WIRING INSTALLATION.
IF THERE IS CONTAMINATION, REFER TO ESPM 20-55-00.
NOTE
: The accomplishment instructions of this Service Bulletin include procedures given
in other documents or in other sections of the Service Bulletin. When the words
’refer to’ are used and the operator has a procedure accepted by the local authority
he belongs to, the accepted alternative procedure can be used. When the words ’in
accordance with’ are used then the given procedure must be followed.
NOTE
: The access and close-up instructions, not comprising return to service tests, in this
Service Bulletin do not constitute or affect the technical intent of the Service
Bulletin. Operators can therefore, as deemed necessary, omit or add access and/or
close-up steps to add flexibility to their maintenance operations as long as the
technical intent of the Service Bulletin is met within the set parameters.
NOTE
: Manual titles given in the accomplishment instructions are referred to by acronyms.
Refer to paragraph 1.J., References, for the definition of acronyms.
NOTE
: This Service Bulletin contains the instructions for the on-aircraft maintenance
necessary to ensure the continued airworthiness of the aircraft.
For any deviations to the instructions contained herein, contact AIRBUS for further
instructions and approval.
DATE: Nov 23/16 SERVICE BULLETIN No.: A330-57-3130
REVISION No.: 01 - Feb 13/18 Page: 21
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 38

@A330
SERVICE BULLETIN
NOTE
: Discarded parts must be managed at the operator’s discretion.
Task Associated Data
**CONF 001
Zone
131 132
Manpower
TOTAL MANHOURS
 49.00
ELAPSED TIME (HOURS)
 23.00
**CONF 002
Zone
131 132
Manpower
TOTAL MANHOURS
 45.00
ELAPSED TIME (HOURS)
 21.00
**CONF 003
Zone
131 132
Manpower
TOTAL MANHOURS
 45.00
ELAPSED TIME (HOURS)
 21.00
**CONF 004
Zone
131 132
Manpower
TOTAL MANHOURS
 49.00
ELAPSED TIME (HOURS)
 23.00
**CONF ALL
A. GENERAL
**CONF 001
(1) Subtask 573130-910-001-001 - Standard Practices
Manpower Resources
Skills
 NON SPECIFIC
DATE: Nov 23/16 SERVICE BULLETIN No.: A330-57-3130
REVISION No.: 01 - Feb 13/18 Page: 22
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 39

@A330
SERVICE BULLETIN
References
Aircraft Maintenance Manual (AMM)
 06-20-00, Page Block 001
06-31-53, Page Block 001
06-41-53, Page Block 001
Task 20-21-11-911-801
Task 21-20-00-010-801
Task 21-20-00-410-801
Structural Repair Manual (SRM)
 51-24-00
51-42-00
51-43-00
51-44-00
51-48-00
51-70-20
51-75-12
(a) For the specification of Material Numbers (Mat. No.) given in this Service Bulletin,
refer to the Consumable Materials List (CML).
(b) For the Frame (FR) identification, refer to AMM 06-31-53, Page Block 001.
(c) For the identification of zones, refer to AMM 06-20-00, Page Block 001.
(d) For the identification of access panels, refer to AMM 06-41-53, Page Block 001.
(e) For the general removal of air-conditioning distribution ducts, refer to AMM Task
21-20-00-010-801.
(f) For the general installation of air-conditioning distribution ducts, refer to AMM Task
21-20-00-410-801.
(g) Remove and install fasteners in accordance with SRM 51-42-00.
(h) Tag all the parts you must remove and retain to make the subsequent installation
easier.
(i) Get fastener hole diameters and drill data in accordance with SRM 51-44-00.
(j) Do the spot facing of the fastener in accordance with SRM 51-70-20.
(k) Get alternative and substitute fastener data in accordance with SRM 51-43-00.
(l) Do a cold working of the fastener holes in accordance with SRM 51-48-00.
(m) To torque tighten the standard threaded fasteners, refer to AMM Task
20-21-11-911-801.
(n) Apply sealant in accordance with SRM 51-24-00.
(o) Renew the protective finish in accordance with SRM 51-75-12.
(p) If alternative and substitute fasteners have to be used, you must make sure that the
associated nut/collar are compatible in accordance with SRM 51-40-00 "Mating
Part" column.
DATE: Nov 23/16 SERVICE BULLETIN No.: A330-57-3130
REVISION No.: 01 - Feb 13/18 Page: 23
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 40

@A330
SERVICE BULLETIN
(q) If the length of any fastener specified in this Service Bulletin does not meet
installation standards given in SRM Chapter 51, then a fastener of the same
specification, or an approved substitute, with a length which meets the installation
standards given in SRM Chapter 51 may be used. In addition, washers may be
installed for fastener grip length in accordance with SRM Chapter 51.
(2) Subtask 573130-839-001-001 - Administrative
Manpower Resources
Skills
 NON SPECIFIC
Write in the applicable aircraft records that you have done all the work given in this
Service Bulletin.
**CONF 002
(1) Subtask 573130-910-001-001 - Standard Practices
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 06-20-00, Page Block 001
06-31-53, Page Block 001
06-41-53, Page Block 001
Task 20-21-11-911-801
Task 21-20-00-010-801
Task 21-20-00-410-801
Structural Repair Manual (SRM)
 51-24-00
51-42-00
51-43-00
51-44-00
51-48-00
51-70-20
51-75-12
(a) For the specification of Material Numbers (Mat. No.) given in this Service Bulletin,
refer to the Consumable Materials List (CML).
(b) For the Frame (FR) identification, refer to AMM 06-31-53, Page Block 001.
(c) For the identification of zones, refer to AMM 06-20-00, Page Block 001.
(d) For the identification of access panels, refer to AMM 06-41-53, Page Block 001.
(e) For the general removal of air-conditioning distribution ducts, refer to AMM Task
21-20-00-010-801.
(f) For the general installation of air-conditioning distribution ducts, refer to AMM Task
21-20-00-410-801.
(g) Remove and install fasteners in accordance with SRM 51-42-00.
DATE: Nov 23/16 SERVICE BULLETIN No.: A330-57-3130
REVISION No.: 01 - Feb 13/18 Page: 24
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 41

@A330
SERVICE BULLETIN
(h) Tag all the parts you must remove and retain to make the subsequent installation
easier.
(i) Get fastener hole diameters and drill data in accordance with SRM 51-44-00.
(j) Do the spot facing of the fastener in accordance with SRM 51-70-20.
(k) Get alternative and substitute fastener data in accordance with SRM 51-43-00.
(l) Do a cold working of the fastener holes in accordance with SRM 51-48-00.
(m) To torque tighten the standard threaded fasteners, refer to AMM Task
20-21-11-911-801.
(n) Apply sealant in accordance with SRM 51-24-00.
(o) Renew the protective finish in accordance with SRM 51-75-12.
(p) If alternative and substitute fasteners have to be used, you must make sure that the
associated nut/collar are compatible in accordance with SRM 51-40-00 "Mating
Part" column.
(q) If the length of any fastener specified in this Service Bulletin does not meet
installation standards given in SRM Chapter 51, then a fastener of the same
specification, or an approved substitute, with a length which meets the installation
standards given in SRM Chapter 51 may be used. In addition, washers may be
installed for fastener grip length in accordance with SRM Chapter 51.
(2) Subtask 573130-839-001-001 - Administrative
Manpower Resources
Skills
 NON SPECIFIC
Write in the applicable aircraft records that you have done all the work given in this
Service Bulletin.
**CONF 003
(1) Subtask 573130-910-001-001 - Standard Practices
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 06-20-00, Page Block 001
06-31-53, Page Block 001
06-41-53, Page Block 001
Task 20-21-11-911-801
Task 21-20-00-010-801
Task 21-20-00-410-801
DATE: Nov 23/16 SERVICE BULLETIN No.: A330-57-3130
REVISION No.: 01 - Feb 13/18 Page: 25
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 42

@A330
SERVICE BULLETIN
References
Structural Repair Manual (SRM)
 51-24-00
51-42-00
51-43-00
51-44-00
51-48-00
51-70-20
51-75-12
(a) For the specification of Material Numbers (Mat. No.) given in this Service Bulletin,
refer to the Consumable Materials List (CML).
(b) For the Frame (FR) identification, refer to AMM 06-31-53, Page Block 001.
(c) For the identification of zones, refer to AMM 06-20-00, Page Block 001.
(d) For the identification of access panels, refer to AMM 06-41-53, Page Block 001.
(e) For the general removal of air-conditioning distribution ducts, refer to AMM Task
21-20-00-010-801.
(f) For the general installation of air-conditioning distribution ducts, refer to AMM Task
21-20-00-410-801.
(g) Remove and install fasteners in accordance with SRM 51-42-00.
(h) Tag all the parts you must remove and retain to make the subsequent installation
easier.
(i) Get fastener hole diameters and drill data in accordance with SRM 51-44-00.
(j) Do the spot facing of the fastener in accordance with SRM 51-70-20.
(k) Get alternative and substitute fastener data in accordance with SRM 51-43-00.
(l) Do a cold working of the fastener holes in accordance with SRM 51-48-00.
(m) To torque tighten the standard threaded fasteners, refer to AMM Task
20-21-11-911-801.
(n) Apply sealant in accordance with SRM 51-24-00.
(o) Renew the protective finish in accordance with SRM 51-75-12.
(p) If alternative and substitute fasteners have to be used, you must make sure that the
associated nut/collar are compatible in accordance with SRM 51-40-00 "Mating
Part" column.
(q) If the length of any fastener specified in this Service Bulletin does not meet
installation standards given in SRM Chapter 51, then a fastener of the same
specification, or an approved substitute, with a length which meets the installation
standards given in SRM Chapter 51 may be used. In addition, washers may be
installed for fastener grip length in accordance with SRM Chapter 51.
DATE: Nov 23/16 SERVICE BULLETIN No.: A330-57-3130
REVISION No.: 01 - Feb 13/18 Page: 26
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 43

@A330
SERVICE BULLETIN
(2) Subtask 573130-839-001-001 - Administrative
Manpower Resources
Skills
 NON SPECIFIC
Write in the applicable aircraft records that you have done all the work given in this
Service Bulletin.
**CONF 004
(1) Subtask 573130-910-001-001 - Standard Practices
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 06-20-00, Page Block 001
06-31-53, Page Block 001
06-41-53, Page Block 001
Task 20-21-11-911-801
Task 21-20-00-010-801
Task 21-20-00-410-801
Structural Repair Manual (SRM)
 51-24-00
51-42-00
51-43-00
51-44-00
51-48-00
51-70-20
51-75-12
(a) For the specification of Material Numbers (Mat. No.) given in this Service Bulletin,
refer to the Consumable Materials List (CML).
(b) For the Frame (FR) identification, refer to AMM 06-31-53, Page Block 001.
(c) For the identification of zones, refer to AMM 06-20-00, Page Block 001.
(d) For the identification of access panels, refer to AMM 06-41-53, Page Block 001.
(e) For the general removal of air-conditioning distribution ducts, refer to AMM Task
21-20-00-010-801.
(f) For the general installation of air-conditioning distribution ducts, refer to AMM Task
21-20-00-410-801.
(g) Remove and install fasteners in accordance with SRM 51-42-00.
(h) Tag all the parts you must remove and retain to make the subsequent installation
easier.
(i) Get fastener hole diameters and drill data in accordance with SRM 51-44-00.
(j) Do the spot facing of the fastener in accordance with SRM 51-70-20.
DATE: Nov 23/16 SERVICE BULLETIN No.: A330-57-3130
REVISION No.: 01 - Feb 13/18 Page: 27
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 44

@A330
SERVICE BULLETIN
(k) Get alternative and substitute fastener data in accordance with SRM 51-43-00.
(l) Do a cold working of the fastener holes in accordance with SRM 51-48-00.
(m) To torque tighten the standard threaded fasteners, refer to AMM Task
20-21-11-911-801.
(n) Apply sealant in accordance with SRM 51-24-00.
(o) Renew the protective finish in accordance with SRM 51-75-12.
(p) If alternative and substitute fasteners have to be used, you must make sure that the
associated nut/collar are compatible in accordance with SRM 51-40-00 "Mating
Part" column.
(q) If the length of any fastener specified in this Service Bulletin does not meet
installation standards given in SRM Chapter 51, then a fastener of the same
specification, or an approved substitute, with a length which meets the installation
standards given in SRM Chapter 51 may be used. In addition, washers may be
installed for fastener grip length in accordance with SRM Chapter 51.
(2) Subtask 573130-839-001-001 - Administrative
Manpower Resources
Skills
 NON SPECIFIC
Write in the applicable aircraft records that you have done all the work given in this
Service Bulletin.
**CONF ALL
B. PREPARATION
**CONF 001
(1) Subtask 573130-941-001-001 - Job Set-up
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 Task 12-34-24-860-802
Task 28-00-00-610-801
Task 28-10-00-910-805
Task 28-25-00-650-801
Task 32-12-00-010-801
Task 52-30-00-010-801
Task 57-17-11-000-801
NOTE
: For the basic Aircraft configuration, refer to AMM Chapter "Introduction -
Aircraft status for maintenance" in Manual Front Matter section.
DATE: Nov 23/16 SERVICE BULLETIN No.: A330-57-3130
REVISION No.: 01 - Feb 13/18 Page: 28
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 45

@A330
SERVICE BULLETIN
(a) Make sure that the aircraft is electrically grounded, refer to AMM Task
12-34-24-860-802.
(b) Put an access platform in position at the cargo door 821.
(c) Open the Main Landing Gear (MLG) doors, refer to AMM Task 32-12-00-010-801.
(d) Open the 821 FWD cargo-compartment door, refer to AMM Task
52-30-00-010-801.
(e) Defuel the center fuel tank, refer to AMM Task 28-25-00-650-801.
(f) Degas and ventilate the center fuel tank, refer to AMM Task 28-00-00-610-801 and
AMM Task 28-10-00-910-805.
(g) Remove the access covers 147AZ and 148AZ, refer to AMM Task
57-17-11-000-801.
(2) Subtask 573130-010-002-001 - Remove/Open for Access in the FWD Cargo-
Compartment
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 Task 21-20-00-010-801
Task 21-21-41-000-801
Task 21-21-51-000-801
Task 25-52-00-000-801
Task 25-80-00-000-801
Fig. A-FBAAA
Removal/Installation of the Air
Conditioning Ducts between FR39.1 and
FR40 (FWD Cargo - Compartment)
Sheet 01
Fig. A-FBEAA
Removal/Installation of the Air Supply
Pipe Assembly
Sheet
 01
CAUTION
: DO NOT STEP ON THE DUCTS BECAUSE THEY ARE FRAGILE.
(a) Remove the partition panels in the FWD cargo compartment 131BX,
 131CX,
131DX, 132CX and 132DX, refer to AMM Task 25-52-00-000-801.
(b) Remove between
 Frame 39.1 and Frame 40 on the LH and RH sides as shown on
Fig. A-FBAAA
 and refer to AMM Task 21-20-00-010-801:
2 Duct Item (1) Retain
2 Duct Item (2) Retain
DATE: Nov 23/16 SERVICE BULLETIN No.: A330-57-3130
REVISION No.: 01 - Feb 13/18 Page: 29
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 46

@A330
SERVICE BULLETIN
(c) Remove as shown on Fig. A-FBAAA
 and refer to AMM Task 21-21-51-000-801 and
AMM Task 21-21-41-000-801:
2 Recirculation Filter Item (3) Retain
2 Recirculation Fan Item (4) Retain
(d) Remove as shown on Fig. A-FBEAA
:
3
 Bolt
 Item (6
) Retain
3
 Washer
 Item (7
) Retain
1
 Strip-Bonding
 Item (9
) Retain
3
 Clamp
 Item (8
) Retain
1
 Air Supply Pipe Assy
 Item (5
) Retain
(e) Remove the necessary insulation blankets to access the work area, refer to AMM
Task 25-80-00-000-801.
**CONF 002
(1) Subtask 573130-941-001-002 - Job Set-up
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 Task 12-34-24-860-802
Task 32-12-00-010-801
Task 52-30-00-010-801
Task 57-17-11-000-801
NOTE
: For the basic Aircraft configuration, refer to AMM Chapter "Introduction -
Aircraft status for maintenance" in Manual Front Matter section.
(a) Make sure that the aircraft is electrically grounded, refer to AMM Task
12-34-24-860-802.
(b) Put an access platform in position at the cargo door 821.
(c) Open the Main Landing Gear (MLG) doors, refer to AMM Task 32-12-00-010-801.
(d) Open the 821 FWD cargo-compartment door, refer to AMM Task
52-30-00-010-801.
(e) Remove the access covers 147AZ and 148AZ, refer to AMM Task
57-17-11-000-801.
DATE: Nov 23/16 SERVICE BULLETIN No.: A330-57-3130
REVISION No.: 01 - Feb 13/18 Page: 30
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 47

@A330
SERVICE BULLETIN
(2) Subtask 573130-010-002-001 - Remove/Open for Access in the FWD Cargo-
Compartment
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 Task 21-20-00-010-801
Task 21-21-41-000-801
Task 21-21-51-000-801
Task 25-52-00-000-801
Task 25-80-00-000-801
Fig. A-FBAAA
Removal/Installation of the Air
Conditioning Ducts between FR39.1 and
FR40 (FWD Cargo - Compartment)
Sheet 01
Fig. A-FBEAA
Removal/Installation of the Air Supply
Pipe Assembly
Sheet
 01
CAUTION
: DO NOT STEP ON THE DUCTS BECAUSE THEY ARE FRAGILE.
(a) Remove the partition panels in the FWD cargo compartment 131BX,
 131CX,
131DX, 132CX and 132DX, refer to AMM Task 25-52-00-000-801.
(b) Remove between
 Frame 39.1 and Frame 40 on the LH and RH sides as shown on
Fig. A-FBAAA
 and refer to AMM Task 21-20-00-010-801:
2 Duct Item (1) Retain
2 Duct Item (2) Retain
(c) Remove as shown on Fig. A-FBAAA
 and refer to AMM Task 21-21-51-000-801 and
AMM Task 21-21-41-000-801:
2 Recirculation Filter Item (3) Retain
2 Recirculation Fan Item (4) Retain
(d) Remove as shown on Fig. A-FBEAA
:
3
 Bolt
 Item (6
) Retain
3
 Washer
 Item (7
) Retain
1
 Strip-Bonding
 Item (9
) Retain
3
 Clamp
 Item (8
) Retain
1
 Air Supply Pipe Assy
 Item (5
) Retain
DATE: Nov 23/16 SERVICE BULLETIN No.: A330-57-3130
REVISION No.: 01 - Feb 13/18 Page: 31
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 48

@A330
SERVICE BULLETIN
(e) Remove the necessary insulation blankets to access the work area, refer to AMM
Task 25-80-00-000-801.
**CONF 003
(1) Subtask 573130-941-001-002 - Job Set-up
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 Task 12-34-24-860-802
Task 32-12-00-010-801
Task 52-30-00-010-801
Task 57-17-11-000-801
NOTE
: For the basic Aircraft configuration, refer to AMM Chapter "Introduction -
Aircraft status for maintenance" in Manual Front Matter section.
(a) Make sure that the aircraft is electrically grounded, refer to AMM Task
12-34-24-860-802.
(b) Put an access platform in position at the cargo door 821.
(c) Open the Main Landing Gear (MLG) doors, refer to AMM Task 32-12-00-010-801.
(d) Open the 821 FWD cargo-compartment door, refer to AMM Task
52-30-00-010-801.
(e) Remove the access covers 147AZ and 148AZ, refer to AMM Task
57-17-11-000-801.
(2) Subtask 573130-010-002-001 - Remove/Open for Access in the FWD Cargo-
Compartment
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 Task 21-20-00-010-801
Task 21-21-41-000-801
Task 21-21-51-000-801
Task 25-52-00-000-801
Task 25-80-00-000-801
Fig. A-FBAAA
Removal/Installation of the Air
Conditioning Ducts between FR39.1 and
FR40 (FWD Cargo - Compartment)
Sheet 01
Fig. A-FBEAA
Removal/Installation of the Air Supply
Pipe Assembly
Sheet
 01
DATE: Nov 23/16 SERVICE BULLETIN No.: A330-57-3130
REVISION No.: 01 - Feb 13/18 Page: 32
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 49

@A330
SERVICE BULLETIN
CAUTION
: DO NOT STEP ON THE DUCTS BECAUSE THEY ARE FRAGILE.
(a) Remove the partition panels in the FWD cargo compartment 131BX,
 131CX,
131DX, 132CX and 132DX, refer to AMM Task 25-52-00-000-801.
(b) Remove between
 Frame 39.1 and Frame 40 on the LH and RH sides as shown on
Fig. A-FBAAA
 and refer to AMM Task 21-20-00-010-801:
2 Duct Item (1) Retain
2 Duct Item (2) Retain
(c) Remove as shown on Fig. A-FBAAA
 and refer to AMM Task 21-21-51-000-801 and
AMM Task 21-21-41-000-801:
2 Recirculation Filter Item (3) Retain
2 Recirculation Fan Item (4) Retain
(d) Remove as shown on Fig. A-FBEAA
:
3
 Bolt
 Item (6
) Retain
3
 Washer
 Item (7
) Retain
1
 Strip-Bonding
 Item (9
) Retain
3
 Clamp
 Item (8
) Retain
1
 Air Supply Pipe Assy
 Item (5
) Retain
(e) Remove the necessary insulation blankets to access the work area, refer to AMM
Task 25-80-00-000-801.
**CONF 004
(1) Subtask 573130-941-001-001 - Job Set-up
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 Task 12-34-24-860-802
Task 28-00-00-610-801
Task 28-10-00-910-805
Task 28-25-00-650-801
Task 32-12-00-010-801
Task 52-30-00-010-801
Task 57-17-11-000-801
NOTE
: For the basic Aircraft configuration, refer to AMM Chapter "Introduction -
Aircraft status for maintenance" in Manual Front Matter section.
DATE: Nov 23/16 SERVICE BULLETIN No.: A330-57-3130
REVISION No.: 01 - Feb 13/18 Page: 33
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 50

@A330
SERVICE BULLETIN
(a) Make sure that the aircraft is electrically grounded, refer to AMM Task
12-34-24-860-802.
(b) Put an access platform in position at the cargo door 821.
(c) Open the Main Landing Gear (MLG) doors, refer to AMM Task 32-12-00-010-801.
(d) Open the 821 FWD cargo-compartment door, refer to AMM Task
52-30-00-010-801.
(e) Defuel the center fuel tank, refer to AMM Task 28-25-00-650-801.
(f) Degas and ventilate the center fuel tank, refer to AMM Task 28-00-00-610-801 and
AMM Task 28-10-00-910-805.
(g) Remove the access covers 147AZ and 148AZ, refer to AMM Task
57-17-11-000-801.
(2) Subtask 573130-010-002-001 - Remove/Open for Access in the FWD Cargo-
Compartment
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 Task 21-20-00-010-801
Task 21-21-41-000-801
Task 21-21-51-000-801
Task 25-52-00-000-801
Task 25-80-00-000-801
Fig. A-FBAAA
Removal/Installation of the Air
Conditioning Ducts between FR39.1 and
FR40 (FWD Cargo - Compartment)
Sheet 01
Fig. A-FBEAA
Removal/Installation of the Air Supply
Pipe Assembly
Sheet
 01
CAUTION
: DO NOT STEP ON THE DUCTS BECAUSE THEY ARE FRAGILE.
(a) Remove the partition panels in the FWD cargo compartment 131BX,
 131CX,
131DX, 132CX and 132DX, refer to AMM Task 25-52-00-000-801.
(b) Remove between
 Frame 39.1 and Frame 40 on the LH and RH sides as shown on
Fig. A-FBAAA
 and refer to AMM Task 21-20-00-010-801:
2 Duct Item (1) Retain
2 Duct Item (2) Retain
DATE: Nov 23/16 SERVICE BULLETIN No.: A330-57-3130
REVISION No.: 01 - Feb 13/18 Page: 34
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 51

@A330
SERVICE BULLETIN
(c) Remove as shown on Fig. A-FBAAA
 and refer to AMM Task 21-21-51-000-801 and
AMM Task 21-21-41-000-801:
2 Recirculation Filter Item (3) Retain
2 Recirculation Fan Item (4) Retain
(d) Remove as shown on Fig. A-FBEAA
:
3
 Bolt
 Item (6
) Retain
3
 Washer
 Item (7
) Retain
1
 Strip-Bonding
 Item (9
) Retain
3
 Clamp
 Item (8
) Retain
1
 Air Supply Pipe Assy
 Item (5
) Retain
(e) Remove the necessary insulation blankets to access the work area, refer to AMM
Task 25-80-00-000-801.
**CONF ALL
C. PROCEDURE
**CONF 001
(1) Subtask 573130-020-001-001 - Remove the Fastener from the Hole 260 between
STGR37 and STGR38 at FR40, on the LH Side
Work Zones and Access Panels
Zone
 Access/Work location
131
 Work location
 Frame 40
from Stringer 37 to Stringer 38
Manpower Resources
Manhours
 0.50
Minimum number of person
 2
Subtask elapsed time
 0.25
Skills
 AIRFRAME
Material necessary to do the job
Consumable CMLA01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Non Aqueous Cleaner -
General
08BAA9
Textile - Lint Free Cotton
 14SBA1
DATE: Nov 23/16 SERVICE BULLETIN No.: A330-57-3130
REVISION No.: 01 - Feb 13/18 Page: 35
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 52

@A330
SERVICE BULLETIN
References
Structural Repair Manual (SRM)
 51-42-00
Fig. A-FBDAA
Removal/Installation of the Fasteners at
Holes 260 between STGR37 and
STGR38 at FR40 on the LH and the RH
Side
Sheet 01
Sheet 02
(a) Remove as shown on Fig. A-FBDAA
 and in accordance with SRM 51-42-00:
1 Screw Item (7) Discard
1 Nut Item (8) Discard
(b) Remove the old sealant with a non metallic spatula.
(c) Clean the work area with:
Textile - Lint Free
Cotton
14SBA1 As required
and
Non Aqueous
Cleaner - General
08BAA9 As required
(2) Subtask 573130-250-001-001 - Do an Inspection of the Fastener Hole 260 between
STGR37 and STGR38 at FR40, on the LH Side
Work Zones and Access Panels
Zone
 Access/Work location
131
 Work location
 Frame 40
from Stringer 37 to Stringer 38
Manpower Resources
Manhours
 0.50
Minimum number of person
 2
Subtask elapsed time
 0.25
Skills
 NON DESTRUCTIVE
TESTING
References
Non Destructive Test Manual (NTM)
 51-10-01
(a) Do a rotating probe test of the fastener hole 260 in accordance with
 NTM 51-10-01.
1
 In case of crack findings in the fastener hole, contact AIRBUS before next
flight and follow their instructions.
2
 In case of no crack findings, do a cold working of the fastener holes in
accordance with SUBTASK 573130-831-001 001 Do a Cold Working of the
Fastener Hole 260 between STGR37 and STGR38 at FR40, on the LH Side .
DATE: Nov 23/16 SERVICE BULLETIN No.: A330-57-3130
REVISION No.: 01 - Feb 13/18 Page: 36
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 53

@A330
SERVICE BULLETIN
(3) Subtask 573130-831-001-001 - Do a Cold Working of the Fastener Hole 260
between STGR37 and STGR38 at FR40, on the LH Side
Work Zones and Access Panels
Zone
 Access/Work location
131
 Work location
 Frame 40
from Stringer 37 to Stringer 38
Manpower Resources
Manhours
 3.00
Minimum number of person
 2
Subtask elapsed time
 1.50
Skills
 AIRFRAME
Material necessary to do the job
Consumable CMLA01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Wash Primer - Structure
 04CMA2
 As required
Primer Polyurethane Paint -
Corrosion Inhibiting
04EAC2
 As required
Non Aqueous Cleaner -
General
08BAA9
 As required
Textile - Lint Free Cotton
 14SBA1
 As required
Standard tool TOOLA01
ITEM
 TOOL N˚
 TOOL NAME
 QTY
 SEE
NOTES
DKA330573130-1
 Durable Tooling
 1
 (1)
EKA330573130-1
 Expendable Tooling
 1
 (2)
FTIA330573130-1
 Capital Tooling
 1
 (3)
NOTE
: FTI has allocated the following tool kit numbers for cold expansion:
For the definition of capital, durable and expendable tools, refer to ISI
51.48.00001
NOTE
 (1)
: Durable tooling: Ref. DK-A330-57-3130-1
The durable tool kit contains the minimum quantity of durable tools
necessary to accomplish the Service Bulletin on one aircraft. If the
Service Bulletin is to be accomplished on more than one aircraft, the
number of durable kits required can be established by reference to ISI
51.48.00001.
NOTE
 (2)
: Expendable tooling: Ref. EK-A330-57-3130-1
DATE: Nov 23/16 SERVICE BULLETIN No.: A330-57-3130
REVISION No.: 01 - Feb 13/18 Page: 37
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 54

@A330
SERVICE BULLETIN
The expendable tool kit contains the quantity of expendable tools
required to accomplish the Service Bulletin on one aircraft. Order one
expendable tool kit for every aircraft on which this Service Bulletin is to
be accomplished.
NOTE
 (3)
: Capital tooling: Ref. FTI-A330-57-3130-1
The capital tools provided in this kit are not specific to this Service
Bulletin and are normally already available in operators’ stock as a long-
term investment or can be loaned from FTI.
Standard tool TOOLA02
ITEM
 TOOL N˚
 TOOL NAME
 QTY
 SEE
NOTES
DKA330573130-1
 Durable Tooling
 1
 (1)
EKA330573130-1
 Expendable Tooling
 1
 (2)
WCIA330573130-1
 Capital Tooling
 1
 (3)
NOTE
: WCI has allocated the following tool kit numbers for cold expansion:
For the definition of capital, durable and expendable tools, refer to ISI
51.48.00001
NOTE
 (1)
: Durable tooling: Ref. DK-A330-57-3130-1
The durable tool kit contains the minimum quantity of durable tools
necessary to accomplish the Service Bulletin on one aircraft. If the
Service Bulletin is to be accomplished on more than one aircraft, the
number of durable kits required can be established by reference to ISI
51.48.00001.
NOTE
 (2)
: Expendable tooling: Ref. EK-A330-57-3130-1
The expendable tool kit contains the quantity of expendable tools
required to accomplish the Service Bulletin on one aircraft. Order one
expendable tool kit for every aircraft on which this Service Bulletin is to
be accomplished.
NOTE
 (3)
: Capital tooling: Ref. WCI-A330-57-3130-1
The capital tools provided in this kit are not specific to this Service
Bulletin and are normally already available in operators’ stock as a long-
term investment or can be loaned from WCI.
References
Structural Repair Manual (SRM)
 51-44-00
51-48-00
51-70-20
51-75-12
DATE: Nov 23/16 SERVICE BULLETIN No.: A330-57-3130
REVISION No.: 01 - Feb 13/18 Page: 38
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 55

@A330
SERVICE BULLETIN
References
Fig. A-FBDAA
Removal/Installation of the Fasteners at
Holes 260 between STGR37 and
STGR38 at FR40 on the LH and the RH
Side
Sheet 01
Sheet 02
(a) Do a check of the existing hole diameter and compare with the values as shown on
Fig. A-FBDAA
.
1
 In case the existing hole diameter is more than or equal to the minimum
starting hole diameter, please contact AIRBUS for further instructions before
next flight.
2
 In case the hole diameter is less than the minimum starting hole diameter, do
the next step.
(b) Drill and ream the fastener hole to the correct starting hole diameter as shown on
Fig. A-FBDAA
 and in accordance with SRM 51-44-00 and SRM 51-48-00.
Refer to FTI Tool list No.:
DKA330573130-1 Durable Tooling 1
or
Refer to WCI Tool list No.:
DKA330573130-1 Durable Tooling 1
(c) Clean the drilled holes with:
Textile - Lint Free
Cotton
14SBA1
 As required
and
Non Aqueous
Cleaner - General
08BAA9
 As required
(d) If necessary, perform spot facing to the related fastener head depth, in accordance
with SRM 51-70-20.
(e) Renew the protective finish in accordance with SRM 51-75-12:
Wash Primer -
Structure
04CMA2
 As required
and
Primer
Polyurethane Paint
- Corrosion
Inhibiting
04EAC2
 As required
DATE: Nov 23/16 SERVICE BULLETIN No.: A330-57-3130
REVISION No.: 01 - Feb 13/18 Page: 39
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 56

@A330
SERVICE BULLETIN
(f) Do the cold working of the fastener hole 260.
1
 Install split sleeve as shown on Fig. A-FBDAA
.
Refer to FTI Tool list No.:
EKA330573130-1 Expendable Tooling 1
or
Refer to WCI Tool list No.:
EKA330573130-1 Expendable Tooling 1
2
 Do the cold working of the fastener hole 260 in accordance with
 SRM
51-48-00.
Refer to FTI Tool list No.:
FTIA330573130-1 Capital Tooling 1
or
Refer to WCI Tool list No.:
WCIA330573130-1 Capital Tooling 1
3
 Remove the split sleeve.
(g) Ream the fastener hole to the final hole diameter, as shown on Fig. A-FBDAA
 and
in accordance with SRM 51-44-00 and SRM 51-48-00.
Refer to FTI Tool list No.:
DKA330573130-1 Durable Tooling 1
or
Refer to WCI Tool list No.:
DKA330573130-1 Durable Tooling 1
(h) Clean the drilled holes with:
Textile - Lint Free
Cotton
14SBA1
 As required
and
Non Aqueous
Cleaner - General
08BAA9
 As required
DATE: Nov 23/16 SERVICE BULLETIN No.: A330-57-3130
REVISION No.: 01 - Feb 13/18 Page: 40
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 57

@A330
SERVICE BULLETIN
(4) Subtask 573130-420-001-001 - Install the Fastener in the Hole 260 between STGR37
and STGR38 at FR40, on the LH Side
Work Zones and Access Panels
Zone
 Access/Work location
131
 Work location
 Frame 40
from Stringer 37 to Stringer 38
Manpower Resources
Manhours
 1.00
Minimum number of person
 2
Subtask elapsed time
 0.50
Skills
 AIRFRAME
Material necessary to do the job
Kit 573130A01R00
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 SEE
NOTES
7
 EN6115K8-16
 1
 BOLT
8
 ASNA2531-8
 1
 NUT
Consumable CMLA01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Primer Polyurethane Paint -
Corrosion Inhibiting
04EAC2
 As required
Polyurethane Coating - Fuel
Vapour Barrier Struct
04PAG2
 As required
Polysulfide Sealant - Fuel
Tank Brushable
06ABA1
 As required
Coating Sealant - Fuel Tank
Brushable
06HAA1
 As required
Adhesion Promoter - For
Sealant
06PAG1
 As required
Non Aqueous Cleaner -
General
08BAA9
 As required
Corrosion Preventive
Compound - Water
Displacing
12ADB1
 As required
Textile - Lint Free Cotton
 14SBA1
 As required
References
Aircraft Maintenance Manual (AMM)
 Task 20-21-11-911-801
Structural Repair Manual (SRM)
 51-42-00
51-75-12
51-76-12
DATE: Nov 23/16 SERVICE BULLETIN No.: A330-57-3130
REVISION No.: 01 - Feb 13/18 Page: 41
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 58

@A330
SERVICE BULLETIN
References
Fig. A-FBDAA
Removal/Installation of the Fasteners at
Holes 260 between STGR37 and
STGR38 at FR40 on the LH and the RH
Side
Sheet 01
Sheet 02
(a) Install the fastener to the aircraft structure.
1
 Wet install in accordance with SRM 51-42-00, refer to Fig. A-FBDAA
 and
AMM Task 20-21-11-911-801.
1 Bolt EN6115K8-16 Item 7
1 Nut ASNA2531-8 Item 8
with
Polysulfide Sealant
- Fuel Tank
Brushable
06ABA1
 As required
2
 Clean the work area with:
Textile - Lint Free
Cotton
14SBA1
 As required
and
Non Aqueous
Cleaner - General
08BAA9
 As required
(b) Apply protective finish on the fastener, refer to
 Fig. A-FBDAA
.
1
 Apply to the bolt head outside the center fuel tank in accordance with
 SRM
51-75-12:
Primer
Polyurethane Paint
- Corrosion
Inhibiting
04EAC2
 As required
Polyurethane
Coating - Fuel
Vapour Barrier
Struct
04PAG2
 As required
Corrosion
Preventive
Compound - Water
Displacing
12ADB1
 As required
DATE: Nov 23/16 SERVICE BULLETIN No.: A330-57-3130
REVISION No.: 01 - Feb 13/18 Page: 42
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 59

@A330
SERVICE BULLETIN
2
 Apply to the nut inside the center fuel tank in accordance with SRM 51-76-12:
Adhesion Promoter
- For Sealant
06PAG1 As required
Polysulfide Sealant
- Fuel Tank
Brushable
06ABA1
 As required
Coating Sealant -
Fuel Tank
Brushable
06HAA1
 As required
(5) Subtask 573130-020-002-001 - Remove the Fastener from the Hole 260 between
STGR37 and STGR38 at FR40, on the RH Side
Work Zones and Access Panels
Zone
 Access/Work location
132
 Work location
 Frame 40
from Stringer 37 to Stringer 38
Manpower Resources
Manhours
 0.50
Minimum number of person
 2
Subtask elapsed time
 0.25
Skills
 AIRFRAME
Material necessary to do the job
Consumable CMLA01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Non Aqueous Cleaner -
General
08BAA9
 As required
Textile - Lint Free Cotton
 14SBA1
 As required
References
Structural Repair Manual (SRM)
 51-42-00
Fig. A-FBDAA
Removal/Installation of the Fasteners at
Holes 260 between STGR37 and
STGR38 at FR40 on the LH and the RH
Side
Sheet 01
Sheet 02
(a) Remove as shown on Fig. A-FBDAA
 and in accordance with SRM 51-42-00:
1 Screw Item (7) Discard
1 Nut Item (8) Discard
DATE: Nov 23/16 SERVICE BULLETIN No.: A330-57-3130
REVISION No.: 01 - Feb 13/18 Page: 43
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 60

@A330
SERVICE BULLETIN
(b) Remove the old sealant with a non metallic spatula.
(c) Clean the work area with:
Textile - Lint Free
Cotton
14SBA1 As required
and
Non Aqueous
Cleaner - General
08BAA9 As required
(6) Subtask 573130-250-002-001 - Do an Inspection of the Fastener Hole 260 between
STGR37 and STGR38 at FR40, on the RH side
Work Zones and Access Panels
Zone
 Access/Work location
132
 Work location
 Frame 40
from Stringer 37 to Stringer 38
Manpower Resources
Manhours
 0.50
Minimum number of person
 2
Subtask elapsed time
 0.25
Skills
 NON DESTRUCTIVE
TESTING
References
Non Destructive Test Manual (NTM)
 51-10-01
Fig. A-FBDAA
Removal/Installation of the Fasteners at
Holes 260 between STGR37 and
STGR38 at FR40 on the LH and the RH
Side
Sheet 01
Sheet 02
(a) Do a rotating probe test of the fastener hole 260 in accordance with
 NTM 51-10-01.
1
 In case of crack findings in the fastener hole, contact AIRBUS before next
flight and follow their instructions.
2
 In case of no crack findings, do a cold working of the fastener holes in
accordance with SUBTASK 573130-831-002 001 Do a Cold Working of the
Fastener Hole 260 between STGR37 and STGR38 at FR40, on the RH Side .
(7) Subtask 573130-831-002-001 - Do a Cold Working of the Fastener Hole 260
between STGR37 and STGR38 at FR40, on the RH Side
Work Zones and Access Panels
Zone
 Access/Work location
132
 Work location
 Frame 40
from Stringer 37 to Stringer 38
DATE: Nov 23/16 SERVICE BULLETIN No.: A330-57-3130
REVISION No.: 01 - Feb 13/18 Page: 44
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

The text continues at https://openairdocs.org/service-documents/airbus/a330-57-3130/file/d6f4d994024d.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
