# Airbus Service Bulletin A340-25-5212

Copy: Revision 01 ("A340-25-5212 R01"), 88 pages: PDF https://openairdocs.org/files/sha256/7b/d7/7bd7c35e6efd22da9dfb9dd3746acf4f9c4344021c72f38f674a1802f27919de; text https://openairdocs.org/service-documents/airbus/a340-25-5212/file/7bd7c35e6efd.md. Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2015-3631; AD 2016-25-31 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Airbus](https://openairdocs.org/service-documents/airbus.md)
- Type: Service bulletin (Service Bulletin)
- Number: A340-25-5212
- Latest revision known: A340-25-5212, Revision 01, dated October 27, 2014 (OpenAirDocs)
- Page: https://openairdocs.org/service-documents/airbus/a340-25-5212

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2016-25-31](https://openairdocs.org/ad/2016-25-31.md), effective Feb 7, 2017: Revision 01

Also cited in [1 proposed AD](https://openairdocs.org/service-documents/airbus/a340-25-5212/proposed.md).

## Text (88 pages)

Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2015-3631; AD 2016-25-31 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

@A340-500/600
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
MANDATORY
 MANDATORY
 MANDATORY
ATA SYSTEM: 25
TITLE: EQUIPMENT/FURNISHINGS - CURTAINS AND PARTITIONS -
INTRODUCE MODIFIED ELECTRICAL BONDING OF COCKPIT DOOR.
MODIFICATION No.: 203228D50684
This page transmits Revision No.01 of Service Bulletin No.A340-25-5212
ADDITIONAL WORK
**CONF ALL
No additional work is required by this revision for aircraft modified by any previous issue.
REASON
Revision No. 01 issued to:
- update the reason paragraph to remove reference to the In-Flight Entertainment (IFE) wiring
- update of Concurrent Requirement to add Service Bulletin No. A340-25-5046.
- update the kits and associated accomplishment instructions.
CHANGES
SUMMARY
REASON/DESCRIPTION/OPERATIONAL
CONSEQUENCES
REASON UPDATED
 R
MATERIAL PRICE INFORMATION
 MATERIAL PRICE INFORMATION TABLE
UPDATED
R
MATERIAL PRICE INFORMATION TABLE
UPDATED
R
EFFECTIVITY
 OPERATOR LIST UPDATED
 R
CONCURRENT REQUIREMENTS
 CONCURRENT REQUIREMENTS ADDED
 N
CONCURRENT REQUIREMENTS DELETED FOR
APPLICABLE MSN
D
DATE: May 27/14 SERVICE BULLETIN No.: A340-25-5212
REVISION No.: 01 - Oct 27/14 Page: 1
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 2

@A340-500/600
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
PLANNING INFORMATION
EFFECTIVITY
 EFFECTIVITY RELATED INFORMATION
UPDATED
R
Configuration definition
CONF 002
 CONFIGURATION DEFINITION UPDATED
CONFIGURATION DESCRIPTION UPDATED
R
Material Effectivity
 MATERIAL EFFECTIVITY UPDATED
MATERIAL SET UPDATED
MATERIAL SET QUANTITY UPDATED
R
MATERIAL EFFECTIVITY UPDATED
MATERIAL SET UPDATED
MATERIAL SET QUANTITY UPDATED
R
CONCURRENT REQUIREMENTS
 CONCURRENT REQUIREMENTS UPDATED
 R
CONCURRENT SB LIST ADDED
 N
REASON
History
 HISTORY UPDATED
 R
WEIGHT AND BALANCE
 Minor editorial or document structure change
 R
REFERENCES
 REFERENCED DOCUMENTATION UPDATED
 R
REFERENCED DOCUMENTATION UPDATED
 R
MATERIAL INFORMATION
MATERIAL - PRICE AND AVAILABILITY
Procurement Addresses
 PROCUREMENT ADDRESSES UPDATED
MATERIAL SET UPDATED
R
Price and Availability
 PRICE AND AVAILABILITY UPDATED
MATERIAL AVAILABILITY UPDATED
MATERIAL PRICE UPDATED
MATERIAL SET UPDATED
R
INDUSTRY SUPPORT INFORMATION
 INDUSTRY SUPPORT INFORMATION UPDATED
 R
LIST OF COMPONENTS
Kit 255212D01R04
 PART MATERIAL SET UPDATED
MATERIAL SET LABEL UPDATED
QUANTITY UPDATED
ITEM NUMBER UPDATED
PART NUMBER UPDATED
KEYWORD UPDATED
R
LIST OF MATERIALS - OPERATOR
SUPPLIED
Components
 COMPONENTS UPDATED
 R
Component COMPD01
 PART MATERIAL SET ADDED
 N
ACCOMPLISHMENT INSTRUCTIONS
TASK 255212- 831-848-001-Modification
 TASK SOLUTION UPDATED
CAUTION UPDATED
NOTE UPDATED
R
Subtask 255212-910-201-001
 SUBTASK SOLUTION UPDATED
REFERENCED DOCUMENTATION UPDATED
REFERENCES UPDATED
R
DATE: May 27/14 SERVICE BULLETIN No.: A340-25-5212
REVISION No.: 01 - Oct 27/14 Page: 2
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 3

@A340-500/600
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
Subtask 255212-910-201-001
 SUBTASK SOLUTION UPDATED
REFERENCED DOCUMENTATION UPDATED
REFERENCES UPDATED
R
Subtask 255212-941-201-001
 SUBTASK SOLUTION UPDATED
NOTE UPDATED
R
Subtask 255212-941-201-001
 SUBTASK SOLUTION UPDATED
NOTE UPDATED
R
Subtask 255212-831-201-001
 SUBTASK SOLUTION UPDATED
MATERIAL LIST UPDATED
R
Subtask 255212-831-202-001
 SUBTASK SOLUTION UPDATED
QUANTITY UPDATED
ITEM NUMBER UPDATED
PART NUMBER UPDATED
KEYWORD UPDATED
PART NUMBER DESCRIPTION UPDATED
MATERIAL LIST UPDATED
R
Subtask 255212-831-201-002
 SUBTASK SOLUTION UPDATED
MATERIAL LIST UPDATED
R
Subtask 255212-831-202-002
 SUBTASK SOLUTION UPDATED
QUANTITY UPDATED
ITEM NUMBER UPDATED
PART NUMBER UPDATED
KEYWORD UPDATED
PART NUMBER DESCRIPTION UPDATED
MATERIAL LIST UPDATED
R
Subtask 255212-942-201-001
 SUBTASK SOLUTION UPDATED
 R
Subtask 255212-942-201-001
 SUBTASK SOLUTION UPDATED
 R
Fig. A-GBDAA
Fig. A-GBDAA Sheet 04
 SHEET UPDATED
 R
Fig. A-GBDAB
Fig. A-GBDAB Sheet 04
 SHEET UPDATED
 R
FILING INSTRUCTIONS
This Service Bulletin has been generated electronically and is reissued as a complete document.
Replace the complete document.
Put this Revision Transmittal Sheet in front of the Service Bulletin.
HISTORY OF PREVIOUS REVISIONS
No previous revision
REVISION SEQUENCE
ORIGINAL: May 27/14
REVISION No. : 01 - Oct 27/14
DATE: May 27/14 SERVICE BULLETIN No.: A340-25-5212
REVISION No.: 01 - Oct 27/14 Page: 3
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 4

@A340-500/600
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
This Page Intentionally Left Blank
DATE: May 27/14 SERVICE BULLETIN No.: A340-25-5212
REVISION No.: 01 - Oct 27/14 Page: 4
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 5

@A340-500/600
SERVICE BULLETIN
SUMMARY
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
This summary is for information only and is not approved for modification of the aircraft.
MANDATORY
 MANDATORY
 MANDATORY
ATA SYSTEM: 25
TITLE: EQUIPMENT/FURNISHINGS - CURTAINS AND PARTITIONS -
INTRODUCE MODIFIED ELECTRICAL BONDING OF COCKPIT DOOR.
**CONF ALL
MODIFICATIONS
MODIFICATION CLASSIFICATION
MAJOR
 None
MINOR
 203228D50684
NOTE
: As per EASA IR 21, a minor change is one that has no appreciable effect on the
mass, balance, structural strength, reliability, operational characteristics affecting the
airworthiness of the product. All other changes are major changes.
REASON/DESCRIPTION/OPERATIONAL CONSEQUENCES
Airbus has identified a potential risk of electrical shocks in case of chafing at the cockpit door. The
electrical bonding of the cockpit door has to be improved in order to mitigate this potential risk.
This Service Bulletin details the work necessary to improve the electrical bonding.
Accomplishment of this Service Bulletin improves the effectiveness of the electrical bonding thus will
contribute to prevent the risk of an electrical shock.
GENERAL EVALUATION
EVALUATION TABLE
COMPLIANCE
 MANDATORY (1)
 CANCELS INSPECTION SB
 NO
POTENTIAL AD
 YES
 A/C OPERATION AFFECTED
 NO
RELIABILITY AFFECTED
 NO
 PAX COMFORT AFFECTED
 NO
COST SAVING
 NO
 LROPS AFFECTED
 NO
STRUCTURAL LIFE EXTN
 NO
 VENDOR SB INVOLVED
 NO
NOTE
 (1)
: Service Bulletin must be accomplished.
DATE: May 27/14 SERVICE BULLETIN No.: A340-25-5212
REVISION No.: 01 - Oct 27/14 Page: 1
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 6

@A340-500/600
SERVICE BULLETIN
SUMMARY
MATERIAL PRICE INFORMATION
**CONF 001
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET
 QTY PER
A/C
PRICE PER
A/C (USD)
MAIN PARTS
Kit
 255212D01R04
 1
 730.00
 Screw, Washer, Nut, Rivet, Bracket,
Bonding-Lead, Tube, Placard
Component
 COMPD01
 1
 See SB
 Bonding Lead, Washer, Screw
**CONF 002
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET
 QTY PER
A/C
PRICE PER
A/C (USD)
MAIN PARTS
Kit
 255212D01R04
 1
 730.00
 Screw, Washer, Nut, Rivet, Bracket,
Bonding-Lead, Tube, Placard
Component
 COMPD01
 1
 See SB
 Bonding Lead, Washer, Screw
EFFECTIVITY
**CONF ALL
This Service Bulletin is applicable to this (these) operator(s) :
06U 25R 32P
 36V 70U 72W 81Q
 AHY AIB CES CHH DLH ETD
HFY I2L
 IBE QAF QTR SAA TAM THA UAE VIR
CONCURRENT REQUIREMENTS
Accomplishment of this Service Bulletin requires the prior or simultaneous accomplishment of the
following Service Bulletins:
Service Bulletin No. A340-25-5046
NOTE
: Service Bulletin No. A340-25-5046 (EQUIPMENT/FURNISHINGS - PAX
COMPARTMENT - MODIFY CDLS WIRING LOOM IN UPPER COCKPIT DOOR
PLATE COVER) which applies Modification No. 51911D44499.
REFERENCES / REPERCUSSIONS
TFU
 None
OEB
 None
AOT
 None
SIL
 None
LINE MAINTENANCE AFFECTED
 No
LIFE LIMIT
 None
OTHER
 None
DATE: May 27/14 SERVICE BULLETIN No.: A340-25-5212
REVISION No.: 01 - Oct 27/14 Page: 2
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 7

@A340-500/600
SERVICE BULLETIN
SUMMARY
NATURE OF THE WORK
AIRCRAFT
 YES
EQUIPMENT
 NO
HARD
 NO
SOFT
 NO
OBRM
 NO
MANPOWER
**CONF 001
Task 255212-831-848-001: Modification
TOTAL MANHOURS
 7.00
ELAPSED TIME (HOURS)
 7.00
**CONF 002
Task 255212-831-848-001: Modification
TOTAL MANHOURS
 8.75
ELAPSED TIME (HOURS)
 8.75
APPENDICES
**CONF ALL
None
DATE: May 27/14 SERVICE BULLETIN No.: A340-25-5212
REVISION No.: 01 - Oct 27/14 Page: 3
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 8

@A340-500/600
SERVICE BULLETIN
SUMMARY
**CONF 001
FR11
FR16A
B
A
A
Z220
B
FR11
FR11A
F_SB_255212_6_SAAA_01_01
Figure A-GSAAA - Sheet 01
DATE: May 27/14 SERVICE BULLETIN No.: A340-25-5212
REVISION No.: 01 - Oct 27/14 Page: 4
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 9

@A340-500/600
SERVICE BULLETIN
SUMMARY
**CONF 002
FR11
FR16A
B
A
A
Z220
B
FR11
FR11A
F_SB_255212_6_SAAB_01_01
Figure A-GSAAB - Sheet 01
DATE: May 27/14 SERVICE BULLETIN No.: A340-25-5212
REVISION No.: 01 - Oct 27/14 Page: 5
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 10

@A340-500/600
SERVICE BULLETIN
SUMMARY
This Page Intentionally Left Blank
DATE: May 27/14 SERVICE BULLETIN No.: A340-25-5212
REVISION No.: 01 - Oct 27/14 Page: 6
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 11

@A340-500/600
SERVICE BULLETIN
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
MANDATORY
 MANDATORY
 MANDATORY
ATA SYSTEM: 25
TITLE: EQUIPMENT/FURNISHINGS - CURTAINS AND PARTITIONS -
INTRODUCE MODIFIED ELECTRICAL BONDING OF COCKPIT DOOR.
MODIFICATION No.: 203228D50684
This document contains AIRBUS PROPRIETARY INFORMATION and shall at all times remain the
property of AIRBUS; no intellectual property right or licence is granted by AIRBUS in connection with
any information contained in it. It is delivered on the express condition that said document and the
information contained in it shall be treated as confidential, shall not be used for any purpose other than
that for which it is hereby delivered. It shall not be disclosed in whole or in part to third parties and shall
not be duplicated in any manner (except for the purposes of performing the tasks described hereunder
and provided that any recipient of such document shall comply with the conditions herein), without
AIRBUS prior written consent.
1. PLANNING INFORMATION
**CONF ALL
A. EFFECTIVITY
This modification is applicable by Service Bulletin only.
(1) Models
340-541 340-542 340-642
(2) Effectivity by MSN
0371 0376 0383 0391 0394 0410 0416-0417 0426 0431 0436 0440 0445 0449 0453
0457 0460 0464 0468 0471 0475 0478 0482 0485 0488 0492 0495 0499 0514 0517
0520 0523 0531 0534 0537 0540 0543 0547 0557 0560 0563 0566 0569 0572 0575
0577 0580 0583 0586 0601 0604 0606 0608 0611 0615 0617 0619 0622 0624 0626
0628 0630 0639 0672 0677 0681 0685 0689 0694 0698 0702 0706 0710 0715 0719
0723 0727 0736 0740 0744 0748 0753 0757 0761-0768 0771 0775 0779 0783 0787
0790 0794 0798 0804 0812 0829 0837 0846 0848 0870 0886 0894 0897 0902 0910
0912 0917 0924 0929 0933 0953 0960 0972 0981 0987 0993 1005 1017 1030 1040
1079 1091 1102 1122
DATE: May 27/14 SERVICE BULLETIN No.: A340-25-5212
REVISION No.: 01 - Oct 27/14 Page: 1
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 12

@A340-500/600
SERVICE BULLETIN
(3) Effectivity by Operator
The Operator/MSN relationship is provided for information only and is correct at the time
of issue in accordance with the information available to AIRBUS. Any future changes
resulting from transfer of an aircraft from one operator to another will not be reflected in
this list unless the Service Bulletin is revised for another reason.
OPERATOR
 MSN
06U
 1091 1102
25R
 0924
32P
 0560
36V
 0391 0416
70U
 0902
72W
 0917
81Q
 0563
AHY
 0779 0886 0894
AIB
 0371
 0376
 0478 0492 0499
CES
 0468 0488 0514 0577 0586
CHH
 0475
DLH
 0482 0517 0523 0537 0540 0543 0566 0569 0580 0583 0762 0763
0767 0771 0790 0794 0812 0846 0848 0897 0972 0981 0987 1005
ETD
 0748 0757 0761 0783 0829 0837 0870 0929 0933 1030 1040
HFY
 0383 0910
 0912
I2L
 0436
 0453
IBE
 0431 0440 0460 0601 0604 0606 0617 0619 0672 0702 0727 0744
0960 0993 1017 1079 1122
QAF
 0495
QTR
 0715 0740 0766 0798
SAA
 0410 0417 0426 0531 0534 0547 0557 0626 0630
TAM
 0445 0464
THA
 0624 0628 0677 0681 0689 0698 0710 0719 0775 0953
UAE
 0394 0457 0471 0485 0520 0572 0608 0611 0685 0694
VIR
 0449 0575 0615 0622 0639 0706 0723 0736 0753 0764 0765 0768
0787 0804
(4) Configuration by MSN
MSN
 CONFIGURATION
0371 0376 0383 0391 0394 0410 0416 0417 0426 0431 0436
0440 0445 0449 0453 0457 0460 0464 0468 0471 0475 0482
0485 0488 0495 0514 0517 0520 0523 0531 0534 0537 0540
0543 0547 0557 0566 0569 0572 0575 0577 0580 0583 0586
0601 0604 0606 0608 0611 0617 0619 0624 0626 0628 0630
0672 0677 0681 0685 0689 0694 0698 0702 0710 0715 0719
0727 0740 0744 0748 0757 0761 0762 0763 0766 0767 0771
0775 0779 0783 0790 0794 0798 0812 0829 0837 0846 0848
0870 0886 0894 0897 0902 0910 0912 0917 0924 0929 0933
0953 0960 0972 0981 0987 0993 1005 1017 1030 1040 1079
1091 1102 1122
001
DATE: May 27/14 SERVICE BULLETIN No.: A340-25-5212
REVISION No.: 01 - Oct 27/14 Page: 2
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 13

@A340-500/600
SERVICE BULLETIN
MSN
 CONFIGURATION
0478 0492 0499 0560 0563 0615 0622 0639 0706 0723 0736
0753 0764 0765 0768 0787 0804
002
(5) Configuration definition
**CONF 001
Config. 001 is valid for all the aircraft given in the effectivity of this Service Bulletin which
have installed the cockpit door via mod 50014D44099 and have installed a reinforced
partition structure via mod 50561S16638 or SB A340-25-5003.
**CONF 002
Config. 002 is valid for all the aircraft given in the effectivity of this Service Bulletin
which have installed a damping device to the cockpit door via mod 51720D44340 or
Service Bulletin A340-25-5132 and have installed a reinforced partition structure via mod
50561S16638 or SB A340-25-5003.
(6) Material Effectivity
**CONF 001
MATERIAL
 QTY PER A/C
 SEE NOTES
Kit
 255212D01R04
 1
Component
 COMPD01
 1
 (1
)
Consumable CMLD01
 1
NOTE
 (1)
: Operators with Kit 255212D01R03 will require COMPD01.
**CONF 002
MATERIAL
 QTY PER A/C
 SEE NOTES
Kit
 255212D01R04
 1
Component
 COMPD01
 1
 (1
)
Consumable CMLD01
 1
NOTE
 (1)
: Operators with Kit 255212D01R03 will require COMPD01.
**CONF ALL
B. CONCURRENT REQUIREMENTS
Accomplishment of this Service Bulletin requires the prior or simultaneous accomplishment of
the following Service Bulletins:
Service Bulletin No. A340-25-5046
NOTE
: Service Bulletin No. A340-25-5046 (EQUIPMENT/FURNISHINGS - PAX
COMPARTMENT - MODIFY CDLS WIRING LOOM IN UPPER COCKPIT
DOOR PLATE COVER) which applies Modification No. 51911D44499.
DATE: May 27/14 SERVICE BULLETIN No.: A340-25-5212
REVISION No.: 01 - Oct 27/14 Page: 3
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 14

@A340-500/600
SERVICE BULLETIN
C. REASON
(1) History
Airbus has identified a potential risk of electrical shocks in case of chafing at the cockpit
door. The electrical bonding of the cockpit door has to be improved in order to mitigate
this potential risk.
(2) Objective/Action
This Service Bulletin details the work necessary to improve the electrical bonding.
(3) Advantages
Accomplishment of this Service Bulletin improves the effectiveness of the electrical
bonding thus will contribute to prevent the risk of an electrical shock.
(4) Operational/Maintenance Consequences
None
D. DESCRIPTION
To accomplish this Service Bulletin it is necessary to :
**CONF 001
Task 255212-831-848-001: Modification
(1) Modify the Cockpit Door Frame Structure
(2) Install Bonding-Leads to the Upper Cockpit Door Frame
**CONF 002
Task 255212-831-848-001: Modification
(1) Modify the Cockpit Door Frame Structure
(2) Install Bonding-Leads to the Upper Cockpit Door Frame
**CONF ALL
E. COMPLIANCE
(1) Classification
MANDATORY: Service Bulletin must be accomplished.
DATE: May 27/14 SERVICE BULLETIN No.: A340-25-5212
REVISION No.: 01 - Oct 27/14 Page: 4
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 15

@A340-500/600
SERVICE BULLETIN
(2) Accomplishment Timescale
This Service Bulletin has been classified Mandatory. It is expected that an Airworthiness
Directive (AD) published by the European Av iation Safety Agenc y (EASA) will be issued
to confirm this classification. The accomplishment timescale, which has not yet been
defined, will be given in the AD.
F. APPROVAL
The technical content of this document is approved under the authority of Design
Organisation Approval No. EASA.21J.031.
If an aircraft listed in the effectivity has a modification or repair embodied that is not of
AIRBUS origin, and which affects the content of this Service Bulletin, the operator is
responsible for obtaining approval by its airworthiness authority for any adaptation necessary
before incorporation of the Service Bulletin.
G. MANPOWER
The manpower estimates given in this Service Bulletin are based on the direct labor cost to
do the work. These estimates assume that the work will be done by experienced personnel,
and may need to be revised upwards to suit operator’s circumstances. The estimates do not
include the time to prepare, plan or inspect the work. Manufacture and procurement of parts
and tools, drying times for paints, sealants, etc., and general administration work are also not
included.
**CONF 001
Task 255212-831-848-001: Modification
Get Access
 1.00
On Aircraft
Modify the Cockpit Door Frame Structure
 3.50
Install Bonding-Leads to the Upper Cockpit Door
Frame
1.00
Tests
 0.50
Close-Up
 1.00
TOTAL MANHOURS
 7.00
ELAPSED TIME (HOURS)
 7.00
**CONF 002
Task 255212-831-848-001: Modification
Get Access
 1.00
On Aircraft
Modify the Cockpit Door Frame Structure
 3.75
Install Bonding-Leads to the Upper Cockpit Door
Frame
2.50
Tests
 0.50
Close-Up
 1.00
TOTAL MANHOURS
 8.75
DATE: May 27/14 SERVICE BULLETIN No.: A340-25-5212
REVISION No.: 01 - Oct 27/14 Page: 5
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 16

@A340-500/600
SERVICE BULLETIN
Task 255212-831-848-001: Modification
ELAPSED TIME (HOURS)
 8.75
**CONF ALL
H. WEIGHT AND BALANCE
The weight and balance estimates given in this Service Bulletin are based on the
Manufacturer’s Empty Weight (MEW) and do not include operator’s items. For the definition of
MEW and operator’s items, refer to the Weight and Balance Manual (WBM) Chapter 1-00-07.
Manufacturers Empty Weight +0.387 KG (+0.8531 LB)
Effect on Balance +3.97 KGM (+28.715 LB.FT )
I. ELECTRICAL LOAD DATA
Not Changed
J. REFERENCES
**CONF 001
Aircraft Maintenance Manual (AMM)
 06-20-00 06-31-53 06-41-53
11-00-00 12-34-24 20-21-11
20-21-15 20-28-00 25-13-44
25-13-46 25-23-42 52-51-00
52-51-15
Consumable Material List (CML)
Elec. Std. Practices Manual (ESPM)
 20-32-20 20-33-00 20-33-30
20-51-20 20-55-00
Illustrated Parts Catalog (IPC)
 52-51-10
Standards Manual (SM)
Structural Repair Manual (SRM)
 51-24-00 51-42-00 51-43-00
51-44-00 51-75-12
Weight and Balance Manual (WBM)
 Chapter 1-00-07
**CONF 002
Aircraft Maintenance Manual (AMM)
 06-20-00 06-31-53 06-41-53
11-00-00 12-34-24 20-21-11
20-21-15 20-28-00 25-13-44
25-13-46 25-23-42 52-51-00
52-51-11 52-51-15
Consumable Material List (CML)
Elec. Std. Practices Manual (ESPM)
 20-32-20 20-33-00 20-33-30
20-51-20 20-55-00
Illustrated Parts Catalog (IPC)
 52-51-10
Standards Manual (SM)
Structural Repair Manual (SRM)
 51-24-00 51-42-00 51-43-00
51-44-00 51-75-12
Weight and Balance Manual (WBM)
 Chapter 1-00-07
DATE: May 27/14 SERVICE BULLETIN No.: A340-25-5212
REVISION No.: 01 - Oct 27/14 Page: 6
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 17

@A340-500/600
SERVICE BULLETIN
**CONF ALL
K. PUBLICATION AFFECTED
Aircraft Maintenance Manual (AMM)
 52-51-00 52-51-11
Illustrated Parts Catalog (IPC)
 25-81-01 52-51-10
L. INTERCHANGEABILITY/MIXABILITY
Not Applicable
M. SPARES
None
DATE: May 27/14 SERVICE BULLETIN No.: A340-25-5212
REVISION No.: 01 - Oct 27/14 Page: 7
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 18

@A340-500/600
SERVICE BULLETIN
This Page Intentionally Left Blank
DATE: May 27/14 SERVICE BULLETIN No.: A340-25-5212
REVISION No.: 01 - Oct 27/14 Page: 8
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 19

@A340-500/600
SERVICE BULLETIN
2. MATERIAL INFORMATION
**CONF ALL
A. MATERIAL - PRICE AND AVAILABILITY
(1) Procurement Addresses
This Service Bulletin is the subject of an AIRBUS monitored retrofit campaign.
Customers with aircraft shown in the effectivity of this Service Bulletin should send a
purchase order to AIRBUS. Quote the number of this Service Bulletin. The address is:
Kit
 255212D01R04
 AIRBUS Material, Logistics and Suppliers
Weg beim Jaeger 150
D-22335 Hamburg
Germany
For ordering by internet:
http://spares.airbus.com
For ordering by fax: +49 40 50 76 2590
For ordering by E-mail: airbus.kit@airbus.com
Customers with aircraft shown in the effectivity of this Service Bulletin should send a
purchase order to AIRBUS. Quote the number of this Service Bulletin. The address is:
Component
 COMPD01
 AIRBUS Material, Logistics and Suppliers
IFD - In Flight Desk
Weg beim Jaeger 150
D-22335 HAMBURG
GERMANY
For ordering by internet:
http://spares.airbus.com
For ordering by fax: +49 40 50 76 4012
For ordering by E-mail:
ifd.spares@airbus.com
(2) Price and Availability
This table shows the component kits COMP needed to update the kits already held in
your stock to the latest status.
KIT HELD BY OPERATOR
 COMP KIT REQUIRED
 LATEST STATUS OF KIT
255212D01R03
 COMPD01
 255212D01R04
Operator supplied standard hardware parts required to accomplish this Service Bulletin
are to be supplied from Operator‘s stock.
Kit
 255212D01R04
Cost
 730.00
 USD
Availability
 90 calendar days from receipt of order
DATE: May 27/14 SERVICE BULLETIN No.: A340-25-5212
REVISION No.: 01 - Oct 27/14 Page: 9
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 20

@A340-500/600
SERVICE BULLETIN
The availability given above is the standard lead time from the date of your purchase
order. If items are required before this time, please include a retrofit planning schedule
with your order so that we can try to comply with your requirements.
The sales terms (costs and availability) are estimated in relation to economic conditions.
The latest valid price and lead time for ordering purposes shall be obtained through the
AirbusSpares portal or through a request for quotation to airbus.kit@airbus.com.
B. INDUSTRY SUPPORT INFORMATION
For aircraft under warranty at Jan 01/12, AIRBUS will credit the manhours indicated in this
Service Bulletin at the agreed in-house warranty labor rate for claims received not later than
90 days after completion of the last affected aircraft of your fleet and AIRBUS will provide the
kits and COMPD01 listed in paragraph 2.D at no charge for orders placed before Nov 30/16.
For the organisation of this retrofit, you are kindly requested to contact AIRBUS retrofit
management department.
AIRBUS CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
France
T e l:( 3 3 )56 71 90 62 2
E-mail : monitored.retrofit@airbus.com
F a x:( 3 3 )56 19 32 74 5
C. LIST OF COMPONENTS
Kit 255212D01R04
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 ITEM
 OLD PART N˚
 INT
 SEE
NOTES
1
 NAS1102-3-8
 2
 SCREW
2
 NAS1102-08-10
 6
 SCREW
5
 NAS1096-3-12
 1
 SCREW
6
 NSA5320-10
 1
 WASHER
7
 ABS1577D54
 1
 BRACKET
8
 ABS0547D503
 2
 RIVET
9
 NAS1802-3-9
 2
 SCREW
10
 ABS0916B05
 0.6 (ME)
 TUBING
11
 E0090-10-125NN
 2
 LEAD
12
 NAS1802-3-7
 4
 SCREW
13
 NAS1149C0332R
 6
 WASHER
14
 F2529200920000
 2
 WASHER
15
 NAS1726C3P
 4
 NUT
16
 E0090-10-100NN
 1
 LEAD
18
 F2529200700400
 6
 PLACARD
19
 NAS1802-08-7
 1
 SCREW
20
 NAS1149CN832R
 1
 WASHER
21
 E0090-18-100NN
 1
 LEAD
22
 E0090-18-200NN
 1
 LEAD
DATE: May 27/14 SERVICE BULLETIN No.: A340-25-5212
REVISION No.: 01 - Oct 27/14 Page: 10
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 21

@A340-500/600
SERVICE BULLETIN
NOTE
: If you find part numbers of hardware components in the related kit(s) which
you cannot identify in the LIST OF COMPONENTS of this Service Bulletin,
refer to Standards Manual (SM). The SM will give you the correct part number
to part number relationship.
D. LIST OF MATERIALS - OPERATOR SUPPLIED
(1) Consumable Materials
Consumable CMLD01
ITEM
 DESCRIPTION
 REFERENCE TO CML
MAT. No.
QTY PER A/C
 SEE
NOTES
Mineral Oil Base Grease
 03FAB1
 As required
Varnish - Electrical Bonding
 04TMB2
 As required
Polysulfide Sealant
 06AAB1
 As required
Non Aqueous Cleaner-General
 08BAA9
 As required
Textile-Lint Free Cotton
 14SBA1
 As required
(2) Components
Component COMPD01
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 ITEM
 OLD PART N˚
 INT
 SEE
NOTES
19
 NAS1802-08-7
 1
 SCREW
20
 NAS1149CN832R
 1
 WASHER
21
 E0090-18-100NN
 1
 LEAD
22
 E0090-18-200NN
 1
 LEAD
NOTE
: If you find part numbers of hardware components in the related kit(s)
which you cannot identify in the LIST OF COMPONENTS of this Service
Bulletin, refer to Standards Manual (SM). The SM will give you the
correct part number to part number relationship.
NOTE
: Operators with Kit 255212D01R03 will require COMPD01.
NOTE
: The above list of components is not an AIRBUS Kit, the required parts
shall be ordered as necessary through the given channel.
(3) Equipment
None
E. PARTS TO BE RE-IDENTIFIED BY OPERATOR
None
F. TOOLING
None
DATE: May 27/14 SERVICE BULLETIN No.: A340-25-5212
REVISION No.: 01 - Oct 27/14 Page: 11
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 22

@A340-500/600
SERVICE BULLETIN
This Page Intentionally Left Blank
DATE: May 27/14 SERVICE BULLETIN No.: A340-25-5212
REVISION No.: 01 - Oct 27/14 Page: 12
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 23

@A340-500/600
SERVICE BULLETIN
3. ACCOMPLISHMENT INSTRUCTIONS
Task 255212-831-848-001 - Modification
WARNING
: MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND ALL THE CAUTIONS
INCLUDED IN THE REFERENCED PROCEDURES.
CAUTION
: ALWAYS OBEY THE PRECAUTIONS THAT FOLLOW TO KEEP
ELECTRICAL WIRING IN A SATISFACTORY CONDITION (ELECTRICALLY
AND MECHANICALLY SERVICEABLE) . WHEN YOU DO MAINTENANCE
WORK, REPAIRS OR MODIFICATIONS, ALWAYS KEEP ELECTRICAL WIRING,
COMPONENTS AND THE WORK AREA AS CLEAN AS POSSIBLE. TO DO
THIS:
- PUT PROTECTION, SUCH AS PLASTIC SHEETING, CLOTHS, ETC; AS
NECESSARY ON WIRING AND COMPONENTS.
- REGULARLY REMOVE ALL SHAVINGS, UNWANTED MATERIAL AND
OTHER CONTAMINATION.
THESE PRECAUTIONS WILL DECREASE THE RISK OF CONTAMINATION
AND DAMAGE TO THE ELECTRICAL WIRING INSTALLATION.
IF THERE IS CONTAMINATION, REFER TO
 ESPM 20-55-00.
NOTE
: The accomplishment instructions of this Service Bulletin include procedures given
in other documents or in other sections of the Service Bulletin. When the words
"refer to" are used and the operator has a procedure accepted by the local
authority he belongs to, the accepted alternative procedure can be used. When the
words "in accordance with" are used then the given procedure must be followed.
NOTE
: The access and close-up instructions, not comprising return to service tests, in this
Service Bulletin do not constitute or affect the technical intent of the Service
Bulletin. Operators can therefore, as deemed necessary, omit or add access and/or
close-up steps to add flexibility to their maintenance operations as long as the
technical intent of the Service Bulletin is met within the set parameters.
NOTE
: Manual titles given in the accomplishment instructions are referred to by acronyms.
Refer to paragraph 1.J., References, for the definition of acronyms.
NOTE
: This Service Bulletin is classified mandatory or expected to be classified mandatory
by an Airworthiness Directive (AD). The paragraphs 3.C. and 3.D. in these
accomplishment instructions are Required for Compliance (RC) and must be done
to comply with the AD. Other paragraphs are recommended and may be deviated
from, done as part of other actions or done with accepted methods different from
those given in the Service Bulletin, as long as the RC paragraphs can be done and
the aircraft can be put back into a serviceable condition.
DATE: May 27/14 SERVICE BULLETIN No.: A340-25-5212
REVISION No.: 01 - Oct 27/14 Page: 13
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 24

@A340-500/600
SERVICE BULLETIN
Task Associated Data
**CONF 001
Zone
220
Manpower
TOTAL MANHOURS
 7.00
ELAPSED TIME (HOURS)
 7.00
**CONF 002
Zone
220
Manpower
TOTAL MANHOURS
 8.75
ELAPSED TIME (HOURS)
 8.75
**CONF ALL
A. GENERAL
**CONF 001
(1) Subtask 255212-910-201-001 - Standard Practices
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 06-20-00, Page Block 001
06-31-53, Page Block 001
06-41-53, Page Block 001
11-00-00, Page Block 201
Task 20-21-11-911-801
Task 20-21-15-912-801
20-28-00, Page Block 201
Consumable Material List (CML)
Elec. Std. Practices Manual (ESPM)
 20-32-20
20-33-00
20-33-30
20-51-20
Structural Repair Manual (SRM)
 51-24-00
51-42-00
51-43-00
51-44-00
51-75-12
(a) For the Frame (FR) identification, refer to AMM 06-31-53, Page Block 001.
(b) For the identification of zones, refer to AMM 06-20-00, Page Block 001.
DATE: May 27/14 SERVICE BULLETIN No.: A340-25-5212
REVISION No.: 01 - Oct 27/14 Page: 14
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 25

@A340-500/600
SERVICE BULLETIN
(c) For the identification of access panels, refer to
 AMM 06-41-53, Page Block 001.
(d) Tag all the parts you must remove and retain to make the subsequent installation
easier.
(e) For the specification of materials (Mat. No.) given in this Service Bulletin refer to
Consumable Materials List (CML).
(f) To torque tighten the standard threaded fasteners, refer to AMM Task
20-21-11-911-801.
(g) To torque tighten the electrical component fasteners, refer to AMM Task
20-21-15-912-801.
(h) For the electrical bonding, refer to ESPM 20-51-20 and AMM 20-28-00, Page Block
201.
(i) For the drilling of rivet holes:
- Use a soft lead pencil and make marks to show the position of the rivet holes.
- Make sure that you have the correct edge clearance before you drill the
fastener holes.
- If not shown otherwise the tolerance for rivet holes is + 0.1 mm (+ 0.004 in.).
- Transfer-drill the existing holes with a pilot drill and a drill bush.
- Drill new fastener holes with a pilot drill of 2.5 mm (0.098 in.) diameter.
Increase the hole diameter to the correct size for the fastener which you must
install.
- Deburr the holes after you have drilled them.
(j) Obtain fastener hole diameters and drill data in accordance with SRM 51-44-00.
(k) Remove and install fasteners in accordance with SRM 51-42-00.
(l) Obtain alternative and substitute fastener data in accordance with SRM 51-43-00.
(m) Apply sealant in accordance with SRM 51-24-00.
(n) Renew the protective finish in accordance with SRM 51-75-12
 .
(o) For the identification of wire and wire harnesses, refer to ESPM 20-32-20.
(p) For the general installation of electr ical wire harnesses, re fer to ESPM 20-33-00.
(q) For the installation of the protectiv e electrical conduits, r efer to ESPM 20-33-30.
(r) For the installation of placards, refer to AMM 11-00-00, Page Block 201.
DATE: May 27/14 SERVICE BULLETIN No.: A340-25-5212
REVISION No.: 01 - Oct 27/14 Page: 15
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 26

@A340-500/600
SERVICE BULLETIN
(2) Subtask 255212-839-201-001 - Administrative
Manpower Resources
Skills
 NON SPECIFIC
Write in the applicable aircraft records that you have done all the work given in the
Service Bulletin.
**CONF 002
(1) Subtask 255212-910-201-001 - Standard Practices
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 06-20-00, Page Block 001
06-31-53, Page Block 001
06-41-53, Page Block 001
11-00-00, Page Block 201
Task 20-21-11-911-801
Task 20-21-15-912-801
20-28-00, Page Block 201
Consumable Material List (CML)
Elec. Std. Practices Manual (ESPM)
 20-32-20
20-33-00
20-33-30
20-51-20
Structural Repair Manual (SRM)
 51-24-00
51-42-00
51-43-00
51-44-00
51-75-12
(a) For the Frame (FR) identification, refer to AMM 06-31-53, Page Block 001.
(b) For the identification of zones, refer to AMM 06-20-00, Page Block 001.
(c) For the identification of access panels, refer to
 AMM 06-41-53, Page Block 001.
(d) Tag all the parts you must remove and retain to make the subsequent installation
easier.
(e) For the specification of materials (Mat. No.) given in this Service Bulletin refer to
Consumable Materials List (CML).
(f) To torque tighten the standard threaded fasteners, refer to AMM Task
20-21-11-911-801.
(g) To torque tighten the electrical component fasteners, refer to AMM Task
20-21-15-912-801.
DATE: May 27/14 SERVICE BULLETIN No.: A340-25-5212
REVISION No.: 01 - Oct 27/14 Page: 16
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 27

@A340-500/600
SERVICE BULLETIN
(h) For the electrical bonding, refer to ESPM 20-51-20 and AMM 20-28-00, Page Block
201.
(i) For the drilling of rivet holes:
- Use a soft lead pencil and make marks to show the position of the rivet holes.
- Make sure that you have the correct edge clearance before you drill the
fastener holes.
- If not shown otherwise the tolerance for rivet holes is + 0.1 mm (+ 0.004 in.).
- Transfer-drill the existing holes with a pilot drill and a drill bush.
- Drill new fastener holes with a pilot drill of 2.5 mm (0.098 in.) diameter.
Increase the hole diameter to the correct size for the fastener which you must
install.
- Deburr the holes after you have drilled them.
(j) Obtain fastener hole diameters and drill data in accordance with SRM 51-44-00.
(k) Remove and install fasteners in accordance with SRM 51-42-00.
(l) Obtain alternative and substitute fastener data in accordance with SRM 51-43-00.
(m) Apply sealant in accordance with SRM 51-24-00.
(n) Renew the protective finish in accordance with SRM 51-75-12
 .
(o) For the identification of wire and wire harnesses, refer to ESPM 20-32-20.
(p) For the general installation of electr ical wire harnesses, re fer to ESPM 20-33-00.
(q) For the installation of the protectiv e electrical conduits, r efer to ESPM 20-33-30.
(r) For the installation of placards, refer to AMM 11-00-00, Page Block 201.
(2) Subtask 255212-839-201-001 - Administrative
Manpower Resources
Skills
 NON SPECIFIC
Write in the applicable aircraft records that you have done all the work given in the
Service Bulletin.
DATE: May 27/14 SERVICE BULLETIN No.: A340-25-5212
REVISION No.: 01 - Oct 27/14 Page: 17
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 28

@A340-500/600
SERVICE BULLETIN
**CONF ALL
B. PREPARATION
**CONF 001
(1) Subtask 255212-941-201-001 - Job Set-up
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 Task 12-34-24-860-802
Task 25-13-44-000-801
Task 25-13-46-000-801
Task 25-23-42-000-801
NOTE
: The following items shall be considered as the basic Aircraft
configuration before you start a maintenance task:
- Aircraft on the ground resting on landing gear (the ground safety
locks and the wheel chocks are in position on the landing gear)
- Engine shut down, thrust reversers closed and locked
- Aircraft in clean configuration
- Parking brake applied
- Aircraft electrical network de-energized
- Hydraulic systems depressurized.
- Access to the cockpit and cabin is available
- All circuit breakers are in closed position
- All controls in NORM, AUTO or OFF position.
(a) Make sure that the aircraft is electrically grounded, refer to AMM Task
12-34-24-860-802.
(b) Remove the ceiling panel 221AC, refer to AMM Task 25-23-42-000-801.
(c) Remove the ceiling panel 211LC and 211MC, refer to AMM Task
25-13-44-000-801.
(d) Remove the upper panel from the coat stowage, refer to
 AMM Task
25-13-46-000-801.
DATE: May 27/14 SERVICE BULLETIN No.: A340-25-5212
REVISION No.: 01 - Oct 27/14 Page: 18
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 29

@A340-500/600
SERVICE BULLETIN
**CONF 002
(1) Subtask 255212-941-201-001 - Job Set-up
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 Task 12-34-24-860-802
Task 25-13-44-000-801
Task 25-13-46-000-801
Task 25-23-42-000-801
NOTE
: The following items shall be considered as the basic Aircraft
configuration before you start a maintenance task:
- Aircraft on the ground resting on landing gear (the ground safety
locks and the wheel chocks are in position on the landing gear)
- Engine shut down, thrust reversers closed and locked
- Aircraft in clean configuration
- Parking brake applied
- Aircraft electrical network de-energized
- Hydraulic systems depressurized.
- Access to the cockpit and cabin is available
- All circuit breakers are in closed position
- All controls in NORM, AUTO or OFF position.
(a) Make sure that the aircraft is electrically grounded, refer to AMM Task
12-34-24-860-802.
(b) Remove the ceiling panel 221AC, refer to AMM Task 25-23-42-000-801.
(c) Remove the ceiling panel 211LC and 211MC, refer to AMM Task
25-13-44-000-801.
(d) Remove the upper panel from the coat stowage, refer to
 AMM Task
25-13-46-000-801.
DATE: May 27/14 SERVICE BULLETIN No.: A340-25-5212
REVISION No.: 01 - Oct 27/14 Page: 19
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 30

@A340-500/600
SERVICE BULLETIN
**CONF ALL
C. PROCEDURE
**CONF 001
(1) Subtask 255212-831-201-001 - Modify the Cockpit Door Frame Structure
Work Zones and Access Panels
Zone
 Access/Work location
220
Manpower Resources
Manhours
 3.50
Minimum number of person
 1
Subtask elapsed time
 3.50
Skills
 AIRFRAME
Material necessary to do the job
Kit 255212D01R04
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 SEE
NOTES
1
 NAS1102-3-8
 2
 SCREW
2
 NAS1102-08-10
 6
 SCREW
5
 NAS1096-3-12
 1
 SCREW
6
 NSA5320-10
 1
 WASHER
7
 ABS1577D54
 1
 BRACKET
8
 ABS0547D503
 2
 RIVET
18
 F2529200700400
 6
 PLACARD
Consumable CMLD01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Mineral Oil Base Grease
 03FAB1
 As required
Varnish - Electrical Bonding
 04TMB2
 As required
Polysulfide Sealant
 06AAB1
 As required
Non Aqueous Cleaner-
General
08BAA9
 As required
Textile-Lint Free Cotton
 14SBA1
 As required
References
Aircraft Maintenance Manual (AMM)
 Task 52-51-00-710-803
Task 52-51-15-000-801
Task 52-51-15-400-801
Illustrated Parts Catalog (IPC)
 52-51-10
DATE: May 27/14 SERVICE BULLETIN No.: A340-25-5212
REVISION No.: 01 - Oct 27/14 Page: 20
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 31

@A340-500/600
SERVICE BULLETIN
References
Fig. A-GBAAA
Prepare the bonding points at the wire
protection
Sheet 01
Sheet 02
Sheet 03
Fig. A-GBBAA
Install the bracket at the pelmet
Sheet 01
Sheet 02
Sheet 03
Fig. A-GBCAA
Prepare the bonding points at the door
posts
Sheet 01
Sheet 02
Sheet 03
Fig. A-GBEAA
Prepare the bonding points at the webs
Sheet 01
Sheet 02
Sheet 03
(a) Remove the keypad from the gap cover, refer to AMM Task 52-51-15-000-801.
(b) Loosen the nuts and carefully remove the wire harness from the wire protection as
shown on Fig. A-GBAAA Sheet 02
 ,V i e wC .
(c) Modify the wire protection as follows:
1
 Prepare the bonding point at the front side of the wire protection:
a
 Mark the position of the bonding point as shown on Fig. A-GBAAA Sheet
03
,V i e wD .
b
 Drill a pilot hole to a diameter of 2.5 mm (0.1 in.).
c
 Remove the metal surface protection to a diameter of 12.5 mm (0.49 in.)
as shown on Fig. A-GBAAA Sheet 03
 ,V i e wD .
d
 Drill the hole to a final diameter of 5.1 mm (0.2 in.) as shown on Fig. A-
GBAAA Sheet 03
,V i e wD .
2
 Prepare the bonding point at the upper side of the wire protection:
a
 Mark the position of the bonding point as shown on Fig. A-GBAAA Sheet
03
,V i e wE .
b
 Drill a pilot hole to a diameter of 2.5 mm (0.1 in.).
c
 Remove the metal surface protection to a diameter of 12.5 mm (0.49 in.)
as shown on Fig. A-GBAAA Sheet 03
 ,V i e wE .
d
 Drill the hole to a final diameter of 5.1 mm (0.2 in.) as shown on Fig. A-
GBAAA Sheet 03
,V i e wE .
3
 Clean the bonding points with:
Non Aqueous
Cleaner-General
08BAA9 As required
DATE: May 27/14 SERVICE BULLETIN No.: A340-25-5212
REVISION No.: 01 - Oct 27/14 Page: 21
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 32

@A340-500/600
SERVICE BULLETIN
Textile-Lint Free
Cotton
14SBA1 As required
4
 Apply to the bonding points a thin coat of:
Mineral Oil Base
Grease
03FAB1 As required
NOTE
: The application of the grease is only necessary if you can
not install the bonding leads (SUBTASK 255212-831-202 001
Install Bonding-Leads to the Upper Cockpit Door Frame ) in
the next 4 hours.
5
 Install as shown on Fig. A-GBAAA Sheet 02
 ,V i e wC :
1 Placard F2529200700400 Item 18
(d) Modify the door posts as follows:
1
 Prepare the bonding point at the LH door post:
a
 Remove as shown on Fig. A-GBCAA Sheet 02
 ,V i e wE :
1 Screw Item (1) Discard
b
 Remove the surface protection around the screw hole to a diameter
approximately 3 mm (0.12 in.) larger than the countersink diameter as
shown on Fig. A-GBCAA Sheet 02
 ,V i e wF .
c
 Install as shown on Fig. A-GBCAA Sheet 02
 ,V i e wF :
1 Screw NAS1102-3-8 Item 1
d
 Apply to the screw, item 1 as shown on Fig. A-GBCAA Sheet 02
 ,V i e wF :
Varnish - Electrical
Bonding
04TMB2 As required
2
 Prepare the bonding points at the RH door post:
a
 Remove as shown on Fig. A-GBCAA Sheet 02
 ,V i e wE :
1 Screw Item (1) Discard
b
 Remove the surface protection around the screw hole to a diameter
approximately 3 mm (0.12 in.) larger than the countersink diameter as
shown on Fig. A-GBCAA Sheet 02
 ,V i e wF .
c
 Install as shown on Fig. A-GBCAA Sheet 02
 ,V i e wF :
1 Screw NAS1102-3-8 Item 1
DATE: May 27/14 SERVICE BULLETIN No.: A340-25-5212
REVISION No.: 01 - Oct 27/14 Page: 22
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 33

@A340-500/600
SERVICE BULLETIN
d
 Remove as shown on Fig. A-GBCAA Sheet 03
 ,V i e wG :
6 Screw Item (2) Discard
1 Gap Cover Item (3) Retain
1 Door Frame Panel Item (4) Retain
NOTE
: For the PN of the gap cover, item (3) and the door frame
panel, item (4), refer to IPC 52-51-10.
e
 Remove as shown on Fig. A-GBCAA Sheet 03
 ,V i e wH :
1 Screw Item (5) Discard
1 Washer Item (6) Discard
f
 Remove the surface protection around the screw hole to a diameter
approximately 3 mm (0.12 in.) larger than the screw head diameter as
shown on Fig. A-GBCAA Sheet 03
 ,V i e wJ .
g
 Install as shown on Fig. A-GBCAA Sheet 03
 ,V i e wJ :
1 Screw NAS1096-3-12 Item 5
1 Washer NSA5320-10 Item 6
h
 Apply to the screws, item 1 and 5 as shown on Fig. A-GBCAA Sheet 02
 ,
View F and Fig. A-GBCAA Sheet 03
 ,V i e wJ :
Varnish - Electrical
Bonding
04TMB2 As required
i
 Install as shown on Fig. A-GBCAA Sheet 03
 ,V i e wG :
1 Gap Cover Item (3) Retained at
removal
1 Door Frame Panel Item (4) Retained at
removal
6 Screw NAS1102-08-10 Item 2
3
 Install as shown on Fig. A-GBCAA Sheet 02
 , View C and D:
2 Placard F2529200700400 Item 18
(e) Install the bracket as follows:
1
 Remove the surface protection from the contact area of the bracket, item 7 to
the pelmet as shown on Fig. A-GBBAA Sheet 02
 ,V i e wD .
DATE: May 27/14 SERVICE BULLETIN No.: A340-25-5212
REVISION No.: 01 - Oct 27/14 Page: 23
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 34

@A340-500/600
SERVICE BULLETIN
2
 Use the bracket, item 7 as template and mark the position of the holes as
shown on Fig. A-GBBAA Sheet 03
 ,V i e wE .
3
CAUTION
: MAKE SURE THAT YOU DO NOT DRILL TO MORE THAN
A DEPTH OF 21 MM (0.83 IN.) TO AVOID DAMAGE TO
THE S_GLASS ON THE CABIN SIDE.
Drill pilot holes to a diameter of 2.5 mm (0.098 in.) and a depth of 21 mm-1
mm (0.83 in.-0.039 in.).
4
 Drill the pilot holes to the final diameter of 4.1 mm (0.16 in.) and a depth of 21
mm-1 mm (0.83 in.-0.039 in.) as shown on Fig. A-GBBAA Sheet 03
 , Section
A-A.
5
 Deburr the holes.
6
 Remove the surface protection around the rivet holes to a diameter
approximately 3 mm (0.12 in.) larger than the rivet head diameter as shown on
Fig. A-GBBAA Sheet 02
 ,V i e wD .
7
 Clean the modification area with:
Non Aqueous
Cleaner-General
08BAA9 As required
Textile-Lint Free
Cotton
14SBA1 As required
8
 Install as shown on Fig. A-GBBAA Sheet 02
 ,V i e wD :
1 Bracket ABS1577D54 Item 7
2 Rivet ABS0547D503 Item 8
9
 Apply to the rivets, item 8 and to the edges of the bracket, item 7 as shown on
Fig. A-GBBAA Sheet 03
 , Section A-A:
Polysulfide Sealant 06AAB1 As required
Varnish - Electrical
Bonding
04TMB2 As required
10
 Install as shown on Fig. A-GBBAA Sheet 02
 ,V i e wC :
1 Placard F2529200700400 Item 18
(f) Modify the webs as follows:
1
 Prepare the bonding points at the RH web:
a
 Mark the position of the bonding point as shown on Fig. A-GBEAA Sheet
02
,V i e wD .
DATE: May 27/14 SERVICE BULLETIN No.: A340-25-5212
REVISION No.: 01 - Oct 27/14 Page: 24
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 35

@A340-500/600
SERVICE BULLETIN
b
 Drill a pilot hole to a diameter of 2.5 mm (0.1 in.).
c
 Remove the metal surface protection to a diameter of 17 mm (0.7 in.) as
shown on Fig. A-GBEAA Sheet 02
 ,V i e wD .
d
 Drill the hole to a final diameter of 5.1 mm (0.2 in.) as shown on Fig. A-
GBEAA Sheet 02
,V i e wD .
e
 Install as shown on Fig. A-GBEAA Sheet 02
 ,V i e wD :
1 Placard F2529200700400 Item 18
2
 Prepare the bonding points at the LH web:
a
 Mark the position of the bonding point as shown on Fig. A-GBEAA Sheet
03
,V i e wF .
b
 Drill a pilot hole to a diameter of 2.5 mm (0.1 in.).
c
 Remove the metal surface protection to a diameter of 17 mm (0.7 in.) as
shown on Fig. A-GBEAA Sheet 03
 ,V i e wF .
d
 Drill the hole to a final diameter of 5.1 mm (0.2 in.) as shown on Fig. A-
GBEAA Sheet 03
,V i e wF .
e
 Install as shown on Fig. A-GBEAA Sheet 03
 ,V i e wF :
1 Placard F2529200700400 Item 18
3
 Clean the bonding points with:
Non Aqueous
Cleaner-General
08BAA9 As required
Textile-Lint Free
Cotton
14SBA1 As required
4
 Apply to the bonding points a thin coat of:
Mineral Oil Base
Grease
03FAB1 As required
NOTE
: The application of the grease is only necessary if you can
not install the bonding leads (SUBTASK 255212-831-202 001
Install Bonding-Leads to the Upper Cockpit Door Frame ) in
the next 4 hours.
(g) Install the keypad to the gap cover, refer to AMM Task 52-51-15-400-801.
(h) Do the operational test of the cockpit door emergency access, refer to AMM Task
52-51-00-710-803.
DATE: May 27/14 SERVICE BULLETIN No.: A340-25-5212
REVISION No.: 01 - Oct 27/14 Page: 25
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 36

@A340-500/600
SERVICE BULLETIN
(2) Subtask 255212-831-202-001 - Install Bondi ng-Leads to the Upper Cockpit Door
Frame
Work Zones and Access Panels
Zone
 Access/Work location
220
Manpower Resources
Manhours
 1.00
Minimum number of person
 1
Subtask elapsed time
 1.00
Skills
 AIRFRAME
Material necessary to do the job
Kit 255212D01R04
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 SEE
NOTES
9
 NAS1802-3-9
 2
 SCREW
10
 ABS0916B05
 0.6
 TUBING
11
 E0090-10-125NN
 2
 LEAD
12
 NAS1802-3-7
 4
 SCREW
13
 NAS1149C0332R
 6
 WASHER
14
 F2529200920000
 2
 WASHER
15
 NAS1726C3P
 4
 NUT
16
 E0090-10-100NN
 1
 LEAD
19
 NAS1802-08-7
 1
 SCREW
20
 NAS1149CN832R
 1
 WASHER
21
 E0090-18-100NN
 1
 LEAD
22
 E0090-18-200NN
 1
 LEAD
Component COMPD01
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 SEE
NOTES
19
 NAS1802-08-7
 1
 SCREW
20
 NAS1149CN832R
 1
 WASHER
21
 E0090-18-100NN
 1
 LEAD
22
 E0090-18-200NN
 1
 LEAD
NOTE
: Operators with Kit 255212D01R03 will require COMPD01.
NOTE
: The above list of components is not an AIRBUS Kit, the required parts
shall be ordered as necessary through the given channel.
Consumable CMLD01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Varnish - Electrical Bonding
 04TMB2
 As required
DATE: May 27/14 SERVICE BULLETIN No.: A340-25-5212
REVISION No.: 01 - Oct 27/14 Page: 26
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 37

@A340-500/600
SERVICE BULLETIN
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Non Aqueous Cleaner-
General
08BAA9
 As required
Textile-Lint Free Cotton
 14SBA1
 As required
References
Fig. A-GBDAA
Install the bonding-leads at the upper
door frame
Sheet 01
Sheet 02
Sheet 03
Sheet 04
Sheet 05
Sheet 06
(a) Install the bonding-leads at the RH door post as follows:
1
 Remove as shown on Fig. A-GBDAA Sheet 03
 ,V i e wE :
1 Screw Item (1) Discard
2
 Remove the surface protection around the screw hole to a diameter
approximately 3 mm (0.12 in.) larger than the diameter of the washer, item 14
as shown on Fig. A-GBDAA Sheet 03
 ,V i e wF .
3
 Clean the bonding points at the wire protection and the door post with:
Non Aqueous
Cleaner-General
08BAA9 As required
Textile-Lint Free
Cotton
14SBA1 As required
4
 Cut two pieces of tubing to a length of 0.11 m (4.33 in.) from:
0.6
 Tubing ABS0916B05 Item 10
5
 Push the tubings, item 10 over the bonding-leads, item 11 and shrink them.
6
 Install at the door post as shown Fig. A-GBDAA Sheet 03
 ,V i e wF :
2 Bonding-Lead E0090-10-125NN Item 11
1 Screw NAS1802-3-9 Item 9
1 Washer NAS1149C0332R Item 13
1 Washer F2529200920000 Item 14
7
 Attach the bonding-lead, item 11 to the wire protection as shown on Fig. A-
GBDAA Sheet 03
, View F with:
1 Screw NAS1802-3-7 Item 12
DATE: May 27/14 SERVICE BULLETIN No.: A340-25-5212
REVISION No.: 01 - Oct 27/14 Page: 27
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 38

@A340-500/600
SERVICE BULLETIN
1 Washer NAS1149C0332R Item 13
1 Nut NAS1726C3P Item 15
8
 Clean the bonding point at the web with:
Non Aqueous
Cleaner-General
08BAA9 As required
Textile-Lint Free
Cotton
14SBA1 As required
9
 Attach the bonding-lead, item 11 to the web as shown on Fig. A-GBDAA
Sheet 05
,V i e wJw i t h :
1 Screw NAS1802-3-7 Item 12
1 Washer NAS1149C0332R Item 13
1 Nut NAS1726C3P Item 15
10
 Apply to the Screw, item 12 and the nut, item 15 as shown on Fig. A-GBDAA
Sheet 05
,V i e wJ :
Varnish - Electrical
Bonding
04TMB2 As required
11
 Apply to the Screws, item 9 and 12 and the nut, item 15 as shown on Fig. A-
GBDAA Sheet 03
,V i e wF :
Varnish - Electrical
Bonding
04TMB2 As required
(b) Install the bonding-leads at the LH door post as follows:
1
 Remove as shown on Fig. A-GBDAA Sheet 04
 ,V i e wG :
1 Screw Item (1) Discard
2
 Remove the surface protection around the screw hole to a diameter
approximately 3 mm (0.12 in.) larger than the diameter of the washer, item 14
as shown on Fig. A-GBDAA Sheet 04
 ,V i e wH .
3
 Make sure that there is no surface protection at the bonding point from the
bracket.
4
 Clean the bonding points at the wire protection, the bracket and the door post
with:
Non Aqueous
Cleaner-General
08BAA9 As required
DATE: May 27/14 SERVICE BULLETIN No.: A340-25-5212
REVISION No.: 01 - Oct 27/14 Page: 28
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 39

@A340-500/600
SERVICE BULLETIN
Textile-Lint Free
Cotton
14SBA1 As required
5
 Cut two pieces of tubing to a length of 0.085 m (3.35 in.) and one piece to a
length of 0.185 m (7.28 in.) from:
0.6
 Tubing ABS0916B05 Item 10
6
 Push the tubings, item 10 over the bonding-leads, item 16, 21 and 22 and
shrink them.
7
 Install at the door post as shown Fig. A-GBDAA Sheet 04
 ,V i e wH :
1 Bonding-Lead E0090-10-100NN Item 16
1 Bonding Lead
 E0090-18-200NN
 Item 22
1 Screw NAS1802-3-9 Item 9
1 Washer NAS1149C0332R Item 13
1 Washer F2529200920000 Item 14
for operators with KITD01R03, get this item from COMPD01:
1
 Bonding Lead
 E0090-18-200NN
 Item 22
8
 Attach the bonding-lead, item 22, to the bracket as shown on Fig. A-GBDAA
Sheet 04
,V i e wHw i t h :
1 Bonding Lead
 E0090-18-100NN
 Item 21
1 Screw NAS1802-08-7
 Item 19
1 Washer NAS1149CN832R
 Item 20
for operators with KITD01R03, get these items from COMPD01:
1
 Bonding Lead
 E0090-18-100NN
 Item 21
1
 Screw
 NAS1802-08-7
 Item 19
1
 Washer
 NAS1149CN832R
 Item 20
9
 Attach the bonding-lead, item 21, to the wire protection as shown on
 Fig. A-
GBDAA Sheet 04
, View H with:
1 Screw NAS1802-3-7 Item 12
1 Washer NAS1149C0332R Item 13
1 Nut NAS1726C3P Item 15
DATE: May 27/14 SERVICE BULLETIN No.: A340-25-5212
REVISION No.: 01 - Oct 27/14 Page: 29
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 40

@A340-500/600
SERVICE BULLETIN
10
 Clean the bonding point at the web with:
Non Aqueous
Cleaner-General
08BAA9 As required
Textile-Lint Free
Cotton
14SBA1 As required
11
 Attach the bonding-lead, item 16 to the web as shown on Fig. A-GBDAA
Sheet 05
,V i e wKw i t h :
1 Screw NAS1802-3-7 Item 12
1 Washer NAS1149C0332R Item 13
1 Nut NAS1726C3P Item 15
12
 Apply to the Screw, item 12 and the nut, item 15 as shown on Fig. A-GBDAA
Sheet 05
,V i e wK :
Varnish - Electrical
Bonding
04TMB2 As required
13
 Apply to the Screws, item 9 and 12 and the nut, item 15 as shown on Fig. A-
GBDAA Sheet 04
,V i e wH :
Varnish - Electrical
Bonding
04TMB2 As required
(c) Install the wire harness to the wire protection as shown on Fig. A-GBDAA Sheet
06
,V i e wL .
**CONF 002
(1) Subtask 255212-831-201-002 - Modify the Cockpit Door Frame Structure
Work Zones and Access Panels
Zone
 Access/Work location
220
Manpower Resources
Manhours
 3.75
Minimum number of person
 1
Subtask elapsed time
 3.75
Skills
 AIRFRAME
Material necessary to do the job
Kit 255212D01R04
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 SEE
NOTES
1
 NAS1102-3-8
 2
 SCREW
DATE: May 27/14 SERVICE BULLETIN No.: A340-25-5212
REVISION No.: 01 - Oct 27/14 Page: 30
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 41

@A340-500/600
SERVICE BULLETIN
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 SEE
NOTES
2
 NAS1102-08-10
 6
 SCREW
5
 NAS1096-3-12
 1
 SCREW
6
 NSA5320-10
 1
 WASHER
7
 ABS1577D54
 1
 BRACKET
8
 ABS0547D503
 2
 RIVET
18
 F2529200700400
 6
 PLACARD
Consumable CMLD01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Mineral Oil Base Grease
 03FAB1
 As required
Varnish - Electrical Bonding
 04TMB2
 As required
Polysulfide Sealant
 06AAB1
 As required
Non Aqueous Cleaner-
General
08BAA9
 As required
Textile-Lint Free Cotton
 14SBA1
 As required
References
Aircraft Maintenance Manual (AMM)
 Task 52-51-00-710-803
Task 52-51-11-000-802
Task 52-51-15-000-801
Task 52-51-15-400-801
Illustrated Parts Catalog (IPC)
 52-51-10
Fig. A-GBAAB
Prepare the bonding points at the wire
protection
Sheet 01
Sheet 02
Sheet 03
Fig. A-GBBAB
Install the bracket at the pelmet
Sheet 01
Sheet 02
Sheet 03
Fig. A-GBCAB
Prepare the bonding points at the door
posts
Sheet 01
Sheet 02
Sheet 03
Fig. A-GBEAA
Prepare the bonding points at the webs
Sheet 01
Sheet 02
Sheet 03
(a) Remove the damper unit from the pelmet, refer to AMM Task 52-51-11-000-802.
(b) Remove the keypad from the gap cover, refer to AMM Task 52-51-15-000-801.
(c) Loosen the nuts and carefully remove the wire harness from the wire protection as
shown on Fig. A-GBAAB Sheet 02
 ,V i e wC .
DATE: May 27/14 SERVICE BULLETIN No.: A340-25-5212
REVISION No.: 01 - Oct 27/14 Page: 31
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 42

@A340-500/600
SERVICE BULLETIN
(d) Modify the wire protection as follows:
1
 Prepare the bonding point at the front side of the wire protection:
a
 Mark the position of the bonding point as shown on Fig. A-GBAAB Sheet
03
,V i e wD .
b
 Drill a pilot hole to a diameter of 2.5 mm (0.1 in.).
c
 Remove the metal surface protection to a diameter of 12.5 mm (0.49 in.)
as shown on Fig. A-GBAAB Sheet 03
 ,V i e wD .
d
 Drill the hole to a final diameter of 5.1 mm (0.2 in.) as shown on Fig. A-
GBAAB Sheet 03
,V i e wD .
2
 Prepare the bonding point at the upper side of the wire protection:
a
 Mark the position of the bonding point as shown on Fig. A-GBAAB Sheet
03
,V i e wE .
b
 Drill a pilot hole to a diameter of 2.5 mm (0.1 in.).
c
 Remove the metal surface protection to a diameter of 12.5 mm (0.49 in.)
as shown on Fig. A-GBAAB Sheet 03
 ,V i e wE .
d
 Drill the hole to a final diameter of 5.1 mm (0.2 in.) as shown on Fig. A-
GBAAB Sheet 03
,V i e wE .
3
 Clean the bonding points with:
Non Aqueous
Cleaner-General
08BAA9 As required
Textile-Lint Free
Cotton
14SBA1 As required
4
 Apply to the bonding points a thin coat of:
Mineral Oil Base
Grease
03FAB1 As required
NOTE
: The application of the grease is only necessary if you can
not install the bonding leads (SUBTASK 255212-831-202 002
Install Bonding-Leads to the Upper Cockpit Door Frame ) in
the next 4 hours.
5
 Install as shown on Fig. A-GBAAB Sheet 02
 ,V i e wC :
1 Placard F2529200700400 Item 18
DATE: May 27/14 SERVICE BULLETIN No.: A340-25-5212
REVISION No.: 01 - Oct 27/14 Page: 32
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 43

@A340-500/600
SERVICE BULLETIN
(e) Modify the door posts as follows:
1
 Prepare the bonding point at the LH door post:
a
 Remove as shown on Fig. A-GBCAB Sheet 02
 ,V i e wE :
1 Screw Item (1) Discard
b
 Remove the surface protection around the screw hole to a diameter
approximately 3 mm (0.12 in.) larger than the countersink diameter as
shown on Fig. A-GBCAB Sheet 02
 ,V i e wF .
c
 Install as shown on Fig. A-GBCAB Sheet 02
 ,V i e wF :
1 Screw NAS1102-3-8 Item 1
d
 Apply to the screw, item 1 as shown on Fig. A-GBCAB Sheet 02
 ,V i e wF :
Varnish - Electrical
Bonding
04TMB2 As required
2
 Prepare the bonding points at the RH door post:
a
 Remove as shown on Fig. A-GBCAB Sheet 02
 ,V i e wE :
1 Screw Item (1) Discard
b
 Remove the surface protection around the screw hole to a diameter
approximately 3 mm (0.12 in.) larger than the countersink diameter as
shown on Fig. A-GBCAB Sheet 02
 ,V i e wF .
c
 Install as shown on Fig. A-GBCAB Sheet 02
 ,V i e wF :
1 Screw NAS1102-3-8 Item 1
d
 Remove as shown on Fig. A-GBCAB Sheet 03
 ,V i e wG :
6 Screw Item (2) Discard
1 Gap Cover Item (3) Retain
1 Door Frame Panel Item (4) Retain
NOTE
: For the PN of the gap cover, item (3) and the door frame
panel, item (4), refer to IPC 52-51-10.
e
 Remove as shown on Fig. A-GBCAB Sheet 03
 ,V i e wH :
1 Screw Item (5) Discard
1 Washer Item (6) Discard
DATE: May 27/14 SERVICE BULLETIN No.: A340-25-5212
REVISION No.: 01 - Oct 27/14 Page: 33
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 44

@A340-500/600
SERVICE BULLETIN
f
 Remove the surface protection around the screw hole to a diameter
approximately 3 mm (0.12 in.) larger than the screw head diameter as
shown on Fig. A-GBCAB Sheet 03
 ,V i e wJ .
g
 Install as shown on Fig. A-GBCAB Sheet 03
 ,V i e wJ :
1 Screw NAS1096-3-12 Item 5
1 Washer NSA5320-10 Item 6
h
 Apply to the screws, item 1 and 5 as shown on Fig. A-GBCAB Sheet 02
 ,
View F and Fig. A-GBCAB Sheet 03
 ,V i e wJ :
Varnish - Electrical
Bonding
04TMB2 As required
i
 Install as shown on Fig. A-GBCAB Sheet 03
 ,V i e wG :
1 Gap Cover Item (3) Retained at
removal
1 Door Frame Panel Item (4) Retained at
removal
6 Screw NAS1102-08-10 Item 2
3
 Install as shown on Fig. A-GBCAB Sheet 02
 , View C and D:
2 Placard F2529200700400 Item 18
(f) Install the bracket as follows:
1
 Remove the surface protection from the contact area of the bracket, item 7 to
the pelmet as shown on Fig. A-GBBAB Sheet 02
 ,V i e wD .
2
 Use the bracket, item 7 as template and mark the position of the holes as
shown on Fig. A-GBBAB Sheet 03
 ,V i e wE .
3
CAUTION
: MAKE SURE THAT YOU DO NOT DRILL TO MORE THAN
A DEPTH OF 21 MM (0.83 IN.) TO AVOID DAMAGE TO
THE S_GLASS ON THE CABIN SIDE.
Drill pilot holes to a diameter of 2.5 mm (0.098 in.) and a depth of 21 mm-1
mm (0.83 in.-0.039 in.).
4
 Drill the pilot holes to the final diameter of 4.1 mm (0.16 in.) and a depth of 21
mm-1 mm (0.83 in.-0.039 in.) as shown on Fig. A-GBBAB Sheet 03
 , Section
A-A.
5
 Deburr the holes.
DATE: May 27/14 SERVICE BULLETIN No.: A340-25-5212
REVISION No.: 01 - Oct 27/14 Page: 34
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 45

@A340-500/600
SERVICE BULLETIN
6
 Remove the surface protection around the rivet holes to a diameter
approximately 3 mm (0.12 in.) larger than the rivet head diameter as shown on
Fig. A-GBBAB Sheet 02
 ,V i e wD .
7
 Clean the modification areas with:
Non Aqueous
Cleaner-General
08BAA9 As required
Textile-Lint Free
Cotton
14SBA1 As required
8
 Install as shown on Fig. A-GBBAB Sheet 02
 ,V i e wD :
1 Bracket ABS1577D54 Item 7
2 Rivet ABS0547D503 Item 8
9
 Apply to the rivets, item 8 and to the edges of the bracket, item 7 as shown on
Fig. A-GBBAB Sheet 03
 , Section A-A:
Polysulfide Sealant 06AAB1 As required
Varnish - Electrical
Bonding
04TMB2 As required
10
 Install as shown on Fig. A-GBBAB Sheet 02
 ,V i e wC :
1 Placard F2529200700400 Item 18
(g) Modify the webs as follows:
1
 Prepare the bonding points at the RH web:
a
 Mark the position of the bonding point as shown on Fig. A-GBEAA Sheet
02
,V i e wD .
b
 Drill a pilot hole to a diameter of 2.5 mm (0.1 in.).
c
 Remove the metal surface protection to a diameter of 17 mm (0.7 in.) as
shown on Fig. A-GBEAA Sheet 02
 ,V i e wD .
d
 Drill the hole to a final diameter of 5.1 mm (0.2 in.) as shown on Fig. A-
GBEAA Sheet 02
,V i e wD .
e
 Install as shown on Fig. A-GBEAA Sheet 02
 ,V i e wD :
1 Placard F2529200700400 Item 18
2
 Prepare the bonding points at the LH web:
a
 Mark the position of the bonding point as shown on Fig. A-GBEAA Sheet
03
,V i e wF .
DATE: May 27/14 SERVICE BULLETIN No.: A340-25-5212
REVISION No.: 01 - Oct 27/14 Page: 35
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 46

@A340-500/600
SERVICE BULLETIN
b
 Drill a pilot hole to a diameter of 2.5 mm (0.1 in.).
c
 Remove the metal surface protection to a diameter of 17 mm (0.7 in.) as
shown on Fig. A-GBEAA Sheet 03
 ,V i e wF .
d
 Drill the hole to a final diameter of 5.1 mm (0.2 in.) as shown on Fig. A-
GBEAA Sheet 03
,V i e wF .
e
 Install as shown on Fig. A-GBEAA Sheet 03
 ,V i e wF :
1 Placard F2529200700400 Item 18
3
 Clean the bonding points with:
Non Aqueous
Cleaner-General
08BAA9 As required
Textile-Lint Free
Cotton
14SBA1 As required
4
 Apply to the bonding points a thin coat of:
Mineral Oil Base
Grease
03FAB1 As required
NOTE
: The application of the grease is only necessary if you can
not install the bonding leads (SUBTASK 255212-831-202 002
Install Bonding-Leads to the Upper Cockpit Door Frame ) in
the next 4 hours.
(h) Install the keypad to the gap cover, refer to AMM Task 52-51-15-400-801.
(i) Do the operational test of the cockpit door emergency access, refer to AMM Task
52-51-00-710-803.
(2) Subtask 255212-831-202-002 - Install Bondi ng-Leads to the Upper Cockpit Door
Frame
Work Zones and Access Panels
Zone
 Access/Work location
220
Manpower Resources
Manhours
 2.50
Minimum number of person
 1
Subtask elapsed time
 2.50
Skills
 AIRFRAME
DATE: May 27/14 SERVICE BULLETIN No.: A340-25-5212
REVISION No.: 01 - Oct 27/14 Page: 36
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 47

@A340-500/600
SERVICE BULLETIN
Material necessary to do the job
Kit 255212D01R04
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 SEE
NOTES
9
 NAS1802-3-9
 2
 SCREW
10
 ABS0916B05
 0.6
 TUBING
11
 E0090-10-125NN
 2
 LEAD
12
 NAS1802-3-7
 4
 SCREW
13
 NAS1149C0332R
 6
 WASHER
14
 F2529200920000
 2
 WASHER
15
 NAS1726C3P
 4
 NUT
16
 E0090-10-100NN
 1
 LEAD
19
 NAS1802-08-7
 1
 SCREW
20
 NAS1149CN832R
 1
 WASHER
21
 E0090-18-100NN
 1
 LEAD
22
 E0090-18-200NN
 1
 LEAD
Component COMPD01
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 SEE
NOTES
19
 NAS1802-08-7
 1
 SCREW
20
 NAS1149CN832R
 1
 WASHER
21
 E0090-18-100NN
 1
 LEAD
22
 E0090-18-200NN
 1
 LEAD
NOTE
: Operators with Kit 255212D01R03 will require COMPD01.
NOTE
: The above list of components is not an AIRBUS Kit, the required parts
shall be ordered as necessary through the given channel.
Consumable CMLD01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Varnish - Electrical Bonding
 04TMB2
 As required
Non Aqueous Cleaner-
General
08BAA9
 As required
Textile-Lint Free Cotton
 14SBA1
 As required
References
Aircraft Maintenance Manual (AMM)
 Task 52-51-11-400-802
Task 52-51-11-820-801
Fig. A-GBDAB
Install the bonding-leads at the upper
door frame
Sheet 01
Sheet 02
Sheet 03
Sheet 04
Sheet 05
Sheet 06
DATE: May 27/14 SERVICE BULLETIN No.: A340-25-5212
REVISION No.: 01 - Oct 27/14 Page: 37
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 48

@A340-500/600
SERVICE BULLETIN
(a) Install the bonding-leads at the RH door post as follows:
1
 Remove as shown on Fig. A-GBDAB Sheet 03
 ,V i e wE :
1 Screw Item (1) Discard
2
 Remove the surface protection around the screw hole to a diameter
approximately 3 mm (0.12 in.) larger than the diameter of the washer, item 14
as shown on Fig. A-GBDAB Sheet 03
 ,V i e wF .
3
 Clean the bonding points at the wire protection and the door post with:
Non Aqueous
Cleaner-General
08BAA9 As required
Textile-Lint Free
Cotton
14SBA1 As required
4
 Cut two pieces of tubing to a length of 0.11 m (4.33 in.) from:
0.6
 Tubing ABS0916B05 Item 10
5
 Push the tubings, item 10 over the bonding-leads, item 11 and shrink them.
6
 Install at the door post as shown Fig. A-GBDAB Sheet 03
 ,V i e wF :
2 Bonding-Lead E0090-10-125NN Item 11
1 Screw NAS1802-3-9 Item 9
1 Washer NAS1149C0332R Item 13
1 Washer F2529200920000 Item 14
7
 Attach the bonding-lead, item 11 to the wire protection as shown on Fig. A-
GBDAB Sheet 03
, View F with:
1 Screw NAS1802-3-7 Item 12
1 Washer NAS1149C0332R Item 13
1 Nut NAS1726C3P Item 15
8
 Clean the bonding point at the web with:
Non Aqueous
Cleaner-General
08BAA9 As required
Textile-Lint Free
Cotton
14SBA1 As required
DATE: May 27/14 SERVICE BULLETIN No.: A340-25-5212
REVISION No.: 01 - Oct 27/14 Page: 38
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 49

@A340-500/600
SERVICE BULLETIN
9
 Attach the bonding-lead, item 11 to the web as shown on Fig. A-GBDAB
Sheet 05
,V i e wJw i t h :
1 Screw NAS1802-3-7 Item 12
1 Washer NAS1149C0332R Item 13
1 Nut NAS1726C3P Item 15
10
 Apply to the Screw, item 12 and the nut, item 15 as shown on Fig. A-GBDAB
Sheet 05
,V i e wJ :
Varnish - Electrical
Bonding
04TMB2 As required
11
 Apply to the Screws, item 9 and 12 and the nut, item 15 as shown on Fig. A-
GBDAB Sheet 03
,V i e wF :
Varnish - Electrical
Bonding
04TMB2 As required
(b) Install the bonding-leads at the LH door post as follows:
1
 Remove as shown on Fig. A-GBDAB Sheet 04
 ,V i e wG :
1 Screw Item (1) Discard
2
 Remove the surface protection around the screw hole to a diameter
approximately 3 mm (0.12 in.) larger than the diameter of the washer, item 14
as shown on Fig. A-GBDAB Sheet 04
 ,V i e wH .
3
 Make sure that there is no surface protection at the bonding point from the
bracket.
4
 Clean the bonding points at the wire protection, the bracket and the door post
with:
Non Aqueous
Cleaner-General
08BAA9 As required
Textile-Lint Free
Cotton
14SBA1 As required
5
 Cut two pieces of tubing to a length of 0.085 m (3.35 in.) and one piece to a
length of 0.185 m (7.28 in.) from:
0.6
 Tubing ABS0916B05 Item 10
6
 Push the tubings, item 10 over the bonding-leads, item 16, 21 and 22 and
shrink them.
DATE: May 27/14 SERVICE BULLETIN No.: A340-25-5212
REVISION No.: 01 - Oct 27/14 Page: 39
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 50

@A340-500/600
SERVICE BULLETIN
7
 Install at the door post as shown
 Fig. A-GBDAB Sheet 04
 ,V i e wH :
1 Bonding-Lead E0090-10-100NN Item 16
1 Bonding Lead
 E0090-18-200NN
 Item 22
1 Screw NAS1802-3-9 Item 9
1 Washer NAS1149C0332R Item 13
1 Washer F2529200920000 Item 14
For operators with KITD01R03, get this item from COMPD01:
1
 Bonding Lead
 E0090-18-200NN
 Item 22
8
 Attach the bonding-lead, item 22, to the bracket as shown on Fig. A-GBDAB
Sheet 04
,V i e wHw i t h :
1 Bonding Lead
 E0090-18-100NN
 Item 21
1 Screw NAS1802-08-7
 Item 19
1 Washer NAS1149CN832R
 Item 20
For operators with KITD01R03, get these items from COMPD01:
1
 Bonding Lead
 E0090-18-100NN
 Item 21
1
 Screw
 NAS1802-08-7
 Item 19
1
 Washer
 NAS1149CN832R
 Item 20
9
 Attach the bonding-lead, item 21, to the wire protection as shown on
 Fig. A-
GBDAB Sheet 04
, View H with:
1 Screw NAS1802-3-7 Item 12
1 Washer NAS1149C0332R Item 13
1 Nut NAS1726C3P Item 15
10
 Clean the bonding point at the web with:
Non Aqueous
Cleaner-General
08BAA9 As required
Textile-Lint Free
Cotton
14SBA1 As required
DATE: May 27/14 SERVICE BULLETIN No.: A340-25-5212
REVISION No.: 01 - Oct 27/14 Page: 40
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 51

@A340-500/600
SERVICE BULLETIN
11
 Attach the bonding-lead, item 16 to the web as shown on Fig. A-GBDAB
Sheet 05
,V i e wKw i t h :
1 Screw NAS1802-3-7 Item 12
1 Washer NAS1149C0332R Item 13
1 Nut NAS1726C3P Item 15
12
 Apply to the Screw, item 12 and the nut, item 15 as shown on Fig. A-GBDAB
Sheet 05
,V i e wK :
Varnish - Electrical
Bonding
04TMB2 As required
13
 Apply to the Screws, item 9 and 12 and the nut, item 15 as shown on Fig. A-
GBDAB Sheet 04
,V i e wH :
Varnish - Electrical
Bonding
04TMB2 As required
(c) Install the wire harness to the wire protection as shown on Fig. A-GBDAB Sheet
06
,V i e wL .
(d) Install the damper unit to the pelmet, refer to AMM Task 52-51-11-400-802.
(e) Make sure that cockpit door operates easily and closes correctly, refer to AMM
Task 52-51-11-820-801.
**CONF ALL
D. TEST
**CONF 001
(1) Subtask 255212-760-201- 001 - Bonding Test
Work Zones and Access Panels
Zone
 Access/Work location
220
Manpower Resources
Skills
 ELECTRICAL
References
Aircraft Maintenance Manual (AMM)
 Task 20-28-00-720-805
(a) This Service Bulletin requires the accomplishment of the following Test which is
given in SUBTASK 255212-831-201 001 Modify the Cockpit Door Frame Structure :
- operational test of the cockpit door emergency access
DATE: May 27/14 SERVICE BULLETIN No.: A340-25-5212
REVISION No.: 01 - Oct 27/14 Page: 41
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 52

@A340-500/600
SERVICE BULLETIN
The manhours for the tests are included in the referenced Service Bulletin
subtasks.
(b) Do a check of the electrical bonding, refer to AMM Task 20-28-00-720-805.
**CONF 002
(1) Subtask 255212-760-201- 002 - Bonding Test
Work Zones and Access Panels
Zone
 Access/Work location
220
Manpower Resources
Skills
 ELECTRICAL
References
Aircraft Maintenance Manual (AMM)
 Task 20-28-00-720-805
(a) This Service Bulletin requires the accomplishment of the following Test which is
given in SUBTASK 255212-831-201 002 Modify the Cockpit Door Frame Structure
and SUBTASK 255212-831-202 002 Install Bonding-Leads to the Upper Cockpit
Door Frame :
- operational test of the cockpit door emergency access
- test of easy operation and correct close of the cockpit door
The manhours for the tests are included in the referenced Service Bulletin
subtasks.
(b) Do a check of the electrical bonding, refer to AMM Task 20-28-00-720-805.
**CONF ALL
E. CLOSE-UP
**CONF 001
(1) Subtask 255212-942-201-001 - Close-up
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 Task 25-13-44-400-801
Task 25-13-46-400-801
Task 25-23-42-400-801
(a) Make sure that the work areas are clean and clear of tools and other items of
equipment.
DATE: May 27/14 SERVICE BULLETIN No.: A340-25-5212
REVISION No.: 01 - Oct 27/14 Page: 42
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 53

@A340-500/600
SERVICE BULLETIN
(b) Install the ceiling panel 211MC and 211LC, refer to AMM Task 25-13-44-400-801.
(c) Install the upper panel to the coat stowage, refer to AMM Task 25-13-46-400-801.
(d) Install the ceiling panel 221AC, refer to AMM Task 25-23-42-400-801.
(e) Put the aircraft back to its initial configuration.
**CONF 002
(1) Subtask 255212-942-201-001 - Close-up
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 Task 25-13-44-400-801
Task 25-13-46-400-801
Task 25-23-42-400-801
(a) Make sure that the work areas are clean and clear of tools and other items of
equipment.
(b) Install the ceiling panel 211MC and 211LC, refer to AMM Task 25-13-44-400-801.
(c) Install the upper panel to the coat stowage, refer to AMM Task 25-13-46-400-801.
(d) Install the ceiling panel 221AC, refer to AMM Task 25-23-42-400-801.
(e) Put the aircraft back to its initial configuration.
DATE: May 27/14 SERVICE BULLETIN No.: A340-25-5212
REVISION No.: 01 - Oct 27/14 Page: 43
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 54

@A340-500/600
SERVICE BULLETIN
**CONF 001
FR11
FR16A
B
A
C
B
A
Z220
F_SB_255212_6_BAAA_01_00
Figure A-GBAAA - Sheet 01
Prepare the bonding points at the wire protection
DATE: May 27/14 SERVICE BULLETIN No.: A340-25-5212
REVISION No.: 01 - Oct 27/14 Page: 44
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 55

@A340-500/600
SERVICE BULLETIN
**CONF 001
C
01
01
01
01
NOTE:
LOOSEN ONLY THE NUTS TO REMOVE THE ELECTRICAL HARNESS01
D
E
18 SB25−5212
F_SB_255212_6_BAAA_02_00
Figure A-GBAAA - Sheet 02
Prepare the bonding points at the wire protection
DATE: May 27/14 SERVICE BULLETIN No.: A340-25-5212
REVISION No.: 01 - Oct 27/14 Page: 45
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 56

@A340-500/600
SERVICE BULLETIN
**CONF 001
12.24 mm
(0.48 in)
12.0 mm
(0.47 in)
5.1 mm DIA
(0.20 in)
D
46.8 mm
(1.84 in)
17.7 mm
(0.70 in)
5.1 mm DIA
(0.20 in)
E
12.5 mm DIA
(0.49 in)
12.5 mm DIA
(0.49 in)
F_SB_255212_6_BAAA_03_00
Figure A-GBAAA - Sheet 03
Prepare the bonding points at the wire protection
DATE: May 27/14 SERVICE BULLETIN No.: A340-25-5212
REVISION No.: 01 - Oct 27/14 Page: 46
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 57

@A340-500/600
SERVICE BULLETIN
**CONF 002
FR11
FR16A
B
A
C
B
A
Z220
F_SB_255212_6_BAAB_01_00
Figure A-GBAAB - Sheet 01
Prepare the bonding points at the wire protection
DATE: May 27/14 SERVICE BULLETIN No.: A340-25-5212
REVISION No.: 01 - Oct 27/14 Page: 47
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 58

@A340-500/600
SERVICE BULLETIN
**CONF 002
C
01
01
01
01
NOTE:
LOOSEN ONLY THE NUTS TO REMOVE THE ELECTRICAL HARNESS01
D
E
18 SB25−5212
F_SB_255212_6_BAAB_02_00
Figure A-GBAAB - Sheet 02
Prepare the bonding points at the wire protection
DATE: May 27/14 SERVICE BULLETIN No.: A340-25-5212
REVISION No.: 01 - Oct 27/14 Page: 48
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 59

@A340-500/600
SERVICE BULLETIN
**CONF 002
12.24 mm
(0.48 in)
12.0 mm
(0.47 in)
5.1 mm DIA
(0.20 in)
D
46.8 mm
(1.84 in)
17.7 mm
(0.70 in)
5.1 mm DIA
(0.20 in)
E
12.5 mm DIA
(0.49 in)
12.5 mm DIA
(0.49 in)
F_SB_255212_6_BAAB_03_00
Figure A-GBAAB - Sheet 03
Prepare the bonding points at the wire protection
DATE: May 27/14 SERVICE BULLETIN No.: A340-25-5212
REVISION No.: 01 - Oct 27/14 Page: 49
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 60

@A340-500/600
SERVICE BULLETIN
**CONF 001
FR11
FR16A
B
A
B
C
G
D
A
Z220
F_SB_255212_6_BCAA_01_00
Figure A-GBCAA - Sheet 01
Prepare the bonding points at the door posts
DATE: May 27/14 SERVICE BULLETIN No.: A340-25-5212
REVISION No.: 01 - Oct 27/14 Page: 50
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

The text continues at https://openairdocs.org/service-documents/airbus/a340-25-5212/file/7bd7c35e6efd.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
