# Airbus Service Bulletin A340-27-4212

Copy: No revision named ("A340-27-4212 R00"), 23 pages: PDF https://openairdocs.org/files/sha256/e7/ee/e7eec22a7c7188d512cf577d50dff548416cb309ae6378b228c39e40eddbd112; text https://openairdocs.org/service-documents/airbus/a340-27-4212/file/e7eec22a7c71.md. Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2020-0456, the docket of AD 2020-17-16. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Airbus](https://openairdocs.org/service-documents/airbus.md)
- Type: Service bulletin (Service Bulletin)
- Number: A340-27-4212
- Page: https://openairdocs.org/service-documents/airbus/a340-27-4212

## Text (23 pages)

Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2020-0456, the docket of AD 2020-17-16. Not covered by OpenAirDocs’ CC0 dedication. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

A340
SERVICE BULLETIN
REV 00 Jul 18/19 A340-27-4212
Page 1
CONF ALL
AIRBUS
2, ROND POINT EMILE DEWOITINE
31700 BLAGNAC
FRANCE
 
The content of this document is the property of Airbus.
It is supplied in confidence and commercial security on its contents must be maintained.
It must not be used for any purpose other than that for which it is supplied, nor may information
contained in it be disclosed to unauthorized persons.
It must not be reproduced in whole or in part without permission in writing from the owners of the
copyright. Requests for reproduction of any data in this document and the media authorized for it must
be addressed to Airbus.
ATA SYSTEM: 27
TITLE: FLIGHT CONTROLS - FLIGHT CONTROL PRIMARY COMPUTER (FCPC)
REPLACE THE 2K0 AND 2K1 FCPC HARDWARE BY THE 2K2 FCPC
HARDWARE
MODIFICATION No.:
208336S34937

### Page 2

A340
SERVICE BULLETIN
SUMMARY
REV 00 Jul 18/19 A340-27-4212
Page 2
ATA SYSTEM: 27
TITLE: FLIGHT CONTROLS - FLIGHT CONTROL PRIMARY COMPUTER (FCPC)
REPLACE THE 2K0 AND 2K1 FCPC HARDWARE BY THE 2K2 FCPC
HARDWARE
SUMMARY
This summary is for information only and is not approved for modification of the aircraft.
A. MODIFICATIONS
CONF 001
MODIFICATION CLASSIFICATION
MAJOR None
MINOR 208336S34937
NOTE: As per EASA IR 21, a minor change is one that has no appreciable effect on the
mass, balance, structural strength, reliability, operational characteristics affecting
the airworthiness of the product. All other changes are major changes.
CONF 002
MODIFICATION CLASSIFICATION
MAJOR None
MINOR 208336S34937
NOTE: As per EASA IR 21, a minor change is one that has no appreciable effect on the
mass, balance, structural strength, reliability, operational characteristics affecting
the airworthiness of the product. All other changes are major changes.
CONF ALL
B. REASON
(1) History
An Airworthiness Directive (AD) is anticipated on “Stop Rudder Input Warning” function
(SRIW) applicable to A340-200 and A340-300 models aircraft with mechanical rudder
control (MOD No. 49144S16279 is not embodied).
As mentioned by OIT 999.0020/16 Rev 01 and Ref. ISI 27.90.00045, this anticipated
AD on SRIW will entail the replacement of 2K0 and 2K1 Flight Control Primary
Computer (FCPC) hardware by 2K2 FCPC hardware.
Airbus recommends operators to initiate this FCPC 2K0/2K1 hardware replacement
as soon as possible by contacting equipment supplier (refer to paragraph 2.D of this
Service Bulletin).
(2) Objective/Action
This Service Bulletin enables the replacement of FCPC standards L26 (2K0 and 2K1
hardware) by L25 (2K2 hardware).
T o accomplish this Service Bulletin, FCPCs have to be replaced on aircraft.
(3) Advantages
Accomplishment of this Service Bulletin introduces FCPC L25 standard (2K2 hardware)
in order to:

### Page 3

A340
SERVICE BULLETIN
SUMMARY
REV 00 Jul 18/19 A340-27-4212
Page 3
- Provide FCPC capability for SRIW function and enable compliance with expected
AD on SRIW function (refer to OIT 999.0020/16 Rev 01 and Ref. ISI 27.90.00045)
- T ake benefits of the improved reliability of 2K2 FCPC hardware
- Enable the implementation of future FCPC software evolutions (refer to Ref. ISI
27.93.00007).
(4) Operational/Maintenance Consequences
None
C. GENERAL EVALUATION
EVALUATION TABLE
COMPLIANCE RECOMMENDED COST SAVING NO
A/C OPERATION
AFFECTED
NO VENDOR SB NO
CANCELS INSPECTION SB NO ETOPS AFFECTED NO
PAX COMFORT AFFECTED NO POTENTIAL AD NO
RELIABILITY AFFECTED YES STRUCTURAL LIFE EXTENSION NO
LIFE LIMIT NO LINE MAINTENANCE AFFECTED YES
NOTE: Service Bulletin recommended to be accomplished to prevent significant
operational disruptions.
D. MAINTENANCE CONFIGURATION
CONF 001
No specific aircraft maintenance configuration required.
CONF 002
No specific aircraft maintenance configuration required.
CONF ALL
E. MATERIAL PRICE INFORMATION
CONF 001
(1) Modification
(a) T ask set A340-A-27-XX-4212-01000-93AA-A Modification
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET QTYPER A/C PRICE PER A/C MAIN PARTS
Equipment See SB See Note FCPCs
NOTE: Price information to be obtained from the given supplier.
CONF 002
(1) Modification

### Page 4

A340
SERVICE BULLETIN
SUMMARY
REV 00 Jul 18/19 A340-27-4212
Page 4
(a) T ask set A340-A-27-XX-4212-01000-93AA-A Modification
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET QTYPER A/C PRICE PER A/C MAIN PARTS
Equipment See SB See Note FCPCs
NOTE: Price information to be obtained from the given supplier.
CONF ALL
F. APPLICABILITY
This Service Bulletin is applicable to this (these) operator(s):
01V 14S 15R 26L 31V 36L 39N 41N 65W 68M 74W 78U 83V 98W ABD AFR AIB ARG AXY BEL
BOE D2F DGA DLH EDW F2I GAF HFM HFY IRC IRM KAC KMF M3R MAU MDG MRJ MSR PAL
PUE QQE ROI S3R SAA SAS SFB SLM SWR SYR TAP THT U6A VCV
G. CONCURRENT REQUIREMENTS
Accomplishment of this Service Bulletin requires the prior or simultaneous accomplishment
of the following Service Bulletin(s).
Service Bulletin(s) Modification(s)
Ref. SB A340-27-4207 206556S33842 206557S33843
NOTE: Service Bulletin No. A340-27-4207 (FLIGHT CONTROLS - FCPC - INSTALL FCPC L26
2K0 AND L26 2K1 ON A340 A/C).
H. NATURE OF THE WORK
CONF 001
(1) Modification
(a) T ask set A340-A-27-XX-4212-01000-93AA-A Modification
AIRCRAFT NO
EQUIPMENT YES
CONF 002
(1) Modification
(a) T ask set A340-A-27-XX-4212-01000-93AA-A Modification
AIRCRAFT NO
EQUIPMENT YES
CONF ALL
I. MANPOWER
CONF 001
(1) Modification
(a) T ask set A340-A-27-XX-4212-01000-93AA-A Modification
MANPOWER
TOTAL MAN-HOURS 2.50 h
ELAPSED TIME (HOURS) 2.50 h

### Page 5

A340
SERVICE BULLETIN
SUMMARY
REV 00 Jul 18/19 A340-27-4212
Page 5
CONF 002
(1) Modification
(a) T ask set A340-A-27-XX-4212-01000-93AA-A Modification
MANPOWER
TOTAL MAN-HOURS 2.50 h
ELAPSED TIME (HOURS) 2.50 h

### Page 6

A340
SERVICE BULLETIN
SUMMARY
Figure ICN-A340-A-27XX4212-A-FAPE3-0132D-A-001-01 SHEET 1/1
REV 00 Jul 18/19 A340-27-4212General Overview
Page 6
CONF ALL
J. GENERAL OVERVIEW
CONF ALL
Z120
FR20
FR1
B
800VU
915VU
A
MODIFICATION OF THE FCPCB
A
2CE1
MODIFICATION OF THE FCPC
MODIFICATION OF THE FCPC
2CE2
2CE3
ICN-A340-A-27XX4212-A-FAPE3-0132D-A-001-01

### Page 7

A340
SERVICE BULLETIN
REV 00 Jul 18/19 A340-27-4212
Page 7
ATA SYSTEM: 27
TITLE: FLIGHT CONTROLS - FLIGHT CONTROL PRIMARY COMPUTER (FCPC)
REPLACE THE 2K0 AND 2K1 FCPC HARDWARE BY THE 2K2 FCPC
HARDWARE
1. PLANNING INFORMATION
A. APPLICABILITY
NOTE: This modification is applicable by Service Bulletin only.
NOTE: This Service Bulletin is only applicable to aircraft on which FCPC 2K2 hardware
has not been introduced through the application of Service Bulletin No. Ref. SB
A340-27-4208 (MOD No. 206555S33841 - FCPC L25 (2K2) ) and on which FCPC L26
(2K0 or 2K1) standard was introduced through the application of Service Bulletin
No. Ref. SB A340-27-4207 (MOD 206556S33842 or MOD 206557S33843).
(1) Models
ON A/C 0026, 0031, 0063, 0074, 0075, 0080, 0081
340-211
ON A/C 0009, 0014, 0022, 0038, 0043, 0046, 0061, 0156, 0159, 0178
340-212
ON A/C 0004, 0151, 0204
340-213
ON A/C 0002, 0020, 0029, 0056, 0058, 0078, 0084, 0115
340-311
ON A/C 0041, 0044, 0047, 0051, 0076, 0079, 0091, 0094, 0367, 0374, 0381
340-312
ON A/C 0089, 0090, 0093, 0101, 0104, 0117, 0123, 0125, 0126, 0128, 0134, 0135, 0145,
0146, 0152, 0158, 0163, 0164, 0166-0168, 0170, 0174, 0175, 0179, 0180, 0185, 0186, 0190,
0192-0194, 0197, 0199, 0201, 0202, 0207, 0208, 0210, 0212, 0213, 0215, 0217, 0221, 0233,
0236, 0237, 0242, 0243, 0245, 0246, 0252, 0257, 0260, 0264, 0268, 0270, 0274, 0278,
0280, 0282, 0292, 0297, 0302, 0304, 0310, 0318, 0319, 0321, 0325, 0327, 0329, 0331,
0332, 0335, 0347, 0352, 0354, 0355, 0373, 0377-0379, 0385, 0387, 0390, 0395, 0399, 0402,
0406, 0411, 0413, 0415, 0424, 0430, 0433-0435, 0438, 0446, 0447, 0450, 0459, 0467, 0470,
0474, 0483, 0528, 0538, 0541, 0545, 0546, 0554, 0556, 0559, 0561, 0562
340-313
CONF ALL
(2) Applicability by MSN
0002 0004 0009 0014 0020 0022 0026 0029 0031 0038 0041 0043 0044 0046 0047
0051 0056 0058 0061 0063 0074-0076 0078-0081 0084 0089-0091 0093 0094 0101
0104 0115 0117 0123 0125 0126 0128 0134 0135 0145 0146 0151 0152 0156 0158
0159 0163 0164 0166-0168 0170 0174 0175 0178-0180 0185 0186 0190 0192-0194
0197 0199 0201 0202 0204 0207 0208 0210 0212 0213 0215 0217 0221 0233 0236
0237 0242 0243 0245 0246 0252 0257 0260 0264 0268 0270 0274 0278 0280 0282
0292 0297 0302 0304 0310 0318 0319 0321 0325 0327 0329 0331 0332 0335 0347
0352 0354 0355 0367 0373 0374 0377-0379 0381 0385 0387 0390 0395 0399 0402
0406 0411 0413 0415 0424 0430 0433-0435 0438 0446 0447 0450 0459 0467 0470
0474 0483 0528 0538 0541 0545 0546 0554 0556 0559 0561 0562
(3) MSN by configuration
CONF 001

### Page 8

A340
SERVICE BULLETIN
REV 00 Jul 18/19 A340-27-4212
Page 8
MSN CONFIGURATION
0002 0004 0009 0014 0020 0022 0026 0029 0031 0038 0041
0043 0044 0046 0047 0051 0056 0058 0061 0063 0074 0075
0076 0078 0079 0080 0081 0084 0089 0090 0091 0093 0094
0101 0104 0115 0117 0123 0125 0126 0128 0134 0135 0145
0146 0151 0152 0156 0158 0159 0163 0164 0166 0167 0168
0170 0174 0175 0178 0179 0180 0185 0186 0190 0192 0193
0194 0197 0199 0201 0202 0204 0207 0208 0210 0212 0213
0215 0217 0221 0233 0236 0237 0242 0243 0245 0246 0252
0257 0260 0264 0268 0270 0274 0278 0280 0282 0292 0297
0302 0304 0310 0318 0319 0321 0325 0327 0329 0331 0332
0335 0347 0352 0354 0355 0367 0373 0374 0377 0378 0379
0381 0385 0387 0390 0395 0399 0402 0406 0411 0413 0415
0424 0430 0433 0434 0435 0438 0446 0447 0450 0459 0467
0470 0474 0483 0528 0538 0541 0545 0546 0554 0556 0559
0561 0562
001
CONF 002
MSN CONFIGURATION
0002 0004 0009 0014 0020 0022 0026 0029 0031 0038 0041
0043 0044 0046 0047 0051 0056 0058 0061 0063 0074 0075
0076 0078 0079 0080 0081 0084 0089 0090 0091 0093 0094
0101 0104 0115 0117 0123 0125 0126 0128 0134 0135 0145
0146 0151 0152 0156 0158 0159 0163 0164 0166 0167 0168
0170 0174 0175 0178 0179 0180 0185 0186 0190 0192 0193
0194 0197 0199 0201 0202 0204 0207 0208 0210 0212 0213
0215 0217 0221 0233 0236 0237 0242 0243 0245 0246 0252
0257 0260 0264 0268 0270 0274 0278 0280 0282 0292 0297
0302 0304 0310 0318 0319 0321 0325 0327 0329 0331 0332
0335 0347 0352 0354 0355 0367 0373 0374 0377 0378 0379
0381 0385 0387 0390 0395 0399 0402 0406 0411 0413 0415
0424 0430 0433 0434 0435 0438 0446 0447 0450 0459 0467
0470 0474 0483 0528 0538 0541 0545 0546 0554 0556 0559
0561 0562
002
CONF ALL
(4) Configuration definition
CONF 001
Configuration 001
CONF 001 is applicable for aircraft fitted with FCPC LA2K015002D0000 (MOD No.
206556S33842 is embodied).
CONF 001 retrofits following modifications: 208336S34937.
CONF 002
Configuration 002
CONF 002 is applicable for aircraft fitted with FCPC LA2K1A1002D0000 (MOD No.
206557S33843 is embodied).
CONF 002 retrofits following modifications: 208336S34937.
CONF ALL
B. CONCURRENT REQUIREMENTS

### Page 9

A340
SERVICE BULLETIN
REV 00 Jul 18/19 A340-27-4212
Page 9
Accomplishment of this Service Bulletin requires the prior or simultaneous accomplishment
of the following Service Bulletin(s).
Service Bulletin(s) Modification(s)
Ref. SB A340-27-4207 206556S33842 206557S33843
NOTE: Service Bulletin No. A340-27-4207 (FLIGHT CONTROLS - FCPC - INSTALL FCPC L26
2K0 AND L26 2K1 ON A340 A/C).
C. REASON
(1) History
An Airworthiness Directive (AD) is anticipated on “Stop Rudder Input Warning” function
(SRIW) applicable to A340-200 and A340-300 models aircraft with mechanical rudder
control (MOD No. 49144S16279 is not embodied).
As mentioned by OIT 999.0020/16 Rev 01 and Ref. ISI 27.90.00045, this anticipated
AD on SRIW will entail the replacement of 2K0 and 2K1 Flight Control Primary
Computer (FCPC) hardware by 2K2 FCPC hardware.
Airbus recommends operators to initiate this FCPC 2K0/2K1 hardware replacement
as soon as possible by contacting equipment supplier (refer to paragraph 2.D of this
Service Bulletin).
(2) Objective/Action
This Service Bulletin enables the replacement of FCPC standards L26 (2K0 and 2K1
hardware) by L25 (2K2 hardware).
T o accomplish this Service Bulletin, FCPCs have to be replaced on aircraft.
(3) Advantages
Accomplishment of this Service Bulletin introduces FCPC L25 standard (2K2 hardware)
in order to:
- Provide FCPC capability for SRIW function and enable compliance with expected
AD on SRIW function (refer to OIT 999.0020/16 Rev 01 and Ref. ISI 27.90.00045)
- T ake benefits of the improved reliability of 2K2 FCPC hardware
- Enable the implementation of future FCPC software evolutions (refer to Ref. ISI
27.93.00007).
(4) Operational/Maintenance Consequences
None
D. DESCRIPTION
T o accomplish this Service Bulletin it is necessary to:
(1) Modification
(a) T ask set A340-A-27-XX-4212-01000-93AA-A Modification
CONF 001
1 Replace the FCPCs (FIN 2CE1, FIN 2CE2 and FIN 2CE3) in Avionics
Compartment
CONF 002

### Page 10

A340
SERVICE BULLETIN
REV 00 Jul 18/19 A340-27-4212
Page 10
1 Replace the FCPCs (FIN 2CE1, FIN 2CE2 and FIN 2CE3) in Avionics
Compartment
CONF ALL
E. COMPLIANCE
(1) Classification
RECOMMENDED: Service Bulletin recommended to be accomplished to prevent
significant operational disruptions.
(2) Accomplishment Timescale
Accomplishment of this Service Bulletin is recommended at the earliest opportunity
where manpower and facilities are available.
F. APPROVAL
The technical content of this document is approved under the authority of Design
Organisation Approval No. EASA.21J.031.
If an aircraft listed in the applicability has a modification or repair embodied that is not
of AIRBUS origin, and which affects the content of this Service Bulletin, the operator
is responsible for obtaining approval by its airworthiness authority for any adaptation
necessary before incorporation of the Service Bulletin.
G. MANPOWER
CONF 001
The manpower estimates given in this Service Bulletin are based on the direct labor cost to
do the work. These estimates assume that the work will be done by experienced personnel,
and may need to be revised upwards to suit operator’s circumstances. The estimates do not
include the time to prepare, plan or inspect the work. Manufacture and procurement of parts
and tools, drying times for paints, sealants, etc., and general administration work are also
not included.
(1) Modification
(a) T ask set A340-A-27-XX-4212-01000-93AA-A Modification
PREPARATION
Job Set-up 0.50 h
PROCEDURE
Replace the FCPCs (FIN 2CE1, FIN 2CE2 and FIN 2CE3) in
Avionics Compartment
1.00 h
PREPARATION FOR TEST
T est Set-up 0.10 h
TEST
T esting 0.40 h
CLOSE-UP
Close-up 0.50 h
TOTAL MAN-HOURS 2.50 h
ELAPSED TIME (HOURS) 2.50 h
CONF 002
The manpower estimates given in this Service Bulletin are based on the direct labor cost to
do the work. These estimates assume that the work will be done by experienced personnel,
and may need to be revised upwards to suit operator’s circumstances. The estimates do not
include the time to prepare, plan or inspect the work. Manufacture and procurement of parts

### Page 11

A340
SERVICE BULLETIN
REV 00 Jul 18/19 A340-27-4212
Page 11
and tools, drying times for paints, sealants, etc., and general administration work are also
not included.
(1) Modification
(a) T ask set A340-A-27-XX-4212-01000-93AA-A Modification
PREPARATION
Job Set-up 0.50 h
PROCEDURE
Replace the FCPCs (FIN 2CE1, FIN 2CE2 and FIN 2CE3) in
Avionics Compartment
1.00 h
PREPARATION FOR TEST
T est Set-up 0.10 h
TEST
T esting 0.40 h
CLOSE-UP
Close-up 0.50 h
TOTAL MAN-HOURS 2.50 h
ELAPSED TIME (HOURS) 2.50 h
CONF ALL
H. WEIGHT AND BALANCE
Not changed
I. ELECTRICAL LOAD DATA
Not changed
J. REFERENCES
CONCURRENT SERVICE BULLETIN (SB)
A340-27-4207
CONF 001
(1) Modification
(a) T ask set A340-A-27-XX-4212-01000-93AA-A Modification
AIRCRAFT MAINTENANCE MANUAL (AMM)
06-20-00, Page Block 001 06-31-53, Page Block 001
06-41-53, Page Block 001 T ask 12-34-24-860-802
T ask 27-93-34-000-801
T ask 27-93-34-400-801
ELECTRICAL STANDARD PRACTICES MANUAL (ESPM)
20-55-00
IN SERVICE INFORMATION (ISI)
27.90.00045 27.93.00007

### Page 12

A340
SERVICE BULLETIN
REV 00 Jul 18/19 A340-27-4212
Page 12
OPERATOR INFORMATION TELEX (OIT)
999.0020/16-01
SERVICE BULLETIN (SB)
A340-27-4207 A340-27-4208
A340-27-4211
CONF 002
(1) Modification
(a) T ask set A340-A-27-XX-4212-01000-93AA-A Modification
AIRCRAFT MAINTENANCE MANUAL (AMM)
06-20-00, Page Block 001 06-31-53, Page Block 001
06-41-53, Page Block 001 T ask 12-34-24-860-802
T ask 27-93-34-000-801
T ask 27-93-34-400-801
ELECTRICAL STANDARD PRACTICES MANUAL (ESPM)
20-55-00
IN SERVICE INFORMATION (ISI)
27.90.00045 27.93.00007
OPERATOR INFORMATION TELEX (OIT)
999.0020/16-01
SERVICE BULLETIN (SB)
A340-27-4207 A340-27-4208
A340-27-4211
CONF ALL
K. PUBLICATION AFFECTED
ILLUSTRATED PARTS CATALOG (IPC)
TROUBLE SHOOTING MANUAL (TSM)
L. INDUSTRY SUPPORT INFORMATION
Industry support terms for the equipment must be negotiated with the equipment supplier.
As per OIT 999.0020/16, Airbus recommends to initiate FCPC 2K0/2K1 hardware
replacement as soon as possible by contacting equipment supplier. Please refer to OIT
999.0020/16 for further information on FCPC 2K0/2K1 hardware replacement campaign.

### Page 13

A340
SERVICE BULLETIN
REV 00 Jul 18/19 A340-27-4212
Page 13
2. MATERIAL INFORMATION
A. MATERIAL APPLICABILITY
CONF 001
Material for task set A340-A-27-XX-4212-01000-93AA-A Modification
MATERIAL QTY SEE NOTES
Equipment See SB (1)
Interchangeable parts See SB
Spare parts See SB
NOTE(S)
(1): Procurement terms for the equipment must be negotiated with the equipment
supplier.
CONF 002
Material for task set A340-A-27-XX-4212-01000-93AA-A Modification
MATERIAL QTY SEE NOTES
Equipment See SB (1)
Interchangeable parts See SB
Spare parts See SB
NOTE(S)
(1): Procurement terms for the equipment must be negotiated with the equipment
supplier.
CONF ALL
B. TOOLING
No tools
C. CONSUMABLES
No consumables
D. LIST OF NEW PARTS
CONF 001
Equipment for task set A340-A-27-XX-4212-01000-93AA-A Modification
Procurement address F6198
AIRBUS OPERATIONS SAS
AVIONICS & SIMULATION PRODUCTS
316 ROUTE DE BAYONNE
31060 TOULOUSE CEDEX 09
FRANCE
Phone: 561957534
Fax: 561180494
E-mail: systems.support@airbus.com
NOTE(S)
Vendor parts are to be procured from the address given above.
ITEM PART No. QTY (UM) KEYWORD DRAWING SEE NOTES
LA2K2B1002C0000
(F6198) 3 FCPC (1)
NOTE(S)
(1): The components listed above are not an AIRBUS Kit, the required parts must be
ordered as necessary through the given channel.

### Page 14

A340
SERVICE BULLETIN
REV 00 Jul 18/19 A340-27-4212
Page 14
CONF 002
Equipment for task set A340-A-27-XX-4212-01000-93AA-A Modification
Procurement address F6198
AIRBUS OPERATIONS SAS
AVIONICS & SIMULATION PRODUCTS
316 ROUTE DE BAYONNE
31060 TOULOUSE CEDEX 09
FRANCE
Phone: 561957534
Fax: 561180494
E-mail: systems.support@airbus.com
NOTE(S)
Vendor parts are to be procured from the address given above.
ITEM PART No. QTY (UM) KEYWORD DRAWING SEE NOTES
LA2K2B1002C0000
(F6198) 3 FCPC (1)
NOTE(S)
(1): The components listed above are not an AIRBUS Kit, the required parts must be
ordered as necessary through the given channel.
CONF ALL
E. LIST OF EXISTING PARTS
CONF 001
Interchangeable parts for task set A340-A-27-XX-4212-01000-93AA-A Modification
DESCRIPTION OLD PART No. NEW PART No. INT SEE NOTES
FCPC-FLIGHT
CONTROL PRIMARY
COMPUTER
LA2K015002D0000 LA2K2B1002C0000 03 (1) (2)
NOTE(S)
For definitions of interchangeability codes in column INT. refer to ATA (CSDD Chapter
2).
Only the mixability configuration(s) and condition(s) stated in this Service Bulletin are
approved.
(1): The interchangeability possibilities are for new or modified parts introduced by the
accomplishment of this Service Bulletin.
(2): Prior the application of Service Bulletin No. Ref. SB A340-27-4211 (embodiment
of FCDC L26/M25/P16 - MOD No. 204828S32944) the new Part Number (PN)
LA2K2B1002C0000 is two ways interchangeable and mixable with FCPC L26 2K0 PN
LA2K015002D0000 (installed by MOD No. 206556S33842) and with FCPC L26 2K1 PN
LA2K1A1002D0000 (installed by MOD No. 206557S33843).
After the application of Service Bulletin No. Ref. SB A340-27-4211 (embodiment of
FCDC L26/M25/P16 - MOD No. 204828S32944) the new PN LA2K2B1002C0000 is not
interchangeable with FCPC L26 2K0 PN LA2K015002D0000 (installed by MOD No.
206556S33842) and with FCPC L26 2K1 PN LA2K1A1002D0000 (installed by MOD No.
206557S33843).
CONF 002
Interchangeable parts for task set A340-A-27-XX-4212-01000-93AA-A Modification

### Page 15

A340
SERVICE BULLETIN
REV 00 Jul 18/19 A340-27-4212
Page 15
DESCRIPTION OLD PART No. NEW PART No. INT SEE NOTES
FCPC-FLIGHT
CONTROL PRIMARY
COMPUTER
LA2K1A1002D0000 LA2K2B1002C0000 03 (1) (2)
NOTE(S)
For definitions of interchangeability codes in column INT. refer to ATA (CSDD Chapter
2).
Only the mixability configuration(s) and condition(s) stated in this Service Bulletin are
approved.
(1): The interchangeability possibilities are for new or modified parts introduced by the
accomplishment of this Service Bulletin.
(2): Prior the application of Service Bulletin No. Ref. SB A340-27-4211 (embodiment
of FCDC L26/M25/P16 - MOD No. 204828S32944) the new Part Number (PN)
LA2K2B1002C0000 is two ways interchangeable and mixable with FCPC L26 2K0 PN
LA2K015002D0000 (installed by MOD No. 206556S33842) and with FCPC L26 2K1 PN
LA2K1A1002D0000 (installed by MOD No. 206557S33843).
After the application of Service Bulletin No. Ref. SB A340-27-4211 (embodiment of
FCDC L26/M25/P16 - MOD No. 204828S32944) the new PN LA2K2B1002C0000 is not
interchangeable with FCPC L26 2K0 PN LA2K015002D0000 (installed by MOD No.
206556S33842) and with FCPC L26 2K1 PN LA2K1A1002D0000 (installed by MOD No.
206557S33843).
CONF 001
Spare parts for task set A340-A-27-XX-4212-01000-93AA-A Modification
DESCRIPTION OLD PART No. SEE NOTES
FCPC-FLIGHT CONTROL PRIMARY
COMPUTER LA2K015002D0000 (1)
NOTE(S)
(1): The above listed parts are no longer considered as spares for aircraft which have
accomplished this Service Bulletin or Service Bulletin No. Ref. SB A340-27-4211
(installation of FCDC L26/M25/P16 - MOD No. 204828S32944).
CONF 002
Spare parts for task set A340-A-27-XX-4212-01000-93AA-A Modification
DESCRIPTION OLD PART No. SEE NOTES
FCPC-FLIGHT CONTROL PRIMARY
COMPUTER LA2K1A1002D0000 (1)
NOTE(S)
(1): The above listed parts are no longer considered as spares for aircraft which have
accomplished this Service Bulletin or Service Bulletin No. Ref. SB A340-27-4211
(installation of FCDC L26/M25/P16 - MOD No. 204828S32944).

### Page 16

A340
SERVICE BULLETIN
REV 00 Jul 18/19 A340-27-4212
Page 16
CONF ALL
3. ACCOMPLISHMENT INSTRUCTIONS
Task set A340-A-27-XX-4212-01000-93AA-A
Modification
WARNING: MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND ALL THE CAUTIONS
INCLUDED IN THE REFERENCED PROCEDURES.
CAUTION: ALWAYS OBEY THE PRECAUTIONS THAT FOLLOW TO KEEP ELECTRICAL
WIRING IN A SATISFACTORY CONDITION (ELECTRICALLY AND MECHANICALLY
SERVICEABLE). WHEN YOU DO MAINTENANCE WORK, REPAIRS OR
MODIFICATIONS, ALWAYS KEEP ELECTRICAL WIRING, COMPONENTS AND
THE WORK AREA AS CLEAN AS POSSIBLE. TO DO THIS:
- PUT PROTECTION, SUCH AS PLASTIC SHEETING, CLOTHS, ETC., AS
NECESSARY ON WIRING AND COMPONENTS.
- REGULARLY REMOVE ALL SHAVINGS, UNWANTED MATERIAL AND
OTHER CONTAMINATION.
THESE PRECAUTIONS WILL DECREASE THE RISK OF CONTAMINATION AND
DAMAGE TO THE ELECTRICAL WIRING INSTALLATION.
IF THERE IS CONTAMINATION, REFER TO Ref. ESPM 20-55-00.
NOTE: The accomplishment instructions of this Service Bulletin include procedures given in
other documents or in other sections of the Service Bulletin. When the words “refer to”
are used and the operator has a procedure accepted by the local authority he belongs to,
the accepted alternative procedure can be used. When the words “in accordance with”
are used then the given procedure must be followed.
NOTE: The access and close-up instructions, not comprising return to service tests, in this
Service Bulletin do not constitute or affect the technical intent of the Service Bulletin.
Operators can therefore, as deemed necessary, omit or add access and/or close-up steps
to add flexibility to their maintenance operations as long as the technical intent of the
Service Bulletin is met within the set parameters.
NOTE: Manual titles given in the accomplishment instructions are referred to by acronyms. Refer
to paragraph 1.J., References, for the definition of acronyms.
NOTE: Discarded parts must be managed at the operator's discretion.
NOTE: This Service Bulletin contains the instructions for the on-aircraft maintenance necessary
to ensure the continued airworthiness of the aircraft.
For any deviations to the instructions, contact AIRBUS for further instructions and
approval.
A. TASK SET ASSOCIATED INFORMATION
Task Manpower
CONF 001
TOTAL MAN-HOURS 2.50 h
CONF 002
TOTAL MAN-HOURS 2.50 h
CONF 001
ELAPSED TIME (HOURS) 2.50 h
CONF 002
ELAPSED TIME (HOURS) 2.50 h

### Page 17

A340
SERVICE BULLETIN
REV 00 Jul 18/19 A340-27-4212
Page 17
CONF ALL
B. PREPARATION
(1) Task A340-A-27-XX-4212-02001-540A-A - Job Set-up
Job Set-Up Information
Manpower/Resources/Skills
Man-hours 0.50 h
Minimum Number of person 1
Elapsed Time 0.50 h
Referenced Information
Manuals/Drawings References/Sheets
AMM T ask 12-34-24-860-802T ask 27-93-34-000-801
Procedure
NOTE: For the basic Aircraft configuration, refer to AMM Chapter "Introduction -
Aircraft status for maintenance" in Manual Front Matter section.
(a) Make sure that the aircraft is electrically grounded, refer to Ref. AMM T ask
12-34-24-860-802.
(b) Do the Job Set-up procedure as specified in the removal of the FCPCs ( FIN 2CE1,
FIN 2CE2 and FIN 2CE3), refer to Ref. AMM T ask 27-93-34-000-801.
C. PROCEDURE
CONF 001
(1) Task A340-A-27-XX-4212-01001-920A-A - Replace the FCPCs (FIN 2CE1, FIN
2CE2 and FIN 2CE3) in Avionics Compartment
Job Set-Up Information
Working Area
Impacted Zone Access / Work Location
Access Door 811
120 Work location Electrical Panel 800VUElectrical Panel 915VU
Manpower/Resources/Skills
Man-hours 1.00 h
Minimum Number of person 1
Elapsed Time 1.00 h
Material necessary to do the job
Equipment
ITEM PART No. QTY (UM) KEYWORD DRAWING SEE NOTES
LA2K2B1002C0000 3 FCPC (1)
NOTE(S)
(1): The components listed above are not an AIRBUS Kit, the required parts must be
ordered as necessary through the given channel.

### Page 18

A340
SERVICE BULLETIN
REV 00 Jul 18/19 A340-27-4212
Page 18
Referenced Information
Manuals/Drawings References/Sheets
AMM
06-20-00, Page Block 001
06-31-53, Page Block 001
06-41-53, Page Block 001
T ask 27-93-34-000-801
T ask 27-93-34-400-801
Procedure
(a) Standard Practices given in this procedure:
1 For the identification of zones, refer to Ref. AMM 06-20-00, Page Block 001.
2 For the Frame (FR) identification, refer to Ref. AMM 06-31-53, Page Block
001.
3 For the identification of access panels, refer to Ref. AMM 06-41-53, Page
Block 001.
(b) Remove the FCPCs ( FIN 2CE1, FIN 2CE2 and FIN 2CE3), refer to Ref. AMM T ask
27-93-34-000-801:
FIN 2CE1
1 FCPC-FLIGHT CONTROL
PRIMARY COMPUTER
LA2K015002D0000   Discard
and
FIN 2CE2
1 FCPC-FLIGHT CONTROL
PRIMARY COMPUTER
LA2K015002D0000   Discard
and
FIN 2CE3
1 FCPC-FLIGHT CONTROL
PRIMARY COMPUTER
LA2K015002D0000   Discard
(c) Install the FCPCs ( FIN 2CE1, FIN 2CE2 and FIN 2CE3), refer to Ref. AMM T ask
27-93-34-400-801:
FIN 2CE1
1 FCPC-FLIGHT CONTROL
PRIMARY COMPUTER
LA2K2B1002C0000  
and
FIN 2CE2
1 FCPC-FLIGHT CONTROL
PRIMARY COMPUTER
LA2K2B1002C0000  
and
FIN 2CE3
1 FCPC-FLIGHT CONTROL
PRIMARY COMPUTER
LA2K2B1002C0000

### Page 19

A340
SERVICE BULLETIN
REV 00 Jul 18/19 A340-27-4212
Page 19
CONF 002
(1) Task A340-A-27-XX-4212-01003-920A-A - Replace the FCPCs (FIN 2CE1, FIN
2CE2 and FIN 2CE3) in Avionics Compartment
Job Set-Up Information
Working Area
Impacted Zone Access / Work Location
Access Door 811
120 Work location Electrical Panel 800VUElectrical Panel 915VU
Manpower/Resources/Skills
Man-hours 1.00 h
Minimum Number of person 1
Elapsed Time 1.00 h
Material necessary to do the job
Equipment
ITEM PART No. QTY (UM) KEYWORD DRAWING SEE NOTES
LA2K2B1002C0000 3 FCPC (1)
NOTE(S)
(1): The components listed above are not an AIRBUS Kit, the required parts must be
ordered as necessary through the given channel.
Referenced Information
Manuals/Drawings References/Sheets
AMM
06-20-00, Page Block 001
06-31-53, Page Block 001
06-41-53, Page Block 001
T ask 27-93-34-000-801
T ask 27-93-34-400-801
Procedure
(a) Standard Practices given in this procedure:
1 For the identification of zones, refer to Ref. AMM 06-20-00, Page Block 001.
2 For the Frame (FR) identification, refer to Ref. AMM 06-31-53, Page Block
001.
3 For the identification of access panels, refer to Ref. AMM 06-41-53, Page
Block 001.
(b) Remove the FCPCs ( FIN 2CE1, FIN 2CE2 and FIN 2CE3), refer to Ref. AMM T ask
27-93-34-000-801:
FIN 2CE1
1 FCPC-FLIGHT CONTROL
PRIMARY COMPUTER
LA2K1A1002D0000   Discard
and
FIN 2CE2
1 FCPC-FLIGHT CONTROL
PRIMARY COMPUTER
LA2K1A1002D0000   Discard

### Page 20

A340
SERVICE BULLETIN
REV 00 Jul 18/19 A340-27-4212
Page 20
and
FIN 2CE3
1 FCPC-FLIGHT CONTROL
PRIMARY COMPUTER
LA2K1A1002D0000   Discard
(c) Install the FCPCs ( FIN 2CE1, FIN 2CE2 and FIN 2CE3), refer to Ref. AMM T ask
27-93-34-400-801:
FIN 2CE1
1 FCPC-FLIGHT CONTROL
PRIMARY COMPUTER
LA2K2B1002C0000  
and
FIN 2CE2
1 FCPC-FLIGHT CONTROL
PRIMARY COMPUTER
LA2K2B1002C0000  
and
FIN 2CE3
1 FCPC-FLIGHT CONTROL
PRIMARY COMPUTER
LA2K2B1002C0000  
CONF ALL
D. PREPARATION FOR TEST
(1) Task A340-A-27-XX-4212-01001-520A-A - Test Set-up
Job Set-Up Information
Manpower/Resources/Skills
Man-hours 0.10 h
Minimum Number of person 1
Elapsed Time 0.10 h
Referenced Information
Manuals/Drawings References/Sheets
AMM T ask 27-93-34-400-801
Procedure
(a) Remove the safety clips and tags and close the circuit breakers as specified after
the installation of the FCPCs ( FIN 2CE1, FIN 2CE2 and FIN 2CE3), refer to Ref.
AMM T ask 27-93-34-400-801.
E. TEST
(1) Task A340-A-27-XX-4212-01001-300A-A - Testing
Job Set-Up Information
Manpower/Resources/Skills
Man-hours 0.40 h
Minimum Number of person 1
Elapsed Time 0.40 h

### Page 21

A340
SERVICE BULLETIN
REV 00 Jul 18/19 A340-27-4212
Page 21
Referenced Information
Manuals/Drawings References/Sheets
AMM T ask 27-93-34-400-801
Procedure
(a) Do the test procedure as specified after the installation of the FCPCs ( FIN 2CE1,
FIN 2CE2 and FIN 2CE3), refer to Ref. AMM T ask 27-93-34-400-801.
F. CLOSE-UP
(1) Task A340-A-27-XX-4212-01001-740A-A - Close-up
Job Set-Up Information
Manpower/Resources/Skills
Man-hours 0.50 h
Minimum Number of person 1
Elapsed Time 0.50 h
Referenced Information
Manuals/Drawings References/Sheets
AMM T ask 27-93-34-400-801
Procedure
(a) Make sure that the work areas are clean and clear of tools and other items of
equipment.
(b) Do the Close-up procedure as specified in the installation of the FCPCs ( FIN
2CE1, FIN 2CE2 and FIN 2CE3), refer to Ref. AMM T ask 27-93-34-400-801.
(c) Put the aircraft back to its initial configuration.
G. ADMINISTRATIVE
(1) Task A340-A-27-XX-4212-01001-90AA-A - Administrative
Procedure
Confirm in the applicable aircraft records that you have completed all the work defined
in this Service Bulletin task set as required.

### Page 22

A340
SERVICE BULLETIN
APPENDIX
REV 00 Jul 18/19 A340-27-4212
Page 22
APPENDIX
A. REPORTING SHEET
TITLE: FLIGHT CONTROLS - FLIGHT CONTROL PRIMARY COMPUTER (FCPC)
REPLACE THE 2K0 AND 2K1 FCPC HARDWARE BY THE 2K2 FCPC
HARDWARE
MODIFICATION No.: 208336S34937
(1) SB Reporting status
This Service Bulletin will only be incorporated into affected customized Maintenance
and Flight Operations Products if it is duly reported to Airbus.
(2) GENERAL information
The SB Reporting policy is published in ISI 00.00.00135. This document provides
information regarding: the SB Reporting means and benefits, the update of
customized Maintenance Products and customized Flight Operations Products.
If this Service Bulletin has an operational impact, refer to paragraph "Flight Operations
Products" for further information on the update of affected Flight Operations Products.
(3) SB Reporting procedure
Standard practice to report SB is to use the online reporting application on
AirbusWorld.
Refer to ISI 00.00.00179:
- For complete information on reporting means to Airbus, Question 2 "What are
the standard practices for SB Reporting?"
- If this SB requires previous or simultaneous accomplishment of other SBs,
Question 3 "What about the reporting of prerequisite Service Bulletins?"
NOTE: ISI 00.00.00179 covers all the frequently asked questions about SB Reporting.
It is revised on a regular basis.

### Page 23

A340
SERVICE BULLETIN
APPENDIX
REV 00 Jul 18/19 A340-27-4212
Page 23
B. QUALITY PERCEPTION FORM
Use this form to tell us what is your perception of the quality of this Service Bulletin.
The reported data that you provide us will be used to analyse areas of difficulties and to
take corrective action to further improve the quality of our Service Bulletin.
We thank you for the time you have taken in completing this form.
Quality rating of this SB 4 3 2 1
Quality rating of the Accomplishment Instructions 4 3 2 1
Quality rating of the Illustrations 4 3 2 1
Is this SB easy to understand ? Y / N
NOTE: Please rate on a scale of 1 to 4, with 4 being the highest score
If you have difficulties in the accomplishment of this SB please quote below the area(s) and
give a short description of the issue.
Planning Material Instructions
X Applicability X T ooling X Preparation
X Reason X List of Materials
Operator Supplied
X Mod/Inspection
X Manpower X Kit content X T est
X References X Re-identification X Close-up
X Publication X Illustrations
X Industry Support
Comments :
Operator : Date :
Name/Title
Please return this form to :
AIRBUS
2, ROND POINT EMILE DEWOITINE
31700 BLAGNAC
FRANCE
Or via your Resident Customer Support Office.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
